Portcheshire

Total Page:16

File Type:pdf, Size:1020Kb

Portcheshire Vauxhall PortCheshire J7 M53 75-acre high profile multi-modal industrial development site PortCheshire • Industrial Units Up To 1m sq ft Sat Nav: CH65 1BA • Land Plots from 5 – 75 Acres • Distribution, Manufacturing or Open Storage • Design & Build or Land Sales • Leasehold or Freehold PortCheshire • Full multi-modal site • Sea - Direct operational berth from • Road - On Junction 7, M53 motorway Manchester Ship Canal • Rail - Direct rail link into site • Air - 45 mins drive from Liverpool and Manchester Airports LR DHL ohso Cotros Liveroo Vaha Hoee J7 M5 Reatta PortCheshire CHP Poer Pat M56 Chester PortCheshire Exisiting Wharf Existing railway line Exisiting Wharf Existing railway line Manchester Ship Canal Manchester Ship Canal Overall site area: Overall site area: approx. 74 acres / 30ha approx. 74 acres / 30ha Cranage 75no. parking spaces Cranage 75no. parking spaces acccess to (inc. 5no. accessible acccess to (inc. 5no. accessible buildings spaces buildings spaces Unit 4 50 no, trailer 60 no, trailer 58 no, trailer 68 no, trailer Unit 3 spaces spaces spaces spaces GIA approx. Unit 5 GIA approx. Unit 4 55,000 sq ft GIA approx. 55,000 sq ft GIA approx. 65,000 sq ft 65,000 sq ft 71 no, parking 71 no, parking spaces (inc, 5no, Distribution Unit 1 spaces (inc, 5no, accessible spaces) GIA approx.1,000,000 sq ft accessible spaces) Distribution Unit 1 Distribution Unit 2 976,500 sq ft warehouse GIA approx. 310,000 sq ft GIA approx. 435,000 sq ft 23,500 sq ft offices 122 no, parking 229,000 sq ft warehouse 417,000 sq ft warehouse spaces (inc, 6no, 11,000 sq ft offices 18,000 sq ft offices accessible spaces) Existing power Existing power station station Unit 2 Unit 3 GIA approx. GIA approx. 100,000 sq ft 100,000 sq ft 46no. loading docks 86no. trailer spaces Direct access Direct access from cargo from cargo loading to loading to 122no. parking North Road North Road spaces (inc. 6no. accessible) Potential rail access Potential rail access route to future Existing access route to future Existing access development road retained development road retained North Road North Road 212no. total parking spaces (inc. 10no. Existing railway line Existing railway line accessible) New access from North Road New access from North Road 523 no. parking spaces (inc. 17no. 277 no. parking accessible) spaces (inc. 12no. accessible) THE MASTERPLAN THE MASTERPLAN TOTAL UNIT AREA: approx 965,000 sq ft A master plan has been prepared for Port Cheshire, demonstrating A master plan has been prepared for Po various development scenarios on the site. The layouts shown are Option 1 Proposed Masterindic aPlantive of the style and layout of development. Option 2 Proposed Master Plan Units from Single unit of up to 55,000 sq ft PortCheshire to . SME units HOME PAGE 435,000 sq ft 1,000,000 sq ft ABOUT PORT to 75-acre (30.35 ha) CHESHIRE 55,000 100,000 sq ft CONNECTIVITY development site for a Maximum benefits of Port Cheshire DEVELOPMENT multimodal port hub OPTIONS MAX SIZE Only consented site in North West that can GALLERY accommodate a single unit of 1m sq ft CONTACT MAX CONNECTIVITY Only true multi-modal site in North West on motorway junction plus direct rail link and shipping berth MAX UTILITIES Significant gas, water, drainage and electric supplies into site from previous use MAX USES Suitable for distribution, manufacturing, processing or open storage MAX DELIVERABILITY Special Port planning allocation to allow immediate development on site for specific uses MAX LABOUR SUPPLY 1.9m million working population within 30-45 mins drive MAX FLEXIBILITY Design and build, plot sales, leasehold, freehold Estimated times and distances by road PortConnectivityCheshire Chester 10 miles 20 mins Port of Liverpool 22 miles 35 mins Liverpool 19 miles 25 mins HOME PAGE Warrington 22 miles 30 mins ABOUT PORT Liverpool Airport 24 miles 30 mins CHESHIRE - Sea, Road & Rail Site Location Manchester Airport 33 miles 35 mins CONNECTIVITY Manchester 40 miles 50 mins Port Cheshire is locatedManchester within a few hundred yards of junction 7 of the M53 motorway, and benefits Port of Liverpool Birmingham 96 miles 1 hrs 45 mins Connectivity List from excellent