Government of

SCHEDULED CASTE SUB PLAN (SCSP) 2014-15

M iiF P A DC

D14980

Directorate of Scheduled Caste Development Department

Thiruvananthapuram

April 2014 Planng^

, noD-

documentation CONTENTS

Page No;

1 Preface 3 2 Introduction 4 3 Budget Estimates 2014-15 5 4 Schemes of Scheduled Caste Development Department 10 5 Schemes implementing through Public Works Department 17 6 Schemes implementing through Local Bodies 18 . 7 Schemes implementing through Rural Development 19 Department 8 Special Central Assistance to Scheduled C ^te Sub Plan 20 9 100% Centrally Sponsored Schemes 21 10 50% Centrally Sponsored Schemes 24

11 Budget Speech 2014-15 26 12 Governor’s Address 2014-15 27 13 SCP Allocation to Local Bodies - District-wise 28 14 29 15 31 16 33 17 35 18 37 19 Idukki 39 20 Emakulam 41 21 44 22 47 23 50 24 53 25 Wayanad 55 24 Kaimur 56 25 58 26 Scheduled Caste Development Directorate 60 27 District SC development Offices 61 PREFACE

The Planning Commission had approved the State Plan of Kerala for an outlay of Rs. 20,000.00 Crore for the year 2014-15. From the total State Plan, an outlay of Rs 1962.00 Crore has been earmarked for Scheduled Caste Sub Plan (SCSP), which is in proportion to the percentage of Scheduled Castes to the total population of the State.

As we all know, the Scheduled Caste Sub Plan (SCSP) is aimed at (a) Economic development through beneficiary oriented programs for raising their income and creating assets; (b) Schemes for infrastructure development through provision of drinking water supply, link roads, house-sites, housing etc. and (c) Educational and Social development activities.

Out of the total outlay of Rs 1962.00 Crores set apart for the Scheduled Caste Sub Plan, development programs for an amount of Rs 1034.42 Crore is being implementing through Scheduled Caste Development Department and execution of schemes for the remaining portion of Rs 927.58 Crore is entrusted to Local Self Government Institutions.

This Document brings the details of development programs for Scheduled Castes, which are formulated with the object of improving their social status and providing them fuller educational and economic opportunities. The details of grant-in-aid provided to each and every Local Self Government Institution are also incorporated in this document. This plan write up document will be of immense help for Department to ensure effective utilization of the earmarked fimds for SC population and to monitor the implementation of schemes through local bodies.

Ali Asgar Pasha IAS Director SC Development Department

Introduction

An amount of Rs. 1962.00 Crore is proposed for the Welfare of Scheduled Castes Development in Kerala during 2014-15. Out of this an amount of Rs.1034.42 Crore is proposed for Scheduled Caste Development Department and Rs.927.58 Crore for Local Self Government Institutions. Details of Plan outlay for SCSP during 2014-15 including grant-in-aid to Local Self Government Institutions are given in the following Table.

Outlay SI. No. Schemes (Rs. Lakh) I State Plan Schemes under SC Department a Schemes through Scheduled Caste Development 95521.00 Deparlment b Schemes through Public Works Department 2200.00 c Schemes transferred to Panchayats 344.00 d Schemes through Rural Development Department 5377.00

Subtotal 1 103442.00

II Grant-in-aid to Local Self Government Institutions for SCP Projects a Village Panchayat 47863.34 b Block Panchayat 15954.44 c District Panchayat 15954.44 d 7142.40 e Corporation 5843.78

Subtotal II 92758.40

Total State Plan Schemes (SCSP) (I+II) 196200.40 BUDGET ESTIMATES 2014-15

9.11 (I) Welfare of Scheduled Castes

Budget Outlay (Rs. in Lakhs)

State Plan Centrally Sponsored/ Other Outside State Plan Gross Plan Outlay Schemes Schemes

103442.00 21665.00 125107.00

STATEMENT IV - STATE PLAN

SCHEMATIC DETAILS

Budget Estimates SI. Code Demand/ Head of Name of Scheme 2014-2015 No. No. Account (Rs. in Lakhs) 9.11 Welfare of SCs / STs /OBCs and Minorities

I WELFARE OF SCHEDULED CASTES

a Schemes through Scheduled Caste Development Department

Land to Landless Families for Construction of Houses WBC 1 278 State Plan [XXV] 2225-01-283-87 7720.00

One Time ACA [XXV] 2225-01-283-86 2280.00 House to Houseless, Completion of WBC Partially Constructed Houses, 2 [XXV] 2225-01-283-89 15000.00 209 Improvement of Dilapidated Households Pooled Fund for special Projects WBC 3 proposed by other Departments under [XXV] 2225=-01-800-26 2000.00 220 SCP Share Capital Contribution to Kerala WBC State Development Corporation for 4 [XXV] 4225-01-190-99 1020.00 060 Scheduled Castes and Scheduled Tribes (51% State Share) WBC Modernization and e-govemance 5 [XXV] 2225-01-001-94 1500.00 279 Initiatives in Development Department Budget Estimates SI. . Code Demand/ Head of Name of Scheme 2014-2015 No. No. Account (Rs. in Lakhs)

Implementation of Protection of Civil [III] 2014-00-103-98 800.00 WBC 6 Rights (PCR) Act and Prevention of 020 Atrocities (PoA) Act (50% State Share) [XXV] 2225-01-800-86 200.00

WBC Corpus Fund for SCP (Critical Gap 7 [XXV] 2225-01-800-57 28400.00 099 Filling Scheme)

Contribution to Kerala State Federation WBC 8 of SCs/STs Development Co-operative [XXV] 4225-80-195-99 200.00 234 Limited

WBC Development Programme for the 9 [XXV] 2225-01-102-99 1000.00 024 Vulnerable Communities among SC

WBC Financial Assistance for Marriage of SC 10 [XXV] 2225-01-102-97 2500.00 280 Girls

Management of Model Residential WBC Schools including Ayyankali Memorial [XXV] 2225-01-277-58 1700.00 281 Model Residential School for Sports, / Vellayani

WBC Assistance for Education of SC [XXV] 2225-01-277-57 27500.00 282 Students

WBC Assistance for Training and 13 [XXV] 2225-01-102-96 3701.00 283 Employment

b Schemes through Public Works Department

14 WBC Construction of Boy's Hostels- [XXV] 4225-01-277-98 400.00 / 015 Scheduled Castes (50% State Share) WBC 15 Works and Buildings [XXV] 4225-01-800-89 1800.00 268 Budget Estimates SI. Code Demand/ Head of Name of Scheme 2014-2015 No. No. Account (Rs. in Lakhs)

c Schemes transferred to Panchayats

Pre Primary Education

Assistance to Village Panchayats [XXV] 2225-01-198-50 65.00 WBC 16 075 Assistance to XXV] 2225-01-192-50 30.00

Assistance to Municipal Corporations [XXV] 2225-01-191-50 30.00

Boarding Grants

Assistance to Municipalities [XXV] 2225-01-192-50 24.00 WBC 17 003 Assistance to Block Panchayats [XXV] 2225-01-197-50 40.00

Assistance to Municipal Corporations [XXV] 2225-01-191-50 20.00

Tuition System in Pre-Matric Hostels

Assistance to Municipalities [XXV] 2225-01-192-50 30.00 WBC 18 010 Assistance to Block Panchayats [XXV] 2225-01-197-50 75.00

Assistance to Municipal Corporations [XXV] 2225-01-191-50 30.00

d Schemes through Rural Development Department

WBC 19 Indira Awas Yojana - SCP (25% SS) [XXV] 2225-01-197-50 4578.00 113

WBC Swama Jayanthi Gram Swarozgar 20 [XXV] 2225-01-197-50 799.00 117 Yojana / NRLM -SCP (25% SS)

Total {a+b+c-^d) 103442.00

Special Central Assistance to Special WBC 1 Component Plan (SCA to SCSP) [XXV] 2225-01-793-99 2200.00 019 (Outside State Plan) STATEMENT V

Centrally Sponsored Schemes having 100% Central Assistance

Anticipated Central SI. Code Demand/ Head of Assistance Name of Scheme No. No. Account 2014-2015 (Rs. in Lakhs)

WBC Post-matric Scholarship (SC) 1 [XXV] 2225-01-277-98 14500.00 157 (100% CSS)

Upgradation of Merits of SC WBC 2 Students [XXV] 2225-01-277-75 25.00 167 (100% CSS) Construction of Girl's Hostels (Post matric )- Babu Jagjivan WBC 3 Ram Chhatrawas Yojana [XXV] 4225-01-277-91 300.00 224 -100%CSS

Pre matric Scholarships for WBC students studying in classes 4 [XXV] 2225-01-277-59 2200.00 274 rx-x (100% CSS) Pre-matric Scholarships to the WBC Children of those engaged in 5 [XXV] 2225-01-277-55 60.00 285 unclean occupations (100% CSS) Total: 100% CSS 17085.00 STATEMENT VI

Centrally Sponsored Schemes having 50% Central Assistance

Anticipated Central SI. Code Demand/ Head of Assistance Name of Scheme No. No. Account 2013-2014 (Rs. in Lakhs) Construction of Boy's WBC [XXV] 4225-01-277-98 400.00 1 Hostels-Scheduled Castes 015 (50% Central Share) Protection of Civil Rights and [XXV] 2225-01-800^86 800.00 WBC 2 Enforcement of PCR Act 020 ( 50% Central Share) [III] 2014-00-103-98 200.00 Kerala State Development WBC [XXV] 4225-01-190-99 980.00 Corporation for Scheduled 3 060 Castes and Scheduled Tribes (49% Central Share) Total: 50% CSS 2380.00 Schemes of Scheduled Caste Development Department

Land to Landless Families for Construction of Houses (Outlay: Rs.10000.00 lakh)

The scheme envisages purchase of land to the poor and eligible landless scheduled caste families for construction of house , during XII* five year plan period. The number of families proposed to be covered under the scheme during 2014-15 is approximately 5000. An amount of Rs. 10000 lakh is provided during 2014-15 for providing land for construction of houses under the scheme.

