RESUME

OF

SOILMAT ENGINEERS

NAME OF THE FIRM : M/S SOILMAT ENGINEERS

ADDRESS : B‐136 BLOCK ‐1, OPP. N.E.D UNIVERSITY, MAIN UNIVERSITY ROAD, GULISTAN‐E‐JAUHAR, .

TELEPHONE NO : +92 ‐ 021‐34623161 – 62 +92 ‐ 021‐35458674

FAX NO. : +92 – 021‐34632483

MOBILE NO : 0300 ‐ 8207186

N. T. N. No : 0525210‐5

SALES TAX NO (STN) : S0525210‐5

BANKERS : MEEZAN BANK LIMITED BLOCK‐1 GULISTAN‐E‐JAUHAR BRANCH

WEBSITE : www.soilmatengineers.com

EMAIL : [email protected] : [email protected]

INTRODUCTION:

For a long time, people in the Civil Engineering business have felt the need for a secondary consultancy to provide technical assistance to the professional engineers. Where an engineering firm finds its resources insufficient to deal with the problems in a project, it has to either forgo the contract, or hire technical help from a foreign partner or consultant. At present, many difficult engineering problems are being tackled with the help of foreign consultants.

SOILMAT ENGINEERS is a group of highly trained professionals with degrees from and USA This Company has been launched to serve the civil engineering profession at both primary and secondary levels. We offer a high-tech backup to the civil engineering business in the country. We provide a broad range of services to our clientele composed of individuals, builders, architects, consultants, contractors and other allied agencies.

The most important activity being provided by the company is execution of Geotechnical / Geological Investigations. The company has capabilities of conducting Geotechnical Investigation both in off-shore and on-shore environments. The company to its credit has more than 1000 projects of Geotechnical Investigation all over Pakistan including landmark projects such as proposed 78 storied KPT Towers, 50 storied IT Tower, Tunnel, various jetties in and , , , Coastal Highway, Transmission Lines, Power Plants (upto 1100 MW), Largest Copper and Gold Mines project in Pakistan (4th largest in the world), Dams, Reservoirs, Industrial Buildings, Wind Power Projects etc. etc.

The company also provides laboratory testing facilities for Soil, aggregate, cement, bitumen, asphalt and concrete. This is done to study the suitability of material. A full fledged materials and geotechnical laboratory is present at company’s head office. The company also runs site laboratory of various contractors, consultant and owners for Quality Assurance and quality control, these laboratories has been established for various multinational companies such as Taisei Corporation (Japan), Saitagami Corporation (Japan), Lasmo Oil (UK) ENI (Italy), BHP (Australia) SKB (Pakistan) etc.

MANAGEMENT OF THE COMPANY

MR. AL-KAZIM MANSOOR CHIEF EXECUTIVE B.E. (CIVIL), M.S. (GEOTECH. USA) P. E.

BIO - DATA

OF

KEY PERSONNEL

ENGR. AL KAZIM MANSOOR, CHIEF EXECUTIVE OF M/S SOILMAT ENGINEERS

EDUCATION: MS in CIVIL ENGINEERING from Louisiana State University, Baton Rouge, LA., USA with Major in Geotechnical Engineering in 1985.

Graduate Courses in Geotechnical Engineering from University of Washington, Seattle, WA., USA in 1983.

BE in CIVIL ENGINEERING from NED University of Engineering & Technology, Karachi with Distinctions in 1983.

RESEARCH AND PUBLICATIONS:

Classifications of Marine Sediments using instrumented Dynamic Penetrometer, MS Thesis, Louisiana State University, Baton Rouge, LA., USA, (A project funded by US Navy).

PROFESSIONAL CERTIFICATION:

Registered Consulting Engineer # Consult / 638, from PAKISTAN ENGINEERING COUNCIL REGISTERED PROFESSIONAL ENGINEER # CIV/12329 from Pakistan Engineering Council. REGISTERED CONSULTING GEOTECHNICAL ENGINEER # GE – 02 – 09 from KARACHI BUILDING CONTROL AUTHORITY. EXPERIENCE: 1992 to Date

Chief Executive of M/S Soilmat Engineers, B 136 Block # 1 Gulistan–e-Jauhar Karachi, a multi dimensional firm conducting soil investigation, piling, pile load tests and a fully equipped laboratory also providing Geotechnical and Material Testing Facilities.

1985 to 1992

Senior Geotechnical Engineer at M/S F&W Engineers Group (Pvt.) Ltd. a leading firm of Geotechnical Engineering dealing in off-shore and on-shore soil Investigations. Piling, Pile Load Tests, De watering and Structural Investigations.

1985 to 1992

Graduate Research Assistant Louisiana State University Director of Civil Engineering Baton Rouge LA. MAJOR PROJECTS HANDLED:

1. Geotechnical Investigation for Process Plant & Infrastructure at Reko Diq Baluchistan, for M/s Tethyan Copper Co. (Pvt.) Ltd. (Consultants M/s SNC-LAVALIN. (Canada).

2. Geotechnical Investigation for Water Feasibility Study at Reko Diq, Baluchistan for M/s Tethyan Copper Co. Consultant: M/s SMEC (Australia)

3. Geotechnical Investigation for Proposed 78 storied KPT Towers at Mai Expressway, Karachi Pakistan in association with Mott Mc Donald International (UK)

4. Geotechnical Investigation for Port Qasim, LNG Terminal Client: M/s Single Bury Moorings (USA).Including off shore and on shore works.

5. Geotechnical Investigation for 1200 MW Coal fired Power plant at Gadani Balouchistan Pakistan, M/s AES USA. (Offshore & Near shore).

6. Geotechnical Investigation for wind Farm Project for Following Companies;

a) Zorlu Power (Turkey), Preliminary & Final Investigation. b) Green Power (Pakistan), Preliminary & Final Investigation c) Master Power (Pakistan) Preliminary Investigation. d) Tanaga Generasi (Malaysia), Preliminary & Final Investigation e) Fauji Foundation (Pakistan), Preliminary & Final Investigation f) Beacon Energy (Pakistan), Preliminary & Final Investigation

7. Geotechnical & Geophysical Investigation for CPF and Gas Gathering system for MOL (Pakistan) at Kohat / Karak, Consultant: M/s VECO (UAE).

8. Geotechnical Investigation for Pro Gas Terminal at Port Qasim (onshore & Off shore) Client: M/s Pro Gas Ltd.

9. Geotechnical Investigation (Onshore & Near Shore at TRL Refinery Port Qasim for Descon Engineering.

10. Geotechnical Investigation at Gwader Port Project, Gwader Balouchistan Pakistan for M/s Techno Consultant

11. Geotechnical Investigation at Kohat Tunnel and Access Road Project for M/s Taisei Corporation (Japan). 12. Geotechnical Investigation for N-65 Kararo Wadh Section for M/s Taisei Corporation Japan.

13. Consulting Material & Geotechnical Engineering for Indus Highway Project Contract Nos. 1 (Kotri - Manjhand) and contract # 6 (Ghauspur – Shorinallah) with M/S Saita Gumi Co. Ltd. (JAPAN). Established fully functional Material Testing Laboratory at site, General Supervision for contractor for Quality Control,

14. On shore & off shore Investigation for 300 MW Barge Mounted Thermal Power Plant for M/s SABAH SHIPYARD BDN (MALAYSIA).

15. Geotechnical Investigation for 300 MW KESC Thermal Power Plant in Association with M/s SOGELEG (France).

16. Geotechnical Investigation for 50 storied IT Tower at Civic Centre Karachi for M/.s IJM (Malaysia).

17. Geotechnical Investigation for K-II 100 mgd conduit from Gharo to Karachi for M/s Mott Mc Donald International U.K.

18. Geotechnical Investigation for K-III 100 mgd conduit from Gharo to Karachi for M/s Techno Consultant.

19. Geotechnical Investigation for Right Bank out Fall Drain project from Sehwan to sea for M/s M.M Pakistan Ltd.

20. Geotechnical Design Consultant 10, 000 cusec Rainee Canal from River Indus to Thatta District for Techno Consultant.

21. Geotechnical Investigation for Bridge for Lasmo Oil (UK) Pakistan.

22. Geotechnical Engineer / Consultant for more then 1000 Projects various magnitude.

PILE DESIGN EXPERIENCE:

1. Bridge over River at Road, Karachi

2. Indus Highway Contract No. 1 Kotri to Manjhand Section (9 Bridges sites) for M/s Saitagumi Co. Ltd.

3. Indus Highway Contract No. 6 Shori Nallah Bridge (A 10 span bridge on Punjab - border). For National Highway Authority. Pile design for Dargah Sehwan (SINDH) for M/S National Construction. Pile design for 18 stoneyed building at Islamabad for M/S Naqvi & Siddique Associates.

4. Bridges on Contract No. 7 of Indus Highway Project for National Highway Authority & STFA (Turkey). 5. Bela - Awaran Road Project (13 bridges along the route) In association with M/S STV LYON & ACE.

6. Quaidabad Overpass Bridge, Karachi, client (Karachi development Authority)

7. Akra Kaur Bridge, Gwader, Baluchistan (C&W Department Govt. of Baluchistan)

8. Inam Bostan Bridge, Naushki (C&W Department Govt. of Baluchistan).

9. Kech Kaur Bridge, Turbet. (In association with USAID Mission to Pakistan and M/S Loya Associates).

10. Gwader Fish Harbour (In association with M/S Gifford and Partners and M/S Techno Consult).

11. 5 bridges on . (In association with M/S A.A. Associates).

12. Pile Design of Railway Bridges for Pakistan Railway (Jacobabad - Rohri Section).

13. Pile Design for several Multistoried Buildings in Karachi including Belle-View Appt. Noman Complex, Sunny view Appt., Cresent Appts., Chinese Chancellory, Allahwalla Town, Millrock Quarries, PNS Mehran, Etc.

14. Pile Design for various other commercial complexes, bridges, industrial units etc.

COMPUTER LANGUAGES:

BASIC AND FORTRAN (have worked on several Main Frame Computers, Mini and Personal Computers). investigations, Piling, water investigation, grouting and Laboratory testing.

Responsibilities included top supervision of all of firms off- shore and on-shore projects. Preparation of Geotechnical Reports, Foundation Designs, Designs and supervision of Water Investigation Schemes, Supervision of Piling works. Overall Supervision of Geotechnical and Material testing works.

Summer 1984 & 1985

Geotechnical Design Engineer with Dr. Joe W. Suhayda, Baton Rouge LA. USA. Responsibilities included Design of foundations and Insitu Testing Instruments.

1984 to 1985

Graduate Research Assistant, Department of Civil Engineering, Louisiana State University, Baton Rouge, LA. USA., Responsibilities included Research for Designing of new instruments for Classification of Marine Sediments and working towards the Degree of Master of Science.

LIST OF PERSONNEL

LIST OF STAFF (LABORATORY)

1. MR. EJAZ SHAH LABORATORY MANAGER & MATERIAL ENGINEER B. Sc (Hons.) M. Sc. (Geology) Over 15 years of experience in Testing of Concrete, Soils and Asphalt.

2. MR. MUZNABEEN ASST. LAB. MANAGER D.A.E. (CIVIL)

3. MR. M. ASLAM ISHAQ CHIEF GEOLOGIST & SOIL ANALYST B.Sc. (Hons.), M. Sc. (Geology), 1965

4. MR. IMTIAZ-UL-HASAN SENIOR GEOLOGIST M. Sc. (Geology)

5. MR. ARSHAD MEHMOOD GEOLOGIST M. Sc. (Geology)

6. MR. ARIF RASHEED SR. LAB. TECHNICIAN

7. MR. MOHAMMAD OBAID SR. LAB. TECHNICIAN

8. MR. FAHAD RAFIQ LAB.TECHNICIAN

9. MR. HIDAYAT KHANZADA LAB.TECHNICIAN

10. MR. SHUJAT KHANZADA LAB.TECHNICIAN

11. MR. MOHSIN KHAN LAB.TECHNICIAN

12. MR. YASEEN GUL LAB.TECHNICIAN

13. MR. ABDUL BASIT LAB.TECHNICIAN

14. MR. MUHAMMAD AMEEN ASSISTANT ADMIN & HR

15. MR. INAYAT ALI SR. COMPUTER EXECUTIVE

16. MR. ASHGAR ALI OFFICE BOY

17. MR. KHALID HUSSAIN OFFICE BOY

18. MR. GULZAR AHMED OFFICE BOY

LIST OF STAFF DRILLING SECTION

1. RAMZAN FOREMAN

2. ABDUL QAYYUM MACHANIC

3. ZAHID HUSSAIN WELDER

4. JANBAR DRILLER

5. ASIF DRILLER

6. MUMTAZ DRILLER

7. BASHAR BORE MASTER

8. ABDUL RAFIQUE BORE MASTER

9. SHADI KHAN STORE KEEPER

10. MUHAMMAD ANWAR STORE HELPER

WORKS EXECUTED BY THE COMPANY

LIST OF THE PROJECTS HANDLED Major Projects completed in 2019 (Subsoil Investigations)

1. Geotechnical Investigation Sea Gardens on Plot No. RP-03, DHA Phase VIII (Ext.) Karachi. (December, 2019) Client: M/s Emaar Giga Karachi Limited

2. Geotechnical Investigation Report on Sewerage Treatment Plant (2.0 MGD), Qublai Khan Restaurant DHA Phase-V Ext., Karachi. (December, 2019) Client: M/s AMCORP-ORIENT (JV)

3. Geotechnical Investigation Report Factory on Plot Nos. H/69, H/70, H/71 & H/72, Sindh Industrial Trading Estate, (S.I.T.E-II), Super Highway Karachi. (November, 2019) Client: Mr. Abdul Baseer

4. Geotechnical Investigation Report on Muscat Royal Enclave, on Survey # 208/2 & 209/2, Bairot, near Hub Chowki, Hub Town Baluchistan. (November, 2019) Client: M/s Atta Builders & Developers

5. Geotechnical Investigation Report on Falcon Mosque located inside PAF Falcon Complex, on Street # 18, Shaheed-e-Millat Road, Karachi. (November, 2019) Client: Mr. Zubair Shamim

6. Geotechnical Investigation Report on Jamia Masjid Saad Bin Abi Waqas, located on Plot # 11, Khayaban-e-Jami, Phase-4, D.H.A., Karachi. (October, 2019) Client: Jamia Masjid Saad Bin Abi Waqas

7. Geotechnical Investigation Report on Warehouse on Amalgamated Plot # W2/57/I & W2/57/II, North Western Industrial Zone, Port Qasim, Karachi. (October, 2019) Client: Mr. Muhammad Haroon Pothiawala

8. Geotechnical Investigation Report on Karachi Neighbourhood Improvement Project (KNIP), Rehabilitation & Improvement of Chowrangi to Thaddo Nallah Bridge, including dualization of Bridge, Khokrapar Road, Malir (Package-A). (October, 2019) Client: M/s Naseeb Khan and Brothers & Mac Engineering & Contractors (JV)

9. Geotechnical Investigation Report on Sea Breeze Complex, Plot # 108 Depot Line, M.A. Jinnah Road, Karachi. (October, 2019) Client: Mr. Adnan Dewan (G.S. Sea Breeze Complex Owners Welfare Association Regd.)

