WWE: Fastlane to Replace Elimination Chamber As Signature February Event

Total Page:16

File Type:pdf, Size:1020Kb

WWE: Fastlane to Replace Elimination Chamber As Signature February Event WWE: Fastlane To Replace Elimination Chamber As Signature February Event Author : Robert D. Cobb February is always a strange month for WWE fans as it incorporates a small hangover from the Royal Rumble, and an anxious anxiety waiting on Wrestlemania to get here. For the past 10 years the WWE filled this gap with a Pay Per View named “Elimination Chamber”, often putting one of their champions in the match to defend against five other men in a barbaric steel cage match. It quickly became one of the most popular shows of the year and has now been moved to June, in an effort to liven up a usual dead spot in the wrestling calendar. This left the WWE with a void in February and they have decided to fill it with a new creation called, “WWE Fastlane” The WWE Fast Lane event is set to take place on Sun., Feb. 22, 2015, at the FedEx Forum in Memphis, Tennessee. With most fans still looking past this event and on to Wrestlemania, WWE has decided to beef up the card as best they can in hopes that more people will subscribe to the WWE Network to see it for only $9.99 a month. Some of the big matches include Roman Reigns vs Daniel Bryan with the winner receiving a shot at Brock Lesnar for the WWE World Heavyweight Title in the Main Event of Wrestlemania 31. Other big matches include the undefeated Bulgarian brute Rusev challenging John Cena, a match originally scheduled for Mania but bumped up for this card. Also appearing on the card will be Divas Champion Nikki Bella in a title defense against former two time champion and British sensation Paige. Perhaps the biggest highlight will come in a non sanctioned match as HHH has challenged WCW icon Sting to face him in the ring and hash things out man to man, which will almost certainly lead to blows exchanged between the two. The assumption is the WWE will book a match between them for WrestleMania 31. There is also a few rumored matches hanging out there as well, as Mizdow looks to break away from the evil reign of his master The Miz. There has been some serious heat between the two since the Miz fired MIzdow as his stunt double a few weeks back. This could lead to the long awaited face turn fans have been hoping Damien Sandow will make. We will find out much more tonight on other matches as tonight’s RAW is the last big show before the Pay Per Event this Sunday. Fastlane will have its work cut out for it to replace the highly popular Elimination Chamber. 1 / 2 Until Next time Fight Fans, No Blood : No Foul 2 / 2 Powered by TCPDF (www.tcpdf.org).
Recommended publications
  • Ncbr (Fastlane)
    APPLICANT CONTACT Port of Moses Lake Jeffrey Bishop, Executive Director 7810 Andrews N.E. Suite 200 Moses Lake, WA 98837 Port of Moses Lake www.portofmoseslake.com [email protected] Project Name Northern Columbia Basin Railroad Project Was a FASTLANE application for this project submitted previously? Yes If yes, what was the name of the project in the previous application? Northern Columbia Basin Railroad Project Previously Incurred Project Costs $2.1 million Future Eligible Project Costs $30.3 million Total Project Costs $32.4 million Total Federal Funding (including FASTLANE) $9.9 million Are matching funds restricted to a specific project component? If so, No which one? Is the project of a portion of the project currently located on Yes National Highway Freight Network? Is the project of a portion on the project located on the NHS? This project crosses under the NHS as well is it runs adjacent to the NHS Does the project add capacity to the Interstate system? Yes, by diverting VMT to rail Is the project in a national scenic area? No Does the project components include a railway-highway grade No crossing or grade separation project? The project includes crossing If so, please include the grade crossing ID improvements. Do the project components include an intermodal or freight rail Yes project, or freight project within the boundaries of a public or private freight rail, water (including ports, or intermodal facility? If answered yes to either of the two component questions above, $9.9 million how much of requested FASTLANE
    [Show full text]
  • NSF S2S Tip Sheet
