DIRECTIONS to ADMISSIONS Guest Parking We Are Excited for You to Visit Point Park University in Downtown Pittsburgh!

Total Page:16

File Type:pdf, Size:1020Kb

DIRECTIONS to ADMISSIONS Guest Parking We Are Excited for You to Visit Point Park University in Downtown Pittsburgh! DIRECTIONS TO ADMISSIONS Guest Parking We are excited for you to visit Point Park University in Downtown Pittsburgh! tudents say that one of Point Park University Campus the greatest advantages of attending Point Park is Shaving the city as their campus. As with any city, parking can be a challenge if you are new to the area. To make it as easy as possible for you to visit campus, the University has an area Admissions Guest Parking Lot especially for prospective GPS Coordinates: students and families to park 40°26’14.5”N 80°00’07.9”W at no charge. It is located behind Admissions Welcome Center West Penn Hall on Wood Street and Fort Pitt Boulevard. Map data ©2019 Google If you have questions about the directions, contact the Office of Admission. Please note: Directions on this flier may be different from those on a GPS or other electronic device as these directions are directly to the parking area. GPS coordinates for parking are 40°26’14.5”N 80°00’07.9”W. FROM THE EAST 1. On Pennsylvania Turnpike, take exit 57, Monroeville. 2. Follow signs to Pittsburgh 376 through Squirrel Hill Tunnel. Continued on back 412-392-3430 | 800-321-0129 | [email protected] | PointPark.edu FROM THE EAST (continued) FROM THE WEST/FORT PITT TUNNEL/ 3. Take Grant Street left exit 71A. PITTSBURGH INTERNATIONAL AIRPORT 4. At first light, make left onto Fort Pitt Boulevard, 1. Merge onto I-376 East toward Pittsburgh/Pennsylvania a one-way street. Stay in middle lane. Turnpike/I-79. 5. Drive straight at light at Smithfield Street. 2. Stay straight to drive onto I-279 North. Then, get in right lane. This is a bus lane, but it is 3. Follow I-279 North straight for several miles and stay permissible to use it to get to guest parking. in left lane leading into Fort Pitt Tunnel. 6. Drive past the parking lot with a gate; then turn right into 4. Take Boulevard of the Allies/Liberty Avenue exit, 70A, next parking lot. This is West Penn Hall; sign says “Point toward PPG Paints Arena. Park University, Permit Parking, Admissions Guests Only.” 5. Keep right to take Boulevard of the Allies ramp. (Note: If you reached Wood Street, you passed the parking area.) 6. Stay straight to drive onto Boulevard of the Allies. After parking, walk around left side of West Penn Hall; 7. Continue straight to the intersection of Grant Street the Welcome Center is across the street in Conestoga Hall. (you will drive through Point Park’s campus). 8. Turn right onto Grant Street. FROM THE NORTH 9. From Grant Street, turn right onto Fort Pitt Boulevard, a one-way street. Stay in middle lane. 1. Merge onto I-79 South toward Pittsburgh. 10. Drive straight at light at Smithfield Street. 2. Keep left and take I-279 South via exit 72 toward Pittsburgh. Then, get in right lane. This is a bus lane, but it is 3. Merge onto I-579 South via exit 2A toward Veterans Bridge. permissible to use it to get to guest parking. 4. Take 7th Avenue exit toward 6th Avenue. 11. Drive past the parking lot with a gate; then turn right into 5. Keep right to take 7th Avenue ramp toward next parking lot. This is West Penn Hall; sign says “Point Convention Center. Park University, Permit Parking, Admissions Guests Only.” (Note: If you reached Wood Street, you passed the 6. Turn right onto 7th Avenue. parking area.) 7. Take first left onto Grant Street. After parking, walk around left side of West Penn Hall; 8. Continue on Grant Street through nine traffic lights the Welcome Center is across the street in Conestoga Hall. to end of town (you will cross the intersection of Boulevard of the Allies). FROM THE SOUTH/LIBERTY TUNNEL 9. At 10th light, turn right onto Fort Pitt Boulevard, a one-way street. Stay in middle lane. 1. Follow Route 19 North or Route 51 North to Liberty Tunnel. 