Toshiba Locomotives

Total Page:16

File Type:pdf, Size:1020Kb

Toshiba Locomotives Safety Toshiba’s transportation system technology is Features of SCiBTM Safe and Durable widely-used all over the world. Toshiba Locomotives: Low Temp. Performance Long Life Lithium-ion Aiming to Meet Your Needs HXD3 7,200kW Traction system, Series 700T Shinkansen for Taiwan Traction system and Traction system for Metra electric locomotive auxiliary power system and High Speed Rail Corporation auxiliary power system for air conditioning system for the Minneapolis Metropolitan PMSM propulsion system for Irish Rail 8500EMU Council Main Battery Busan metro Line 1 AC electric locomotives for Traction system, Turkish State Railways (TCDD) auxiliary power system and train information system for Electric train equipment for the Traction system and SCiB™ Toshiba’ s lithium-ion battery realizes Dalian Modern Rail Transit Co., Traction system and Northern Indiana Commuter train information system for Ltd. (Jinzhou Line) auxiliary power system for Transportation District WMATA 7000 Series Korail’s 8500 series electric safety, long life and good performance, even in United locomotive Kingdom Moscow Electric train equipment for Electric train equipment for Turkish State Railways (TCDD) low-temperature environments. EMU800 and TEMU2000 Auxiliary power system for Ireland of Taiwan Railway Administration MTA New York City Transit Traction system, Canada auxiliary power system and Germany train information system for United States Toshiba Locomotives Line 1 of Wuhan Metro Group Turkey Independent-control main circuit of Co., Ltd. China Korea Electric Locomotive India Bulk Substation for Taiwan High Speed Rail Corporation Egypt Taiwan Thailand Philippines Traction system, High Availability with Hybrid Locomotive Traction system, VVVF PWM PWM VVVF auxiliary power system auxiliary power system and Malaysia and air conditioning system TM TM train information system for Zaire INV. RECT. RECT. INV. Diesel electric locomotives Scott-connected Singapore for IFE EMU2000 and Tianjin Binhai Mass Transit transformers for Venezuela EMU3000 Series Development Co., Ltd. Western Dedicated VVVF PWM PWM VVVF Specifications HBR700 Zambia Freight Corridor Indonesia TM TM Diesel electric locomotives INV. RECT. RECT. INV. Water-Cooled Electric train equipment for LRTA Line No. 2 Locomotive Total at Tread 700 kW Brazil South Auxiliary power system, train VVVF PWM PWM VVVF Africa TM TM Maximum Power (Battery Output) 800 kW Australia information system and INV. RECT. RECT. INV. air-conditioning system for LRTA Argentina Air conditioning system for Line No. 1 Traction system for BCRTC, (Diesel Engine Output) 330 kW Beijing Mass Transit Railway Power Converter Vancouver Corporation, Line No. 13 Traction system for DC electric trains Traction system for DC electric New Zealand Electric locomotives Main circuit of Auxiliary power system trains Length 15.0 m Diesel electric locomotives Electric train equipment for Train information system Air-conditioning system Thai Purple Line Air conditioning system Traction system, Hybrid Locomotive auxiliary power system, Independent control is applied for high availability Weight 80 – 100 tons train information system for Central PWM VVVF Eng MA TM Bogie Arrangement Bo - Bo PCC, main transformer, Substation system for Central and performance. RECT. INV. traction motor for HXD3G electric locomotive Maximum speed 60 km/h Class 15E (50kV AC) AC electric train for ROCA line electric locomotive VVVF Diesel electric locomotive DC traction power substation TM for KTMB equipment INV. Air conditioning system Traction motors for Line 1 of VVVF Auxiliary power system for City Rail TM Companhia do Metropolitano INV. Main circuit of Substation equipment for ROCA line de Sao Paulo Class 19E dual voltage Traction system and (25kV AC / 3kV DC) auxiliary power system VVVF electric locomotive TM Diesel Electric Locomotive for Salvador CTS INV. PMSM Propulsion System for Manufacturing Facilities MAIN VVVF C151 Refurbishment Eng MA TM Manufacturing Facilities & RECT. INV. Air conditioning system for C751B, C151A and Changi Airport Sky Train Sales O¤ice Sales O¤ice VVVF Auxiliary power system for Changi TM Electric train equipment for Electric train equipment for Electric train equipment for Airport Sky Train and SBS-Transit INV. Cairo Metro Line 1 Cairo Metro Line 2 Cairo Metro Line 3 Sengkang-Punggol LRT Sales & Engineering O¤ice VVVF TM INV. MAIN VVVF Headquarters Manufacturing Facilities & Sales Oice TM RECT. INV. Headquarters (Kawasaki, Japan) Toshiba International Corporation (Houston, U.S.A.) Motors, adjustable speed drives (inverters), UPSs, switchgears, transportation systems, etc. VVVF TM Manufacturing Facilities Toshiba Transmission & Distribution Systems (India) Pvt. Ltd. (Telangana, India) INV. Convertor/inverter system, Auxiliary convertors, Train control and monitoring system, Control electronics Fuchu Complex (Tokyo, Japan) VVVF Electric locomotives, traction control equipment, auxiliary power supply equipment, Toshiba Transmission & Distribution Systems Asia Sdn. Bhd. (Petaling Jaya, Malaysia) TM MV Switchgears, EPC of Substations INV. traction motor, train information system, ATC/ATS system, etc. Mie Operations (Mie, Japan) Transformers, motor control centers Sales Oice Hamakawasaki Operations (Kawasaki, Japan) Transformers, switchgears, surge arresters Toshiba China Co., Ltd. (Dalian, China) Kashiwazaki Operations (Kashiwazaki, Japan) Toshiba Electronic Components Taiwan Corporation (Taipei, Taiwan) Rechargeable Battery Toshiba Asia Pacific Pte Ltd (Singapore) Toshiba Carrier Corporation (Fuji, Japan) Toshiba India Private Ltd. (Gurgaon, India) Air-conditioning systems PT. Toshiba Asia Pacific Indonesia (Jakarta, Indonesia) Dalian Toshiba Locomotive Electric Equipment Co., Ltd. (Dalian, China) Drive systems for locomotives, DC train drive systems, Toshiba International Corporation Pty Ltd (Sydney, Australia) auxiliary power supply, traction motor, train information system, etc. Toshiba Africa (Pty) Ltd. (Sandton, South Africa) Guangzhou Toshiba Baiyun Electrical Equipment Co., Ltd. (Guangzhou, China) Toshiba Rus LLC (Moscow, Russia) MV Switchgears Sales & Engineering Oice Toshiba Railway Europe GmbH (Kiel/Düsseldorf, Germany) Hybrid Locomotive Find out more about Toshiba transportation solutions on http://toshiba-railway.com Diesel Electric Locomotive Toshiba Infrastructure Systems & Solutions Corporation Electric Locomotive 72-34, Horikawa-cho, Saiwai-ku, Kawasaki-shi, Kanagawa 212-8585, Japan Eicient Traction Motor Specifications DEL45 DEL35 Low-emission Specifications EL72 EL96 EL45 Maximum Power 4,500 BHP 3,500 BHP Railway Systems Division TEL.+81-(0)44-331-1600 Catenary Voltage 25kVac 50/60Hz (Engine Output) (3,356 kW) (2,610 kW) The information contained herein is as of September 1, 2019. PMSM (Permanent Magnet Synchronous Motor) ● Maximum Power at Tread 7,200 kW 9,600 kW 4,500 kW The information contained herein is subject to change without notice. ● Transformer Gauge Standard Standard / Narrow The information contained herein is presented only as a guide for the applications of our products. No responsibility is assumed by TOSHIBA for any infringements of patents technology realizes high eiciency of up to 97%.* ● Gauge Standard Standard Narrow or other rights of the third parties which may result from its use. No license is granted by implication or otherwise under any patent or patent rights of TOSHIBA or others. Weight 120 – 150 tons 96 – 120 tons ● TOSHIBA products should not be embedded to the downstream products which are prohibited to be produced and sold, under any law and regulations. Weight 132 – 150 ton TOSHIBA does not take any responsibility for incidental damage (including loss of business profit, business interruption, loss of business information, and other pecuniary damage) Nitrogen gas sealed transformer technology Bogie Arrangement Co - Co ● * The eiciency of PMSM was calculated with loss measurement based on IEC 60349-2 at the arising out of the use or disability to use TOSHIBA products. Bogie Arrangement Co - Co The products described in this document may include products subject to the foreign exchange and foreign trade laws. reduces need for insulation oil exchange. temperature below 40˚C from 8/25/2009 to 9/25/2009. Maximum speed 120 km/h ● ● The products described in this document may contain components made in the United States and subject to export control of the U.S. authorities. Diversion contrary to the U.S. law is prohibited. Maximum speed 120 – 160 km/h 120 km/h 2019-09(1) Safety Toshiba’s transportation system technology is Safety Toshiba’s transportation system technology is Features of SCiBTM Safe and Durable widely-used all over the world. Toshiba Locomotives: Features of SCiBTM Safe and Durable widely-used all over the