transportWarrington connections to road, rail, air and water. London 208 miles 3 hrs 50 mins Site Location PortCheshire Ellesmere Port has a catchment area of 10 million Glasgowpeople within a 1-hour238 miles radius. It3 has hrs 50a long mins history of industrial use and as such benefits from a skilled workforce. Liverpool2 Port Cheshire (Ellesmere Port) benefits from excellent transport links, being located adjacent to the M53, which joins the M56 to Aerial Photo of site the South, providing connections to the M6 motorway to the East. There are regular train services which connect Port Cheshire Blackpool M55 Eastham DEVELOPMENT (Ellesmere Port Station)New Chester Rd to bothQueen ChesterLocks and Liverpool City Blackpool Airport Elizabeth M6 OPTIONS Preston centre. Manchester InternationalDock Airport is located approximately Blackburn 33 miles to the east andEastham Liverpool John Lennon AirportRiver is locat ed M65 approximately 24 milesVillage away. Tarleton A41 Eastham Mersey GALLERY New Chester Rd Rd Southport Port Cheshire (Ellesmere Port) is situated on the Estuary of the CONTACT River Mersey and adjacentRivacre to Rd the Manchester Ship Canal, which M6 joins the River MerseyA41 a short distance to the north at Eastham Ormskirk Bury B5132 M61 Bolton Docks. It provides a 36-mile navigable link to Manchester,Port Cheshire Formby M53 handling over 6 million5 tonnes 6of freight per year. The Port of North Rd M62 M58 Wigan Liverpool offers a range of port faclities, handling more than M62 33 million tonnes of cargo and 15,000 ship movements a year, M602 7 Canal St Helens M6 making it one of Britain’s largest ports. M53 Hooton Netherpool Rd M57 Manchester 8 M62 A540 Parkgate Road Birkenhead Rivacre Rd Sale Welsh Rd Liverpool M62 B5132 A550 M63 Warrington 9 Manchester Rossmore Rd M56 Airport Liverpool M53 Airport Wilmslow Ellesmere M6 Port M56 Knutsford Northwich Frodsham Jon Thorne Richard Johnson T: 01925 320 520 T: 0161 238 7416 Chester M: 07738 735 632 M: 07980 837328 E: [email protected] Nav: CH65E: [email protected] 1BA.
Recommended publications
  • Wirral Landscape Character Assessment 2019 A
    Wirral Metropolitan Borough Council Wirral Landscape Character Assessment Final report Prepared by LUC October 2019 Wirral Metropolitan Borough Council Wirral Landscape Character Assessment Version Status Prepared Checked Approved Date 1. Draft Final Report A Knight K Davies K Davies 07.10.2019 K Davies 2. Final Report A Knight K Davies K Davies 30.10.2019 Bristol Land Use Consultants Ltd Landscape Design Edinburgh Registered in England Strategic Planning & Assessment Glasgow Registered number 2549296 Development Planning Lancaster Registered office: Urban Design & Masterplanning London 250 Waterloo Road Environmental Impact Assessment Manchester London SE1 8RD Landscape Planning & Assessment Landscape Management landuse.co.uk 100% recycled paper Ecology Historic Environment GIS & Visualisation Contents Wirral Landscape Character Assessment October 2019 Contents 1c: Eastham Estuarine Edge 60 Chapter 1 Introduction and Landscape Context 4 Chapter 7 Structure of this report 4 LCT 2: River Floodplains 67 Background and purpose of the Landscape Character Assessment 4 2a: The Birket River Floodplain 68 The role of Landscape Character Assessment 5 Wirral in context 5 2b: The Fender River Floodplain 75 Policy context 6 Relationship to published landscape studies 9 Chapter 8 LCT 3: Sandstone Hills 82 Chapter 2 Methodology for the Landscape 3a: Bidston Sandstone Hills 83 Character Assessment 13 3b: Thurstaston and Greasby Sandstone Hills 90 3c: Irby and Pensby Sandstone Hills 98 Approach 13 3d: Heswall Dales Sandstone Hills 105 Process of assessment
    [Show full text]
  • [Wirral] Seacombe Ferry Terminal
