Quick viewing(Text Mode)

Infrastructure Investment Pipeline and to Sign up for Automatic Alerts: Date of Issue: Feb 2021

Infrastructure Investment Pipeline and to Sign up for Automatic Alerts: Date of Issue: Feb 2021

Investment Strategy for Northern Ireland (ISNI) Please visit the NI Executive's ISNI Information Portal for more information Infrastructure Investment Pipeline and to sign up for automatic alerts: Date of issue: Feb 2021 www.isni.gov.uk

Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 2021

WHAT IS THE INFRASTRUCTURE INVESTMENT PIPELINE DOCUMENT?

The pipeline document is designed to complement information provided on the ISNI Information Portal (www.isni.gov.uk).

• The ISNI Information Portal provides a wide range of information on construction projects (and their underpinning procurements) under the Executive’s Investment Strategy for Northern Ireland. With effect from May 2015, all bodies covered by NI Public Procurement Policy are required to maintain detailed information on infrastructure developments, including procurement information, on the ISNI Information Portal. This requirement is set out in Procurement Guidance Note PGN 02/15 (see link below).

• The pipeline differs from the Information Portal in two ways. Firstly, it has a focus on procurement opportunities that have not yet been tendered (i.e. only pre-procurement). Secondly, the pipeline document provides a longer-term view of potential deal flow and broad estimates of the timing of procurement opportunities over that term.

• Procurement opportunities within the pipeline encompass both construction works and construction related services (e.g. design).

WHERE HAS THE INFORMATION IN THE PIPELINE COME FROM?

All information has been provided by departments, Non Departmental Public Bodies or agencies that have a responsibility for developing infrastructure. For ease of use, the Excel version of the pipeline document can be filtered to show information by department. Note: As this is the first iteration of the document, a number of departments are continuing to supply further detail and the pipeline document will be refreshed accordingly.

HOW OFTEN WILL THE PIPELINE DOCUMENT BE UPDATED?

As a minimum, the Procurement Pipeline will be updated on a quarterly basis. Where appropriate (e.g. where a material change to procurement information is required) the document will be revised more frequently and made available via the ISNI Information Portal (www.isni.gov.uk).

WHERE SHOULD I DIRECT QUERIES? Any queries can be directed to [email protected]

PROCUREMENT GUIDANCE NOTE PGN 02/15 https://www.finance-ni.gov.uk/publications/procurement-guidance-note-0215-procurement-pipeline 0

Investment Strategy for Northern Ireland (ISNI) Please visit the NI Executive's ISNI Information Portal for more information Infrastructure Investment Pipeline and to sign up for automatic alerts: Date of issue: Feb 2021 www.isni.gov.uk

The Infrastructure Investment Pipeline provides details of government funded infrastructure contracts that have not yet entered procurement. Full details of contracts in procurement, procurement concluded, construction/delivery started, construction/ delivery completed can be found on the Investment Strategy Northern Contracts are presented below in chronological order, under five pillars (Networks, Skills, Social, Environment and Health) and states the contracts type (Construction, Design, Enabling Works and Maintenance Framework). Delivery Bodies (i.e Departments and their agencies) have provided a brief outline of their projects Where contracts contained in the document are at an advanced stage they will also be published to the ISNI website. More detail on those contracts can be accessed by clicking on the information links contained within the document. Please note that the ISNI Information Portal is not a tendering portal, once contracts have entered procurement more details will be available on eTendersNI, in the press or on the appropriate Contracting Authority's website.

Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

St Patrick's Barracks Link Road, Ballymena Open Networks Construction Works Civils DfI Roads eTenders NI DfI £4m - £6m Q/E Mar 21 Click Here Scheme is being developed for New link Road Market procurement stage.

Term Contracts for Surface Dressing 2021 - SDS2 - North Open Networks Construction Works Civils DfI Roads eTenders NI DfI £10m - £12m Q/E Mar 21 Click Here & Ards and , & Down Market

Term Contracts for Surface Dressing 2021 - SDW1 - Mid Open Networks Construction Works Civils DfI Roads eTenders NI DfI £4m - £6m Q/E Mar 21 Click Here Ulster Market

Term Contracts for Surface Dressing 2021 - SDN1 - Open Networks Construction Works Civils DfI Roads eTenders NI DfI £4m - £6m Q/E Mar 21 Click Here Causeway Coast & Glens Market

Term Contracts for Surface Dressing 2021 - SDE1 - Open Networks Construction Works Civils DfI Roads eTenders NI DfI £2m - £4m Q/E Mar 21 Click Here and & Castlereagh Market

Structures Examination and Assessment Programme - Phase 2 Framework Call Networks Construction Services Civils Translink eTenders NI DfI £15m - £20m Q/E Mar 21 Package 2 of the Structures Examination and Assessment Off Project. To be called off the PSC CE Framework Pre-Procurement

Belfast Transport Hub - Permanent Way Contract Framework Call Delivery of the Permanent Way and associated civils Networks Construction Services Civils Translink eTenders NI DfI £20m - £25m Q/E Mar 21 Click Here Off works for the Belfast Transport Hub Project Pre-Procurement

Blessed Trinity College Belfast- ICT Open Design and Project Manage delivery of a Major Capital Skills Construction Services Building CPD eTenders NI DE £1m - £2m Q/E Mar 21 Market Works Project

Framework Call Integrated Consultant Team for CCEA New Accomodation Skills Construction Services Building CPD eTenders NI DE £1m - £2m Q/E Mar 21 Off

Gaelscoil Ui Dhochartaigh, Strabane ICT Open Construction Works Economic appraisal approved. Contract for new build facilities for Gaelscoil Ui Skills Local Press DE £2m - £4m Q/E Mar 21 Click Here Market Building Stage 3 approved. Dhochartaigh school. Converted to traditional.

Open Construction Works Professional Team appointed Priory IC - Integrated Supply Team Skills Education Authority eTenders NI DE £20m - £25m Q/E Mar 21 Market Design and Build Mar 20. Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Lisnaskea Helath and Care Centre Open Design Contract Health Construction Services Building CPD Health Estates eTenders NI DoH £1m - £2m Q/E Mar 21 Click Here Market

NHSCT New Mental Health Inpatient Hospital Appointment of the Design Team to design the new 134 Open Health Construction Services Building CPD Health Estates eTenders NI DoH £2m - £4m Q/E Mar 21 Click Here bed facility in accordance with the Trusts project brief Market

Bullring Environmental Improvement Scheme - Lower Open Social Construction Works Civils CPD eTenders NI DfC £1m - £2m Q/E Mar 21 Click Here Shankill Market

Open Project at early stage. Subject to Glengormley Public Realm - ICT Social Construction Services Civils CPD eTenders NI DfC £300k - £600k Q/E Mar 21 Click Here Market business case.

Lower Clonard, Belfast Open Construction Works Design of new build housing - infill development Social Housing Association NIFHA DfC £300k - £600k Q/E Mar 21 Click Here Market Building

Medium Rise Flats Rathcoole Flat Roof Repairs Open Construction Works Roof Repairs to NIHE dwellings Social NIHE eTenders NI DfC £1m - £2m Q/E Mar 21 Click Here Market Building

Open Construction Works ECM South West Area Roofs (Kilmacormick) Social NIHE eTenders NI DfC £600K - £1m Q/E Mar 21 Click Here Market Building

Open Construction Works ECM South Down Roofs Social NIHE eTenders NI DfC £600K - £1m Q/E Mar 21 Click Here Market Building

Open Construction Works Causeway Aluminium Bungalows Social NIHE eTenders NI DfC £600k - £1m Q/E Mar 21 Click Here Market Building

Open Construction Works ECMs - Carrickfergus, Ballyduff, Drumhoy, Ballykeel Social NIHE eTenders NI DfC £2m - £4m Q/E Mar 21 Click Here Market Building

Open Construction Works Flat Roof/ Windows/ECM Green End Social NIHE eTenders NI DfC £1m - £2m Q/E Mar 21 Click Here Market Building

Connecting Pomeroy - GAC, COI, MUGA Integrated Open Construction Works Social CPD eTenders NI DfE £1m - £2m Q/E Mar 21 Supply Team Market Building

SEUPB Connecting Pomeroy - Public Realm Works Open Social Construction Works Civils CPD eTenders NI DfE £600k - £1m Q/E Mar 21 Integrated Supply Team Market Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Open Construction Works Black Mountain Shared Space - IST Social CPD Local press SEUPB £10m - £12m Q/E Mar 21 Market Building

Open Construction Works Shankill Shared Woman Centre - IST Social CPD Local press SEUPB £6m - £8m Q/E Mar 21 Market Building

Open Construction Works Bushmills Courthouse Redevelopment Project Social CPD eTenders NI SEUPB £2m - £4m Q/E Mar 21 Market Building

Open Ballyclare Rugby Club Multi Facilities Social Construction Services Building CPD Local press Sport NI £100k - £300k Q/E Mar 21 Market

Integrated Consultant Team Beann Mhadagain Family Open eSourcingNI and Local Social Construction Services Building CPD TEO <£100k Q/E Mar 21 Centre Market Press

PQQ docs being prepared

Integrated Consultant Team Pitt Park Open eSourcingNI and Local Social Construction Services Building CPD TEO <£100k Q/E Mar 21 Redevelopment Pitt Park Market Press PQQ docs being prepared

Open PSNI/Clanmil ICT Belfast Social Construction Services Building CPD TBC TEO £600K - £1m Q/E Mar 21 Market

Open Construction Works Urban Village - Newgate Social CPD Local press TEO £1m - £2m Q/E Mar 21 Market Building

