REPORT‐V NH(O)

REPORT‐V [ending March2017] REPORT‐V [ending March 2017]

STATE: STATE: KERALA DETAILS OF ONGOING PROJECTS IN KERALA (P-7) DETAILS OF ONGOING PROJECTS IN KERALA (P-7)

Expenditure Revised Cumulative Final Date of for Current Target date of Name of the Project NH No Old / Date of Original/ San. Cost Length Cumlv Physical Cost/Anticipat Financial expendit Rev / Date of Actual Date of Name of NH Division / Name of the contractor Sl No Length (km) Job No. Agreement/Com Financial completion as per New Revised Sanction Rs . in Cr Completed prog % ed cost in Rs. progress ure in Rs. Completion Completion Executive Enginee /PH No. mencement Year in Rs. contract crore (Rs. Crore) crore crore

FS/Detailed Engineering

Consultancy services for preparation of feasibility report Muvattupuzha/ cum Detailed Project Report (DPR) for widening to two 03.02.2016/ M/s C.V Kand 1 220/183 30.30 31.12.2015 850 0.85 NA 80% 0.85 0.42 0.42 14.08.2016 Smt.P.K.Rema - lane with paved shoulder from km 106/700 to km 137/00 15.03.2016 ConsultantsPvt Ltd 08086395223 (Kottayam to Mundakkayam) on NH 220(New NH-183)

Consultancy services for preparation of feasibility report cum Detailed Project Report (DPR) for widening to two Malappuram/ M/S Dhruv 10.02.2016/ 03.03.2016/ 2 lane with paved shoulder from km 87/000 to km 213/966 53.96 852 1.52 NA 85% 1.52 1.21 1.21 31.08.2016 Sri Gokul Das - Consultancy Services 05.04.2016 15.03.2016 140/960(Nattukal to Chandra Nagar in Palakkad) on NH 08086395238 Pvt Ltd 966(Old NH 213)

Consultancy services for preparation of feasibility report / cum Detailed Project Report (DPR) for widening to two 28.03.2016/ 3 208/744 36 04.03.2016 854 0.7344 NA 90% 0.7344 0.072 0.072 19.09.2016 Smt.Cini.A- M/s KITCO lane with paved shoulder from km 45/0 to km 81/0(Punalur 20.04.2016 08086395216 to Kottavasal) on NH 744(Old NH 208)

Consultancy services for preparation of feasibility report Kollam/ cum Detailed Project Report (DPR) for widening to two 07.04.2016/ M/s Mukesh 4 220/183 45 04.03.2016 853 1.1103 NA 90% 1.1103 0.11 0.11 26.09.2016 Smt.Cini.A- lane with paved shoulder from km0/000 to km 45/000 27.04.2016 &Associates 08086395216 (Kollam to Punalur ) on NH 744(Old NH 208)

Being prepared Consultancy services for preparation of feasibility report by NHAI as 5 cum Detailed Project Report (DPR) for four lane 17/66 12.00 31.12.2015 851 0.34 03.03.2016/ NA 0.34 0.034 0.034 14.08.2016 M/s KITCO stand alone Thalassery-Mahe bypass on NH 17(New NH 66) project

Widening to 2 lane 177.26

Improvement of safety by way of widening of existing 5.5mintermediate lane to 7.0m two lane with geometric Muvattupuzha/ M/s Reji Mathew 15.05.2015 / 14.05.2016 6 improvement of Hill track along with signages,road 220/183 5.72 23.12.2014 835 12.34 5.72 100% 12.04 9.65 11.89 - 30.06.2016 30.06.2016 Smt.P.K.Rema - &Co.Pamplaniyil, 23.05.2015 marking,retaining wall,construction of drains etc.from km 08086395223 Bharananganam 205/180 to km 210/900 on NH-220(New NH-183)

Widening to 2 lane with paved shoulders from km 87/000 Malappuram/ Awarded on M/s ULCCS, 7 to km 133/720 (Nattukal to Thanau Jn in Palakkad) of NH 966/213 46.72 8/10.02.2017 870 294.26 294.26 Sri Gokul Das - 30.03.2017 Kozhikode 966(Old NH 213) on EPC mode 08086395238

