Building Climate Resilience in the Pyanj River Basin
Total Page:16
File Type:pdf, Size:1020Kb
Bi-annual Environmental Monitoring Report November 2016 Grant 0352-TAJ: Building Climate Resilience in the Pyanj River Basin Prepared by the Agency for Land Reclamation and Irrigation under the Government of the Republic of Tajikistan The bi-annual environmental monitoring report is a document of the borrower. The ¡¢ £¤ ¢ ¥¦§¢¤¤¢ ¨ ©¢§¢ ¡ ¨ ¢ ¢¤¤ § ¡ §¢ ¦§¢¤¢ © ¤¢ ¤ § ¨ Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. The Agency for Land Reclamation and Irrigation under the Government of the Republic of Tajikistan Project Implementation Center (PIC) EPRBRCC REPORT ON ENVIRONMENT for 6 months (from 1 January to 30June 2016) on the progress of the Project ¡¢£¤ ¥£¦§ CLIMATE RESILIENCE IN THE PYANJ BASIN" Component 1 and 2 (Grant 0352-TAJ) Dushanbe, 2016 1 Bi-annual Environmental Monitoring Report Project Number: 45354-003 Grant0352 Reporting period: January-June 2016 Tajikistan: Building Climate resilience in the Pyanj River basin Component 1 and 2 (irrigation and flood management) (Financed by the Asian Development Bank) Prepared by Prepared by the EPTISA For: Agency for Land reclamation Amelioration and Irrigation under the Government of the Republic of Tajikistan (Project implementation center) This report on environmental monitoring is the document of the borrower. The views expressed here do not necessarily reflect those of ADB's Board of Directors, its managers or employees, and can essentially be carried only preliminary. While preparing any country program or strategy, financing any project, or by any indication or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments concerning the legal or other status of any territories or areas 2 Content Page Maps 4 Figures 4 Tables 4 Photographs 4 Abbreviations 6 1 INTRODUCTION 7 1.1 Background 7 1.2 Objectives and report methodology 7 1.3 Description of the project 8 1.4 Contract services for construction supervision 11 II Consideration of environmental protection safeguards during project 11 preparation 2.1 Development of Environmental Management Plan 11 2.2 Preparation of tender documentation 12 2.3 Interaction with the contractor, owners etc. 12 III Information about the quality control progress 13 3.1 Rehabilitation of irrigation systems, drainage networks and pumping station 13 ¡ Baytudasht ¢ jamoatsNamuna,Mehvar, K. Saiffudinov andNuriVahdat ofPyanj district, Khatlon 3.2 Construction and reconstruction work on the bank protection structures in Dagana 21 sai in jamoats Dagana and Ziraki in Kulyab district,Khatlonoblast. 3.3 Reconstruction work on the bank protection structures in rivers Yahsu, Kyzylsu 23 and simple span bridge injamoatsM. MahmadalievandRudaki Vosedistrict,Khatlon oblast. 3.4 Construction and reconstruction work on the bank protection structures in rivers 26 Devdara, Vishavr andPyanjas well as irrigation system in jamoats Kalaihumb,Vishharv in Darvaz district (GBAO) 3.5 Reconstruction of the bank protection structures, cleaning of channel and 28 irrigation network in jamoats «Jovidon» and «Vodhud» in Vanj district (GBAO) 3.6 Reconstruction of irrigation system and Construction and reconstruction work on 32 the bank protection structures in jamoatsDodhudoev in Rushan district(GBAO) IV. ENVIRONMENTAL MONITORING 33 4.1 Noise and vibration 33 4.2 Water Quality 34 4.3 Air Quality 34 4.4 Monitoring of flora and fauna 34 4.5 Monitoring of the occupational health, safety and HIV / AIDS issues 34 V. ENVIRONMENTAL MANAGEMENT 35 5.1 SSEMP and work plan 35 5.2 Site inspections and audit 35 5.3 Notifications of non-compliance 35 5.4 Corrective action plan 37 5.5 Consultations and complaints 40 3 Maps Map 1 Location of pilot sites Figures Figure 1 Institutional scheme of security policies (protective measures) in the environment Figure 2 The scheme of irrigation and drainage network Pyanj district Tables Table 1 The progress of the construction works during the reporting period Pyanj district Table 2 The progress of the construction works during the reporting period Kulyab district Table 3 The progress of the construction works during the reporting period Vose district Table 4 The progress of the construction works during the reporting period Darvaz district Table 5 The progress of the construction works during the reporting period Vanj district Table 6 The progress of the construction works during the reporting period Rushan district Table 7 Notifications of non-compliance Table 8 Corrective actions plan for July-December 2016 Photographs Photo 1 Channel Kelanchi, jamoat Namuna - special equipment is working