Towards the Next Regional Transportation Plan

Total Page:16

File Type:pdf, Size:1020Kb

Towards the Next Regional Transportation Plan Towards the Next Regional Transportation Plan Freight Day University of Toronto Peter Paz, Manager of Regional Partnerships 2 Addressing the GTHA’s transportation challenges WHO IS METROLINX Metrolinx was created in 2006 by the Province of Ontario as the first Regional Transportation Agency for the Greater Toronto and Hamilton Area (GTHA). PLAN BUILD OPERATE 4 What is Metrolinx’s mandate? 1. Regional transformation 2. Plan, build, and operate 3. Create connections 2008 “In 25 years, the GTHA will have an integrated transportation system that enhances our quality of life, our environment and our prosperity” Billions in construction projects Regional Express Rail: $13.5 billion over 10 years Rapid transit will change everything Goods Movement Strategy #9 – Improve Goods Movement within the GTHA Urban Freight Forum Implementing The Big Move Review of The Regional Transportation Plan Metrolinx is required to review the GTHA multimodal regional transportation plan under the Metrolinx Act (2006) at least every ten years, in alignment with Ontario’s Growth Plan for the The Corporation shall, at least Greater Golden Horseshoe. every 10 years after subsection (1) comes into force, complete a review of the transportation plan A review of The Big Move at this time allows Metrolinx to: required by clause (1) (a) and make any necessary changes to the transportation plan to ensure • Evaluate and incorporate evidence-based research, new that it complies with the analysis and innovative approaches prescribed provincial plans and • Assess progress, change and the impacts of committed policies in accordance with clause provincial investments on the region’s transportation system (2) (d). 2006, c. 16, s. 6 (4). • Continue to strengthen our relationships with stakeholders by advancing and aligning the provincial, regional and local priorities that together can achieve the shared vision for the GTHA’s transportation system. Path to the Next RTP The Next RTP Coordination with the Growth Plan The Next RTP Timeline We are Metrolinx Board of Directors Meeting Online Consultation Public Meetings here 2006 2014 2015 2016 2017 2018 PHASE 1 PHASE 2 PLAN IMPLEMENTATION REVIEW UPDATE CONSULTATION PLANNING & ADOPTION FALL 2016 DECEMBER 2017 2006 NOV 2008 FEB 2014 Growth Plan for the GGH The Big Move RTP Review Introduction to Board 2016 Consultation Results Final Updated Regional from Discussion Paper Transportation Plan Regional Transportation Plan Growth Plan Amendments GROWTH PLAN for the Greater Golden APRIL 2006 Horseshoe JUNE 2017 2018 / 2019 Metrolinx created under SPRING 2015 AUGUST 2016 WINTER 2017 - TBD Draft Updated Regional RTP Implementation Plan the Metrolinx Act, 2006 Growth Plan Discussion Paper RTP Discussion Paper Finalized Growth Plan Transportation Plan Partnerships with Technical Background Papers University Researchers • Active Transportation Needs and Opportunities • Access to Regional Transit • Goods Movement Issues and Opportunities • Journeys to School and Work • Mobility Hub Profiles and Indicators • Factors Influencing Transit Use • New Mobility Services Trends and Implications • Regional Intermodal Demand • Social Equity Analysis Modelling • Transit Needs and Opportunities • Transportation Demand • Transportation Demand Management Needs and Management Opportunities • Transit Equity • Screening Process • Health and Transit Access • Draft Updated Vision, Goals & Objectives • Walkability at GO Stations • Land Use Context • Barriers to Active Transportation • Children’s Independent Mobility • Shared Economy GTHA Population Growth by Age 25% Youth 0-19 (age 3-19) 20% Young Adults 20-34 (age 20-34) 15% Middle Age 35-49 Population (age 35-49) 10% GTHA Adults 50-64 (age 50-64) 5% Seniors (65+) Proportionof 65+ 0% 2016 2021 2026 2031 2036 2041 Future Travel Demand (a.m. peak)* Total Trip Growth AM PEAK TRIPS (MILLIONS) Total Auto Vehicle km Travelled 5.0 11% 17.6 M 24.0 M 4.0 3 2006 2031 33% 18% 9% 3.0 10% 18% Auto Vehicle km Travelled / Person 10% 16% 2.0 19% 71% 2.09 2.02 73% 74% 2006 2031 3% 1.0 71% 0.0 1991 2001 2011 2031 AUTO TRANSIT ACTIVE * Note: 2031 data assume implementation of currently funded rapid transit network. Home and Work Location: 1991 - 2031 Employment Growth: 2006 - 2041 3.5 600 Total Employment Office Employment 3.0 500 2.5 400 2.0 300 1.5 200 1.0 Total Employment (Millions) 100 0.5 Office