INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Hyderabad regional office Mine file No : AP/ANP-LST-19/HYD Mine code : 38APR02022 (i) Name of the Inspecting : PG01( ) P.GURUVAIAH Officer and ID No. (ii) Designation : Assistant Mining Geologis (iii) Accompaning mine : Sri D. Sudhershan Reddy,Mines Representative. Official with Designation (iv) Date of Inspection : 17/10/2016 (v) Prev.inspection date : 03/11/2015 PART-I : GENERAL INFORMATION 1. (a) Mine Name : NAGARUR (S.NO.6D) (b) Registration NO. : (c) Category : B Manual (d) Type of Working : Opencast (e) Postal address State : ANDHRA PRADESH District : ANANTAPUR Village : Taluka : Post office : Pin Code : FAX No. : E-mail : Phone : 08552-252712, 252713, (f) Police Station : (g) First opening date : 10/11/1991 (h) Weekly day of rest : MON 2. Address for : SRI.L.V.KRISHNAREDDY(MINEOWNER) correspondance H.NO.7/847,TADIPATRI ROAD.GOOTY-515401 ANATAPUR.DIST.A.P. 3. (a) Lease Number : APR0104 (b) Lease area : .81 (c) Period of lease : 20 (d) Date of Expiry : 06/11/2021 4. Mineral worked : LIMESTONE Main SERPENTINE Associated DOLOMITE Associated PAGE : 2 5. Name and Address of the Lessee : L.V. KRISHNA REDDY ANANTAPUR ANDHRA PRADESH Phone: FAX : Owner : L.V.KRISHNA REDDY H.NO.7/847, TADIPATRI ROAD. GOOTY (PO) ANANTAPUR ANDHRA PRADESH Phone: (9441145599,)( FAX : Mining Engineer Name : M.BASAPPA,Full Time Qualification : S.S.C.WITHFOREMAN CERTIFICATE Appointment/ : 03/11/2003 Termination date 6. Date of approval of Mining : Plan/Scheme of Mining PAGE : 3 PART - II : OBSERVATION/COMMENTS OF INSPECTING OFFICERS Exploration : Sl.No. Item Proposals Actual work Remarks 1a Backlog of No proposal. Nil Mine is not previous year working Mining scheme is due and suspended. 1b Exploration over Nil Nil Mine is not lease area for working Mining geological axis 1 scheme is due and or 2 suspended. 1c Exploration Nil Nil Mine is not Agencies and working Mining Expenditure in scheme is due and lakh rupees suspended. during the year 1d Balance area to Nil Nil Mine is not be explored to working Mining bring Geological scheme is due and axis in 1 or 2 suspended. 1e Balance reserve No proposal. Totaol Res= Mine is not as on 01/04/20 0.142Million Tonnes. working Mining scheme is due and suspended. 1f General remarks no proposal. Nil Mine is not of inspecting working Mining officers on scheme is due and geology, suspended. exploration etc Development : Sl.No. Item Propasals Actual work Remarks 2a Location of No proposal. Nil Mine is not development working Mining w.r.t.lease area scheme is due and suspended. 2b Separate benches No proposal. three benches. Mine is not in topsoil, working Mining overburden and scheme is due and minerals (Rule suspended. 15) 2c Stripping ratio No proposal. Nil Mine is not or ore to OB working Mining ratio scheme is due and suspended. 2d Quantity of No proposal. Nil Mine is not topsoil working Mining generation in m3 scheme is due and suspended. PAGE : 4 2e Quantity of No proposal. 640 cu m. Mine is not overburden working Mining generation in m3 scheme is due and suspended. 2f General remarks Nil Nil Mine is not of inspecting working Mining officers on scheme is due and development of suspended. pit w.r.t. type of deposit etc Exploitation: Sl.No. Item Propasals Actual work Remarks 3a Number of pit NO proposal. One old pit with size of Mine is not proposed for 80 x50 x3 m. working Mining production scheme is due and suspended. 3b Quantity of ROM No proposal. Nil Mine is not mineral working Mining production scheme is due and proposed suspended. 3c Recovery of No proposal. Nil Mine is not sailable/usable working Mining mineral from ROM scheme is due and production suspended. 3d Quantity of No proposal. Nil Mine is not mineral reject working Mining generation scheme is due and suspended. 3e Grade of mineral No proposal. Nil Mine is not rejects working Mining generation and scheme is due and threshold value suspended. declared. 3f Quantity of sub No proposal. Nil Mine is not grade mineral working Mining generation. scheme is due and suspended. 3g Grade of sub No proposal. Nil Mine is not grade mineral working Mining generation scheme is due and suspended. 3h Manual / No proposal. Nil Mine is not Mechanised working Mining method adopted scheme is due and for segregating suspended. from ROM PAGE : 5 3i Any analysis or No propsal. Nil Mine is not beneficiation working Mining study proposed scheme is due and and carried out suspended. for sub grade mineral and rejects. 3j Provision of No proposal. Nil Mine is not drilling and working Mining blasting in scheme is due and mineral benches suspended. 3k Provision of No proposal. nil Mine is not mining working Mining machineries in scheme is due and mineral benches suspended. 