Bangkok's First

Total Page:16

File Type:pdf, Size:1020Kb

Bangkok's First Case study Thailand Bangkok’s first APM BOMBARDIER* INNOVIA* APM 300 automated people mover for Bangkok's Gold Line will be the first driverless mass transit in Thailand. Bangkok has selected a modern It operates on dedicated guideways automated people mover (APM) to ensure separation from road system for phase one of its new traffic, providing outstanding Gold Line. The first 1.72 km section, availability as well as cost, energy 1st with three stations, will increase and life-cycle efficiency. Driverless rail system transportation options in the in Thailand. Thon Buri district, linking to the System integration, rail control/ BTS Skytrain, local attractions signalling design and project delivery and Iconsiam complex. are managed from Bombardier’s Engineering Centre in Bangkok. The contract was awarded in 2018 The vehicles are manufactured by to supply three 2-car INNOVIA APM Bombardier’s Chinese joint venture 3 300 trains with BOMBARDIER* based on a design from Canada. Urban rail lines in Bangkok. CITYFLO* 650 automatic train control To run with Bombardier and integrated wayside sub-systems. Bombardier is also delivering its INNOVIA solutions. The quiet and safe electric, rubber- INNOVIA monorail 300 system wheeled solution is suited to dense for Bangkok’s new Pink and urban areas and airports. Yellow Lines. Light rail transit / signalling and infrastructure Performance and capacity Max. speed 80 km/h Minimum curve radius 22 m Traction motor rating +/-375 V DC Air conditioning Dual high-capacity units Current collection Two collector shoes (+/-375 V DC) and one ground shoe in the center Empty weight of train 32,600 kg/train @ AW0 Passenger capacity 112 passenger seats per car, 138 passengers (seated+standing) n 24 passenger seats per train, 276 passengers (seated+standing) Technical characteristics Train configuration Driverless APM Nominal voltage 497 V AC (voltage L-L, 75 Hz) Motor AC traction General data Bogies Two steerable axles First contract awarded 1 February 2018 Brake Regenerative, dynamic, friction Type of vehicle Automated people mover Bodyshell Lightweight, aluminium carbody Model INNOVIA APM 300 system External sliding doors Two electrically operated bi-parting sliding doors (outside) Transit system Light rail transit Interior LCD dynamic passenger information Owner Bangkok Mass Transit System PCL system, PA, PIP (intercom) Quantity Base contract: six cars Air flow rate 5100 mˆ3/h Train consist 2-car Seamless delivery through integrated wayside Car configuration sub-systems Length of train 25,500 mm Delivering a transportation system requires a high number Length of driving motor car 12,750 mm of systems to integrate, not only the vehicles and rail Width 2,846 mm control, but also a wide range of sub-systems from power supply, automated fare collection to passenger screen Height 3,394 mm doors. With the growing complexity of rail systems, Floor height 1,113 mm Bombardier is an expert in delivering these wayside Wheel gauge 2,050 mm systems as one turnkey solution, ensuring a seamless Width of entrance area 1,980 mm delivery experience for our customers. Height of entrance area 1,960 mm Floor fire resistance at least 30 mins The leading rail technology company in Thailand, Bombardier employs more than 600 employees to deliver multiple projects in country and across Asia Automatic train control Pacific. Its Bangkok hub hosts a global centre of Type of project City line (Greenfield) excellence in digital mass transit solutions and rail Technology CITYFLO 650 communication- systems integration working for projects worldwide. based train control (CBTC) In addition to its pioneering APM and monorails, system Bombardier is the signalling supplier for the Bangkok Automation UTO (GoA 4) Skytrain, MRT Purple Line and a section of the State Type of operation Bi-directional (ATO and ATP) Trademark(s) of Bombardier Inc. or its subsidiaries. © 2020, Bombardier Inc. or its subsidiaries. All rights reserved. 12039/11-2020/e Railway of Thailand’s Northern Line upgrade. * Bombardier Transportation 3354/16-19 6th floor, Manorom Building Rama IV Road, Klongton, Klongtoey Bangkok 10110, Thailand Tel +66 2 67 28 290 www.bombardier.com.
