Appendix 4, Letter from Chief Planner to President And
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Environmental Assessment Act Section 7.1 Notice of Completion of Ministry Review an Invitation to Comment on the Environmental A
ENVIRONMENTAL ASSESSMENT ACT SECTION 7.1 NOTICE OF COMPLETION OF MINISTRY REVIEW AN INVITATION TO COMMENT ON THE ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED SPADINA SUBWAY EXTENSION An environmental assessment (EA) was submitted to the Ministry of the Environment by the Toronto Transit Commission (TTC) and the City of Toronto for the extension of the Spadina Subway from Downsview Station to Steeles Avenue (via York University). The Spadina Subway Extension includes the construction, operation and maintenance of TTC’s subway from Downsview Station to Steeles Avenue, with stations located at: 1. Sheppard Avenue West/Downsview Park, west of the CN Newmarket Subdivision (Sheppard West Station); 2. The intersection of Keele Street/Finch Avenue West (Finch West Station); 3. The York University Common (York University Station); and, 4. The proposed inter-regional transit terminal at Steeles Avenue West between Keele Street and Jane Street (Steeles West Station). In addition, the following surface commuter facilities will be provided: 1. Finch West Station – an 8-10 bay bus terminal as well as a passenger pick-up and drop-off and a 400-space commuter parking lot in the Richview/Cherrywood (Finch) hydro corridor; and, 2. Steeles West Station – a 35-40 bay bus terminal with a passenger pick-up and drop-off and a 2,400 to 3,000 space commuter parking lot in the Claireville/Cherrywood (Steeles) hydro corridor. You can submit comments on the undertaking, the environmental assessment, and the ministry Review. You may also request that the Minister refer the application to a hearing by the Environmental Review Tribunal. If you request a hearing you must state in your submission, whether you are requesting a hearing on the whole application or on only specified matters related to the application. -
Regional Express Rail Update
Clause 5 in Report No. 10 of Committee of the Whole was adopted by the Council of The Regional Municipality of York at its meeting held on June 23, 2016 with the following additional recommendation: 3. Receipt of the memorandum from Daniel Kostopoulos, Commissioner of Transportation Services, dated June 22, 2016. 5 Regional Express Rail Update Committee of the Whole recommends adoption of the following recommendations contained in the report dated June 1, 2016 from the Commissioner of Transportation Services: 1. Metrolinx be requested to mitigate the impacts of Regional Express Rail service by addressing the gap between their Initial Business Case for Regional Express Rail and York Region’s needs for grade separations, additional GO stations and parking charges. 2. The Regional Clerk circulate this report to Metrolinx, Ontario Ministry of Transportation and Clerks of the local municipalities. Report dated June 1, 2016 from the Commissioner of Transportation Services now follows: 1. Recommendations It is recommended that: 1. Metrolinx be requested to mitigate the impacts of Regional Express Rail service by addressing the gap between their Initial Business Case for Regional Express Rail and York Region’s needs for grade separations, additional GO stations and parking charges. 2. The Regional Clerk circulate this report to Metrolinx, Ontario Ministry of Transportation and Clerks of the local municipalities. Committee of the Whole 1 June 9, 2016 Regional Express Rail Update 2. Purpose This report provides an update to Council on the Provincial Regional Express Rail (RER) Service Plan and associated staff activities as York Region’s response to the RER Service Plan to be implemented by the Province over the next 10 years. -
3.09 Metrolinx—Regional Transportation Planning