10. Geotechnical Investigation Report on Plot # BS-9, Block-14, F.B. Area, Karachi. (September, 2019) Client: M/s Taha Builders

11. Geotechnical Investigation Report on Proposed Bread Factory Plot # L/5/1, Block # 21 Scheme # 16, F.B. Area, Karachi. (September, 2019) Client: M/s Golden Harvest Food 12. Geotechnical Investigation Report on Under Ground Water Tank on Plot # F-73, near Ghagar Phatak, Eastern Industrial Zone, Port Qasim, Karachi. (September, 2019) Client: M/s North West Trading Services

13. Geotechnical Investigation Report on Installation of Weather Surveillance Radar Rohri Sukkur, Sindh. (August, 2019) Client: M/s International Meteorological Consultant Inc.

14. Geotechnical Investigation Report at Amna Tower Plot # CS 16-20, Scheme # 33, Karachi. (August, 2019) Client: Mr. Muhammad Siraj Jokhio.

15. Geotechnical Investigation Report on Plot # 07, Precinct: 33 Street: 92-B, Bahria Town, Karachi. (July, 2019) Client: Syed Ather Ali Ahmed

16. Geotechnical Investigation Report on Hotel in Sanghar Housing Project, , Balouchistan. (May, 2019) Client: M/s Sanghar Housing Society. Consultant: M/s Consultant Group Holdings (Pvt.) Ltd.

17. Geotechnical Investigation Report on Extention of Prime Foods (Pvt.) Ltd. Plot # G/5-(A), situated at SITE area, near Nara Jail, Hyderabad, Sindh. (May, 2019) Client: M/s Prime Foods (Pvt.) Ltd.

18. Geotechnical Investigation Report on Extention of Lucky Textile Mills (LTM) # 02, F. B. Area, Karachi. (March, 2019) Client: M/s Lucky Textile Mills Ltd.

19. Geotechnical Investigation Report on Factory Shed on Plot # M-35, H.I.T.E, Hub, City, Baluchistan. (March, 2019) Client: M/s Dysin Automobiles Ltd.

20. Geotechnical Investigation Report on Extention of Govt. Degree Boys College Sector: 5-L, Township, Karachi. (March, 2019) Client: Education Works Deptt., District Central Karachi.

21. Geotechnical Investigation Report on Rehabilitation of Out-fall Area Sheet Piling at KPC for KTPS Ibrahim Hydri, , Karachi. (February, 2019) Client: M/s Exponent Engineers

22. Geotechnical Investigation on Extention of Aga Khan Hospital at Karimabad, Karachi. (February, 2019) Client: M/s Hospital (AKUH)

23. Geotechnical Investigation on Vehicular Bridge at Aga Khan University Hospital, Stadium Road Campus, Karachi. (January, 2019) Client: M/s Aga Khan University Hospital (AKUH)

LIST OF THE PROJECTS HANDLED Major Projects completed in 2018 (Subsoil Investigations)

1. Geotechnical Investigation Report on Oil Pier-1 Karachi Port Trust (KPT), Karachi. (December, 2018) Client: M/s Techno Consult International

24. Geotechnical Investigation Report on 50 MW AC Solar Power Plant near Gwadar in Balouchistan. (December, 2018) Client: M/s IBVOGT GMBH (Germany)

25. Geotechnical Investigation Report on High-Rise Building on Plot # A-1, Block-A, Sindhi Muslim Co-operative Housing Society, Karachi. (December, 2018) Client: M/s Alliance Consultants

26. Geotechnical Investigation Report on High-Rise Building on Plot # 9-B, Block-A, Sindhi Muslim Co-operative Housing Society, Karachi. (December, 2018) Client: M/s Alliance Consultants

27. Geotechnical Investigation Report on Various Buildings Structures at BDA Complex & Training Auditorium at Gadani, Balouchistan. (December, 2018) Client: M/s Consultant Group (CG)

28. Geotechnical Investigation Report on Fisheries Allied Industries / (Fish Processing Unit) on Plot # A-44, Korangi Fisheries Harbour Authority, Karachi. (October, 2018) Client: M/s Friends Food Export Co.

29. Geotechnical Investigation Report on Karachi Bus Rapid Transit (BRT), Redline Corridor from Mazar-e-Quaid to Malir Halt, Karachi. (September, 2018) Client: M/s MM Pakistan (Pvt.) Ltd.

30. Geotechnical Investigation Report on Multi-storeyed building on Plot # FL-04, Sub- Sector-F, Sector # 05, Scheme # 41, , Karachi. (September, 2018) Client: Mr. Ghulam Mohiuddin & Others.

31. Geotechnical Investigation Report on 18 MW Solar Power Project, Mankera Bhakkar, Punjab. (August, 2018) Client: M/s IBVOGT GMBH

32. Geotechnical Investigation Report on LPG Bulk Storage Terminal, at Plot # SP- LPG/Oil/04, North Western Industrial Zone, Port Qasim, Karachi. (August, 2018) Client: M/s Techno Consult International

33. Geotechnical Investigation Report on Single Storeyed Pre-Engineered Building on Plot Survey Nos. 542, 543, 544 & 545, Situated in Deh: Joreji, Taluka Bin Qasim, Karachi. (August, 2018) Client: M/s Ghandhara Nissan Ltd.

34. Geotechnical Investigation Report on Extention of Existing Offices of Main Building at Dawood University of Engineering and Technology, M. A. Jinnah Road, Karachi. (August, 2018) Client: M/s Dawood University of Engineering and Technology

35. Geotechnical Investigation Report on Pakistan LEPCL 660MW CFPP Test Pile Project Port Qasim, Karachi. (July, 2018) Client: M/s SYNOHYDRO Foundation Corporate Ltd.

36. Geotechnical Investigation Report on SPEL Karachi Plant on Plot # DSU-12A, Sector # II, Pakistan Steel, Down Street Industrial Estate, Port Qasim Karachi-50. (June, 2018) Client: M/s Synthetic Products Enterprises Ltd. (SPEL)

37. Geotechnical Investigation Report on Karachi Bus Rapid Transit (BRT), Redline Corridor, Bus Depot No: 01, Gulistan-e-Jauhar, Bus Depot No: 02, Malir Halt, Karachi. (May, 2018) Client: M/s MM Pakistan (Pvt.) Ltd.

38. Geotechnical Investigation Report on K-IV Greater Karachi Bulk Water Supply Scheme Jhampir, Thatta, Sindh. (May, 2018) Client: M/s KWSB Contractor: M/s 757 Construction Team Engineers (FWO)

39. Geotechnical Investigation Report on Aqua-duct at RD: 60+790 to RD: 61+ 180 for K-IV Greater Karachi Bulk Water Supply Scheme at Jhampir, Thatta, Sindh. (May, 2018) Client: Section 757 Construction Team of M/s Frontier Works Organization (FWO).

40. Geotechnical Investigation Report on Pumping Station, at chainage: 5+450, K-IV Greater Karachi Bulk Water Supply Scheme at Jhampir, Thatta, Sindh.(May, 2018) Client: Section 757 Construction Team of M/s Frontier Works Organization (FWO).

41. Geotechnical Investigation Report on LPG Storage Terminal on Plot # B-27, North Western Industrial Zone, Port Qasim, Karachi. (May, 2018) Client: M/s Hascol Petroleum Ltd.

42. Geotechnical Investigation Report on Office Building / Head Quarter of HESCO, near 132 KV GIS Colony, HESCO, Hyderabad, Sindh. (February, 2018) Client: M/s EA Consulting (Pvt.) Ltd.

43. Geotechnical Investigation Report on Hascol Bulk Oil Storage Installations at Machike “C” Distt. Sheikhupura, Punjab. (January, 2018) Client: M/s Hascol Petroleum Ltd.

44. Field Geological Investigation Logs on North Free Zone Gwadar, Baluchistan. (January, 2018) Client: M/s CCCC-FHDI Engineering Co. Ltd.

LIST OF THE PROJECTS HANDLED Major Projects completed in 2017 (Subsoil Investigations)

1. Geotechnical Report on Karachi Bus Rapid Transit (BRT), REDLINE Corridor, Mazar-e-Quaid to Shahra-e-Qaideen. (December, 2017) Client / Consultant: M/s MM Pakistan (Pvt.) Ltd.

2. Geotechnical Report on Women & Child Health- Centre of Excellence (WCH-COE) at Aga Khan University Campus, Karachi. (December, 2017) Client: M/s Aga Khan University Hospital (AKUH)

3. Geotechnical Report on K-IV Greater Karachi Bulk Water Supply Scheme Jhampir, Thatta, Sindh (November, 2017) Client: M/s KWSB Consultant: M/s Osmani & Co. Ltd. Contractor: M/s 757 Construction Team Engineers (FWO)

4. Geotechnical Report on Sanghar Housing Project, Gwadar, Balouchistan (October, 2017) Client: M/s The Deputy Commissioner, Gwadar Consultant: M/s Consultant Group

5. Geotechnical Report on 30 MW Solar Power Project at Jhampir, Thatta, Sindh. (October, 2017) Client: M/s M/s Fauji Fertilizer Company Limited Consultant: M/s B & W Engineers (Germany)

6. Geotechnical Report on Installation of Weather Surveillance Radar Multan, Punjab (August, 2017) Client: M/s International Meteorological Consultant Inc.

7. Geotechnical Report on Multi-Storeyed Building on Plot # 477-B, Main National Highway, Opp. Sindh Museum Qasimabad, Hyderabad, Sindh (July, 2017) Client: M/s S. A. Architects

8. Geotechnical Report on Hasco Bulk Oil Storage Installations at Machike "B" Distt. Sheikhupura, Punjab (July, 2017) Client: M/s Hascol Petroleum Ltd.

9. Geotechnical Report on Boulevard Hotel & Club on Plot # B-3 S.I.T.E. Hyderabad, Sindh (July, 2017) Client: M/s S. A. Architects

10. Geotechnical Report on KandhKot Field Gas Compressor Station Project (KFGCS) at Kandhkot, Sindh (April, 2017) Client: M/s GASCO Engineering (Pvt.) Ltd

11. Geotechnical Report on Khuzdar Medical College & Allied Buildings Khuzdar, Balouchistan (April, 2017) Client: M/s The Architect 12. Geotechnical Report on Confirmatory Boring at 50 MW HAWA Wind Power Project Jhimpir, Sindh. (March, 2017) Client: M/s HDEC Engineering (Pvt.) Ltd.

13. Geotechnical Report on Bulk Oil Storage Tanks at FOTCO Terminal, Port Qasim, Karachi (January, 2017) Client: M/s Fauji Oil Terminal & Distribution Co. Ltd. (FOTCO) Consultant: M/s Zishan Engineers (Pvt.) Ltd.

14. Geotechnical Report on Oil Village on Plot # 6 & 7, at Mouza Sial Thalian, near Islamabad. January, 2017) Client / Consultant: M/s MM Pakistan (Pvt.) Ltd.

LIST OF THE PROJECTS HANDLED Major Projects completed in 2016 (Subsoil Investigations)

1. Geotechnical Report on Lubricant Blending Plant, Port Qasim, Karachi. (December, 2016) Client: M/s Hascol Petroleum Ltd.

2. Geotechnical Report on Commercial Building on Plot # G-1, New Town, Main Airport Road, Gwadar, Baluchistan (November, 2016) Client: Mr. Jameel Dashti Consultant: M/s Consultant Group (C.G)

3. Geotechnical Report on Bulk Oil Storage Depot Kotla Jam, District Bhakkar (November, 2016) Client: M/s Hascol Petroleum Ltd.

4. Geotechnical Report on EPCC of Complete Facility of Gas Pressure, Boosting Compressor Station on Mari Gas Pipe Line at Daharki (November, 2016) Client: M/s GASCO Engineering (Pvt.) Ltd.

5. Geotechnical Report on Development of Jahangir Park, Near , , Karachi. (October, 2016) Client: M/s Consultant Group

6. Geotechnical Report on The Initial Area of Gwadar Commercial Logistic Free Zone, Pakistan, Gwadar (October, 2016) Client: M/s CCCC-FHDI Engineering Co. Ltd.

7. Geotechnical Report on Construction of Various Buildings / Structures at Taba Complex, Gwadar, Balochistan. (September, 2016) Client: M/s Taba Complex

8. Geotechnical Report on Karachi Port Near Kemari (PDWCP) (September, 2016) Client: M/s China International Water & Electric Corp.