Proposed Rate of Assistance is as follows:

Present Rate of Minimum Land Amount Assistance (Rs. Area to be No. of families Required Local Body Lakhs) purchased to be assisted (Rs. In (In cents) Lakhs) Grama Panchayat 1.50 4000 7500.00 Municipality 2.00 1.5 500 1000.00 Corporation 3.00 1.5 500 1500.00 total 5000 10000.00

• The scheme intends to give financial assistance at the said rates, to the landless poor for purchase of land for construction of houses. An amount of Rs.10000.00 lakh is provided for the scheme during 2014-15 of which Rs.2280 lakh includes as One Time ACA during 2014-15.

2. House to Houseless, Completion of partially constructed Houses, Improvement of Dilapidated Households ( Outlay Rs.15000.00 lakh) The scheme envisages:

(I) Financial assistance for construction of new houses or construction of flats for houseless SC families, wherever feasible are envisaged under the scheme. Rate of assistance per family will be as per Government norms. (II) A special mission for completing incomplete department assisted spill over houses is envisaged. Providing financial assistance for completion of houses sanctioned in the previous years is also included under the Scheme (Sanctioning/award of remaining installments in new/higher rates). (III) 83,520 families or households belonging to SC community are residing in dilapidated houses. (2011 Census). It is proposed to give assistance to such households for improving the condition of the dilapidated houses by providing essential facilities for improving the a s house including construction of additional rooms. Maximum of Rs. 1.00 lakh per household will be provided on the basis of plan and estimate submitted.

An amount of Rs.15000.00 lakh is provided for the above components during 2014-15

3. Pooled Fund for Special Projects under SCSP (Outlay: Rs.2000.00 lakh) An amount of Rs. 2000.00 lakh is provided for implementation of special projects proposed by other department/Govemment agencies under SCSP during 2014-15. The processing, sanctioning, implementation and monitoring etc will be done as per the guidelines issued vide G.O (P) NO.44/2009/SCSTDD dated: 19.06.2009. 4. Share Capital Contribution to Kerala State Development Corporation for Scheduled Castes and Scheduled Tribes Ltd -SCP (51 % State Share) ( Outlay: Rs.1020.00 lakh) Under this centrally sponsored scheme, share capital contribution is released to the Kerala State Development Corporation for SCs & STs in the ratio 51:49 between State Government and Central Government. The Central share of equity capital is sent directly to the Corporation. The Corporation provide finance to the employment oriented schemes covering diverse areas of economic activities. The Corporation has focused their efforts for identification of eligible SC families and motivating them to undertake suitable economic development schemes, sponsoring these schemes to financial institutions for credit support, providing financial assistance in the form of margin money on low rate of interest and subsidy in order to reduce their repayment liability and providing necessary link/tie up with other poverty alleviation programmes.

An amount of Rs. 1020.00 lakh is provided as 51% state share of the scheme during 2014-15.

5. Modernization and e-governance Initiatives in SC Development Department ( Outlay Rs.1500.00 lakh) This scheme meant for the modernization, maintenance, procurement of equipments of the Directorate and offices at regional, district and local body levels and other institutions under the control of Department. The following are the components of the scheme.

• Training to Officers and Staff of Scheduled Caste Department including training in National and International institutions or organizations and also for attending seminars/workshops • Purchase of computers, laptops printers, photocopier and peripherals etc and providing linkage to computer networic in Directorate and Regional, District and Block level offices. • Provision for setting up of additional facilities in the proposed new directorate building including conference hall ,video conference hall, lift, furnishing and other facilities • Development of Website / IT enabled services, maintenance of website equipments and internet charges in the Directorate and District Offices. • Development of software for implementation of e-govemance initiatives for direct cash transfer to all categories of beneficiaries, e-procurement, ID cards for staff

11

...... - ...... -...... - ...... - ...... • Supply of application forms required for various schemes of the Department and advertisement charges, all expenses in coimection with various inauguration programmes under the department. • Printing of posters, guides, booklets, journals, publication, pamphlets etc. and expenses for documentation of events and schemes. • Replacement of old and condemned vehicles and hiring of vehicles for official purpose subject to the approval of Govenmient. • Updating the database on SC colonies created by the Department in Association with LSGD, KILA and Other reputed agencies. • Dissemination of biformation through different methods including Production of Documentary films for creation of awareness of schemes of the Department. • Expenses for monitoring and evaluation of projects imdertaken by the department/LSGD and HR assistance in technical matters and schemes / projects under SCP. An amount of Rs.l500.00 lakh is provided for the scheme during 2014-15

6. Implementation of Protection of Civil Rights Act and Prevention of Atrocities Act (50% State Share) ( Outlay Rs.l000.00 lakh) The activities included under this Scheme are • Effective implementation of the provisions of the Protection of Civil Rights Act 1955 and The SC & ST (Prevention of Atrocities) Act, 1989. • Functioning and strengthening of the Scheduled Castes Protection Cell and Special Police Stations. • Setting up and functioning of exclusive Special Courts. • Relief and Rehabilitation of atrocity victims. • Cash incentives for hiter-Caste Marriages. • Awareness Creation. Out of the state Share of Rs 1000 lakh , Rs 200 lakh is set apart for setting up of special courts and its administration. An amount of Rs. 1000.00 lakh is provided as 50% state share of the scheme during 2014-15. 7. Corpus Fund for SCP (Critical Gap Filling Scheme) (Outlay Rs.28400.00 lakh) A project based approach is proposed for sanction and implementation of schemes under the scheme. This scheme is intended to provide funds for filling critical gap in the SCSP provision made under various schemes on project basis. One third of the amount would be allocated to Districts on the basis of SC population. Administrative sanction for schemes up to 25 lakh shall be issued at the Districts based on the approval of District Level Committee constituted for Scheduled Caste Development. An amount of Rs. 28400.00 lakh is provided for the programme during 2014-15 for the following components. • For provision of basic amenities like drinking water, sanitation, alternate sources of energy, waste management, infrastructure development, cormectivity, communication facilities. • Financial assistance to Societies other than co-operative societies dominated by SCs • Human resource development including training • Financial assistance shall be give to deserving individual cases for treatment by Producing proper medical certificate obtained from concerned specialist medical Practitioners. Honorarium and training cost of SC promoters • Infrastructure development of all institutions under the department • For meeting the recurring expenditure of Vijnj anvadis • Monthly stipend to apprentice clerk cum typist • For meeting the expenditure towards self employment subsidy • For providing balance amount fbr implementing the schemes in 2014-15 which are sanctioned in the previous years.If pending payment is required for any scheme sanctioned in theprevious years, file may be circulated to Planning and Economic AffairsDepartment for getting new / revised administrative sanction. • Nadan Kalamela,prize for A grade winners ,tourism float,Sahithyothsavam etc. • Attending and conducting trade fairs. Cultural festivals. • Self sufficient village scheme( an amount of Rs. 10000.00 lakh is set apart for implementing self sufficient village scheme in 100 selected SC Colonies @ Rs. 1 crore each for infrastructure development) 8. Contribution to SC/ST Federation (Outlay Rs.200.00 lakh) The scheme proposes to give financial assistance to SCT co-operative societies federated under SC/ST Federation. Presently 531 number of SC Co-operative societies are federated under SC/ST federation out of 832 SC co-operative societies in the state. The Proposal is to assist SC co-operative societies federated under SC/ST federation to take up economic development activities on project basis. Financial assistance to ‘Ayurdhara’ (an ayurvedic unit) and petrol pump controlled by the Federation, expenditure for developing infrastructure for SC/ST Federation and to take up projects for improving the functioning of the Federation would also be met from this scheme.

An amount of Rs. 200.00 lakh is provided for the scheme during 2014-15

9. Development Programme for Vulnerable Communities among SC (Outlay Rs.1000.00 lakh) The objective of this scheme is rehabilitation of landless and homeless SC people belonging to vulnerable communities such as Vedar, Vettuvan, Nayadi, Kalladi, Arundhathiar/ Chakkiliar. This scheme has the following provisions:

13 ...... -..-...... -...... -.....-... -.. n • Assistance of for purchase of five cents of land and for the construction of house as per Government norms. • Providing infrastructure, connectivity, communication facilities, education, treatment, drinking water, electricity, road etc. to the vulnerable groups. • Improvement of infrastructure in the colonies It is provided to assist 200 families during 2014-15.

An amount of Rs.1000.00 lakh is proposed for the above components during 2014-15.

10. Financial Assistance for Marriage of SC girls ( Outlay Rs.2500.00 lakh) In order to assist the parents of SC girls, having annual family income up to Rs. 50000.00 for marriage ceremony of their daughters, financial assistance will be provided to the tune of Rs. 50000.00 in each case. An amount of Rs 2500 lakh is provided for providing assistance to SC girls during 2014-15.

Management of Model Residential Schools including Ayyankali Memorial Model Residential School for Sports, Vellayani ( Outlay Rs. 1700.00 lakh) There are 10 Model Residential Schools including the MRS for Sports, Vellayani. MRS s are established to ensure the academic and physical excellence in the respective fields of SC/ST students providing residential facilities from 5* standard to 12*^ standard. The scheme includes the following components. • All expenses relating to MRS and MRS for Sports, for their day to day management, except cost of establishment (salaries & allowances). ^ Meeting expenses for projects on additional construction, infrastructural facilities, repairs and maintenance, waste management, landscaping, water supply, sanitation, energy including alternative sources of energy etc • Cost of establishment in respect of three +2 batches newly started in Alappuzha, Emakulam, and Palakkad and +1 batch started in Idukki districts. « Expenses towards nutritional food as prescribed by Nutrition Board, periodical medical checkup, counseling. • Special coaching for Personality development for weaker sections of students to improve their academic performance and for various competitions. • Conducting Arts Festivals and sports meets at different levels, regional and State etc. and seminars inviting eminent scholars in various fields. •C Expenses towards Cash prizes and awards for the winners at state, national and international level

competition^*--^ ^ j w \ A ^ ' Expenses towards the implementation of Student PoUce Cadet Programme, Additional Skill Acquisition Programme, NCC, NSS and similar projects in MRS and Sports School. For meeting travel expenses of students and faculty for participation in various programmes for giving exposure to places and fields, institutions of excellence and provision for hiring of vehicles to meet emergency situations. Projects on modernization and e-govemance initiatives like online admission, development of website etc. An amount of Rs.1700.00 lakh is provided for the scheme during 2014-15

‘|!2. Assistance for Education of SC Students ( Outlay Rs. 27500.00 lakh) Following are the components of the scheme.