Open Construction Works Urban Village - Gas Yard Social CPD Local press TEO £600K - £1m Q/E Mar 21 Market Building

Urban Villages Colin Glen Trust Integrated Consultant Open Social Construction Services Civils CPD eTenders NI TEO £100k - £300k Q/E Mar 21 Team Market

Urban Villages Colin Community Hub Integrated Open Social Construction Services Building CPD eTenders NI TEO £100k - £300k Q/E Mar 21 Consultant Team Market

Lurgan Flood Alleviation Scheme Open Environment Construction Works Civils CPD eTenders NI DfI £1m - £2m Q/E Mar 21 Clcik Here Provision of flood alleviation works. Market

Fintona Flood Alleviation Scheme Open Environment Construction Works Civils DfI Roads eTenders NI DfI £1m - £2m Q/E Mar 21 Click Here Provision of flood alleviation works. Market Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Lurgan Moira WIIM 2.1 Work Package Framework Call Northern Ireland Environment Construction Works Civils eTenders NI DfI £2m - £4m Q/E Mar 21 Click Here Main Contract - Civil & M&E works Off Water

Faughan Crescent WWPS, Londonderry. Pumping station Framework Call Northern Ireland Environment Construction Works Civils eTenders NI DfI £300k - £600k Q/E Mar 21 Click Here and Pumping main upgrade Off Water Business case being prepared

Framework Call Northern Ireland First Time Services Programme-FTS Programme Environment Construction Works Civils eTenders NI DfI £4m - £6m Q/E Mar 21 Click Here Off Water

Garrison WwTWs Framework Call Northern Ireland Environment Construction Works Civils eTenders NI DfI £1m - £2m Q/E Mar 21 Click Here Main contract Off Water Business case being prepared

Framework Call Northern Ireland Lisburn WIIM 2.1 WP Environment Construction Works Civils eTenders NI DfI £2m - £4m Q/E Mar 21 Click Here Off Water

Neillsbrook WwPS Framework Call Northern Ireland Environment Construction Works Civils eTenders NI DfI £600k - £1m Q/E Mar 21 Click Here WwPS Upgrade Appraisal Off Water

Portadown Drainage Area Network Improvements - Meadow Lane and Bann Street Framework Call Northern Ireland Environment Construction Works Civils eTenders NI DfI £2m - £4m Q/E Mar 21 Click Here Main Contract - Civil & M&E works Off Water

Upper Crescent, Waste Water Pumping Station Framework Call Northern Ireland Environment Construction Works Civils eTenders NI DfI £1m - £2m Q/E Mar 21 Click Here Provision of a new WwPS Off Water Business case approved

Waringfield SPS Upgrade Framework Call Northern Ireland Environment Construction Works Civils eTenders NI DfI £600k - £1m Q/E Mar 21 Click Here Main Contract - Civil & M&E works Off Water

NIAO Accommodation Project This contract is for the procurement of a contractor to Open Construction Works refurbish the NIAO's office accommodation on University Productive CPD eTenders NI NIAO £2m - £4m Q/E Mar 21 Click Here Market Building Street, Belfast. The refurbished accommodation will be based on an open plan environment.

Upgrade of Heating Mains and Installation of New Fire and Water Mains at Hydebank Outline Business Case Open Construction Works Provision of new heating mains and establish a new Justice CPD eTenders NI DoJ £2m - £4m Q/E Jun 21 Click Here approved. Market Building dedicated fire and water mains supply In Design Development. Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Upgrade of Fire Mains Water Storage Tank and External Domestic Water Mains at Maghaberry Open Construction Works Provision of fire mains water storage tank and external Justice CPD eTenders NI DoJ £2m - £4m Q/E Jun 21 Click Here Business Case approved Market Design and Build domestic water mains

NIPS Minor Works Term Service Contract (2021) Provision of delivering individual capital works projects up Open Construction Works Justice CPD eTenders NI DoJ £35m - 40m Q/E Mar 21 Click Here Business Case approved to across the estate. Market Building

A24 Ballynahinch Bypass The proposal is for a single carriageway by-pass, Scheme is in the DfI Roads approximately 4.1km long, extending around the eastern Preparation Pool. Draft Orders Open side of Ballynahinch. The current proposal includes a Networks Construction Works Civils DfI Roads eTenders NI DfI £30m - £35m Q/E Jun 21 Click Here published (Mar 15). Public Market length of wide single carriageway to provide a guaranteed Inquiry held (Jan 16). Notice northbound overtaking opportunity and a Park and Ride Intention to Proceed made (Dec or Park and Share at the northern end of the scheme. 16).

Scheme is in the DfI Roads A4 Enniskillen Southern Bypass Service Preparation Pool. 3.2km of single carriageway to bypass Enniskillen from Open Networks Construction Works Civils DfI Roads eTenders NI DfI £20m - £25m Q/E Jun 21 Click Here Preferred Option approved (Sep A509/A4 Sligo Road to the A4 Belfast Road. Full project Market 15). Draft Orders published costs shown. (Mar 18).

Scheme is in the DfII Roads Preparation Pool. Draft Orders A32 Cornamuck Open Networks Construction Works Civils DfI Roads eTenders NI DfI £4m - £6m Q/E Jun 21 Click Here published (Aug 15). Notice 2km of single carriageway realignment Market Intention to Proceed and Direction Order made (Mar 16). Vesting Order made (Mar 17)

Feasibility report completed, (2014) in which 11 design Lagan Pedestrian & Cycle Bridge - Construction Work Open options were considered and 3 Networks Construction Works Civils DfI Roads eTenders NI DfI £10m - £12m Q/E Jun 21 Click Here Construction of a new pedestrian and cycle bridge. Market options taken forward for further consideration. Scheme Assessment Report published (Jan 15) which identified a

Scheme is in the DfII Roads York Street Interchange, Belfast Open Preparation Pool. Draft Orders Networks Construction Works Civils DfI Roads eTenders NI DfI £120m - £140m Q/E Jun 21 Click Here Westlink/York Street Flyover, Belfast Market published (Jan 15). Notice Intention to Proceed and Direction Order made (Nov 16).

A1 Junctions - Stage 2 Scheme is in the DfI Roads Provide 5 compact grade separated junctions at Skeletons Open Networks Construction Works Civils DfI Roads eTenders NI DfI £50m - £60m Q/E Mar 22 Click Here Preparation Pool. Preferred Road, Gowdystown Road, Listullycurran Road, Market Option approved (Mar 14). Warringstown Road & Road. . Draft Orders published (Mar

Belfast Transport Hub - S&T Contract Framework Call GRIP 6 to 8 Delivery of the S&T works for the Belfast Networks Construction Services Civils Translink eTenders NI DfI £20m - £25m Q/E Dec 21 Click Here Off Transport Hub

Yorkgate Station Re-development Option currently being explored for the redevelopment of Framework Call Construction Works Project has received Letter of Yorkgate Station on the existing station site including Networks Translink eTenders NI DfI £6m - £8m Q/E Sep 21 Click Here Off Building Offer. Currently in Detailed rationalisation of site topography and external Design Phase landscaping. Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Lurgan to Portadown - S&T Cable Renewals Design and construction of a serviceable cable duct route Framework Call Project has received Letter of Networks Construction Works Civils Translink eTenders NI DfI £6m - £8m Q/E Mar 22 Click Here system for the Signalling and Telecoms (S&T) cabling Off Offer. Currently in Detailed infrastructure between Lurgan and Portadown. Design Phase

Dark Arch Whiteabbey - Track Renewal (Construction) Full Track Renewal between Dark Arches and Whiteabbey Framework Call Project is currently in an Networks Construction Works Civils Translink eTenders NI DfI £15m - £20m Q/E Sep 21 Click Here (circa 800m) including track drainage and ground Off Appraisal Stage stabilisation enabling works.

Platform LED Lighting Programme. Installation of Quality LED Lighting systems including Framework Call Project is currently in an Networks Construction Works Civils Translink eTenders NI DfI £2m - £4m Q/E Dec 21 Click Here smart controls across all NIR Stations, Halts, Platforms, Off Appraisal Stage Walkways and Car Parks.

Cullybackey - LC Upgrade MCB Framework Call Project is currently in Feasibility Networks Construction Works Civils Translink eTenders NI DfI £20m - £25m Q/E Dec 21 Click Here Level Crossing upgrades at Cullybackey Off stage

Bus Engineering Pit Modifications. Framework Call Project is currently awaiting a Pit modifications to ensure suitable pit clearances are Networks Construction Works Civils Translink eTenders NI DfI £1m - £2m Q/E Mar 22 Click Here Off Letter of Offer available for engineering resource.

Mossley West P&R Extention Project has received Letter of Framework Call Development of existing Park & Ride Facility at Mossley Networks Construction Works Civils Translink eTenders NI DfI £1m - £2m Q/E Mar 22 Click Here Offer. Currently in Detailed Off West to expand Car Parking Capacity Design phase.

Trooperslane Park & Ride Framework Call Project is currently in Detailed Networks Construction Works Civils Translink eTenders NI DfI £1m - £2m Q/E Jun 21 Click Here Construction of a Park & Ride facility at Trooperslane Off Design Stage

Track Asset Surveying Framework Call Networks Construction Services Civils Translink eTenders NI DfI £2m - £4m Q/E Sep 21 Click Here Ballast sampling / testing and ground investigation works. Off

Adelaide / Boucher Road Halt Development The project scope is to improve the halt access and Subject to funding. Estimated provide a DDA compliant halt facility that will meet the Framework Call Networks Construction Works Civils Translink eTenders NI DfI £1m - £2m Q/E Mar 22 Click Here Construction Costs are shown. needs of passengers in the Lisburn Road & Boucher Road Off Project is curently in Revised vicinity. Feasibility stage

Lisburn Area Renewals Project Scope is to replace the life expired relay interlocking that controls the Signalling around Lisburn Framework Call Project is currently in a Networks Construction Works Civils Translink eTenders NI DfI £25m - £30m Q/E Jun 21 Click Here Railway Station. Additionally renewal of the Lisburn Area Off feasibility stage S&C and platform extension will be completed as part of this scheme.