9. Geotechnical Report on Green Line Project (Package: 05) Surjani Town, Karachi. (August, 2016) Client: M/s KIDCL Consultant: M/s Engineering Associates (EA) Contractor: M/s NPI Construction & Engineering

10. Geotechnical Report on 10 Storeyed Building (Tower-2) Shahra-e-Faisal, Karachi. (August, 2016) Client: M/s The City School

11. Geotechnical Report on Bulk Oil Storage Terminal, Plot # G-5/G-6 & D-15/D-16/D- 17/D-18, Northern Industrial Zone, Port Qasim, Karachi. (August, 2016) Client: M/s Hascol Petroleum Ltd.

12. Geotechnical Report on Karachi-Thatta Carriageway Project at 20 Locations. (June, 2016) Client: The Commanding Officer 786 Section Head Quarters, M/s Frontier Works Organization (F.W.O.) Consultant: M/s Exponent Engineering, M/s A. A. Associates & M/s ECIL (JV)

13. Geotechnical Report on Karachi-Hyderabad Motorway project (M-9) at 19 Locations. (May, 2016) Client: M/s Project Director, Frontier Works Organization (F.W.O.) Consultant: M/s NESPAK

14. Geotechnical Report on 50 MW Solar Power Plant, Jhimpir, Distt: Thatta, Sindh (February, 2016) Client: M/s Metro Solar Power Ltd.

15. Geotechnical Report on 50 MW Solar Power Plant, Jhimpir, Distt: Thatta, Sindh (February, 2016) Client: M/s Gul Ahmed Solar Power Ltd.

16. Geotechnical Report on Various Departments of NICVD, Rafiq Shaheed Road, Bizerta Lines, Karachi Cantt. (January, 2016) Client: M/s National Institute of Cardio-vascular Diseases (NICVD) Consultant: M/s Beg Associates

LIST OF THE PROJECTS HANDLED Major Projects completed in 2015 (Subsoil Investigations)

1. Geotechnical Report on The City School, Plot # ST-4, Block-4. Scheme - 16, F. B. Area, Karachi (December, 2015) Client: M/s The City School

2. Laboratory Test Results Report for UEPL, Jhimpir Wind Power (99 MW Phase-I) Jhimpir, Sindh (December, 2015) Client: M/s China Gezhouba Group

3. Geotechnical Report on Factory on Plot # 12, 27, Sector-20, , Karachi (December, 2015) Client: M/s International Textile Mill Ltd.

4. Geotechnical Report on Greater Karachi Sewerage Plan S-III, Group "A Works" for the Construction of New RCC Conduit & Other Allied Works From Teen Hatti Bridge to Garden Along , Karachi (Contract Package: LS-5) (November, 2015) Client: M/s Sardar M. Ashraf D' Baloch (Pvt.) Ltd. Consultant: M/s Techno-Consult International

5. Geotechnical Report on Buildings & Infrastructure Development at Naval Housing Scheme Phase-IV, Karsaz, Karachi (November, 2015) Client: M/s Directorate of Naval Housing Consultant: M/s NESPAK

6. Geotechnical & Material Report on (Existing Road) Rehabilitation of N-5 (by KMC) Project from, Quaidabad Flyover to Pakistan Steel, Material Investigation (Existing Road Material) August, 2015) Client: M/s E.A Consulting (Pvt.) Ltd.

7. Geotechnical Report on Sick Bay Pakistan PH-1 at PNS Rahbar Manora, Karachi (July, 2015) Client: M/s GE (Navy) Construction

8. Geotechnical Report on Proposed Coal Fired Power Plant, at Hubco Gadani Balouchistan (July, 2015) Client: M/s Hubco Power Co. Ltd.

9. Geotechnical Report on Establishment of Sindh Cultural Heritage Institute, Kashi Hostel at National Museum of Pakistan, Karachi (June, 2015) Client: M/s Culture, Tourism & Antiquities Department, Govt. of Sindh

10. Geotechnical Report on Plot # 87/7 & 87/6 Deh Tappo Ibrahim Hydri, Taluka , Karachi (June, 2015) Client: M/s M. N. Textiles (Pvt.) Ltd.

11. Geotechnical Report on Pro0posed University Administration Building (UAB) at Aga Khan University Campus, Karachi (June, 2015) Client: M/s Aga Khan University Hospital (AKUH)

12. Geotechnical Report on Sadaf Skyline, Plot # 1-A, Block-A, Surjani Town, Karachi (April, 2015) Client: M/s Kamil Builders

13. Geotechnical Report on Trauma Centre at Dow University of Health Sciences, Karachi (January, 2015) Client: M/s Dow University of Health Sciences (DUHS)

14. Geotechnical Report on Jhimpir Wind Power Project, Jhimpir, Sindh (January, 2015) Client: M/s Jhimpir Power (Pvt.) Ltd. (JPL)

LIST OF THE PROJECTS HANDLED Major Projects completed in 2014 (Subsoil Investigations)

1. Geotechnical Report on Extention of Restaurant at Marina Club, DHA, Karachi (December, 2014) Client: Pakistan Defence Officers Housing Authority

2. Geotechnical Report on Jhimpir Wind Power Project, Jhimpir, Sindh (December, 2014) Client: M/s Jhimpir Power (Pvt.) Ltd. (JPL)

3. Geotechnical Report on Strengthening of Faculty of Oral Health Sciences & Support Facilities at Dow University of Health Sciences, Karachi (December, 2014) Client: M/s Dow University of Health Sciences (DUHS)

4. Geotechnical Report on Municipal Services Program (MSP) Filter Plant at Mauladad Main Road, Jacobabad, Sindh (January, 2014) Client: M/s Jacobabad MSP, A&E Support Team Consultant: M/s A.A. Associates & M/s Techno-Consult International (J.V)

5. Geotechnical Report on Improvement Project, Fulleli Canal at 30th Mile Cross Regulator, Guniwah & Pandhi Wah Head Regulator (November, 2014) Client: M/s MM Pakistan (Pvt.) Ltd.

6. Geotechnical Report on Factory, Admin Block & Pipe Storage Sadiqabad (September, 2014) Client: M/s Data Steel Pipe Industries

7. Geotechnical Report on Geotechnical & Geophysical Survey of CPP Site Project, Port Qasim, Karachi (September, 2014) Client: M/s Fauji Fertilizer Bin Qasim Ltd. (FFBL) Consultant: M/s NESPAK

8. Geotechnical Report on Regulating Complex at RD: 63 Location # A, Ghotki Feeder Area (September, 2014) Client: M/s MM Pakistan (Pvt.) Ltd.

9. Geotechnical Report on Regulating Complex at Location # B, RD-125, Ghotki Feeder Area (September, 2014) Client: M/s MM Pakistan (Pvt.) Ltd.

10. Geotechnical Report on Proposed Construction of New Private Wing, Karachi (August, 2014) Client: M/s Aga Khan University Hospital

11. Geotechnical Report on Confirmatory Borehole for Bridge, (RBOD) Near Ali Behar Band Crossing RD: 678+500 (July, 2014) Client: M/s Mohammad Yar & Brothers / Irrigation & Power Deptt. (Govt. of Sindh) Consultant: M/s ECIL

12. Geotechnical Report on Plot # LE-17-A1, Korangi Creek Industrial Park, Karachi (July, 2014) Client: M/s Alucan (Pvt.) Ltd. Consultant: M/s Mushtaq & Bilal

13. Geotechnical Report on 02 Bed Apartments in Bahria Town, Super Highway, Karachi (July, 2014) Client: M/s Paragon Constructors (Pvt.) Ltd. Consultant: M/s Mushtaq & Bilal

14. Geotechnical Report on Coal, Cement & Clinker Terminal, Port Qasim, Karachi (May, 2014) Client: M/s Pakistan International Bulk Terminal Ltd. Consultant: M/s Turkpak International

15. Geotechnical Report on Sugar Mills, Land in Khambarah Tehsil: Obauro, Distt. Ghotki, Sindh (April, 2014) Client: M/s Technical Associates Pak (Pvt.) Ltd. Consultant: M/s A.A Associates

16. Geotechnical Report on Installation of Weather Surveillance Radar, Gulistan-e- Jauhar, Karachi (February, 2014) Client: Consortium of (JWA) - (IMC)

17. Geotechnical Report on Construction of Bungalows at Naya City, Road, Karachi (February, 2014) Client: M/s Javedan Corporation (Pvt.) Ltd.

LIST OF THE PROJECTS HANDLED Major Projects completed in 2013 (Subsoil Investigations)

1. Geotechnical Report on Greater Karachi Sewerage Plan S-III, Construction of New RCC Conduit & Other Allied Works From Road to TP-III along Lyari River, Karachi (December, 2013) Client: M/s Crescent Construction Company (Pvt.) Ltd. Consultant: M/s Techno-Consult International

2. Geotechnical Report on Improvement of Child Health Institute ( Sindh Govt. Childern Hospital) ST-18, Sector: 14-B near Nagan Chowrangi, North Karachi (October, 2013) Client: M/s Tobishima Corp.

3. Geotechnical Report on Reconstruction of berth: 15-17-A, East wharf, KPT, Karachi (October, 2013) Client: M/s SsangYong & Dong Yang (J.V.) Consultant: M/s Techno Consultant International

4. Geotechnical Report on Godown / Rice Mill at Plot # E-175 to E-179, North Western Industrial Zone, Port Qasim, Karachi (July 2013) Client: M/s Asif Rice Mills

5. Geotechnical Report on Factory at Plot # FD-06-07-A-6-26-27-A7, Korangi Industrial Park, Karachi (July, 2013) Client: M/s Youngs Food

6. Geotechnical Report on Reconstruction / Upgradation of Main Run-Way at Int'l Airport (June, 2013) Client: M/s Meinhardt Pak. Ltd.

7. Geotechnical Report on For the Construction of Godown / Mill at Plot # A-44, Eastern Industrial Zone, Port Qasim, Karachi (June, 2013) Client: M/s Meskay & Femtee Trading Company (Pvt.) Ltd.

8. Geotechnical Report on Construction of Flour Mill at Plot # F-17, North Western Industrial Zone, Port Qasim, Karachi (June, 2013) Client: M/s Al-Hamza Flour Mill

9. Geotechnical Report on Power Plant, Pakistan Deep Water Container Port, (Phase-I) , Karachi (April, 2013) Client: M/s South Asia Pakistan Terminal Ltd. (SAPT) Consultant: M/s Halcrow Pakistan Pvt. Ltd. Contractor: M/s Aero Royce JV Ltd. Sub-Contractor: M/s Petro-con Pvt Ltd.

10. Geotechnical Report on Plot # E-93, N. W. Industrial Zone Port Qasim, Karachi (April, 2013) Client: M/s

11. Geotechnical Report on Over Head Water Tank for Improvement of Water Supply System in Scheme ICB-4, DNI Zone-5, Mir Wah Road, Khairpur, Sindh (March 2013) Client: M/s M.M. Pakistan (Pvt.) Ltd.

12. Geotechnical Report on Over Head Water Tank for Improvement of Water Supply System in Scheme ICB-4, DNI Zone-6, Dilshad Park, Khairpur, Sindh (March 2013) Client: M/s M.M. Pakistan (Pvt.) Ltd.

13. Geotechnical Report on Construction of Silos & Factory at Plot # BBA / SP-04, Back-up Area, SWIZ Port Qasim, Karachi (January, 2013) Client: M/s A.A. Construction Co.

14. Geotechnical Report on Drive Through ISO Tanker Station on a Part of Plot # W2/1/138, North Western Industrial Zone, Port Qasim, Karachi (January, 2013) Client: M/s FSA Enterprises

15. Geotechnical Report on Commercial Building Block-C, Main Auto Bhan Road, Latifabad, Hyderabad, Sindh (February, 2013) Client: M/s Developers Group

LIST OF THE PROJECTS HANDLED Major Projects completed in 2012 (Subsoil Investigations)

1. Geotechnical Report on Project for Strengthening Weather Forecasting and Dissemination System of Early Warning in the Islamic Republic of Pakistan at Sector H-8, Islamabad (December, 2012) Client: Joint Venture of International Meteorological Consultant Inc. (IMC) Japan Weather Association (JWA) & CTI Engineering International Co. Ltd.

2. Geotechnical Report on Section: Sindhi Hotel to Teen Hatti Manghopir to Dhobi Ghat Dhobi Ghat To Mewa Shah , Karachi (November, 2012) Client: M/s Frontier Works Organization (FWO) / National Highway Authority (NHA) Consultant: M/s Engineering Associates (EA)

3. Geotechnical Report on Parking Complex & Mosque at PNSC Head office, M.T. Khan Road, Karachi (October, 2012) Client: M/s Pakistan National Shipping Corporation (PNSC) Consultant: M/s DGP / MR ALI

4. Geotechnical Report on Plot # E-15, Kotri Industrial Area, Kotri, Sindh (October, 2012) Client: M/s Philip Morris (Pakistan) Limited (Formerly Lakson Tobacco Company Limited) Consultant: M/s SMK Associates

5. Geotechnical Report on Proposed KPI Industrial Building, Plot # C-15, Sindh Industrial Trading Estate, Sukkur (September, 2012) Client: M/s DeeCon Construction

6. Geotechnical Report on Construction of Model Apartments at , Manghopir Road, Karachi (September, 2012) Client: M/s Javedan Corporation Limited Consultant: M/s Mushtaq & Bilal

7. Geotechnical Report on Arkadian Mall Phase-VIII, DHA, Karachi (August, 2012) Client: M/s Creek Developers (Pvt.) Ltd. Consultant: M/s Halcrow Pakistan (Pvt.) Ltd.