on compaction of dredged soil Photo 2 Channel Kelanchi, jamoat Namuna cleaned cannel sections Photo 3 Channel Kelanchi cleared, the coast of the channel leveled Photo 4 Channel Kelanchi plastic bottles can be observed in the channel Photo 5 Other been preserved in many places ¢ Photo 6 Condition of collector -1-3 (jamoatMehvar) before works start (March 2016) and after (May 2016) Photo 7 Condition of collector ¢-2-9 (jamoatKabudSaifidinov) prior to and after the design works. Photo 8 Condition of collector¢ -7-0 (jamoatNuri Vahdat) prior to and after the design works Photo 9 Construction site of pumping station Boitudasht, jamoat Nuri Vahdat fences are availible, information boards are installed. Photo10 Accommodation conditions, open-air kitchen and «shower» room for workers do not comply with environmental requirements Photo 11 Site toilet area for staff Photo 12 EMPand permissions as required Photo 13 Permits and certificates on the site in accordance with the environmental requirements Photo 14 Construction and reconstruction work on the bank protection structures in Dagana sai - jamoatsDagana Kulyab district. Photo 15 Progress of works on bank protection structures construction in river Kyzyl- Suuin Rudaki M. Mahmadaliev jamoat of Vose district, village Sari Angur Photo 16 Progress of works on bank protection structures construction in river Kyzyl- Suu in Rudaki M. Mahmadaliev jamoat of Vose district, village Sari Angur Photo 17 Office room and canteen Photo 18 Residence for workers does not meet the requirements 4 Photo 19 Protective wall inDarvaz district (villageRuzvay, riverPyanj) concrete works are complete, ground leveling work just remain to be done June 2016. Photo 20 The applied machinery for collecting and transporting the stones - in good condition, meet the requirements June 2016. Photo 21 The construction of the stone embankment to protect the school (riverViskharv,jamoat Viskharv). Photo 22 Engineers shows maintenance schedule of machinery and equipment, records of staff training on occupational safety issues Photo 23 Most part stone embankment for strengthening the coast and flood protection on river Vanchobinjamoat «Vodhud», villageVahdat ofVanjdistrict,ready. The access road passes away from settlements. Photo 24 Cleaning the riverbed and river bank reinforcement river Bunai throughout 1154 m - Jamoat "Jovidon", Vanj district. The sudden rise of water due to rainfall and the melting of glaciers in the May-June 2016 led to a partial reverse silting of the riverbed. Additional clean-up is planned by the end of August 2016 Photo 25 An information board about the project in Vanj district. Photo 26 An information board in the room of join office PIOand the contractor in Vanj district Photo 27 Contractor shows maintenance schedule of machinery and journals withinstructions for workers, EMP andecological permission documents are in compliance with requirements. Photo 28 Building flood embankments in Rushan district (built half of the total (330 meters built, there are still about 300 m to be constructed). Photo 29 There are records of briefings for workers in the area of occupational safety. Photo 30 Information board in the joint office of the Contractor and PIU established by NGO "Umedbahsh" for information and awareness of the local population Photo 31 Meetings with representatives of the environmental authority in the Contractor's Pyanj district office Photo 32 Beneficiaries of the project received information that during implementation EMP is used, for the purposes of mitigation measures and monitoring during the implementation of the works on different bank protection structures and single span, bridge that must be included to contract documents. Photo 33 Organizing seminars among the leaders of jamoat of Vose district Photo 34 Meetings with representatives of the contractor and the local population in Darvaz district Photo 35 An information board about the project in Vanj district 5 ABBREVIATIONS WUA Water Users Association AEMP Adapted Environmental Management Plan. ADB Asian Development Bank BPA Bank Protecting Activities BPS Bank Protecting Structures SLMC State Land Management Committee SEE State Ecological Expertise EA Executive Agency IN Irrigation Network CDN Collector and Drainage Network CEP Committee for Environment Protection NDRMC Natural Disaster Risk Management Committee DI Drip Irrigation AAI Agency for Amelioration and Irrigation MoA Ministry of Agriculture ME Monitoring and Evaluation NGO Non-government Organization EIA Environment Impact Assessment EAP Environment Action Plan SSEMP Site Specific Environmental Management Plan