Recommended publications
  • CONTRACT AGREEMENT MRT Blue Line Extension Project Hua
    Contract Agreement CA-1 CONTRACT AGREEMENT MRT Blue Line Extension Project Hua Lamphong - Bang Khae and Bang Sue - Tha Phra Sections Contract 4: Elevated Civil Works Tha Phra - Lak Song Section This Contract is made at the Mass Rapid Transit Authority of Thailand, 175 Rama IX Road, Huay Khwang, Bangkok 10320 on 17 day of February B.E. 2554 (A.O. 2011) between: (1) MASS RAPID TRANSIT AUTHORITY OF THAILAND by Mr.Ronnachit Yaemsaard, the MRTA Acting Governor, with office located at 175 Rama IX Road, Huay Khwang, Bangkok 10320, hereinafter referred to as the "MRTA" or the "Employer", as the case may be, of the one part and ; (2) SINO-THAI ENGINEERING AND CONSTRUCTION PUBLIC COMPANY LIMITED a company registered and existing under the laws of Thailand, with head office located at 27th floor, Sino-Thai Tower, 32/59-60, Sukhumvit 21 Road , Klang Toey Nua Sub-District, Wattana District, Bangkok, 10110, Thailand by Mr. Vallop Rungkijvorasathien authorized to sign and bind the company, hereinafter referred to as the "Contractor" of the other part. WHEREAS the Employer is desirous that certain Works should be executed by the Contractor, viz, the construction of Elevated Structure at Tha Phra - Lak Song Section with precast segment box girder viaduct of approximately 10.5 km. in length, elevated approximately 17 meters above existing ground, transition structure, with the construction of 7 elevated stations, architectural works and building services within the stations, and the intermodal transfer facilities (ITF), Depot, Operation and Control Center (OCC), Park & Ride Buildings and other works as defined in the Contract, and has accepted a Tender by the Contractor for execution and completion of such Works and the remedying of any defects therein.
    [Show full text]
  • Corporate Profile
    Silom Corporate Profile www.silom.cc @silombkk February 2020 Silom THE BRAND 06 The brand and the designers IN NUMBERS 08 Main numbers 2019/2020 JUST GETTING STARTED 12 Timeline of an exciting first year LA MANUFACTURE 18 Silom’s secret PLATING 21 So shiny and long lasting THE SCARF 24 100% Silk IN THE WILD 28 Celebrities wearing Silom CONTACT 32 Contact, store and stockists 5 6 Oval Hoops 7 8 The Brand Silom is an indie jewelry brand founded Silom opened its first store in February in January 2019 by designers Jitwaree & 2019 in Siam Center, in downtown Bangkok Pablo Echegoyen and based in the Silom and the website silom.cc was launched district of Bangkok. in March with the “Mini Shop” featuring a selection of the brand’s top pieces. The district is the heart of silver and jewelry making in Thailand and a major In April 2019, Silom was selected international hub for gemstones and to be part of the Designer’s Room, an jewelry. This is where talented craftsmen exclusive club comprising the top young manufacture the brand’s pieces. Thai fashion brands and supported by Thailand’s Department of International Silom approaches jewelry as a search Trade Promotion. for the minimum, throughout the process of creation, from ideation to manufacturing. THE DESIGNERS This idea manifests itself in essential, timeless pieces, uncluttered by adornments. After graduating in Marketing from the Jitwaree and Pablo meet in 2016 in Ramkhamhaeng University and obtaining Switzerland, relocated to Bangkok in 2018 her MBA, Jitwaree went on to study jewelry and launched Silom in 2019.