Middlepath Street - Bridge Pier Repair (Main Works Contract) Delivery of the main works for the repair of the Framework Call Networks Construction Services Civils Translink eTenders NI DfI £1m - £2m Q/E Dec 21 Click Here Pre-Procurement Middlepath Street Pier including repair the defects Off evident in the pier and free or replace the bridge bearing. Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Riverine Open Networks Construction Works Civils CPD OJEU SEUPB £8m - 10m Q/E Jun 21 Pre-Procurement Civil and Infrastructure Works at Lifford & Strabane Market

CAFRE Masterplan - Loughry The redevelopment of campus to include new student Framework Call Construction Works OBC in preparation. Funding Skills CPD eTenders NI DAERA £35m - 40m Q/E Jun 21 accommodation, teaching facilities, staff offices and new Off Building not yet allocated subject to HUB approvals.

CAFRE Masterplan - Greenmount The redevelopment of campus to include new student OBC in preparation. Funding Skills TBC Construction Services Building CPD eTenders NI DAERA TBC Q/E Jun 21 accommodation, teaching facilities, staff offices and new not yet allocated subject to HUB approvals.

CAFRE Masterplan - Loughry The redevelopment of campus to include new student Framework Call OBC in preparation. Funding Skills Construction Services Building CPD eTenders NI DAERA TBC Q/E Jun 21 accommodation, teaching facilities, staff offices and new Off not yet allocated subject to HUB approvals.

Integrated Consultant Team for Methodist College, Framework Call Belfast Skills Construction Services Building CPD eTenders NI DE £100k - £300k Q/E Jun 21 Off Design and Project Manage the delivery of a SEP Scheme

Construction team for Chapel Road Primary School, Waterside Open Construction Works Supply and build a School Enhancement Project. This may Skills CPD eTenders NI DE £2m - £4m Q/E Mar 22 Click Here Market Building include refurbishment, extension or new build on school site.

Construction team for St Kevin's College, Lisnaskea Supply and build a School Enhancement Project. This may Open Construction Works Skills CPD eTenders NI DE £2m - £4m Q/E Mar 22 Click Here include refurbishment, extension or new build on school Market Building site.

Construction team for St Malachy's College, Belfast Supply and build a School Enhancement Project. This may Open Construction Works Skills CPD eTenders NI DE £2m - £4m Q/E Dec 21 Click Here include refurbishment, extension or new build on school Market Building site.

Construction Team for St Mary's Primary School, Newtownbutler Open Construction Works Supply and build a School Enhancement Project. This may Skills CPD eTenders NI DE £2m - £4m Q/E Mar 22 Market Building include refurbishment, extension or new build on school site.

Integrated Consultant Team for St John the Baptist PS, Framework Call Belfast Skills Construction Services Building CPD eTenders NI DE £100k - £300k Q/E Dec 21 Off Design and Project Manage the delivery of a SEP Scheme

Integrated Consultant Team for St Kieran's PS, Dunmurry Framework Call Skills Construction Services Building CPD eTenders NI DE £100k - £300k Q/E Dec 21 Design and Project Manage the delivery of a SEP Scheme Off

Integrated Consultant Team for Holy Child PS, Framework Call Londonderry Skills Construction Services Building CPD eTenders NI DE £100k - £300k Q/E Dec 21 Off Design and Project Manage the delivery of a SEP Scheme Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Integrated Consultant Team for St Paul's PS, Belfast Framework Call Skills Construction Services Building CPD eTenders NI DE £100k - £300k Q/E Dec 21 Design and Project Manage the delivery of a SEP Scheme Off

Integrated Consultant Team for St Louis GS, Ballymena Framework Call Skills Construction Services Building CPD eTenders NI DE £100k - £300k Q/E Dec 21 Design and Project Manage the delivery of a SEP Scheme Off

Integrated Consultant Team for Victoria College, Belfast Framework Call Skills Construction Services Building CPD eTenders NI DE £600K - £1m Q/E Dec 21 Design and Project Manage the delivery of a SEP Scheme Off

Integrated Consultant Team for Sullivan Upper GS, Framework Call Skills Construction Services Building CPD eTenders NI DE £100k - £300k Q/E Dec 21 Off Design and Project Manage the delivery of a SEP Scheme

Open Construction Works Contractor for CCEA New Accomodation Skills CPD eTenders NI DE £15m - £20m Q/E Dec 21 Market Building

Integrated Supply Team for Forge IPS Open Construction Works Complete design from ICT and construct new build for Skills Education Authority Local Press DE £4m - £6m Q/E Sep 21 Click Here Market Design and Build Forge IPS

Ardnashee Framework Call Construction Works Amalgamation of Belmont House and Foyle View Special Skills Education Authority eTenders NI DE £25m - £30m Q/E Jun 21 Click Here BCA under review in DE Off Building schools to create Ardnashee.

Holy Trinity College - IST Open Construction Works Skills Education Authority eTenders NI DE £4m - £6m Q/E Sep 21 Click Here Exemplar design under way. 1300 pupil new school, design and build Market Design and Build

EA are advanced in the finalisation of the Business Case Seaview PS - ICT Open Construction Works with a targeted submission to Design and Project Manage a Major Capital Works Project. Skills Education Authority eTenders NI DE £300k - £600k Q/E Jun 21 Click Here Market Building DE by late February 2021. It is 14 Classbase Primary School & Double Nursery Unit hoped to have an ICT appointed before the summertime in line

Islandmagee Primary School - Contractor Open Construction Works Skills Education Authority TBC DE £2m - £4m Q/E Jun 21 Click Here Stage 2 approved 5 class base, traditional build Market Building

Open Construction Works Abbey Community College - Contractor Skills Education Authority TBC DE £25m - £30m Q/E Dec 21 Stage 1 approved Market Building

Integrated Supply Team for St Vincent de Paul PS Construction Works Design team appointed and Skills TBC Education Authority TBC DE £4m - £6m Q/E Jun 21 Click Here Complete design from ICT and construct new build Building design under way.

Lower Mourne amalgamation - IST Open Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 21 Click Here Site issues 7 class base, design and build on new site Market Design and Build Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Moy Shared Education Campus - IST Open Construction Works Skills Education Authority eTenders NI DE £6m - £8m Q/E Dec 21 Click Here Complete design from ICT and construct new build Market Design and Build

Revised Stage 1 currently being Contractor for Gaelscoil Eanna, Newtownabbey Open Construction Works progressed by Delivery Team. Skills Education Authority TBC DE £2m - £4m Q/E Jun 21 Click Here Construct new building Market Building Due to be completed W/C 16.09.19

Scoil an Droichid Open Construction Works Traditional Contract for the erection of a 7 class base Skills Education Authority eTenders NI DE £2m - £4m Q/E Sep 21 Click Here Stage 3 commenced Market Building Primary School & double nursery unit

PQQ for Contractor completetd Contractor for Down High School Open Construction Works Skills Education Authority eTenders NI DE £20m - £25m Q/E Sep 21 Click Here Auguts 2019. CfT likley to issue Construct new build Market Building Q/E June 20

Crawfordsburn PS Contractor Open Construction Works Skills Education Authority eTenders NI DE £4m - £6m Q/E Sep 21 Click Here Stage 3 commenced Construct new school Market Building

St Joseph's & St James' PS, Poyntzpass Open Construction Works Skills Education Authority Local Press DE £2m - £4m Q/E Mar 22 Click Here Economic appraisal ongoing. Contract to to erect a 5 classbase Primary School. Market Building Land issues to be resolved.

Integrated Supply Team for St Peter's PS Open Construction Works Revised Stage2 with DE Design and Build Contract to erect a 5 classbase Primary Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 21 Click Here Market Design and Build technical advisors for review. School with associated Enabling Works.

Integrated Supply Team for St Killian's College, Carnlough Construction Works Design team appointed and Skills TBC Education Authority TBC DE £20m - £25m Q/E Dec 21 Click Here Complete design from ICT and construct new build Building design under way.

Integrated Supply Team for Gaelscoil Aodha Rua Construction Works Design team appointed and Skills TBC Education Authority TBC DE £2m - £4m Q/E Dec 21 Click Here Complete design from ICT and construct new build Building design under way.