    Pier Head Ferry Terminal [Liverpool] Mersey Ferries, Pier Head, Georges Parade, Liverpool L3 1DR Telephone: 0151 227 2660 Fax: 0151 236 2298 By Car Leave the M6 at Junction 21a, and take the M62 towards Liverpool. Follow the M62 to the end, keeping directly ahead for the A5080. Continue on this road until it merges into the A5047, following signs to Liverpool City Centre, Albert Dock and Central Tourist Attractions. Pier Head Ferry Terminal is signposted from the city centre. Parking Pay and display parking is available in the Albert Dock and Kings Dock car parks. Pier Head Ferry Terminal is approximately 5-10 minutes walk along the river. By Public Transport Using Merseyrail’s underground rail service, alight at James Street Station. Pier Head Ferry Terminal is a 5- minute walk from James Street. For further information about bus or rail links contact Merseytravel on: 0870 608 2 608 or log onto: www.merseytravel.gov.uk By National Rail Lime Street Station is Liverpool’s main national rail terminus, with main line trains to and from Manchester, London, Scotland and the rest of the UK. Pier Head Ferry Terminal is a 20-minute walk from Lime Street [see tourist information signs]. Enquire at Queen Square Tourist Information Centre for details of bus services to Pier Head. Woodside Ferry Terminal [Wirral] Mersey Ferries, Woodside, Birkenhead, Merseyside L41 6DU Telephone: 0151 330 1472 Fax: 0151 666 2448 By Car From the M56 westbound, turn right onto the M53 at Junction 11. Follow the M53 motorway to Junction 1, and then take the A5139 [Docks Link/ Dock Road].
    [Show full text]
  • Deep Mapping
    Deep Mapping Edited by Les Roberts Printed Edition of the Special Issue Published in Humanities www.mdpi.com/journal/humanities Les Roberts (Ed.) Deep Mapping This book is a reprint of the Special Issue that appeared in the online, open access journal, Humanities (ISSN 2076-0787) from 2015–2016 (available at: http://www.mdpi.com/journal/humanities/special_issues/DeepMapping). Guest Editor Les Roberts University of Liverpool UK Editorial Office MDPI AG Klybeckstrasse 64 Basel, Switzerland Publisher Shu-Kun Lin Assistant Editor Jie Gu 1. Edition 2016 MDPI Basel Beijing Wuhan Barcelona ISBN 978-3-03842-165-8 (Hbk) ISBN 978-3-03842-166-5 (PDF) © 2016 by the authors; licensee MDPI, Basel, Switzerland. All articles in this volume are Open Access distributed under the Creative Commons Attribution license (CC BY), which allows users to download, copy and build upon published articles even for commercial purposes, as long as the author and publisher are properly credited, which ensures maximum dissemination and a wider impact of our publications. However, the dissemination and distribution of physical copies of this book as a whole is restricted to MDPI, Basel, Switzerland. III Table of Contents List of Contributors ............................................................................................................... V About the Guest Editor .........................................................................................................VI Les Roberts Preface: Deep Mapping and Spatial Anthropology Reprinted from: Humanities
    [Show full text]
  • Portcheshire P Ortc Heshire
    www.peelports.com Vauxhalls J7 Cheshire M53 Interserve Port More than Ports Jon Thorne: Dan Burn Cheshire T: 01925 320 520 | M: 07738 735632 T: 0161 238 6226 | M: 07966 882137 [email protected] [email protected] Port Sat Nav: CH65 1BA Tom Davis: Peel Ports Group Richard Evans T: 01925 320520 | M: 07793 118900 T: 0207 399 5223 | M: 07734 078937 A high quality build to suit development opportunity Maritime Centre [email protected] [email protected] Port of Liverpool for industrial and warehouse buildings of up to MISREPRESENTATION ACT: All Agents and for the vendors or lessors of this property whose agents they are, give notice that (i) these particulars are L21 1LA produced in good faith, are set out as a general guide only and do not constitute any part of an offer or contract. They are believed to be correct but 1,000,000 sq ft on a site of 75 acres any intending purchasers or tenants should not rely on them as statements or representations of fact but must satisfy themselves as to the correctness of each of them. (ii) no person in the employment of all agents has any authority to make or give any representation or warranty in relation to this property. i-brochure designed & produced by Peel Ports Group. PortCheshire PortCheshire Peel Ports. More than Ports. At Peel Ports Group we’re an ideal example of the whole being more than the sum of the individual parts. We’re not merely a collection of ports with superior infrastructure, facilities and services…we’re a unique, innovative network.
