Building Climate Resilience in the Pyanj River Basin

Total Page:16

File Type:pdf, Size:1020Kb

Building Climate Resilience in the Pyanj River Basin Bi-annual Environmental Monitoring Report November 2016 Grant 0352-TAJ: Building Climate Resilience in the Pyanj River Basin Prepared by the Agency for Land Reclamation and Irrigation under the Government of the Republic of Tajikistan The bi-annual environmental monitoring report is a document of the borrower. The ¡¢ £¤ ¢ ¥¦§¢¤¤¢ ¨ ©¢§¢ ¡ ¨ ¢ ¢¤¤ § ¡ §¢ ¦§¢¤¢ © ¤¢ ¤ § ¨ Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. The Agency for Land Reclamation and Irrigation under the Government of the Republic of Tajikistan Project Implementation Center (PIC) EPRBRCC REPORT ON ENVIRONMENT for 6 months (from 1 January to 30June 2016) on the progress of the Project ¡¢£¤ ¥£¦§ CLIMATE RESILIENCE IN THE PYANJ BASIN" Component 1 and 2 (Grant 0352-TAJ) Dushanbe, 2016 1 Bi-annual Environmental Monitoring Report Project Number: 45354-003 Grant0352 Reporting period: January-June 2016 Tajikistan: Building Climate resilience in the Pyanj River basin Component 1 and 2 (irrigation and flood management) (Financed by the Asian Development Bank) Prepared by Prepared by the EPTISA For: Agency for Land reclamation Amelioration and Irrigation under the Government of the Republic of Tajikistan (Project implementation center) This report on environmental monitoring is the document of the borrower. The views expressed here do not necessarily reflect those of ADB's Board of Directors, its managers or employees, and can essentially be carried only preliminary. While preparing any country program or strategy, financing any project, or by any indication or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments concerning the legal or other status of any territories or areas 2 Content Page Maps 4 Figures 4 Tables 4 Photographs 4 Abbreviations 6 1 INTRODUCTION 7 1.1 Background 7 1.2 Objectives and report methodology 7 1.3 Description of the project 8 1.4 Contract services for construction supervision 11 II Consideration of environmental protection safeguards during project 11 preparation 2.1 Development of Environmental Management Plan 11 2.2 Preparation of tender documentation 12 2.3 Interaction with the contractor, owners etc. 12 III Information about the quality control progress 13 3.1 Rehabilitation of irrigation systems, drainage networks and pumping station 13 ¡ Baytudasht ¢ jamoatsNamuna,Mehvar, K. Saiffudinov andNuriVahdat ofPyanj district, Khatlon 3.2 Construction and reconstruction work on the bank protection structures in Dagana 21 sai in jamoats Dagana and Ziraki in Kulyab district,Khatlonoblast. 3.3 Reconstruction work on the bank protection structures in rivers Yahsu, Kyzylsu 23 and simple span bridge injamoatsM. MahmadalievandRudaki Vosedistrict,Khatlon oblast. 3.4 Construction and reconstruction work on the bank protection structures in rivers 26 Devdara, Vishavr andPyanjas well as irrigation system in jamoats Kalaihumb,Vishharv in Darvaz district (GBAO) 3.5 Reconstruction of the bank protection structures, cleaning of channel and 28 irrigation network in jamoats «Jovidon» and «Vodhud» in Vanj district (GBAO) 3.6 Reconstruction of irrigation system and Construction and reconstruction work on 32 the bank protection structures in jamoatsDodhudoev in Rushan district(GBAO) IV. ENVIRONMENTAL MONITORING 33 4.1 Noise and vibration 33 4.2 Water Quality 34 4.3 Air Quality 34 4.4 Monitoring of flora and fauna 34 4.5 Monitoring of the occupational health, safety and HIV / AIDS issues 34 V. ENVIRONMENTAL MANAGEMENT 35 5.1 SSEMP and work plan 35 5.2 Site inspections and audit 35 5.3 Notifications of non-compliance 35 5.4 Corrective action plan 37 5.5 Consultations and complaints 40 3 Maps Map 1 Location of pilot sites Figures Figure 1 Institutional scheme of security policies (protective measures) in the environment Figure 2 The scheme of irrigation and drainage network Pyanj district Tables Table 1 The progress of the construction works during the reporting period Pyanj district Table 2 The progress of the construction works during the reporting period Kulyab district Table 3 The progress of the construction works during the reporting period Vose district Table 4 The progress of the construction works during the reporting period Darvaz district Table 5 The progress of the construction works during the reporting period Vanj district Table 6 The progress of the construction works during the reporting period Rushan district Table 7 Notifications of non-compliance Table 8 Corrective actions plan for July-December 2016 Photographs Photo 1 Channel Kelanchi, jamoat Namuna - special equipment is working on compaction of dredged soil Photo 2 Channel Kelanchi, jamoat Namuna cleaned cannel sections Photo 3 Channel Kelanchi cleared, the coast of the channel leveled Photo 4 Channel Kelanchi plastic bottles can be observed in the channel Photo 5 Other been preserved in many places ¢ Photo 6 Condition of collector -1-3 (jamoatMehvar) before works start (March 2016) and after (May 