Integrated Supply Team for Forthill IPS Open Construction Works Skills Education Authority Local Press DE £4m - £6m Q/E Jun 21 Click Here Procurement of ICT ongoing. Complete design from ICT and construct new build Market Design and Build

Integrated Consultant Team for Botanic Primary School Framework Call Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Sep 21 Design and Project Manage the delivery of a SEP Scheme Off

Integrated Consultant Team for Carrick Primary School Framework Call Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Sep 21 Design and Project Manage the delivery of a SEP Scheme Off

Integrated Consultant Team for Cliftonville Integrated Framework Call Primary School Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Sep 21 Off Design and Project Manage the delivery of a SEP Scheme Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Integrated Consultant Team for Glencraig Integrated Framework Call Primary School Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Sep 21 Off Design and Project Manage the delivery of a SEP Scheme

Integrated Consultant Team for Irvinestown Primary Framework Call School Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Sep 21 Off Design and Project Manage the delivery of a SEP Scheme

Integrated Consultant Team for Kilcooley Primary School Framework Call Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Sep 21 Design and Project Manage the delivery of a SEP Scheme Off

Integrated Consultant Team for Primary School Framework Call Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Sep 21 Design and Project Manage the delivery of a SEP Scheme Off

Integrated Consultant Team for Strabane Primary School Framework Call Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Sep 21 Design and Project Manage the delivery of a SEP Scheme Off

Integrated Consultant Team for Glastry College Framework Call Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Sep 21 Design and Project Manage the delivery of a SEP Scheme Off

Integrated Consultant Team for Riverside School Framework Call Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Sep 21 Design and Project Manage the delivery of a SEP Scheme Off

Integrated Consultant Team for Greenisland Primary Framework Call School Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Dec 21 Off Design and Project Manage the delivery of a SEP Scheme

Integrated Consultant Team for Hart Memorial Primary Framework Call School Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Dec 21 Off Design and Project Manage the delivery of a SEP Scheme

Integrated Consultant Team for Kilbride Primary School Framework Call Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Dec 21 Design and Project Manage the delivery of a SEP Scheme Off

Integrated Consultant Team for Strandtown Primary Framework Call School Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Dec 21 Off Design and Project Manage the delivery of a SEP Scheme

Integrated Consultant Team for Ashfield Boys' High Framework Call School Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Dec 21 Off Design and Project Manage the delivery of a SEP Scheme

Integrated Consultant Team for Carrickfergus Grammar Framework Call School Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Dec 21 Off Design and Project Manage the delivery of a SEP Scheme Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Integrated Consultant Team for Clounagh Junior High Framework Call School Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Dec 21 Off Design and Project Manage the delivery of a SEP Scheme

Integrated Consultant Team for Clifton School Framework Call Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Dec 21 Design and Project Manage the delivery of a SEP Scheme Off

Integrated Consultant Team for Hill Croft School Framework Call Skills Construction Services Building Education Authority eTenders NI DE £100k - £300k Q/E Dec 21 Design and Project Manage the delivery of a SEP Scheme Off

Open Construction Works Skills Education Authority eTenders NI DE £25m - £30m Q/E Jun 21 Integrated Supply Team for Forthill IST Market Building Complete design from ICT and construct new build

Elmgrove Primary School - IST Open Construction Works Complete design from ICT and construct new build Skills Education Authority eTenders NI DE £12m - £15m Q/E Jun 21 Market Building

Open Construction Works Mary Queen of Peace - IST Skills Education Authority eTenders NI DE £4m - £6m Q/E Jun 21 Complete design from ICT and construct new build Market Building

Lismore Comprehensive - IST Open Construction Works Skills Education Authority eTenders NI DE £30m - £35m Q/E Sep 21 Complete design from ICT and construct new build Market Building

Open SRC Newry New Build Integrated Constant Team Skills Construction Services Building CPD eTenders NI DfE £600k - £1m Q/E Jun 21 Market

Open Construction Works SRC Newry New Build Integrated Supply Team Skills CPD eTenders NI DfE £4m - £6m Q/E Dec 21 Market Design and Build

Ulster Hospital Laundry Open Construction Works Procurement Documentation Health CPD Health Estates eTenders NI DoH £2m - £4m Q/E Jun 21 Construction Works Market Building being prepared

SEHSCT New Mental Health Inpatient Hospital Open Design Contract Health Construction Services Building CPD Health Estates eTenders NI DoH £4m - £6m Q/E Dec 21 Market

RGH Energy Centre Provision of a replacement energy centre for the Royal Group of Hospitals, strategically located within the Open Construction Works Health CPD Health Estates eTenders NI DoH £25m - £30m Q/E Mar 22 Click Here Business Case approved (Sept designated non-clinical support zone of the site. This Market Building 16) would make the new centre closer to connected buildings, utilities and access roads.

The proposed Project remains Ballymoney High Street Public Realm Open in the early planning stage and This project seeks to improve and enhance the physical Social Construction Works Civils CPD eTenders NI DfC £1m - £2m Q/E Jun 21 Click Here Market subject to development of and environment in High Street, Ballymoney. approval of business case. Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Strabane Town Centre Public Realm - Enhancements to ICT in place. EA drafted, the physical environment within Strabane Town Centre Open revisions required before final Social Construction Works Civils CPD eTenders NI DfC £4m - £6m Q/E Dec 21 Click Here comprising Abercorn Square, Market Street, Castle Street, Market approval. Subject to business Upper Main Street, Derry Road and Railway Street. case approval.

Banbridge Linkages Public Realm Scheme Enhancement of the physical environment of areas in Open Social Construction Works Civils CPD eTenders NI DfC £4m - £6m Q/E Sep 21 Click Here EA still being developed. Banbrdge leading to and from the main town centre Market thoroughfare.

ICT in place. EA has been delayed due to objections to planned one-way system. Open Maghera Public Realm IST Social Construction Works Civils CPD eTenders NI DfC £4m - £6m Q/E Sep 21 Click Here Economic Appraisal now due Market Oct 2020. IST appointment likely to be in April 2021 subject

Shankill Gateway Phase 1 Construction Public Realm Deliver a high quality Public Realm Scheme to include Open Social Construction Works Civils CPD eTenders NI DfC £2m - £4m Q/E Jun 21 Click Here natural stone paving with granite kerbs, lighting and Market boundary treatments. ICT in place. Planning not yet approved awaiting DFI input.

Belfast Streets Ahead Phase 3 - IST This Public Realm Improvement and Regeneration Project will link to 's plans for their campus at Open ICT in place. Funding not yet Social Construction Works Civils CPD eTenders NI DfC £20m - £25m Q/E Dec 21 Click Here York Street, delivering high quality streetscapes and open Market allocated. Subject to capital space and including improvements to surfacing, lighting, funding. landscaping, street furniture and public artwork.

Lanark Way Public Realm Construction Deliver a high quality streetscape to include natural stone Open Social Construction Works Civils CPD eTenders NI DfC £1m - £2m Q/E Jun 21 Click Here banding with granite kerbs, decorative lighting and Market boundary treatments. Potential for going forward in 21/22 dependant on budget.

Lower Oldpark Road Public Realm Construction Deliver a high quality Public Realm Scheme to include Open Social Construction Works Civils CPD eTenders NI DfC £2m - £4m Q/E Jun 21 Click Here natural stone paving with granite kerbs, tree planting and Market boundary treatments. Potential for going forward in 21/22 dependant on budget.

Omagh Town Centre Public Realm -Campsie Project currently in the very Open Enhancements to the physical environment in Omagh Social Construction Works Civils CPD eTenders NI DfC £600K - £1m Q/E Mar 22 Click Here early planning stage and subject Market Town centre to development of and approval of business case.

Clifton Gateway Public Realm Construction Deliver a high quality Public Realm Scheme to include Open Social Construction Works Civils CPD eTenders NI DfC £4m - £6m Q/E Mar 22 Click Here natural stone paving with granite kerbs, lighting and Market ICT in place. Design process boundary treatments to Planning Approval stage. paused to faciliate review of road infrastructure.

Inner Walled City Public Realm - Enhancements to the physical environment immediately adjacent to the City ICT in place. Design ongoing. Open Walls in Londonderry comprising Linenhall Street, Bank Social Construction Works Civils CPD eTenders NI DfC £4m - £6m Q/E Jun 21 Click Here Business case approved and Market Place, Union Hall Place, Magazine Street, Society Street planning permission secured. and Palace Street.

Templemore Junction Public Reals Social DSS Construction Works Civils CPD eTenders NI DfC £300k - £600k Q/E Sep 21 ICT appointed, design progressing

Albertbridge / Junction Social DSS Construction Works Civils CPD eTenders NI DfC £300k - £600k Q/E Jun 21 Click Here ICT appointed, design progressing Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Open Construction Works Girwood Sports Facilities IST Social CPD esourcingNI DfC £15m - £20m Q/E Dec 21 Market Building

Integrated Supply Team for Five Cs Project College Street, College Avenue, College Court, Calender Open Street and Chichester Street within Belfast City centre. Social Construction Works Civils CPD eTenders NI DfC £1m - £2m Q/E Mar 22 Click Here ICT in place Market Proposed improvements include paving, some carriageway, lighting, street furniture and artwork.