Chapter 3 Section 3.09 Metrolinx—Regional Transportation Planning relates only to upgrading and expanding the regional Background transportation network but does not include the esti- mated maintenance that is expected to be required to keep the additional transportation infrastructure Metrolinx, an agency of the government of Ontario, in a state of good repair over its useful life. was created by the Greater Toronto Transportation In the first 15 years, Metrolinx plans to imple- Authority Act, 2006, now the Metrolinx Act, 2006 ment the priority transit projects listed in Figure 1. (Act). According to the Act, one of Metrolinx’s Metrolinx’s estimate of the cost of these projects is key objectives is to provide leadership in the co- approximately $33 billion, of which approximately ordination, planning, financing and development of $3 billion had been spent by the province as of an integrated, multi-modal transportation network March 31, 2012. For about half of these projects, in the Greater Toronto and Hamilton Area (GTHA). the majority of the funding comes from a 2007 The GTHA consists of two single-tier municipalities Chapter 3 • VFM Section 3.09 provincial commitment of $11.5 billion, along with (Toronto and Hamilton), four regional munici- previously announced project funding. The remain- palities (Durham, Halton, Peel and York) and 24 ing priority projects that are funded—such as the local municipalities. Air Rail Link between Union Station and Pearson In November 2008, Metrolinx formally adopted International Airport and projects to revitalize a Regional Transportation Plan (RTP)—also known Union Station—are being funded from the prov- as “The Big Move”—that sets out the priorities, ince’s capital budget for GO Transit (the commuter policies and programs for implementing a trans- rail and bus system serving the GTHA, a division of portation system within the GTHA. -
Ontario Partners with Business to Build New Etobicoke GO Station Improving the Transit Experience and Making Life Easier for Ontarians October 25, 2018 8:00 A.M
NEWS Ministry of Transportation Ontario Partners with Business to Build New Etobicoke GO Station Improving the transit experience and making life easier for Ontarians October 25, 2018 8:00 A.M. TORONTO — Ontario's Government for the People is keeping its promise to build transit and make Ontario open for business by working with the private sector to build commuters a new, modern station at Mimico GO. This station is the product of a new kind of partnership. This project will optimize the use of government-owned land and increase transit ridership by building a new development along an existing transit line. We are improving the transit experience and making life easier for Ontarians. Today John Yakabuski, Minister of Transportation, Steve Clark, Minister of Municipal Affairs and Housing, Kinga Surma, Parliamentary Assistant to the Minister of Transportation, Christine Hogarth, MPP, Etobicoke-Lakeshore, and Phil Verster, President and CEO, Metrolinx, visited the Mimico GO Station to announce that Ontario had signed a non-binding Letter of Intent with Vandyk Group of Companies. Metrolinx and Vandyk will negotiate the construction of a new Mimico GO Station. "We are making it easier for people commuting in the GTHA," said Minister Yakabuski. "The new station we are building at Mimico is part of our plan to improve service on the Lakeshore West line to every 15 minutes or better. By working with businesses to develop this site, we are delivering on our promise that Ontario is open for business, while we get this work done at a lower cost to the taxpayer." The new Mimico GO Station will include a new, accessible station building, pedestrian tunnels and elevators, refurbished platforms and new entrances to the station and below grade parking. -
2012 Annual Report
2012 Annual Report Office of the Auditor General of Ontario Office of the Auditor General of Ontario To the Honourable Speaker of the Legislative Assembly In my capacity as the Auditor General, I am pleased to submit to you the 2012 Annual Report of the Office of the Auditor General of Ontario to lay before the Assembly in accordance with the provi- sions of section 12 of the Auditor General Act. Jim McCarter, FCA Auditor General Fall 2012 Copies of this report are available for $9.00 from Publications Ontario: (416) 326-5300 or toll-free long distance 1-800-668-9938. An electronic version of this report is available on the Internet at www.auditor.on.ca © 2012, Queen’s Printer for Ontario Ce document est également disponible en français. Cover photograph credits: ISSN 1719-2609 (Print) top right: Dick Hemingway Photographs ISBN 978-1-4606-0348-2 (Print, 2012 ed.) middle left: © Tetra Images/INMAGINE.com middle centre: © iStockphoto.com/ssuaphoto ISSN 1911-7078 (Online) bottom left: Office of the Auditor General of Ontario/Mariana Green ISBN 978-1-4606-0349-9 (PDF, 2012 ed.) bottom centre: © iStockphoto.com/mevens, HooRoo Graphics Table of Contents Chapter 1 Overview and Summaries of Value-for-money Audits and Reviews 5 Chapter 2 Public Accounts of the Province 27 Chapter 3 Reports on Value-for-money Audits and Reviews 45 Section 3.01 Cancer Screening Programs 46 Section 3.02 Criminal Prosecutions 65 Section 3.03 Diabetes Management Strategy 82 Section 3.04 Drive Clean Program 107 Section 3.05 Education of Aboriginal Students 129 Section -