Employment (Thousands) 0.0 0 2006 2011 2016* 2031 2041 2006 2011 2016* 2031 2041 Toronto Rest of GTHA Downtown Rest of Toronto Rest of GTHA • *2016 data are estimated • Office Employment data: Hemson Consulting Ltd. • 2031 – 2041 Total Employment Data: Growth Plan for the GGH, schedule 3 The Geography of Work Source: Neptis Foundation 2016 Goods Movement in the Next Plan Urban Goods Movement Background Paper Several key areas covered in this paper: • What should be the vision for goods movement in the GTHA? • What is the state of the goods movement system in the GTHA, and how is it used? • What changes have occurred since Metrolinx’s Goods Movement Status Update was completed? • What are the global best practices in goods movement policy of relevance to the GTHA? • What demographic and economic trends are likely to impact the nature and volume of goods movement in the GTHA over the next 10 years? • What progress has been made on goods movement in the GTHA since 2008 and should any updates be made to the Urban Freight Action Plan? Key Issues and Proposed Updates 1. Managing congestion • Overwhelmingly the most important issue for the private sector • Goods movement vehicles shoulder a disproportionate share of the economic burden of congestion 2. Managing land use compatibility • Reduce conflicts: incompatible land uses, freight sprawl vs. compact development, conflicts in shared use of corridors 3. Reducing the environmental impact of goods movement • Fuel use, GHG emissions, air pollutants, noise, vibration From Urban Goods Movement Background Discussion Paper – CPCS/DKCI (2016) Urban Goods Movement Data (Phase 1 and 2) Metrolinx commissioned goods movement data plan, to support modelling and planning needs (Phase I – 2013) Phase II (2016): Refresh the 2013 plan in light of new data and priorities, and help Metrolinx and its partners move forward with implementation This work complements parallel work in support of goods movement component of RTP Review Also considered as part of Phase II: • Key Performance Indicators (where are we?) • Models, analysis and forecasting (where are we headed, and what do we need?) Heavy Infrastructure Balance of Priorities Emphasis The Big Move was focused The next RTP will emphasize on ‘catching up’ after strategies that further leverage years of underinvestment infrastructure investments The NEXT Plan: Strengthening Connections Congestion Safe Active Parking management complete Transportation strategies strategies streets Supporting Expanded Public Urban freight sustainable TDM education regional growth Frequent System New Rapid transit management mobility Transit service options expansion Source: Neptis Foundation 2016 Source: Neptis Foundation 2016 Thank You .
Recommended publications
  • Welcome What Is a Mobility Hub? Mobility Hubs and the Big Move
    Kennedy Station Mobility Hubs in the Greater Toronto and Hamilton Area MobilityMobility Hubs in the Greater Hub Toronto and Hamilton Area 1 Introduction Mobility Hubs in Toronto, York Region, and Peel Region. Welcome Mobility TORONTO/YORKHubs and The REGION/PEEL Big Move REGION This is the second public meeting for the Kennedy Station Mobility The Big Move identifies 18 Anchor Hubs and 33 Gateway Hubs. Hub Study. Anchor hubs act as anchors in the regional transportation system The Kennedy Station Mobility Hub Study is intended to serve due to their roles as the Greater Toronto and Hamilton Areas as a background study for a future secondary plan for the area. primary international gateways. They include: Conceptual plans created as part of this study will set the stage • Major transit stations and surrounding areas in urban growth for detailed site plans and identify whether there are area-specific centres. opportunities and constraints that warrant a municipal secondary plan or other legislated process for the broader mobility hub area. • Pearson Airport. Your input today will help shape the study recommendations. • Union Station. Gateway hubs are key nodes in the regional transportation system, and are: • Located where two or more regional rapid transit lines What is a Mobility Hub? intersect and where there is expected to be significant The Province’s Growth Plan for the Greater Golden Horseshoe passenger activity. (2006) defines major transit station areas as the area within an • Forecasted to achieve a minimum density target of approximately 10-minute walk of any existing or planned higher DURHAM REGION approximately 50 people + jobs per hectare.