world. Toshiba Locomotives: Low Temp. Low Temp. Performance Long Life Lithium-ion Aiming to Meet Your Needs Performance Long Life Lithium-ion Aiming to Meet Your Needs HXD3 7,200kW HXD3 7,200kW Traction system, Series 700T Shinkansen for Taiwan Traction system and Traction system for Metra Traction system, Series 700T Shinkansen for Taiwan Traction system and Traction system for Metra electric locomotive electric locomotive auxiliary power system and High Speed Rail Corporation auxiliary power system for auxiliary power system and High Speed Rail Corporation auxiliary power system for air conditioning system for the Minneapolis Metropolitan air conditioning system for the Minneapolis Metropolitan PMSM propulsion system for PMSM propulsion system for Irish Rail 8500EMU
Recommended publications
  • Bionic Shape Design of Electric Locomotive and Aerodynamic Drag Reduction
    ARCHIVES OF TRANSPORT ISSN (print): 0866-9546 Volume 48, Issue 4, 2018 e-ISSN (online): 2300-8830 DOI: 10.5604/01.3001.0012.8369 BIONIC SHAPE DESIGN OF ELECTRIC LOCOMOTIVE AND AERODYNAMIC DRAG REDUCTION Zhenfeng WU1, Yanzhong HUO2, Wangcai DING3, Zihao XIE4 1, 2, 3, 4 School of Mechanical and Electrical Engineering, Lanzhou Jiaotong University, Lanzhou, China Contact: 1) [email protected] Abstract: Bionics has been widely used in many fields. Previous studies on the application of bionics in locomotives and vehicles mainly focused on shape optimisation of high-speed trains, but the research on bionic shape design in the electric locomotive field is rare. This study investigated a design method for streamlined electric locomotives according to the principles of bionics. The crocodiles were chosen as the bionic object because of their powerful and streamlined head shape. Firstly, geometric characteristic lines were extracted from the head of a crocodile by analysing the head features. Secondly, according to the actual size requirements of the electric locomotive head, a free-hand sketch of the bionic electric locomotive head was completed by adjusting the position and scale of the geometric characteristic lines. Finally, the non- uniform rational B-splines method was used to establish a 3D digital model of the crocodile bionic electric locomotive, and the main and auxiliary control lines were created. To verify the drag reduction effect of the crocodile bionic electric locomotive, numerical simulations of aerodynamic drag were performed for the crocodile bionic and bluff body electric locomotives at different speeds in open air by using the CFD software, ANSYS FLUENT16.0.
    [Show full text]
  • Failure of Wheel on Locomotive SCT 008 Near Fisher, South Australia
    Failure of wheel on locomotive SCTInsert 008 document title Locationnear Fisher, | Date South Australia | 28 May 2011 ATSB Transport Safety Report Investigation [InsertRail Occurrence Mode] Occurrence Investigation Investigation XX-YYYY-####RO -2011- 0 09 Final – 3 July 2013 Released in accordance with section 25 of the Transport Safety Investigation Act 2003 Publishing information Published by: Australian Transport Safety Bureau Postal address: PO Box 967, Civic Square ACT 2608 Office: 62 Northbourne Avenue Canberra, Australian Capital Territory 2601 Telephone: 1800 020 616, from overseas +61 2 6257 4150 (24 hours) Accident and incident notification: 1800 011 034 (24 hours) Facsimile: 02 6247 3117, from overseas +61 2 6247 3117 Email: [email protected] Internet: www.atsb.gov.au © Commonwealth of Australia 2013 Ownership of intellectual property rights in this publication Unless otherwise noted, copyright (and any other intellectual property rights, if any) in this publication is owned by the Commonwealth of Australia. Creative Commons licence With the exception of the Coat of Arms, ATSB logo, and photos and graphics in which a third party holds copyright, this publication is licensed under a Creative Commons Attribution 3.0 Australia licence. Creative Commons Attribution 3.0 Australia Licence is a standard form license agreement that allows you to copy, distribute, transmit and adapt this publication provided that you attribute the work. The ATSB’s preference is that you attribute this publication (and any material sourced from it) using the following wording: Source: Australian Transport Safety Bureau Copyright in material obtained from other agencies, private individuals or organisations, belongs to those agencies, individuals or organisations.
