2009 – 2013 Kingston Cycling and Walking Plan
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Eastern Metro Region Five Year Plan for Jobs, Services and Infrastructure 2018–2022
Eastern Metro Region Five Year Plan for Jobs, Services and Infrastructure 2018–2022 Eastern Metro Region © The State of Victoria Department of Environment, Land, Water and Planning 2018 This work is licensed under a Creative Commons Attribution 4.0 International licence. You are free to re-use the work under that licence, on the condition that you credit the State of Victoria as author. The licence does not apply to any images, photographs or branding, including the Victorian Coat of Arms, the Victorian Government logo and the Department of Environment, Land, Water and Planning (DELWP) logo. To view a copy of this licence, visit creativecommons.org/licenses/by/4.0/ Printed by (Impact Digital, Brunswick). ISBN 978-1-76077-179-9 (Print) ISBN 978-1-76077-180-5 (pdf/online/MS word) Disclaimer This publication may be of assistance to you but the State of Victoria and its employees do not guarantee that the publication is without flaw of any kind or is wholly appropriate for your particular purposes and therefore disclaims all liability for any error, loss or other consequence which may arise from you relying on any information in this publication. Accessibility If you would like to receive this publication in an alternative format, please telephone the DELWP Customer Service Centre on 136 186, or email [email protected] (or relevant address), or via the National Relay Service on 133 677, www.relayservice.com.au. This document is also available on the internet at www.delwp.vic.gov.au. Office for Suburban Development Aboriginal acknowledgement The Victorian Government proudly acknowledges Victoria’s Aboriginal community and their rich culture and pays respect to their Elders past and present. -
State of Maroondah 2021
State of Maroondah 2021 Maroondah 2040 - Our future together 2 STATE OF MAROONDAH 2021 Measuring our progress The State of Maroondah Report 2021 provides a snapshot of how our municipality is progressing towards the community vision identified in Maroondah 2040 - Our future together. Welcome to the State of Maroondah Report 2021. This report provides a snapshot of our progress as a municipality over the past two years, since the previous State of Maroondah Report was released in 2019. The report focuses on the Maroondah 2040 Community Indicators of Progress, along with some of the key Council Plan achievements during the period 2018/19 and 2019/20 and how these are working towards the vision identified in Maroondah 2040 - Our future together. The past two years has seen the completion of some significant infrastructure projects along with a range of strategic work aimed at creating a vibrant and attractive city. These projects have included: construction of Maroondah Nets; development of a Children and Families Strategy; public art installations in Croydon, Croydon South and Heathmont; development of the Maroondah Vegetation Strategy 2020-2030; design of multi-level carparks in Croydon; Ringwood; Heathmont and Heatherdale station; renewal works along the Dandenong Creek shared trail; commencement of staged redevelopment for the Croydon Community Wellbeing Precinct; finalisation of the Ringwood Activity Centre Masterplan; implementation of the new Local Government Act 2020; development of a COVID-19 relief and recovery response framework; and launch of the Be Kind Maroondah campaign. This State of Maroondah Report 2021 provides just a snapshot of key projects delivered by Council over this period and highlights areas of focus for the next two years in working towards the Maroondah 2040 Community Vision. -
Wyndham Pedestrian & Cycle Strategy
