A Study on Flyover Construction with Ecotechnical Road System
Total Page:16
File Type:pdf, Size:1020Kb
© 2018 JETIR June 2018, Volume 5, Issue 6 www.jetir.org (ISSN-2349-5162) A STUDY ON FLYOVER CONSTRUCTION WITH ECOTECHNICAL ROAD SYSTEM Vishnu Vijayan1 , Athira Anil2, Feba Mariam James3 , M V Karthika4, Malavika Suresh5, Sreekandan B R6 1Assistant Professor, Department of Civil Engineering, BMCE, Kerala, India 2,3,4,5,6Final Year B.tech Civil engineering Students, BMCE Kerala Abstract - Our project deals with planning and proposal of a Therefore, the introduction of flyover suits best for the situation. flyover at Kallumthazham which is located at the heart of A flyover connecting the bypass and Mevaram road can Kollam , Kerala and will become the center of attraction by the effectively reduce the traffic congestion in the junction. By coming of Kollam bypass. This place is one of the most accident using Echotechnic road system, we aimed at a more prone areas in the city. To reduce the traffic congestion at the environment friendly, safer pavement promoting safe passage region, a flyover connecting the bypass in the Mevaram- for vehicles. Echotechnic road system mainly includes changes Kavanad side of Kollam city is proposed. The flyover at the done in the pavements which can control air pollution, water region is introduced using echo-technic road system. Echo- logging on road surface and can increase the durability of the technic road system is mainly focused on move towards a green road as well as reduce fatal accidents on roads. For the control infrastructure. It is a concept of an integrated infrastructure of air pollution, we use TiO2 in the pavement which absorbs air based on the most innovative technologies adopted inorder to dust and lets the atmosphere clean. By the use of permeable control global air pollution due to traffic as well as water pavements, the water logging on road surface can be reduced logging on road surfaces. These technologies can hence promote thus prevent skidding of vehicles thereby reducing accidents. smooth transportation at the junction with reduced accident Due to the use of porous asphalt in the road section, water will rates. As for air quality treatment, the main solution is the not sustain in the surface of roads and thus durability of road treatment of pollutants as close to the sources as possible. surface can be assured. Therefore photo catalytic materials can be added to the surface of pavement and building material. The pollutants are 1.1 OBJECTIVES OF THE PROJECT neutralized by the action of light and then gets washed away by ➢ The overall objective of the flyover is to provide an rain. Hence air pollution due to traffic can be controlled. equitable balance of safe and efficient movement of Particles get charged and then grounded which can be cleaned traffic through intersections. periodically. For the successful completion of the project, we ➢ The public felt inconvenience to cross Kallumthazham have mainly conducted the site survey and feasibility study of junction. As a solution to ease the transportation the region. Also; both traffic and rainfall data were collected. problem, the introduction of a flyover was very We further conducted tests for controlling air pollution and also necessary at the region. for water absorption. For water controlling measurements, ➢ To minimise the global air pollution and disturbances pavements with filtering type nature is to be provided. To due to traffic, an Echotechnic road system is prevent water logging, the pavements should be laid with implemented. permeable layers which act as a water absorbing or filtration ➢ The features of an Echotechnic roadway is such that unit beneath the top layer and hence the water will not be there can be an easy flow of traffic in the region and accumulated as such on the road surface. the chances of accidents can be very much decreased. ➢ Due to the commencement of the flyover at Keywords- Flyover , Ecotechnic road system , air pollution test, Kallumthazham, there will an easy path between water absorption test Alappuzha and Trivandrum. So emergency vehicles like ambulances can easily reach the medical hospitals 1. INTRODUCTION at different cities. A Flyover is a bridge constructed along an intersecting highway ➢ Moreover time can be very much saved due to the over an at-grade intersection. Flyover is one of the methods for absence of traffic signal at the region. solving traffic problems at-grade junctions on a highway including capacity, congestion, long delay and queue length. The area of the proposed flyover is at Kallumthazham, which is 1.2 SCOPE OF THE PROJECT the intersecting point of two national highways NH66 bypass, Kollam and NH744 passing