10. Drive straight at light at Smithfield Street. 2. Upon exiting tunnel, immediately turn right onto P.J. McArdle Then, get in right lane. This is a bus lane, but it is Roadway. P.J. McArdle Roadway becomes Arlington Avenue. permissible to use it to get to guest parking. 3. At intersection of East Carson Street, turn left onto East 11. Drive past the parking lot with a gate; then turn right into Carson Street. next parking lot. This is West Penn Hall; sign says “Point 4. At next light, turn right onto Smithfield Street Bridge Park University, Permit Parking, Admissions Guests Only.” (Station Square is on left). (Note: If you reached Wood Street, you passed the 5. At end of Smithfield Street Bridge, turn left onto Fort Pitt parking area.) Boulevard, a one-way street. Get in right lane. This is a bus After parking, walk around left side of West Penn Hall; lane, but it is permissible to use it to get to guest parking. the Welcome Center is across the street in Conestoga Hall. 6. Drive past the parking lot with a gate; then turn right into next parking lot. This is West Penn Hall; sign says “Point Park University, Permit Parking, Admissions Guests Only.” (Note: If you reached Wood Street, you passed the parking area.) After parking, walk around left side of West Penn Hall; the Welcome Center is across the street in Conestoga Hall. 2019_005MC.
Recommended publications
  • Ft. Pitt Tunnel Luminaire Connection Failure Event Report
    Event Report FHWA Office of Bridges and Structures Subject: Ft. Pitt Tunnel Luminaire Connection Failure Date of Event: September 30, 2012 Location: Pittsburgh, PA Discipline: Structural Design Structural Inspection Geotech Hydraulic Distributed for your: Information Action Audience: For Internal Use Public Relevant Policy or Guidance: None. Summary: The Ft. Pitt Tunnel carries I-376 through Mt. Washington between downtown Pittsburgh and its west end. On September 30, 2012 an overhead luminaire (lighting fixture) fell from its support bracket onto a parking apron within the portal of the tunnel on the downtown side. The connection failed as a result of galvanic corrosion between the aluminum frame of the luminaire and the stainless steel bolts connecting it to the support bracket. The fixture was manufactured by Schréder Lighting. Galvanic corrosion is an electrochemical process that can occur between dissimilar metals. During this process, metallic ions sacrificially move from the less noble metal (smaller atomic number) to the more noble metal which accelerates the deterioration of the less noble metal while retarding the deterioration of the more noble metal. This incident is very similar to one that occurred in Boston’s Central Artery/Tunnel in March of 2011. The results of that investigation were circulated by the Office of Bridge Technology and are attached to this Event Report for your reference. Current Report [October 25, 2012]: A luminaire similar to the one that fell is shown in Figure 1. The luminaires are approximately 49-inches long and weigh 75 lbs. Like the one that fell, the fixture shown is mounted to the ceiling of the tunnel over an area used by maintenance workers and tunnel operators to park their vehicles just inside one of the tunnel portals.