2016) Photo 7 Condition of collector ¢-2-9 (jamoatKabudSaifidinov) prior to and after the design works. Photo 8 Condition of collector¢ -7-0 (jamoatNuri Vahdat) prior to and after the design works Photo 9 Construction site of pumping station Boitudasht, jamoat Nuri Vahdat fences are availible, information boards are installed. Photo10 Accommodation conditions, open-air kitchen and «shower» room for workers do not comply with environmental requirements Photo 11 Site toilet area for staff Photo 12 EMPand permissions as required Photo 13 Permits and certificates on the site in accordance with the environmental requirements Photo 14 Construction and reconstruction work on the bank protection structures in Dagana sai - jamoatsDagana Kulyab district. Photo 15 Progress of works on bank protection structures construction in river Kyzyl- Suuin Rudaki M. Mahmadaliev jamoat of Vose district, village Sari Angur Photo 16 Progress of works on bank protection structures construction in river Kyzyl- Suu in Rudaki M. Mahmadaliev jamoat of Vose district, village Sari Angur Photo 17 Office room and canteen Photo 18 Residence for workers does not meet the requirements 4 Photo 19 Protective wall inDarvaz district (villageRuzvay, riverPyanj) concrete works are complete, ground leveling work just remain to be done June 2016. Photo 20 The applied machinery for collecting and transporting the stones - in good condition, meet the requirements June 2016. Photo 21 The construction of the stone embankment to protect the school (riverViskharv,jamoat Viskharv). Photo 22 Engineers shows maintenance schedule of machinery and equipment, records of staff training on occupational safety issues Photo 23 Most part stone embankment for strengthening the coast and flood protection on river Vanchobinjamoat «Vodhud», villageVahdat ofVanjdistrict,ready. The access road passes away from settlements. Photo 24 Cleaning the riverbed and river bank reinforcement river Bunai throughout 1154 m - Jamoat "Jovidon", Vanj district. The sudden rise of water due to rainfall and the melting of glaciers in the May-June 2016 led to a partial reverse silting of the riverbed. Additional clean-up is planned by the end of August 2016 Photo 25 An information board about the project in Vanj district. Photo 26 An information board in the room of join office PIOand the contractor in Vanj district Photo 27 Contractor shows maintenance schedule of machinery and journals withinstructions for workers, EMP andecological permission documents are in compliance with requirements. Photo 28 Building flood embankments in Rushan district (built half of the total (330 meters built, there are still about 300 m to be constructed). Photo 29 There are records of briefings for workers in the area of occupational safety. Photo 30 Information board in the joint office of the Contractor and PIU established by NGO "Umedbahsh" for information and awareness of the local population Photo 31 Meetings with representatives of the environmental authority in the Contractor's Pyanj district office Photo 32 Beneficiaries of the project received information that during implementation EMP is used, for the purposes of mitigation measures and monitoring during the implementation of the works on different bank protection structures and single span, bridge that must be included to contract documents. Photo 33 Organizing seminars among the leaders of jamoat of Vose district Photo 34 Meetings with representatives of the contractor and the local population in Darvaz district Photo 35 An information board about the project in Vanj district 5 ABBREVIATIONS WUA Water Users Association AEMP Adapted Environmental Management Plan. ADB Asian Development Bank BPA Bank Protecting Activities BPS Bank Protecting Structures SLMC State Land Management Committee SEE State Ecological Expertise EA Executive Agency IN Irrigation Network CDN Collector and Drainage Network CEP Committee for Environment Protection NDRMC Natural Disaster Risk Management Committee DI Drip Irrigation AAI Agency for Amelioration and Irrigation MoA Ministry of Agriculture ME Monitoring and Evaluation NGO Non-government Organization EIA Environment Impact Assessment EAP Environment Action Plan SSEMP Site Specific Environmental Management Plan
Recommended publications
  • Analysis of the Situation on Inclusive Education for People with Disabilities in the Republic of Tajikistan Report on the Results of the Baseline Research