    [Show full text]
  • Bangkok Expressway and Metro Public Company Limited (BEM) FEBRUARY 2021 Business Overview
    Bangkok Expressway and Metro Public Company Limited (BEM) FEBRUARY 2021 Business Overview COMMERCIAL ROAD INVESTMENT RAIL DEVELOPMENT Total Expressway Total Rail BL = IBL + BL Ex Infrastructure portfolio SES 38.50 km BL 48 km 38 stations For advertising in Stations & • Owns 99.99% in NECL Sector C+ 32.00 km PPL 23 km 16 stations Trains, Retailing and • Owns 90.52% in BMN SOE 17.06 km Total 71 km 54 stations Telecommunications • Owns 18.47% in TTW Total 87.56 km • Owns 16.64% in CKP BL Ridership PPL to be negotiated with MRTA Traffic Volume Jan 2021 Profit sharing in P&L Jan 2021 151,237 trips/day Expressway Ads on SES Y2019 173 MB 799,583 trips/day Growth -61.95% YoY 9M/2020 - MB Growth -34.30% YoY Avg. 2021 CD Revenue Avg. 2021 151,237 trips/day Y2019 783 MB Cash Dividend Received 799,583 trips/day Growth -61.95% YoY 9M/2020 586 MB Y2019 489 MB Growth -34.30% YoY Growth 4.30% YoY 9M/2020 483 MB BL farebox Tolls Revenue Jan 2021 Jan 2021 4.24 MB/day 17.33 MB/day Growth -60.05% YoY Growth -37.67% YoY Avg. 2021 Avg. 2021 4.24 MB/day 17.33 MB/day Growth -60.05% YoY Growth -37.67% YoY PPL O&M service income Annual Income apx.1,800 - 2,000 MB/year 2 Financial Highlights & Earnings Outlook REVENUE STRUCTURE TOTAL REVENUE As of 9M/2020 Unit: MB SteadyRevenue with Growth 20,404 trong Earnings with Good Dividend 19,087 S Rail : 34% 15,393 13,232 Stable Cash Flow Road : 60% 10,589 Road Gearing for new investment Rail Commercial CD Development : Other 6% 2016 2017 2018 2019 9M/2020 NET PROFIT DPS / EPS NET IBD/E Unit: MB Unit: THB Unit : Times 5,317* 5,435** 1.44 3,123 0.35* 0.36** 1.38 2,606 1.37 1.34 1,482 0.20 1.33 0.17 0.15 0.15 0.11 0.13 0.10 DPS EPS 2016 2017 2018 2019 9M/2020 2016 2017 2018 2019 9M/2020 2016 2017 2018 2019 9M/2020 Remark : * Including non - cash extra item from reclassified the investment in CKP ** Including non - cash extra item from reclassified the investment in TTW 3 Expressway Map Expressway Network Distance (km) Operator 1.
    [Show full text]
  • ESCAP PPP Case Study #1
    Public-Private Partnerships Case Study #1 Traffic Demand Risk: The case of Bangkok’s Skytrain (BTS) by Mathieu Verougstraete and Isabelle Enders (March 2014) The following case study examines the issue of traffic demand risk and sheds light on how the problem of inaccurate ridership forecasts can impact a PPP project by using the example of the Bangkok SkyTrain. TRAFFIC DEMAND RISK FIGURE 1 : ACTUAL/FORECAST TRAFFIC Even though literature is rich about theory and practice of traffic forecasting, insufficient attention has been paid to the predicted accuracy of traffic forecasting models and the consequences of occurring errors. Emperical studies suggest however that traffic forecasts in the transport sector are characterized by large errors and considerable optimism bias.1 This statement goes in line with the review conducted on PPP projects financed by the European Investment Bank which states that major issues in road projects BANGKOK BTS: CASE SUMMARY occurred because of traffic performance has been overestimated. Findings disclose that Bangkok covers about 606 square miles 1/2 of toll road projects failed to meet their and is densely populated. By 1990 it was early-year forecasts; often by some margin renowned for its chronic traffic congestion, 2 (errors of 50% - 70%). and over the subsequent decade vehicle ESCAP supports govern- ownership more than doubled. Heavy traffic ments in Asia-Pacific in This pattern of forecasting error and volume which is caused by bus, car and implementing measures systematic optimism-bias is even more motorbike journeys was making Bangkok to efficiently involve marked in the case of toll roads compared the private sector in one of the worst cities in the world in terms infrastructure develop- to toll-free road as illustrated in figure 1, of congestion and air pollution caused by which compares two samples of international ment.