    Submission tips for system-to-system NSF proposals in RAMP 1. Proposals that do not include any committed effort/salary for the PI cannot be submitted system-to-system but must be submitted in either Fastlane or Research.gov. The Grants.gov application defaults adding the PI to the budget, but NSF does not allow anyone without salary to be included in the budget. 2. All solicitations should be reviewed to ensure Grants.gov submission is allowable before beginning an application. 3. The Biosketch and Other Support (Current and Pending) documents do not map to the SF424 for NSF applications, so it’s not necessary to upload them to the Personnel page in the Funding Proposal smartform. 4. NSF-Approved Formats must be used for the Biosketch and Current and Pending Support documents. If a different format is used, or the NSF template is altered in any way, the proposal will not upload successfully into Fastlane. The links for the approved templates can be found here: • https://www.nsf.gov/bfa/dias/policy/biosketch.jsp • https://www.nsf.gov/bfa/dias/policy/cps.jsp Last Revised 2/18/2021 5. RAMP does not flag an error if you are missing an additional performance site. You have to know if additional sites should be included (e.g. when you have subawards). 6. If a Performance Site is added, but the Organization Name is left blank, RAMP will return a non- descriptive error that will prevent the proposal from validating for submission. 7. Person month effort maps from the Proposal Budget to the SF424 as Calendar Months and may also calculate a number with several decimal places.
    [Show full text]
  • WWE: Wrestlemania 31 Shaping up to Be the Worst Ever
    WWE: Wrestlemania 31 Shaping Up To Be The Worst Ever Author : Robert D. Cobb The WWE Universe is less than three weeks away from their biggest show of the year, and things are not looking very promising for Wrestlemania 31. Following last year’s brilliant card, the WWE had a ton of momentum heading into this year and with a healthy roster they shouldn’t be having the problems they currently are. Lets take a look at the current card, and how it could have been a lot better. WWE World Heavyweight Title Match Brock Lesnar (c) vs. Roman Reigns Paul Heyman has cut some amazing promos to keep this even close to watchable. No one wanted to see Roman Reigns in the main event over Daniel Bryan, and the WWE forced it to happen anyway. The leaked story of Lesnar leaving WWE the night after Mania to return to the UFC isn’t helping matters. No one expects Lesnar to leave Mania with the title, and if he does you can almost certainly expect Seth Rollins to cash in his MITB on him the following night and properly send Lesnar off to the UFC. Triple H vs. Sting This match actually had legs at one point, everyone wanted to see the returning Sting, take down the evil Authority leader HHH. Things were going good until last night, when they had Sting deliver a taped promo and used SOMEONES ELSES VOICE??????? Any steam this match had is now gone. You have a 55 year old Sting, whose sole image was to be the silent vigilante, and in one ill timed, idiotic promo, the WWE blew that one.
    [Show full text]
  • Enterprise Best Practices for Ios Devices On
    White Paper Enterprise Best Practices for iOS devices and Mac computers on Cisco Wireless LAN Updated: January 2018 © 2018 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. Page 1 of 51 Contents SCOPE .............................................................................................................................................. 4 BACKGROUND .................................................................................................................................. 4 WIRELESS LAN CONSIDERATIONS .................................................................................................... 5 RF Design Guidelines for iOS devices and Mac computers on Cisco WLAN ........................................................ 5 RF Design Recommendations for iOS devices and Mac computers on Cisco WLAN ........................................... 6 Wi-Fi Channel Coverage .................................................................................................................................. 7 ClientLink Beamforming ................................................................................................................................ 10 Wi-Fi Channel Bandwidth ............................................................................................................................. 10 Data Rates .................................................................................................................................................... 12 802.1X/EAP Authentication ..........................................................................................................................