    Public Organization - League of women with disabilities «Ishtirok» April - July 2018 Analysis of the situation on inclusive education for people with disabilities in the Republic of Tajikistan Report on the results of the baseline research 1 EXPRESSION OF APPRECIATION A basic study on the inclusive education of people with disabilities in the Republic of Tajikistan (RT) conducted by the Public Organization Disabled Women's League “Ishtirok”. This study was conducted under financial support from ASIA SOUTH PACIFIC ASSOCIATION FOR BASIC AND ADULT EDUCATION (ASPBAE) The research team expresses special thanks to the Executive Office of the President of the RT for assistance in collecting data at the national, regional, and district levels. In addition, we express our gratitude for the timely provision of data to the Centre for adult education of Tajikistan of the Ministry of labor, migration, and employment of population of RT, the Ministry of education and science of RT. We express our deep gratitude to all public organizations, departments of social protection and education in the cities of Dushanbe, Bokhtar, Khujand, Konibodom, and Vahdat. Moreover, we are grateful to all parents of children with disabilities, secondary school teachers, teachers of primary and secondary vocational education, who have made a significant contribution to the collection of high-quality data on the development of the situation of inclusive education for persons with disabilities in the country. Research team: Saida Inoyatova – coordinator, director, Public Organization - League of women with disabilities «Ishtirok»; Salomat Asoeva – Assistant Coordinator, Public Organization - League of women with disabilities «Ishtirok»; Larisa Alexandrova – lawyer, director of the Public Foundation “Your Choice”; Margarita Khegay – socio-economist, candidate of economic sciences.
    [Show full text]
  • Fiscal Decentralization in the Republic of Tajikistan: Progress Made, Key Considerations, and the Way Forward
    Fiscal decentralization in the Republic of Tajikistan: Progress made, key considerations, and the way forward Prepared by Paul Bernd Spahn Dushanbe - 2014 Fiscal Fiscal decentralization in the Republic of Tajikistan T The World Bank Table of Content Preface ..................................................................................................... 4 A. Introduction ......................................................................................... 4 B. The structure of the public sector in Tajikistan ......................................... 5 C. Political deconcentration of State powers ................................................. 7 1. Executive and legislative authorities at local levels ................................. 7 2. The assignment of functions to lower tiers of government ..................... 11 a. Expenditure functions .................................................................... 11 b. Revenue functions ......................................................................... 13 c. Equalization .................................................................................. 18 3. Summary of section ......................................................................... 22 D. The budget process: decentralization or deconcentration? ....................... 23 1. The structure of the Republican budget ............................................... 23 4. Public financial management (PFM) .................................................... 26 5. Preparing the budget .......................................................................
    [Show full text]
  • Building Climate Resilience in Pyanj River Basin: Irrigation and Flood
    Initial Environmental Examination April 2013 TAJ: Building Climate Resilience in the Pyanj River Basin Irrigation and Flood Management Prepared by the Ministry of Land Reclamation and Water Resources (MLRWR) and the State Unitary Enterprise for Housing and Communal Services Kochagi Manzillu Kommunali (KMK, formerly Tajikkomunservices) for the Asian Development Bank. ABBREVIATIONS ADB - Asian Development Bank AP - Affected Population/Person/Party CEP - Committee for Environmental Protection under the Government of Tajikistan EA - Executing Agency EC - Erosion Control EIA - Environmental Impact Assessment EMMP - Environmental Management and Monitoring Plan ES - Environmental Specialist ESM - Environmental Supervisor and Monitor Expert GBAO - Gorno-Badakhshan Autonomous Oblast (Province) GOST Gosudartsvennye Standarty (Russian Technical Standards) GoT - Government of Tajikistan IEE - Initial Environmental Examination LARC - Land Acquisition and Resettlement Committee LARP - Land Acquisition and Resettlement Plan MLRWR - Ministry of Land Reclamation and Water Resources NGO - Non Governmental Organization PC - Public Consultation PIU - Project Implementation Unit PMU - Project Management Unit SEE - State Ecological Expertise SOP - Standard Operation Procedure SR - Sensitive Receiver SSEMP - Site Specific Environmental Management Plan TD - Temporary Drainage TOR - Terms of Reference CONTENTS Page EXECUTIVE SUMMARY I I. INTRODUCTION 1 A. Background 1 B. Policy and Statutory Requirements in Tajikistan 1 C. Asian Development Bank Safeguard Policies 2009 5 II. DESCRIPTION OF THE PROJECT 6 A. Project Location. 11 III. DESCRIPTION OF EXISTING ENVIRONMENT IN THE PROJECT AREA 28 A. Physical Environment 28 B. Biological Environment 41 C. Socio-Economic and Physical Cultural Resources 46 IV. SCREENING OF POTENTIAL ENVIRONMENTAL IMPACTS OF THE PROJECT AND MITIGATION MEASURES 52 A. Beneficial impacts and maximization measures 53 A. Adverse impacts and mitigation measures 54 B.