8. Geotechnical Report on Wind Power Project Near Nooriabad, Sindh (August, 2012) Client: M/s Dewan Energy (Pvt.) Ltd.

9. Geotechnical Report on Construction of Break water, Fisheries Harbor, Pasni, Balouchistan (August, 2012) Client: M/s National Institute of Oceanography (NIO)

10. Geotechnical Report on Bio-gas Plant, Near Shikarpur, Sindh (July, 2012) Client: M/s Asian Energy Ventures (Pvt.) Ltd.

11. Geotechnical Report on Plot # 13, Sector 20, Korangi Industrial Area, Karachi Plot # 13, Sector 20, Korangi Industrial Area, Karachi (June, 2012) Client: M/s Abbott Laboratories Pak. Ltd.

12. Geotechnical Report on Various Structures on Plot # A-40-41,Chemical Area, Eastern Industrial Zone, Port Qasim, Karachi (May, 2012) Client: M/s Sharif Solvent Plant (Pvt.) Ltd.

13. Geotechnical Report on 50 Bedded Hospital Building at GAI Khan Chowk, Quetta (May, 2012) Client: M/s National Engineering Services Pakistan (Pvt.) Limited. (NESPAK)

14. Geotechnical Report on Agriauto Stamping Company Plant at Port Qasim, Karachi (April, 2012) Client: M/s Agriauto Stamping Company Consultant: M/s Mushtaq & Bilal

15. Geotechnical Report on Plot # E-15, Kotri Industrial Area, Kotri, Sindh (April, 2012) Client: M/s Philip Morris (Pakistan) Limited (Formerly Lakson Tobacco Company Limited) Consultant: M/s SMK Associates

16. Geotechnical Report on 10 MW Solar PV Project, Distt. Kasur (Punjab). (March, 2012) Client: M/s Roshan Power (Pvt.) Ltd.

17. Geotechnical Report on Construction of two new 5000 tons Phosphoric Acid Tanks at Fauji Fertilizer Bin Qasim (FFBL) Plant Site, Karachi (February, 2012) Client / Consultant: (NESPAK)

LIST OF THE PROJECTS HANDLED Major Projects completed in 2011 (Subsoil Investigations)

1. Geotechnical Report on Pakistan Deep Water Container Port, Keamari Groyne (March, 2011) Client: M/s South Asia Pakistan Terminals Ltd. Consultant: M/s Halcrow Pakistan (Pvt.) Ltd.

2. Geotechnical Report on Improvement of N-70 National Highway, Rakhi - Gajj to Bewata (Vol-I (April, 2011) Client: CTII-OC-EA-EE-Joint Venture

3. Geotechnical Report on Improvement of N-70 National Highway, Rakhi - Gajj to Bewata (Vol-II (April, 2011) Client: CTII-OC-EA-EE-Joint Venture

4. Geotechnical Report Laboratory test results of aggregate samples for Rakhi - Gajj to Bewata (33.84km, Was West Road Project (July, 2011) Client: CTII-OC-EA-EE-Joint Venture

5. Geotechnical Report on 50 MW Wind Power Plant, Near, Jhimpir, Sindh (July, 2011) Client: M/s Zorlu Industries Pakistan (Pv.t) Ltd.

6. Geotechnical Report on Feasibility Study of Resettlement site for Revival of KCR near Juma Goth (Between 33.789-40.225 Km) (Nov, 2011) Client: M/s Zorlu Industries Pakistan (Pvt.) Ltd.

7. Geotechnical Report on Plot # E-15, Kotri Industrial Area, Kotri, Sindh (Dec, 2011) Client: M/s Philip Morris (Pakistan) Limited (Formerly Lakson Tobacco Company Limited) Consultant: M/s SMK Associates

8. Geotechnical Report on Shafa Twin Tower, Amalgamated Plot # D-8, 9, 10, 17, 18, & 19, Railway Employees Coop. Housing Society Main Auto Bhan Road, Latifabad, Hyderabad (Sep, 2011) Client: M/s Shafa Builders & Developers

9. Geotechnical Report on Construction of Road & Railway Track (Sep, at Winder (Baluchistan) (July,2011) Client: M/s United Construction Company

10. Geotechnical Report on Centre for Innovation in Medical Education (CIME), Aga Khan University Hospital (June, 2011) Client: M/s Aga Khan University Hospital

11. Geotechnical Report on Salt project (Pre-engineered Building), at Mukhai near Nagar Parker, Sindh (June, 2011) Client: M/s Hub Pak Salt Refineries Consultant: M/s Arch Tec.

12. Geotechnical Report on 22 Nos. of Bridges Indus Highway Project (N-55) Phase III, Contract # 3 Contractor: M/s Danial Associates Client: M/s Frontier Works Organization Consultant: M/s Techno Consult

13. Geotechnical Report on Hira Foundation Educational City & Sports Complex, Korangi, K Area, Karachi (May, 2011) Client: M/s Hira Foundation School Darul Uloom

14. Geotechnical Report on Shaheed Rani Benazir Bhutto Gharib Nawaz Hospital Situated on Survey # 556, Taluka Tharo Shah Dist. Naushehro Feroz, Sindh. (March, 2011) Client: All Sindh Gharib Nawaz Association

15. Geotechnical Report on Open Area of United Medical Institute & Hospital, at final Amalgamated Plot # 17/3 Deh: Dehi, NA Class: 24, Ibrahim , Korangi, Karachi. (March, 2011) Client: M/s Akbar Mahmud Qaizar Associates

16. Geotechnical Report on Plot # C-18, NHS, (Bahadur), Karsaz, Karachi.(February, 2011) Client: Mr. Air Syed Sarfaraz Ali

LIST OF THE PROJECTS HANDLED Major Projects completed in 2010 (Subsoil Investigations)

1. Geotechnical Report on Ayesha Memorial Hospital at Plot # C-50, Sub-Sector: PH-I & II (Ext.) Gulshan-e-Hadeed, Steel Town, Bin Qasim Karachi (Dec, 2010) Client: Dr. Hameeda Narejo

2. Geotechnical Report on Block-7, Askari-IV Gulistan-e-Jauhar, Karachi. (Oct, 2010) Client: M/s Directorate of Army Housing

3. Geotechnical Report on Hub School at Deh Loharko Lung near Madina-tul-Hikmat, Hub Dam, Road, Hub, Baluchistan. (Oct, 2010) Client: M/s Ahmed E.H. Jaffer Foundation Consultant: Aiak Associates

4. Geotechnical Report on Hub Karimabad Diagnostic Centre, near Ayesha Manzil, F.B. Area, Karachi. (Sep, 2010) Client: M/s Aga Khan University Hospital

5. Geotechnical Report on Holy Shepherd Grammar School, New Mianwali Colony, UC-9, S.I.T.E, Karachi. (Sep, 2010) Client: M/s ZOR Engineers Pvt Ltd.

6. Geotechnical Report on Karimabad Diagnostic Centre, near Ayesha Manzil, F.B. Area, Karachi. (Sep, 2010) Client: M/s Aga Khan University Hospital

7. Geotechnical Report on Factory's Packed Tobacco Warehouse & Other Buildings at Sahiwal, Punjab (Aug, 2010) Client: M/s Lakson Tobacco Co. Ltd. Consultant: M/s S.M.K

8. Geotechnical Report on 50 MW Wind Power Project, Jhimpir, Sindh (Aug, 2010) Client: M/s China International Water & Electric Corp. (CWE)

9. Geotechnical Report on 50 Wind Power Plant, Jhimpir, Sindh (July, 2010) Client: M/s Sachal Energy Development (Pvt.) Ltd.

10. Geotechnical Report on Gymnasium at North Karachi, near Nagan Chowrangi, Karachi (July, 2010) Client: Executive Engineer, Karachi Central Civil Div: IX, Pak PWD, Karachi

11. Geotechnical Report on Off-Shore Geotechnical Investigations Pakistan Deep Water Container Port, Karachi. (June, 2010) Client: M/s China International Water & Electrical Corp. Consultant: M/s Techno Consult International

12. Geotechnical Report on Infrastructure Design of Naya Nazimabad City, Manghopir Road, Karachi (June, 2010) Client: M/s M/s Javedan Cement Ltd. (JCL) Consultant: M/s Halcrow Pakistan

13. Geotechnical Report on Aga Khan Hospital for Women Garden, Karachi. (June, 2010) Client: M/s Aga Khan University Hospital

14. Geotechnical Report on Prestressed Bridge over Miro Khan Zakaria Drain Along Nao-Tharo to Behram Road, Near Village Laghari, Sindh (June, 2010) Client: The District Officer Roads & Transport, Kamber at Shahdadkot Consultant: M/s Mushtaq & Bilal

15. Geotechnical Report on 80 RFT Prestressed Bridge over Miro Khan Zakaria Drain Along Nao-Tharo to Behram Road Near Village Laghari, Sindh (June, 2010) Client: The District Officer Roads & Transport, Kamber at Shahdadkot Consultant: M/s Mushtaq & Bilal

16. Geotechnical Report on Reconstruction & Improvement of Fighter Ground Park at UC-6, Karachi (June, 2010) Client: Executive Engineer, Karachi Central Civil Div: IX, Pak PWD, Karachi

17. Geotechnical Report on High School at UC Town, Gadap, Karachi. (April, 2010) Client: Executive Engineer, Karachi Central Civil Div: IX, Pak PWD, Karachi

18. Geotechnical Report on Waste Heat Recovery Power Project (WHRPP) at Attock Cement Factory Hub, Baluchistan. (April, 2010) Client: M/s Attock Cement Pakistan Ltd

19. Geotechnical Report on Fly-over at Kotri Inter-change on National Highway (N-5). (Feb, 2010) Client: M/s N.H.A Consultant: M/s A.A Associates

20. Geotechnical Report on Plot Combined Effluent Treatment Plant (CETP) at Pakistan Textile City, Port Qasim, Karachi. (Feb, 2010) Client: M/s Pakistan Textile City Ltd. Consultant: M/s N.E.C

LIST OF THE PROJECTS HANDLED Major Projects completed in 2009 (Subsoil Investigations)

1. Geotechnical Report on Slurry Pipeline, Reko Diq Project, Baluchistan. (Dec, 2009). Client: M/s Tethyan Copper Co. Ltd. Consultant: M/s SMEC

2. Geotechnical Report on Office cum Residence & Other Related Facilities for CRL (Khalifa Point) Hub Baluchistan. (Nov-2009) Client: Coastal Refinery Ltd. (CRL)

3. Geotechnical Report on Rawalpindi Commercial Complex, Rawalpindi cantt. (Aug.2009) Client: M/s Sprint Services Rawalpindi Ltd. Consultant: M/s Habib Fida Ali

4. Geotechnical & Hydrological study for Aga Khan Hospital & Medical College Stadium Road campus, Karachi. (May-2009) Client: Aga Khan Hospital & Medical College Foundation. Consultant: M/s Associated Consulting Engineers (Pvt.) Ltd. (ACE)

5. Geotechnical Report on Process Plant & Infrastructure, Reko Diq, Baluchistan. (Jan-2009) Client: M/s Tethyan Copper Co. Ltd. Consultant: M/s SNC, Lavalin Inc. (SLI)

6. Geotechnical Report for Process Plant & onsite & offsite Infrastructure, Reko Diq, Baluchistan. (Mar-2009) Client: M/s Tethyan Copper Co. Ltd. Consultant: M/s SNC, Lavalin Inc. (SLI)

7. Geotechnical Report for Geo-electrical Studies & Surface wave Analysis at wind Mill Area, Reko Diq, Baluchistan. (Jan-2009) Client: M/s Tethyan Copper Co. Ltd. Consultant: M/s SMEC

8. Geotechnical Report for Vocational Training Centre (CBM) Korangi, Karachi. (Feb- 2009). Client /Consultant: M/s Akbar Mahmud Qaizar Associates

9. Geotechnical Report for PAF Museum staff, PAF Base Faisal, Karachi (Feb-2009). Client: Vice Chairman, PAF Museum Consultant: M/s Zakir Associates

10. Geotechnical Report for Faiz Hospital Survey # 397/1, Korangi, Karachi. (Mar-2009) Client / Consultant: M/s Akbar Mahmud Qaizar Associates

11. Geotechnical Report for Construction of 5.0 MGD Filter Plant at Ghangra Mori, Mirpur Road, S.I.T.E, Hyderabad (Sindh). (Mar-2009) Client / Consultant: M/s R.C.C. Consultants

12. Geotechnical Report for Abbott Laboratories, , Karachi (Apr-2009). Client / Consultant: M/s Gul & Thariani

13. Geotechnical Report for Confirmatory sub-soil Investigation for the construction of Jamia Al-Imam Al-Malik Abdul Aziz Bin Abdur Rehman Al-Saud at Hazara University, Mansehra. (Apr-2009) Client: V M/s ZCL Consultant: M/s Mushtaq & Bilal

14. Geotechnical Report for Hamal Head Regulator, RD: 342 +220, near Mehar, Distt: Dadu, Sindh (Apr-2009) Client: M/s R.B.O.D

15. Geotechnical Report for Multi-storied Building at Plot # Comm-1, Sector 52-A, Pakistan Atomic Energy Employees C.H. Society, Scheme # 33, Gulzar-e-Hijri, Karachi. (Apr-2009) Client: M/s Sherwani Builders & Developers

16. Geotechnical Report for Residense of Hon. Agha Siraj Khan Durrani, in Kot Durrani in Garhi Yasin, Distt. Shikarpur, Sindh. (May-2009). Client: Hon. Agha Siraj Khan Durrani Consultant: M/s Arif Kassim

17. Geotechnical Report for Sarina Terrace, Plot # FL-2, Block-3, Sector 35/A, Scheme # 33, Gulzar-e-Hijri, Karachi. (July-2009). Client: M/s Pioneer Enterprises Consultant: M/s Mushtaq & Bilal

18. Geotechnical Report for Labour Colony in T.B. Hospital, Ojha Campus, Karachi. (July-2009) Client: Dow University of Health Sciences

19. Geotechnical Report for MDR Building in T.B. Hospital, campus, Karachi. (July- 2009) Client: Dow University of Health Sciences