Rehablitation and upgradation of NH-85 (Old NH 49) from Muvattupuzha/ km 119/017 to km 161/300 (Design chainage km 119/017 Financial bid 8 85/49 42.28 8/10.02.2017 869 380.76 380.76 0.05 0.05 Smt.P.K.Rema - to km 160/800)(Bodimettu to Munnar) to 2 lane with to be opened 08086395223 paved shoulders on EPC mode

Improvement of Riding Quality (IRQP)

Muvattupuzha/ M/s Antech IRQP from km 0/000 to km 16/000 of NH 185(newly 30.05.2016/ 9 185 16.00 04.03.2016 855 12.25 16.00 100% 12.25 8.62 8.62 06.03.2017 16.02.2017 Smt.P.K.Rema - Construction declared) 07.06.2016 08086395223 Company

C:\Users\User\Downloads\Progress Report NH ending March 1 REPORT‐V NH(O)

REPORT‐V [ending March2017] REPORT‐V [ending March 2017]

STATE: KERALA STATE: KERALA DETAILS OF ONGOING PROJECTS IN KERALA (P-7) DETAILS OF ONGOING PROJECTS IN KERALA (P-7)

Expenditure Revised Cumulative Final Date of for Current Target date of Name of the Project NH No Old / Date of Original/ San. Cost Length Cumlv Physical Cost/Anticipat Financial expendit Rev / Date of Actual Date of Name of NH Division / Name of the contractor Sl No Length (km) Job No. Agreement/Com Financial completion as per New Revised Sanction Rs . in Cr Completed prog % ed cost in Rs. progress ure in Rs. Completion Completion Executive Enginee /PH No. mencement Year in Rs. contract crore (Rs. Crore) crore crore

LOA issued on Kollam/ IRQP from km 0/000 to km 16/100 of NH 183A(newly 20.12.2016. LOA 10 183A 16.10 04.03.2016 856 13.68 0.00 13.68 0 0 NA Smt.Cini.A- M/S Metaguard declared) not accepted by the lowest bidder. 08086395216

M/s. Raji Mathew & Muvattupuzha/ IRQP including geometric improvements from km 73/200 30.05.2016/ Co. 11 185 22.80 04.03.2016 857 18.56 15.00 75% 18.56 8.71 8.71 06.03.2017 Sri.Issac Varghese - to km 96/000 of NH 185(newly declared) 07.06.2016 Pamplaniyil, 08086395223 Bharananganam

M/s. Raji Mathew & Muvattupuzha/ IRQP from km 41/500 to 55/250 of NH 185 (Newly 01.03.16/ WorkCompleted Co. 12 185 13.75 30.12.2015 848 8.92 13.75 100% 9.06 8.55 8.55 02.11.2016 Sri.Issac Varghese - declared) 03.03.16 on 15.01.2017 Pamplaniyil, 08086395223 Bharananganam

Kollam/ Shri Abdul Faizy, IRQP from km 482/000 to 520/400 of NH47 (new 03.10.2015/ Work completed on 13 47/66 38.40 17.02.2015 839 30.58 38.40 100% 31.15 25.95 29.13 0 18.06.2016 NA Smt.Cini.A- M/s. Tarmac NH66) in State of Kerala under PBFF 19.12.15 Dec 2016 08086395216 Builders ()

Kannur/ 20.06.2015 / Shri Moideen kutty 14 IRQP from Km 63/000 to 94/000 of NH 17(NH-66) 17/66 31.00 24.03.2015 842 15.34 31.00 100% 16.6604 12.1 16.64 0 24.06.2016 NA 24.06.2016 Smt.Mini.P.K - 25.06.2015 Haji 08086395242

Alappuzha/ M/s Begora Improvement from km 390/570 to km 406/600 on NH 47 18.03.17/ 15 47/66 16.03 17.10.2016 866 17.00 0.00 1% 17.00 0 17.06.2017 Sri Ajith Kumar.V.V- Infrastructure and [PBFF] 01.04.2017 08086395220 development Pvt Ltd

Construction of Bypasses 154.08 114.15

Construction of 6.80 km 2 lane with paved shoulders Alappuzha bypass on NH47 (New NH 66) from km Alappuzha/ 11.02.2015 / 16 408/100 to 414/900 in the State of Kerala on EPC basis 47/66 6.80 17-01-2014 817 255.75 0.00 55% 348.43 55.05 116.06 - 15.09.2017 NA NA Sri Ajith Kumar.V.V- M/s RDS-CVCC (JV) 16.03.2015 with 50:50 cost sharing between and 08086395220 (MORTH)