Welcome What Is a Mobility Hub? Mobility Hubs and the Big Move
Kennedy Station Mobility Hubs in the Greater Toronto and Hamilton Area MobilityMobility Hubs in the Greater Hub Toronto and Hamilton Area 1 Introduction Mobility Hubs in Toronto, York Region, and Peel Region. Welcome Mobility TORONTO/YORKHubs and The REGION/PEEL Big Move REGION This is the second public meeting for the Kennedy Station Mobility The Big Move identifies 18 Anchor Hubs and 33 Gateway Hubs. Hub Study. Anchor hubs act as anchors in the regional transportation system The Kennedy Station Mobility Hub Study is intended to serve due to their roles as the Greater Toronto and Hamilton Areas as a background study for a future secondary plan for the area. primary international gateways. They include: Conceptual plans created as part of this study will set the stage • Major transit stations and surrounding areas in urban growth for detailed site plans and identify whether there are area-specific centres. opportunities and constraints that warrant a municipal secondary plan or other legislated process for the broader mobility hub area. • Pearson Airport. Your input today will help shape the study recommendations. • Union Station. Gateway hubs are key nodes in the regional transportation system, and are: • Located where two or more regional rapid transit lines What is a Mobility Hub? intersect and where there is expected to be significant The Province’s Growth Plan for the Greater Golden Horseshoe passenger activity. (2006) defines major transit station areas as the area within an • Forecasted to achieve a minimum density target of approximately 10-minute walk of any existing or planned higher DURHAM REGION approximately 50 people + jobs per hectare. -
95% Draft Final Environmental Project Report
Park Lawn GO Station DRAFT ENVIRONMENTAL PROJECT REPORT AUGUST 2021 First Capital - Park Lawn GO Station 95% Draft Final Environmental Project Report First Capital Park Lawn GO Station 95% Draft Final Environmental Project Report Draft Final 2021-08-27 E Izabela Jasiak Mark Armstrong Melissa Alexander Report 2021-06-04 D Rachel Eagles Mark Armstrong Melissa Alexander Draft Report 2021-04-21 C Rachel Eagles Mark Armstrong Melissa Alexander Draft Report Date Rev. Prepared By Checked By Approved By Status 360807-H-EV-PLG-RPT-EP-0002, Rev. E Page i © Hatch 2021 All rights reserved, including all rights relating to the use of this document or its contents. First Capital - Park Lawn GO Station 95% Draft Final Environmental Project Report Executive Summary ES Section 1- Introduction and Project Overview First Capital (Park Lawn) Corporation (FCR) has proposed the new Park Lawn GO Station to be developed in partnership with Metrolinx, located at the north end of 2150 Lake Shore Boulevard West in the City of Toronto (“the Project”). Hatch was retained by FCR to undertake an Environmental Assessment (EA) for the proposed Park Lawn GO Station on the Lakeshore West rail corridor. The evaluation of environmental impacts of the proposed Park Lawn GO Station has been carried out in accordance with the Transit Project Assessment Process (TPAP). The TPAP is regulated by the Environmental Assessment Act (EAA) under Ontario Regulation 231/08 - Transit Projects and Metrolinx Undertakings (O. Reg. 231/08). The purpose of the TPAP is to ensure effects associated with the Project are clearly identified and mitigated to the greatest extent feasible. -
Pre-Arrival Guide: International Students Fall 2021