20. Geotechnical Report for Construction of 22.5 MGD Eastern Sewage Treatment Plant, Hyderabad. (Sep-2009) Client: M/s Muslim Constructors (Pvt.) Ltd. Consultant: M/s Osmani & Company

LIST OF THE PROJECTS HANDLED Major Projects Completed in 2008 (Subsoil Investigations)

1. Geotechnical Report on Reko Diq Water Feasibility Study Project Reko Diq, Baluchistan (Dec-2008) Client: M/s Tethyan Copper Co. Ltd. Consultant: M/s SMEC

2. Geotechnical Report on Fan Sediments Pipe Line Reko DiqWater Feasibility Project Reko Diq, Baluchistan (Dec-2008). Client: M/s Tethyan Copper Co. Ltd. Consultant: M/s SMEC

3. Geotechnical Report on Reconstruction of Berth No.10-14 at East wharf, KPT Karachi. (Nov-2008) Client: M/s SsangYong & M/s Usmani (J.V.) 4. Geotechnical Report on 200 MW power project at Mithranwally, Faisalabad project. (Oc-2008) Client: M/s Liberty Power Tech Ltd. Consultant: M/s WARTSILA

5. Geotechnical Report for Enabling Works at Trans Asia Refinery at Bin Qasim (Oct-2008) Client: M/s Descon Engineering Ltd Consultant: M/s ECIL 6. Down hole seismic survey for Enabling works for Trans Asia Refinery at Bin Qasim (Sep-2008) Client: M/s Descon Engineering Ltd Consultant: M/s ECIL 7. Geotechnical Report on Wind Power project, Nooriabad, Sindh (Oct-2008) Client: M/s Lucky Energy Ltd. 8. Onshore & offshore Geotechnical Report on 1000-1200 MW coal fired power plant at Gaddani Baluchistan (Jan-2008) Client: M/s AES Pakistan (Pvt.) Ltd. 9. Sub-soil Investigation for multi-storied Building at Plot # F.L.B.ST-11, scheme -24, Gulshan-e-Iqbal, Karachi. (Feb-2008) Client: M/s Saima Builders Consultant: M/s Alliance Consultants (Pvt.) Ltd. 10. Geotechnical Report for I.T Tower Complex, Near Civic Centre, Karachi. (April-2008) Client: M/s I J M Construction (Pakistan) (Pvt. Ltd. 11. Geotechnical Report on construction of Small Dam at Nai Baran, near Thana Bula Khan Kirther Range, Sindh. (May-2008) Client: M/s Techno Consultant 12. Sub-soil Investigation for the construction of SUPARCO Complex, off. Hub- River Road, Karachi. (May-2008) Client / Consultant: M/s SMK Associates 13. Sub-soil Investigation Report for the construction of Chest Department, Hospital, Nazimabad, Karachi. (May-2008) Client: M/s Abbasi Shaheed Hospital / C.D.G.K Consultant: M/s Ghaffar Associates 14. Sub-soil Investigation at Sindh Medical College, near Jinnah Hospital, Karachi. (June-2008) Client: M/s Abbasi Shaheed Hospital / C.D.G.K Consultant: M/s Ghaffar Associates 15. Sub-soil Investigation for the construction of 02 Bridges on Railway track between Kotri-Jamshoro (Kot Dadu Station & Jungshai- Makli. (June-2008) Client: M/s ABM Engineers Consultant: M/s ESS-1-AAR 16. Sub-soil Investigation for the construction of Bridge at Gwadar-Gabd Section, Pak Iran Border Road, Baluchistan. (Sep-2008) Client: M/s N.H.A /M/s Khawaja Ghani Joo & Co Consultant: M/s E.C.I.L 17. Sub-soil Investigation for the construction of various Apartments for Federal Govt. in scheme # 33, Karachi. (Aug-2008) Client: Federal Govt. Employees Housing Foundation 18. Sub-soil Investigation for the construction of Multi-storied Building at old Nazimabad & Malir Township. (Sep-2008) Client: M/s E.O.B.I 19. Sub-soil Investigation for the construction of Multi-storeyed Building at Plot # 17-B, Block-A, S.M.C.H.S main Shahra-e- Faisal, Karachi. (Feb-2008). Client: M/s Javed (Pvt.) Ltd. 20. Sub-soil Investigation for the construction of P.SC Bridge 60 Rft over K.K Feeder @ Mile 14/0 Geehal Pur Badani Road: 3.8414. (Feb-2008) Client: District Officer Roads, Kashmore @ Kandhkot. Contractor: M/s Muhammadi Engineers & Drillers Group 21. Sub-soil Investigation for the construction of Construction of 350 Rft Pre-Stressed R.C.C Bridge over B.S Feeder, along Badani Road @ Mile 2/2-2/6 (Feb-2008) Client: District Officer Roads, Kashmore @ Kandhkot. Contractor: M/s Muhammadi Engineers & Drillers Group 22. Sub-soil Investigation for the construction of 350 Rft Pre-Stressed R.C.C Bridge over B.S Feeder, along @ R.D 82 @ Mile: 1/6-1/7. (Feb-2008) Client: District Officer Roads, Kashmore @ Kandhkot. Contractor: M/s Muhammadi Engineers & Drillers Group 23. Sub-soil Investigation for the construction of Sewerage Treatment Plant,Chachar Gas Field, Kandh Kot, Sindh. (Mar-2008) Client: M/s Tullow Pak Ltd Contractor: M/s Water Engineering & Management Services. 24. Sub-soil Investigation for the construction of SUPARCO Complex, off. Hub-River Road, Karachi (May-2008) Client: M/s SMK Associates 25. Sub-soil Investigation for the construction of Chest Department, Abbasi Shaheed Hospital, Nazimabad, Karachi (May-2008) Client: M/s Abbasi Shaheed Hospital / C.D.G.K Consultant: M/s Ghaffar Associates 26. Sub-soil Investigation for the construction of Bridge on Railway Track RD: 477+00 (Kotri Yard Main line) (June-2008) Client: M/s ABM Engineers / M/s ESS-1-AAR 27. Sub-soil Investigation for the construction of Office Building at The Aga Khan University Hospital, Stadium Road, Karachi. (July-2008). Client: M/s The Aga Khan University Hospital 28. Sub-soil Investigation for the construction of Coastal Highway Project Bridge at Gwadar-Gabd Sec., Pak Iran Border RD: 55+305 (Dust Kour), Baluchistan (Sep-2008) Client: M/s N.H.A / M/s Khawaja Ghani Joo & Co. Consultant: M/s E.C.I.L 29. Sub-soil Investigation for the construction of Multi-Storeyed Building at Plot # 12, Row No.1, Block III A, Old Nazimabad, Karachi. (Sep-2008) Client: M/s E.O.B.I (Employees Old Age Benefits Institution) 30. Sub-soil Investigation for the construction of Multi-Storeyed Building on Plot # 5/423 Darakshan C.H.S. Malir Township, National Highway, Karachi (Sep-2008) Client: E.O.B.I (Employees Old Age Benefits Institution) 31. Sub-soil Investigation for the construction of Plot # F.L.B.ST-11, scheme -24 Gulshan-e-Iqbal, Karachi (Feb-2008) Client: M/s Saima Builders Consultant: Alliance Consultants (Pvt.) Ltd

LIST OF THE PROJECTS HANDLED Major Projects completed in 2007 (Subsoil Investigations)

1. Geotechnical Report for 78 storied KPT Office, Tower (Dec-2007) Client: M/s Karachi Port Trust Consultant: M/s M.M.P

2. Geotechnical Report on 50 MW Wind Power Plant near Jhimpir, Sindh (Dec-2007) Client: M/s Zorlu Industries and Power Plants (Turkey)

3. Geotechnical Report on 50 MW Wind Power Plant Near Gharo, Sindh (Dec-2007) Client: M/s Green Power (Pvt.) Ltd.

4. Geotechnical Report on Manzalai Field Development Surface Facilities, Kohat, NWFP) (May-2007) Client: M/s VECO Engineering (Abu Dhabi)

5. Geotechnical Report on LNG Re-Gasification Terminal at Port Qasim, Karachi. (Feb-2007) Client: M/s SBM Consultant: M/s Techno Consult

6. Geotechnical Report on Sports Complex at Distt. Orangi, Karachi. (Jan-2007) Client: CDGK / N.A.A. Consulting Engineers

7. Geotechnical Report on Sports Complex at Distt. Landhi, Karachi. (Jan-2007). Client: CDGK / N.A.A. Consulting Engineers

8. Geotechnical Report on Compressor Unit at Rehmat Gas Plant-2, Near Sukkur Sindh. (Feb-2007) Client: M/s Gasco Engineering (Pvt.) Ltd.

9. Geotechnical Report on Kausar ETF For Produce Water Pit # 3 & 4 (Feb-2007) Client: M/s Gasco Engineering (Pvt.) Ltd./ OPI

10. Geotechnical Report on Shikarpur Depot Sindh. (Mar-2007) Client: M/s Hascombe Storage (Pvt.) Ltd Consultant: M/s Zishan Engineers (Pvt.) Ltd

11. Geotechnical Report on Makran Coastal Highway Project (Gwadar - Plari - Jiwani Section) Bridge # 06 (Jiwani Link Road) (Apr-2007). Client: M/s Khawaja Ghani & Co. Consultant: M/s E.C.I.L

12. Geotechnical Report on Wind Farm at Jhimpir Sindh (Apr-2007) Client: M/s Fauji Fertilizer Co. Ltd.

13. Geotechnical Report on Wind Power Project, Near Jhimpir, Sindh (May-2007) Client: M/s Master Wind Energy (Pvt.) Ltd.

14. Geotechnical Report on Academic Block F.U.U.A.S.T, University Road. (May- 2007). Client: M/s Federal University of Arts, Science and Technology (F.U.U.A.S.T)

15. Geotechnical Report on Maymar North Bridge View at Plot # 5 / Com, Block-1, Gulshan-e-Kaneez Fatima KMC United Workers CHS, Karachi. (June-2007). Client: M/s Maymar North Bridge View Consultant: M/s Alliance Builders & Developers

16. Geotechnical Report on Sindh Golf Club @ Malir Cantt, Karachi. (Aug-2007). Client: M/s Quality Golf (Pakistan) Consultant: M/s Consultant Group

17. Geotechnical Report on Falak Heaven, Qasimabad Main Auto Bhan Road Hyderabad. (Aug-2007). Client: M/s Falak Heaven Consultant: M/s Zulfiqar Associates

18. Geotechnical Report on 200 Mega Watt Power Plant Near, Faislabad (Sep-2007) Client: M/s Liberty Powertech Limited

19. Geotechnical Report on 50 MW Wind Power Plant Near Gharo, Sindh (Nov-2007) Client: M/s Green Power (Pvt.) Ltd.

20. Geotechnical Report on Plot # 409, 1-9 Industrial Area, Islamabad (Nov-2007) Client: M/s Glaxo SmithKline Pakistan Ltd

21. Geotechnical Report on Small Dam at Nai San, Ranikot, San (Sindh) (Nov-2007) Client: M\s Irrigation & Power Department, Govt. of Sindh Consultant: M\s Techno Consult International

LIST OF THE PROJECTS HANDLED Major Projects completed in 2006 (Subsoil Investigations)

1. Geotechnical Report on Gold Crest Commercial Complex D.H.A. Phase II Islamabad (Oct-2006). Client: M/s AL-Ghurair Giga Pak (Pvt.) Ltd Consultant: M/s Alliance Consultants M/s A. Razzak Associates

2. Geotechnical Report on various bridges on CDGK proposed along Karachi. (Dec- Jan-2006) Client: CDGK

3. Geotechnical Report on Umer Gas Field/ Condensate Processing Facility Near Tando Allahyar (Sindh) (Jan-2006) Client: M/s Orient Petroleum Inc.

4. Geotechnical Report on various bridges on Turbat-Hoshab Section IIA (76.25 Km), (Km 62+375) (Jan-2006) Client: (M/s Husnain Cotex Ltd.) Consultant: M/s LRA Group

5. Geotechnical Report on 50 Mega-Watts Wind Plant Near Gharo, Sindh. (Feb-2006) Client: M/s Green Power (Pvt.) Ltd.

6. Geotechnical Report on Wind Power Project Near Gharo Sindh, (P-3/7) (Feb-2006) Client: M/s Tenaga Generasi, Malaysia Consultant: M/s M.E Consultant

7. Geotechnical Report on Institute of Nursing, Dow University of Health Sciences, Ojha, Karachi. (Feb-2006) Client: Engineering Associates (Pvt.) Ltd.

8. Geotechnical Report on 2 Rooms Foreign Faculty Accommodation at HEJ Research Institute of . (Mar-2006) Client: M/s U.S. Construction Co.

9. Geotechnical Report on Wind Power Project, Tidal Zone, Gharo, Distt: Thatta, Sindh. (Apr-2006) Client: M/s Beacon Energy (Pvt.) Ltd. Consultant: M/s Cube Engineering GmbH (Germany)

10. Geotechnical Report on Commercial Plus Residential Building, Plot # G-4, Block- 7,Clifton, Karachi. (Apr-2006) Client: M/s New Allied Electronics Industries (Pvt.) Ltd. Consultant: M/s Meinhardt Pakistan (Pvt.) Ltd.

11. Geotechnical Report on OGDCL's Qadirpur Gas Field, District Ghotki, Sindh Turbine / Compressor (Apr-2006) Client: M/s Soil & Foundation Engineering Services

12. Geotechnical Report on Wind Power Project, Tidal Zone, Gharo, Distt: Thatta, Sindh. (May-2006) Client: M/s Beacon Energy (Pvt.) Ltd. Consultant: M/s Cube Engineering GmbH (Germany).