    [Show full text]
  • Central Asia the Caucasus
    CENTRAL ASIA AND THE CAUCASUS No. 1(25), 2004 CENTRAL ASIA AND THE CAUCASUS Journal of Social and Political Studies 1(25) 2004 CENTRAL ASIA AND THE CAUCASUS CENTER FOR SOCIAL AND POLITICAL STUDIES SWEDEN 1 No. 1(25), 2004 CENTRAL ASIA AND THE CAUCASUS FOUNDED AND PUBLISHED BY CENTRAL ASIA AND THE CAUCASUS CENTER FOR SOCIAL AND POLITICAL STUDIES Center registration number: 620720 - 0459 Journal registration number: 23 614 State Administration for Patents and Registration of Sweden E d i t o r i a l S t a f f Murad ESENOV Editor Tel./fax: (46) 920 62016 E-mail: [email protected] Irina EGOROVA Executive Secretary (Moscow) Tel.: (7 - 095) 3163146 E-mail: [email protected] Botagoz represents the journal in Kazakhstan (Almaty) KULAKBAYEVA Tel./fax: (7 - 3272) 67 51 72 E-mail: [email protected] Ainura ELEBAEVA represents the journal in Kyrgyzstan (Bishkek) Tel.: (996 - 312) 47 26 12 E-mail: [email protected] Jamila MAJIDOVA represents the journal in Tajikistan (Dushanbe) Tel.: (992 - 372) 27 92 22 E-mail: [email protected] Farkhad represents the journal in Uzbekistan (Tashkent) KHAMRAEV Tel.: (998 - 71) 184 94 91 E-mail: [email protected] Husameddin represents the journal in Azerbaijan (Baku) MAMEDOV Tel.: (994 - 12) 68 78 64 E-mail: [email protected] Aghasi YENOKIAN represents the journal in Armenia (Erevan) Tel.: (374 - 1) 54 10 22 E-mail: [email protected] Paata represents the journal in Georgia (Tbilisi) ZAKAREISHVILI Tel.: (995 - 32) 99 75 31 E-mail: [email protected] Garun KURBANOV represents the journal in the North Caucasian republics
    [Show full text]
  • Yodgor Faizov: the Greatest Wealth of GBAO Is Its People
    Yodgor Faizov: The Greatest Wealth of GBAO Is Its People The Chairman of the Gorno-Badakhshan Autonomous Region of the Republic of Tajikistan and CABAR.asia summarize the results of one year of his work. Follow us on Facebook Yodgor Faizov officially took the lead in GBAO on October 1, 2018 by Decree of the President of Tajikistan Emomali Rahmon. He superseded Shodihon Jamshed on this position, whom the President criticized during a working trip to Khorog on September 15 of the same year. Yodgor Faizov has been the chairperson of GBAO since According to Rahmon, in October 2018. Photo: CABAR.asia GBAO, primarily in Khorog, the administrative center of the region, criminal groups have become active. The President gave a month to law enforcement agencies of the country and region to restore order. A month later, senior officials of security and law enforcement agencies were replaced. To resolve the situation and to seize arms, an interdepartmental headquarters of law enforcement agencies in GBAO was created. Yodgor Faizov: The Greatest Wealth of GBAO Is Its People Before an assignment to a position of GBAO’s Head, Yodgor Faizov for a long time worked in the Aga Khan Foundation programs in Tajikistan, and since 2004, as its executive director in Dushanbe. Rahmon appointed Fayzov not without a reason: he is a native of this region; he began his career in local branches of the Komsomol. GBAO is a unique region in terms of its social, geographical, cultural, political characteristics. Pamiri peoples live here; they differ from Tajiks in culture and language.