    [Show full text]
  • 2016 FASTLANE Grant Program
    IH-35 Laredo Bundle FASTLANE Grant Application i. COVER PAGE Project Name: IH-35 – Laredo Bundle Previously Incurred Project Cost $0 Future Eligible Project Cost $58,600,000 Total Project Cost $58,600,000 NSFHP Request $35,160,000 Total Federal Funding (including NSFHP) $46,880,000 Are matching funds restricted to a specific project component? No If so, which one? Is the project or a portion of the project currently located on National Highway Yes Freight Network? Is the project or a portion of the project located on the National Highway System Yes Does the project add capacity to the Interstate system? No Is the project in a national scenic area? Do the project components include a railway-highway grade crossing or grade Yes separation project? Do the project components include an intermodal or freight rail project, No or freight project within the boundaries of a public or private freight rail, water (including ports), or intermodal facility? If answered yes to either of the two component questions above, how much of $0.0 requested NSFHP funds will be spent on each of these projects components? State(s) in which project is located. Texas Small or large project Small Also submitting an application to TIGER for this project? No Urbanized Area in which project is located, if applicable. Laredo Population of Urbanized Area. 636,520 Is the project currently programmed in the: (please specify in which plans the project is currently programmed) TIP No STIP No MPO Long Range Transportation Plan Yes State Long Range Transportation Plan Yes State Freight Plan No i ii.
    [Show full text]
  • US 69/75 Upgrade to Limited Access Highway
    US 69/75 BRYAN COUNTY, OKLAHOMA FASTLANE GRANT Previously incurred project cost $625,500 Future eligible project cost $120,000,000 Total project cost $120,625,500 NSFHP request $72,000,000 Total federal funding, including NSFHP $96,000,000 Are matching funds restricted to a specific project component? No Is the project or a portion of it currently on the National Highway Freight Yes Network? Is the project or a portion of it located on the National Highway System? Yes Does the project add capacity to the Interstate system? No Is the project in a national scenic area? No Do the project components include a rail/highway grade crossing or separation Yes project? Does the project include an intermodal or freight rail project, or a freight project No within a freight rail, water, or intermodal facility? Small or large project? Large Also submitting a TIGER grant application for this project? No Urbanized area in which project is located Not applicable Is the project currently programmed in the: TIP? Not applicable STIP? No MPO Long Range Transportation Plan? Not applicable State Long Range Transportation Plan? Yes State Freight Plan? Yes, LRTP component Fast Lane Project Location Fast Lane Project Location 1 US 69/75 BRYAN COUNTY, OKLAHOMA FASTLANE GRANT PROJECT NARRATIVE TABLE OF CONTENTS PROJECT DESCRIPTION ............................................................................................................................................. 1 PROJECT LOCATION ...............................................................................................................................................
    [Show full text]
  • Emerging Frontiers in Research and Innovation 2018 (EFRI-2018) (Nsf 17-578) |
    This document has been archived and replaced by NSF 19-502. Emerging Frontiers in Research and Innovation 2018 (EFRI-2018) 1. Chromatin and Epigenetic Engineering (CEE) 2. Continuum, Compliant, and Configurable Soft Robotics Engineering (C3 SoRo) PROGRAM SOLICITATION NSF 17-578 REPLACES DOCUMENT(S): NSF 16-612 National Science Foundation Directorate for Engineering Emerging Frontiers and Multidisciplinary Activities Directorate for Biological Sciences Directorate for Computer & Information Science & Engineering Air Force Office of Scientific Research Letter of Intent Due Date(s) (required) (due by 5 p.m. submitter's local time): September 29, 2017 Preliminary Proposal Due Date(s) (required) (due