Complete EC File Application for Prior Environmental Clearance of Granite Building Stone Quarry of M/s Marath Enterprises & Crushers Pvt Ltd in an extent of 0.9449 Ha Koppam Village, Pattambi Taluk, Palakkad PRE – FEASIBILITY REPORT Pre-feasibility Report Page -28 Application for Prior Environmental Clearance of Granite Building Stone Quarry of M/s Marath Enterprises & Crushers Pvt Ltd in an extent of 0.9449 Ha Koppam Village, Pattambi Taluk, Palakkad PRE-FEASIBILITY REPORT FOR GRANITE BUILDING STONE QUARRY OF M/S MARATH ENTERPRISES & CRUSHERS PVT LTD OVER AN EXTENT OF 0.9449 HA IN KOPPAM VILLAGE, PATTAMBI TALUK, PALAKKAD DISTRICT, KERALA STATE 1.0 EXECUTIVE SUMMARY OF THE PROJECT The total extent of the Area is 0.9449 Hectares in Resurvey No. 203/3, of Koppam Village, Pattambi Taluk, Palakkad District, Kerala State It is a proposal of Granite Building stone Quarry project in Koppam Village. Category of project :‘B2’. Toposheet No. 58 B/1 Latitude : 10°50'37.1"N to 10°50'41.5"N Longitude: 76°12'12.0"E to 76°12'15.9"E Proposed area exhibits hilly terrain. Proposed stone production is 67,152 Tonnes per annum Life of the mine is about 3 years. The top soil thickness varies from about 1.00 m to 1.50 m. The soil will be utilized for plantation on the mined out benches. The quarry operation is proposed to carry out with conventional open cast mechanized mining with 5.0 meter vertical bench with a bench width of 5.0 meter. Quarrying operation is carried out Splitting of rock mass of considerable volume from the parent rock mass by jackhammer drilling and blasting, hydraulic excavators are used for loading the Building stone into trucks and will be transported from pithead to nearby crushers. Hydraulic excavators are attached with rock breakers for fragmentation to avoid secondary blasting. Most part of the proposed land is exposed rock and existing quarry pit and small area in the applied mining area is covered with some rubber, bamboo trees along with native trees, shrubs, herbs, grass, climbers, bushes etc. The Lease area is gently slope from NE to SW. The highest elevation in this area is 110 mRL and the lowest elevation is 80mRL. There is no habitation in the lease area. Commitment from applicant regarding the proposed project: I have applied for Environmental Clearance to DEIAA, Palakkad for quarrying of Building stone from Resurvey No. 203/3. of Koppam Village, Pattambi Taluk, Palakkad District, Kerala State over an extent of 0.9449 Hectares . I will not deploy any child labours below 18 years for any type of quarrying operation. All labors engaged for quarrying operation will be insured till the end of life of quarry period. All type of safety / Protective equipments will be provided to all the labourers working in my quarry site. Pre-feasibility Report Page -29 Application for Prior Environmental Clearance of Granite Building Stone Quarry of M/s Marath Enterprises & Crushers Pvt Ltd in an extent of 0.9449 Ha Koppam Village, Pattambi Taluk, Palakkad I will sincerely follow and execute the Afforestation and Green belt during the course of quarrying operation and maintain Afforestation after the expiry of quarrying lease. I ensure to involve and participate in the corporate social responsibilities of the local community. The quarrying operation will not cause any hindrance to the nearby public and also it will not cause any hindrance to nearby villagers and human settlements during transportation of mineral. ü The project area does not fall in ‘HACA’ region. ü The Tamil Nadu state boundary is located at 49.34 km ENE ü The project area does not fall in CRZ zone within the radius of 15 km. ü The project area does not fall in Western Ghats boundary ü About 8.0 KLD of water will be required for dust suppression, plantation and for drinking and domestic use. The required water will be met from bore well and open well from nearby area through tankers and also from rain water accumulated in mine pit. ü The report of Baseline studies like Air, Water and Noise analysis has been enclosed. ü Estimated project cost: Rs. 0.80 Crore. 2.0 INTRODUCTION OF THE PROJECT The Building stone is proposed to excavate by conventional opencast mechanized method in applied stone quarry located in Koppam Village, Pattambi Taluk, Palakkad District, Kerala State over an extent of 0.9449 Hectares, and it is a Category – B2 project. 