through the Kollam city, Kerala. The traffic volume of the region can be largely Many educational institutions, hospitals and other important controlled since there is no signal system in the region. institutions of the city are located near to this region, As a result, Delay at Kallumthazham intersection can be reduced high traffic density is likely to be occurred here especially due to the absence of signal system. intersection, time during the morning and evening peak hours. From the traffic management can be done very efficiently and there study conducted on the region, it was seen that the present will not be wastage of travel time. system to be installed by the bypass authority, i.e. the traffic Due to the presence of certain materials in the signaling will not work satisfactorily there. By the completion of pavement, air pollution can be controlled to a great Kollam bypass road, the situation is likely to get worse. extend JETIR1806181 Journal of Emerging Technologies and Innovative Research (JETIR) www.jetir.org 411 © 2018 JETIR June 2018, Volume 5, Issue 6 www.jetir.org (ISSN-2349-5162) Replacing the normal pavement with permeable or PASSENGERCARS, 378 1 378 538 1 538 porous concrete can absorb water from the road surface AUTORICKSHAW, and can let the top surface of the road clean and dry quickly. PICKUPS MOTORCYCLE, 511 .5 255.5 678 .5 339 2. CASE STUDY AT KALLUMTHAZHAM SCOOTER JUNCTION AGRICULTURE 5 1.5 7.5 12 1.5 18 TRACTOR,LIGHT COMMERCIAL VEHICLE TRUCK,BUS 42 3 126 77 3 121 TRACTOR,TRUCK 0 4.5 0 0 4.5 0 TOTAL FAST 767 118 2 SLOW VEHICLES CYCLES 4 .5 2 2 .5 1 CYCLE RICKSHAWS 1.5 1.5 HANDCART 3 3 HORSE DRAWN 4 4 Fig : 2.1 Kallumthazham Junction 3. TRAFFIC STUDY 4. RAINFALL INTENSITY DATA The objective of rainfall intensity collection is useful in the It helps in geometric design and traffic control, which tend to design of urban drainage works example storm sewers, culverts, safe and efficient traffic movement. and other hydraulic structure. The intensity of rainfall is the Traffic studies for collection of data are also known as traffic measure of the amount of rain that fall over time. Intensity of census. Traffic survey was made on 29/01/2018 and 30/01/2018, rain is measured in the height of water layer covering the ground in the project site from 8:00 am to 10:00 am and 3:30 pm to 5:00 in a period of time. It means that if the rain stays where it falls it pm. This time was selected on the basis of the past traffic study form a layer of certain height. as an average of peak hour. All the three junctions of the site observed and number of vehicles Passed was converted to PCU These datas are used: ( passenger car unit) ● Design of hydraulic structures , roads, urban Identification of the Peak Hours drainage system The traffic flow along a road does not remain constant ● Land use planning and soil conservation throughout a day or week but varies with both space and time. studies The peak hour represents the most critical period for operations Management of municipal infrastructure and has the highest capacity requirements for a given location. including sewers ,storm water management, Two peak hours of the day were identified from the traffic data ponds and street curbs collected respectively for Kollam- Punalur route, Kollam Meravam junction and Mevaram Punalur route .Traffic surveys ● Design of safe and economical structures were carried out from 6:30 am to 9:30 am and 3.30 to 6.30 ● Risk assessment of dams and bridges Separation of the Traffic Flow ● Design of roof and storm water drainage To cause minimum disturbance to the traffic along Kollam system Kallumthazham road (the main traffic flow), a flyover was ● Flood plain management proposed. ● Soil conservation studies ENTERING TO KOLLAM FROM 6.30 AM TO 9.30 AM DAILY RAINFALL(MM) Sl ENTERING TO KOLLAM STATION : KOLLAM ENTERING MEVARAM PUNALOOR YEAR:2016 1 FAST VEHICLES NO PCU PCU NOS PCU PCU Da 1 2 3 4 5 6 7 8 9 10 11 12 te EQU EQU JETIR1806181 Journal of Emerging Technologies and Innovative Research (JETIR) www.jetir.org 412 © 2018 JETIR June 2018, Volume 5, Issue 6 www.jetir.org (ISSN-2349-5162) 01 0 0 0 0 0 6 0 3 0 0 4.5 0 02 0 0 0 0 0 20 27 0 0 0 5.1 0 5. ECHO TECHNIC ROAD SYSTEM 03 0 0 0 0 0 4 5 0 0 0 2 0 As rivers and mountains naturally reclaim the geographical 04 0 0 0 0 0 0 3.5 4 0 0 0 0 composition of continents, so ground transportation systems dominate the physical planning of landscapes and cities. These 05 0 0 0 0 0 0 4 1 0 0 0 0 2 man-made systems/barriers offer freedom of movement to people and goods in society on the one hand, while having 06 0 0 0 0 0 17 7 1 0 4 0 0 almost irreversible consequences for communities and natural 2 habitats along roads and railways on the other hand.