    [Show full text]
  • Pittsburgh, Pa), Photographs, 1892- 1981 (Bulk 1946-1965)
    Allegheny Conference On Community Development Page 1 Allegheny Conference On Community Development (Pittsburgh, Pa), Photographs, 1892- 1981 (bulk 1946-1965) Historical Society of Western Pennsylvania Archives MSP# 285 30 boxes (Boxes 1-22 Prints, Boxes 23-28 Negatives, Box 28 Transparencies, Boxes 29-30 Oversized Prints) Table of Content: Historical Note page 1 Scope and Content Note page 2 Series I: Prints page 2 Sub-series: Aviation page 3 Sub-series: Buildings page 3 Sub-series: Culture page 3 Sub-series: Education page 3 Sub-series: Golden Triangle page 4 Sub-series: Health & Welfare page 4 Sub-series: Highways page 4 Sub-series: Historical page 4 Sub-series: Housing page 4 Sub-series: Miscellaneous page 5 Sub-series: PA Pitt Partner’s Program page 5 Sub-series: Personnel page 5 Sub-series: Publications page 5 Sub-series: Recreation page 6 Sub-series: Research page 6 Sub-series: Smoke Control page 6 Sub-series: Stadiums page 6 Sub-series: Transportation page 6 Sub-series: Urban Redevelopment page 7 Series II: Negatives page 7 Sub-Series: Glass Plate Negatives page 7 Series III: Transparencies page 7 Series IV: Oversized Prints & Negatives page 7 Provenance page 8 Restrictions and Separations page 8 Catalog Entries page 8 Container List page 10 Series I: Prints page 10 Sub-series: Aviation page 10 Sub-series: Buildings page 10 Sub-series: Culture page 14 Allegheny Conference On Community Development Page 2 Sub-series: Education page 16 Sub-series: Golden Triangle page 20 Sub-series: Health & Welfare page 22 Sub-series: Highways page
    [Show full text]
  • 2021-2024 TIP Amendment Click Here to Download
    MTA Market Place District Improvements County: Allegheny Municipality: Moon Township Location: Montour Run Road / Market Place Blvd Improvement: Roadway and intersection improvements including pedestrian and bike connections. Project Sponsor: Moon Transportation Authority Project Cost and Schedule: $738,000 in 2021-2022; $590,000 in 2023; $4,264,000 in 2024. Total Cost in 2021-2024 TIP: $5,592,000. Preliminary engineering ongoing/beginning in February 2021. Project Description: Roadway improvements on Montour Run Road and Market Place Blvd. will support development of a 780-acre site in Moon Twp., Allegheny County. The improvements include roadway widening, adding turn lanes, implementing pedestrian and bike connections and intersection improvements on Montour Run Road, and upgrading Market Place Blvd. This project is separate from the I-376 Frontage Road and Improvements. It is fully funded through a public-private partnership using Local/MTA and private funding. This is Phase 1 of a $17 million multiphase infrastructure program. SPC Long Range Transportation Plan Fiscally Constrained Highway/Bridge Project List Investment MPMS/ County Title Estimated Cost Route Stage Narrative Category GIS ID Multi‐County US 18 Corridor $57,590,000 18 Regional Corridor (Detailed in Corridor Section) Multi‐County US 19 Corridor $137,930,500 19 Regional Corridor (Detailed in Corridor Section) Multi‐County US 22 Corridor $112,333,000 22 Regional Corridor (Detailed in Corridor Section) Multi‐County SR 28 Corridor $354,852,000 28 Regional Corridor (Detailed
    [Show full text]
  • IS 270 – Innovative Congestion Management Contract MONTGOMERY and FREDERICK COUNTIES
    STATEMENT OF QUALIFICATIONS IS 270 – Innovative Congestion Management Contract MONTGOMERY AND FREDERICK COUNTIES CONTRACT # MO0695172 | JULY 25, 2016 IN ASSOCIATION WITH TABLE OF CONTENTS Cover Letter Tab 1 Key Staff Experience and Qualifications Tab 2 Project Understanding & Progressive Design-Build Approach Tab 3 Design-Build Team Ability & Experience Tab 4 Table of Contents page i Key Staff Experience and Qualifications AND QUALIFICATIONS AND KEY STAFF EXPERIENCE EXPERIENCE STAFF KEY Design Key Staff Stanley Niemczak, PE — Project Design Manager — Primary Contact — Jacobs Education: MS, Civil Engineering, Villanova University; BS, Civil Engineering, Drexel University Registration: Professional Engineer, PA; MD Registration In-Progress