    [Show full text]
  • 3 Assessment of Urban Transport Systems in Bangkok
    Assessment Urban Transport System: Bangkok, Thailand Siradol Siridhara Mahidol University BLAK Bangkok Metro and Vicinity Population 16.43 million Bkk Population 5.56 million Employment 10.42 million Income 39,459 baht/hh Bangkok Metro and Vicinity 35 million trips per day. ≈ 70% by private vehicles. Average Speeds Morning peak hour 10.7 kph Evening peak hour 14.2 kph Key Players Regulators, Project Owners & Operators Rail Bus Regulators Project Owners Project Operators 3 Current Rail Network Current Network: 5 Lines, 97 Stations, 142.9 km Light Green Line 32 stations 39.5 km Dark Green Line 13 stations 14.7 km Blue Line 26 stations 47.0 km Purple Line 16 stations 23.6 km Airport Rail Link 8 Stations 28.6 km Total 153.4 km Green Blue Purple Red Ridership (approx.) 1500000 trips/day4 Future Rail Network Future Network: Approx. 540 km Light Green Line 55 stations 66.5 km Dark Green Line 20 stations 22.5 km Blue Line 42 stations 55.0 km Purple Line 32 stations 42.8 km Orange Line 30 stations 35.4 km Pink Line 30 stations 36.0 km Yellow Line 23 stations 30.4 km Brown Line 23 stations 21.0 km Gold Line 4 stations 2.7 km Grey 39 stations 26.0 km Light Blue Line 19 stations 30.0 km Light Red Line 55 stations 58.5 km Dark Red Line 20 stations 80.8 km Airport Rail Link 14 Stations 49.5 km Total 504 km 5 Assessment Urban Transport System: Bangkok SUTI01 Extent to Which Transport Plans Cover Public Transport, Intermodal Facilities and Infrastructure for Active Modes MIN SCORE MAX 0 11 16 No Aspects Explanation Score 1 Walking Networks Little attention has been paid to pedestrian network planning, although the awareness of maintenance of walkways and other pedestrian facilities have 2 been raised from the general public.
    [Show full text]
  • Pre-Feasibility Study on Yangon Circular Railway Modernization Project
    32mm Republic of the Union of Myanmar Yangon Regional Government PROJECT FOR COMPREHENSIVE URBAN TRANSPORT PLAN OF THE GREATER YANGON (YUTRA) Pre-Feasibility Study on Yangon Circular Railway Modernization Project Final Report January 2015 Japan International Cooperation Agency (JICA) ALMEC Corporation Oriental Consultants Co., Ltd Nippon Koei Co., Ltd EI JR 14-208 The exchange rate used in the report is: US$ 1.00 = MMK 1,000.00 Project for Comprehensive Urban Transport Plan of the Greater Yangon (YUTRA) Pre-Feasibility Study on Yangon Circular Railway Modernization Project FINAL REPORT TABLE OF CONTENTS 1 UPPER PLANNING, COMPREHENSION OF THE CURRENT ISSUE 1.1 CURRENT SITUATION AND ISSUE OF TRANSPORT SECTOR IN THE GREATER YANGON .................. 1-1 1.1.1 GENERAL ............................................................................................................ 1-1 1.1.2 MAIN TRANSPORT COMPONENTS ......................................................................... 1-2 1.1.3 TRANSPORT DEMAND CHARACTERISTICS ............................................................. 1-9 1.2 CURRENT SITUATION AND ISSUE OF RAILWAY SECTOR IN THE GREATER YANGON ...................... 1-11 1.2.1 RAILWAY IN GREATER YANGON ........................................................................... 1-11 1.2.2 CURRENT SITUATION AND ISSUES ........................................................................ 1-13 1.3 COMPREHENSION OF THE CURRENT UPPER PLANNING AND POLICY OF RAILWAY SECTOR IN YANGON REGION ....................................................................................................................
