Environmental Impact Assessment For
Total Page:16
File Type:pdf, Size:1020Kb
ENVIRONMENTAL IMPACT ASSESSMENT FOR JINNAH HEAVENS BUILDING PROJECT Final Report November 2018 Submission to: Environmental Protection Agency Government of Sindh Consultants Environmental Consultancy and Services 223/F, Block-2, P.E.C.H.S. Karachi-75400 Ph: 021-34303165 November 2018 Submitted By Prime Properties Plot No. 21, Sector 53-A, Deh Dozan Tappu Gujro, Scheme 33, Malir, Karachi. Construction of Jinnah Heavens Building Project Environmental Impact Assessment EXECUTIVE SUMMARY M/S Prime Properties (PPS) is the proponent of Jinnah Heavens Building Project, headed by Mr. Abdul Jabbar. The Project Proponent is a well-known builder who aims to provide an affordable and luxurious standard residential project in Cantonment Board Malir, Karachi. The proposed project, “Jinnah Heavens”, is located at Plot No. 21, Sector 53-A, Deh Dozan Tappu Gujro, Scheme 33, Malir, Karachi. The proposed project area is shown in below figure. The Proposed project was designed initially as G+10 floors, Ground and First floors (Parking Area) Second to Tenth Floor (Flats +Circulation Area). In compliance with Honorable Supreme Court order dated 16.03.2017 project has been revised and building plan has been approved by Cantonment Board Malir, as follows; G+ Seven floors, Ground and First floors will be used for Parking and Second to Seventh floors will have flats +circulation area only. Plot is measuring 1.0 Acre 32 ghunta or 8712.80 Sq.yds. The EIA Report has been prepared in compliance with the requirements of Sindh Environmental Protection Act, 2014 and Sindh EPA (IEE and EIA) review Regulation 2014, for submission to the Sindh Environmental Protection Agency for decision on the Project Jinnah Heavens. The Honorable Supreme Court of Pakistan, in a public interest Constitution petition filed by a concerned citizen constituted a single member judicial commission of a judge of High Court of Sindh (SHC) to probe and record its findings in regard to providing/supply of clean water to the residents of Sindh besides the deteriorating condition of sanitation in Sindh. The Commission is also mandated to examine the statutory role played by the Sindh Environmental Protection Agency on the issues mandated by the Sindh Environmental Protection Act, 2014. The Commission is further empowered to examine the officials or material from relevant agencies / organizations inclusive of all the Civic and land owing agencies. The SC while making November, 2018 i Construction of Jinnah Heavens Building Project Environmental Impact Assessment conclusion and recommendations of the Commission part of its order dated 16.03.2017 directed the Chief Secretary Sindh to form a task force to comply with the recommendations made by the Commission in its report. The SC in same order directed the Commission to continue working to ensure compliance of the recommendations contained in its report. The Commission is still working and submits reports on state of compliance in the SC. In compliance of the order dated 16.03.2017 passed by the Supreme Court of Pakistan (SC) in C.P. No. 38 of 2016, the SBCA and other regulators including Cantonment Boards has imposed a ban on construction of multistoried/high rise buildings of more than ground + 6 (excluding Parking Floors) in the Province of Sindh. That the Applicant will at this stage be applying for such permission with the caveat that it will only process it application for the additional stories subject to the order dated 16. 03.2017 being modified or vacated. It would also imperative to mention here that EIA as a tool was created to be used at the planning stage in line with the precautionary principle – a principle initiated by the Rio Declaration for better and sustainable development. This Environmental Impact Assessment (EIA) has been conducted with above objective to collect information about environmental effects of the project. For Baseline information the project area was surveyed to collect primary data. During the field visits, information was collected on environmental sensitivities in the areas, existing roads, neighborhood attributes, and public services. Information on ambient air quality, ambient noise quality, traffic assessment, adjoining roads, specific geotechnical conditions were obtained from the primary sources; whereas, the weather historical data was obtained from secondary sources. Pre-construction Period: Environmental assessment documentation and the Environment Management Plan (EMP) are prepared and approved during the pre- construction period and The EMP’s mitigation (EmiT) Table-18 and monitoring (EmoT) Table 19, identify actions to be undertaken by the PPS management. Prime Properties management will provide a briefing to Staff on the implementation requirements of the EMP. Most of the environmental impacts during design phase such as dislocation of peoples, change of land use, loss of trees and vegetation, relocation of existing utilities, and impacts on archeological sites are neutral and do not require mitigation measures. Construction Period: The Construction phase EMP actions focus mostly on project activities for construction and the management of worksites and equipment and people. Specifically this part of the EMP focuses in defining ways to minimize effects November, 2018 ii Construction of Jinnah Heavens Building Project Environmental Impact Assessment such as top soil erosion, wastewater discharges, air emission release, noise, disposal of demolition / construction debris, disturbance to traffic flow, water consumption and demand, fuel storage, safety of workers and public during construction, employment and business opportunity. Appropriate mitigation protocols are defined in this EIA report. By applying careful building design all other potential impacts can be avoided. However, care will need to be taken during construction activity. Operation Period: Operation period actions focus on confirming that the PPS management has completed the EMP tasks required and that the after residence /occupancy of the building will improve lifestyle of the residents of the building and basic issues like solid waste management, wastewater discharge, provision of sustainable energy, provision of utilities and their consumption, and any fire hazard, sustainable plantation, exhaust ventilation in parking and employment generation will be managed and monitored and per EMP provided in the report. A schedule of activities associated with construction has been prepared and the potential environmental impacts of each activity assessed. For each activity, recommended mitigation and monitoring actions have been identified. These are covered in the EMP. All impacts are minor and able to be mitigated. This EIA study authors concluded that the proposed building project will not lead to significant adverse environmental and social impacts. Careful implementation of the EMP will ensure that environmental impacts are managed and minimized. The project meets all statutory requirements. The environmental safeguard implementation will have to be monitored by concerned persons, including the Project Manager and EHS Officer of PPS. Due diligence, with mandatory coordination among various stakeholders will further ensure mitigation of any adverse impacts. November, 2018 iii Construction of Jinnah Heavens Building Project Environmental Impact Assessment Table of Content CHAPTER 1: Introduction .............................................................................................. 1 1.1 Background ...................................................................................................... 1 1.2 Project Proponent (Prime Properties) ............................................................ 1 1.3 Project Overview (Jinnah Heavens) ................................................................ 2 1.4 Approvals Status .............................................................................................. 3 1.5 Ownership ....................................................................................................... 4 1.6 Legal Aspects of EIA Study .............................................................................. 4 1.6.1 Legislative Requirement .............................................................................. 4 1.6.2 Justification for EIA Study ............................................................................ 4 1.6.3 Other Regulatory Requirements ................................................................. 5 1.7 Approach and Methodology of EIA Study ....................................................... 5 1.7.1 Scope of EIA Study ....................................................................................... 5 1.7.2 Purpose and Objectives ............................................................................... 6 1.7.3 Methodology ............................................................................................... 6 1.7.4 Phases of Study ............................................................................................ 7 1.8 Report Structure ............................................................................................ 10 1.9 EIA Study Team.............................................................................................. 10 1.10 Contact Details ........................................................................................... 11 CHAPTER 2: Environmental Legislation ....................................................................... 12 2.1 Introduction ..................................................................................................