by 5 p.m. submitter's local time): October 25, 2017 Full Proposal Deadline(s) (due by 5 p.m. submitter's local time): February 23, 2018 IMPORTANT INFORMATION AND REVISION NOTES Any proposal submitted in response to this solicitation should be submitted in accordance with the revised NSF Proposal & Award Policies & Procedures Guide (PAPPG) (NSF 18-1), which is effective for proposals submitted, or due, on or after January 29, 2018. SUMMARY OF PROGRAM REQUIREMENTS General Information Program Title: EMERGING FRONTIERS IN RESEARCH AND INNOVATION (EFRI): Chromatin and Epigenetic Engineering (CEE) and Continuum, Compliant, and Configurable Soft Robotics Engineering (C3 SoRo) Synopsis of Program: The Emerging Frontiers in Research and Innovation (EFRI) program of the NSF Directorate for Engineering (ENG) serves a critical role in helping ENG focus on
    [Show full text]
  • Connecticut Statewide Freight Plan
    November 2017 Connecticut Statewide Freight Plan This page intentionally left blank. LIST OF ACRONYMS AHTD – Annual Hours of Truck Delay ATA – American Trucking Association BPA – Bridgeport Port Authority CIP – Capital Improvement Plan CMAQ – Congestion Mitigation and Air Quality Program CNG – Compressed Natural Gas COG – Council of Governments CPA – Connecticut Port Authority CRA – Connecticut Railroad Association CRFC – Critical Rural Freight Corridors CTDOT – Connecticut Department of Transportation CUFC – Critical Urban Freight Corridors CVISN – Commercial Vehicle Information Systems and Networks DECD – Department of Economic and Community Development DEEP – Department of Energy and Environmental Protection DMV – Department of Motor Vehicles EJ – Environmental Justice EPA – United States Environmental Protection Agency FAA – Federal Aviation Administration FAST Act – Fixing America’s Surface Transportation Act FHWA – Federal Highway Administration FMCSA – Federal Motor Carrier Administration FRA – Federal Railroad Administration FTA – Federal Transit Administration FTIP – Freight Transportation Improvement Program GIS – Geographic Information System GPS – Global Positioning Systems HCAADT – Heavy Commercial Average Annual Daily Traffic HHS – U.S. Department of Health and Human Services HOS – Hours of Service HSIP – Highway Safety Improvement Program ITS – Intelligent Transportation Systems LEP – Limited English Proficiency LRP – Long Range Plan MAP-21 – Moving Ahead for Progress in the 21st Century Act MPG – Miles Per Gallon MPH –
    [Show full text]
  • **Streaming-Live!* - 2021 Fastlane 21Th March 2021
    **streaming-live!* - 2021 Fastlane 21th March 2021 WWE Fastlane 2021 Starting XI Live Video result for WWE Fastlane 2021 Live120 WWE Fastlane 2021 Live Stream HD VCU vs Video result for WWE Fastlane 2021 Live4231 WWE Fastlane 2021 PreMatch Build Up Ft James Video result for WWE Fastlane 2021 Live WATCH ONLINE WWE Fastlane 2021 Live Online WWE Fastlane 2021 Live WWE WWE 2020 Live Streams WWE Fastlane 2021 Live op tv WWE Fastlane 2021 Live Reddit WWE Fastlane 2021 Live 2020WWE2020 Strean WWE Fastlane 2021Live 25 November 2020 Broadcast Today USTV Live op tv WWE Fastlane 2021 Free On Tv Strean WWE Fastlane 2021Live score AEK Athens vs VCU Live WWE Fastlane 2021 Live Update Score WWE Fastlane 2021 Live AEK Athens vs WWE Fastlane 2021 Live WWE Fastlane 2021 Live WWE Fastlane 2021 Live on radio 2020 WWE Fastlane 2021 Live Start Time Today WWE Fastlane 2021 LIVE Latest team news lineups standardcouk › Sport › WWE 12 mins ago — WWE Fastlane 2021 LIVE The Gunners return to college WWE action this evening looking to bounce back from last weekends defeat A total of seven matches have been announced for the show. This includes four championship matches, two singles matches, and an intriguing intergender match.This event features a number of matches including the Intercontinental Championship between Big E and Apollo Crews, as well as the Women’s Tag Team Championship pitting Sasha Banks and Bianca Belair against defending champions Shayna Baszler and Nia Jax. 2021 Fastlane Start times Fastlane emanates from WWE’s ThunderDome, held in Florida’s Tropicana Field stadium.
