INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Hyderabad regional office

Mine file No : AP/ANP-LST-19/HYD Mine code : 38APR02022 (i) Name of the Inspecting : PG01( ) P.GURUVAIAH Officer and ID No. (ii) Designation : Assistant Mining Geologis (iii) Accompaning mine : Sri D. Sudhershan Reddy,Mines Representative. Official with Designation (iv) Date of Inspection : 17/10/2016 (v) Prev.inspection date : 03/11/2015

PART-I : GENERAL INFORMATION 1. (a) Mine Name : NAGARUR (S.NO.6D) (b) Registration NO. : (c) Category : B Manual (d) Type of Working : Opencast (e) Postal address State : District : Village : Taluka : Post office : Pin Code : FAX No. : E-mail : Phone : 08552-252712, 252713, (f) Police Station : (g) First opening date : 10/11/1991 (h) Weekly day of rest : MON 2. Address for : SRI.L.V.KRISHNAREDDY(MINEOWNER) correspondance H.NO.7/847, ROAD.-515401 ANATAPUR.DIST.A.P.

3. (a) Lease Number : APR0104 (b) Lease area : .81 (c) Period of lease : 20 (d) Date of Expiry : 06/11/2021

4. Mineral worked : LIMESTONE Main SERPENTINE Associated DOLOMITE Associated PAGE : 2

5. Name and Address of the Lessee : L.V. KRISHNA REDDY ANANTAPUR ANDHRA PRADESH Phone: FAX :

Owner : L.V.KRISHNA REDDY H.NO.7/847, TADIPATRI ROAD. GOOTY (PO) ANANTAPUR ANDHRA PRADESH Phone: (9441145599,)( FAX : Mining Engineer Name : M.BASAPPA,Full Time Qualification : S.S.C.WITHFOREMAN CERTIFICATE Appointment/ : 03/11/2003 Termination date

6. Date of approval of Mining : Plan/Scheme of Mining PAGE : 3

PART - II : OBSERVATION/COMMENTS OF INSPECTING OFFICERS

Exploration :

Sl.No. Item Proposals Actual work Remarks

1a Backlog of No proposal. Nil Mine is not previous year working Mining scheme is due and suspended. 1b Exploration over Nil Nil Mine is not lease area for working Mining geological axis 1 scheme is due and or 2 suspended. 1c Exploration Nil Nil Mine is not Agencies and working Mining Expenditure in scheme is due and lakh rupees suspended. during the year 1d Balance area to Nil Nil Mine is not be explored to working Mining bring Geological scheme is due and axis in 1 or 2 suspended. 1e Balance reserve No proposal. Totaol Res= Mine is not as on 01/04/20 0.142Million Tonnes. working Mining scheme is due and suspended. 1f General remarks no proposal. Nil Mine is not of inspecting working Mining officers on scheme is due and geology, suspended. exploration etc

Development :

Sl.No. Item Propasals Actual work Remarks

2a Location of No proposal. Nil Mine is not development working Mining w.r.t.lease area scheme is due and suspended. 2b Separate benches No proposal. three benches. Mine is not in topsoil, working Mining overburden and scheme is due and minerals (Rule suspended. 15) 2c Stripping ratio No proposal. Nil Mine is not or ore to OB working Mining ratio scheme is due and suspended. 2d Quantity of No proposal. Nil Mine is not topsoil working Mining generation in m3 scheme is due and suspended. PAGE : 4

2e Quantity of No proposal. 640 cu m. Mine is not overburden working Mining generation in m3 scheme is due and suspended. 2f General remarks Nil Nil Mine is not of inspecting working Mining officers on scheme is due and development of suspended. pit w.r.t. type of deposit etc

Exploitation:

Sl.No. Item Propasals Actual work Remarks

3a Number of pit NO proposal. One old pit with size of Mine is not proposed for 80 x50 x3 m. working Mining production scheme is due and suspended. 3b Quantity of ROM No proposal. Nil Mine is not mineral working Mining production scheme is due and proposed suspended. 3c Recovery of No proposal. Nil Mine is not sailable/usable working Mining mineral from ROM scheme is due and production suspended. 3d Quantity of No proposal. Nil Mine is not mineral reject working Mining generation scheme is due and suspended. 3e Grade of mineral No proposal. Nil Mine is not rejects working Mining generation and scheme is due and threshold value suspended. declared. 3f Quantity of sub No proposal. Nil Mine is not grade mineral working Mining generation. scheme is due and suspended. 3g Grade of sub No proposal. Nil Mine is not grade mineral working Mining generation scheme is due and suspended. 3h Manual / No proposal. Nil Mine is not Mechanised working Mining method adopted scheme is due and for segregating suspended. from ROM PAGE : 5