Pre-Arrival Guide: International Students Fall 2021 Updated 27 May 2021 Information can change rapidly. Please consult official Government of Canada links before travelling Planning for Canada Overview Pre-Arrival Checklist • Immigration • PGWP Updates • COVID Travel Restrictions • Quarantine Requirement Ann Welsh Vino Shanmuganathan • Accommodations Associate Director International Student Support • University Health Insurance International Relations Specialist • Connect with Other Students Cheryl Stickley Lan Yu • Packing List Graduate International Program International Information Coordinator Assistant International Relations Office Room W262, SSB Life in Toronto Virtual Office Hours: Monday – Friday, 9AM – 4:30PM • Self-quarantine Requirements Email: [email protected] • State of Emergency (Ontario) Website: International Relations Virtual Q&A Sessions https://schulich.yorku.ca/international • Transportation -relations-qa-webinars/ • Shopping Webinar Guest: Kaitlyn (Chufeng) Zhang Graduate Business Council (GBC), International Relations [email protected] PREPARING TO ARRIVE IN CANADA Pre-Arrival Checklist Immigration Documents Please note: Immigration and border PGWP Update information is valid as of 27 May 2021 Monitor Government of Canada information for updates Understand Travel Restrictions as information may change rapidly: • COVID 19- Travel, quarantine and borders Self-Quarantine • IRCC COVID-19 website • Flying to Canada checklist • Canada Travel Wizard Secure Accommodations Learn about -
(BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016
Bolton Residential Expansion Study (BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016 The purpose of this memorandum is to review the professional literature pertaining to the potential develop- ment of a Transit-Oriented Development (TOD) in the Bolton Residential Expansion Study area, in response to the Region of Peel’s recent release of the Discussion Paper. The Discussion Paper includes the establishment of evaluation themes and criteria, which are based on provincial and regional polices, stakeholder and public comments. It should be noted that while the Discussion Paper and the Region’s development of criteria does not specifi- cally advocate for TOD, it is the intent of this memorandum to illustrate that TOD-centric planning will not only adequately address such criteria, but will also complement and enhance the Region’s planning principles, key points and/or themes found in stakeholder and public comments. In the following are research findings related to TOD generally, and specifically, theMetrolinx Mobility Hub Guidelines For The Greater Toronto and Hamilton Area (September 2011) objectives. Additionally, following a review and assessment of the “Response to Comments Submitted on the Bolton Residential Expansion Study ROPA” submission prepared by SGL Planning & Design Inc. (March 15, 2016), this memorandum evaluates some of the key arguments and assumptions made in this submission relative to the TOD research findings. Planning for Transit-Oriented Developments TOD policy and programs can result in catalytic development that creates walkable, livable neighborhoods around transit providing economic, livability and equitable benefits. The body of research on TODs in the United States has shown that TODs are more likely to succeed when project planning takes place in conjunction with transit system expansion. -
Winter 2018 Something's in the Air Dressing Meghan Markle Math To
Winter 2018 York’s groundbreaking Department of Dance On Edge PLUS Something’s in the Air Dressing Meghan Markle Math to the Rescue 4 The President 5 Editor’s Notes 6 View 36 Giving 38 Alumni 46 Flashback 14 DANCING ON THE EDGE Nearing 50, Canada’s first degree program THIS in dance is still going strong 22 NAIL BITER IS PhD student Reena Shadaan investigates the health hazards of discount nail salons 26 HISTORY THE GILLER GUYS Canada’s top literary prize goes, not once [ OPEN YOUR MIND ] but twice, to writers who honed their craft at York Traces of our history can be found in unexpected places. An International Bachelor of Arts 32 FRESH COAT from our world-acclaimed History department provides unique global perspectives and inspiring Schulich alum Bojana Sentaler designs opportunities to study abroad. Discover new ways of thinking. YORKU.CA/OPENYOURMIND luxury outerwear for discerning fashionistas (and a princess or two) Winter 2018 The York University Magazine 3 YorkMagazine_HISTORY.indd 1 2018-04-20 9:27 AM “MY WORK HERE IS DONE.” With these words, our Chancellor Greg Sorbara (BA ’78, THE PRESIDENT LLB ’81) perfectly captured the spirit of shared accomplishment and exuberance at the EDITOR’S NOTES official ribbon-cutting ceremony to open the Toronto-York Spadina Subway Extension at Where It’s At our Keele campus on Dec. 15, 2017. When I reflect on that historic day for our community, as we welcomed Prime Minister I ARRIVED AT YORK UNIVERSITY IN THE FALL, after decades strong as working ideals. Justin Trudeau, Premier Kathleen Wynne, Toronto Mayor John Tory and a number of as a staff journalist at the Globe and Mail newspaper, to take the York is where it’s at. -