dd Wyndham Pedestrian & Cycle Strategy Cyclist Feedback, Identified network expansion requirements and missing links Wyndham City Council has received a great deal of feedback on cycling within the municipality. The identified issues were considered in writing the 2019 Pedestrian and Cycling Strategy. The feedback has been grouped under common categories in the tables below, to keep like comments together. Table-1 Safety and Blackspot feedback Location Type Comment Derrimut Road Crossing Points crossings at Sayers and Leakes Roads – but I believe these are going to be dealt with by VicRoads Cycle lane Cycle lane on the Eastern side is in one direction only. It’s a busy Derrimut Road road so lanes on both sides of the road need to be two way. Also, going under the railway bridge near the Princess Highway Obstacles There are many obstacles within the shared paths – e.g. Derrimut SUP Road, adjacent to Aqualink – a no standing sign (I think) way too close to the middle of the Shared path. Cyclists could easily crash into it; Cnr Derrimut Road and Willmott Cres – many signs Derrimut Road obstructing the path – traffic lights, bike path sign (!!), no standing or something. Not at all safe. Also a shared path sign on cnr of Kookaburra and Derrimut – in middle of path instead of off to the side. Kookaburra Ave Cycle Path Paths on Kookaburra Ave have speed cushions in them. At night Obstacles they are invisible (even with bicycle lights). No need – could have treatment similar to Shaw’s Road. Also path disappears before T intersection with Derrimut Road. -
Road Management Plan 2020-2021
Department of Transport Road Maintenance Category - Road List Version : 1 ROAD NAME ROAD NUMBER CATEGORY RMC START RMC END ACHERON WAY 4811 4 ROAD START - WARBURTON-WOODS POINT ROAD (5957), WARBURTON ROAD END - MARYSVILLE ROAD (4008), NARBETHONG AERODROME ROAD 5616 4 ROAD START - PRINCES HIGHWAY EAST (6510), SALE ROAD END - HEART AVENUE, EAST SALE AIRPORT ROAD 5579 4 ROAD START - MURRAY VALLEY HIGHWAY (6570), KERANG ROAD END - KERANG-KOONDROOK ROAD (5578), KERANG AIRPORT CONNECTION ROAD 1280 2 ROAD START - AIRPORT-WESTERN RING IN RAMP, TULLAMARINE ROAD END - SHARPS ROAD (5053), TULLAMARINE ALBERT ROAD 5128 2 ROAD START - PRINCES HIGHWAY EAST (6510), SOUTH MELBOURNE ROAD END - FERRARS STREET (5130), ALBERT PARK ALBION ROAD BRIDGE 5867 3 ROAD START - 50M WEST OF LAWSON STREET, ESSENDON ROAD END - 15M EAST OF HOPETOUN AVENUE, BRUNSWICK WEST ALEXANDRA AVENUE 5019 3 ROAD START - HODDLE HIGHWAY (6080), SOUTH YARRA ROAD BREAK - WILLIAMS ROAD (5998), SOUTH YARRA ALEXANDRA AVENUE 5019 3 ROAD BREAK - WILLIAMS ROAD (5998), SOUTH YARRA ROAD END - GRANGE ROAD (5021), TOORAK ANAKIE ROAD 5893 4 ROAD START - FYANSFORD-CORIO ROAD (5881), LOVELY BANKS ROAD END - ASHER ROAD, LOVELY BANKS ANDERSON ROAD 5571 3 ROAD START - FOOTSCRAY-SUNSHINE ROAD (5877), SUNSHINE ROAD END - MCINTYRE ROAD (5517), SUNSHINE NORTH ANDERSON LINK ROAD 6680 3 BASS HIGHWAY (6710), BASS ROAD END - PHILLIP ISLAND ROAD (4971), ANDERSON ANDERSONS CREEK ROAD 5947 3 ROAD START - BLACKBURN ROAD (5307), DONCASTER EAST ROAD END - HEIDELBERG-WARRANDYTE ROAD (5809), DONCASTER EAST ANGLESEA -
Vicroads Annual Report
VICROADS ANNUAL REPORT KEEPING VICTORIANS CONNECTED 2011 – 2012 Table of contents 1 Letter to the Minister 2 Chief Executive’s foreword 3 About VicRoads 5 Part one: Report on operations 6 Connection 12 Safety 17 Integration and sustainability 25 Service 29 Part two: Organisational capability and culture 35 Part three: Corporate governance and structure 40 Part four: Mandatory disclosures 46 Part five: Financial management 53 Part six: Financial statements 103 Disclosure index The Hon Terry Mulder MP Minister for Roads Level 16 121 Exhibition Street MELBOURNE VIC 3000 Dear Minister VicRoads 2011–12 Annual Report I have much pleasure in submitting to you, for your presentation to Parliament, the annual report of the Roads Corporation (VicRoads) for the period 1 July 2011 to 30 June 2012. Yours sincerely Gary Liddle Chief Executive 17 September 2012 VicRoads Annual Report 2011-2012 1 Chief Executive’s foreword It’s been another busy year for VicRoads Much of what we achieve at VicRoads is the result of working with others. Road safety is a key example of where we’ve continued our focus on what can be achieved in partnership with government delivering Victorians a sustainable road agencies, local communities and other stakeholders. system that is safe, efficient, reliable and In 2011, Victoria achieved its lowest ever road toll with integrated with the rest of the transport 287 fatalities, one fewer than in 2010. system. During the year, we also achieved some significant milestones in upgrading the road network including completing: One of the highlights for me in 2011–12 was the release of VicRoads Strategic Directions 2012–2014. -