Construction of 13.0 km 2 lane with paved shoulders Kollam bypass on NH47 (New NH 66) from km 486/500 Kollam/ 11.02.2015 / 17 to 499/500 in the State of Kerala on EPC basis with 50:50 47/66 13.00 17-01-2014 818 267.16 0.00 56% 352.05 53.09 123.96 - 26.11.2017 NA NA Smt.Cini.A- M/s RDS-CVCC (JV) 27.05.2015 cost sharing between Government of Kerala and 08086395216 Government of India (MORTH)

C:\Users\User\Downloads\Progress Report NH ending March 2 REPORT‐V NH(O)

REPORT‐V [ending March2017] REPORT‐V [ending March 2017]

STATE: KERALA STATE: KERALA DETAILS OF ONGOING PROJECTS IN KERALA (P-7) DETAILS OF ONGOING PROJECTS IN KERALA (P-7)

Expenditure Revised Cumulative Final Date of for Current Target date of Name of the Project NH No Old / Date of Original/ San. Cost Length Cumlv Physical Cost/Anticipat Financial expendit Rev / Date of Actual Date of Name of NH Division / Name of the contractor Sl No Length (km) Job No. Agreement/Com Financial completion as per New Revised Sanction Rs . in Cr Completed prog % ed cost in Rs. progress ure in Rs. Completion Completion Executive Enginee /PH No. mencement Year in Rs. contract crore (Rs. Crore) crore crore

Construction of balance portion of service road left out Time extension up from km 402/500 to 404/580, Extension of Box culvert to 6 months or Kodungalloor/ Shri Abdul Faizy, at km 402/810, Construction of 3.08km CCdrain, 14.11.2014 / 18 47/66 2.00 07.08.2014 832 15.13 0.00 95% 15.13 2.68 12.09 - 19.05.2016 subject to the NA Smt.Sreemala - M/s. Tarmac Construction of 225m retaining wall and road safety 20.11.2014 decision of DRE 08086395228 Builders (India) works on Kodungallur By-pass on NH -17 (New NH- whichever is earlier 66)

Total Length 779.20 Major Bridges

Kodungalloor/ Rehabilitation of existing bridge - Special repair to 08.05.2013 / M/s. Padmaja 19 17/66 89 15.01.2013 3.34 NA 100% 5.18 0.48 4.62 - 28.02.2014 30.04.2016 30.04.2016 Smt.Sreemala - Chettuva Bridge at Km 369/600 of NH17 01.06.2013 Specialities 08086395228 001-Kerala-2012-13

Kodungalloor/ Rehabilitation of existing bridge - Special repair to 05.04.2013 / M/s. Padmaja 20 17/66 15.01.2013 2.59 NA 100% 4.28 0.96 3.36 - 26.01.2014 31.05.2016 31.05.2016 Smt.Sreemala - Puduponnani Bridge at Km 342/400 of NH17 27.04.2013 Specialities 08086395228 002-Kerala-2012-13

30.07.2016 Muvattupuzha/ Construction of Vandiperiyar bridge at km 200/850 06.01.2015 / M/s. Akshaya 21 220/183 12.02.2014 820 9.51 NA 100% 9.51 4.6 7.01 - EOT granted 12.01.2017 NA Smt.P.K.Rema - (EPC Mode) 20.01.2015 Builders till 13.12.2016 08086395223

Kannur/ Rehabilitation of Valapattanam Bridge near km 10.04.2015 Work completed on M/s.Padmaja 22 17/66 05.03.2014 828 4.36 NA 100% 4.36 3.67 4.28 - 17.04.16 NA Smt.Mini.P.K - 147/250 in NH17 /18.04.2015 17.12.2016 Specialities 08086395242

Kannur/ 02.08.2014 / M/s.Padmaja 23 Rehabilitation of Mahe Bridge near km 184/600 of NH17 17/66 05.03.2014 830 1.07 NA 100% 1.1694 0.62 1.14 - 25.02.2015 31.05.2016 31.05.2016 Smt.Mini.P.K - 22.08.2014 Specialities 08086395242