Educational Allowances to the students; all other course related expenses, pocket money, course fee. Additional amount required to meet the expenditure for providing educational allowances to students of families having annual income of above Rs. 2.00 lakh, not covered by the 100% CSS of Post Metric and Pre Metric Scholarships and the amount additionally required for students covered by the Scheme. • The scheme is envisaged to provide Laptop to SC students studying professional courses in approved University/institutes. The course covered for such facilities are MBA, MSc Computer Science, MCA, MBBS, BDS, BAMS, BHMS, BVSc. &AH and M.Tech. AppUcation for the same should be forwarded through the Principal/ Head of the histitution. Amount required for providing special and remedial coaching for poor performing students. • Expenses towards study tours conducted by educational institutions including incidental expenses to students, at the rates prescribed by Government. State/ University level cash awards to metric and post metric students of excellence. All expenses relating to day to day management of Post Metric Hostels, except cost of establishment (salaries & allowances); repairs and maintenance; waste management, landscaping, water supply, sanitation, energy including alternative sources of energy; expenses towards honorarium to personal who are taken temporary for meeting the requirements in the Hostels, provision nutritional food as prescribed by the nutrition Board; special tuition for weak students; modernization and e-govemance initiatives like online admission, website etc. Execution of works, procurement of tools and equipments, honorarium to temporary staff and provision of other facilities in the 44 ITIs so as to ensure retaining of affiliation and obtaining affiliation for new trades and for trades which do not have affiliation; modernization in accordance with the instmctions issued by DGE&T fi*om time to time; development of soft skills, cost of conducting refresher courses including short term courses, skill development programmes, Modular Employable Skills etc; all expenses for implementing projects like Additional Skill • Acquisition Programme and Student Police Cadets in ITFs, providing tool kits and nutrition programme for ITI Students. Expenses for apprenticeship training programme and English language training for students. • Conduct of annual arts/sports festival at different levels for ITIs, Post Metric Hostels and financial assistance for conducting cultural festivals or camps in those Institutions and assistance for Vadakkancheri Community College. Assistance for foreign education information dissemination activities (workshops, meetings etc). Financial assistance for meeting the initial expenses to SC students who get admission in Medical/Engineering courses @ Rs. 10000.00 and Rs. 5000.00 respectively, subject to the annual parental income limit permissible by Government. • An amount of Rs 15000 lakh is proposed for the expenditure related to the construction and all other related expenses for Palakkad Medical College An amount of Rs.27500.00 lakh is provided for the scheme during 2014-15.

, 13. Assistance for Training and Employment (Outlay Rs.3701.00 lakh) The Scheme has the following components. ‘ Meeting expenses/fee for training for getting employment in organized sector in recognized well known training centers/institutions Entrepreneurship Development Training with the assistance of Line Departments and PSUs under their control. Financial assistance for Self Employment / starting Micro Enterprises on the basis of the training imparted for group and individual ventures • Financial assistance to SC youths seeking job opportunities abroad will be supported. • Provision of financial and other overhead assistance to Institutions, such as Institute for Civil Services Examination Training Society (ICSETS), Pre Examination Training Centres (PETC), Cyber Sri, Centre for Research and Education of Social Transformation (CREST) and other reputed institutions upon submission of suitable projects.lt is proposed to provide Rs. 100 lakh as grant to CREST under the scheme An amount of Rs. 3701.00 lakh is provided for the scheme during 2014-15. Schemes ~ Imple men ting through PWD

14. Construction of Boys’ Hostel (50% State Share) ( Outlay Rs.400.00 lakh) The amount prov ded is for the completion of all ongoing construction works in the Post Matric Hostels at Thiruvananth?.puram (Mannanthala) and Emakulam districts and for the construction of new hostels and ,Post matric Hostel at Palakkad and and pre matric hostel at . The provision is to meet all expenses in connection with the construction of the above said hostels.

An amount of Rs.400.00 lakh is provided as 50% state share for the implementation of the scheme during 20^ 4-15

15. Works and Building ( Outlay Rs.1800.00 lakh)

The sc leme has the following components. • Const uction of buildings and other civil and electrical works for Industrial Training Institutes, Pre matr'c and Post matric hostels, Para Medical Institutes, Nursing Colleges (Kozhikode), Pre Ex?.nination Training Centres, Model Residential Schools, Staff (garters. District Offices, SCDO of ices and Directorate. • F epair/ Renovation / maintenance of existing Post- Metric Hostels, Industrial Training Institutes, Pre Examination Training Centres, Model Residential Schools • Ongoing works of Dr. Ambedkar Bhavanara , new Directorate Building and Working Women’s Hostels. • Construction of new buildings for ITls after dismantling the buildings which are in dilapidated condition. ® Construction of buildings for starting new trades as part of Revamping of Trades in ITIs. • Construction of buildings for MRS are proposed at (Thrisr.ur)), (Palakkad), Peerumed (Idukki), Alappuzha and (Emakulam) and Kozhikode during 2014-15 • Construction of buildings for PETCs are proposed at Mannanthala (Thiruvananthapuram) and Harippad (Alappuzha) during 2014-15

This head of Account is operated by PWD. An amount of Rs.1800.00 lakh is proposed during 2014-15 SCSP Plan Schemes - Implementmg throcigh LSGIs

An outlay of Rs.5721.00 lakh is set apart for the implementation of schemes through Local Bodies. The scheme details are as given below.

Outlay Sl.No Name of Scheme ( Rs. in lakh) 1 Pre-Primary Education 125.00 2 Boarding Grant 8^.00 3 Tuition system in Pre-matric Hostels 13i.00 4 Indira Awaz Yojana - SCP (25% SS) 457J..00 5 Swamajayanthi Gram Swarozgar Yojana NRLM - 799.01 SCP(25% SS) Total 5721.00

The write up portion of Rs. 5721 lakh has been included in the Appendix IV of the budget 2014-15.

16./^re-Primary Education (Outlay Rs.125.00 lakh)

The scheme is for running the Pre-Primary schools under the control of the SC Development Department. Activities proposed are:

• Providing pL\y and study materials ' ^ • : Supplyjifnuuidous food and clothing. • i^Ionorarium tc teachers ahd1Ierp5¥.

Th is scheme is to be implemented through the Local Self Government.

An amount of Rs.125.00 lakh is provided for the programme during 2014-15 as detailed below.

• Corporations - Rs.30.00 lakh • Municipalities - Rs.30.00 lakh Grama Panchayaths Rs.65.00 lakh

Boarding Grant ( Outlay Rs.84.00 lakh) The scheme is intended for giving boarding grant to SC students staying in hostels managed by NGOs. It is a transferred scheme to local self governments.

An amount of Rs.84.00 lakh is provided for the programme during 2014-15 as detailed below.

18 • Corporations - Rs.20.00 lakh • Municipalities - Rs.24.00 lakh • Block Panchayaths - Rs.40.00 lakh

*3. Tuition System in Pre-matric Hostel ( Outlay Rs.135.00 lakh) The objective of this scheme is to impart tuition in subjects like Mathematics, Science, English and for inmates of pre-metric hostels and students of high schools and upper primary classes. This scheme will be implemented through Local Self Governments.

An amount of Rs. 135.00 lakh is proovided for the programme during 2014-15 as detailed below.

• Corporations - Rs,30,00 lakh • Municipalities - Rs.30.00 lakh • Block Panchayaths - Rs.75.00 lakh

Schemes - Implementing though Rural Development Department

19. Indira Awaz Yojana - SCP (25% State Share) ( Outlay Rs.4578.00 lakh) The objective of the scheme is to provide houses to Scheduled Castes under the Centrally Sponsored Scheme of Indira Awaz Yojana. Construction of new houses and up-gradation of existing kutcha houses into pucca houses are the two components of the scheme.

An amount of Rs.4578.00 lakh is provided for the programme during 2014-15 as 25% State Share. The provision is earmarked to Block Panchayats.