2.1 Identification of project and project proponent: In case of mining project, a copy of mining lease/letter of intent should be given owner/authorized signatory name and address of the Project Proponent Name of owner /Authorized signatory :Mr. Subramanian Registered Address / Address for Correspondence Mr. Subramanian (Managing Director) Marath Enterprises & Crushers Pvt Ltd Regd. Office : No-4, Kuwait Building, Guruvayoor Road, Koottanad Post, Palakkad district, Kerala – 679 533 Site Office : Koppam, Amayur P.O., Palakkad district, Kerala – 679 310 Pin code : 679 533 Mobile No : +918086 242 242 Email Address : [email protected] Pre-feasibility Report Page -30 Application for Prior Environmental Clearance of Granite Building Stone Quarry of M/s Marath Enterprises & Crushers Pvt Ltd in an extent of 0.9449 Ha Koppam Village, Pattambi Taluk, Palakkad Location of the Lease Applied Area: Name of the quarry : Granite Building stone quarry of M/s Marath Enterprises & Crushers Pvt Ltd Resurvey No. : 203/3 Extent : 0.9449 Hectares Village : Koppam Taluka : Pattambi District : Palakkad State : Kerala Pin code : 679 310 Ownership : Private land The proposed quarry area bearing Resurvey No. 203/3 , over an total extent of 0.9449 Hectares , is a private Patta land, and owned by private party . 2.2 Brief description of nature of the project The Building stone quarrying operation is proposed to carry out by conventional opencast mechanized method by formation of benches. Mine benches are proposed with a height of 5mts and the width of each bench is proposed not less than the height. The proposed area exhibits hilly terrain. The massive building stone boulders are clearly outcropped in area. The Lease area is gently slope from NE to SW. The highest elevation in this area is 110 mRL and the lowest elevation is 80mRL. ü Proposed depth upto 65 m. MSL ü The proposed stone production is 67,152 Tonnes per annum ü Life of the mine is estimated to be around 3 Years The top soil thickness varies from 1.0 m to 1.50 m, will be removed during the mining operations. The topsoil excavated from the quarry will be dumped separately at predetermined place and subsequently will be utilized in spreading over reclaimed areas for plantation. 2.3 Need for the project and its importance to the country and or region The basic objective of the project is to effective utilization of material in the region. Granite Building Stone is the most commonly used metal in road, railway track construction etc. Being a construction material, the mineral will be used in local market. The excavated mineral will be crushed into required sizes and made ready for use. The mining project will fulfill its end uses in construction purposes. Pre-feasibility Report Page -31 Application for Prior Environmental Clearance of Granite Building Stone Quarry of M/s Marath Enterprises & Crushers Pvt Ltd in an extent of 0.9449 Ha Koppam Village, Pattambi Taluk, Palakkad The mining and associated activities in the mineral bearing areas will add to the revenue of the state through royalty on the mineral and the taxes as well as improve the economic conditions of the local people through direct and secondary employment. The mining project will provide employment to local people. Applicant will pay royalty for the mineral produced from the mine, direct and indirect taxes will be paid thereby contributing to the regional revenue. The public revenue so generated will further be put for use in infrastructural development and other sectors like health, education and social welfare. The applicant will allocate funds for the socio-economic development of the area i.e. medical facilities, schools, temples and other social work. 2.4 Demand and supply gap There is large demand of building stone for road, railway track, building, construction etc. Granite building stone is widely used in construction activities as main raw material. It is available in almost all the parts of the State. The entry in the target market is easy and there is a notable gap in the supply and demand, which is growing. 2.5 Imports vs indigenous production The building stone is required for construction and infrastructure development projects. The stone is available in local markets and hence, there is no scope of import. However, the demand for the stone is continuously increasing due to rising trend in the infrastructure projects. 2.6 Export Possibility Granite Building Stone production from the mine will cater to the needs of well established domestic markets. No export is possible. 2.7 Domestic/Export Markets Domestic demand is one of the main reasons for the rapid growth of building stone business in Kerala. Thus, domestic market for granite building stone as building material is well established. Since it is an allied industry of the construction sector, growth in construction sector may be considered as proxy for the growth in stone mining sector. The market scope for granite building stone is found to be encouraging in local market with the increased demand from building industry & construction projects. Pre-feasibility Report Page -32 Application for Prior Environmental Clearance of Granite Building Stone Quarry of M/s Marath Enterprises & Crushers Pvt Ltd in an extent of 0.9449 Ha Koppam Village, Pattambi Taluk, Palakkad 2.8 Employment Generation (Direct and Indirect) due to the project Project will create direct & indirect employment opportunities within the surrounding region.