13. Geotechnical Report on various bridges on Gawadar-Ratodero Road Project (M-8) Section-1 (Gawadar Turbat), Package II-B Bridge # 01A (Km 118+160) (May-2006). Client: M/s Sardar Muhammad Ashraf D Balouch (Pvt.) Ltd.

14. Geotechnical Report on Pedestrian Over-Head Bridge at Nazimabad # 01, Near Bus stop # 02 Karachi. (May-2006) Client: M/s United Construction Co.

15. Geotechnical Report on Avari Hotel (Former Al-Faisal Hotel) Islamabad. (Jun-2006) Client: M/s E.C.I.L

16. Geotechnical Report on Channelization of Nehre Khayyam, (CH: 2+600) Clifton, Karachi. (Jun-2006) Client: M/s C.D.G.K Consultant: M/s Umer Munshi

17. Geotechnical Report on Makran Coastal Highway Project (Gwadar-Jiwani Section) Bridge # 02 at CH: 3+510-3+630. (Jun-2006) Client: M/s NHA Consultant: M/s E.C.I.L

18. Geotechnical Report on De-Salination Plant, Gwadar Industrial Estate Surbander, Gwadar. (Jun-2006). Client: M/s Sidddiq sons Services (Pvt.) Ltd Consultant: M/s Consultant Group

19. Geotechnical Report on Makran Coastal Highway Project (Gwadar-Jiwani Section) Bridge # 03 CH: 4+300-4+360. (Jun-2006) Client: M/s NHA / F.W.O. Consultant: M/s E.C.I.L Contractor: M/s Khawaja Ghani Joo & Co.

20. Geotechnical Report on Wind Power Project, Off-Shore, Gharo District Thatta Sindh (July-2006) Client: M/s Master Energy (Pvt.) Ltd.

21. Geotechnical Report on Makran Coastal Highway Project (Gwadar-Plari-Jiwani) Bridge # 06 (CH: 29+200--29+320) (Aug-2006) Client: M/s NHA / F.W.O. Consultant: M/s E.C.I.L Contractor: M/s Khawaja Ghani Joo & Co.

22. Geotechnical Report on Power Plant, Near KTPS, Karachi. (Aug-2006) Client: M/s Siemens Pakistan Engineering Co. Ltd.

23. Geotechnical Report on Steel Town, Karachi. (Sep-2006) Client: Cadet College Consultant: M/s E.C.I.L

24. Geotechnical Report on Expansion of National Stadium, Karachi. (Sep-2006). Client: M/s Pakistan Cricket Board Consultant: M/s S.M.K Associates

25. Geotechnical Report on Construction of Various Departments (Clinic) University of Karachi. (Oct-2006) Client: M/s University of Karachi Consultant: M/s Engineering Consultants Int'l (Pvt.) Ltd.

26. Geotechnical Report on Girls Student Hostel, Survey # 233/1 at Qazi A.Qayoom Road, Hyderabad. (Oct-2006) Client: M/s Kaim Khani Education Trust Consultant: M/s Isra Islamic Foundation Guarantee Ltd.

27. Geotechnical Report on Multistoried Parking Plaza in Lines Area, Karachi. (Sep-2006) Client: M/s Naqvi & Siddique Associates

28. Geotechnical Report on Sports Complex at New Karachi. (Dec-2006) Client: C.D.G.K / N.H.A

LIST OF THE PROJECTS HANDLED Major Projects completed in 2005 (Subsoil Investigations)

1. Geotechnical Report on C.D.G.K's Pedestrian Over-Pass Adjacent to Baqai Hospital Nazimabad # 2 Karachi. (Jan-2005). Client: M/s Semcon Engineers

2. Geotechnical Report on Institute of Proteomics, University of Karachi. (Jan-2005) Client: M/s University of Karachi. Consultant: M/s E.C.I.L

3. Geotechnical Report on Sangar House Project Gwader. (Feb-2005). Client: M/s Consultant Group.

4. Geotechnical Report on Erection of Wind Mills near Sea, Gharo Disst. Badin Sindh. (Feb-2005) Client: M/s Green Energy (Pvt.) Ltd.

5. Geotechnical Report on Club House for Pak. Navy near Bahria Auditorium Karachi. (Feb-2005) Client: M/s Millennium Entertainment (Pvt.) Ltd.

6. Geotechnical Report on various bridges at (N-4) Section 11-A Turbat-Hoshab Gwader-Ratodero Project (M-8) Baluchistan. Client: M/s Husnain Cotex Ltd. Consultant: M/s LRA Group

7. Geotechnical Report on DHA’s married Officers Accommodation sea-view, Karachi. (March-2005). Client: P.D.O.H.A

8. Geotechnical Report on Rehman Medical College Hayatabad Peshawar. (March- 2005). Client: M/s Rehman Medical College Consultant: M/s Consult – Tech

9. Geotechnical Report on Sarina Terrace Plot # FL-1, Block-3 Sector 35/A Scheme # 33 Karachi. (March-2005) Client: M/s Pioneer Enterprises Consultant: M/s Mushtaq & Bilal

10. Geotechnical Report on Dolmen City at Old Casino, Clifton Beach, Karachi. (April- 2005). Client: M/s. Dolmen City (Pvt.) Ltd. Consultant: M/s Consult-Tech

11. Geotechnical Report on Sonax Steel, Dhabeji (April-2005) Client: M/s. Sonax Steel (Pvt.) Ltd.

12. Geotechnical Report on Hotel at Dream World Family Resort Deh Taiser, Karachi. (April-2005). Client: M/s Dream World Ltd. Consultant: M/s S.M.K. Associates

13. Geotechnical Report on P.I.A. Jahangir Khan Squash Complex Karachi. (June-2005) Client: M/s Saleem Qureshi Associates

14. Geotechnical Report on Indoor Sports Complex Pakistan Naval Academy Manora, Karachi. (June-2005) Client: M/s Consultant Group

15. Geotechnical Report on Entrance Gate, Mangla View Resort, Mangla. (June-2005). Client: M/s Mangla View Resort (Pvt.) Ltd.

16. Geotechnical Report on Desalination Plant (DHA/ Cogan Ltd.) Phase-8, Near Clifton Beach, D.H.A. (June-2005). Client: M/s Siemens Pakistan Engineering Co. Ltd. Consultant: M/s E.C.I.L

17. Geotechnical Report on LG Warehouse Northern Bypass, Karachi. (July-2005) Client: M/s Izhar (Pvt.) Ltd.

18. Geotechnical Report on Pakistan National Tiles Nooriabad.(July-2005). Client: M/s Pakistan National Textiles Ltd. Consultant: M/s S.M.K. Associates

19. Geotechnical Report on DHA Power & Desalination Plant Karachi, Pakistan. (Aug- 2005). Client: M/s Siemens Pakistan Engineering Co. Ltd. Consultant: M/s E.C.I.L

20. Geotechnical Report on 50 Bed Hospital, Muzafarabad Colony, Union Council-3 , Karachi. (Sep-2005). Client: M/s E.D.O. Health

21. Geotechnical Report on Lake City at Raiwind Road, Lahore. (Oct-2005). Client: M/s Lake City Holdings (Pvt.) Ltd. Consultant: M/s Meinhardt

22. Geotechnical Report on Creek Twin Towers, Gwader, Baluchistan. (Oct-2005). Client: M/s Creek Builders & D.H. Associates (J.V.)

23. Geotechnical Report on RBOD Package No.DW/R2-06 (478+00-514+394/51) Drain- Vol-I (Dec-2005). Client: M/s M.M.P. (Pvt.) Ltd.

LIST OF THE PROJECTS HANDLED Major Projects completed in 2004 (Subsoil Investigations)

1. Geotechnical Report on COD labour camp, Block-2, 3 & 5 near Askari-IV, Karachi. (Jan-2004) Client: Director of Army Housing.

2. Geotechnical Report on Jet Engine Testing Facility, Karachi Air Port. (Jan-2004). Client: M/s P.I.A.C.

3. Geotechnical Report on plot adjacent to Matiari Sugar Mills, Matiari dist. Hyderabad. (Jan-2004). Client: M/s Matol (Pvt.) Ltd.

4. Geotechnical Report on Jinnah Complex, M.A. Jinnah road, Karachi. (Feb-2004). Client: M/s Jinnah Complex.

5. Geotechnical Report on Kinare Restaurant, Beach Avenue, D.H.A, Karachi. (Feb-2004) Client: M/s P.D.O.H.A

6. Geotechnical Report on Kiran Hospital, Gulistan-E-Johar, Karachi. (Feb-2004) Client: M/s National Construction.

7. Geotechnical Report on Construction of 19 SD Houses, Nos. 174-192, Army Officers Housing Scheme, d. O. H. S-ii, Malir Cantt, Karachi. (Apr-2004). Client: M/s Adh (W) Khi. Army Housing Directorate.

8. Geotechnical Report on various Buildings at Gwader deep Water port, Gwader. (Apr-2004). Client: Gwader Port Authority

9. Geotechnical Report on Bhurban Valley View Resort. (May-2004) Client: M/s Bhurban Valley View Resort.

10. Geotechnical Report on Administration and Research Centre Dow University of Health Sciences Karachi. (Jun-2004). Client: Project Director, Dow University of Health Sciences.

11. Geotechnical Report on Soil & Material Investigation for Kandhar to Hirat Road (Kandhar to Grishak Section) for M/s Nippon Kobe Consulting Engineers. (May-2004) Client: M/s Nippon Kobe (Japan)

12. Geotechnical Report on (Birth Place Of Quaid - Azam) - Karachi. (July-2004). Client: M/s The National Museum, Of Pakistan Department of Archaeology & Museums

13. Geotechnical Report on Factory For Gul Ahmed Textile Mills At Plot # 82 & St-2 Landhi Industrial Area Karachi. (July-2004) Client: M/s Gul Ahmed Textile Mills

14. Geotechnical Report on Mirani Dam Project (July-2004) Client: M/s Geo Research

15. Geotechnical Report on 2nd Line Project Hub Chowki Baluchistan. (July-2004) Client: M/s Attock Cement Pak. Ltd.

16. Geotechnical Report on Rehabilitation & Improvement of University Road from peoples chowrangi to safoorah goth. (Aug-2004) Client: Techno Consultant International.

17. Geotechnical Report on Cause Way, Pakistan Progas, LPG Terminal, In Port Qasim, Karachi Pakistan. (Aug-2004). Client: M/s S.N.I. (Pvt.) Ltd.

18. Geotechnical Report on Institute Of Business Management (IBM) Korangi Creek Karachi. (Oct-2004) Client: M/s Construction (Pvt.) Ltd.

19. Geotechnical Report on Latif Ebrahim Jamal National Sciences Center University Of Karachi. (Oct-2004) Client: M/s l. E. J. National Sciences Center.

20. Geotechnical Report on 500/220 KV Sub Station Near Northern Bypass RCD Road Karachi. (Nov-2004). Client: M/s Siemen's Pakistan Ltd.

21. Geotechnical Report on Core & steel Testing at village Restaurant near sea view, Clifton, Karachi. (Nov-2004) Client: M/s D.H.A

22. Geotechnical Report on Container Yard & Ware House at Plot # B-1 North Western Zone, Port Qasim Karachi. (Nov-2004) Client: M/s Pak Shaheen Group Consultant: M/s Osmani & Company (Pvt.) Ltd.

23. Geotechnical Report on Factory for Gul Ahmed Textile Mills at Plot # 82 Landhi Industrial Area Karachi. (July-2004) Client: M/s Gul Ahmed Textile Mills

24. Geotechnical Report on Proposed New Total-Parco Petrol Pump near Old Truck Stand, Maripur Road, Karachi. (Dec-2004) Client: M/s Total Parco Pakistan (Ltd.)

LIST OF THE PROJECTS HANDLED Major Projects completed in 2003 (Subsoil Investigations)

nd 1. Geotechnical Report on Karachi Bulk water supply scheme Phase V, stage II 2 100 MGD K-III WN-12 project.(Jan-2003) Client: M/s Techno Consultant International

2. Geotechnical Report on Potential area for further construction at the premiers of the N.E.D. (Jan-2003) Client: M/s N.E.D

3. Geotechnical Report on Oncology services building Agha Khan University Hospital (Mar-2003) Client: M/s Agha Khan

4. Geotechnical Report on Baluchistan Component K-III (Mar-2003) Client: M/s K.W.S.B

5. Geotechnical Report on chemical lab at Agha Khan university Hospital. (May-2003) Client: M/s Agha Khan University

6. Geotechnical Report on I.I.T Pharmacy, Chemistry, Micro , Girls Hostel at University of Sindh Jamshoro (May-2003) Client: M/s University of Sindh Jamshoro

7. Geotechnical Report on Degree College for women II Phase VII (Exten), D.H.A Karachi (May-2003). Client: M/s P.D.O.H.A

8. Geotechnical Report on Hotel Metropole, Karachi. (May-2003) Client: M/s Rehman Cons. Co.

9. Geotechnical Report on Rehabilitation of Taxi-way at Karachi Airport.(July-2003). Client: M/s E.C.I.L

10. Geotechnical Report on New Entry School, PNS Hemalaya, Manura Karachi. (July- 2003). Client: M/s C.M.E.S (Navy)

11. Geotechnical Report on 3x128 Men’s Barracks at PNS Qasim, Manora, Karachi. (July-2003). Client: M/s C.M.E.S (Navy)

12. Geotechnical Report on Al-Hada Campus, Plot # 5 & 6 Sector H-11, Islamabad. Client: M/s Arshad Shahid Abdullah

13. Geotechnical Report on Nasira School (Super Highway), Karachi. Client: M/s Consult Tech. International

14. Geotechnical Report on Shah Latif Special Education Centre, Glushan-e-Baz Hyderabad. Client: M/s P.E.P.A.C

15. Geotechnical Report on Navy Section Centre, Sukkur. Client: M/s C.M.E.S

16. Geotechnical Report on Zamzama Club, Stadium commercial Area, Phase-VI D.H.A Karachi. Client: M/s P.O.D.H.A

17. Geotechnical Report on LPG Storage , Plot # A-3 Area at N.W.I Zone, Port Qasim, Karachi Client: M/s Mecom Gas (Pvt.) Ltd.