    [Show full text]
  • Enhanced Eglinton West Rapid Transit Initial Business Case Analysis
    APPENDIX 4 ENHANCED EGLINTON WEST RAPID TRANSIT INITIAL BUSINESS CASE ANALYSIS JUNE 2016 Cover Image: Marcus Bowman TABLE OF CONTENTS Problem Statement II 1.0 Introduction 1 2.0 Context 2 3.0 Study Overview 4 4.0 Strategic Case 9 5.0 Financial Case 18 6.0 Economic Case 20 7.0 Deliverability and Operations Case 23 8.0 Next Steps 25 Appendix 26 I PROBLEM STATEMENT The implementation of the Mississauga BRT, Eglinton Crosstown Phase 1, as well as Union Pearson Express and RER connections at Mt. Dennis will bring vital rapid transit improvements to the Eglinton corridor and the region, but will also leave a key gap in the rapid transit network along Eglinton West between Mt. Dennis and Renforth Gateway. The corridor provides an opportunity for a connection to Pearson Airport and surrounding employment by linking communities, people, and jobs to and along the Mississauga BRT and Eglinton LRT. An Environmental Assessment was completed in 2010 for an at- grade LRT through the corridor with 14 stops along Eglinton Ave at all cross roads. In the context of current planning work being coordinated between Metrolinx and the City of Toronto there is a need to develop feasible options to optimize the 2010 EA design and understand their various benefits to different users and travel patterns. II INITIAL BUSINESS CASE 1.0 INTRODUCTION Eglinton West: A Gap in the Regional Rapid Transit Network The Greater Toronto and Hamilton Area’s Regional Transportation Plan, The Big Move, was adopted in 2008 and set out a 25-year vision for supporting growth in the region.
    [Show full text]
  • Appendix 4, Letter from Chief Planner to President And
    Appendix 4 Letter from Chief Planner to President and CEO, Metrolinx Appendix 4: Letter from Chief Planner to President and CEO, Metrolinx Jennifer Keesmaat, MES MCIP RPP Chief Planner and Executive Director City Planning City Hall Tel: 416-392-8772 John Livey, Deputy City Manager 100 Queen Street West Fax: 416-392-8115 12th Floor, East Tower [email protected] Toronto, Ontario M5H 2N2 www.toronto.ca/planning February 12, 2016 Mr. Bruce McCuaig President and CEO Metrolinx 97 Front Street West Toronto, Ontario M5J 1E6 Dear Mr. McCuaig: Re: Metrolinx Evaluation of Potential New GO RER Station Sites within the City of Toronto I am writing to summarize key points from recent meetings between City and Metrolinx staff regarding the evaluation of potential new RER station sites identified by Metrolinx. The discussions have taken place to provide City Planning input to the Metrolinx evaluation of station site options and your intended further shortlisting of options and reporting to the Metrolinx Board. Comments from City staff on the GO RER station sites has focused on planning considerations including development/city building opportunities, accessibility, and network connectivity, reflecting some of the key elements of the City’s Feeling Congested evaluation criteria for rapid transit projects. These meetings have involved City Planning staff from each District, with the exception of the East District (Scarborough) in which all new RER station sites are associated with the SmartTrack initiative. In this case, comments on these station evaluations were previously reported to the October 20, 2015 meeting of the City’s Executive Committee: http://app.toronto.ca/tmmis/viewAgendaItemHistory.do?item=2015.EX9.1 City comments on the remaining GO RER new station sites are detailed in Attachment 1.
    [Show full text]
  • 4.08: Metrolinx—Regional Transportation Planning
    Chapter 4 Section 4.08 Metrolinx—Regional Transportation Planning Follow-up to VFM Section 3.09, 2012 Annual Report RECOMMENDATION STATUS OVERVIEW # of Status of Actions Recommended Actions Fully In Process of Little or No Will Not Be Recommended Implemented Being Implemented Progress Implemented Recommendation 1 1 1 Recommendation 2 1 1 Recommendation 3 1 1 Recommendation 4 2 2 Recommendation 5 1 1 Recommendation 6 2 2 Recommendation 7 1 1 Recommendation 8 2 2 Recommendation 9 1 1 Recommendation 10 2 2 Recommendation 11 1 1 Total 15 5 9 1 – % 100 33 60 7 – integrated, multi-modal transportation network in Background the Greater Toronto and Hamilton Area (GTHA). In November 2008, Metrolinx formally adopted Chapter 4 • Follow-up Section 4.08 a Regional Transportation Plan (Plan)—also known Metrolinx, an agency of the government of Ontario, as “The Big Move”—that set out the priorities, poli- was created by the Greater Toronto Transportation cies and programs for implementing a transporta- Authority Act, 2006, now the Metrolinx Act, 2006 tion system within the GTHA. The Plan, which was (Act). According to the Act, one of Metrolinx’s key the result of two years of public consultation, was objectives is to provide leadership in the coordina- adopted by Metrolinx’s Board of Directors, which at tion, planning, financing and development of an 495 496 2014 Annual Report of the Office of the Auditor General of Ontario that time included representatives from the GTHA as well as other projects contemplated in years 16 municipalities. through 25. Among the Plan’s more significant proposals was In 2012, our review of the more significant to build more than 1,200 km of rapid transit with the projects in the early stages of the Regional Trans- aim of getting 80% of GTHA residents within 2 km of portation Plan identified a number of issues that rapid transit.