Recommended publications
  • To Read / Download the Order
    WWW.LIVELAW.IN IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT THE HONOURABLE MR. JUSTICE K.HARIPAL WEDNESDAY, THE 14TH DAY OF JULY 2021 / 23RD ASHADHA, 1943 BAIL APPL. NO. 3850 OF 2021 CRIME NO.26/2020 OF EE & ANSS, MALAPPURAM PETITIONERS/ACCUSED: 1 MIDHUN AGED 30 YEARS,SON OF PURUSHAN, KOCHUPARAMBIL HOUSE, PANAYIKULAM, ALANGAD P O, ERNAKULAM DISTRICT, PIN 683502 2 SUJITH P U AGED 30 YEARS, SON OF UNNI,PUTHANVEETIL, EDAYAR P O, ERNAKULAM DISTRICT, PIN 686662 BY ADV K.NIRMALAN RESPONDENTS/STATE: 1 STATE OF KERALA STATE OF KERALA, REPRESENTED BY THE PUBLIC PROSECUTOR, HIGH COURT OF KERALA, HIGH COURT P O, ERNAKULAM 682 031 ERNAKULAM, PIN - 682031 2 INSPECTOR OF EXCISE INSPECTOR OF EXCISE, ENFORCEMENT AND ANTI NARCOTIC SQUAD, MALAPPURAM, REPRESENTED BY THE PUBLIC PROSECUTOR, HIGH COURT OF KERALA, HIGH COURT P O, ERNAKULAM BY PUBLIC PROSECUTOR SMT.SRREJA V. THIS BAIL APPLICATION HAVING COME UP FOR ADMISSION ON 5.07.2021,ALONG WITH CRL.M.C.NOS.2712/2021 AND 2901/2021, THE COURT ON 14.07.2021 DELIVERED THE FOLLOWING: WWW.LIVELAW.IN CRL.M.C.2712 & 2901 OF 2021 & BAIL APPL.NO.3850 OF 2021 -2- IN THE HIGH COURT OF KERALA AT ERNAKULAM PRESENT THE HONOURABLE MR. JUSTICE K.HARIPAL WEDNESDAY, THE 14TH DAY OF JULY 2021 / 23RD ASHADHA, 1943 CRL.MC NO. 2712 OF 2021 CRIME NO.26/2020 OF EE & ANSS, MALAPPURAM PETITIONERS/ACCUSED 2 & 3: 1 MIDHUN AGED 30 YEARS S/O PURUSHAN, KOCHUPARAMBIL HOUSE, PANAYIKKULAM, ALANGADE P.O.ERNAKULAM DISTRICT-680 502. 2 SUJITH P.U, AGED 30 YEARS S/O UNNI, PUTHANVEETIL, EDAYAR P.O.ERNAKULAM DISTRICT- 686 662.