Mr. Niemczak has diversified experience in traffic and highway engineering, transportation planning, ITS, communication network design, and utility coordination and design in both the public and private sectors. In his 20+ years in the field, he has performed management and engineering for numerous traffic and highway design, transportation studies, ITS planning, ITS design, ITS PS&E review, communication networks, and utility projects. Stan developed a strong project management foundation and coordination skills during his tenure with the City of Philadelphia where he was heavily involved with their capital improvement program. He is well versed in preparing technical reports and computer applications for highway capacity analysis, traffic signal optimization, and traffic simulation. Stan is also an
    [Show full text]
  • The Bigelow Blvd/ Blvd of the Allies “Escape” Routes Driving Guide To
    Seavey 28 Aspinwall Driving Guide to Marathon Sunday - May 6, 2018 Vets Bridge/Bigelow Blvd Connector 8 ark The Bigelow Blvd/ After crossing Vets Bridge,28 follow right Baker St Waterworks Start: Liberty Ave between 279Marathon Course Road Closures Approximate Greenwood Blvd of the Allies Highland P lanes for Downtown/6th & 7th Aves. Then Bridge Smithfield St and 10th St Extent Closure Times Adelphia 19 take the left exit for Consol Center/6th Ave. Morningside “Escape” Routes Wheelchairs @ 6:50 a.m. Highland 8 Allegheny River Blvd Park Runners @ 7:05 a.m. Starting line back-up 1:30 a.m. - 9:30 a.m. Bear left at the blue “Vets Bridge/Bigelow Zoo Approaches to 130 Connector” sign (following the overhead “U-turn” Route Liberty Ave - Strip District 5:30 a.m. - 2:30 p.m. ve Finish: Blvd of the Allies green sign for Consol Center) - yes, this Bigelow Blvd P between Wood St and e North Side to West End Br 6:00 a.m. - 10:00 a.m. same ramp also works to connect Bigelow r r StanwixRiverview St y 51st St Bunkerhill s Stanton v Millvale back to Vets Bridge. i Park l l e Heights West End to South Side 6:00 a.m. - 10:45 a.m. Morningside A 3 12 25 Approaches to Chislett Mile Markers A Bryant St v Stay left and go across the overpass 579 e 20 the “Escape” Fifth to Grant (½ Marathon) 6:00 a.m. - 11:30 a.m. RE Relay Exchange toward the former Mellon Arena site.
    [Show full text]
  • Building Trust from Controversy to Consensus October 15, 2018 Presenters
    Building Trust from Controversy to Consensus October 15, 2018 Presenters • Jason Zang, P.E. Assistant District Executive, District 11-0, Pennsylvania Department of Transportation • Darryl Phillips, P.E., PTOE Senior Transportation Engineer, WSP USA • Jennifer Threats Senior Communication Specialist, McCormick Taylor The Parkway East Interstate 376 • 14.2 miles • Fort Pitt Bridge to Turnpike • Carries 165,000 vpd Squirrel Hill Tunnel • Opened 1953 • 4,225 feet long • 29’ -6 “ each direction • Two lanes each direction • Capacity 3500 VPH each way • Daily flow 93,000 vehicles Squirrel Hill Tunnel • Congested 6+ hours per day Westbound Eastbound Churchill to tunnel Forbes to Tunnel Distance 4.3 miles 2.9 miles Off-Peak 5 minutes 3 minutes Peak 20-40 minutes 14-28 minutes Squirrel Hill Tunnel Something needed to be done Ramp Metering What is Ramp Metering? Advancing Ramp Metering Comprehensive Study • Review of Best Practices • Identification of Congested Freeways • Criteria for Ramp Management Implementation • Evaluation of I-376 Corridor • Costs and Benefits of I-376 Ramp Metering • Three options: – Meter six interchanges – Close three interchanges and meter three – Close one interchange Controversy Controversy Controversy Controversy What would you do? Have you experienced controversy early in a project? How was it addressed? What steps did you take? Did the project move forward? Were there lingering issues afterwards? The Department Responds Couldn’t hide Could not move ahead against community wishes The need to do something remained as strong as ever The Department Responds Starting Over Comprehensive study • I-376 from downtown Pittsburgh to Turnpike • Intersecting Arterials • Parallel Arterials • All modes- Auto, freight, transit, pedestrians, bikes.