20. Swarnjayanthi Gram Swarozgar Yojana/NRLM - SCP (25% State Share) (Outlay Rs.799.00 lakh) This Centrally sponsored scheme envisages establishing a number of micro-enterprises in the rural areas. The Scheduled Caste Sub Plan share under this scheme proposed during 2014-15 is Rs.799.00 lakh which is 25% State Share. The provision is earmarked to Block Panchayats. j S l i ...... -.... ^...... -...... ^... -....-....-...... :...... -.. -...... j i i i

SPECIAL CENTRAL ASSISTANCE TO SCHEDULED CASTE SUB PLAN (SCA to SCSP) ( Outlay: Rs.2200.00 lakh)

The Scheme of Special Central Assistance (SCA) to Scheduled caste Sub Plan (SCSP) for Scheduled Castes is linked with the Government of ’s strategy for the development of Scheduled Castes. The main objective of the scheme is to give a thrust to the economic development programmes for Scheduled Castes with reference to their occupational pattern and secondly, to increase the productivity and income from their limited resources. A portion of the amount provided will be placed with the District Collectors for implementing the project. Distribution of funds will be on the basis of the percentage of SC population in the district. The subsidy component under Self Employment Scheme in accordance with the SGS Y guidelines is also met under this scheme. insists on the conduct of concurrent monitoring and evaluation of schemes implemented under SCA to SCSP. Therefore, Planning and Monitoring cell of the Directorate has to be suitably strengthened with computer/laptop and linkage facilities. Project/Scheme implemented under SCA to SCSP has to be effectively monitored. The components of the scheme are the following. • Projects implemented by the District Collectors through the line departments • Assistance to SC/ST Corporation • Monitoring Cell at State Level • Implementation of economic development programmes through the Department • Improving monitoring of schemes under SCA to SCSP at Scheduled Caste Development Directorate and District level including service of manpower. Anticipated Central assistance during 2014-15 is Rs.2200.00 lakh. 100% CENTRALLY SPONSORED SCHEMES

l;/^ost -Mearic Scholarship to Scheduled Caste Students ( Outlay Rs.145GG.DG lakh) The scheme aims to provide financial assistance to students belonging to Scheduled Castes for pursuing post-matriculation courses or post secondary courses through recognized institutions. Components of the Scheme include; (i) maintenance allowance; (ii) reimbursement of non-refimdable compulsory fee charged by educational institutions; (iii) Book Bank facility for specified courses; (iv) study tour charges; (v) thesis typing/printing charges for Research Scholars; book allowance for students pursuing correspondence courses; additional allowances for students with disabilities etc. Scholarships will be disbursed to the students whose parents/guardian’s income fi-om all sources does not exceed Rs.2.00 lakh per annum. Scholars will be paid enrolment/registration, tuition, games, union, library, magazine, medical examination and such other fees compulsorily payable by the scholar to the institution or jmiYgrsity/board. Refiindable deoosits will be excluded. The scheme is implemented by the State (iovemment which receives 100% central assistance fi*om Govenmient of India for the total expenditure under the scheme, over and above the committed liability of the State Government. The Central Assistance anticipated for the scheme for the year 2014-15 is Rs.14500.00 lakh.

2. U|^,,gf^dation of Merit of Scheduled Caste Students (Outlay Rs.25.GG lakh) The main objective of the scheme is to upgrade the merits of SC students by providing with facilities for all round development through education in Residential School. Under this scheme 100% Central assistance is given to State Government for arranging coaching for SC students studying in class 9 th to 12th. Remedial coaching aims to remove deficiencies in school subjects and special coaching aims to prepare students for competitive examinations for entering into professional courses are components of this scheme. It will also help the students for admission to higher education courses and generating self confidence The schools selected under the scheme should have (a) facility for all round development; (b) hostel facility; (c) good academic result in past three years continuously or the school may be Kendiya Vidyalaya with hostel facility.

21 l i i f ...... [ ...... IS ic s State Government has to intimate the school selected to Ministry of Social Justice and Empowerment. The number of awards allotted to Kerala State is 10. Coaching should be started at 9* level and continue up to 12* for a period of four years. Rs. 15000/- per student per year will be given under the scheme as a package as follows: 1. Rs.8000/- per student per year as a. Boarding and lodging charges @ Rs.500/- per month for 10 months b. Pocket money @ Rs.lOO/- for 10 months c. Books and stationery-Rs.2000/- 2. Rs.7000/- per year per student for honorarium to Principal, experts and other incidental charges. As per the scheme, the total number of students that may be selected for arranging coaching in a year is 40 and hence an amount of Rs.25.00 lakh is anticipated as 100% central assistance for the year 2014-15. ^ Construction of Girls’ Hostels (Post matric)-Babu Jagjivan Ram Chhatrawas Yojana (100% CSS) (Outlay Rs.300.00 lakh) The scheme is implemented through the State Government with 100% central assistance both for fresh construction of hostel buildings and for expansion of existing hostel facilities for Scheduled Caste Girls. A central assistance of Rs.300.00 lakh is anticipated for constructing new hostels during 2014-15 4. Pre Matric Scholarships to the children of those engaged in Unclean Occupations (Outlay Rs.60.00 lakh) The object of the scheme is to provide financial assistance to children whose parents/guardian belongs to one of the categories in Manual Scavengers, Tanners; and Flayers to pursue Pre-matric education. The scholarships may be given to students enrolled in class I or any subsequent class of pre­ metric stage in the case of day scholars, and class III or any subsequent class of pre-metric stage in case of hostellers. The scholarship will terminate at the end of class X. The duration of scholarship in an academic year is ten months. The rate of scholarship for hostellers is Rs.700/- per month and for day scholars is Rs. 110/- per month. An ad hoc grant of Rs. 750/- per student per annum to all day scholars and Rs. 1000/- per student per annum to hostellers would be admissible. Certain additional provisions for students amongst target groups with disabilities are also included under the scheme. The scheme is implemented by the State Government, which receive 100% central assistance from Government of India for the total expenditure under the scheme, over and above the committed liability of the State. The central assistance anticipated for the year 2014-15 is Rs.60.00 lakh. 5. Matric Scholarship for Scheduled Caste Students in class IX-X (100% CSS) (Outlay Rs.2200.00 lakh)

22 f"..-...... ^ Objectives of the scheme are; a) To support parents of SC children for education of their wards studying in classes DC and X so that the incidence of drop-out, especially in the transition from the elementary to the secondary stage is minimized, and b) To improve participation of SC children in classes IX and X of the pre-metric stage, so that they perform better and have a better chance of progressing to the post-metric stage of education. Scholarships will be paid to the students whose parents/guardians’ income from all sources does not exceed Rs. 2,00,000/- (Rupees two lakh only) per annum. The value of scholarship includes (i) Scholarship and other grant, and (ii) Additional allowance for students with disabilities studying in private un-aided recognized Schools for complete duration of the course. The rate of scholarship will be Rs. 150/- per month for day scholars and Rs. 350/- per month for hostellers for 10 months. Books and Ad hoc grant for day scholars will be Rs. 750/- per annum and for hostellers it will be Rs. 1000/- per annum. Scholarship for studying in any class will be available for only one chance. The scheme is implemented by the State Government with 100% cenfral assistance from Government of India for expenditure under the scheme, over and above the committed liability.

An amount of Rs. 2200.00 lakh is anticipated as central assistance for implementing the scheme during 2014-15

r CENTRALLY SPONSORED SCHEMES HAVING 50% CENTRAL ASSISTANCE

1. Share Capital Contribution to Kerala State Development Corporation for Scheduled Caste and Scheduled Tribes Ltd. (49% Central Share) • ( Outlay Rs.980.00 lakh) Under this centrally sponsored scheme, share capital contribution is released to the Kerala State Development Corporation for SCs & STs in the ratio 49:51 between Central Government and State Government. The Central share of equity capital is sent directly to the Corporation. The Corporation provides the employment oriented schemes covering diverse areas of economic activities. The Corporation has focused their efforts for identification of eligible SC families and motivating them to undertake suitable economic development schemes, sponsoring these schemes to financial institutions for credit support, providing financial assistance in the form of margin money on low rate of interest and subsidy in order to reduce their repayment liability and providing necessary link/tie up with other poverty alleviation programmes.

An amount of Rs.980.00 lakh is anticipated as 49% central share of the scheme during 2014-15

2. Construction of Boys' Hostels (50% Central Share)

( Outlay Rs.400.00 lakh) The amount proposed is for the completion of all ongoing construction of works in the Post Metric Hostels at Thiruvananthapuram (Mannanthala) and Emakulam Districts and for the construction of new hostels and post matric hostels at Palakkad nad Cherthala nad pre metric hostel at Vandip[eriyar. The proposal is to meet all expenses in connection with the construction of the above said hostels.

An amount of Rs.400.00 lakh is anticipated as 50% central share of the implementation of the scheme during 2014-15.

3. Implementation of Protection of Civil Rights Act and Prevention of Atrocities Act (50"/o Central Share) ( Outlay Rs.1000.00 lakh) The activities proposed under this Scheme are • Effective implementation of the provisions of the Protection of Civil Rights Act 1955 and the SC & ST (Prevention of Atrocities) Act, 1989.

24 K: • Functioning and strengthening of the Scheduled Castes Protection Cell and Special Police Stations. • Setting up and functioning of exclusive Special Courts. • Relief and Rehabilitation of atrocity victims. • Cash incentives for Inter-Caste Marriages. • Awareness Creation.

An aifiount of Rs.1000.00 lakh is proposed as 50% Central share of the scheme during 2014-15. BUDGET SPEECH 2014-15

SCHEDULED CASTE & SCHEDULED TRIBE

252. Several schemes for the welfare of the Scheduled Castes and Scheduled Tribes are being implemented in the State. An amount of Rs. 460.78 crore for Scheduled Tribes and Rs. 1034,42 crore for Scheduled Castes have been earmarked for the year 2014-15.

253. Government intend to give assistance to tribal families who do not have livable house/shelter for the construction of new houses. During the financial year 2014-15,1000 such families will be given financial assistance at the rate of Rs. 2.50 lakh per family for this purpose.

254. An amount of Rs. 150 crore has been earmarked for the project, Integrated Sustainable Development of Scheduled Tribe population in identified locations/settlements under the Additional Tribal Sub Plan which focus on the socio-economic development by protecting the cultural values of the scheduled tribe. This scheme will be implemented in the 14 identified most backward locations.

255. There is a debt relief scheme for the loans upto Rs. 50,000 availed by the Scheduled Caste. This benefit will be made applicable to the Scheduled Tribe also. An amount of Rs. 2 crore will be provided for this.

256. Steps will be taken for setting up of multi-purpose hostel for STs for providing hostel facilities to ST women along with their children when they leave their homes for seeking employment /higher education/ training in other locations. An amount of Rs. llakh has been earmarked for this as token provision. Central assistance is also expected for this scheme.

257. An amount of Rs.l50 crore has been provided for giving, fmancial assistance to Scheduled Castes for construction of new houses for the houseless, completion of partially constructed houses and improvement of dilapidated houses.

258. An amount of Rs.lOO crore is earmarked for providing fmancial assistance to the Poor landless scheduled Caste families for purchase of land for construction of houses.

259. In order to enhance the employment opportunities of the Scheduled Tribes, financial assistance will be given to the industrial entrepreneurs of this community. An amount of Rs. 2 crore will be earmarked for this scheme.