    [Show full text]
  • Accused Persons Arrested in Palakkad District from 28.03.2021To03.04.2021
    Accused Persons arrested in Palakkad district from 28.03.2021to03.04.2021 Name of Name of the Name of the Place at Date & Arresting Court at Sl. Name of the Age & Cr. No & Sec Police father of Address of Accused which Time of Officer, which No. Accused Sex of Law Station Accused Arrested Arrest Rank & accused Designation produced 1 2 3 4 5 6 7 8 9 10 11 Chirakkad colony, produced 319/2021 U/S Sreejith, SI of Sanmughesh Kannan 33/m Kunnathurmeedu, South PS 30/3/2021 South PS before the 379 IPC Police 1 Palakkad Court 318/2021 U/S Chelambathu house, Sreejith, SI bail from Jayakrishnan Rajan 43/m 15 ( C) of South PS 28/3/21 South PS Pandarakavu, of Police station Abakri Act 2 Palakkad 318/2021 U/S Mangangam house, Sreejith, SI bail from Ramadas Ponnu 32/m 15 ( C) of South PS 28/3/21 South PS Pandarakavu, of Police station Abakri Act 3 Palakkad 318/2021 U/S Mangangam house, Sreejith, SI bail from Prajith Ramankutty 32/m 15 ( C) of South PS 28/3/21 South PS Pandarakavu, of Police station Abakri Act 4 Palakkad 320/2021 U/S Noorani, Vithunni, Sreejith, SI bail from Rajamani 25/m 279, 185 MV South PS 30/3/2021 South PS Palakkad of Police station 5 Santhosh Act Cherumkulam 323/21 U/s 15 Sreejith, SI bail from Mohanan 28/m house, Ganesagiri, ( C) of Abkari South PS 31/3/2021 South PS of Police court 6 Sham mohan Shoaranur act 323/21 U/s 15 Sreejith, SI bail from Balakrishnan 31/m Vilayankad house, ( C) of Abkari South PS 31/3/21 South PS of Police court 7 Viswambharan Parali, Ottapalam act 324/2021 u/s Sreejith, SI bail from Sajerali 28/m 118 €
    [Show full text]
  • Vadanamkurussi Rob Sia Draft Report English
    SOCIAL IMPACT ASSESSMENT STUDY DRAFT REPORT LAND ACQUISITION FOR THE CONSTRUCTION OF RAILWAY OVER BRIDGE AT VADANAMKURISSI IN ONGALLUR VILLAGE, PALAKKAD DISTRICT Requiring Body ROADS AND DEVELOPMENT CORPORATION OF KERALA LTD (A Government of Keral Undertaking) Mahakavi Vailoppilli Roiad Palarivattam, Kochi – 682025 Phone: 0484-2338205 SIA Unit Rajagiri College of Social Sciences Rajagiri P.O Kalamassery Pin: 683104 Ph: 0484 2911330 – 332/2550785 [email protected] www.rajagirioutreach.org 16.05.2019 SIA - Land Acquisition for Construction of Railway Over Bridge at Vadanamkurissi in Palakkad District. CONTENTS CHAPTER 1 - EXECUTIVE SUMMARY 1.1 Project and public purpose 1.2 Location 1.3 Size and attributes of land acquisition 1.4 Alternatives considered 1.5 Social impacts 1.6 Mitigation measures CHAPTER 2 - DETAILED PROJECT DESCRIPTION 2.1 Background of the project, including developers background and governance/ management structure 2.2 Rationale for project including how the project fits the public purpose criteria listed in the Act 2.3 Details of project size, location, capacity, outputs, production targets, costs and risks 2.4 Examination of alternatives 2.5 Phases of the project construction 2.6 Core design features and size and type of facilities 2.7 Need for ancillary infrastructural facilities 2.8 Work force requirements (temporary and permanent) 2.9 Details of social impact assessment/ environment impact assessment if already conducted and any technical feasibility reports 2.10 Applicable legislations and policies CHAPTER 3 –TEAM COMPOSITION APPROACH, METHODOLOGY AND SCHEDULE OF THE SOCIAL IMPACT ASSESSMENT 3.1 List of all team members with qualification 3.2 Description and rationale for the methodology and tools used to collect information for the social impact assessment 3.3 Sampling methodology used 3.4 Overview of information/ data sources used 3.5 Schedule of consultations with key stakeholders and brief description of public hearings conducted SIA - Land Acquisition for Construction of Railway Over Bridge at Vadanamkurissi in Palakkad District.
    [Show full text]
  • Social Exclusion of Ravuthar Community: a Case Study
    International Journal of Science and Research (IJSR) ISSN: 2319-7064 ResearchGate Impact Factor (2018): 0.28 | SJIF (2018): 7.426 Social Exclusion of Ravuthar Community: A Case Study Mohammed Rishad K P M.Phil Scholar, Gandhigram Rural Institute (Deemed to be University) Centre for Applied research Dindigul, Tamil Nadu, India Abstract: India, the world’s largest democracy, has a multi-cultural rash that has numerous religious communities. According to the 2011 census, 79.8 percent are practicing Hinduism and 14.2 percent are adheres to Islam, while the remaining 6 percent are other religions. According to Rizvi and Roy (1984), Indian Muslims are not a homogeneous community as it appears in the general perception Muslims are divided based on different religious ideologies, caste differentiation and customary practices. Among the different Muslim communities, Ravuthar is one of the Muslim communities from the South Indian States of Tamil Nadu and Kerala who are socially excluded at a wider. The etymology of the word suggests ‘ravath’ means ‘warriors’. But in reality, the Ravuthar community is facing high discrimination among the Muslim community. The present study is focused on how the Ravuthar community is excluded or discriminated among the Muslim community at Thiruvegappura Panchayat, Palakkad District, and Kerala by using descriptive research design. The researcher has employed an interview guide and case study. From the case studies, the relevant information was collected by the researcher. In the community, they were facing various issues such as stigma discrimination based on their linguistic and spatial. Their representation in any religious or social positions is very less.