3i Any analysis or No propsal. Nil Mine is not beneficiation working Mining study proposed scheme is due and and carried out suspended. for sub grade mineral and rejects. 3j Provision of No proposal. Nil Mine is not drilling and working Mining blasting in scheme is due and mineral benches suspended. 3k Provision of No proposal. nil Mine is not mining working Mining machineries in scheme is due and mineral benches suspended. 3l Whether height No proposal. Nil Mine is not of benches in working Mining overburden and scheme is due and mineral suitable suspended. for method of mining proposed in MP/SOM 3m Total area No proposal. 0.4 ha Mine is not covered under working Mining excavation/pits scheme is due and suspended. 3n Ore to OB ratio No proposal. Nil Mine is not for the pit/mine working Mining during the year. scheme is due and suspended. 3o Total area put No proposal. Nil Mine is not in use under working Mining different heads scheme is due and at the end of suspended. year 3p Production of No proposal. - Mine is not ROM mineral working Mining during the last scheme is due and five year period suspended. as applicable 3q General remarks No proposal. Nil Mine is not of inspecting working Mining officers on scheme is due and method of mining suspended. etc.

Solid Waste Management - Dumping:

Sl.No. Item Propasals Actual work Remarks PAGE : 6

4a Separate dumping No proposal. Nil Mine is not of topsoil, OB working Mining and mineral scheme is due and rejects (Rule suspend 32,33) 4b Location of No proposal. Nil Mine is not topsoil, OB and working Mining mineral reject scheme is due and dumps suspend 4c Number of dumps No proposal. one old dump is located Mine is not within lease in the North side of the working Mining area and outside pit scheme is due and of lease area suspend 4d Location of No proposal. Nil Mine is not dumps w.r.t. working Mining ultimate pit scheme is due and limit (Rule 16) suspend 4e Number of active No proposal. Nil Mine is not and alive dumps. working Mining scheme is due and suspend 4f Number of dead No proposal. One dump. Mine is not dumps. working Mining scheme is due and suspend 4g Number of dumps No proposal. Nil Mine is not established. working Mining scheme is due and suspend 4h Whether No proposal. Nil Mine is not Retaining wall working Mining or garland drain scheme is due and all along dumps suspend are there. 4i Length of No proposal. Nil Mine is not Retaining wall working Mining or garland drain scheme is due and all along dumps suspend 4j Number of No proposal. Nil Mine is not settling ponds working Mining scheme is due and suspend 4k Specific No proposal. Nil Mine is not comments of working Mining inspecting scheme is due and officer on waste suspend dump management

Solid Waste Management - Backfilling:

Sl.No. Item Propasals Actual work Remarks PAGE : 7

5a Status of part No proposal. Nil Mine is not or full working Mining extraction of scheme is due and mineral from suspended. mined out area before starting backfilling. 5b Area under No proposal. Nil Mine is not backfilling of working Mining mined out area scheme is due and suspended. 5c Concurrent use No proposal. Nil Mine is not of topsoil for working Mining restoration or scheme is due and rehabilitation suspended. of mineral out area (Rule 32) 5d Total area No proposal. Nil Mine is not fully reclaimed working Mining and scheme is due and rehabilitated suspended. 5e General remarks No proposal. Nil Mine is not of inspecting working Mining officers on scheme is due and backfilling and suspended reclamation etc.

Progressive Mine Clousre Plan:

Sl.No. Item Propasals Actual work Remarks

6a Whether Annual No proposal. Nil Mine is not report on PMCP working Mining submitted on scheme is due and time and suspended correctly. Rule 23 E(2). 6b Area available No proposal. Nil Mine is not for working Mining rehabilitation scheme is due and (ha) . suspended 6c afforestation No proposal. Nil Mine is not done (ha). working Mining scheme is due and suspended 6d No. of saplings No proposal. Nil Mine is not planted during working Mining the year scheme is due and suspended 6e Cumulative no No proposal. Nil Mine is not .of plants working Mining scheme is due and suspended PAGE : 8