18. Geotechnical Report on Club House & Restaurant at Marina Club, Phase-VIII, D.H.A, Karachi. Client: M/s D.H.A

19. Geotechnical Report on Bahria Complex III, M.T Khan Road, Karachi. Client: M/s Bahria Foundation

20. Geotechnical Report on TCF School Qayyam abad, Hino Chowrangi, Korangi, Karachi. Client: M/s T.C.F School

LIST OF THE PROJECTS HANDLED Major Projects completed in 2002 (Subsoil Investigations)

1. Geotechnical Report on Gharo Sehwan Volume-I & II R.B.O.D irrigation & npower Department. Client: M/s M.M.P Ltd.

2. Geotechnical Report on Municipal Administration Gulshan-e- Iqbal Town University Road Karachi. Client: M/s Municipal Administration Gulshan-e-Iqbal, Town, Karachi.

3. Geotechnical Report on Plot of D.H.O Office near KDA pul< Karachi. Client: M/s Women Resource Centre

4. Geotechnical Report on PAF creek club, Karachi. Client: M/s .

Major Projects completed in 2001

1. Geotechnical Report on Construction of Economic flats Karachi. Client: M/s G.E (Air) PAF Base Masroor

2. Geotechnical Report on Bridge over Qadirabad Nullah Baghh-Dhulli Road Azad Kashmir. Client: M/s ESS-I-AAR

Major Project Completed from 1993-2000 More than 200 Projects.

LABORATORY TESTING AND ALLIED WORKS:

1. 03 Concrete Mix Designs of various Classes for the project of 50MW Zephyr Wind Power Project, Gharo Sindh (November-2017) Client: M/s Orient Energy System.

2. Asphaltic Wearing Coarse Mix Design for the project of Extension of Gwadar Airport Runway Revised (June-2017) Client: M/s Executive Agency FWO 756 CTE

3. Pump-Out Test at University Administration Building (UAB) at Aga Khan University Campus, Karachi (June-2017) Client: M/s Aga Khan University Hospital Consultant: Total Construction (Pvt.) Ltd.

4. Asphaltic Base Coarse Mix Design for the project of Sukkur- Multan Motorway, Section-1 (April-2017) Client: M/s CSCEC

5. Asphalt Base Coarse Mix Design for the project of Dualization of Balance Portion of Sukkur By-Pass Km: 4+700 to 11+000 Project (April-2017) Client: M/s Rakhshani Builders

6. Concrete Mix Design for the project of Pakistan LNG Terminal Project (January-2017) Client: M/s CCCC Third Harbour Co. Ltd.

7. Asphaltic Base Coarse Mix Design for the project of Hub River Road (Balance Portion) from Shersh Bridge to Murshid Hospital, Karachi (January-2017) Client: M/s Sultan Mehmood & Co.

8. 07 Concrete Mix Designs of various Classes for the project of 150MW Tricon Boston Wind Power Project (December-2016) Client: M/s Tricon Boston Consulting Corp. (TB-CCPL) Contractor: M/s Hydrochina Int’l Eng. Co. Ltd.

9. Electrical Resistivity Test for EPCC of complete Facility of Gas pressure boosting compressor station on Mari Gas Pipe Line at Daharki, Sindh (November-2016) Client: M/s Gasco Engineering (Pvt.) Ltd.

10. 05 Concrete Mix Designs of various Classes for the project of K-IV Greater Karachi, Bulk Water Supply Package-A (Novemberr-2016) Client: M/s KWSB Contractor: M/s Osmani & Co.

11. 15 Concrete Mix Designs of various Classes for the project of Three Gorges Second Phase Wind Power Project in Pakistan (August-2016) Client: M/s Shanghai Investigation Design & Research Institute Co. Ltd. (SIDRI)

12. 09 Concrete Mix Designs of various Classes for the project of 2 x 330 MW Coal Fired Power Plant, Thar Block-II (August-2016) Client: M/s CMEC/TEC

13. 06 Concrete Mix Designs of various Classes for the project of Fazaia Housing Scheme, Karachi (July-2016) Client: M/s AA Quality Builders

14. 04 Concrete Mix Designs of various Classes for the project of 2 x 330 MW Coal Fired Power Plant, Thar Block-II (August-2016) Client: M/s CMEC/TEC

15. Plate Load Test at GGES School Sari Village (JV-05) Sari Town, Distt. Jamshoro, Sindh (April-2016) Client: M/s Amcorp Eng. & Construction (Pvt.) Ltd.

16. 04 Concrete Mix Designs of various Classes for the project of Paksitan Jhimpir UEP Wind Power Phase-1 (April-2016) Client: M/s China Gezhauba Group Co. Ltd.

17. Petrography of Motor (Bindeded with Portland & Lime Cement on Shrivaran Dev Mandir, Manora Island, Karachi (April-2016) Client: M/s Sindh Exploration & Adventure Society

18. Asphalt Mix Design for the project of pavement Rehabilitation works at Khaskheli Air- Strip (March-2016) Client: M/s Amcorp Eng. & Construction (Pvt.) Ltd.

19. 08 Concrete Mix Designs of various Classes for the project of Green Line BRTS Contract Package # GL/02 (Marach-2016) Client: M/s Ch. A. Latif & Sons (Pvt.) Ltd.

20. 07 Concrete Mix Designs of various Classes for the project of Green Line BRTS Project package # BRTS/GL-01 (March-2016) Client: M/s CRFC- Metracon (JV)

21. Material Survey & Testing Report for Master Plan & Modernization of Gadani Ship- breaking yard & Allied facilities Gwadar, Balouchistan (February-2016) Client: M/s Consultant Group

22. 11 Concrete Mix Designs of various Classes for the project of 2 x 330MW Coal Fired Power Plant at Thar Block-III, Tharparkur, Sindh (January-2016) Client: M/s CMEC

23. Report on Laboratory Test Results for UEPL-Jhimpir Wind Power (99MW Pashe-1) Jhimpir, Sindh (December-2015) Client: M/s China Gezhauba (Group)

24. Concrete Mix Design for the construction of centre for advance studies (CAS-water) at Mehran University of Eng. & Technology, Jamshoro, Sindh (December-2015) Client: M/s Amcorp Eng. & Construction

25. Concrete Mix Design for the project of KPD-TAY Integrated Development Project Phase-II, PROC-FC/CB/PROJ/KPD-981-A/786/30/2015-(PC-4) (November-2015) Client: M/s Descon Eng. (Pvt.) Ltd.

26. Asphalt Mix Design (Base Coarse), for the project of Pakistan Deep Water Container Port, Container Yard & Buildings, Phase-1 Project Management (September-2015) Client: M/s South Asia Pakistan Terminal Ltd. (SAPT).

27. Geotechnical & Material investigation report (Existing Road) for Re-habilitation on N-5 Project from Quaidabad Fly-Over to Pakistan Steel Mills. VOL: 1/A (Test Pit Holes Section) VOL: 1/B (DCPT & FDT Test Section) VOL: II/A (Lab. Test Results section) VOL: II/B Proctor + CBR Tests Section) VOL: III (Asphalt Section) (August-2015) Client: M/s EA Consulting (Pvt.) Ltd. M/s JICA)

28. Geotechnical Survey Report for Infrastructure & Development Meerani Housing Scheme, Turbat Balouchistan (June-2015) Client: M/s Commission Turbat (Consultant Group)

29. Concrete Mix Design of class 3500 PSI with Lucky Cement OPC for H2 Ready Mix (Pvt.) Ltd. (April-2015) Client: M/s H2 Ready Mix (Pvt.) Ltd.

30. Concrete Mix Design for the project of Sapphire 50MW Wind Power Project, Jhimpir, Sindh (March-2015) Client: M/s Hydrochina Int’l Engg. Co. Ltd.

31. Concrete Mix Design for the project of up gradation of Fauji Fertilizer Bin Qasim Coal Fired project (CPP) (February-2015) Client: M/s F.F.B.L

32. Concrete Mix Design for the project of Sapphire 50 Wind Power Project, Jhimpir, Sindh (December-2014) Client: M/s Hydrochina Int’l Eng. Co. Ltd.

33. Geotechnical Survey Report for Alignment, Detail Design & Development of Road / Rail Network, (Pakistan Deep Water Container Port (POWCEP) near Shirien Jinnah Colony, Shahra-e-Ghalib, Clifton, Karachi (October-2014) Client: M/s EA Consulting (Pvt.) Ltd.

34. Asphalt Wearing Coarse Mix Design for the project of ADD, Skrand (October-2014) Client: M/s MLS Building System

35. Concrete Mix Design for the project of 50MW Metro Wind Power Project, Jhimpir, Sindh (September-2014) Client: M/s Descon Engineering Ltd.

36. Concrete Mix Design for the project of Finished Material Production Shed for Peoples Steel Mills, Manghopir (July-2014) Client: M/s Jammy Contractor (Pvt.) Ltd.

37. Concrete Mix Design for the project of Kadanwari K-4 Extension / Modification (July-2014) Client: M/s Saita Pakistan (Pvt.) Ltd.

38. Percolation Test at Liaquat Camp, near Tank # 04 (near D-type flats Malir Cantt., Karachi (April-2014) Client: M/s A.G.E. Liaquat Camp.

39. Asphaltic Wearing Coarse for the project F.B. Warehouse B-233/234, M-12, H.I.T.E., Area (February-2014) Client: M/s Saita Pakistan (Pvt.) Ltd.

40. Geotechnical Report of Dewatering Plan of the proposed site under Greater Karachi Sewerage Plan S-III for the construction of new RCC conduit & allied works from Maripur Road to TP-III along Lyari River (Contract Package LS-7) (December-2013) Client: M/s Crescent Construction Co. (Pvt.) Ltd.

41. Report on Concrete/stone Masonry coring & testing at Sukkur Barrage (December-2013) Client: M/s WS AitKin, M/s Associates Consulting Eng. M/s National Development Consultants (JV)

42. Asphalt Base Coarse Mix Design for New Gwadar International Airport (NGIA) Package-A Site Protection Works (September-2013) Client: M/s F.W.O.

43. Structure Load Test at Concrete Cores at Plot # A8H, Sindh Industrial Trading Estate. (SITE), Karachi (September-2013) Client: M/s Khaddi

44. Concrete Mix Design of class 3000 PSI with Pakland Cement SRC for the project of Kadanwari (June-2013) Client: M/s Saita Pakistan (Pvt.) Ltd.

45. Concrete Mix Design for the project of Infrastructure development works DHA Phase- VIII section project sector-D, South (June-2013) Client: M/s F.W.O.

46. 15 Concrete Mix Designs of various classes with lucky cement for the project of Three Gorgs First Wind Farm Pakistan (June-2013) Client: M/s S.C.S.T.

47. Concrete Mix Design for the construction of 20 bedded In-door Hospital & 8 Nos. staff quarter & 2 Banglow @ Nando Shahar Distt. Badin. (May-2013) Client: M/s Haji Sirajuddian Soomro

48. Asphalt Wearing Coarse Mix Design for the construction & Repair pf KFGCS Road at KandhKot Gas Field (April-2013) Client: M/s Balouch Engineering

49. Concrete Mix Design for the project of Surbandar Jetty & Pishukan Jetty, Gwadar (March-2013) Client: M/s HBZ Construction Co.

50. Concrete Mix Design for the project of Infrastructure Development Works including water Supply Sewerage, Drainage & Roads of Benazir Colony at Deh Luqman, Khairpur, Sindh (February-2013) Client: M/s Kazmi Construction

51. Laboratory Test Results of the Third Party Monitoring of Road Sector Development projects in Districts of Tharparkar at Mithi, Umakot, Mirpurkhas, Badin & Thatta, Sindh (December-2012) Client: M/s M.M. Pakistan (Pvt.) Ltd.

52. Asphalt Base Coarse Mix Design for Re-habilitation of Larkana-Naseerabad via-Rasheed Wagan.(October-2012) Client: M/s Lucky International (Pvt.) Ltd.

53. Concrete Mix Design for FOSPAK (Pvt.) Ltd. Karachi (October-2012) Client: M/s FOSPAK (Pvt.) Ltd.

54. Concrete Mix Design for Urdu University, Gulshan-e-Iqbal, Karachi (August-2012) Client: M/s H.S. Enterprises

55. Concrete Mix Design for Abbasi Shaheed Hospital, Karachi (August-2012) Client: M/s H.S. Enterprises

56. Concrete Mix Design for Reconstruction of Morris Pier at Manora, Karachi (July-2012) Client: M/s Iqbal & Sons

57. Structure Load Test at International Textile Mills, Plot # 12 & 27, Sector: 20, Korangi Industrial Area, Karachi (July-2012) Client: M/s SMK Associates

58. Structure Load Test at T.B Hospital (Institute of chest diseases at Ojha Campus DUHS, Karachi (June-2012) Client: D.U.H.S.

59. Structure Load Test at HEC Regional office, near Liaquat National Library, Bhadurabad, Karachi (June-2012) Client: M/s Higher Education Commission (HEC)

60. Structure Load Test at 400 Beded Hospital at Plot # ST-8, Block-10 Gulshan-e-Iqbal, near NIPA Chowrangi, Karachi (June-2012) Client: C.D.G.K.

61. Concrete Mix Design for Reconstruction of Jetties Baba & Bhit Islands (February-2012) Client: M/s Echo-West International (Pvt.) Ltd.

62. Structure Load Test at Plot # 44, Sector: 15, Korangi Industiral Area, Karachi (February-2012) Client: M/s Soorty Textile Mills (Pvt.) Ltd.