Transportation Impact Study Proposed Residential Development 22-28 Ann Street & 78 Park Street East, Port Credit City of Mississauga
TRANSPORTATION IMPACT STUDY PROPOSED RESIDENTIAL DEVELOPMENT 22-28 ANN STREET & 78 PARK STREET EAST, PORT CREDIT CITY OF MISSISSAUGA April 2019 19244 Disclaimer This Report represents the work of LEA Consulting Ltd (“LEA”). This Report may not be relied upon for detailed implementation or any other purpose not specifically identified within this Report. This Document is confidential and prepared solely for the use of Edenshaw Ann Developments Ltd. Neither LEA, its sub-consultants nor their respective employees assume any liability for any reason, including, but not limited to, negligence, to any party other than Edenshaw Ann Developments Ltd. for any information or representation herein. Transportation Impact Study Proposed Residential Development 22- 28 Ann Street & 78 Park Street East, City of Mississauga TABLE OF CONTENTS 1 INTRODUCTION ...................................................................................................................... 1 2 EXISTING CONDITIONS ............................................................................................................ 3 Transit Network ............................................................................................................................... 3 Existing Cycling Network .................................................................................................................. 4 Pedestrian Network ......................................................................................................................... 6 Street Network ................................................................................................................................ -
Toronto Transit Commission Report No
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: TTC COMMUNITY RELATIONS ANNUAL REPORT INFORMATION ITEM RECOMMENDATION It is recommended that the Board receive this report for information. FUNDING The recommendation of this report does not have any financial impact. BACKGROUND At its meeting of February 25, 2013, the Board adopted a Construction Projects Community Relations Management Plan and TTC Good Neighbour Policy for Construction Projects. Attached is the annual Community Relations report for 2013. DISCUSSION Community Relations efforts in 2013 focused on pro-active outreach for major capital projects including: Leslie Barns, New Second Exits Expert Advisory Panel, Coxwell Station Easier Access, Woodbine Station Easier Access, Toronto-York Spadina Subway Extension, Pape Station Modernization, Dufferin Station Modernization, Ossington Station Easier Access, and Lawrence Station Fire Vents and other projects that are in the planning phase. The community outreach on major TTC construction projects has ensured that community questions, concerns, and recommendations are clearly identified, evaluated and responded to throughout planning, design and construction. The Community Relations team is a bridge between communities, TTC construction staff and contractors. By building early understanding and trust, and working diligently to incorporate community feedback and resolve concerns, the TTC can build projects more effectively with community support. This is especially important given that major projects with long term benefits may cause major inconvenience to our neighbours and customers during construction. The attached report summarizes community relations efforts throughout 2013. - - - - - - - - - - - - March 5, 2014 87-02-08 03078-5-89 Attachment: Appendix A – 2013 Community Relations Annual Report 2013 Community Relations Annual Report Engineering, Construction & Expansion Department March 2014 03078-4-419 Table of Contents 1 Introduction………….