    [Show full text]
  • Durham E-Theses
    Durham E-Theses Soil creep: an assessment of certain controlling factors with special reference to upper Weardale England Anderson, E. W. How to cite: Anderson, E. W. (1977) Soil creep: an assessment of certain controlling factors with special reference to upper Weardale England, Durham theses, Durham University. Available at Durham E-Theses Online: http://etheses.dur.ac.uk/8394/ Use policy The full-text may be used and/or reproduced, and given to third parties in any format or medium, without prior permission or charge, for personal research or study, educational, or not-for-prot purposes provided that: • a full bibliographic reference is made to the original source • a link is made to the metadata record in Durham E-Theses • the full-text is not changed in any way The full-text must not be sold in any format or medium without the formal permission of the copyright holders. Please consult the full Durham E-Theses policy for further details. Academic Support Oce, Durham University, University Oce, Old Elvet, Durham DH1 3HP e-mail: [email protected] Tel: +44 0191 334 6107 http://etheses.dur.ac.uk 2 SOIL. CREEP; AN ASSESSMENT. OP CERTAIN CONTROLLING FACTORS WITH SPECIAL REFERENCE TO UPPER WEARMLE. ENGLAND by E.W. ANDERSON M.A. (Oxon) M.A. (Manch) Part-time research student in the Department of Geography, University of Durham The copyright of this thesis rests with the author. No quotation from it should be published without his prior written consent and information derived from it should be acknowledged. A thesis submitted to the University of Durham for the degree of Doctor of Philosophy JANUARY 1977 ABSTRACT Soil creep is important as a process affecting landforra development, as a factor influencing slope stability and as an element of land wastage.
    [Show full text]
  • Matalan Bromborough
    BROMBOROUGH VILLAGE ROAD BROMBOROUGH CHESHIRE CH62 7ES RETAIL WAREHOUSE INVESTMENT OPPORTUNITY ENTER RETAIL WAREHOUSE INVESTMENT OPPORTUNITY BROMBOROUGH Investment Location & Situation & Retail Description Tenancy, Tenure & Covenant, EPC Proposal & Highlights Catchment Warehousing in Planning & VAT Contacts Population Bromborough Offers are sought in excess of • Bromborough is strategically located on the Wirral Peninsular, between Liverpool and Chester. INVESTMENT £5,640,000 (Five Million, Six • Excellent visibility from the busy A41 New Chester Road, close to The Croft Retail & Leisure Park, Hundred and Forty Thousand which attracts 7 million visitors annually. HIGHLIGHTS Pounds), subject to contract • Standalone unit of 29,497 sq ft let to the 5A1 D&B rated covenant of Matalan Retail Ltd. and exclusive of VAT. This • £450,851 per annum rent (£15.05 per sq ft). equates to an attractive net • In excess of 8 years unexpired. initial yield of 7.50%, based on • Open A1 non-food planning consent. purchaser’s costs of 6.61%. RETAIL WAREHOUSE INVESTMENT OPPORTUNITY BROMBOROUGH Investment Location & Situation & Retail Description Tenancy, Tenure & Covenant, EPC Proposal & Highlights Catchment Warehousing in Planning & VAT Contacts Population Bromborough 6 5 4 ST HELENS M57 LOCATION & CATCHMENT POPULATION BOOTLE 3 WALLASEY Bromborough is one of the principal retail centres of the Wirral, being located 2 PRESCOT on the Wirral Peninsular in the North West of England. The town is 6 miles 1 LIVERPOOL HUYTON M62 8 south of Liverpool city centre across the Mersey and 13 miles north of Chester. 5 M62 7 Birkenhead is 2 miles north. HOYLAKE 2 BIRKENHEAD 6/1 M53 As a result of its strategic location, Bromborough benefits from excellent WEST KIRBY 3 communication links.