63. Structure Load Test at THQ, DHQ Hospital, Dist Jamshoro at Kotri, Sindh (July-2011) Client: Rehman Builders Consultant: I.D.G (International Design Group) 64. Report on Ground Temperature, Electrical resistively & thermal Conductivity for Zorlu’s 50MW wind power Project at Jhimpir. (Nov-2011) Client: Zorlu Industries & Power Plants (Turkey)

65. Concrete Mix Design for Construction of new Academic Block at IBA Main Campus, Karachi. (May-2011) Client: M/s A.H Construction (Pvt.) Ltd.

66. Concrete Mix Design for N.S.O.T.C., Gharo (May-2011) Client: M/s LES/KIG

67. Concrete Mix Design for DMNI Power Plant at Matli (March-2011) Client: M/s Jammy Constructor Pvt. Ltd.

68. Concrete Mix Design for Infrastructure design of Naya Nazimabad City, Manghopir, Road, Karachi (Jan-2011) Client: M/s Javedan Cement Ltd.

69. Concrete Mix Design for IBA Aman Tower, Karachi. (Dec-2011) Client: M/s Paragon Construction

70. Concrete Mix Design for Medical & Dental College (Jan-2011) Client: M/s Al-Mansoor Pvt Ltd.

71. Concrete Mix Design for Orient Energy System office workshop Building, Block-24 Plot # 9, K.D.A. (June-2010) Client: M/s PMACS

72. Concrete Mix Design for PPL-TCF School, Kandhkot. (June-2010) Client: M/s PPL

73. Concrete Mix Design for Harbin Electric. (June-2010) Client: M/s Fos Pak Pvt Ltd.

74. Concrete Mix Design for QICT. (May-2010) Client: M/s Kazmi Construction

75. Concrete Mix Design for 560MW PQPS-II. (March-2010) Client: M/s Harbin Electric Corp.

76. Laboratory Test Results for Feasibility Study & Transaction Advisory Services, Hyderabad,-Badin Road. (July-2010) Client: EPZA

77. Concrete Mix Design for United Dental College Medical and Dental College, Korangi, Karachi. (Nov-2009) Client: M/s United Medical & Dental College

78. Concrete Mix Design for construction of Road from Gharo-Ketty Bandar, Project (N-110) Package II, Mirpur Sakro to Gharo. (Oct-2009) Client: M/s Maj & FE (J.V)

79. Concrete Mix Design for AKUH High Pressure Gas Station, Karachi. (August-2009) Client: M/s Aga Khan University Hospital

80. Concrete Mix Design for Nallah protection works at Port Qasim for Pakisatn Textile City Ltd. May-2009) Client: M/s A. Sattar & Co.

81. Concrete Mix Design for New Head Office Building, Meezan Bank (Feb-2009) Client: M/s Total Construction

82. Laboratory Test Results for Infrastructure Development at Export Processing Zone, Gwadar. (Oct-2008) Client: EPZA

83. Trial Tube well at Korangi Thermal power Station, Karachi. (August-2008) Client: M/s K.E.S.C M/s MMP

84. Structural Load Test at Office Complex Building-D Pakistan Aeronautical Complex, Kamra (Trest-1). (July-2008) Client: NESPAK

85. Structural Load Test for Carrefour Footers Stadium, Lahore. (April-2008) Client: M/s Carrefour Hypermarket

86. Structural Load Test for EPZA Road over Bridge at level Crossing # 15-A at Km: 30/11- 12 between Landhi & Jumma Goth, Karachi. (March-2008) Client: M/s Railcop

87. Concrete Mix Design for Construction of construction of Nai Baran crossing RD: 537+000 RBOD (Nov-2008) Client: M/s A.R. & Co.

88. Concrete Mix Design for Construction of Building 10-14 East-Wharf, Karachi Port Trust. (Nov-2008) Client: M/s Ssang Yong & Usmani (J.V)

89. Concrete Mix Design for Medical College Foundation Karachi Office Building-2 (August-2008) Client: M/s Aga Khan University Hospital.

90. Concrete Mix Design for Rehabilitation & strengthening of water supply system K-III. (August-2008) Client: M/s NPI Const. Engg.

91. Concrete Mix Design for medical Institute Gambat (August-2008) Client: M/s Maqbool Ahmed & Co.

92. Concrete Mix Design for the construction of Road from library Block to Boundary wall, DHUS-Ojha. (March-2008) Client: M/s Maqbool Ahmed & Co.

93. Laboratory Testing & Concrete Mix Design of 560MW BQPS II. Client: M/s Harbin Electric (HE) Corporation

94. Laboratory Testing for Improvement of N-70 National Highway Rakhi - Gajj to Bewata. Client: CTII-OC-EA-EE-Joint Venture

95. Laboratory Testing for Feasibility Study and Transaction Advisory Services, Hyderabad - Badin Road. Client: M/s M.M Pakistan

96. Laboratory Testing for Kadanwari Field Development project. Consultants: M/s Mott. Macdonald International (Pak.) Ltd.

97. Laboratory Testing for Indus Highway Contract # 6. Client: M/s Saitagumi Co. Ltd. (JAPAN) Consultants: M/s Engineering Consultants.

98. Laboratory Testing for Greater Bulk Water Supply project. (Financed by WORLD BANK) a) Contract W-1 (M/S SMAD Baluch Co. Pvt. Ltd.) b) Contract W-2 (M/S Interglobe (Pvt.) Ltd.) c) Contract W-3 (M/S RM Gulistan Co. Pvt. Ltd.) d) Contract W-8 (M/S J&P International) Consultants: M/S ACE/MOTT MACDONALD.

99. Laboratory Testing for N-5 National Highway Section Hala to Moro. Client: M/s L & M International. Consultants: M/s Engineering Consultants.

100. Laboratory Testing for Bela Awaran Road Project (USAID PROJECT). Client: M/s Husnain Const. Co. Consultants: M/s Wilbur smith & M/s Republic Engineering Co. Ltd.

101. Structural Evaluation and Conc. Coring at IHP Section 6 (Ghauspur - Shori Nallah). Client: M/s Saitagumi Co. Pvt. Ltd. (JAPAN) Consultants: M/s NIPPON KOEI IN ASSOCIATION WITH M/S E.C.

102. Soil and Concrete Testing for N-5. GOP I & GOP II. Client: M/s Husnain Const. Co. Consultants: M/s Techno Consultant & M/s Engineering Associates.

103. Laboratory Testing and Asphalt Mix Designs for Shaheed-e-Millat Flyover, Karachi. Client: M/s Associated Consultants Ltd. Consultants: M/s A.A. Associates.

Laboratory testing for various other projects.

PILING & PILE LOAD TESTS

1) Piling of 660mm (26 inches) diameter for SAADI CEMENT HATTAR near Taxila.

2) Piling of 900 mm diameter, 30.0 m deep bored and cast in situ piles at Bridge No. 3 of IHP Contract # 1. Pile Load test at 750 Tons ( Largest in Pakistan).

3) Pile Load Test at Unnerwah Bridge in Indus Highway Contract # 6.

4) Piling 750 mm diameter, 32.0 m deep bored and cast in situ pile at Shori Nallah Bridge.

5) Piling of 750 mm & 900 mm diameter, 20.0 m deep pile and 525 Ton load test at Bridge # 4 of Indus Highway Project Contract # 1.

6) Piling of 750 mm diameter piles and Pile load test of 480 Tons at Bridge # 5 of IHP Contract # 1.

7) Piling of 750 mm diameter and 900 mm diameter piles at Bridge # 7 and Pile load test of 525 Tons at IHP Contract # 1.

8) Piling of 750 mm diameter and Pile load test at Bridge # 8 at IHP Contract # 1.

9) Piling of 750 mm dia Piles at Kohat Tunnel & Access Road Projects, Kohat.

a) Bridge No. 1 at Teri Toi Kohat and Pile Load Test 5of 500 Tons.

b) Railway Over Pass at Pindi Road and Pile Load test of 500 Tons.

c) Fly Over at Rawalpindi Road and Pile Load test of 500 Tons.

d) 35 M High Bridge No. 4 and Pile Load test of 450 Tons.

e) Bridge No. 5 at Dera Adam Khel and Pile Load test of 400 Tons.

f) Bridge No. 6A at Dera Adam Khel and Pile Load test of 500 Tons.

g) Bridge No. 7 at Dera Adam Khel and Pile Load test of 400 Tons.

h) Army Over Pass at Kohat and Pile Load test of 450 Tons.

i) Bazid Khel ocer Pass at Kohat and Pile Load test of 400 Tons.

10. Piling of 900mm dia bored piles at Bridge No. 2 in Kohat Tunnel & Access Road Projects & Pile Load test of 450 Tons.

LABORATORY

&

FIELD EQUIPMENTS

LABORATORY FACILITIES

SOIL SECTION

S.NO. EQUIPMENT ATTACHMENT(s) QTY.

01 Triaxial Testing Machine ELE Load Cells 01 No.

02 Consolidation Machine ELE Micrometers 05 Nos.

03 Direct Shear Machine SOILTEST load cell 02 Sets

04 Unconfined Testing Machine SOILTEST load cell 02 Sets

05 CBR Machine Control Proving Ring 03 Sets

06 Field CBR Machine Control Proving Ring 02 Sets

07 Atterberg Limit Device 07 Sets

08 Hydrometer Sets 10 Nos.

09 Std Proctor Test apparatus Additional Moulds 01 Set

10 Modified Proctor Test apparatus Additional Moulds 03 Sets

11 Field Density apparatus 04 Sets

12 BSS and ASTM Sieve Sets Original sieves and All Meshes Sizes

13 Densities apparatus 02 Nos.

14 Temperature controlled Oven Control Italy 03 Nos.

15 Balance (OHAUS) 25 kg capacity Standard weights 02 Nos.

16 Balance (OHAUS) 2,600 g capacity Standard weights 03 Nos.

17 Balance (OHAUS) 20 kg Capacity 02 Nos.

18 Electronic Balance 05 Nos.

19 CBR Moulds 18 Nos.

20 Sample extruder (Hydraulic type) 01 No.

21 Pocket Penetrometer 01 No.

22 Shaking + Vibrating Table Control 01 No.

All other Allied Equipment’s

LABORATORY FACILITIES

Material Testing Section

S.NO. EQUIPMENT QTY.

01 Cube Crushing Machine (150 Tons Capacity) 03 Nos.

02 Aggregate Crushing Value apparatus 01 Set

03 Aggregate Impact Value apparatus 01 Set

04 Gradation Sieves 05 Set

05 Flakiness and Elongation Sieves 01 Set

06 Marshall Stability apparatus 02 Nos.

07 Asphalt Extractor 02 Nos.

08 Cement Setting Time apparatus 01 No.

09 Cube Moulds for Concrete 20 Nos.

10 Cylinder Moulds for Concrete 24 Nos.

11 Mortar Cube Set 04 Set

12 Cylinder Capping apparatus 02 Nos.

13 Asphalt Moulds 48 Nos.

14 Asphalt Hammer 02 Nos.

15 Water Bath for Asphalt 03 Nos.

16 Automatic Asphalt Compactor 02 Nos.

17 Centrifuge Asphalt Extraction 03 Nos.

18 Asphalt/ Concrete Coring Machine 04 Nos.

LIST OF BORING & PILING EQUIPMENTS

S.NO. EQUIPMENT QTY.

01 F-35 Winch complete with 4 cylinder Diesel Engine for Piling upto 36 inches diameter. 03 Nos. 02 F-25 Investigation Boring Machine complete with Engine. 02 Nos. 03 F-15 Investigation Boring Rotary Drilling Machine with Engine. ACER type, Capable to Drill upto 100 meters. 02 Nos. 04 Rotary Drilling Machine with engine Joy Type capable to Drill upto 200 meters 07 Nos.

05 Casing 04" ∅ 1000 ft. 06 Casing 06" ∅ 800 ft. 07 Casing 08" ∅ 500 ft. 08 Casing 12" ∅ 400 ft.

09 Casing 16" ∅ 120 ft. 10 Casing 22" ∅ 124 ft.

11 Casing 26" ∅ 85 ft. 12 Casing 30" ∅ 140 ft. 13 Casing 30” ∅ 220 ft.

14 Bailer 08" ∅ 04 Nos. 15 Bailer 06" ∅ 12 Nos. 16 Bailer 12" ∅ 03 Nos. 17 Bailer 16" ∅ 04 Nos. 18 Bailer 22" ∅ 03 Nos. 19 Bailer 26" ∅ 02 Nos. 20 Bailer 30" ∅ 03 Nos. 21 Bailer 36" ∅ 02 Nos. 22 Chisels from 4" ∅ to 36" ∅ 10 Nos. 23 Tripods 35 ft. to 40 ft. 12 Nos. 24 Tripods 20 ft. to 30 ft. 06 Nos.

25 Pumps & Suction 2" to 5" 12 Nos.

26 Generators 1 KVA to 20 KVA 07 Nos. 27 Pile Load test equipment’s capable to perform load tests of 800 TONS.

28 Rods of A, B, N & H Type. 600 meters.

29 Core barells of B, N & H Type. 20 Nos.

OFFICE EQUIPMENTS

1. COMPUTER PENTIUM DUEL CORE i5 02 Nos.

2. COMPUTER PC PENTIUM IV 05 Nos.

3. LAP TOP INTEL DUEL CORE 02 Nos.

4. COPIER TOSHIBA 02 No.

5. HEWLETT PACKARD LASER COLOUR PRINTER 01 Nos.

6. HEWLETT PACKARD COLOUR PRINTER 04 Nos.

7. HEWLETT PACKARD LASER PRINTER 04 Nos.

8. EPSON LQ-300+II DOT MATRIX PRINTER 01 Nos.

9. HEWLETT PACKARD SCANNER 02 No.

10. EXTERNAL HARD DRIVE 160 GB. 01 No.