    [Show full text]
  • PENNSYLVANIA RAILROAD ELECTRIC LOCOMOTIVE GG1 4800 National Historic Mechanical Engineering Landmark
    PENNSYLVANIA RAILROAD ELECTRIC LOCOMOTIVE GG1 4800 National Historic Mechanical Engineering Landmark Friends of GG1 4800 The American Society of Mechanical Engineers Railroad Museum of Pennsylvania Strasburg, Pennsylvania April 23, 1983 he GG1 was a remarkable design, and so The locomotive required two frames; one of the two pantographs. Steps at the ends successful, because of its integrative each frame was a one-piece casting from the of the prototype GG1 led to the pantographs T synthesis of innovations from many General Steel Castings Corporation and was on the roof. But, as long as a pantograph was fields of engineering — mechanical, electrical, machined by Baldwin at Eddystone, Pennsyl- raised and “hot”, access was prevented by a industrial. vania. The two frames, each nearly forty feet blocking plate at the top of the steps. Throwing In 1913, before the era of the GG1, the long, held three driver axle assemblies and a a lever swung the plate clear but caused the Pennsylvania Railroad decided to electrify its two-axle pilot truck. Driver axles fit into roller pantograph to de-energize by dropping. tracks in the vicinity of Philadelphia. The bearing boxes that could move vertically in system, at 11,000 volts and 25 hertz, expanded pedestal jaws in the frame. The driver axle Three pairs of General Electric GEA-627-A1 until by the early 1930s it stretched from New was surrounded by a quill on which was electric motors were mounted in each frame. York City south to Wilmington, Delaware, and mounted a ring gear driven by the pinions of Each pair drove one quill.
    [Show full text]
  • The Piedmont Service: Hydrogen Fuel Cell Locomotive Feasibility
    The Piedmont Service: Hydrogen Fuel Cell Locomotive Feasibility Andreas Hoffrichter, PhD Nick Little Shanelle Foster, PhD Raphael Isaac, PhD Orwell Madovi Darren Tascillo Center for Railway Research and Education Michigan State University Henry Center for Executive Development 3535 Forest Road, Lansing, MI 48910 NCDOT Project 2019-43 FHWA/NC/2019-43 October 2020 -i- FEASIBILITY REPORT The Piedmont Service: Hydrogen Fuel Cell Locomotive Feasibility October 2020 Prepared by Center for Railway Research and Education Eli Broad College of Business Michigan State University 3535 Forest Road Lansing, MI 48910 USA Prepared for North Carolina Department of Transportation – Rail Division 860 Capital Boulevard Raleigh, NC 27603 -ii- Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. FHWA/NC/2019-43 4. Title and Subtitle 5. Report Date The Piedmont Service: Hydrogen Fuel Cell Locomotive Feasibility October 2020 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. Andreas Hoffrichter, PhD, https://orcid.org/0000-0002-2384-4463 Nick Little Shanelle N. Foster, PhD, https://orcid.org/0000-0001-9630-5500 Raphael Isaac, PhD Orwell Madovi Darren M. Tascillo 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) Center for Railway Research and Education 11. Contract or Grant No. Michigan State University Henry Center for Executive Development 3535 Forest Road Lansing, MI 48910 12. Sponsoring Agency Name and Address 13. Type of Report and Period Covered Final Report Research and Development Unit 104 Fayetteville Street December 2018 – October 2020 Raleigh, North Carolina 27601 14. Sponsoring Agency Code RP2019-43 Supplementary Notes: 16.