260. An amount of Rs. 20 lakh will be earmarked for Ayyankali Centre for Research Studies. GOVERNOR’S ADDRESS 2014-15

My Government will take up the development of undeveloped Scheduled Caste colonies during 2014-15. There will be a special drive for completing incomplete houses taken up under various departmental initiatives. Thrust will be given for providing land for landless and house for houseless. Fifty colonies will be adopted additionally under the Self Sufficient Colony Schemes. There will be a special drive to facilitate students to successfully complete professional degree courses. A Sports College will be started for giving special training for students belonging to SC community who are outstanding in the field of sports. ------rr"

Grant-in-aid to Local Bodies under SCSP 2014-15

Source: LSGD Budget 2014-15, Finance Department (Appendix IV 2014-15) 1. Thiruvananthapuram District

Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 District Panchayat (f Corporation (1)

1 Thiruvananthapuram 1506.11 1 Thiruvananthapuram 2783.04 Municipality (4)

1 184.37 3 172.40 2 111.88 4 j’^eyyattinkara 226.52 Block Panchayat (11) 1 7 Varkala 155.19 143.18 2 8 209.05 Nemom 173.80 3 9 149.02 Perumkadavila 109.04 4 10 Vamanapuram 170.24 Athi>annoor 96.48 5 11 Vellanad 115.58 102.12 6 Nedumangad 82.41 Grama Panchayat i73)

Varkala Block 1 123.22 Chirayinkeezhu Block 2 16 44 Anjuthengu 18.16 3 17 Elakamon 17 Vakkom 34.67 4 18 69.62 Chirayinkeezhu 82.87 5 19 Ottoor 46.92 Kizhuvilam 110.34 6 20 77.54 125.56 7 21 Vettoor 36.36 75.44 Kilimanoor Block Vamanapuram Block 8 22 Kilimanoor 63.02 51.32 9 23 Pazhayakunnummel 89.57 Nellanad 62.46 10 24 86.58 Pullampara 66.33 11 25 Madavoor 56.12 Vamanapuram 38.22 12 26 Pallickal 35.35 Pangode 79.60 13 27 Nagaroor 84.49 Nanniyode 55.98 14 28 Navaikulam 114.76 Peringammala 71.43 15 29 Pulimath 97.25 Manickal 85.39 ThiruvanaDthapuram District (Contd..,)

Rs. In Lakhs Outlay Outlay SI. under SI. kinder Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 Vellanad Block 30 Aryanad 51.51 52 Vilappil 42.97 31 Poovachal 61.51 53 Vilavoorkkal 38.73 32 Vellanad 34.51 54 Kalliyoor 103.90 33 Vithura 49.40 Perumkadavila Block 3^^ Uzhamalackal 25.17 55 Perumkadavila 32.98 35 Kuttichal 27.75 56 Kollayil 66.34 ,6Tholicode 17.88 57 OttasekHaramangalam 40.26 37 79.02 58 Aryancode 42.20 Nedumangad Block 59 Kallikkadu 17.46 38 40.48 60 64.02 39 Aruvikkara 41.39 61 43.10 40 Panavoor 38.86 62 Amboori 20.75 41 Karakulam 74.76 Athiyannoor Block 42 51.76 63 Athiyannoor 62.98 Pothencode Block 64 25.85 43 Andoorkonam 85.93 65 Karumkulam 24.85 44 Kadinamkulam 73.42 66 Kottukal 66.61 45 Mangalapuram 115.69 67 Venganoor 109.16 46 Pothencode 57.11 Parassala Block 47 971.41 68 Chenkal 64.36 Nemom Block 69 Karode 46.28 48 69.37 70 Kulathoor 39.17 49 Pallichal 108.02 71 Parassala 94.22 50 Maranalloor 98.46 72 Thirupuram 16.82 51 Malayinkeezh 59.94 73 45.51

31 2. Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 District Panchayat (1) Corporation (1)

1 Kollam 1686.17 1 Kollam S78.73 Municipality (3)

1 Karunagappally 139.60 3 1 '7.68 2 Paravoor 138.73 Block Panchayat (11

1 91.26 7 151 70 2 Sasthamcotta 194.51 8 88.^0 3 190.84 9 164.17 4 137.11 10 171.11 5 184.37 11 170.28 6 141.79 Grama Panchayat (70)

Oachira Block 15 Vettikkavala 103.34 1 Oachira 47.66 16 Melila 52.37 2 48.10 17 Mylam 113.54 3 26.56 18 92.65 4 58.53 19 124.24 5 7.76 Pathanapuram Block 6 85.19 20 Vilakudy 59.97 Sasthamcotta Block 21 82.76 7 Sasthamcotta 84.95 22 Piravanthur 111.68 8 WestKallada 70.18 23 Pattazhi 46.27 9 South 61.33 24 Pattazhi 43.34 10 84.70 25 Pathanapuram 67.30 11 Kimnathur 91.42 Anchal Block 12 Sooranad North 83.34 26 127.25 13 107.61 27 69.06 Vettikkavala Block 28 52.18 14 Ummannur 86.37 29 Anchal 54.36

32 : T ■ Kollam District (Contd.,.)

Rs. In Lakhs SI. Local Body Outlay SI. Local Body Outlay No. under No. under SCSP SCSP 2014-15 2014-15 30 Edamulakkal 78.27 51 88.69 31 50.52 52 21.17 32 63.48 Mukhathala Block 33 59.46 53 91.69 Kottarakkara Block 54 98.39 34 91.83 55 84.59 35 55.13 56 Elambalur 116.61 36 58.69 57 101.54 37 69.55 Ithikkara Block 38 Neduvathur 76.39 58 71.27 39 Kottarakkara 73.79 59 156.24 Chittumala Block 60 Chathannur 140.59 40 91.30 61 71.94 41 65.31 62 73.35 42 74.28 Chadayamangalam Block 43 Perayam 17.62 63 110.04 44 Mundrothuruthu 25.17 64 103.81 45 66.42 65 Chadayamangalam 45.47 46 Thrikkadavur 53.30 66 63.19 47 61.72 67 Velinallur 50.91 Chavara Block 68 Elamadu 62.53 48 23.99 69 33.14 49 Chavara 61.89 70 41.74 50 69.46 3. Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 District Panchayat (V Corporation (0)

1 Pathanamthitta 883.72 c Municipality (3)

1 . 96.33 3 Pathanamthitta 102.11 2 142.88 Block Panchayat (8)

1 Mallappally 84.31 5 92.48 2 Pulikeezhu 61.38 6 Konni 98.88 3 Koipram 82.35 7 160.70 4 Elanthur 82.31 8 Parakkode 221.30 Grama Panchayat (54)

Mallappally Block 16 65.64 1 30.48 17 22.46 2 51.16 18 33.08 3 Kottanadu 31.47 19 Puramattom 38.01 4 25.53 Elanthur Block 5 33.72 20 41.21 6 Kunnanthanam 49.24 21 61.86 7 Mallappally 31.45 22 43.61 Pulikeezhu Block 23 12.13 8 49.45 24 Kozhenchery 17.86 9 48.83 25 Mallapuzhassery 38.94 10 29.93 26 31.32 11 Nedumpram 17.25 Ranni Block 12 38.66 27 Ranni Pazhavangadi 29.99 Koipram Block 28 Ranni 22.14 14 Ayiroor 17.72 29 Ranni 13.41 15 70.15 30 Ranni 39.60

Pathanamthitta District (Contd...) Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 30 Vadasserikkara 40.18 Pandalam Block 31 Chittar 46.12 42 65.87 32 25.27 43 30.29 33 Naranamoozhy 32.20 44 Pandalam 126.99 34 Vechuchira 28.54 45 129.72 Konni Block 46 56.42 35 Konni 44.01 47 72.82 36 Aruvapulam 46.34 Parakkode Block 37 57.92 48 76.32 38 19.53 49 80.95 39 58.34 50 84.07 40 28.19 51 Kadampanadu 84.72 41 Malayalapuzha 42.31 52 88.52 53 117.56 54 Pallickal 131.77

tP,' '^Acc.No. P \.\/' , l ( Date; o 4 - -<=

^documentationrr.eV''*-'*' Ce 4. Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 District Panchayat (1 Corporation (0) 1 Alappuzha 1071.13 Municipality (5) 1 83.19 4 136.62 2 Mavelikara 121.98 5 Alappuzha 111.64 3 Cherthala 46.15 Block Panchayat (12) 1 Thycattussery 65.37 7 40.45 2 133.80 8 Chengannur 151.60 3 46.08 9 Harippad 81.80 4 41.38 10 147.65 5 Ambalapuzha 35.82 11 160.54 6 Champakkulam 64.76 12 101.69 Grama Panchayat (73) Thycattussery Block 15 Thanneermukkam 23.74 1 30.25 16 36.15 2 Chennampallippuram 51.12 17 15.43 3 61.59 Aryad Block 4 11.53 18 Aryad 14.43 5 Thaicattussery 41.60 19 Mannanchery 53.90 Pattanakkad Block 20 South 32.13 6 42.27 21 24.27 7 Pattanakkad 30.46 Ambalapuzha Block 8 Thuravoor 68.26 22 29.07 9 Kuthiathodu 31.85 23 21.31 10 Kodamthuruthu 63.28 24 22.46 11 86.23 25 South 15.24 12 79.03 26 19.38 Kanjikuzhy Block Champakkulam Block 13 Mararikulam North 32.64 27 Thalavadi 32.19 14 30.27 28 34.93 Alappuzha District (Contd...) Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 29 Thakazhi 47.37 52 68.77 30 31.62 53 38.22 31 20.63 54 31.40 32 27.52 Mavelikkara Block Mavelikkara Veliyanad Block 55 Thekkekara 101.08 33 15.64 56 106.19 34 57 Veliyanad 21.52 Thripperumthura 68.46 35 19.62 58 Thazhakara 102.53 36 18.13 59 Mannar 64.71 37 Pulinkunnu 14.91 Bharanikkavu Block 38 Ramankari 31.54 60 80.49 Chengannur Block 61 Vallikunnani 70.20 39 100.34 62 Bharanikavu 100.08 Mavelikkara 40 63 69.60 78.65 41 58.58 64 61.22 42 Ala 51.81 65 90.98 43 46.65 Muthukulam Block 44 Budhannoor 65.45 66 57.39 45 33.81 67 23.44 46 Thiruvanvandur 28.25 68 49.59 Harippad Block 69 Muthukulam 37.06 47 Karthigappally 25.08 70 21.72 48 Thrikkimnapuzha 20.29 71 Krishnapuram 48.68 49 16.49 72 Devikulangara 42.48 50 26.77 73 24.73 51 18.37

37 5.

Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 District Panchayat (1^ Corporation (0)

1 Kottayam 805.65 Municipality (4)

1 Pala 18.67 3 122.94 2 54.51 4 Kottayam 273.78 Block Panchayat (11)

1 Vaikom 85.24 7 52.31 2 96.06 8 70.72 3 68.93 9 Madappally 85.39 4 53.03 10 Vasdhoor 73.16 5 Lalam 37.27 11 154.81 6 28.74 Grama Panchayat (73)

Vaikom Block 16 25.55 1 41.95 17 25.80 2 38.26 18 16.75 3 36.04 19 Thiruvarpu 31.31 4 TV Puram 22.95 Uzhavoor Block 5 37.70 20 24.71 6 Udayanapuram 78.82 21 Marangattupally 13.85 Kaduthuruthy Block 22 Kanakkari 26.94 7 Kaduthuruthy 74.46 23 5.56 8 Kallara 45.74 24 11.07 9 45.19 25 Uzhavoor 17.16 10 16.88 26 Ramapuram 24.51 11 48.99 27 35.28 12 46.91 Lalam Block Ettumanoor Block 28 11.44 13 Ettumanoor 53.53 29 40.14 14 Aimanam 28.60 30 12.37 15 25.25 31 14.64 Kottayam District (Contd...) Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 32 15.19 .53 40.07 33 18.02 54 Vijayapuram 34.03 Erattupetta Block 55 73.98 34 7.73 Madappally Block 35 6.04 56 Madappally 67.05 36 8.24 57 56.77 37 Erattupetta 3.31 58 60.75 38 Poonjar Thekkekara 15.24 59 33.75 39 12.62 60 37.84 40 7.73 Block 41 Thalanad 7.04 61 34.81 42 Thidanad 18.30 62 24.00 Pampady Block 63 30.62 43 18.09 64 49.06 44 Elikulam 23.46 65 Vazhoor 30.74 45 16.98 ,6 6 50.24 46 Pampady 33.15 Kanjirappally Block 47 Pallikkathode 12.16 67 Erumeli 103.14 48 Meenadom 6.35 68 Kanjirappally 41.00 49 Kidangoor 21.79 69 Kootickal 32.96 50 Manarkkad 24.94 70 86.37 Pallom Block 71 127.27 51 Ayarkkunnam 41.67 72 26.36 52 Puthuppally 22.40 73 Koruthod 47.32

..... 6. Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 District Panchayat (1^ Corporation (0) 1 Idukki 922.21 Municipality (1) 1 63.77 Block Panchayat (8) • 1 Adimaly 66.50 5 Idukki 40.60 2 313.75 6 98.08 3 68.02 7 Thodupuzha 29.76 4 Elamdesam 39.08 8 Azhutha 266.42 Grama Panchayat \53) Adimaly Block Nedumkandam Block 1 Adimaly 64.07 15 49.06 2 Koraiathady 19.41 16 Senapathy 16.86 3 Bisonvally 17.55 17 31.27 4 Vellathooval 26.77 18 6.46 5 71.71 19 Nedumkandam 38.61 Devikulam Block 20 43.63 6 Marayoor 59.04 21 Rajakumari 18.16 7 364.39 Elamdesam Block 8 50.72 22 Vamiappuram 30.30 9 12.28 23 Udumbanoor 17.26 10 71.85 24 Kodikulam 10.35 11 Chimiakanal 89.91 25 Alakkode 11.67 12 14.96 26 18.41 13 Devikulam 278.09 27 16.17 14 Edamalakudy 0 28 13.08

40 ::r- Idukki District (Contd...) Rs. In Lakhs Outlay Outlay SL under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 Idukki Block Thodupuzha Block 29 42 Idukki Kaniikuzhy 24.02 Muttom 17.05 30 43 Vattikudy 14.27 Kumaramangalam 16.05 31 • 44 Arakulam 29.72 Edavetty 13.73 32 45 Kamakshy 12.46 Karimkunnam 15.75 33 . 46 Vazhathope 33.a3 16.89 34 47 Mariyapuram 8.29 9.80 Kattappana Block Azhutha Block 35 48 Kattappana 45.58 22.70 36 49 74.40 124.67 37 50 Vandenmed 70.89 28.65 38 51 25.85 Peerumedu 191.33 39 52 Erattayar 15.42 124.03 40 53 23.32 Vandiperiyar 307.90 41 38.79 7. District

Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 District Panchayat (1) Corporation (1)

1 Ernakulam 1183.17 1 644.85 Municipality (11) . 1 159.62 7 71.56 2 67.14 8 Aluva 29.07 3 43.51 9 222.25 4 Tripimithura 308.69 10 Elloor 110.40 5 49.70 11 116.87 6 N.Paravur 42.72 Block Panchayat (14) 1 Paravur 81.73 8 45.20 2 81.12 9 Mulamthuruthy 94.09 3 Angamaly 80.20 10 129.72 4 Koovappady 89.52 11 Kothamangalam 90.20 5 Vazhakkulam 110.13 12 Pampakuda 60.13 6 64.01 13 107.97 7 95.90 14 Muvattupuzha 53.16 Grama Panchayat (73) Paravur Block Angamaly Block 1 Chennamangalam 31.87 10 Mookkannur 20.10 2 78.93 11 Thuravoor 25.02 3 65.61 12 16.67 4 Vadakkekara 27.01 13 37.80 5 Chittattukara 41.76 14 28.58 Alangad Block 15 Kanjoor 28.53 6 96.37 16 48.08 7 Varapuzha 14.54 17 36.09 Neeleswaram 8 Alangad 78.96 Koovappady Block 9 Kadungallur 53.50 18 31.85 (Contd...) Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 19 Mudakuzha 47.95 Mulamthuruthy Block 20 37.08 42 Udayampemr 55.91 21 67.31 43 Mulamthuruthy 48.64 22 Koovappady 60.66 44 44.68 23 Okkal 23.69 45 34.18 Vazhakkulam Block 46 Amballur 46.16 24 68.95 47 52.69 25 Vazhakkulam 52.79 Vadavucode Block 26 51.07 48 Puthrukka 42.48 27 Choomikkara 37.43 49 47.80 Vadavucode Puthen 28 68.98 50 88.29 Cruz 29 Keezhmad 51.16 51 66.38 Edappaiiy Block 52 Aikaranad 55.54 30 Kadamakudy 24.39 53 Kmmathunad 88.68 31 31.89 Kothamangalam Block 32 Mulavucaud 51.26 54 Paingottur 18.83 33 Elamkumiapuzha 84.49 55 34.44 Vypin Block 56 Pindimana 26.73 34 Njarakkal 61.47 57 43.94 35 70.13 58 Kavalangad 47.15 36 Edavanakkad 64.23 59 12.88 37 Pallippuram 57.30 60 27.51 38 34.58 61 12.74 Palluruthy Block 62 Pallarimangalam 10.47 39 30.36 63 35.90 40 Kumbalangy 36.04 Pampakuda Block 41 Kumbalam 69.21 64 13.66 Ernakulam District (Contd...) Rs. In Likhs SI. Local Body Outlay SI. Local Body Outlay No. under No. under SCSP SCSP 2014-15 2014-15 65 18.43 75 55.75 66 36.50 76 48.94 67 29.81 Muvattupuzha Block 68 Palakuzha 13.80 77 Avoly 16.81 69 Pampakuda 31.61 78 16.30 70 36.60 79 Valakom 14.41 Parakkadavu Block 80 37.34 71 Puthenvelikara 51.26 81 15.29 72 Chengamanad 40.67 82 20.06 73 75.80 83 20.47 74 Parakkadavu 51.49 84 18.81 8.

Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 District Panchayat (1) Corporation (1) 1 Thrissur 1745.76 Thrissur 773.84 Municipality (6) 1 220.39 4 Chalakkudy 94.98 2 76.28 5 210.67 3 161.01 6 178.44 Block Panchayat (16) 1 Chavakkad 82.72 9 Anthikkad 108.73 2 Chowwannur 147.09 10 73.53 3 Vadakkamchery 143.99 11 128.57 4 166.37 12 Irinjalakkuda 91.46 5 74.08 13 94.76 6 86.42 14 Mathilakam 128.67 7 78.50 15 Mala 96.97 8 Thalikkulam 143.00 16 Chalakkudy 100.90 Grama Panchayat (88) Chavakkad Block 11 44.10 1 45.63 12 69.65 2 45.30 13 Velur 63.83 3 51.47 Vadakkamchery Block 4 56.30 14 58.39 5 Vadekkekad 49.47 15 Erumapetty 96.16 Chowwannur Block 16 48.57 6 52.46 17 34.60 7 Chowwannur 27.33 18 53.78 8 86.99 19 61.93 9 34.16 20 Vadakkancherry 78.54 10 Kattakambal 62.74 Thrissur District (Contd..,) Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 Pazhayannur Block 42 88.71 21 Chelakkara 96.61 43 77.17 22 Vallathol Nagar 42.76 44 68.77 23 70.43 45 Valappad 99.99 24 64.88 Anthikkad Block 25 Pazhayannur 118.37 46 Anthicad 39.61 26 106.06 47 78.26 Ollukkara Block 48 85.53 27 35.95 49 Manallur 63.09 28 Nadathara 35.32 50 Arimpoor 59.71 29 64.18 Cherpu Block 30 86.79 51 24.67 Puzhakkal Block 52 Cherpu 88.08 31 Adat 60.77 53 55.33 32 49.20 54 52.51 33 Kaiparambu 43.06 Kodakara Block 34 Mulamkunnathukavu 26.38 55 Alagappa Nagar 36.29 35 Thoiur 43.77 56 Kodakara 68.81 36 Kolazhy 36.04 57 93.22 Mullassery Block 58 38.24 37 36.19 59 Pudukkad 59.99 38 Mullassery 60.80 60 40.51 39 46.42 61 48.64 40 89.08 Irinjalakkuda Block Thalikkulam Block 62 54.98 41 94.36 63 Kattur 46.46