    [Show full text]
  • The Industrial Foundation
    I ✦ The Industrial Foundation For more than a century, heavily capitalized industry drove the growth of Pittsburgh and its metropolitan region. Before 1900 the iron and steel industry defined the region both locally and nationally. Several other in- dustries, from railroad equipment and electrical machinery to glass, alumi- num, and all manner of associated manufactures, also thrived throughout southwestern Pennsylvania. The coal and coke, oil and natural gas, sand, clay, and limestone industries provided essential raw materials and energy inputs. Transportation and communication networks connected the widely scattered parts of the sprawling industrial region. The omnipresent river system and complex hill and valley topography presented both opportuni- ties and challenges for entrepreneurs. Industrial and natural resource firms manipulated, engineered, and abused land, water, and air in pursuit of in- dustrial growth and financial success. The first essay of this section explores the resulting complex landscape and environmental consequences of natural resource exploitation, indus- trialization, and urbanization. Many southwestern Pennsylvania residents accept the landscape around them as “natural” without appreciating how altered and dynamic it is. The second essay provides a brief overview of the region’s industrialization and the emergence of industrial corridors of mills, © 2019 University of Pittsburgh Press. All rights reserved. The Industrial Foundation factories, mines, and working-class communities along the waterways and railroads that threaded their way through the winding valleys. The third essay describes the decentralization of industries in search of suitable pro- duction sites for large operations and efficiencies of excellent transportation facilities. This centrifugal movement by the early twentieth century created a vast industrial region that in spite of its sprawling, dispersed character was strikingly interconnected by communication, transportation, and pro- duction linkages.
    [Show full text]
  • ​Thanks, Steve, It Was More Planned Road Closures / Restrictions That I Was Concerned About
    From: Cowan, Steve To: Karen Lindenfelser Subject: RE: Squirrel Hill Tunnel Cleaning Activities Monday Night in Pittsburgh Date: Friday, April 29, 2016 3:40:07 PM Attachments: Fort Pitt inbound overnight closures 5.2-5.2016.doc Unfortunately, the individuals coming in from the airport will hit an inbound closure of the Fort Pitt Tunnel between 9 pm and 6 am all week. I have attached the press release which includes the detour route. Coming from NYC – I can only provide info on Allegheny County. There should not be any closures but there will be a few single-lane restrictions for tunnel cleaning and bridge inspection. Nothing major however. From: Karen Lindenfelser [mailto:[email protected]] Sent: Friday, April 29, 2016 3:26 PM To: Cowan, Steve <[email protected]> Subject: Re: Squirrel Hill Tunnel Cleaning Activities Monday Night in Pittsburgh ​Thanks, Steve, It was more planned road closures / restrictions that I was concerned about. Most are flying in the evening of May 2 or at several different times on May 3; in some cases taking the red eye in arriving at 6 am on the 3 and the 4th. I think the NYC to PIT drivers would be driving in on May 2 and May 3 as well. Most would leave either on May 4 or May 5. Thank you, Karen Lindenfelser CMU - PDL 4720 Forbes Avenue - CIC 2209 Pittsburgh, PA 15213 412-268-6716 - v 412-268-3010 - f www.pdl.cmu.edu From: Cowan, Steve <[email protected]> Sent: Friday, April 29, 2016 2:31 PM To: Karen Lindenfelser Subject: RE: Squirrel Hill Tunnel Cleaning Activities Monday Night in Pittsburgh When are they traveling? What type of info are they looking for (closures, restrictions, etc.)? Typically, I can provide you with that info.