3l Whether height No proposal. Nil Mine is not of benches in working Mining overburden and scheme is due and mineral suitable suspended. for method of mining proposed in MP/SOM 3m Total area No proposal. 0.4 ha Mine is not covered under working Mining excavation/pits scheme is due and suspended. 3n Ore to OB ratio No proposal. Nil Mine is not for the pit/mine working Mining during the year. scheme is due and suspended. 3o Total area put No proposal. Nil Mine is not in use under working Mining different heads scheme is due and at the end of suspended. year 3p Production of No proposal. - Mine is not ROM mineral working Mining during the last scheme is due and five year period suspended. as applicable 3q General remarks No proposal. Nil Mine is not of inspecting working Mining officers on scheme is due and method of mining suspended. etc. Solid Waste Management - Dumping: Sl.No. Item Propasals Actual work Remarks PAGE : 6 4a Separate dumping No proposal. Nil Mine is not of topsoil, OB working Mining and mineral scheme is due and rejects (Rule suspend 32,33) 4b Location of No proposal. Nil Mine is not topsoil, OB and working Mining mineral reject scheme is due and dumps suspend 4c Number of dumps No proposal. one old dump is located Mine is not within lease in the North side of the working Mining area and outside pit scheme is due and of lease area suspend 4d Location of No proposal. Nil Mine is not dumps w.r.t. working Mining ultimate pit scheme is due and limit (Rule 16) suspend 4e Number of active No proposal. Nil Mine is not and alive dumps. working Mining scheme is due and suspend 4f Number of dead No proposal. One dump. Mine is not dumps. working Mining scheme is due and suspend 4g Number of dumps No proposal. Nil Mine is not established. working Mining scheme is due and suspend 4h Whether No proposal. Nil Mine is not Retaining wall working Mining or garland drain scheme is due and all along dumps suspend are there. 4i Length of No proposal. Nil Mine is not Retaining wall working Mining or garland drain scheme is due and all along dumps suspend 4j Number of No proposal. Nil Mine is not settling ponds working Mining scheme is due and suspend 4k Specific No proposal. Nil Mine is not comments of working Mining inspecting scheme is due and officer on waste suspend dump management Solid Waste Management - Backfilling: Sl.No. Item Propasals Actual work Remarks PAGE : 7 5a Status of part No proposal. Nil Mine is not or full working Mining extraction of scheme is due and mineral from suspended. mined out area before starting backfilling. 5b Area under No proposal. Nil Mine is not backfilling of working Mining mined out area scheme is due and suspended. 5c Concurrent use No proposal. Nil Mine is not of topsoil for working Mining restoration or scheme is due and rehabilitation suspended. of mineral out area (Rule 32) 5d Total area No proposal. Nil Mine is not fully reclaimed working Mining and scheme is due and rehabilitated suspended. 5e General remarks No proposal. Nil Mine is not of inspecting working Mining officers on scheme is due and backfilling and suspended reclamation etc. Progressive Mine Clousre Plan: Sl.No. Item Propasals Actual work Remarks 6a Whether Annual No proposal. Nil Mine is not report on PMCP working Mining submitted on scheme is due and time and suspended correctly. Rule 23 E(2). 6b Area available No proposal. Nil Mine is not for working Mining rehabilitation scheme is due and (ha) . suspended 6c afforestation No proposal. Nil Mine is not done (ha). working Mining scheme is due and suspended 6d No. of saplings No proposal. Nil Mine is not planted during working Mining the year scheme is due and suspended 6e Cumulative no No proposal. Nil Mine is not .of plants working Mining scheme is due and suspended PAGE : 8 6f Any other method No proposal. Nil Mine is not of working Mining rehabilitation scheme is due and suspended 6g Cost incurred on No proposal. Nil Mine is not watch and care working Mining during the year scheme is due and suspended 6h Compliance on No proposal. Nil Mine is not reclamation and working Mining rehabilitation scheme is due and by backfilling suspended (i) Voids available for backfilling ( Lx B x D 6i Compliance on no proposal. Nil Mine is not reclamation and working Mining rehabilitation scheme is due and by backfilling suspended (ii) Voids filled by waste / tailings 6j Compliance on No proposal. Nil Mine is not reclamation and working Mining rehabilitation scheme is due and by backfilling suspended (iii)Afforestati on on backfilled area 6k Compliance on No proposal.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages12 Page
-
File Size-