    [Show full text]
  • Sali DIESEL-ELECTRIC LOCOMOTIVE Empresa Ferroviaria Andina S.A, Bolivia
    SALi DIESEL-ELECTRIC LOCOMOTIVE Empresa Ferroviaria Andina S.A, Bolivia At the end of 2017, the Andina-FCA Railway Company and Stadler Valencia signed a contract for the supply of the first three SALi locomotives to be used for freight transport services on its metric gauge railway network in Bolivia. SALi is a 6-axle diesel-electric locomotive with an ultra-lightweight design and with forefront technology, to successfully face the challenges entailed in operating on metre-gauge networks under conditions of great altitude (over 5,000 metres above sea-level) at a maximum speed of 100km/h, combining a high-power output at great altitude with reduced fuel consumption. It features 6 AC traction motors and two acoustic and heat-insulated driver’s cabs, to enhance comfort under extreme temperature conditions. Due to its design and performance, it is destined to become the benchmark locomotive of the Bioceanic Rail Integration Corridor which, crossing Bolivia, will link the Peruvian port of Ilo with the port of Santos, near Sao Paulo in Brazil. www.stadlerrail.com Stadler Rail Group Stadler Rail Valencia S.A. Ernst-Stadler-Strasse 1 Pol. Ind. Mediterráneo. Mitjera 6 CH-9565 Bussnang E-46550 Albuixech (Valencia) Phone +41 71 626 21 20 Phone +34 96 141 50 00 [email protected] [email protected] Technical features Vehicle data Technology – Based on proven models such as the EURO4000, UKLIGHT and Customer Empresa Ferroviaria Andina S.A EURODUAL. Region Bolivia – Suitable for operations at high altitude (over 5,000 m above
    [Show full text]
  • UKDUAL LOCOMOTIVE BRLL to Be Used by DRS, United Kingdom
    UKDUAL LOCOMOTIVE BRLL to be used by DRS, United Kingdom Beacon Rail Leasing Limited (BRLL) ordered 10 UKDUAL locomotives in August 2013 to be used by British operator Direct Rail Services (DRS) for both passenger and freight services. This locomotive – named Class 88 in the United Kingdom – is a dual-mode locomotive that can run on electrified lines under 25 kV AC overhead catenary with a power at rail of up to 4000 kW, but also has a diesel engine to run on non-electrified lines. It is a four-axle locomotive adapted to UK loading gauges, with AC/AC transmission and low axle load. It fully complies with all European standards regarding safety, emissions and environmental protection and with British regulations. The UKDUAL locomotive offers excellent flexibility to rail operators since the units can be operated on main lines as well as on secondary lines. www.stadlerrail.com Stadler Rail Group Stadler Rail Valencia S.A. Ernst-Stadler-Strasse 1 Pol. Ind. Mediterráneo. Mitjera 6 CH-9565 Bussnang E-46550 Albuixech (Valencia) Phone +41 71 626 21 20 Phone +34 96 141 50 00 [email protected] [email protected] Technical features Vehicle data Technology – Based on the UKLIGHT locomotive Customer BRLL/DRS – Multipurpose locomotive for passenger and freight Region United Kingdom applications Number of vehicles 10 – Adapted to UK gauges and regulations Commissioning 2017 – Caterpillar diesel engine C27 Stage IIB Locomotive type Dual-mode: electric/ – Electrical transmission manufacturer: ABB diesel-electric – AC traction
    [Show full text]
  • H2@Railsm Workshop
    SANDIA REPORT SAND2019-10191 R Printed August 2019 H2@RailSM Workshop Workshop and report sponsored by the US Department of Energy Office of Energy Efficiency and Renewable Energy Fuel Cell Technologies Office, and the US Department of Transportation Federal Railroad Administration. Prepared by Mattie Hensley, Jonathan Zimmerman Prepared by Sandia National Laboratories Albuquerque, New MexiCo 87185 and Livermore, California 94550 Issued by Sandia National Laboratories, operated for the United States Department of Energy by National Technology & Engineering Solutions of Sandia, LLC. NOTICE: This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government, nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees, make any warranty, express or implied, or assume any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represent that its use would not infringe privately owned rights. References herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government, any agency thereof, or any of their contractors or subcontractors. The views and opinions expressed herein do not necessarily state or reflect those of the United States Government, any agency thereof, or any of their contractors. Printed in the United States of America. This report has been reproduced directly from the best available copy. Available to DOE and DOE contractors from U.S. Department of Energy Office of Scientific and Technical Information P.O.