46 - H i g Thrissur District (Contd...) Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 64 84.52 Mala Block 65 88.43 78 82.80 Vellangallur Block 79 Annamanada 57.69 66 39.58 80 28.93 67 42.31 81 Mala 79.26 68 51.77 82 42.22 69 Vellangallur 69.00 Chalakkudy Block 70 81.62 83 46.21 Mathilakam Block 84 81.07 71 82.71 85 56.98 72 60.31 86 Melur 33.40 73 Mathilakam 51.44 87 36.67 74 45.65 88 Athirappally 48.34 75 Sree Narayanapuram 78.42 76 21.63 77 Eriyad 45.86 9. Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 District Panchayat (1' Corporation (0) 1 Palakkad 2389.65 Municipality (4) Chittur 1 Ottappalam 134.76 3 119.27 Thathamangalam 2 Shomur 269.42 4 Palakkad 320.90 Block Panchayat (13) 1 Thrithala 109.14 8 Kuzhalmamiam 257.10 2 177.50 9 Chittur 153.88 3 Ottappalam 222.78 10 Kollamgode 203.45 4 Sreekrishnapuram 193.50 11 Nemnara 167.90 5 214.11 12 22.428 6 Attappady 17.74 13 136.33 7 Palakkad 221.92 Grama Panchayat 91)

Thrithala Block 9 57.81 1 90.05 10 84.01 2 Chalisseri 64.55 11 Ongallur 88.50 3 Kappur 66.43 12 Pattambi 58.94 4 95.79 13 79.37 5 80.92 14 Thiruvegapuram 61.58 6 Thirumittacode 87.23 15 39.30 7 Thrithala 87.23 Ottappalam Block Pattambi Block 16 Ambalapara 109.51 8 63.00 17 65.87 Palakkad District (Contd...) Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 18 95.43 Palakkad Block 19 Lakkidiperur 70.87 43 Keralassery 82.39 20 Vaniamkulam 127.32 44 149.71 21 Thrikkadeeri 81.66 45 77.24 22 49.56 46 57.48 23 Nellaya 68.12 47 Mundur 103.97 Sreekrishnapuram Block 48 Parali 129.98 24 Cherplachery 104.7« 49 65.01 25 120.81 Kuzhalmannam Block 26 Karimpuzha 115.80 50 Kottai 121.62 27 Pookkottukavu 69.64 51 Kuthanoor 87.89 28 Sreekrishnapuram 58.81 52 Kuzhalmannam 95.05 29 48.54 53 97.81 30 62.14 54 Peringottukurissi 149.46 Mannarkkad Block 55 Thenkurissy 130.42 31 96.79 56 89.05 32 Karimba 61.52 Chittur Block 33 Kottoppadam 67.56 57 42.83 34 72.82 58 36.32 35 Kanjirappuzha 64.51 59 94.75 36 Mannarkkad 106.98 60 87.09 37 Thachanattukara 70.94 61 30.04 38 50.61 62 Elappully 111.89 39 Thenkara 50.59 63 58.73 Attappady Block Kollamgode Block 40 27.19 64 Kollenkode 117.61 41 Pudur 7.95 65 Koduvayur 96.02 42 Sholayar 18.07 66 Muthalamada 97.46

49 Palakkad District (Contd...) Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 67 42.53 79 109.88 68 67.74 80 Kavassery 104.62 69 Pattenchery 104.71 81 Kizhakkenchery 107.52 70 Peruvembu 82 69.42 Nenmara Block 83 78.86 71 68.18 84 Vadakkanchery 88.84 72 Nelliampathy 33.45 85 64.69 73 Elavenchery 68.47 Malampuzha Block 74 Pallassana 88.27 86 49.61 75 69.90 87 Malampuzha 34.67 76 Nenmara 77.64 88 Marutharoad 76.92 77 Vandazhy 97.79 89 Puduppariyaram 82.39 Alathur Block 90 Pudussery 88.22 78 Alathur 49.01 91 Kodumbu 77.19

50 10. Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 District Panchayat (1 Corporation (0) 1 Malappuram 1564.76 Municipality (7) 1 140.26 5 Malappuram 87.40 2 171.23 6 89.36 3 224.11 7 36.11 4 83.07 Block Panchayat (15) 1 Nilambur 62.90 9 96.31 2 113.98 10 Vengara 66.61 3 Vandoor 172.53 11 95.30 4 169.89 12 Thanur 47.22 5 Areekkode 167.55 13 Tirur 89.93 6 Malappuram 62.56 14 Pomiani 122.92 7 Perinthalmamia 165.63 15 Perumpadappu 61.98 8 69.45 Grama Panchayat (100) Nilambur Block 11 48.17 1 22.10 12 Thuwur 63.97 2 39.89 13 31.92 3 31.29 Vandoor Block 4 51.35 14 Mambad 47.20 5 27.54 15 Pandikkad 93.94 6 16.52 16 Porur 79.14 Kalikavu Block 17 101.58 7 69.13 18 90.33 8 43.13 19 Vandoor 105.40 9 Kalikavu 45.35 Kondotty Block 10 Chokkadu 40.26 20 Chelambra 45.77 Malappuram District (Contd...) Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 21 53.64 46 61.15 22 Kondotty 52.64 47 Thazhekode 80.23 23 66.77 48 Vettathur 57.44 24 Pallikkal 64.64 49 Pulamanthole 47.11 25 53.23 50 68.11 • 26 62.54 Mankada Block 27 56.98 51 Kuruva 39.37 28 Muthuvallur 53.45 52 Mankada 43.45 Areekkode Block 53 Makkaraparamba 18.69 29 Urungattiri 54.13 54 44.68 30 Kavannur 65.29 55 34.26 31 Kizhuparambu 29.76 56 27.89 32 74.35 Kuttippuram Block 33 Chekkode 95.93 57 24.55 34 Kuzhimanna 52.69 58 46.14 35 48.34 59 Irimbilayam 62.81 36 83.17 60 20.50 Malappuram Block 61 Kuttippuram 73.98 37 48.24 62 Valancherry 56.54 38 37.62 63 Kalpakancheri 4.42 39 Ponmala 22.53 Vengara Block 40 37.03 64 Abdul Rahiman Nagar 33.63 41 Kodoor 16.63 65 18.39 42 Othukkimgal 25.62 66 10.66 Perinthalmanna Block 67 Thennala 9.43 43 Aliparambu 72.61 68 Vengara 43.45 44 Elamkulam 56.86 69 Kannamangalam 57.92 45 Melattur 53.06 70 Urakam 26.34 Malappuram District (Contd...) Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 Tirurangadi Block Tirur Block 71 Tirurangadi 23.11 86 85.02 72 Thenhippalam 47.13 87 39.05 73 56.67 88 37.27 74 54.33 89 Vettom 37.50 75 Moonniyur 47.60 90 Thirunavaya 38.35 76 16.45 91 Mangalam 32.61 ■ 77 Peruvalloor 40.62 Ponnani Block Thanur Block 92 Tavanur 154.12 78 Cheriyamimdam 7.46 93 80.42 79 19.67 94 64.11 80 21.80 95 Kalady 70.11 81 12.16 Perumpadappu Block 82 Tanur 39.17 96 Alamcode 64.90 83 5.68 97 Marancheri 28.88 84 Niramaruthur 25.45 98 48.24 85 Perumaimaciari 10.26 99 Perumpadappa 17.21 100 Veliyancode 26.71 11. Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 District Panchayat (1^ Corporation (1) 1 Kozhikode 1021.05 1 Kozhikode 763.32 Municipality (2) 1 Vadakara 50.69 2 136.32 Block Panchayat (12) 1 Vadakara 15.73 7 148.21 2 16.84 8 Panthalayani 70.55 3 23.99 9 120.53 4 Thodannur 29.88 10 165.93 5 Melady 56.62 11 188.86 6 104.87 12 Kozhikode 79.02 Grama Panchayat i75) Vadakara Block 15 Kuttiadi 7.51 1 Azhiyoor 16.40 16 Maruthomkara 11.46 2 11.88 17 19.82 3 12.90 18 Narippetta 7.53 4 Onchiyam 6.02 Thodannur Block Thuneri Block 19 11.81 5 6.11 20 13.02 6 10.93 21 42.11 7 8.54 22 Thiruvallur 22.68 8 Thuneri 5.98 Melady Block 9 4.42 23 36.62 10 Vanimel 3.41 24 Keezhariyoor 23.86 11 11.14 25 25.09 Kunnummal Block 26 50.51 12 Kunnummal 9.54 27 Meppayyur 33.79 13 10.35 Perambra Block 14 5.77 28 Cheruvannur 47.59 Kozhikode District (Contd...) Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 29 39.60 Koduvally Block 30 54.15 53 Thiruvambadi 26.85 31 23.51 54 12.74 32 29.86 55 31.99 33 Perambra 66.96 56 Madavcor 44.95 34 52.95 57 Koduvally 49.86 Balussery Block 58 Puduppady 63.92 ■ 35 ■ BalUssery 64.60 59 121.36 36 53.90 60 54.08 37 68.53 61 60.80 38 Kottur 74.67 62 Kodencheiy 31.25 39 80.97 Kunnamangalam Block 40 Panangad 80.65 63 36.60 41 Koorachimdu 21.35 64 Kuruvattur 48.41 Panthalayani Block 65 62.37 42 Chemanchery 41.39 66 48.08 43 25.96 67 Kunnamangalam 76.80 44 40.00 68 Chatharaangalam 98.25 45 26.27 69 103.93 46 Atholi 78.03 70 56.72 Chelannur Block 71 Perumanna 35.43 47 62.49 Kozhikode Block 48 Chelannur 74.99 72 48.99 49 54.85 73 58.73 50 71.17 74 81.99 51 52.30 75 47.36 52 45.79