Woodbourne Environmental Improvement Scheme - Open Social Construction Works Civils CPD eTenders NI DfC £600k - £1m Q/E Jun 21 Click Here Lenadoon & Glencolin Market

Open DFC Strategic Planning Consultancy Framework Social Construction Services Building CPD eTenders NI DFC £300k - £600k Q/E Jun 21 Business case to be approved - replacement framework Market

Redevelopment of Existing Sports Pitches at Stranmillis Open Construction Works University College. Social CPD eTenders NI DfE £2m - £4m Q/E Dec 21 Click Here Market Building Redevelopment of Existing Sports Pitches

Campus Street Lighting Open Construction Works CCTV, Underground Ducting and Data Infrastructure Social CPD eTenders NI DfE £1m - £2m Q/E Jun 21 Click Here Market Building Upgrades at Stranmillis University College

Stranmillis University College - Integrated Consultant Open Team framework Social Construction Services Building CPD eTenders NI DfE £300k - £600k Q/E Mar 21 Market Redevelopment of Existing Sports Pitches

0rchard House Internal Refurbishment Outline Business Case Internal refurbishment Open Construction Works approved. Social CPD eTenders NI DoF £6m - £8m Q/E Jun 21 Click Here Market Design and Build PQQ documentation in preparation

Open Riverine Environmental Works Integrated Supply Team Social Construction Works Civils CPD Local Press SEUPB £2m - £4m Q/E Jun 21 Market

Open Construction Works Multi Function Facilities NICSSA Sports Pavilion - IST Social CPD eTenders NI Sport NI £2m - £4m Q/E Jun 21 Market Building

Urban Villages - Open Social Construction Services Civils CPD Local press TEO £100k - £300k Q/E Jun 21 Ballysillan Playing fields Market

Open Construction Works PSNI/Clanmil IST Belfast Social CPD TBC TEO £6m - £8m Q/E Mar 22 Market Building

Urban Villages - Open Social Construction Works Civils CPD Local press TEO £2m - £4m Q/E Dec 21 Marrowbone Millennium Park Market

Urban Villages - Open Social Construction Works Civils CPD Local press TEO £2m - £4m Q/E Jun 22 Ballysillan Playing fields Market Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Construction Team for Beann Mhadagain Open Construction Works eSourcingNI and Local Social CPD TEO £1m - £2m Q/E Sep 21 Family Centre Refurbishment Market Building Press

Construction Team for Pitt Park Open Construction Works eSourcingNI and Local Social CPD TEO £600k - £1m Q/E Sep 21 Redevelopment Pitt Park Market Building Press

Open Construction Works Urban Villages - Meenan Square Social CPD Local press TEO £4m - £6m Q/E Dec 21 Market Building

Open Urban Villages Colin Glen Trust Integrated Supply Team Social Construction Works Civils CPD eTenders NI TEO £2m - £4m Q/E Dec 21 Market

Urban Villages ABC St Gemmas Community Hub Open Construction Works Social CPD eTenders NI TEO £4m - £6m Q/E Dec 21 Integrated Supply Team Market Building

South East Fermanagh Foundation Integrated Consultant Open Social Construction Services Building CPD Local Press TEO £100k - £300k Q/E Jun 21 Team Market

South East Fermanagh Foundation Integrated Supply Open Construction Works Social CPD Local Press TEO £1m - £2m Q/E Dec 21 Team Market Building

Construction of new DVA Test Centres Open Construction Works Contract for the construction and fit out of new DVA Test Environment CPD eTenders NI DfI £100m - £120m Q/E Jun 21 Click Here Market Design and Build Design progressing Centres across Northern Ireland.

Monea WWTWs Appraisal Framework Call Northern Ireland Environment Construction Works Civils eTenders NI DfI £1m - £2m Q/E Mar 22 Click Here Main Contract - Civil & M&E works Off Water

Framework Call Northern Ireland Mountfield WWTW's Environment Construction Works Civils eTenders NI DfI £1m - £2m Q/E Sep 21 Click Here Off Water Business case approved

Framework Call Northern Ireland Brompton Park WWPS and Derryhale WWPS Environment Construction Works Civils eTenders NI DfI £300k - £600k Q/E Mar 22 Click Here Off Water Business case approved

Framework Call Northern Ireland Dunadry WWPS Upgrade Environment Construction Works Civils eTenders NI DfI £300k - £600k Q/E Jun 21 Click Here Off Water

Dungannon WWTW Feasibility Study Open Northern Ireland Environment Construction Works Civils eTenders NI DfI £20m - £25m Q/E Jun 21 Click Here Main Contract Market Water Business case being prepared

Framework Call Northern Ireland Bangor DAP Work Package 1: Stream UID Environment Construction Works Civils eTenders NI DfI £2m - £4m Q/E Sep 21 Click Here Off Water

Carmoney - Strabane TM Open Northern Ireland Carmoney - Strabane Strategic Link Watermain. Main Environment Construction Works Civils eTenders NI DfI £12m - £15m Q/E Dec 21 Click Here Market Water contract Civil M&E works

Glenmachan Strategic Project Phase 1a Framework Call Northern Ireland Environment Construction Works Civils eTenders NI DfI £8m - 10m Q/E Sep 21 Click here Sicily Park and Marguerite Park Flood Alleviation. Off Water Business case approved

Framework Call Northern Ireland Glenavy Road Crumlim WWPS Rehab Environment Construction Works Civils eTenders NI DfI £300k - £600k Q/E Mar 22 Click Here Off Water Business case approved Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Framework Call Northern Ireland Newtownards WIIM 2.1 WP Environment Construction Works Civils eTenders NI DfI £2m - £4m Q/E Mar 22 Click Here Off Water

Cottage Row , Eglinton, WWPS, Upgrade/Replace. Framework Call Northern Ireland Environment Construction Works Civils eTenders NI DfI £600k - £1m Q/E Mar 22 Click Here Main Contract Off Water

Framework Call Northern Ireland Laganbank Sewer Investigation, Belfast Environment Construction Works Civils eTenders NI DfI £600k - £1m Q/E Mar 22 Click Here Off Water

Limavady Catchment Framework Call Northern Ireland Upgrade To Address New Development And External Environment Construction Works Civils eTenders NI DfI £2m - £4m Q/E Mar 22 Click Here Off Water Flooding

Framework Call Northern Ireland Bangor DAP Work Package 2: Rathmore Stream UIDs Environment Construction Works Civils eTenders NI DfI £600k - £1m Q/E Dec 21 Click Here Off Water Business case being prepared

Framework Call Northern Ireland Treatability Appraisal of Caugh Hill WTW Environment Construction Works Civils eTenders NI DfI £6m - £8m Q/E Dec 21 Click Here Off Water

Framework Call Northern Ireland Dublin Road Newry Out of Sewer Flooding Environment Construction Works Civils eTenders NI DfI £100k - £300k Q/E Jun 21 Click Here Off Water Business case approved

Framework Call Northern Ireland Macosquin WWTW Phase 2 Base Maintenance Environment Construction Works Civils eTenders NI DfI £300k - £600k Q/E Jun 21 Click Here Project on hold Off Water

Ballycairn CSO , Coleraine, Upgrade. Framework Call Northern Ireland Environment Construction Works Civils eTenders NI DfI £300k - £600k Q/E Mar 22 Click Here CSO Attenuation and screening Off Water

Outline Business Case in Magilligan Redevelopment Open Construction Works Justice CPD eTenders NI DoJ £100m - £120m Q/E Dec 21 Click Here preparation. Redevelopment of Magilligan Prison Market Design and Build Funding not yet allocated. Subject to capital funding.

New Facility for Women - Construction Outline Business Case 1 in Open Construction Works New build to replace existing accommodation on shared Justice CPD eTenders NI DoJ £30m - £35m Q/E Dec 21 Click Here preparation. Market Design and Build site with Young Offenders. Funding not yet allocated. Subject to capital funding.

Outline Business Case in Maghaberry - New Visits Open Construction Works Justice CPD eTenders NI DoJ £20m - £25m Q/E Dec 21 Click Here preparation. Enhancement of Visitor facilities. Market Design and Build Funding not yet allocated. Subject to capital funding.

Maghaberry High Security Facility Open Construction Works Outline Business Case in Enhancement of facilities used to house high risk Justice CPD eTenders NI DoJ £8m - 10m Q/E Dec 21 Click Here Market Design and Build preparation. prisoners Subject to capital funding.

Open Construction Works FSNI Accomodation Project Justice CPD eTenders NI DoJ £15m - £20m Q/E Dec 21 SOC Complete Market Building Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

NIPS General Facilities Management Contract (2022) Provision of multi-disciplinary planned preventative Open Construction Works Scheduled for Renewal. Justice CPD eTenders NI DoJ TBC Q/E Jun 21 Click Here maintenance services across the estate. Market Building Business Case to be prepared.

Major Works Consultancy Services Framework 2022 The framework will comprise of 6 Consultants to assist TransportNI deliver the Major Works Programme. Open Networks Construction Services Civils DfI Roads eTenders NI DfI TBC Q/E Dec 22 Click Here Although not exhaustive, services under the following Market headings are likely to be required in relation to projects mainly valued over £5m.

Scheme is in the DfI Roads Newry Southern Relief Road Open Forward Planning Schedule. New Southern Relief of Newry serving the Port of Networks Construction Works Civils DfI Roads eTenders NI DfI £60m - £80m Q/E Jun 22 Click Here Market Preferred Corridor approved . (Mar 17). Preferred option approved (Sept 18).

A2 Widening Buncrana Road, Derry~Londonderry Improvement of the A2 Buncrana Road, Scheme is in the DfI Roads Derry~Londonderry between the Pennyburn Roundabout Open Preparation Pool. Preferred and the Border. Buncrana Road is part of the North Networks Construction Works Civils DfI Roads eTenders NI DfI £45m - £50m Q/E Dec 22 Click Here Market Option approved (Feb 09). Western Key Transport Corridor connecting Belfast to Preferred Route reaffirmed Derry~Londonderry and on to Donegal. Full project costs (Mar 19). shown.

A28 Armagh East Link Scheme is in the DfI Roads Scheme to provide a 2.25km single carriageway link from Open Roads Preparation Pool. Networks Construction Works Civils DfI Roads eTenders NI DfI £15m - £20m P the A3 Portadown Road to A28 Markethill Road. Full Market Preferred Option approved project costs shown. (Mar 12). Preferred Route reaffirmed (Jul 19).

Scheme is in the DfI Roads A32 Kilgortnaleague Open Networks Construction Works Civils DfI Roads eTenders NI DfI TBC P Forward Planning Schedule. 2km of single carriageway realignment and widening Market Preferred Option approved (Mar 16).