    [Show full text]
  • 35/1 Vallapuzha Village, Pattambi Taluk, Palakkad District, Kerala Quarry Area: 0.7099 Ha (70.99 Ares) Non Forest - Private Land
    APPLICATION FOR ENVIRONMENTAL CLEARANCE FOR GRANITE BUILDING STONE QUARRY PROJECT (As per EIA Notification 2006 and amendments thereof) Form-IM, PFR & EMP Proponent/Applicant SRI. K. SUKUMARAN President OTTAPPALAM TALUK KARINKAL QUARRY OPERATORS INDUSTRIAL CO-OPERATIVE SOCIETY LIMITED Vadanamkurussi Palakkad District (D), Kerala – 679121 Email ID: [email protected] Phone No: 9846 883 731, 9846 959 618 Site at Re. Survey No. : 35/1 Vallapuzha Village, Pattambi Taluk, Palakkad District, Kerala Quarry Area: 0.7099 Ha (70.99 Ares) Non Forest - Private Land Prepared by Hareesh G. Thampy 905-D, Sankarnagar, Kaimanam P. O., Thiruvananthapuram, Kerala RQP/BNG/296/2013/A Mobile : 9387 838 782 1 TABLE OF CONTENTS Sl. No. DESCRIPTION Page No. I FORM – IM 4-7 II CHECKLIST FOR MINING PROJECTS 8-19 III QUESTIONNAIRE FOR MINING PROJECTS 20-22 IV PRE-FEASIBILITY REPORT 23-41 1. Executive Summary 24 2. Introduction of the Project 26 3. Project Description 29 4. Site Analysis 34 5. Planning Brief 36 6. Proposed Infrastructures 38 7. Rehabilitation & Resettlement (R & R) Plan 40 8. Project Schedule & Cost Estimates 40 9. Analysis of the Proposal (Final Recommentation) 41 V ENVIRONMENTAL MANAGEMENT PLAN & CSR 42-65 1. Introduction of the Project/Proponent 43 2. Details of the Project 43 3. Baseline Environment 47 4. Environmental Management Plan 50 5. Safety in Blasting 56 6. Mine Closure Plan 56 7. Risk Assessment 58 8. Disaster Management Plan 59 9. Occupational Health & Safety 60 10. Environmental Monitoring Program 61 11. Social (Corporate) Responsibilty 64 12. Conslusion 65 2 Sl. No. DESCRIPTION Page No. ANNEXURE 1.
    [Show full text]
  • Quarry of M/S KUMBIDI GRANITES at Anakkara Village, Pattambi Taluk & Palakkad District, Kerala
    Granite (Building Stone) Quarry of M/s KUMBIDI GRANITES at Anakkara Village, Pattambi Taluk & Palakkad District, Kerala. PRE-FEASIBILTY REPORT 1.0 INTRODUCTION OF THE MINING ACTIVITY Mohanan. V for M/s KUMBIDI GRANITES is proposing a (Building Stone) Quarry with Permit at Survey No. 149/1A1A1 of AnakkaraVillage, PattambiTaluk, PalakkadDistrict, Kerala for an area of 0.9912 hectares. The proposed quarry area is hill rock. In most parts of the quarry permit area, the rocks are exposed and also the granite (building stone) exposures are present / bordering to the permit boundary proving the occurrence of the granite (building stone). The highest elevation of the permit area is 140m MSL and lowest is 115m MSL. As the proposed area is hillock, the dra inage of the permit area is towards west direction. The geological resources of granite (building stone) in mining permit area are estimated to be 409179 MT. The Blocked Reserves and Mineable Reserve of granite (building stone) in mining permit area are estimated to be 202842MT and 206337MT respectively. In the first years of plan period, total 41200 Tons of granite (building stone) shall be quarried/mined. The balance mineral reserves and part of blocked resources shall be quarried after modifying the ben ch design in next five year period. Kerala experiences rainfall on duration of 3 to 4 months in a year and the quarry operations will be affected because of the rainy days. The anticipated life of the quarry is 5 years expected. 3 Granite (Building Stone) Quarry of M/s KUMBIDI GRANITES at Anakkara Village, Pattambi Taluk & Palakkad District, Kerala.