    [Show full text]
  • A Case Study of the 2015 Toronto Pan American Games and the Union-Pearson Express
    Short-Term Gain and Long-Term Pain: A case study of the 2015 Toronto Pan American Games and the Union-Pearson Express By: Monica Silberberg Date of Submission: November 30, 2015 A Major Paper submitted to the Faculty of Environmental Studies in partial fulfillment of the requirements for the degree of Master in Environmental Studies, York University, Toronto, Ontario, Canada. _____________________________________ Monica Silberberg, MES Candidate _____________________________________ Dr. Liette Gilbert, Supervisor Abstract Mega-events have been credited with being catalysts of urban regeneration and accelerating infrastructure development. Staging a mega-event not only requires significant investment in event-related facilities but also usually necessitates upgrades to transportation infrastructure. This paper broadly examines the role of mega-events in fast-tracking urban improvements as well as the ramifications of accelerated development on cities. In particular, it discusses how the 2015 Pan American Games held in Toronto fast-tracked the completion of the Union-Pearson Express, a rail link connecting the city’s downtown and primary airport, after the project had been stalled for years. This case study reveals the tensions between the long-term planning goals of the host city and more short-term demands for mega-events. The Union- Pearson Express is criticized for being inconvenient, inaccessible and over-priced, resulting in adverse impacts on the environment and human health and not doing enough to encourage public transportation. This paper contends that the Union-Pearson Express offered short-term gain associated with the Pan American Games that fails to address the long-term transit and other needs of the Greater Toronto Area.
    [Show full text]
  • The Big Move: Transforming Transportation in the Greater Toronto and Hamilton Area Modelling and Measuring Against the Triple Bottom Line
    The Big Move: Transforming Transportation in the Greater Toronto and Hamilton Area Modelling and measuring against the triple bottom line Lisa Salsberg, Manager, Transportation Policy and Planning, Metrolinx Abril Novoa-Camino, Intern Policy and Planning, Metrolinx Paper prepared for Best Practices in Urban Transportation Planning: Measuring Change Session 2009 Annual Conference of the Transportation Association of Canada Vancouver, British Columbia October 2009 Acknowledgements: Metrolinx wishes to acknowledge the invaluable contribution of IBI Group in the preparation of the modelling work in support of the Big Move and of in the drafting of the modelling sections of this paper. Abstract: In November 2008, Metrolinx - the transportation authority for the Greater Toronto and Hamilton Area - released its 25-year regional transportation plan: The Big Move. The Big Move adopts the “triple bottom line” of a high quality of life, a protected environment and a prosperous economy as its foundational basis. The triple bottom line is used to inform the development and measurement of a comprehensive vision, goals and objectives for the regional transportation system, and to model and analyse system performance and implementation options. This paper describes the process followed by Metrolinx to develop the goals and objectives for the regional transportation plan and the metrics that will be used to measure its implementation. The paper provides an in depth overview of the technical modelling and system performance analysis undertaken to support the development of the plan. The paper describes the way in which an iterative process of stakeholder input and technical analysis were used together to select a recommended regional rapid transit network.