    [Show full text]
  • KSP 7 Lessons from Korea's Railway Development Strategies
    Part - į [2011 Modularization of Korea’s Development Experience] Urban Railway Development Policy in Korea Contents Chapter 1. Background and Objectives of the Urban Railway Development 1 1. Construction of the Transportation Infrastructure for Economic Growth 1 2. Supply of Public Transportation Facilities in the Urban Areas 3 3. Support for the Development of New Cities 5 Chapter 2. History of the Urban Railway Development in South Korea 7 1. History of the Urban Railway Development in Seoul 7 2. History of the Urban Railway Development in Regional Cities 21 3. History of the Metropolitan Railway Development in the Greater Seoul Area 31 Chapter 3. Urban Railway Development Policies in South Korea 38 1. Governance of Urban Railway Development 38 2. Urban Railway Development Strategy of South Korea 45 3. The Governing Body and Its Role in the Urban Railway Development 58 4. Evolution of the Administrative Body Governing the Urban Railways 63 5. Evolution of the Laws on Urban Railways 67 Chapter 4. Financing of the Project and Analysis of the Barriers 71 1. Financing of Seoul's Urban Railway Projects 71 2. Financing of the Local Urban Railway Projects 77 3. Overcoming the Barriers 81 Chapter 5. Results of the Urban Railway Development and Implications for the Future Projects 88 1. Construction of a World-Class Urban Railway Infrastructure 88 2. Establishment of the Urban-railway- centered Transportation 92 3. Acquisition of the Advanced Urban Railway Technology Comparable to Those of the Developed Countries 99 4. Lessons and Implications
    [Show full text]
  • Construction Supervision
    SAMBO ENGINEERING Corporate Profile To the World, For the Future Construction engineering is basically having big change as periodic requirements from “The 4th Industrial Revolution”. SAMBO ENGINEERING is trying hard to change and innovate in order to satisfy clients and react actively to the change of engineering market. SAMBO ENGINEERING provides total solution for the entire process of engineering such as plan, design, CM/PM, O&M in roads, railways, civil structures, tunnels & underground space development, transportation infrastructure & environmental treatment, new & renewable energy, urban & architecture planning for land development, water and sewage resource. Recently, from natural disaster such as earthquakes and ground settlement, in order to create motivation for stable profit system, we adapt BIM, perform topographical survey using Drones, design automation using AI, underground safety impact assessment as well as active investment for new & renewable energy such as solar and wind power plant. We accumulate lots of technologies and experience from R&D participation which develops and applies new technology and patent as well as technical exchange with academies and technical cooperation with major globalized engineering companies. SAMBO ENGINEERING will be one of the leading engineering companies in the future by overcoming “The 4th Industrial Revolution”. Algeria - Bir Touta~Zeralda Railway Project Armenia - Project Management for South-North Expressway Project Azerbaijan - Feasibility Study for Agdas~Laki, Arbsu~Kudamir~Bahramtepe
    [Show full text]
  • Effective 10/21/2016
    Association of American Railroads SAFETY AND OPERATIONS MANUAL OF STANDARDS AND RECOMMENDED PRACTICES SECTION A, PART I TABLES OF CONTENT Compiled under the direction of the Committees responsible for the subjects shown herein. EFFECTIVE 10/21/2016 Published by The Association of American Railroads 425 Third Street, SW., Washington, D.C. 20024 © Copyright Association of American Railroads Printed in U.S.A. EFFECTIVE 10/21/2016 EFFECTIVE Copyright © 2016 by the Association of American Railroads (AAR) Safety and Operations 425 Third Street SW Suite 1000 Washington, DC 20024 All rights reserved, including the right to reproduce this book in any form. It is the AAR’s intention that this publication be used to promote the objectives of the AAR and its members for the safe, efficient, and uniform interchange of rail equipment in North America. To this end, only excerpts of a rule or specification may be reproduced by the purchaser for their own use in promoting this objective. No portion of this publication may be displayed or otherwise made available to multiple users through any electronic distribution media including but not limited to a local area network or the Internet. No portion may be sold or used for advertisement or gain by any entity other than the AAR and its authorized distributor(s) without written permission from the AAR. AAR Manual of Standards and Recommended Practices Tables of Content ORDERING INFORMATION Copies of the various sections of this manual can be obtained as follows: ORDERS FOR Publications Department PUBLICATIONS Transportation Technology Center, Inc. P.O. Box 11130 55500 DOT Road Pueblo, CO 81001 Email: [email protected] Phone: Toll-free 877-999-8824, Direct 719-584-0538 Fax: 719-584-7157 TTCI Web page: http://www.aar.com Online ordering: http://www.aarpublications.com/ CIRCULAR Subscriptions to Circular Letters of the AAR Safety and Operations’ Technical Services are available in LETTER hardcopy or electronic format (online access via AAR’s Web page at http://aarcirculars.aar.org.