    [Show full text]
  • Cross-Border Collaboration on Malaria Between Countries of the WHO Eastern Mediterranean and European Regions
    Cross-border collaboration on malaria between countries of the WHO Eastern Mediterranean and European regions Report of the Biregional Coordination Meeting Dushanbe, Tajikistan Cross-border collaboration on malaria between countries of the WHO Eastern Mediterranean and European regions Report of the Biregional Coordination Meeting Dushanbe, Tajikistan Abstract The Biregional Coordination Meeting, held in Dushanbe, Tajikistan, on 27–28 November 2019, brought together countries of the WHO Eastern Mediterranean and European regions that share borders; the aims of the meeting were to report on their activities in eliminating malaria and preventing re-establishment of malaria transmission, to share lessons learned and discuss challenges, and to develop solutions, especially on cross-border issues. In addition to malaria, both the Eastern Mediterranean and the European regions have witnessed, in recent years, outbreaks of emerging and re-emerging vector-borne diseases (VBDs) – principally, the mosquito-borne arboviral diseases West Nile virus, dengue and chikungunya. The rapid expansion of the distribution of Aedes aegypti and Aedes albopictus – vectors of dengue, chikungunya and Zika virus – in these regions is alarming and poses a significant risk to public health. To tackle this issue, possible interregional collaboration on capacity strengthening for integrated vector surveillance and control was discussed at length. Participants reaffirmed their commitment to make efforts to achieve malaria elimination and maintain malaria-free status,
    [Show full text]
  • Safeguards Due Diligence Report Tajikistan: Building Climate
    Safeguards Due Diligence Report Social Safeguards Due Diligence Report (SSDDR) Document Stage: Final Project Number: 45354-002 January 2017 Tajikistan: Building Climate Resilience in the Pyanj River Basin Prepared by the State Institution Project Management Unit of Building Climate Resilience in the Pyanj River Basin Project. This social due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CURRENCY EQUIVALENTS (as of November 20161) Currency unit - Tajikistan Somoni (TJS) TJS 1.00 = $ 0.1269 $1.00 = TJS 7.8780 ABBREVIATIONS ADB – Asian Development Bank ALRI – Agency on Land Reclamation and Irrigation EA – Executing Agency GRC – Grievance Redress Committee GRM – Grievance Redress Mechanism Ha – Hectare KMK – Khojagii Manziliyu Kommunali (Housing and Utility Company) LAR – Land Acquisition and Resettlement LARF – Land Acquisition and Resettlement Framework LARP – Land Acquisition and Resettlement Plan MOF – Ministry of Finance NGO – Non-government Organization PIU – Project Implementation Unit WUA – Water Users Association WEIGHTS AND MEASURES km - Kilometer m - Meter NOTES In this report, "$" refers to US dollars and “TJS” refers to Tajikistan Somoni. 1 Source: National Bank of Tajikistan http://nbt.tj/en/ i CONTENTS 1. INTRODUCTION ............................................................................................................. 1 A. Introduction ............................................................................................................... 1 B. Project description ...................................................................................................
    [Show full text]
  • Stakeholder Engagement Plan 1 December 2020 CEPF Grant 110812 Panthera Engaging Communities to Safeguard Rural Livelihoods and C
    Stakeholder Engagement Plan 1 December 2020 CEPF Grant 110812 Panthera Engaging communities to safeguard rural livelihoods and cultivate conservation partnerships in Kyrgyzstan and Tajikistan Grant Summary 1. Grantee organization: Panthera 2. Grant title: Engaging communities to safeguard rural livelihoods and cultivate conservation partnerships in Kyrgyzstan and Tajikistan 3. Grant number: 110812 4. Grant amount (US dollars): approximately US $150,000 5. Proposed dates of grant: 1 December 2020 – 30 November 2022 6. Country: Kyrgyzstan, Tajikistan 7. Date of preparation of this document: 1 December 2020 8. Introduction The Turkestan-Alai Mountains of Tajikistan and Kyrgyzstan are home to ~10% of the global population of snow leopards and are essential for range-wide connectivity of the species. Protecting snow leopards here will have global implications for their future persistence. However, because snow leopards and other carnivores in the landscape exist at low densities, their conservation requires action at large geographic scales. The success of snow leopard conservation hinges on three overarching needs: 1) reliable, specific knowledge of snow leopard (and other species) distributions, interactions with people, and threats; 2) empowerment of local communities, protected areas, and other conservation stakeholders through that knowledge by networking, communicating, and collaborating; and, 3) scalable and effective solutions to address conservation challenges while elevating human livelihoods and well- being. We address these needs in unison, and in close partnership with local communities, to inform meaningful and lasting conservation that truly benefits people. We propose activities across four landscapes in the Pamir and Turkestan Ranges. Each landscape was identified and selected based on previous assessments indicating high snow leopard density or probability of occupancy, high probability of human-wildlife conflict (HWC) and other unsustainable threats, or a large extent of probable habitat with uncertain occupancy status.