    [Show full text]
  • The Big Move and Active Transportation Investment
    Acknowledgments Researcher and Author Pauline Craig, Moving Right Along Inc. Editor and Director Nancy Smith Lea, Director, Toronto Centre for Active Transportation, Clean Air Partnership Cover Photo Credit: Ontario Growth Secretariat, Ministry of Municipal Affairs and Housing Copyright Queen's Printer for Ontario This work is generously supported by the Toronto Atmospheric Fund. © Clean Air Partnership, September 2013. For more information, contact: Clean Air Partnership 75 Elizabeth Street Toronto, Ontario M5G 1P4 416-392-6672 | [email protected] Clean Air Partnership (CAP) is a registered charity dedicated to improving air quality, minimizing greenhouse gas emissions and reducing the impacts of air pollution and climate change. The Toronto Centre for Active Transportation (TCAT), a project of CAP, conducts research, develops policy, and creates opportunities for knowledge sharing, all with the goal of providing evidence and identifying workable active transportation solutions. 1 Table of Contents 1.0 Executive Summary ............................................................................................................. 4 2.0 Introduction .......................................................................................................................... 8 2.1 Outline and Goals of this Report .................................................................................. 10 2.2 Complete Streets Forum 2013 ...................................................................................... 10 3.0 Benefits of
    [Show full text]
  • Connecting the Region
    CONNECTING THE REGION MARY PROC, VICE PRESIDENT, CUSTOMER SERVICE DELIVERY, METROLINX NATIONAL RAILWAY DAY NOVEMBER 7, 2017 OUR NEW CEO – PHIL VERSTER “I am very excited about joining the team of dedicated women and men at Metrolinx, and to be part of one of the most exciting transit transformations taking place anywhere in the world. I believe Ontario is the place to be. Not just because of the very large scale of investment being made in transit, but because of the dynamism, optimism and quality of life that has made this region so envied all over the world.” “At the end of the day, it’s important to remember that all the investment, all the construction, all the new trains and services are not an end in themselves. They’re about improving the experience of passengers, contributing to communities and to the economy.” 2 • Metrolinx was created in 2006 by the Province of Ontario to improve the coordination and integration of all modes of transportation in the Greater Toronto and Hamilton Area. • Guided by its Regional Transportation Plan, Metrolinx has worked to plan, design and build a regional transportation network that aims to enhance the quality of life, the environment and the prosperity of area residents. 3 METROLINX’S GEOGRAPHIC MANDATE: THE GREATER TORONTO AND HAMILTON AREA Expansive 8,242 km2 —urban, suburban and rural land use Complex Working with thirty municipalities, four levels of government and nine transit agencies 5 OUR MANDATE PLAN BUILD OPERATE 6 THE BIG MOVE OVER $30 BILLION IN INFRASTRUCTURE INVESTMENT 7 THE BIG MOVE - RECORD INVESTMENT The Big Move has shaped a record investment in new infrastructure and transit services: Over $30B in investment in the GTHA’s rapid transit network currently being planned, procured and constructed.
    [Show full text]
  • Review of Metrolinx's Big Move
    REVIEW OF METROLINX’S BIG MOVE Michael Schabas, First Class Partnerships Limited Neptis Foundation December 2013 Review of Metrolinx’s Big Move Michael Schabas, First Class Partnerships Limited ISBN 978-0-9739888-8-8 Suite 501 1240 Bay Street Toronto, Ontario M5R 2A7 +1 416 972 9199 [email protected] www.neptis.org ©2013 Neptis Foundation Review of Metrolinx’s Big Move 1 To Tony Coombes, 1937-2013, who created better cities with his patient observation, meticulous analysis, and thoughtful perspective. Review of Metrolinx’s Big Move 2 Review of Metrolinx’s Big Move 3 FOREWORD This report began as a question asked by Tony Coombes, the founding executive director of the Neptis Foundation, who passed away earlier this year. It then continued as a conversation between Tony and Michael Schabas, the report’s author. Both Tony and Michael were colleagues during the early days of the Canary Wharf project, when Canada’s powerhouse development company, Olympia and York (O&Y), set out to build a new city centre in east London. Tony hired Michael as O&Y’s Vice-President of Transport, to conceive, plan, and make the business case for the Jubilee Line Extension that would link London’s Underground to the new city, and to upgrade the Docklands Light Railway. Many years later, Michael and Tony reconnected during one of Michael’s visits to Toronto, his hometown. Metrolinx had just released The Big Move, the $36 billion regional transit plan. Questions were raised as the two began a series of conversations about the Plan. • What evidence suggests
    [Show full text]
  • Appendix 1: GO Transit Regional Express Rail Overview______
    Appendix 1: GO Transit Regional Express Rail Overview____________________________ APPENDIX 1 METROLINX GO TRANSIT REGIONAL EXPRESS RAIL OVERVIEW 1. GO REGIONAL EXPRESS RAIL OVERVIEW Over the next ten years Metrolinx will be implementing Regional Express Rail (GO RER) service across the GO rail network, a part of the Government of Ontario’s Moving Ontario Forward plan, announced on April 17, 2015. Through GO RER, the core segments of the GO network will be upgraded to feature: • Frequent, all-day service • Faster trip times • Electric trains New rail service will be provided throughout the weekday, evenings, and weekends, leading to substantial increases in ridership in the off-peak periods, and augmenting already significant ridership in the peak periods. This would be a 140% forecast increase in overall ridership over the next fifteen years. In order to speed travel, investments will be made in track speed improvements, electric trains and equipment, grade separations, and other improvements. The tracks, corridors, and trains themselves will be used more intensively and GO RER will improve the time it takes for commuters to complete their journeys in a host of ways. In addition to reductions in journey times achieved by cutting wait times and increasing travel speeds through electrification, GO RER will increase transit system capacity. Investing in capital improvements to existing GO rail corridors would mean that additional service and capacity could be provided cost effectively in a built-up urban environment while generating important economic, social and environmental benefits. With the Greater Toronto and Hamilton Area (GTHA) region poised to grow to 9 million people by 2031, GO RER is a means to meet the region’s transit needs.