    [Show full text]
  • BK B.A.D. Awards 1 4
    BK B.A.D. Awards 1 4 BAR OF THE YEAR 8 Who’s in charge? Managing Director & Publisher BEST COCKTAIL BARS Andrew Hiransomboon Managing Editor Craig Sauers 10 Deputy Editor Angela Symons Senior Digital Content Coordinator Nontaya Kumyat BEST SPECIALTY BARS Digital Content Coordinator Pakchira Bunphol Junior Digital Content Coordinator Kawee Jarach Senior Writer Dhipkawee Sriyananda Selley 12 Contributors Megan Leon, Choltanutkun Tun-atiruj BEST NIGHTCLUBS ver the past three years, the BK B.A.D. Awards have given us at BK Magazine a chance to raise a glass in honor of the best Creative Director Bhatara Chirdchuen Production Supervisor Komkrit Klinkaeo places to drink, party and spend mostly unforgettable nights O Senior Graphic Designer Assaya Dejkong 16 out in Bangkok. Somehow, we’re all still kicking. Graphic Designers Anunya Chobnitas, Wirankan Saiyasombut BEST DIVE BARS To put together this year’s guide, we’ve once again hit the Photographer Poonsawat Suttama streets, and hard. We’ve bellied up to the bar at more places than Junior Videographers Jaruwan Suwandee, Tham Rodjananaudomvutigul we care to count, sampling rotary-evaporated cocktails, tasting the Junior Video Editor Jakphet Potisarn 20 latest bottles of gin on the market, finding out why water bugs are BEST BEER BARS suddenly a thing and assessing the freshness of the same IPA at Business Development Director Jane Bay Advertising Director Wanida Akeapichai several different bars across town. Helluva life, isn’t it? Senior Business Development Manager Madeleine Anantasuk More than just putting our livers through the ringer, we’ve spo- Sales Managers Tipkritta Chiraporncharas, 24 ken with bartenders, importers and insiders, examined the kinds Tassanee Mahamad BEST WINE BARS of crowds turning up at bars citywide, and spent maybe too much Senior Sales Associates Nattaya Bovornsettanon, Orakarn Laohakanjanasiri time dissecting playlists to give you the most qualified perspective Sales Associate Parinda Dermsripoom we can.
    [Show full text]
  • Skripsi Yunda
    CHAPTER 1 INTRODUCTION 1.1 General Overview of Research Object 1.1.1 Light Rail Transit Figure 1.1 LRT Source : www.kabar3.com The Palembang Light Rail Transit (Palembang LRT) is an operational light rail transit system in Palembang, Indonesia which connects Sultan Mahmud Badaruddin II International Airport and Jakabaring Sports City. Starting construction in 2015, the project was built to facilitate the 2018 Asian Games and was completed in mid-2018, just a few months before the event. Costing Rp 10.9 trillion for construction, the system is the first operational light rail transit system in Indonesia, and utilizes trains made by local manufacturer PT.INKA. The system's only line has a total of 13 stations (6 operational). As Palembang was to host the 2018 Asian Games, the project was pushed to be completed before the event began. Groundbreaking for the project occurred on 1 November 2015, with state-owned company Waskita Karya being appointed as the primary contractor following the issuance of Presidential Regulation 116 of 2015 on Acceleration of Railway Train Operation in South Sumatera Province. The contract, which was signed in February 2017, was initially valued at Rp 12.5 trillion. Construction was scheduled for completion in February 2018, with commercial service beginning in May 2018. However, the completion date was moved to June 2018 with operations beginning in July, only one month before the Asian Games. A test run was done on 22 May 2018 and was inaugurated by President Joko Widodo on 15 July 2018. Operations for the LRT started on 1 August, several days before the Jakarta LRT began running, making it the first operational LRT system in the country.