6f Any other method No proposal. Nil Mine is not of working Mining rehabilitation scheme is due and suspended 6g Cost incurred on No proposal. Nil Mine is not watch and care working Mining during the year scheme is due and suspended 6h Compliance on No proposal. Nil Mine is not reclamation and working Mining rehabilitation scheme is due and by backfilling suspended (i) Voids available for backfilling ( Lx B x D 6i Compliance on no proposal. Nil Mine is not reclamation and working Mining rehabilitation scheme is due and by backfilling suspended (ii) Voids filled by waste / tailings 6j Compliance on No proposal. Nil Mine is not reclamation and working Mining rehabilitation scheme is due and by backfilling suspended (iii)Afforestati on on backfilled area 6k Compliance on No proposal. Nil Mine is not reclamation and working Mining rehabilitation scheme is due and by backfilling suspended (iv) Rehabilitation by making water reservoir 6l Compliance on No proposal. Nil Mine is not reclamation and working Mining rehabilitation scheme is due and by backfilling suspended (v)any other specific means. 6m Compliance of No proposal. Nil Mine is not rehabilitation working Mining of waste land scheme is due and within lease suspended (i)afforestation 6n Compliance of No proposal. Nil Mine is not rehabilitation working Mining of waste land scheme is due and within lease suspended (ii)Area rehabilitation (ha) PAGE : 9

6o Compliance of No proposal. Nil Mine is not rehabilitation working Mining of waste land scheme is due and within lease suspended (iii)Method of rehabilitation 6p Compliance of No proposal. Nil Mine is not environmental working Mining monitoring (core scheme is due and zone and buffer suspended zone) 6q General remarks No proposal. Nil Mine is not of inspecting working Mining officers on PMCP scheme is due and compliance and suspended progressive closure operations etc.

Mineral Conservation:

Sl.No. Item Propasals Actual work Remarks

7a ROM Mineral No proposal. Nil Mine is not dispatch or working Mining grade-wise scheme is due and sorting within suspended lease area 7b Method of grade- No proposal. Nil Mine is not wise mineral working Mining sorting i.e. scheme is due and manual or suspended mechanical. 7c Different grade No proposal. Nil Mine is not of mineral working Mining sorted out at scheme is due and mines. suspended 7d Any No proposal. Nil Mine is not beneficiation working Mining process at mines scheme is due and . suspended 7e General remarks No proposal. Nil Mine is not of inspecting working Mining officer on scheme is due and Mineral suspended conservation and beneficiation issues

Environment:

Sl.No. Item Propasals Actual work Remarks PAGE : 10

8a Separate removal No prposal. Nil Mine is not and utilization working Mining of topsoil (Rule scheme is due and 32) suspended 8b Concurrent use No proposal. Nil Mine is not or storage of working Mining topsoil scheme is due and suspended 8c Separate dumps No proposal. Nil Mine is not for overburden, working Mining waste rock, scheme is due and rejects and suspended fines (Rule 33) 8d Use of No proposal. Nil Mine is not overburden, working Mining waste rock, scheme is due and rejects and suspended fines dumps for restoring the land to its original use 8e Phased No proposal. Nil Mine is not restoration, working Mining reclamation and scheme is due and rehabilitation suspended of lands affected by mining operations (Pits, dumps etc) 8f Baseline No proposal. Nil Mine is not information on working Mining existence of scheme is due and plantation and suspended additional plantation done (Rule 41) 8g Survival rate Nil Nil Mine is not working Mining scheme is due and suspended 8h Water sprinkling Nil Nil Mine is not on roads to working Mining control airborne scheme is due and dust suspended 8i General remarks Nil Except degraded pit in Mine is not of inspecting and around aesthetic working Mining officer on beauty is good. scheme is due and aesthetic beauty suspended in and around mines area

Compliance of Rule 45: PAGE : 11

Sl.No. Item Propasals Actual work Remarks

9a Status of Nil returns Nil Mine is not submission of submitted. working Mining Monthly and scheme is due and Annual returns suspended 9b Scrutiny of Nil Nil Mine is not Annual return working Mining for information scheme is due and on Mining suspended Engineer, Geologist and Manager 9c Scrutiny of Nil Nil Mine is not Annual return on working Mining land use pattern scheme is due and for area under suspended pits, reclaimed area, dumps etc. 9d Scrutiny of Nil Nil Mine is not Annual return on working Mining afforestation scheme is due and suspended 9e Scrutiny of Nil Nil Mine is not Annual return on working Mining mineral reject scheme is due and generation suspended (Grade and quantity) 9f Scrutiny of Nil Nil Mine is not Annual return on working Mining ROM stock and/or scheme is due and graded ore suspended 9g Scrutiny of Nil Nil Mine is not Annual return on working Mining sale value, Ex. scheme is due and Mine price and suspended production cost 9h Scrutiny of Nil Nil Mine is not Annual return on working Mining fixed assets scheme is due and suspended 9k Scrutiny of Nil Nil Mine is not Annual return on working Mining mining scheme is due and machineries suspended PAGE : 12

Details of violations observed during current inspection and compliance position of violation pointed out

Violation observed Show couse position Rule NO. Issued on Compliance on Rule NO. Issued on Compliance on

Date : (P.GURUVAIAH)

Indian Bureau of Mines