    [Show full text]
  • State Expert Appraisal Committee (SEAC) Kerala
    State Expert Appraisal Committee (SEAC) Kerala AGENDA FOR 121ST SEAC MEETING TO BE HELD ON 22ND, 23RD AND 24TH APRIL 2021 - PART-2 AGENDA Venue: CONFERENCE HALL, STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY- KERALA Please Check MoEF&CC Website at www.parivesh.nic.in for details and updates From Date:22 Apr 2021 TO Date:24 Apr 2021 Date when Agenda was Created:16 Apr 2021 CONSIDERATION/RECONSIDERATION OF ENVIRONMENTAL CLEARANCE S.No Proposal Environmental Clearance for the building stone quarry at Survey Nos. 26/2,26/2,26/2,27/1,27/3 of Vaniyamkulam-2 Village, Ottappalam Taluk, Palakkad District, Kerala for an area of 0.9990 hectares by Mr Deepak N D Managing Partner M/s Quality Rocks (ADS received) (1) S. State District Tehsil Village No. (1.) Kerala Palakkad Ottappalam Vaniyamkulam-2 [SIA/KL/MIN/126088/2019 , 1525/EC1/2019/SEIAA ] Environmental Clearance for Granite Building Stone Quarry at Re Survey No. 397, Block No : 64 in Elankur Village, Ernad Taluk, Malappuram District, Kerala State for an extent of 3.2636 Ha by Sri. Mujeeb Rahman Kurikkal, M/s Manjeri City Infrastructures And Developers (ADS received) (2) S. State District Tehsil Village No. (1.) Kerala Malappuram Ernad Elankur [SIA/KL/MIN/129623/2019 , 1537/EC3/2019/SEIAA ] Environmental Clearance for the mining of ordinary earth in Re survey no.36/10 in Velom village, Vadakara Taluk, Kozhikode District, Kerala from an area of 0.0876 ha of land by Smt.Nafeesa (Referred Back from SEIAA) S. (3) State District Tehsil Village No. (1.) Kerala Kozhikode Vadakara VELOM [SIA/KL/MIN/132197/2019 , 1735/EC4/2019/SEIAA ] Environmental Clearance for the mining of ordinary earth in Re survey (4) no.36/10 in Velom village, Vadakara Taluk, Kozhikode District, Kerala from an area of 0.1064 ha of land by Smt.Nafeesa (Referred Back from SEIAA) S.
    [Show full text]
  • Koppam Village of Pattambi Taluk, Palakkad District, Kerala. (Proposal Number: DIA/KL/IIIN/I3 1 4 1/20 1 8)
    MINUTES OF THE ELEVENTH MEETING OF THE DISTRICT ENVIRO.NMENT TMPACT ASSESSMENT AUTHORTTY (DETAA) PALAKKAD HELD ON 31/05/2018 AT 2.30 PM IN CHAMBER OF DISTRICT COLLECTOR, COLLECTORATE, PALAKKAD List of members present : LDr. P Suresh Babu District Collector & Chairman, DEIAA. 2.P.Kavery kutty, Revenue Divisional Officer Palakkad, Member Secretary 3 .N arendr a N ath. U D iv i s i o nal F or e s t Offi c er P al akka d (Memb er) The Eleventh meeting o1 DEIAA has been convened on 3110512018 at 4.00pm in the chamber of District Collector, Palakkad. The meeting was held as per the agenda, in presence of the Chairman, Member Secretary. The Chairman welcomed the members. The commitee decided to direct the quarry owners who had aheady allotted the EC to submit the report of CSR activities done by them. The committee after examining the mining plan, pre-feasibility report, field inspection report and all other submitted documents, decided to recommend for issuance of environment clearance subject to general conditions in addition to the following specific conditions for mining projects. Item No:19.02 Granite (Building Stone) quarry project of IWs Cee Cee Granite, Amal'ur, Pattambi, Palakkad District for an area of 2.0573 hectares of land comprised in Survey Number 37512 of Koppam Village of Pattambi Taluk, Palakkad District, Kerala. (Proposal Number: DIA/KL/IIIN/I3 1 4 1/20 1 8) The committee appraised the proposal based on Form-I, Pre-Feasibility report, Mining Plan and Field Inspection Repot. The committee decided to recommend for issuance of Environmental Clearance with the general conditions subject to the following specifrc conditions.