Cycling Into the Future 2013–23
DECEMBER 2012 CYCLING INTO THE FUTURE 2013–23 VICTORIA’s cyCLING STRATEGY Published by the Victorian Government, Melbourne, December 2012. © State of Victoria 2012 This publication is copyright. No part may be reproduced in any process except in accordance with the provisions of the Copyright Act 1968. Authorised by the Victorian Government Melbourne Printing managed by Finsbury Green For more information contact 03 9655 6096 PAGE III CYCLING INTO THE FUTURe 2013–23 VICTORIA’s CYCLING STRATEGY CONTENTS Minister’s foreword v Executive summary vi 1 Cycling in Victoria 1 2 Growing cycling in Victoria 5 Current cycling patterns 5 Potential growth 5 3 Benefits of cycling 8 Healthier Victorians 8 Better places to live 9 Stronger economy 9 Healthier environment 10 4 Strategic framework 11 Direction 1: Build evidence 12 Direction 2: Enhance governance and streamline processes 14 Direction 3: Reduce safety risks 16 Direction 4: Encourage cycling 20 Direction 5: Grow the cycling economy 22 Direction 6: Plan networks and prioritise investment 24 5 Implementation, monitoring and evaluation 29 Appendix 1: Cycling networks, paths and infrastructure 30 PAGE IV CYCLING INTO THE FUTURe 2013–23 VICTORIA’s CYCLING STRATEGY Some of our work in metropolitan Melbourne includes: > a new bridge on the Capital City Trail at Abbotsford > bike lanes along Chapel Street > extensions and improvements to the Federation Trail, Gardiner’s Creek Trail and Bay Trail on Beach Road > Jim Stynes Bridge for walking and cycling between Docklands and the CBD along the Yarra River > Heatherton Road off-road bike path from Power Road to the Dandenong Creek Trail > a bridge over the Maroondah Highway at Lilydale > bike connections to Box Hill and Ringwood > Parkiteer bike cages and bike hoops at 16 railway stations > Westgate Punt weekday services > bike paths along the Dingley Bypass, Stud Road, Clyde Road and Narre Warren – Cranbourne Road > bike infrastructure as part of the Regional Rail Link project > a new trail in association with the Peninsula Link. -
Recreational Activity Surveys During COVID-19 and Comparison with Pre-Lockdown Activity Levels
More people out on bicycles: Recreational activity surveys during COVID-19 and comparison with pre-lockdown activity levels May 2020 Measuring recreational activity in unprecedented times Lockdown in Victoria On 30 March 2020, the Minister for Health and Medical Research signed an Order for stage 3 lockdown measures to be put in place across Australian states, following a national outbreak of the novel coronavirus. The Order, which in Victoria falls under section 200 of the Public Health and Wellbeing Act (2008)1, 2, places legally enforceable restrictions on all non-essential gatherings, as a means of minimising the spread of the deadly virus. During the stage 3 restrictions, there are only four reasons for Victorian residents to be outside: • purchasing food and essential supplies; • medical, care or compassionate needs; • exercise; and • work and study if they cannot be undertaken remotely2. How has this affected our recreational activities? An arising question is how these restrictions have affected the recreational needs of residents in Victoria and elsewhere. A recent survey by Bicycle Network3 found that, in response to stage 3 restrictions across Australian states: • 73 per cent [of respondents] are planning to use a bicycle to access essential services (shops, healthcare, work and education) in the coming weeks and months; • 84 per cent of healthcare workers said they would ride bicycles more or the same amount; and • Most respondents (39 per cent) said that they will be riding a bicycle outdoors to get their daily exercise. In addition, emerging data suggests an increase in bicycle purchases during lockdown restrictions4. These findings suggest that, given these increased needs for bicycle-related transport, exercise and recreation; Australian roads and shared paths may be exhibiting major deviations from normal bicycle traffic volumes. -
Maribyrnong River Valley Design Guidelines