    [Show full text]
  • Comotive: Preliminary Design Study
    WAYS l DE ENERGY STORAGE STUDY Volume IV - Dual Mode Locomotive: Preliminary Design Study L. J. Lawson L. M. Cook AIRESEARCH MANUFACTURING COMPANY OF CALIFOR,NIA Torrance CA 90509 FEBRUARY 1979 FINAL REPORT DGCUMEN'T 15 /V&II.ABLE TO TkE PUBLIC TPIROLJGH 7Ht NATICJNA1 TECHNICAL. INFOHMATICIN SERVICE. SPRINGFrELD, VIRGINIA 72161 $1 I Prepared for I1 4C -<I, U,S, DEPARTMENT OF TRANSPORTATION FEDERAL RAILROAD ADMINISTRATION ?- - ', offj ce of Research and Development ;(TF Washington DC 20590 I975 I il .A47 I AS'SOCIAT~ON AM~<@c~~; fjd&jj,p~7P. F' " L i, t-4, * I :5 IV- I r- x----- '-$-;7% Y I w U>3 aq )P <>..? *F$p p-.?q&' 4 *BECB~~@~C;~I\~g lkdLfi,.&~5+~ 4 \ AESEARC~ TEST CEPAB~,QE,$~- 3 4I PUEgio, ca 81001 ,. NOTICE This document is disseminated under the sponsorship of the Department of Transportation in the interest of information exchange. The United States Government assumes no I iab i I ity for its contents or the use thereof. The United States Government does not endorse products or manufacturers. Trade orrnanufacturers' names appear . herein sol el y because they are considered essential to the object of this report. 1 Technical Heport Documentation Page ......... R.port No. _- R.cipi.nt', Cotolo~ No. l. 2. C;overnmonf Ace.'.'on No. 3. ~~\)9 'I,. 1. FRA/ORD-78/78,IV ,)\)\..- - 4. Titl" ond Subtitl. 5. Report Dote WAYSIDE ENERGY STORAGE STUDY February 1979 Volume IV - Dual-Mode Locomotive: 6. Performing Organiz.atiQn Code Preliminary Design Study --- -_. B.a P• .,fof'minOi O"'Qantza'.on Re~Qr.
    [Show full text]
  • How Should Techno Parks Innovate to Support Start-Ups and Small and Medium-Sized Enterprises Effectively in the Era of the Fourth Industrial Revolution?
    https://doi.org/10.7165/wtr17a0829.16 OPEN ACCESS How Should Techno Parks Innovate to Support Start-ups and Small and Medium-Sized Enterprises Effectively in the Era of the Fourth Industrial Revolution? Inje Cho1, Eung-Hyun Lee2, Hoonje Cho3* 1 CEO of Actnerlab 2 Researcher of World Technopolis Association 3 Invited Professor of Chungnam National University Abstract In 1995, the Republic of Korea started to establish Techno Park (TP) in order to develop the regional industry while promoting the balanced development of the land. By 2008, 18TPs were established nationwide and have become cradles for developing local industries. And recently evolved forms of TP such as Daedeok Techno Valley and Pangyo Techno Valley emerged. In addition, 19 Centers for Creative Economy and Innovation (CCEI) were established nationwide and Tech-Incubator Program for start-ups (TIPS) was introduced to support and mentor start-ups. TPs in Korea become bureaucratic in course of time, and the new trial of innovation of TP is needed. In Korea, professional TIPS-accelerators mentoring and investing start-ups have a history of only five years. But they support and mentor start-ups efficiently, and have obtained good results. In this paper, we propose that TP attract TIPS-accelerators actively and collaborate with each other to support and mentor start-ups and SMEs effectively. Keywords Technopark, TIPS, Accelerator, Start-up and SMEs, Mentoring and nurturing Ⅰ. INTRODUCTION government’s dedication to the development of science and technology over the last 40 years. It is a powerful example of Developments in science and technology can have pro- how the growth of science and technology in a country is found effects on a country’s economic growth and employ- linked to its economic development.
    [Show full text]