MINUTES OF THE ELEVENTH MEETING OF THE DISTRICT ENVIRO.NMENT TMPACT ASSESSMENT AUTHORTTY (DETAA) HELD ON 31/05/2018 AT 2.30 PM IN CHAMBER OF DISTRICT COLLECTOR, COLLECTORATE, PALAKKAD List of members present : LDr. P Suresh Babu District Collector & Chairman, DEIAA. 2.P.Kavery kutty, Revenue Divisional Officer Palakkad, Member Secretary 3 .N arendr a N ath. U D iv i s i o nal F or e s t Offi c er P al akka d (Memb er)

The Eleventh meeting o1 DEIAA has been convened on 3110512018 at 4.00pm in the chamber of District Collector, Palakkad. The meeting was held as per the agenda, in presence of the Chairman, Member Secretary. The Chairman welcomed the members. The commitee decided to direct the quarry owners who had aheady allotted the EC to submit the report of CSR activities done by them. The committee after examining the mining plan, pre-feasibility report, field inspection report and all other submitted documents, decided to recommend for issuance of environment clearance subject to general conditions in addition to the following specific conditions for mining projects.

Item No:19.02 Granite (Building Stone) quarry project of IWs Cee Cee Granite, Amal'ur, , for an area of 2.0573 hectares of land comprised in Survey Number 37512 of Village of , Palakkad District, . (Proposal Number: DIA/KL/IIIN/I3 1 4 1/20 1 8)

The committee appraised the proposal based on Form-I, Pre-Feasibility report, Mining Plan and Field Inspection Repot. The committee decided to recommend for issuance of Environmental Clearance with the general conditions subject to the following specifrc conditions.

1 . The natural flow of water along the western side of the applied area should not be disturbed or obstructed. 2. Quarrying should be practiced by benching system as mentioned in the approved mining plan. 3. A Qualified Person shall be appointed to control, direct, manage and supervise the quanying operations. 4. The approach road to the quarry must be maintained in good motorable condition. 5. Controlled blasting should be practised and blasting shall be done only during day time. 6. Plantation shall be done which includes a green belt of adequate width around the Mining Lease area excluding the rocky area, along roads, overburden dumps and non mineralized area by planting suitable native specious in consultation with thel ocal DFO/Agriculture Department. 7. The drains should be regularly de silted and maintained properly. Check dam and gully checks shall be constructed wherever required to arrest siltation. De siltation shall also be done every year before the onset of monsoon. 8. Fencing must be maintained properly all around the lease area. 9. Appropriate sign boards should be displayed. 10. The blasting time must be displayed and strictly adhered to. 11. Dust suppression mechanism must be in place. Sprinklers shall be installed along the main haulage road for dust suppression. I2.Hea\thand welfare measures for the persons employed shall be implemented. 13.The overbffien shall be properly stacked and suitably protected from soil erosion by planting -' lFodder grass and leguminous plants during temporary storage. .; Post,

(ProPosal

018) , Mining Plan and of Environmental ific conditions'

approved mining pl?n sysgT'as mentioned in the be.nr.1ciic11l1-O*"*ng quarrylng 1. Quarrying should age and supervise the person be uppoirrt"J io ait."f -u" A shalr "inirot, 2. eualified trees otorable condition' Avenue

planting suitable native sPe '0. e tuitt water harvesting and gully checks afea. properrv c-h".gk.dam de silted and maintained should be regularly pJririution shall also be done everv vear 7. The drains r"qoir.a,;;;;iiiation. shalr be o.t.o*rJi.rli.r "orrrt