Construction of 2-lane bridge over Ponnani Cochin Canal Kodungalloor/ (Canoli canal) and its approaches in aggregate length of 21.05.2015 / M/s. EKK & 24 17/66 1 31.03.2014 831 40.62 NA 95% 46.5 16.5 34.18 - 03.06.2017 NA NA Smt.Sreemala - 1.54 km of NH17 from km 332/650 to km 333/900 (on 04.06.15 Company. 08086395228 EPC mode)

C:\Users\User\Downloads\Progress Report NH ending March 3 REPORT‐V NH(O)

REPORT‐V [ending March2017] REPORT‐V [ending March 2017]

STATE: KERALA STATE: KERALA DETAILS OF ONGOING PROJECTS IN KERALA (P-7) DETAILS OF ONGOING PROJECTS IN KERALA (P-7)

Expenditure Revised Cumulative Final Date of for Current Target date of Name of the Project NH No Old / Date of Original/ San. Cost Length Cumlv Physical Cost/Anticipat Financial expendit Rev / Date of Actual Date of Name of NH Division / Name of the contractor Sl No Length (km) Job No. Agreement/Com Financial completion as per New Revised Sanction Rs . in Cr Completed prog % ed cost in Rs. progress ure in Rs. Completion Completion Executive Enginee /PH No. mencement Year in Rs. contract crore (Rs. Crore) crore crore

Rehabiltation of Ambalapuzha ROB at km 425/000 and 4 EOT granted till minor bridges in between km 366/905 and km 387/300 Alappuzha/ 22.06.16/ 31.12.2016; EOT M/s Nath 25 namely Chandiroor Bridge at km 370/915,Kuthiathodu 47/66 04.03.2016 862 2.96 NA 95% 3.4081 2.55 2.55 26.09.16 Sri Ajith Kumar.V.V- 27.06.16 applied till Construction bridge at km 376/392,Ponnamveli bridge at km 382/315 & 08086395220 31.01.2017 Puthenthodu bridge at km 385/920 on NH-66 (old NH-47)

Kozhikkode/ Construction of Pathiri bridge at km 89/400 on NH 766 23.01.2017/ 26 212/766 17.10.2016 865 5.23 1% 5.23 0 0 22.01.2018 Shri.Vinayaraj.K - Sri. Rajeev (Old NH 212) 08086395234

NHAI proposed 6 laning in same reach. Kozhikkode/ Reconstruction of Karimpannpalam bridge and approaches 27 17/66 06.12.2016 868 12.71 Decision to 12.71 0 0 Shri.Vinayaraj.K - from km 200/000 to km 201/000 of NH 66 taken 08086395234 regarding execution of work NHAI proposed 6 laning in same Kozhikkode/ Reconstruction of Palolipalam bridge and approaches from reach. 28 17/66 07.12.2016 867 12.33 12.33 0 0 Shri.Vinayaraj.K - km 201/000 to km 202/000 of NH 66 Decision to taken 08086395234 regarding execution of work Minor Bridges

Rehabilitation of Shiriya Bridge at km 36/100, Kumbala Kannur/ 30.05.2016/ 29 Bridge at km 38/525 and Nileswaram bridge at km 93/320 66/17 04.03.2016 863 3.0774 70% 3.0774 1.32 1.32 08.03.17 Smt.Mini.P.K - P.K Sulphikar 09.06.2016 of NH 66(Old NH 17) 08086395242

Muvattupuzha/ Construction of parallel bridge to iron bridge at km 02.03.2015 / 30 49/85 10.02.2014 822 5.904 NA 100% 5.904 3.86 4.13 - 01.09.2016 31.01.2017 28.02.2017 Smt.P.K.Rema - M/s.Akshya Builders 174/000 (Kallar Bridge) (EPC Mode) 07.03.2015 08086395223

Kollam/ Reconstruction of Kazhuthurutty Bridge at km 69/960 EOT applied till Sri. KN 31 208/744 31.03.2015 843 3.35 16.09.2015/ NA 5% 3.35 0.004 0.004 - 15-06-2016 NA Smt.Cini.A- of NH-744 10.07.2017 Madusoothanan 08086395216