    [Show full text]
  • SURVIVAL GUIDE Helpful Information About Living in Pittsburgh, Pennsylvania
    SURVIVAL GUIDE Helpful Information about Living in Pittsburgh, Pennsylvania Compiled by: Tepper School of Business at Carnegie Mellon Partners Club Survival Guide 2008 Dear First Year Students and Partners: Welcome to the Tepper School of Business at Carnegie Mellon and to Pittsburgh! You’re probably experiencing a mix of emotions right now—from excitement to anxiety. Not only are you uprooting your lives to attend graduate school, but also, for most of you, this entails moving to a new city— perhaps even a new country! So, we’ve assembled this guide to assuage your apprehension, ease your relocation, and introduce you to some of the fantastic things Pittsburgh has to offer. Pittsburgh has a somewhat dubious reputation. The most prevalent characterization of Pittsburgh is probably that of a blue-collar industrial city. Yet, when people actually have the opportunity to visit and explore here, they are pleasantly surprised. Pittsburgh’s unique charm may not be obvious at first glance, many of its wonderful attributes not immediately evident. But they are most definitely there—waiting to be discovered across one of the abundant bridges or over one of the numerous hills that dot the landscape. In many ways, Pittsburgh is an anomaly of itself—just when you think you have it figured out, it reveals something new. Pittsburgh boasts a motley assortment of neighborhoods that offer extensive dining, shopping and entertainment. Family-run ethnic markets stand alongside trendy martini bars. Greasy spoon Pittsburgh institutions serving up “native” dishes like pierogies flank quaint galleries showcasing up-and-coming artists. There are certain names that you will continually hear—Carnegie, Heinz, Frick and Mellon to name a few.
    [Show full text]
  • Fuel-Based Particulate Matter and Gaseous Emission Factors Determined from Vehicles in Pittsburgh, Pa's Squirrel Hill Tunnel
    FUEL-BASED PARTICULATE MATTER AND GASEOUS EMISSION FACTORS DETERMINED FROM VEHICLES IN PITTSBURGH, PA'S SQUIRREL HILL TUNNEL Andrew Grieshop, Eric Lipsky and Allen Robinson Carnegie Mellon University, Pittsburgh, PA Why a Tunnel Study? In short… • Vehicles are a major source of fine particles Fuel-based Emission Factors PM2.5 Emissions as a Function of Fleet Composition In general, emissions studies in traffic tunnels are and other pollutants: Similarly, the total PM mass and OC and EC emissions from the different vehicle classes can be used to provide a composite emissions profile of the 2.5 – Carbonaceous Aerosol (OC and EC) • Fuel-based EFs were determined (i.e. mg/kg fuel vs. mg/mile or mg/hp-hr) separated. In each case, multiple instruments/methods were used to determine the tunnel and full range of vehicles found in a geographical region. – Ultra-fine particles • Kg fuel determined through a mass balance on the carbon in fuel background concentrations during the sample periods. The results of each are shown here, along with This study was specifically undertaken to provide an – Gases (NOx, CO, VOCs, NH3, SO2, etc.) values from literature and a brief explanation of the methods used. OC/EC analysis was completed automotive traffic source profile for the Pittsburgh Air • Ideal, stoichiometric combustion of octane (gasoline): • Reliable, representative Emission Factors using NIOSH method 5040. Overall car and HDDV EFs are tabulated in the Conclusions. Quality Study (PAQS) EPA Supersite project. Along (EFs) are needed. with taking a small suite of gas-phase measurements, C8H18 + (12.5O2 + 47N2 ) ⎯⎯→ 8CO2 + 9H 2O + 47N2 600 – E.g.