    [Show full text]
  • Metrolinx RTP and RER Update
    CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF APRIL 11, 2018 Item 9, Report No. 14, of the Committee of the Whole, which was adopted, as amended, by the Council of the City of Vaughan on April 11, 2018, as follows: By receiving communication C6, from Mr. Fred Winegust, Tangreen Circle, Thornhill, dated April 5, 2018. 9 METROLINX DRAFT 2041 REGIONAL TRANSPORTATION PLAN AND REGIONAL EXPRESS RAIL INITIATIVES UPDATE The Committee of the Whole recommends: 1) That the recommendation contained in the following report of the Deputy City Manager, Public Works and Deputy City Manager, Planning and Growth Management, dated April 4, 2018, be approved; and 2) That the deputation by Mr. Fred Winegust, Tangreen Circle, Thornhill, be received. Purpose This report provides an overview of the Metrolinx’s Draft Final 2041 Regional Transportation Plan and a high-level update on Regional Express Rail related initiatives in the City. Recommendations 1. That Council request Metrolinx to: a) Include the Kirby Road grade separation located west of Keele Street, in Metrolinx’s upcoming Transit Project Assessment Process (TPAP) for the Kirby GO Station; b) Work with City staff to develop the Kirby Station design and layout in order to support optimal station operations, sustainable mobility, safe access to and from the station, and the development of the required density around the station; and c) Initiate a stakeholder engagement process that includes the Block 27 participating Landowners Group; 2. That Council reaffirm its opposition to an increase in freight rail traffic through the City of Vaughan; 3. That staff be directed to participate in any studies related to modifications of the freight rail network as identified in the 2041 Regional Transportation Plan; and 4.
    [Show full text]
  • Governance of Regional Transit Systems
    GOVERNANCE OF REGIONAL TRANSIT SYSTEMS: Observations on Washington, New York, and Toronto Anne Golden, PhD Public Policy Scholar, The Wilson Center Distinguished Visiting Scholar, Ryerson University June, 2014 ABSTRACT This report examines the governance models of the regional transit agencies in three large metropolitan areas: Washington, D.C., New York, and Toronto. After reviewing the history, structure, and challenges of each system, it assesses the governance arrangements in relation to widely accepted principles of good governance. It concludes that given the unique circumstances in each region, the models are not transferable and specific governance challenges require singular responses. Non-governmental organizations can make substantial planning and advocacy contributions. A shared vision and values among those with decision-making authority matter more than the actual governance structure. There are pros and cons to having elected officials on regional transit boards, but positive engagement with locally elected representatives is essential. Financing cannot be separated from governance; a predictable and sufficient funding framework is an integral part of good governance. INTRODUCTION The importance of public transit to the economic prosperity and livability of city-regions is now widely recognized. For decades, North American cities had counted on the automobile to move people around, but two obvious pressures are moving public transit to the political forefront. The global movement of people into cities means quite simply that we cannot meet the mobility needs of people by depending on the automobile alone. Growing awareness of climate change issues is underscoring the imperative of supporting urban growth in ways that contribute to environmental sustainability. Creating the right governance structure to plan and operate the required systems is a particular challenge for metropolitan regions that extend beyond political boundaries.
    [Show full text]