Kollam/ Reconstruction of Muruganpanchal Bridge at km 76/00 EOT applied till Sri. KN 32 208/744 31.03.2015 844 3.25 16.09.2015/ NA 5% 3.25 00- 15-06-2016 NA Smt.Cini.A- of NH-744 10.07.2017 Madusoothanan 08086395216

Road Safety Works

C:\Users\User\Downloads\Progress Report NH ending March 4 REPORT‐V NH(O)

REPORT‐V [ending March2017] REPORT‐V [ending March 2017]

STATE: KERALA STATE: KERALA DETAILS OF ONGOING PROJECTS IN KERALA (P-7) DETAILS OF ONGOING PROJECTS IN KERALA (P-7)

Expenditure Revised Cumulative Final Date of for Current Target date of Name of the Project NH No Old / Date of Original/ San. Cost Length Cumlv Physical Cost/Anticipat Financial expendit Rev / Date of Actual Date of Name of NH Division / Name of the contractor Sl No Length (km) Job No. Agreement/Com Financial completion as per New Revised Sanction Rs . in Cr Completed prog % ed cost in Rs. progress ure in Rs. Completion Completion Executive Enginee /PH No. mencement Year in Rs. contract crore (Rs. Crore) crore crore

Providing traffic Safety measures including improvement Muvattupuzha/ of junctions,construction of drains,extension of 26.05.2016/ EOT applied till 33 183/220 04.03.2016 860 6.32 NA 60% 6.32 2.23 2.23 31.01.2017 Smt.P.K.Rema - M/s.Akshya Builders culvert,retaining wall and traffic sign boards in between km 01.06.2016 24.03.2017 08086395223 137/200 to 172/700 on Nh 183(Old NH 220)

Providing road Safety measures between km 104/000 to 126/000 of NH 17(New NH 66) including easing of Kannur/ curves,widening of junction from km 114/750 to km 04.07.16/ 34 66/17 04.03.2016 861 6.68 NA 20% 6.68 2.39 2.39 13.04.17 Smt.Mini.P.K - P.K Sulphikar 115/300 &widening of existing carriage way in selected 14.07.2016 08086395242 reaches,construction of drain , extension of culvert,construction of retaining wall etc

Providing road Safety measures between km151/270 to km 184/600 including easing of curves, construction of drain, Kannur/ 04.07.16/ 35 extension of culvert, construction of retaining wall and 66/17 04.03.2016 859 18.90 NA 20% 18.90 2.99 2.99 13.04.17 Smt.Mini.P.K - P.K Sulphikar 14.07.2016 renewal of surface from km 151/270 to km 157/000 and 08086395242 from km 174/000 to 184/600 of NH17

Providing following traffic safety measures between km 264/100 to km 267/500, km 271/700 to km275/950, km Malappuram/ 07.06.16/ 36 276/750 to km277/400,km282/400 to km287/200,km 66/17 04.03.2016 858 15.64 NA 85% 15.64 11.44 11.44 16.06.2017 Sri Gokul Das - M/s Malabar Tech 17.06.16 295/00 to 305/500 and km 312/000 to km316/500 of NH 08086395238 66(Old NH 17)

Kozhikkode/ Providing following road safety measures between km 15/0 29.02.2016/ Eot applied till June 37 212/766 19.10.2015 846 19.7468 NA 75% 20.12 4.26 7.31 03.03.17 Shri.Vinayaraj.K - M/s. K Ravindran to 57/0 of Calicut Kollangal road of NH 766(Old NH 212) 04.03.16 2017 08086395234

Providing following road safety measures between km Muvattupuzha/ 26.02.2016/ Work completed on M/S Madathil 38 169/700 to km 170/700 and from km170/800 to 172/200 49/85 19.10.2015 845 6.645 NA 100% 6.65 4.06 4.06 26.12.16 Smt.P.K.Rema - 26.02.16 25.12.2016 Enterprises on NH -85(Old NH-49) 08086395223

Design drawing to be Awarded on approved. 03.03.2016.Ag Construction of gabion wall with necessary road safety Permission Kollam/ reement M/S Akshaya 39 measures from km 45/700 to km 46/100 on NH 208(New 208/744 03.12.2015 847 2.39 NA from railway 2.39 0 0 - _ _ Smt.Cini.A- executed on Builders NH-744) expected to be 08086395216 04.03.2016 obtained by 1st week of Nov 2016