55 X::T 12. Rs, In Lakhs Outlay Outlay SI under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 District Panchayat (1' Corporation (0) 1 Wayanad 182.44 Municipality (1) 1 68.04 Block Panchayat (4) 1 32.11 3 Sulthan Bathery 38.57 2 33.75 4 Kalpetta 78.01 Grama Panchayat 25) Mananthavady Block 1 Mananthavady 28.93 13 Nenmeni 36.59 2 Vellamunda 12.02 14 19.11 3 9.73 15 Sulthanbathery 30.09 4 Thondemad 9.12 16 11.63 5 Edavaka 9.10 Kalpetta Block 6 Thavinhal 27.44 17 8.61 Panamaram Block 18 5.05 7 Panamaram 16.95 19 52.28 8 17.46 20 Mutil 18.81 9 Mullamkolly 30.20 21 21.10 10 Pulpalli 23.18 22 3.80 11 Kaniambetta 13.48 23 30.23 Sulthan Bathery Block 24 67.52 12 18.28 25 Muppainadu 26.61

56 T'- 13. District

Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 District Panchayat (1 Corporation (0) 1 Kannur 495.64 Municipality (6) 1 Mattannur 29.89 4 Payyannur 116.66 2 Thalipparamba 82.86 5 61.37 3 Koothuparamba 13.35 6 Kannur 131.81 Block Panchayat (11) 1 Payyannur 52.67 7 Thalassery 18.74 2 Kallyassery 78.47 8 11.89 3 Thaliparamba 96.17 9 Koothuparamba 13.51 4 63.44 10 22.67 5 Kannur 75.06 11 12.18 6 50.84 Grama Panchayat (81)

Payyannur Block 15 50.58

1 17.86 Thaliparamba Block 2 19.99 16 21.47 3 Paralam 15.15 17 39.65 4 19.31 18 Kurumathur 16.14 5 Kuttoor 17.56 19 Pariyaram 29.02 6 23.78 20 23.37 7 44.35 21 Naduvil 62.68 Kallyassery Block 22 Udayagiri 33.61 8 24.13 23 Alakode 51.47

9 Ezhone 30.88 24 Kadannapally 11.10 10 46.42 Irikkur Block 11 Mattool 17.76 25 22.97 12 22.19 26 Irikkur 3.22 13 22.51 27 Malapattom 8.32 14 20.94 28 30.92 (Contd...) Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 29 Kuttiattor 18.06 Panoor Block 30 25.20 55 5.75 31 40.95 56 Chokli 8.66 32 Padiyurkalliad 11.53 57 7.25 33 Ulickal 29.16 58 Peringalom 4.01 Kannur Block 59 2.76 34 Chirakkal 48.18 60 2.83 35 Pallikkunnu 20.31 61 Panoor 4.40 36 Puzhathi 53.57 Koothuparamba Block 37 2.16 62 Trippangottur 9.50 38 Azhikode 48.25 63 Chittariparamba 4.29 39 52.69 64 Kunnathuparamba 7.50 Edakkad Block 65 Mangattidom 9.19 40 Edakkad 23.16 66 5.40 41 Elayavoor 21.50 67 Kottayam 4.65 42 Kadamboor 3.99 Iritty Block 43 33.63 68 4.75 44 Chembilode 7.50 69 Ayyamkunnu 11.93 45 20.84 70 Keezhalloor 6.76 46 15.75 71 Thilankeri 3.82 47 Kolacherry 26.13 72 Koodali 9.89 Thalassery Block 73 Payam 15.84 48 12.53 74 Chavasseri 15.01 49 Eranjoli 110.62 Peravoor Block 50 10.21 75 5.12 51 New Mahi 2.01 76 Kelakom 4.07 52 9.26 77 8.69 53 Ancharakandy 6.90 78 Muzhakkuimu 4.07 54 9.80 79 Kolayad 4.45 80 Malur 4.42 81 Peravoor 5.74 14.

Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 District Panchayat (1 Corporation (0) 1 Kasaragod 496.98 Municipality (3) 1 51.71 3 43.89 2 Kasaragod 50.87 Block Panchayat (6) 1 Manjeswaram 67.78 4 Kanhangad 51.81 2 Karadukka 100.85 5 Parappa 162.32 3 Kasaragod 68.77 6 Neeleswaram 45.49 Grama Panchayat i38) Manjeswaram Block Kasaragod Block 1 45.61 15 Chengala 34.72 2 13.80 16 Chemnad 19.82 3 Puthige 23.19 17 Madhur 29.95 4 19.04 18 Mogral Puthur 22.58 5 Manjeswhar 28.47 19 Badiyadka 59.87 6 35.07 20 Kumbala 39.33 7 38.15 Kanhangad Block Karadukka Block 21 Uduma 22.72 8 Belloor 27.98 22 Ajanoor 22.10 9 Kumbadaje 25.22 23 Madikkai 24.90 10 Muliyar 34.51 24 Pallikkara 30.81 11 33.75 25 Pullurperiya 54.88 12 43.57 Parappa Block 13 Bedaduka 63.18 26 104.27 14 Kuttikol 74.33 27 -Beloor 111.48 KasaragodDistrict (Contd...) Rs. In Lakhs Outlay Outlay SI. under SI. under Local Body Local Body No. SCSP No. SCSP 2014-15 2014-15 28 Panathady 37.99 Neeleswaram Block 29 Kallar 60.85 33 21.85 30 East Eleri 37.92 34 18.52 31 West Eleri 77.05 35 22.43 32 57.40 36 Thrikkaripur 36.42 37 Valiyaparamba 10.10 38 27.19 Source: LSGD Budget 2013-14, Finance Department (Appendix IV 2013-14) ' ...... '"'I*?

oJ§1S0(B)1 ail2<^ (U)CD)0<£bS

aJDCD)0(£bS(8 (.C/^)lojl.o^o.(STd&il 0471 2737400 (0TdCrUCO(S oJ0o9d 0471 2737240, 0471 2314455 9447791297 6)a^.a^.o^CTU Fax-0471 2317397

(3TdCU)“)o9d6rD(58 COQ“lia0)l.nj].a^o. SSCCy(.f/D"l 0471 2737225 ai)cx2)Od6bS(8 8547630000

cru‘1cT)lCQ)(& aDloDoaSnru 630o£)1fr\)(3 C(/D“l.6).(SQJ6TDJ 0471 2737244 0471 2733359

CT\)"1cd1qQ)^ (0T3(\JL)Qna)lcrU(SCSO“lOJ (.(/olo^cro.ciaooDar) tej^fflocS 0471 2737222 Fax-0471 2737223 aOoDlCTUd 9496107636

nj"ln^ (^OCmloW 630aQlcnJ(S (,C/0‘1a(0)l6).SQQ) 0471 2737227 9447673212

GS0CQ)1ng CU)(D)0(flbS^ (.C/0t6)d93.6)dft).

(ssocQ)1ng ojacQjOdEbS^ L(/0ln^o.o^aS.Gl0J0(ej(Dn^ 0471 2737229 (OjlcesCTUCDo) 854763003

Qjlslojn^cru 630fiQ“l(TV)^ (.ao"1.0(6D.(2aj6nr)2 0471 2737248 Fax-0471 2737249 8547630001

6)(.SCQ)1(Dlo(n 630oD®)(rU^ (.(/ot an.6)OOCQ)GJ)J§l 0471 2737263 9744923736

o1cnj(8^ 630fiD“l(n)d C(/D"l.Crul.(3TdCT)l(Z52JfflOd 0471 2737237 8547454451

61 __lib. s s l^ o aJ§1da>socro1 oilceaarDCD QOaalcru^cftaS

(SoJ

(0)1(DJOJ(D(TO)nJJ(Do o s t u s s T o raG C o Jo 0471-2314238 8547630006

6 )< ft)0 ^ o CC/d 1. n3 . (o o j I l c b o S 0474 2794996 8547630022 oJ(tiI0)CT)o(0)n§ (.C/d I. CCOOrJd03^0O(& ixJ(.03ab 0468 2322712 8547630037

CC/0“). CUl(3TdCDl(5dce3jl2)0^ 0477 2252548 8547630048

Cda>0§CQ)o (.C/Q"1. 0 ^ 0 . CDSg^o 0481 2562503 8547630061

^ S J (6 6 )1 Gcu)o. nil.enjl. cno(/)oa)(Dcr8 0486 2252003 8547630073 o^OGTDOcfijJgo LOO“1. GSOal aJ0C(e€)0 0484 2422256 8547630081

(.c/Dlca^l.Otea.OdBD. c/DorrooiaerDl 0487 2360381 8547630099

Ojoejfl06)os C(/D“1. Q jl.n^cru ffiJnDQQfS ^LSTUOaDlo 0491 2505005 8547630118

O e J r ^ J O o C(/0*1.6).njl. 0483 2734901 8547630133

Cd9>0«>1Cd9€)0S LOO"1. oil.n^.CfOaOl 0495 2370379 9447942199

OJCSDCDOS t,C/Dl.6)<63.6)S.6)6)l2ce6)1(/8 04936 203824 8547630160

LC/Ol. ©tfij. nJ(012)(DOSa8 0497 2700596 8547630164

093O(T\)(8(2COOajQ LC/olfflflj)! ej(0)0 cDOCQ)(a 04994 256162 8547630170

------Educational Plannina------,

V- c.^ . © 8 0 ^ ( 6

°cutnentation

MilFPA DC 62

P14980