    [Show full text]
  • Social Impact Assessment Study
    SOCIAL IMPACT ASSESSMENT STUDY Final report Entrusted by District Administration Palakkad Land Acquisition for LAND ACQUISITION FOR RAILWAY OVER BRIDGE AT KODUMUNDA, PATTAMBI THALUK, PALAKKAD DISTRICT 10 January 2020 Requiring Body SIA Unit RajagirioutREACH 2nd Floor, Preethi Building Rajagiri College of Social Sciences MV Road, Palarivattom (Autonomous) Kochi- 682025, Kerala Rajagiri P.O., Kalamassery 0484-2338205 Kochi- 683104, Kerala [email protected] 0484 2911330-332/2550785 www.rbdck.com [email protected] www.rajagirioutreach.in CONTENTS List of Tables and Figures List of Abbreviations Chapter 1 Executive Summary 1.1 Project and public purpose 1.2 Location 1.3 Size and attributes of land acquisition 1.4 Alternatives considered 1.5 Social impacts 1.6 Mitigation measures Chapter 2 Detailed Project Description 2.1 Background of the project, including developer’s background and governance/ management structure 2.2 Rationale for project including how the project fits the public purpose criteria listed in the act 2.3 Details of project size, location, capacity, outputs, production targets, costs and risks 2.4 Examination of alternatives 2.5 Phases of the project construction 2.6 Core design features and size and type of facilities 2.7 Need for ancillary infrastructural facilities 2.8 Work force requirements (temporary and permanent) 2.9 Details of social impact assessment/ environment impact assessment if already conducted and any technical feasibility reports 2.10 Applicable legislations and policies Land Acquisition for Railway
    [Show full text]
  • Interview List for Selection of Appointment of Notaries in the State of Kerala
    Interview List For Selection of Appointment of Notaries in the State of Kerala Area Of Practice Enrollment S.No. Name Category Appl.Date File No. Father Name Address Applied For No. Nadukkandy House, Puduppanam Manoj Kumar N-11013/5838/2018- Lt.Sh.N.K.Kunhi K/50/1997 1 Gen 04.05.12 Vatakara Po.Vatakara, P.K. NC raman Dt.31.08.97 Kozhikode Distt.Kerala- Mathiyamkallingal M.K. House, Vazhakkad 09.12.11/07.0 N-11013/5839/2018- K/1350/200 2 Muhammedali Gen Malappuram M.K.C.Moideen Po., Malappuram 1.12 NC 3 Dt.20.12.03 Noushad Distt.Kerala- 673640 Mangattu (H), Valiyajarm Edavetty K/254/2000 Muhammed N-11013/5840/2018- 3 Obc 16.03.12 Thodupuzha Ibrahim.M.A Po, Thodupuzha, Dt.05.03.200 Abbas M.I. NC Iddukki Kerala- 0 685588 Parathur House N-11013/5841/2018- K/765/1999 4 Jaison P.A. Gen 11.04.12 Thrissur Distt. P.V .Antony Parannur Choondal NC Dt.05.04.99 Post Kerala-680502 Flat No.5822 Bilathikulam K.P. N-11013/5842/2018- K/518/2002 5 Obc 31.03.12 Kozhikode Dt. Chathu Housing Colony, Kunhiraman NC Dt.25.11.02 Eranhippalam.Po.Ko zhikode Kerala Kashmi Nivas, Edodi 19.11.11/03.0 N-11013/5843/2018- T.Kunhirama Vatakara Kozhikode K/769/1994 6 L. Jyothikumar Gen Vatakara 5.12 NC Kurup Distt. Kerala- Dt.17.07.94 673101 Kovilakam, Karuvattumkuzhy, Kareelakulangara N-11013/5844/2018- K/1098/199 7 Jeeva Kumar S. Obc 11.05.12 Allapuzha Distt.