    [Show full text]
  • Interchange Improvements
    Page 35 SUMMARY OF COSTS AND BENEFITS Concept 14 Construction Cost Description Transportation Impacts Environmental Features This concept would improve the eastbound merge between Direct user benefits from this concept are difficult to project. This concept should qualify for a Categorical Exclusion con- Supplemental Roadway Construction $0.00 Ramp A from the Fort Duquesne Bridge and Ramp R from Revised signage is not anticipated to impact the capacity of sisting of installation of fencing, signs, pavement markings, Earthwork $0.00 Wood Street. Under the existing configuration, the ramps join the ramp, but it should improve cooperative merging and re- traffic signals, and railroad warning devices where no substan- together following a short acceleration lane, but with lane sult in fewer vehicles slowing or stopping at the merge point, tial land acquisition or traffic disruption would occur. Pavement $0.00 changes and merging prohibited through the Grant Street un- and should provide corresponding safety benefits. derpass, the ramps merge within an abbreviated 300-foot ta- ROW Impacts Walls $0.00 This concept is anticipated to be constructed entirely within per, with no parallel approach. At the merge point, horizontal Bridges $0.00 and vertical curves and restricted sight distance make cooper- the existing right-of-way. ative merging difficult, particularly under heavy traffic condi- Traffic Signals $0.00 MPT tions. Installation of signage is anticipated to take place under tem- Signage $1,250.00 A review of roadway geometry indicates that the cartway is porary, short-term traffic control measures severely constrained by surrounding facilities, including the Utilities $0.00 ITS Strategies Grant Street ramps, the underpass, the Smithfield Street Additional Lump Sum $0.00 Bridge, and the I-376 mainline.
    [Show full text]
  • Postcard Collection Library
    Revised January 22, 2016 General Postcard Collection (GPCC) (See also: MSS#177 Papers of Margaret Deland MSS#389 Jewish Community Center of Greater Pittsburgh MSS#573 Rose Kaplan Papers MSS#66 Papers of the McClelland Family MSS#237 Papers of William M. McKillop MSS#860 Park-Kelly Family Papers and Photographs MSS#571 Paslawsky Family Papers and Photographs MSS#301 Richard E. Rauh Papers MSS#335 Papers of Aaronel deRoy Gruber MSS#204 Papers of Bill Green MSS#760 Britta C. Dwyer Papers MSS#773 Dwyer Family Papers MSS#938 Grete Zacharias Papers PSS#035 Howard Etzel Photograph Collection MFF#2944 Postcard Scrapbook of Dr. B. Heintzman, 1929 Acc. 1994.0001 Acc. 1994.0255 Acc. 1994.0285 Acc. 1995.0013 Acc. 1995.0014 Acc. 1996.0024 – Pittsburgh and Kittaning, Pa. postcards Acc. 1996.0084 Acc. 1996.0155 Acc. 1997.0040 Acc. 1997.0042 – Views of Pittsburgh Acc. 1997.0065 – Pittsburgh and Western Pennsylvania postcards Acc. 1997.0104 – Pittsburgh and Allegheny postcard album 1902 Acc. 1997.0201 – View of Pittsburgh 1849 Acc. 1997.0228 Acc. 1999.0163 Acc. 2001.0195 Acc. 2001.0243 Acc. 2002.0022 Acc. 2003.0186 Acc. 2004.0074 Acc. 2006.0096 Acc. 2008.0126 Acc. 2009.0170 Acc. 2010.0085 Postcard Collection Inventory, Page # 2 of 81 Acc. 2011.0171 – Interesting Views of Pittsburgh postcard book Acc. 2011.0218 – Pittsburgh and Western Pa. Acc. 2011.0292 – Gateway Center, Point, Downtown Acc. 2014.0017) (Book Resources: Search Postcard History Series in catalog Greetings from Pittsburgh: A Picture Postcard History/Ralph Ashworth - F159.3.P643 A84 1992 q A Pennsylvania Album: picture postcards 1900-1930/George Miller - F150.M648 long Riverlife: Postcards from the Rivers/Riverlife Task Force – HT177 .P5 P6 2002 long Box 1 Pittsburgh Aviaries Conservatory Aviary Churches All Saints Episcopal- Allegheny Bethany Evangelical Lutheran- East Liberty Bethel Presbyterian Calvary Episcopal – Shady/Walnut Calvary United Methodist – North Side Christ Evangelical Lutheran-East End Christ Church of the Ascension – Ellsworth & Neville Christ M.E.
    [Show full text]