A2 Ballykelly Bypass The preferred route is 6km of single carriageway that Open Scheme is in the DfI Roads passes Ballykelly to the south of the village. A proposed Networks Construction Works Civils DfI Roads eTenders NI DfI £40m - £45m P Market Preparation Pool. Preferred junction at the Loughermore Road will provide access to Option approved (Mar 10). and from the dual carriageway. Full project costs shown

A2 Sydenham Bypass, Belfast The proposed scheme will widen a 2.5km stretch of the existing A2 Sydenham Bypass to a dual 3-lane carriageway. Some of the key aspects of the scheme Open Scheme is in the DfI Roads include the replacement of Sydenham Footbridge and Networks Construction Works Civils DfI Roads eTenders NI DfI £40m - £45m P Market Preparation Pool. Preferred provision of a shared footway and cycle way, along with Option approved (Dec 09). the eventual removal of Dee Street junction upon the completion of a new Connswater junction. Full Project costs shown.

A29 Cookstown Eastern Distributor Bypass involving the construction of approximately 4km of new wide-single carriageway to the east of the town. The Open Scheme is in the DfI Roads Networks Construction Works Civils DfI Roads eTenders NI DfI £35m - 40m P upgrading of approximately 0.5km of the C622 Sandholes Market Preparation Pool. Preferred Link Road is also included in the proposal. Full project Option approved (Mar 10). costs shown.

A3 Armagh North & West link The proposal is for the provision of a single carriageway road, approximately 6.9 km long, extending around the Open Scheme is in the DfI Roads Networks Construction Works Civils DfI Roads eTenders NI DfI £50m - £60m P northern and western outskirts of the City of Armagh, Market Preparation Pool. Preferred linking between the A3 Portadown Road and the A3 Corridor approved (Apr 08). Monaghan Road. Full project costs shown Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

M1/A1 Sprucefield Bypass Scheme is in the DfI Roads 4km of new dual carriageway from the M1 motorway to Open Networks Construction Works Civils DfI Roads eTenders NI DfI TBC P Forward Planning Schedule. A1 at Hillsborough, bypassing Sprucefield, including a Market Preferred Corridor approved flyover at Hillsborough Junction. (Mar 11).

A26 Ballmoney to Coleraine Dual Carriageway Future scheme to upgrade 7km of existing route to Open Networks Construction Works Civils DfI Roads eTenders NI DfI TBC P Scheme is in the DfI Roads standard dual carriageway between the Portrush Road Market Forward Planning Schedule. Roundabout to Windyhall.

A26 Nutts Corner to M1 Moira Open Future scheme to provide a number of improvements to Networks Construction Works Civils DfI Roads eTenders NI DfI TBC P Scheme is in the DfI Roads Market the A26 between Moira and Nutts Corner. Forward Planning Schedule.

A3 Portadown to Richill Dual Carriageway Open Future scheme to upgrade 6.5km of existing route to Networks Construction Works Civils DfI Roads eTenders NI DfI TBC P Scheme is in the DfI Roads Market standard dual carriageway. Forward Planning Schedule.

A4 Fivemiletown Bypass Open Networks Construction Works Civils DfI Roads eTenders NI DfI TBC P Scheme is in the DfI Roads 3.4km of single carriageway to bypass Fivemiletown. Market Forward Planning Schedule.

M1 Slip Roads at Blacks Road, Belfast Open Networks Construction Works Civils DfI Roads eTenders NI DfI TBC P Scheme is in the DfI Roads Provision of on/off slips (western side) onto the M1. Market Forward Planning Schedule.

M2/A8(M) Sandyknowes Junction, Belfast Open Networks Construction Works Civils DfI Roads eTenders NI DfI TBC P Scheme is in the DfI Roads Provision of a link Road for Belfast - Larne traffic. Market Forward Planning Schedule.

Scheme is in the DfI Roads Open A55 Widening at Knock Road, Belfast Networks Construction Works Civils DfI Roads eTenders NI DfI £12m - £15m P Preparation Pool. Draft Orders Market published (Aug 15). Notice Intention to Proceed and UWC Safety Improvement Programme - Phase 2C An ongoing programme of works to manage the network risk at user work crossing is already established. Phase 2C Framework Call Pre-procurement is an additional package of works to look at 2no crossings Networks Construction Works Civils Translink eTenders NI DfI £2m - £4m Q/E Jun 23 Click Here Off Project still to be initiated, to provide (RRI) Minature Stop Lights (MSL), additional subject to planning approval protecting signals and telephone link to the signaller at and funding. Estimated each crossing. Construction Costs are shown

Ballymartin Park & Ride Ph2 Framework Call Project is currently in Detailed Construction of additional Park & Ride provision at Networks Construction Works Civils Translink eTenders NI DfI £1m - £2m Q/E Mar 23 Click Here Off Design Stage Ballymartin

Lurgan Level Crossing Signalling Alterations Signalling Alterations at Lurgan Level Crossing to reduce road Framework Call Project is currently in an Networks Construction Works Civils Translink eTenders NI DfI £15m - £20m Q/E Jun 22 Click Here closure times to improve traffic flow and improve the time Off Appraisal Stage taken for rail traffic to pass through the area.

Ballymoney to Coleraine - Re-railing Framework Call Re-railing of the line section between Ballymoney and Networks Construction Services Civils Translink eTenders NI DfI £4m - £6m Q/E Jun 22 Click Here Pre-Procurement Off Coleraine including some minor remedail works

Lisburn - Bus Engineering and Depot Refurbishment Provision of new joint Bus Engineering and Operations Framework Call Networks Construction Services Civils Translink eTenders NI DfI £2m - £4m Q/E Jun 22 Click Here Pre-Procurement staff welfare facility including increased storge space, Off energy performance and rationalised external work areas Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Ballymena Station Park & Ride Phase 2 Extension of the Park & Ride provision at Ballymena Bus / Framework Call Project is currently in Detailed Rail Station Networks Construction Works Civils Translink eTenders NI DfI £1m - £2m Q/E Dec 22 Click Here Off Design Stage

Bellarena Park & Ride Project is currently in an Networks TBC Construction Works Civils Translink eTenders NI DfI £1m - £2m Q/E Dec 22 Construction of a Park & Ride facility at Bellarena Appraisal Stage

Central Area Track Renewal - Dargan Bridge to Yorkgate Plain Line Renewal between Yorkgate and Dargan Bridge Framework Call Networks Construction Works Civils Translink eTenders NI DfI £12m - £15m Q/E Dec 22 Click Here including associated S&C Off

Lisburn West New Halt and P&R The proposed new Halt and Park & Ride for West Lisburn is at the site of the former South Eastern Regional College (SERC), Knockmore Road, Lisburn. The scope includes the Framework Call Revised feasibility progressing, Networks Construction Works Civils Translink eTenders NI DfI £10m - £12m Q/E Sep 24 Click Here requirement for an island and a single line platform with Off subject to funding. Estimated DDA access. There is requirement to realign the branch Construction Costs are shown. line and to smooth/slue both main lines to facilitate the island platform.

Adelaide - Footbridge Development Pre-procurement Removal of the existing two footbridges and construction Framework Call Project is at Feasibility stage of new footbridge linking Up and Down Platforms and Networks Construction Works Civils Translink eTenders NI DfI £4m - £6m Q/E Jun 24 Click Here Off and is subject to planning connecting with new entrance. approval and funding. Disabled access to all platforms Estimated Construction Costs are shown

Lurgan Railway Station Redevelopment Upgrade passenger and staff facilities to the railway station to extend facility lifespan and improve Framework Call Networks Construction Works Civils Translink eTenders NI DfI £6m - £8m Q/E Jun 23 Click Here accessibility. Subject to land purchase and funding. Off Estimated Construction Costs are shown, which also include estimated demolition costs on the existing site.

Moira Station Park and Ride Site acquisition and construction of a new 430 space P&R Project subject to funding and Framework Call facility with vehicular access from Glenavy Road and Networks Construction Works Civils Translink eTenders NI DfI £2m - £4m Q/E Sep 22 Click Here Planning Approval. Estimated Off Station Road. Includes CCTV, lighting and perimeter Construction Costs are shown. security fencing.

SPAD and Overspeeding Mitigation Project Framework Call Project is currently in Feasibility Mitigation measures to be introduced to minimise the Networks Construction Works Civils Translink eTenders NI DfI £12m - £15m Q/E Jun 23 Click Here Off stage impact of any SPAD or over-speeding event.

Ballymena Bus & Rail Integrated Station Options currently being explored for the construction of a new Integrated Bus and Rail Station to replace the existing Open Construction Works Networks Translink eTenders NI DfI £12m - £15m Q/E Mar 24 Click Here Currently at feasibility stage. separate station buildings. Works are to include Market Building Project currently on hold redevelopment of the existing site features including parking, bus stands and site circulation.

Omagh Bus Engineering Workshop Refurbishment The project scope is to provide a new bus engineering Framework Call Awaiting letter of offer. workshop to service the Omagh region, with workshop, Networks Construction Works Civils Translink eTenders NI DfI £8m - 10m Q/E Mar 23 Click Here Off Project On Hold pending welfare and administrative facilities, plus parking for 50 acquisition of suitable site buses.