    [Show full text]
  • The M48 Motorway (Junctions 1-2)
    ROAD TRAFFIC: TRAFFIC REGULATION The M48 Motorway (Junctions 1-2) (Severn Bridge High Winds) The M62 Motorway (Junction 8 Westbound Entry Slip Road) (Temporary Restriction and Prohibition of Traffic) Order 2015 No. (Temporary Prohibition of Traffic) Order 2015 No. 2015/1256. - 2015/1228. - Enabling power: Road Traffic Regulation Act 1984, s. 14 Enabling power: Road Traffic Regulation Act 1984, s. 14 (1) (a). - (1) (b). - Issued: 26.03.2015. Made: 24.03.2015. Coming into force: Issued: 01.04.2015. Made: 25.03.2015. Coming into force: 12.04.2015. 28.03.2015. Effect: None. Territorial extent & classification: E. Local. - Effect: None. Territorial extent & classification: E. Local. - Available at Available at http://www.legislation.gov.uk/uksi/2015/1256/contents/made http://www.legislation.gov.uk/uksi/2015/1228/contents/made Non-print Non-print The M62 Motorway (Junction 23 to Junction 24) (Temporary The M50 Motorway (Junction 1 - Junction 4) (Temporary Prohibition of Traffic) Order 2015 No. 2015/1068. - Enabling power: Restriction and Prohibition of Traffic) Order 2015 No. 2015/1237. - Road Traffic Regulation Act 1984, s. 14 (1) (a). - Issued: 18.02.2015. Enabling power: Road Traffic Regulation Act 1984, s. 14 (1) (a). - Made: 05.02.2015. Coming into force: 16.02.2015. Effect: None. Issued: 20.04.2015. Made: 23.03.2015. Coming into force: 30.03.2015. Territorial extent & classification: E. Local. - Available at Effect: None. Territorial extent & classification: E. Local. - Available at http://www.legislation.gov.uk/uksi/2015/1068/contents/made http://www.legislation.gov.uk/uksi/2015/1237/contents/made Non-print Non-print The M62 Motorway (Junction 25 to Junction 26) (Temporary The M53 Motorway (Junctions 4-3 Northbound Carriageway and Prohibition of Traffic) Order 2015 No.
    [Show full text]
  • Global Freight & Logistics
    SUPERPORT Global Freight & Logistics Hub Glasgow M8 Edinburgh M74 Newcastle Belfast M6 A1 Preston Bradford Liverpool Leeds IRELAND John Lennon M62 LIVERPOOL Airport Manchester Dublin Manchester Sheffield M56 International Airport M1 Stoke Nottingham M6 Derby Norwich Wolverhampton Birmingham Leicester Coventry A1 Cambridge M5 Northampton Felixstowe M40 NORTH Gloucester AND LATIN Swansea Oxford Luton AMERICA Cardiff M4 London Bristol M25 Southampton Brighton Plymouth MAINLAND EUROPE AND ASIA &DUERQ(IÀFLHQW&RVW(IIHFWLYH/RJLVWLFDO6HQVH 9LVXDOLVDWLRQRI0HUVH\*DWHZD\%ULGJH &217(176 SUPERPORT 1 SUPERPORT Developments 2 SUPERPORT Sites and Premises 3 Liverpool City Region 4 Long Term Vision 5 /LYHUSRROLQUHODWLRQWRJOREDOWUDGHURXWHV 9V[[LYKHT 30=,97663 -LSP_Z[V^L ;Z\NHY\ ;HP^HU:[YHP[ :H]HUUHO @\RH[HU :\La*HUHS +\IHP :OHUNOHP *OHUULS >PUK^HYK7HZZHNL :[YHP[VM 4VUH7HZZHNL /VYT\a 7HUHTH *HUHS :[YHP[VM )HI,S4HUKHI 4HSHJJH :\La9V\[L )HSIVH 4HRHZZHY :PUNHWVYL 3VTIVR ;VYYLZ *HWL9V\[L +\YIHU *HWLVM.VVK/VWL 4HNLSSHU7HZZHNL Executive Summary The £1billion investment in Liverpool of the UK from Birmingham of commercial and public sector SUPERPORT currently under way northwards – comprising over 30 stakeholders both within and beyond presents a generational opportunity million people and much of the UK’s the City Region. to place the port and surrounding manufacturing heartlands. logistics infrastructure at the heart of Liverpool SUPERPORT embodies business in the UK– creating a Global In order to redress that situation this ambition - encompassing local Freight