    [Show full text]
  • CBRE MARKET INSIGHT - Q3 2015 29Th September, 2015 WE ARE FACING GROWING DISRUPTION in OUR INDUSTRY
    CBRE MARKET INSIGHT - Q3 2015 29th September, 2015 WE ARE FACING GROWING DISRUPTION IN OUR INDUSTRY TECHNOLOGY LEGISLATION 17,000 Vietnamese students in the U.S NEW PLAYERS TRADE 2 CBRE | CBRE MARKET INSIGHTS | Q3 2015 HCMC: 15/09/2015 HANOI: 21/09/2015 3 CBRE | CBRE MARKET INSIGHTS | Q3 2015 4 CBRE | CBRE MARKET INSIGHTS | Q3 2015 1 Economy EU IS NO LONGER WORRIED ABOUT GREECE - NOW IT’S ALL ABOUT MIGRANTS AND CHINA 6 CBRE | CBRE MARKET INSIGHTS | Q3 2015 CONNECTING VIETNAM WORLDWIDE Breaking News – Trans Pacific Partnership Agreement – Deal 98 Percent Done! Estimated boost to real GDP from TPP is highest for Vietnam 2.5% 2.0% 1.5% 1.0% 0.5% 0.0% -0.5% US Peru Laos India Chile China Korea Japan Brunei EU_25 Mexico Canada Vietnam Thailand Australia Malaysia Indonesia Singapore Cambodia RoSEAsia Philippines New Zealand Rest of the world the Rest of Source: Vietnam Institute for Economic and Policy Research 7 CBRE | CBRE MARKET INSIGHTS | Q3 2015 ASEAN ECONOMIC COMMUNITY Number of Greenfield Investments in ASEAN Countries 1. ASEAN would be 7th largest economy 2. 600 million people, 3rd largest working population 3. Open economic: 54% of GDP is from Exports 4. 2013, 279 measures (79.7%) of the AEC Blueprint have been implemented. 5. ASEAN FTA: tariff rates on goods among ASEAN is 0% for ASEAN-6 6. Could triple per capita income by 2030, raising its citizens' quality of life to levels enjoyed today by members of the Organisation for Economic Co-operation and Development (OECD) 8 CBRE | CBRE MARKET INSIGHTS | Q3 2015 GOLD, OIL, STOCK, CURRENCY FLUCTUATIONS Vietnam consumes 14.5 tons of gold in Q2 Oil (WTI) 51.19% y-o-y Global gold 0.6% y-o-y SJC Gold 3.45% y-o-y VN Index 5.52% y-o-y VN Index follows when Shanghai Stock Exchange SBV will hold forex rate steady until early 2016 Composite Index Plunges Currency recovers after the plunge in late-Aug along with Fed’s declaration of delaying interest rate hike.
    [Show full text]
  • Wat Arun Temple Sebagai Tujuan Destinasi Wisata Terbaik Di Bangkok Thailand
    Foreign Case Study 2018 Sekolah Tinggi Pariwasata Ambarrukmo Yogyakarta WAT ARUN TEMPLE SEBAGAI TUJUAN DESTINASI WISATA TERBAIK DI BANGKOK THAILAND M. Deo Reksa Putra 17.02722 Sekolah Tinggi Pariwasata Ambarrukmo Yogyakarta Abstract : Makalah ini merupakan hasil laporan Foreign Case Study untuk syarat publikasi ilmiah di Sekolah Tinggi Pariwasata Ambarrukmo Yogyakarta dengan Judul Wat Arun Temple Sebagai Tujuan Destinasi Wisata Terbaik di Bangkok Thailand. 1. PENDAHULUAN Foreign Case Study (FCS) adalah sebuah kegiatan kewajiban bagi mahasiswa S1 Pariwisata di Sekolah Tinggi Ilmu Pariwisata Ambarrukmo Yogyakarta yang nantinya akan membuat laporan FCS dimana digunakan sebagai standar kualifikasi dan syarat kelulusan. Program FCS ini menuntut mahasiswa untuk melakukan pejalanan ke Luar Negeri untuk mempelajari perbedaan budaya, pengembangan bidang pariwisata di negara lain. Ada beberapa cara yang dapat ditempuh untuk melakukan FCS ini, yaitu Student Exchange, Double Degree, Join Degree, Journey dan program Magang. Thailand adalah salah satu negara di kawasan Asia Tenggara yang berbatasan dengan negara Laos dan Kamboja di sebelah timur dan negara Malaysia dan Teluk Siam di sebelah selatan dan negara Myanmar dan Laut Andaman di sebelah barat. Negara Thailand merupakan negara yang kaya akan keindahan alam dan sejarah hal itu di buktikan dengan banyaknya wisatawan yang datang untuk menikmati keindahan alam dan belajar sejarah ke negara tersebut. Thailand dikenal dengan julukan negara seribu Budha tentunya Thailand memiliki banyak sekali Candi