C:\Users\User\Downloads\Progress Report NH ending March 5 REPORT‐V NH(O)

REPORT‐V [ending March2017] REPORT‐V [ending March 2017]

STATE: KERALA STATE: KERALA DETAILS OF ONGOING PROJECTS IN KERALA (P-7) DETAILS OF ONGOING PROJECTS IN KERALA (P-7)

Expenditure Revised Cumulative Final Date of for Current Target date of Name of the Project NH No Old / Date of Original/ San. Cost Length Cumlv Physical Cost/Anticipat Financial expendit Rev / Date of Actual Date of Name of NH Division / Name of the contractor Sl No Length (km) Job No. Agreement/Com Financial completion as per New Revised Sanction Rs . in Cr Completed prog % ed cost in Rs. progress ure in Rs. Completion Completion Executive Enginee /PH No. mencement Year in Rs. contract crore (Rs. Crore) crore crore

Design drawing to be Awarded on approved. 03.03.2016.Ag Construction of gabion wall with necessary road safety Permission Kollam/ reement M/S Akshaya 39 measures from km 45/700 to km 46/100 on NH 208(New 208/744 03.12.2015 847 2.39 NA from railway 2.39 0 0 - _ _ Smt.Cini.A- executed on Builders NH-744) expected to be 08086395216 04.03.2016 obtained by 1st week of Nov 2016

Providing traffic Safety measures including geometric Muvattupuzha/ improvement to carriage way, providing crash barrier and 01.03.2016/ Work completed M/s. Raji Mathew & 40 49/85 30.12.2015 849 2.08 NA 100% 2.08 1.57 1.57 - 02.07.16 Smt.P.K.Rema - traffic safety measures from km 174/000 to 183/000 of NH 03.03.16 on 27.06.2016 Co. 08086395223 49

EOT granted till Providing traffic safety measures at various Black Work expected to Trivandrum/ M/s. Metaguard 12.03.15/ 22.05.2016 41 spots and accident prone location b/w km 520/400 to 47/66 04.02.2015 837 8.25 NA 98% 8.25 0.01 0.01 - 12.03.2016 complete on Smt. Bindhu.R- Engineers 23.12.2015 applied for EOT 544/000 of NH 66(Old NH-47) 07.04.2017 08086395212 upto 30.1.2017

Extension of 14 Nos of culverts from km 164/000 to km Muvattupuzha/ M/s. Antech 21.05.2015 / Work completed 42 167/300 and construction of retaining walls(aggregate 49/85 17.02.2015 840 3.57 NA 100% 3.56 2.48 3.47 - 24.02.2016 Smt.P.K.Rema - Construction 25.05.2015 on 07.10.2016 length of 730m) in NH 49 08086395223 Company

Providing traffic safety measures including Muvattupuzha/ reconstruction of damaged culverts and construction of 26.06.2015 M/s. Akshaya 43 220/183 20.03.2015 841 11.72 NA 100% 11.72 6.12 9.62 - 28.06.2016 NA Smt.P.K.Rema - drains from Km 106/700 to Km 215/485 of NH-183(Old /29.06.2015 Builders 08086395223 NH-220)

Utility shifting of electrical poles from km 15/656 to km Expected to Malappuram/ Kerala State 44 87/000 in Malappuram District & km 87/000 to km 213/966 04.03.2014 827 1.52 NA NA 95% 1.52 0 1.19 - 31.03.2016 complete on NA Sri Gokul Das - Electricity Board. 134/000 In Palakkad District on NH213 31.12.2016 08086395238

Utility shifting of electrical poles from km 20/000 to km Expected to Kollam/ Kerala State 45 33/000 and km 40/000 to km 81/250 on NH-744 (Old NH 208/744 04.03.2014 825 0.97 NA NA 90% 0.97 0 0.97 - 30.06.2015 complete on NA Smt.Cini.A- Electricity Board. 208) 31.12.2016 08086395216

Expected to Kozhikkode/ Utility shifting of electrical poles from km 15/000 to km Kerala State 46 212/766 04.03.2014 826 1.04 NA NA 80% 1.04 0 0.71 - 30.06.2015 complete on NA Shri.Vinayaraj.K - 107/000 of NH 212 Electricity Board. 31.12.2016 08086395234

1754.10

C:\Users\User\Downloads\Progress Report NH ending March 6