    [Show full text]
  • List of Consent of Communities of the Republic of Tajikistan of the Nomination of Falak
    • List of consent of communities of the Republic of Tajikistan of the nomination of Falak 1. Students of the Tajik National Conservatory 1 Mo LI.OHMWI{yeHM cpaKyJITeTM MYCMK.YIYI cyHHaTMrr TO"t.J;YIKYI KoHcepsaToprrHH MMJTIIYIH To"t.J;rrKHCTOH 6a HOMH T. CaTTopos cpanaKXOHHpo ~aMI.JYH Kac6 rrHTrrxo6 Kap.n:aeM. TasaccyTrr MaKTa6H onrr:rr MycrrK.ii KOHcepsaToprrH ~a~aKxOHHpo oMyxTa po~H ~aeTH xy.n:po 6o oH MerraHBaH.n:eM. rapi.JaH.n:e cpanaKXOHM MYCYIK.HH cyHHaTfi acT, OH .n.ap ~ap~aHrH Myoc:rrprr xanK.rr TO"t.J;YIK MaBK.err xy.npo xene ycTysop HMrox, Me.n:opa;::x:. Mo, rapqaH.D.e l{aBOH ~acTeM, neKHH xy6 .n:apK Kap.n:aeM, Krr .n;ap l{OMeaH 11Mpy3aH MO rnyHaBaH,;::x:aroHrr <PanaK xene 3He,n:aH.n:. OH~o MeTaBoHaH.n: coaT~OH .n:apo3 cpanaKpo ryw KyHaH;:I.. ,ll,ap 3aMOHH MyocHp <Pa.aaK MeTaBoHa.n: .D.ap rnaK;J~OH HaBH xy.n; pym.u e6aLJ,, TeaTp11 xy,n:po TaWaKKYJT .D.Hx.a.n:. fio BYI{Y.D.I1 HH HaBoBap11~0 <PanaK rnaKJIH cyHHaTMH xy.upo ryM HaKap.n:aacT sa 6apaKc 6o rnaKn~oH ryHoryHpaHraw .nap aMaJTMHH MYCHK.HH I1Mpy3a MabMy.'1 acT. Mo HHHT .n:opeM, KJ1 .nap pyW,!U1 OH cax,Mry30p MeWaBeM. qyHI01 <iJa.laK HcpT11XOpi1 M11JIJiaTI1 MO aCT. 1. An11es Mypo.n;aJili 2. Eyp~oHos MaHyqe~p 3. K,yp6oHos EaxTMep 4. Ca11.n:os Cop6oH 5. 6. Jiynlmwoes 1\o.n:Hp 7. Marnpa6osa cDoTMMa 8. 30KI1p0B cDapYIJJ:YH 9.