    [Show full text]
  • FASTLANE NEXT GENERATION User Guide
    Developed by TEI Software Development for Louisiana Economic Development FASTLANE NEXT GENERATION User Guide Contents About FASTLANE Next Generation ............................................................................................................... 4 Available Incentive Programs.................................................................................................................... 4 FASTLANE Next Generation Features ....................................................................................................... 4 How to Use FASTLANE Next Generation ....................................................................................................... 5 Account Registration ................................................................................................................................. 5 Login after new Registration ..................................................................................................................... 7 Log in with an account created in Old FASTLANE ..................................................................................... 8 Forgot Password ..................................................................................................................................... 10 Search Advance Data .............................................................................................................................. 12 Search Project Data ................................................................................................................................
    [Show full text]
  • EPP Graduate Fellowship Table Name Deadline for Application
    EPP Graduate Fellowship Table Deadline for Contact Information/ Name Eligibility requirements Brief Description Application Website CMU's Fellowship & CMU FSO Scholarship n/a n/a Fellowship and Scholarship Office http://www.cmu.edu/fso/ Office (FSO) Applicants must be from one of the following GEM: Graduate Application open on July underrepresented groups: For MS or PhD students in Gem Fellowship Degrees for Minorities 1, 2017 through Native American, African physical or natural sciences, or http://www.gemfellowship.org/gem- in Engineering and November 13, 2017. American, Latino, Puerto engineering. fellowship Science Rican, or other Hispanic American. Applicants must be nominated Ph.D. students who have an by doctoral faculty members interest in solving problems that IBM Fellowship The IBM Ph.D. Applications accepted and enrolled full-time in a are important to IBM and http://www.research.ibm.com/universi Fellowship Program through October 26,2017 college or university Ph.D. fundamental to innovation in ty/phdfellowship/ program. multiple areas. Students pursuing PhD studies in applied physics, biological and engineering sciences. US citizens Applications accepted or permanent residents. August 15, 2017 - The Hertz Foundation Fellowships Applications from students The Hertz Foundation October 27, 2017. U.S Citizens or permanent Brochure currently beyond their first year of Fellowships Reference Reports must resident aliens. http://hertzfoundation.org/fellowships/ graduate school are rarely acted be received by October, fellowshipaward upon favorably, and only 30, 2017. considered in cases of exceptional leverage. (Critical to apply to as a first year). 2018 Pre-doctoral Ford Foundation For graduate study in any field for National Academies Fellowship application deadline: Fellowship for U.S Minorities those planning a career in teaching http://sites.nationalacademies.org/pga/ December 14, 2017 Minorities or research.
    [Show full text]
  • A04120071 Page 1 of 1
    +PC * S NATIONU SCIENCE FOUNDATION OFFICEOFFICE OF OF INSPECTOR INVESTIGATIONS GENERAL z4 .q$$@!0 CLOSEOUT MEMORANDUM D~~~~ \o Case Number: A04120071 Page 1 of 1 In connection with a proactive review, we reviewed an awardee's ' General Ledger. This review revealed that the awardee had spent the last $32,000 of NSF funds on post-award expenditures. Further iilvestigation revealed that the PI had requested an extension of tiine to complete work beyond the award's expiration, but NSF denied this request. In addition, investigation revealed that despite NSF's denial of the second-no-cost extension, the PI engineered the draw down of the $32,000 by falsely characteriziilg the draw down as a reimbursement. However, the ~najorityof the funds, approxi~nately$27,000, were used to fund newly incurred, ongoing, post-award expenses. Thereafter, the awardee filed a false final Federal Cash Transaction Report certifying that all award funds had been spent. Then, the PI filed a Final Report that falsely represented that all work on the award was complete. When asked about this by OIG investigators, the PI said she didn't know the second no-cost extension had been denied by NSF. The weight of the evidence refuted this assertion. Without adinitting liability, the awardee settled a civil false claims case with the Department of Justice for $52,150 and agreed to enter into a self-governance programdesigned to ensure that it will operate with honestly and integrity and in compliance with applicable law. In a separate and unrelated ad~ni~listrativeaction, the PI was debarred by NSF for 5 years.
    [Show full text]