    [Show full text]
  • Portcheshire P O Rtc Heshire
    www.peelports.com e r i h Vauxhalls s e h J7 C M53 t r o Interserve P More than Po rts Jon Thorne: Dan Burn T: 01925 320 520 | M: 07738 735632 T: 0161 238 6226 | M: 07966 882137 [email protected] [email protected] PortCheshire Sat Nav: CH65 1BA Tom Davis: Peel Ports Group Richard Evans T: 01925 320520 | M: 07793 118900 T: 0207 399 5223 | M: 07734 078937 A high quality build to suit development opportunity Maritime Centre [email protected] [email protected] Port of Liverpool for industrial and warehouse buildings of up to MISREPRESENTATION ACT: All Agents and for the vendors or lessors of this property whose agents they are, give notice that (i) these particulars are L21 1LA produced in good faith, are set out as a general guide only and do not constitute any part of an offer or contract. They are believed to be correct but 1,000,000 sq ft on a site of 75 acres any intending purchasers or tenants should not rely on them as statements or representations of fact but must satisfy themselves as to the correctness of each of them. (ii) no person in the employment of all agents has any authority to make or give any representation or warranty in relation to this property. i-brochure designed & produced by Peel Ports Group. PortCheshire PortCheshire Peel Ports. More than Ports. At Peel Ports Group we’re an ideal example of the whole being more than the sum of the individual parts. We’re not merely a collection of ports with superior infrastructure, facilities and services…we’re a unique, innovative network.
    [Show full text]
  • White Papers 08/Client Intelligence
    WHITE PAPERS 08/CLIENT INTELLIGENCE A PRODUCT WHITE PAPERS 08/CLIENT INTELLIGENCE 1/CONTENTS 2/EXECUTIVE SUMMARY 3 7/TOP CLIENT LISTS 25 7.1 Top 50 public and regulated sector clients 3/INTRODUCTION 5 7.2 Top 50 private sector clients 3.1 Methodology 3.1.1 Public/private split 8/ TOP 15 PUBLIC AND REGULATED SECTOR CLIENT PROFILES 27 3.1.2 Surveys Birmingham City Council 3.1.3 Top client tables and profiles Crossrail EDF Energy 4/MARKET OVERVIEW AND KEY SECTOR BREAKDOWN 7 Essex County Council 4.1 Housing Glasgow City Council 4.1.1 Private housing Highways Agency 4.1.2 Public/social housing Homes and Communities Agency 4.2 Public sector building Hounslow Council 4.2.1 Education Kent County Council 4.2.2 Health London Legacy Development Corporation 4.2.3 Other central and local government Ministry of Defence 4.3 Private sector building Network Rail 4.3.1. Office Rushmoor Borough Council 4.3.2 Retail Transport for London 4.3.3. Industrial Transport Scotland 4.3.4 Leisure and other private sector building 4.4 Infrastructure 9/ TOP 15 PRIVATE SECTOR CLIENT PROFILES 42 4.4.1 Transport Able UK 4.4.2 Energy, airports and communications Berkeley Group 4.4.3 Water, harbours and flood defence British Land 4.5 Repair and maintenance Crown Estate 4.5.1 Residential Jaguar Land Rover 4.5.2 Non-housing Land Securities 4.6 Regional spending predictions Legal and General London & Continental Railways Menta 5/CEO SENTIMENT SURVEY 11 Peel Group 5.1 Economic threats and opportunities Sainsbury’s 5.2 BIM Schroder Property Investment 5.3 Government policy St
    [Show full text]
  • POOLE HALL Poole Hall Lane | Ellesmere Port | Cheshire | CH66 1ST INDUSTRIAL ESTATE