    [Show full text]
  • Initial Environmental Examination
    Initial Environmental Examination DRAFT April 2013 TAJ: Building Climate Resilience in the Pyanj River Basin Irrigation and Flood Management Projects in 8th districts of Tajikistan (Pyandj, Kulob, Vose, Vanj, Darvoz, Ishkoshim, Roshtkala, Rushan) Prepared by the Ministry of Land Reclamation and Water Resources (MLRWR) and the State Unitary Enterprise for Housing and Communal Services Kochagi Manzillu Kommunali (KMK, formerly Tajikkomunservices) for the Asian Development Bank. ABBREVIATIONS ADB - Asian Development Bank AP - Affected Population/Person/Party CEP - Committee for Environmental Protection under the Government of Tajikistan EA - Executing Agency EC - Erosion Control EIA - Environmental Impact Assessment EMMP - Environmental Management and Monitoring Plan ES - Environmental Specialist ESM - Environmental Supervisor and Monitor Expert GBAO - Gorno-Badakhshan Autonomous Oblast (Province) GOST Gosudartsvennye Standarty (Russian Technical Standards) GoT - Government of Tajikistan IEE - Initial Environmental Examination LARC - Land Acquisition and Resettlement Committee LARP - Land Acquisition and Resettlement Plan MLRWR - Ministry of Land Reclamation and Water Resources NGO - Non Governmental Organization PC - Public Consultation PIU - Project Implementation Unit PMU - Project Management Unit SEE - State Ecological Expertise SOP - Standard Operation Procedure SR - Sensitive Receiver SSEMP - Site Specific Environmental Management Plan TD - Temporary Drainage TOR - Terms of Reference CONTENTS Page EXECUTIVE SUMMARY I I. INTRODUCTION 1 A. Background 1 B. Policy and Statutory Requirements in Tajikistan 1 C. Asian Development Bank Safeguard Policies 2009 5 II. DESCRIPTION OF THE PROJECT 6 A. Project Location. 11 III. DESCRIPTION OF EXISTING ENVIRONMENT IN THE PROJECT AREA 29 A. Physical Environment 29 B. Biological Environment 43 C. Socio-Economic and Physical Cultural Resources 49 IV. SCREENING OF POTENTIAL ENVIRONMENTAL IMPACTS OF THE PROJECT AND MITIGATION MEASURES 54 A.
    [Show full text]
  • Assessment of Economic Impacts from Disasters Along Key Corridors
    Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ASSESSMENT OF ECONOMIC IMPACTS FROM DISASTERS ALONG KEY CORRIDORS Final Report May 2021 World Bank Public Disclosure Authorized in association with: The information contained in this document is confidential, privileged and only for the information of the intended recipient and may not be used, published or redistributed without the prior written consent of IMC Worldwide Ltd. Disclaimer: This work is a product of the staff of The World Bank and the Global Facility for Disaster Reduction and Recovery (GFDRR) with external contributions. The findings, analysis and conclusions expressed in this document do not necessarily reflect the views of any individual partner organization of The World Bank, its Board of Directors, or the governments they represent. Although the World Bank and GFDRR make reasonable efforts to ensure all the information presented in this document is correct, its accuracy and integrity cannot be guaranteed. The boundaries, colors, denomination, and other information shown in any map in this work do not imply any judgment on the part of The World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries. Within this study, the locations of sites with existing hazards have been determined based upon extensive site visits. These made use of official measures of the length of each road where possible. Efforts have been made to ensure that these are correct at the time of the site visit. In light of possible reconstructions or rehabilitations of the automobile roads, there is a likelihood of changes to the kilometrages of the identified hazard prone locations.
    [Show full text]
  • Mapping Registered Extreme Poverty in Rural Tajikistan
    G ALS 17 GOALS TO TRANSFORM OUR WORLD MAPPING REGISTERED EXTREME POVERTY IN RURAL TAJIKISTAN ANALYTICAL BRIEF April, 2017 ANALYTICAL BRIEF recent years Tajikistan has seen located. This analytical brief contributes to the considerable progress in reducing geographic mapping of poverty in Tajikstan by poverty levels in the country*. At utilizing one recently constructed dataset – the the same time, poverty remains a challenge for Jamoat Basic Indicators (JAMBI) dataset. Tajikistan as is the case for many other countries in the world. The global nature of Data was assembled by the United National this challenge is reflected in the 2030 Agenda Development Programme (UNDP) in on Sustainable Development. The very first cooperation with the Ministry of Economic goal in this agenda, which was endorsed by the Development and Trade (MEDT). The dataset Republic of Tajikistan at the United Nations includes a large number of indicators, Summit in 2015, reads: “End poverty in all its information on which was primarily collected forms everywhere.” on a local level. Among these indicators there are several that refer to the number of poor As is implicit in this statement, to achieve the people at the jamoat (municipality) level. goal one should know where poverty is SDG tar e get 1.1 xtreme po BOX PLOT “By 2030, er everywher verty for all people adicate people livinge, curr on less than $1.25 a ently measur Indicator 1.1.1: Proportion of day.” Pr ogr ed as population below the international target is intendedess to to measur war poverty line, by sex,
    [Show full text]