MARIBYRNONG RIVER VALLEY DESIGN GUIDELINES APRIL 2010 CONTENTS Minister’s foreword 01 Executive summary 02 Acknowledgements 09 1 Introduction 11 1.1 Why these guidelines are needed 13 1.2 Policy context 13 1.3 Overview of the river 14 1.4 Study area 18 2 What we want to achieve 21 2.1 Vision 22 2.2 Preferred river character 23 3 Priorities for action 29 3.1 Enlarge the open space corridor 30 3.2 Improve site and precinct planning 38 3.3 Undertake important capital works 41 3.4 Improve overall governance 44 3.5 Refine planning controls 45 3.6 Enhance community engagement 51 4 Design guidelines 53 4.1 Additional open space 54 4.2 Open space management – landscape 59 4.3 Open space management – access 63 4.4 Landform 66 4.5 Urban development interface 68 4.6 Site layout and building visibility 70 4.7 Building design 76 4.8 Infrastructure design 79 5 Definitions and abbreviations 81 5.1 Definitions 81 5.2 Abbreviations 82 6 Bibliography 83 7 Appendices 84 Appendix A Relevant maps of the Maribyrnong River 84 Appendix B Consultation, views and values 91 Appendix C Broad objectives table 96 Appendix D Possible planning permit conditions 102 Appendix E Planning Schemes zoning map 104 Appendix F Maribyrnong River Valley settlement chronology 105 Appendix G Maribyrnong River – responsibilities of government agencies 108 MINISTER’S FOREWORD Consistent and coordinated planning is essential for protecting the natural and built character of our treasured waterways. The Maribyrnong River is one of Melbourne’s most used and loved assets, with thousands of Melburnians relaxing along the river every day. -
Melbourne Bushwalkers Inc. ABN 14 396 912 508 November 2019
THE NEWS OF THE A000133X Melbourne Bushwalkers Inc. ABN 14 396 912 508 November 2019 NEW YEAR’S DAY BBQ AT 12:30 Come along and celebrate the beginning of 2020 (gulp!) with the Bushies BBQ at Yarra Bend Park, Yarra Boulevard, Kew. Melway maps 44 I4 / 45 A4. Please bring a small contribution to the table, your own cutlery and a plate. Plus a mug and tea or coffee. A chair might be handy, too. No need to book. Due date for contributions (including January previews) to December News ([email protected]): 21 November Issue 824 – November 2019 MEMBER OF NEW MEMBERS We welcome the following new members: Caryl Kitchen, Kuninor Shimbo, Adam Kabriel, Tina Henderson, Members of the Melbourne Bushwalkers Inc meet Jessica Smith, on Wednesday evenings between 7:00 and 9:00 pm Annie Bergamasco in the club rooms at: Mission to Seafarers Victoria 717 Flinders Street Docklands VALE PETER HavlICEK (Melway map 2E 8J) I served on the MBW committee for ten years Visitors are always welcome! and Peter served for most of that time, plus many years more. He broke the record for the General correspondence should be directed to: longest-serving term on committee. He became Membership Secretary and again I believe that The Secretary he holds the record for the longest serving Melbourne Bushwalkers Inc club officer – seventeen years. In my time as PO Box 1751 President, he was one of those people who MELBOURNE VIC 3001 always made valuable contributions at committee www.melbournebushwalkers.org.au meetings. When one of those thorny problems arose (and it seemed that there was at least one The News of the Melbourne Bushwalkers Inc per meeting) Peter would listen carefully and (The News) is published monthly, and is the official quietly before making his contribution. -
Eastlink Sculpture Park Booklet
To use EastLink you’ll need a tag, DISCOVER THE non-tag account or EastLink trip pass. MAGNIFICENT If you already have a tag it will work ARTWORKS OF on EastLink. Otherwise contact us before EASTLINK’S or up to three days after your trip and SCULPTURE PARK we’ll help you with your toll payment. EastLink.com.au Phone (03) 9955 1400 CE-MK-B-045 JULY 2017 CE-MK-B-045 JULY EastLink.com.au CONNECTING YOU WITH THE ARTS HEIDE GALLERY ARTLINK IS A UNIQUE CREATIVE ENDEAVOUR THAT EASTERN FWY CONNECTS THE ARTS ACROSS THE CITY, THROUGH MELBOURNE CBD AUSTRALIA’S LONGEST SCULPTURE PARK. C IT EASTLINK Y LINK Victoria has a proud history of supporting visual arts. Many of our world-renowned artists are showcased in and around our state’s capital, both within galleries and in public spaces. EastLink connects you to the arts by linking Melbourne’s city with Heide Museum of Modern Art, Monash Gallery, McClelland Gallery and live performances at Frankston Arts Centre. MONASH FWY MONASH GALLERY ArtLink guides you on a journey through the highlights of EastLink’s unique open-air sculpture park. From the comfort of your vehicle, you can discover significant pieces of sculpture by internationally recognised Australian artists. The four large-scale artworks (see pages 6 and 7) located on EastLink’s As you travel on EastLink, you can see four large-scale artworks (see roadside can be seen from your vehicle pages 6 to 7). The artists who created these pieces designed them to as you drive on the tollway. -