    [Show full text]
  • Social Impact of Railway Project A
    SOCIAL IMPACT OF RAILWAY PROJECT A CASE STUDY OF MASS RAPID TRANSIT (MRT) JAKARTA, INDONESIA DAMPAK SOSIAL PROYEK KERETA API STUDI KASUS MASS RAPID TRANSIT (MRT) JAKARTA, INDONESIA Listifadah Research and Development Land Transportation-Ministry of Transportation Jl. Medan Merdeka Timur No. 5 Jakarta Pusat 10110 email: [email protected] Diterima: 11 November 2014, Revisi 1: 1 Desember 2014, Revisi 2: 10 Desember 2014, Disetujui: 19 Desember 2014 ABSTRACT Jakarta MRT system had been planned since the 1980’s. Many constraints such as political, finan- cial, as well as bureaucratic make the project delayed for a long time. When the plan scheduled to be implemented in a couple years ago, some protests arise. Communities and some interest group against. The fears of income decline and loss of livelihood become their main concerns which in- duce protests before the project really started. Based on this experience, this paper tries to reveal social impacts of transport development in case MRT Jakarta. Now the project construction is being carried out. Social impact as well as the project construction continues. This study investigate how social impact of railway project was happened. Literatures and documents analysis was used to analyze this study. The result of the study were the MRT Jakarta project inevitably have negative and positive impacts both for society and environment. But with the start of the project after a long delay, it gives hope to the community for better transportation. It is a positive impact before the project was completed. Community engagement in a meeting or discusssion should more be em- phasized in the process in order to minimize the conflicts of interest.
    [Show full text]
  • Charoen Nakhon Thailand
    NAVARANG ASSET PRESENT CHAROEN NAKHON THAILAND About Best Health & Culture Restaurants Wellness Heritage CHAROEN Instagramable NAKHON Coffee Culture ATTRACTIONS! And more ... VOL. 01 MAY 2021 01 CHAROEN NAKHON How to get there? From 40 Suvarnabhumi international mins airport From 20 Sukhumvit rd mins (Siam-Asoke) From 5 BTS Krung mins Thon Buri Charoen Nakhon is located along Thailand’s most majestic river “The Chao Praya”. Widely regarded as Bangkok’s most popular trade route and cultural heritage site. From cool art and lifestyle hubs, ‘trendy cafes, and superb street eats to iconic riverside hotels, not to forget the unique shopping districts, life on Charoen Nakhon has never been more attractive. With the new BTS Gold Line on rails, Charoen Nakhon is one of the most desirable neighborhoods of Bangkok. 02 CHAROEN NAKHON About Charoen Nakhon There are few places in the world that make it possible for The riverside neighborhood can visitors to see its urban areas via boat. Charoen Nakhon is a be reached via a handful of BTS charming neighborhood situated in the Thonburi community on stations, or by boat, which is the western banks of the Chao Phraya River. Thonburi was the oftentimes a faster and more capital of Thailand for a short time in 1768, after Ayutthaya authentic way to see the city. was destroyed by the Burmese. After the capital was moved While many tourists who venture across the river, Thonburi became a separate city, but now it is this way come to stay in one of one of many districts that make up the city of Bangkok.
    [Show full text]