    POOLE HALL Poole Hall Lane | Ellesmere Port | Cheshire | CH66 1ST INDUSTRIAL ESTATE Self-Contained Multi-Let Industrial Investment Opportunity Proposed Retail / Lesiure Junction 8 Trade Park Pioneer Proposed Residential J8 Business Park Plot 2 POOLE HALL Pioneer Business Park INDUSTRIAL ESTATE Plot 1 Scania To Chester / Warrington Manchester Regatta M53 Prowell To Liverpool / Birkenhead J7 PH Ellesmere Port | Cheshire | CH66 1ST SUMMARY • Excellent opportunity to purchase a self-contained, purpose built industrial estate. • Well established industrial location, forming part of Poole Hall Industrial Estate, Ellesmere Port and benefitting from excellent transport communications. • Immediate access to both Junction 7 and Junction 8 of the M53. • Comprising 82,863 sq ft across 14 units with a good range of sizes from 4,134 sq ft to 37,680 sq ft. • Site area of 5.05 acres, providing a low density of just 37%. • Currently fully let to 5 tenants with low rents ranging from £3.25 psf to £4.85 psf. • Current net rent of £285,793 per annum. • Potential net ERV of £361,219 per annum. • Long leasehold. • Opportunity to further enhance value through pro-active asset management. • Seeking offers in excess of £3,355,000 (Three Million Three Hundred and Fifty Five Thousand Pounds), subject to contract and exclusive of VAT. • Attractive NIY of 8.0%, with a reversionary yield of 10.1%. • Low capital value of £40.48 per sq ft. Units 13 & 14 PH Ellesmere Port | Cheshire | CH66 1ST M57 M602 RPOOL A580 Bootle 23 MANCHESTER AY Port of St. Helens M62 Liverpool M6 6 5 M60 LIVERPOOL A LOCATION 10 21A 1 4 1 M62 6 M60 56 3 1 Warrington A5 10 Speke 34 Birkenhead Manchester Ship Canal A A56 6 2 Widnes 5 R A M53 I 20 6 Ellesmere Port is an established commercial location situated approximately 13 miles south of Liverpool, V M56 A E 9 R 4 1 Runcorn M M56 E 7 miles north of Chester and 39 miles south west of Manchester.
    [Show full text]
  • The M53 Motorway
    STATUTORY INSTRUMENTS 2014 No. 1151 ROAD TRAFFIC The M53 Motorway (Junction 5-9 Southbound Carriageway and Slip Roads and the A41 Trunk Road Northbound and Southbound Carriageways from the junction with M53 Junction 5 to the A550) (Temporary Prohibition of Traffic) Order 2014 Made - - - - 11th February 2014 Coming into force - - 16th February 2014 WHEREAS the Secretary of State for Transport, being the traffic authority for the M53 Motorway and A41 Trunk Road and their slip roads, is satisfied that traffic on sections of that motorway and trunk road and on seven of those slip roads in Cheshire West and Chester and the District of Wirral in Merseyside should be prohibited because works are proposed to be executed thereon: NOW, THEREFORE, the Secretary of State, in exercise of the powers conferred by section 14(1)(a) of the Road Traffic Regulation Act 1984( a) hereby makes the following Order:- 1. This Order may be cited as the M53 Motorway (Junction 5-9 Southbound Carriageway and Slip Roads and the A41 Trunk Road Northbound and Southbound Carriageways from the junction with M53 Junction 5 to the A550) (Temporary Prohibition of Traffic) Order 2014 and shall come into force on 16th February 2014. 2. In this Order: “the tip of the nosing of the exit slip road” means the last point where the slip road leaves the carriageway of the motorway; “the tip of the nosing of the entry slip road” means the first point where the slip road joins the carriageway of the motorway; “the first length of carriageway” means the southbound carriageway of the
    [Show full text]