Shared Paths
Shared paths – the issues They [cyclists] go ‘whoosh’ as they go past, and often the “ paths aren’t very wide, so this notion that you have to share has to come with more thought. If there’s not enough room it’s not a good match. If it’s got to be shared it’s got to be wider. Or separation between them.” Quote from focus groups with Victorian seniors (Garrard 2013) Thank You Victoria Walks would like to acknowledge and thank the following organisations who provided source information and feedback on the initial draft of this paper. • CDM Research • Frankston City Council • Wyndham City Council • Malcolm Daff Consulting • City of Yarra • Cardinia City Council Victoria Walks would also like to thank Dr Jan Garrard, VicRoads and officers from the following councils, who provided comment on the draft – Ballarat, Bayside, Boroondara, Brimbank, Dandenong, Latrobe, Macedon Ranges, Manningham, Maroondah, Melton, Moonee Valley, Mornington Peninsula, Nillumbik and Surf Coast. Finally, Victoria Walks would like to thank the Municipal Association of Victoria (MAV) for facilitating engagement with councils. Acknowledgement of these organisations should not be implied as endorsement of this paper and its recommendations by any of the organisations named. Shared Paths – the issues. Version 3.1, May 2015 ©Victoria Walks Inc. Registration No. A0052693U Recommended citation Victoria Walks (2015). Shared paths – the issues, Melbourne, Victoria Walks. Shared paths – the issues Outline This paper considers issues around shared walking and cycling paths. It reviews the literature relating to: • The safety of shared paths, including collision risk, the speed of cyclists and potential impact on pedestrians • User perception of shared paths • The circumstances where walking and cycling paths should be segregated or separated • International and local design guidance around shared paths • The practice of converting footpaths to shared paths • Legal liability issues raised by shared paths. -
Maribyrnong River Valley a Shared Vision for a Vibrant River
MARIBYRNONG RIVER VALLEY A SHARED VISION FOR A VIBRANT RIVER APRIL 2010 CALDER FWY BRIDGE MINISTER’S FOREWORD The Guidelines also contribute to the KEILOR PARK Government’s wider vision for a more The Maribyrnong River is one of Melbourne’s liveable, sustainable city, as outlined in BRIMBANK most loved and well-used rivers. the Melbourne 2030: a planning update – 1 PARK Melbourne @ 5 million, where people have Thousands of Melburnians spend time access to high quality housing, transport, relaxing along it every day – from its source community facilities and open space. above the Organ Pipes National Park through the suburbs of Keilor, Essendon, In addition, the Guidelines establish for KEILOR EAST Footscray and Yarraville to where it meets the first time a Maribyrnong River Valley the Yarra River near the West Gate Bridge. Coordinating Committee, which will oversee strategic planning along the river valley. Coordinated planning is essential to protect and enhance the Maribyrnong River’s Membership of the committee will include natural and built environment for current Brimbank, Hume, Maribyrnong, Melbourne and future generations. and Moonee Valley councils, the Department of Planning and Community Development Maribyrnong River Valley Design Guidelines and Parks Victoria. ESSENDON is an overarching framework to help achieve greater planning consistency along the By working together we can protect river valley. and enhance the special qualities of the Maribyrnong River Valley for everyone, The Guidelines set out a broad vision for now and into the future. a healthy, vibrant river with quality open space, good walking and cycling trails and sensitive development that protects the river’s natural and urban features.