Coleraine to Derry - Phase 3 Framework Call Networks Construction Services Civils Translink eTenders NI DfI £50m - £60m Q/E Mar 24 Click Here Pre-Procurement Phase 3 of the Coleraine to Derry line enhancements Off Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Newtownards Park and Ride Framework Call Development of a Park and Ride Site at Newtownards Bus Networks Construction Services Civils Translink eTenders NI DfI £4m - £6m Q/E Mar 23 Click Here Pre-Procurement Off Station

Belfast Central - NIROC - Phase 1A Framework Call Provision of integrated control office and centralised Networks Construction Services Civils Translink eTenders NI DfI £15m - £20m Q/E Sep 22 Click Here Pre-Procurement Off signalling system enabling Belfast Transport Hub Project

Seahill - Platform Replacement (Main Works Contract) Framework Call Delivery of the platform replacement and remedial works Networks Construction Services Civils Translink eTenders NI DfI £2m - £4m Q/E Dec 22 Click Here Pre-Procurement Off at Station including DDA compliance

CAFRE Masterplan - Greenmount The redevelopment of campus to include new student Construction Works OBC in preparation. Funding Skills TBC CPD eTenders NI DAERA £25m - £30m TBC accommodation, teaching facilities, staff offices and new Building not yet allocated subject to HUB approvals.

Construction Team for St Brides Primary School, Belfast Supply and build a School Enhancement Project. This may Open Construction Works Skills CPD eTenders NI DE £2m - £4m Q/E Jun 22 include refurbishment, extension or new build on school Market Building site.

Construction Team for St Joseph's Primary School, Belfast Supply and build a School Enhancement Project. This may Open Construction Works Skills CPD eTenders NI DE £2m - £4m Q/E Sep 22 include refurbishment, extension or new build on school Market Building site.

Construction Team for Dominican College, Portstewart Supply and build a School Enhancement Project. This may Open Construction Works Skills CPD eTenders NI DE £2m - £4m Q/E Sep 22 include refurbishment, extension or new build on school Market Building site.

Construction Team for St Columbanus' College, Bangor Supply and build a School Enhancement Project. This may Open Construction Works Skills CPD eTenders NI DE £2m - £4m Q/E Sep 22 include refurbishment, extension or new build on school Market Building site.

Construction Team for St Mary's Christian Brothers' GS, Belfast Open Construction Works Supply and build a School Enhancement Project. This may Skills CPD eTenders NI DE £2m - £4m Q/E Sep 22 Market Building include refurbishment, extension or new build on school site.

Construction Team for St Patrick's & St Brigid's College, Claudy Open Construction Works Supply and build a School Enhancement Project. This may Skills CPD eTenders NI DE £2m - £4m Q/E Sep 22 Market Building include refurbishment, extension or new build on school site.

Construction Team for Methodist College, Belfast Supply and build a School Enhancement Project. This may Open Construction Works Skills CPD eTenders NI DE £2m - £4m Q/E Sep 22 include refurbishment, extension or new build on school Market Building site.

Construction team for St Joseph's Grammar, Donaghmore Open Construction Works Supply and build a School Enhancement Project. This may Skills CPD eTenders NI DE £2m - £4m Q/E Jun 22 Click Here Market Building include refurbishment, extension or new build on school site.

Portadown Integrated PS Open Construction Works Skills CPD Local Press DE £4m - £6m Q/E Sep 23 Professional Team appointed Design and build of new school Market Design and Build Aug 17. Site issues still exist Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Construction Team for St John the Baptist PS, Belfast Supply and build a School Enhancement Project. This may Open Construction Works Skills CPD eTenders NI DE £2m - £4m Q/E Dec 22 include refurbishment, extension or new build on school Market Building site.

Construction Team for St Kieran's PS, Dunmurry Supply and build a School Enhancement Project. This may Open Construction Works Skills CPD eTenders NI DE £2m - £4m Q/E Dec 22 include refurbishment, extension or new build on school Market Building site.

Construction Team for Holy Child PS, Londonderry Supply and build a School Enhancement Project. This may Open Construction Works Skills CPD eTenders NI DE £2m - £4m Q/E Dec 22 include refurbishment, extension or new build on school Market Building site.

Construction Team for St Paul's PS, Belfast Supply and build a School Enhancement Project. This may Open Construction Works Skills CPD eTenders NI DE £2m - £4m Q/E Dec 22 include refurbishment, extension or new build on school Market Building site.

Construction Team for St Louis GS, Ballymena Supply and build a School Enhancement Project. This may Open Construction Works Skills CPD eTenders NI DE £2m - £4m Q/E Dec 22 include refurbishment, extension or new build on school Market Building site.

Construction Team for Victoria College, Belfast Supply and build a School Enhancement Project. This may Open Construction Works Skills CPD eTenders NI DE £6m - £8m Q/E Dec 22 include refurbishment, extension or new build on school Market Building site.

Integrated Consultant Team for Christian Brothers' Framework Call Primary School Skills Construction Services Building CPD eTenders NI DE £100k - £300k Q/E Jun 22 Off Design and Project Manage the delivery of a SEP Scheme

Integrated Consultant Team for Our Lady & St Patrick Framework Call Primary School Skills Construction Services Building CPD eTenders NI DE £100k - £300k Q/E Dec 23 Off Design and Project Manage the delivery of a SEP Scheme

Integrated Consultant Team for St Brigid's Primary Framework Call School, Magherafelt Skills Construction Services Building CPD eTenders NI DE £100k - £300k Q/E Dec 23 Off Design and Project Manage the delivery of a SEP Scheme

Integrated Consultant Team for St Comgall's Primary Framework Call School, Antrim Skills Construction Services Building CPD eTenders NI DE £100k - £300k Q/E Dec 23 Off Design and Project Manage the delivery of a SEP Scheme

Integrated Consultant Team for St Patrick's Primary Framework Call School, The Meadow, Newry Skills Construction Services Building CPD eTenders NI DE £100k - £300k Q/E Dec 23 Off Design and Project Manage the delivery of a SEP Scheme

Integrated Consultant Team for St Peter's Primary Framework Call School, Moortown, Cookstown Skills Construction Services Building CPD eTenders NI DE £100k - £300k Q/E Dec 23 Off Design and Project Manage the delivery of a SEP Scheme

Integrated Consultant Team for Belfast Royal Academy Framework Call Skills Construction Services Building CPD eTenders NI DE £100k - £300k Q/E Dec 23 Design and Project Manage the delivery of a SEP Scheme Off Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Construction Team for Christian Brothers' Primary School Open Construction Works Skills CPD eTenders NI DE £2m - £4m Q/E Dec 23 Design and Project Manage the delivery of a SEP Scheme Market Building

Construction Team for Our Lady & St Patrick Primary Open Construction Works School Skills CPD eTenders NI DE £2m - £4m Q/E Dec 23 Market Building Design and Project Manage the delivery of a SEP Scheme

Construction Team for St Brigid's Primary School, Open Construction Works Magherafelt Skills CPD eTenders NI DE £2m - £4m Q/E Dec 23 Market Building Design and Project Manage the delivery of a SEP Scheme

Construction Team for St Comgall's Primary School, Open Construction Works Antrim Skills CPD eTenders NI DE £2m - £4m Q/E Dec 23 Market Building Design and Project Manage the delivery of a SEP Scheme

Construction Team for St Patrick's Primary School, The Open Construction Works Meadow, Newry Skills CPD eTenders NI DE £2m - £4m Q/E Dec 23 Market Building Design and Project Manage the delivery of a SEP Scheme

Construction Team for St Peter's Primary School, Open Construction Works Moortown, Cookstown Skills CPD eTenders NI DE £2m - £4m Q/E Dec 23 Market Building Design and Project Manage the delivery of a SEP Scheme

Construction Team for Belfast Royal Academy Open Construction Works Skills CPD eTenders NI DE £2m - £4m Q/E Dec 23 Design and Project Manage the delivery of a SEP Scheme Market Building

Business case approved May 2019 however additional Integrated Supply Team for St Malachy's PS, Armagh Construction Works options being explored due to Skills TBC Education Authority TBC DE £4m - £6m Q/E Dec 22 Click Here Design & Build of a new 7 class base primary school Design and Build land purchase complications. Anticipate start on site end 2021

Construction team for Beechlawn Special School, Hillsborough Open Construction Works Supply and build a School Enhancement Project. This may Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 22 Click Here Market Building include refurbishment, extension or new build on school site.

Construction team for Carniny Primary School, Ballymena Supply and build a School Enhancement Project. This may Open Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 22 Click Here include refurbishment, extension or new build on school Market Building site.

Construction team for Integrated Primary, Killyleagh Open Construction Works Supply and build a School Enhancement Project. This may Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 22 Click Here Market Building include refurbishment, extension or new build on school site.

Construction team for Knockevin Special School, Open Construction Works Supply and build a School Enhancement Project. This may Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 22 Click Here Market Building include refurbishment, extension or new build on school site. Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Construction team for Longstone Special School, Dundonald Open Construction Works Supply and build a School Enhancement Project. This may Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 22 Click Here Market Building include refurbishment, extension or new build on school site.

Construction team for Lurgan College, Lurgan Supply and build a School Enhancement Project. This may Open Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Sep 22 Click Here include refurbishment, extension or new build on school Market Building site.

Construction team for Lurgan Model Primary School, Lurgan Open Construction Works Supply and build a School Enhancement Project. This may Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 22 Click Here Market Building include refurbishment, extension or new build on school site.

Construction team for Roddensvale Special School, Larne Supply and build a School Enhancement Project. This may Open Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 22 Click Here include refurbishment, extension or new build on school Market Building site.

Construction team for Sandleford Special School, Dungannon Open Construction Works Supply and build a School Enhancement Project. This may Skills Education Authority eTenders NI DE £2m - £4m Q/E Sep 22 Click Here Market Building include refurbishment, extension or new build on school site.

Sperrinview Special School, Dungannon Supply and build a School Enhancement Project. This may Open Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Mar 23 Click Here include refurbishment, extension or new build on school Market Building site.

Construction Team for Thornfield House School, Newtownabbey Open Construction Works Supply and build a School Enhancement Project. This may Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 22 Click Here Market Building include refurbishment, extension or new build on school site.