be installed along the

surei a'?:[Tli'"Xo,io'bY Pranting protr Plan Muhammedali'K'V an area of 0'6771 of Pattambi Taluk' 0rl20t1\ report' Revised on Form-l, pre-Feasibility the proposar and based issuance of The committee considered to recommend for ;9 conditions' Mining pran #Ti;rd-tr.p""tio'"il;I _decidedthe foll0wing specific wirh general condition, .rru3..ito Environmental ciearance mgnti.onld i" tT^lpl;ilif by benching svsJgm as .t should be practiced the lease afea I #Tlt"tJ,H 1. euarrying ,..,, i,, tr,"-'outr'J* side outside 2. The water logged pit, and supervise the quarrying to control, direct, manase Ttttffi?:lg::: shau be appointed otorable condition' during daY time' around the Mining Lease non mineralized area bY planting suitable native specious in consultation with thel ocal DFO/Agriculture Department. 7. The drains should be regularly de silted and maintained properly. Check dam and gully checks shall be constructed wherever required to arrest siltation. De siltation shall also be done every year before the onset of monsoon. 8. Fencing must be maintained properly all around the lease area. 9. Appropriate sign boards should be displayed. 10. The blasting time must be displayed and strictly adhered to. 11. Dust suppression mechanism must be in place. Sprinklers shall be installed along the main haulage road for dust suppression. 12. Health and welfare measures for the persons employed shall be implemented. 13. The overburden shall be properly stacked and suitably protected from'soil erosion by planting fodder grass and leguminous plants during temporary storage.

Item No:19.05 Environmental clearance for removal of ordinary earth from an area of 0.0826' hectors of land comprised in Re.Survey No: 7/6,7/8 of Mundur-Il Village, Palakkad Taluk, Palakkad District by Sri. Father Sebastian Panjikkaran, St. Mary's Church, Mylampully, palakkad District, Kerala. (File Number: A-694118).

Item No:19.06 Environmental clearance for removal of ordinary earth from an area of 0.2047 hectors of land comprised in Re.Survey No: 87112 of Kavassery-Il Village, Taluk, Palakkad District by Sri. Shaji Saleem, Palathinkal Veedu, Kaduval, . (File Number: A-662U17).

Item No:19.07 Environmental clearance for removal of ordinary earth from an area of 0.0202 hectors of land comprised in Survey No: 32l2A2A of Karimba-Il Village, Taluk,Palakkad District by Sri. Mohanan K.P, Kuttiyanikkal, Kalldikode Post, Palakkad. (File Number: A-620118).

Item No:19.08 Environmental clearance for removal of ordinary earth from an area of 0.2348 hectors of land comprised in Survey No: 1261181 of Village, Pattambi Taluk, palakkad District by Sri. Kamarsaman, Pulikkapalimanjalil, Koodallur Post, Palakkad. (File Number: A-290tr8).

Item No:19.09 Environmental clearance for removal of ordinary earth from an area of 0.0200 hectors of land comprised in Re.Survey No: 73811 of Village, , Palakkad District by Sri. Shafiyulla Alayar House, Vandithavalam, Chittur Palakkad District. Kerala. (File Number: A-696118).

Item No:19.10 Environmental clearance for removal of ordinary clay from an area of 0.1851 hectors of land comprised in Re.Swvey No: 55 of -II Village, Alathur Taluk, Palakkad District by Sri. K.V.Paulose, Karimathi House, Sreemoolanagararrr P.O, , District, Kerala. (FiIe Number: A-245l18).

Item No. 19.11 Environmental clearance for removal of ordinary earth from an arca of 0.0153 hectars of land comprised in Re.Survey No: ll4lI of Peringotfukurussi-Il Village, Alathur Taluk, Palakkad District by Sri. Vasu, S/o Ravunni, Neerppara, Naduvathapara.P.O, Peringottukurussi, Palakkad District. (File Numb er : F"-17 20 I 18) i) \

Building ordinary Earth/Laterite extraction of to be followed for General conditions ClaY : Stone/OrdinarY Earrh/LateriteBuilding::T:T,1ilil:":[''#'t=; level shouto the site' The

shallberequiredforminingfrom2metersto6metersbelow

LateriteBuildingStone/ordinaryClayshouldberestrictedto2m paftem * as natural drinage i""il","for useful purpose Propor stored bY the Project J;t:"TJ,.T';lli;t wed/excavatedpit*"11'':Xtl):ffof burror emision u! coueiing in the water f breeding of vectors

sanitation' ;;;ito atleasthalf the

l5mfromanycivilstructureshallkeptfromtheperipheryoftheof above case of violation cance'ed in any be liabre to be excavated clearance shall 12' The Erffio*"rrtal guidelines' at 5'30 PM' was conclucled The meeting

Babu' lAS' r & Chairman uiraa, Falakkad

Palakkao \

)