    [Show full text]
  • Classical Arts/Kathakali/Son G
    BLOCK PANCHAYATHS/MUNICIPALITIES/CORPORATIONS ALLOTTED TO THE FELLOWSHIP ARTISTS Block Panchayat/Municipal Sl No Name Address Art Category District Taluk ity/Corporation where the artist is deployed ULLADAMPARAMBIL, KALAVOOR Classical Arts P.O. AMBALAPPUZHA TALUK, 1 REMYA R / Music Alappuzha Ambalappuzha Ambalappuzha ALAPPUZHA DIST PIN 688522 / Vocal AMBANAKULANGARA VELI MANNANCHERRY P O Classical Arts / 2 VINSHIA S AMBALAPPUZHA ALAPPUZHA - 688 Dance/Mohiniyatta Alappuzha Ambalappuzha Ambalappuzha 538 m Classical SIVASADANAM, KAROOR, Arts/Kathakali/Son AMBALAPUZHA.P.O ALAPPUZHA, 3 KRISHNAKUMAR M N g Alappuzha Ambalappuzha Ambalappuzha 688561 Vijay Bhavan, NR Tharayil L.P.S. 4 Reshmi V Ponakam, Mavelikara 690101 Finearts /Painting Alappuzha Mavelikkara Bharanikkavu RETHEESH BHAVAN, KOLLAKADAVU P.O. KOLLAKADAVU, Folklore Arts / Folk 5 REJITHA RAJAN TALUK - CHENGANNUR DIST. Alappuzha Chenganoor Bharanikkavu ALAPPUZHA - 690509 song ALATHOOR HOUSE KODIYATTUKARA CHENGANNUR Folklore Arts / 6 HARIKRISHNAN M G Alappuzha Chenganoor Bharanikkavu ALAPPUZHA 689121 Vanchipattu MANOLIL HOUSE EDANAD P.O. Folklore Arts / 7 HARISH KUMAR M. S. CHENGANNUR ALAPPUZHA 689 123 Alappuzha Chengannur Chengannoor Vanchipattu kunnileparambil nadukkethil, puliyoor p Classical Arts / 8 AISWARYA o, chengannur, alappuzha, kerala Dance/Mohiniyatta Alappuzha Chengannur Chenganoor m CHERUVELIL ILLAM PANDANAD WEST PO CHENGANNUR, 9 SREEKUMAR C N Finearts /Painting Alappuzha Chengannur Chenganoor ALAPUZHA 689506 Classical Arts NISHADHAM, VARANAD.P.O, / Kathakali / CHERTHALA,
    [Show full text]
  • Hectare), Koppam Village, Pattambi Taluk
    District office of the No. DOPl346l20I7 lAI. Department of Mining & GeologY' Town Bus Stand ComPlex, Palakkad-l4 PH:No' 0491 2527196 E-mail : geo.pal.dmg@kerala' gov'in Dated :2710312017 . From The Geologist, Palakkad. To Sri. P.K" SubramaniYan, S/o. K\rttYmon, Managing Director, (Pvt) Ltd'' IWs. Marath Enterprises and Crusher AmaYoor. P.O, KoPPam, Palakkad - 679310' Sir, Building Stone Quarry at Sub:_ Approval of Eco-friendly mining plan-Granite Pattambi Taluk' Palakkad Re.Survey No. 20313, Koppam village, District, Kerala- reg: from Geologist' Letter.No. Dop 134612017lAl, dated 1510312017 Ref:- 1). Palakkad' District Office, Department of Mining & Geo]oBY, 2). Mining plan submitted by you on 2010312017. quarry project at Sy.No' 20313 (09449 The mining plan for the building stone pattambi palakkad District, Kerala is hereby Hectare), Koppam village, Taluk, of mining the District Geologist for the approval approved vide the powers delegated to Mineral concession Rules' 2015 with the plan for the Minor Minerals vide Kerala Minor following conditions :- & Regulations of central Government and 1). That you will follow the prescribed Rules time in regard to mining' State Government issued from time to & Regulations' Z). That you will follow the Mine Safety Rules 3)' That you will store the mining waste in the earmarked location/dumping yardonly as specified in the plan. 4)' That you will carTy out the plantation as committed in the plan. 5)' That provision shall be made for the housing facility for the labour infrastructure with all basic facilities including safe drinking *r"t il;;, within the site. Yours faithfully, GEOLOGIST District Office of the Depa.rtqen! Mhl's a";;f P ar a kkad l3lind,,i .