Construction team for Greenhaw Primary School, Londonderry Open Construction Works Supply and build a School Enhancement Project. This may Skills Education Authority eTenders NI DE £2m - £4m Q/E Sep 22 Click Here Market Building include refurbishment, extension or new build on school site. Construction Team for Antrim Primary School Supply and build a School Enhancement Project. This may Open Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Sep 23 include refurbishment, extension or new build on school Market Building site.

Construction Team for Ballyclare Primary School Supply and build a School Enhancement Project. This may Open Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Sep 23 include refurbishment, extension or new build on school Market Building site.

Construction Team for Dungannon Primary School Supply and build a School Enhancement Project. This may Open Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Sep 23 include refurbishment, extension or new build on school Market Building site.

Construction Team for Fairview Primary School, Ballyclare Open Construction Works Supply and build a School Enhancement Project. This may Skills Education Authority eTenders NI DE £2m - £4m Q/E Sep 23 Market Building include refurbishment, extension or new build on school site.

Construction Team for Glengormley CIPS Supply and build a School Enhancement Project. This may Open Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Sep 23 include refurbishment, extension or new build on school Market Building site. Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Construction Team for Thompson Primary School Supply and build a School Enhancement Project. This may Open Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Sep 23 include refurbishment, extension or new build on school Market Building site.

Construction Team for Kilronan Special School Supply and build a School Enhancement Project. This may Open Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Sep 23 include refurbishment, extension or new build on school Market Building site.

Construction Team for Lisanally School, Armagh Supply and build a School Enhancement Project. This may Open Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Sep 23 include refurbishment, extension or new build on school Market Building site.

Project at Stage 1 development. Contractor for Kings Park PS Open Construction Works ICT to produce programme. Traditional contract to erect a 23 class base Primary Skills Education Authority TBC DE £8m - 10m Q/E Jun 22 Click Here Market Building Anticipate start on site Q/E Dec School and triple nursery. 21

Contractor for Iveagh PS Open Construction Works ICT appointment end Jan 20. Skills Education Authority eTenders NI DE £4m - £6m Q/E Mar 24 Click Here New build school Market Building Feasibility Report in progress.

Contractor for Cullybackey College Open Construction Works Skills Education Authority TBC DE £15m - £20m Q/E Dec 22 Click Here Feasibility Report in progress New build Market Building

Glenwood PS, Belfast - Traditional Contractor EA for Glenwood PS ongoing. Refurbishment of existing listed building and new build Open Construction Works Skills Education Authority eTenders NI DE £12m - £15m Q/E Dec 22 Hope to appoint ICT when way extension on existing site - 21 class base primary school Market Building forward is clear. and 2 LSC

Construction Team for Sullivan Upper GS, Holywood Supply and build a School Enhancement Project. This may Open Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Jun 24 include refurbishment, extension or new build on school Market Building site.

Construction Team for Botanic Primary School Supply and build a School Enhancement Project. This may Framework Call Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Jun 24 include refurbishment, extension or new build on school Off Building site.

Construction Team for Carrick Primary School Supply and build a School Enhancement Project. This may Framework Call Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Jun 24 include refurbishment, extension or new build on school Off Building site.

Construction Team for Cliftonville Integrated Primary School Framework Call Construction Works Supply and build a School Enhancement Project. This may Skills Education Authority eTenders NI DE £2m - £4m Q/E Jun 24 Off Building include refurbishment, extension or new build on school site.

Construction Team for Glencraig Integrated Primary School Framework Call Construction Works Supply and build a School Enhancement Project. This may Skills Education Authority eTenders NI DE £2m - £4m Q/E Jun 24 Off Building include refurbishment, extension or new build on school site.

Construction Team for Irvinestown Primary School Supply and build a School Enhancement Project. This may Framework Call Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Jun 24 include refurbishment, extension or new build on school Off Building site. Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

Construction Team for Kilcooley Primary School Supply and build a School Enhancement Project. This may Framework Call Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Jun 24 include refurbishment, extension or new build on school Off Building site.

Construction Team for Killinchy Primary School Supply and build a School Enhancement Project. This may Framework Call Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Jun 24 include refurbishment, extension or new build on school Off Building site.

Construction Team for Strabane Primary School Supply and build a School Enhancement Project. This may Framework Call Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Jun 24 include refurbishment, extension or new build on school Off Building site.

Construction Team for Glastry College Supply and build a School Enhancement Project. This may Framework Call Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Jun 24 include refurbishment, extension or new build on school Off Building site.

Construction Team for Riverside School Supply and build a School Enhancement Project. This may Framework Call Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Jun 24 include refurbishment, extension or new build on school Off Building site.

Construction Team for Greenisland Primary School Framework Call Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 24 Design and Project Manage the delivery of a SEP Scheme Off Building

Construction Team for Hart Memorial Primary School Framework Call Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 24 Design and Project Manage the delivery of a SEP Scheme Off Building

Construction Team for Kilbride Primary School Framework Call Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 24 Design and Project Manage the delivery of a SEP Scheme Off Building

Construction Team for Strandtown Primary School Framework Call Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 24 Design and Project Manage the delivery of a SEP Scheme Off Building

Construction Team for Ashfield Boys' High School Framework Call Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 24 Design and Project Manage the delivery of a SEP Scheme Off Building

Construction Team for Carrickfergus Grammar School Framework Call Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 24 Design and Project Manage the delivery of a SEP Scheme Off Building

Construction Team for Clounagh Junior High School Framework Call Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 24 Design and Project Manage the delivery of a SEP Scheme Off Building

Construction Team for Clifton School Framework Call Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 24 Design and Project Manage the delivery of a SEP Scheme Off Building

Construction Team for Hill Croft School Framework Call Construction Works Skills Education Authority eTenders NI DE £2m - £4m Q/E Dec 24 Design and Project Manage the delivery of a SEP Scheme Off Building Integrated Supply Team for Bangor Central IPS Open Construction Works Complete design from ICT and construct new build Skills Education Authority eTenders NI DE £8m - 10m Q/E Jun 22 Market Building Whilst the Departments have used their best efforts to ensure that the information appearing in this document is reasonably accurate, the information and material contained in this report is provided for general information purposes only and Departments cannot accept responsibility for any errors, omissions or inaccuracies. No reliance should be placed upon such information and material. None of the Departments or other bodies referred to on this report will accept responsibility for any loss which may arise from reliance on information contained therein. The eventual procurement and implementation of projects will be dependent upon completion of business case and other approvals, and subject to change in the light of political and budgetary circumstances. Information is correct as of Feb 21.

Project title Pillar Route Contract Type COPE Advertised Sponsor Dept Value 2020-21 2021-2022 2022+ Information Link Current Stage

NHSCT New Mental Health Inpatient Hospital Open Construction Works Build Contract Health CPD Health Estates eTenders NI DoH £60m - £80m Q/E Sep 23 Click Here Market Building

Lisnaskea Helath and Care Centre Open Construction Works Health CPD Health Estates eTenders NI DoH £10m - £12m Q/E Sep 22 Click Here Market Building

MagherafeltTown Centre Public Realm Project currently in the very (Rainey St-Queen St-Union Rd- King St-Church St and Open Social Construction Works Civils CPD eTenders NI DfC £2m - £4m P Click Here early planning stage and subject Linkages) Enhancements to the physical environment in Market to development of and approval Magherafelt Town centre of business case.

Glengormley Public Realm Open Resurfacing footpaths, street lighting, improving civic Social Construction Works Civils CPD eTenders NI DfC £4m - £6m Q/E Jun 22 Click Here Market spaces.

Integrated Supply Team for Armagh Leisure Village Open Construction Works Social CPD OJEU Sport NI/Council £25m - £30m 2022+ Supply and build new leisure centre and sports facilities Market Building

Urban Villages Colin Community Hub Integrated Supply Open Construction Works Social CPD eTenders NI TEO £2m - £4m Q/E Sep 22 Team Market Building

Framework Call Northern Ireland Framework for Site Supervision Environment Construction Services Civils eTenders NI DfI £35m - 40m Q/E Mar 23 Click Here Off Water

Eastleigh Dale/Pasadena Gardens, Belfast, Framework Call Northern Ireland Environment Construction Works Civils eTenders NI DfI £2m - £4m Q/E Dec 22 Click Here Sewer Upgrade for DG5 removals. Off Water

Belleek WWTW Feasibility Framework Call Northern Ireland Environment Construction Works Civils eTenders NI DfI £1m - £2m Q/E Mar 23 Click Here Upgrade of existing works Off Water

Scrabo Road, Newtownards, Waste Water Pumping Station Framework Call Northern Ireland Environment Construction Works Civils eTenders NI DfI £2m - £4m Q/E Mar 23 Click Here Business case approved. Land Provision of Civil and M&E works for compliance with Off Water required NIEA.

Framework Call Northern Ireland Eglish (Dungannon) WwTW upgrade Environment Construction Works Civils eTenders NI DfI £1m - £2m Q/E Mar 23 Click Here Off Water

Open Northern Ireland Ballyronan WWTW Feasibility Study Environment Construction Works Civils eTenders NI DfI £1m - £2m Q/E Dec 22 Click Here Market Water

Framework Call Northern Ireland Killygonlan (Mullanahoe)WwTW Upgrade Environment Construction Works Civils eTenders NI DfI £1m - £2m Q/E Mar 23 Click Here Off Water

Northern Ireland Community Safety College NIPS Project Outline Business Case 1 Open Construction Works Design, construction and enhancement of new and Justice CPD eTenders NI DoJ £4m - £6m Q/E Jun 22 Click Here approved. Market Design and Build existing NIPS training facilities Funding not yet allocated. Subject to capital funding.