A Study on Flyover Construction with Ecotechnical Road System

Total Page:16

File Type:pdf, Size:1020Kb

A Study on Flyover Construction with Ecotechnical Road System © 2018 JETIR June 2018, Volume 5, Issue 6 www.jetir.org (ISSN-2349-5162) A STUDY ON FLYOVER CONSTRUCTION WITH ECOTECHNICAL ROAD SYSTEM Vishnu Vijayan1 , Athira Anil2, Feba Mariam James3 , M V Karthika4, Malavika Suresh5, Sreekandan B R6 1Assistant Professor, Department of Civil Engineering, BMCE, Kerala, India 2,3,4,5,6Final Year B.tech Civil engineering Students, BMCE Kerala Abstract - Our project deals with planning and proposal of a Therefore, the introduction of flyover suits best for the situation. flyover at Kallumthazham which is located at the heart of A flyover connecting the bypass and Mevaram road can Kollam , Kerala and will become the center of attraction by the effectively reduce the traffic congestion in the junction. By coming of Kollam bypass. This place is one of the most accident using Echotechnic road system, we aimed at a more prone areas in the city. To reduce the traffic congestion at the environment friendly, safer pavement promoting safe passage region, a flyover connecting the bypass in the Mevaram- for vehicles. Echotechnic road system mainly includes changes Kavanad side of Kollam city is proposed. The flyover at the done in the pavements which can control air pollution, water region is introduced using echo-technic road system. Echo- logging on road surface and can increase the durability of the technic road system is mainly focused on move towards a green road as well as reduce fatal accidents on roads. For the control infrastructure. It is a concept of an integrated infrastructure of air pollution, we use TiO2 in the pavement which absorbs air based on the most innovative technologies adopted inorder to dust and lets the atmosphere clean. By the use of permeable control global air pollution due to traffic as well as water pavements, the water logging on road surface can be reduced logging on road surfaces. These technologies can hence promote thus prevent skidding of vehicles thereby reducing accidents. smooth transportation at the junction with reduced accident Due to the use of porous asphalt in the road section, water will rates. As for air quality treatment, the main solution is the not sustain in the surface of roads and thus durability of road treatment of pollutants as close to the sources as possible. surface can be assured. Therefore photo catalytic materials can be added to the surface of pavement and building material. The pollutants are 1.1 OBJECTIVES OF THE PROJECT neutralized by the action of light and then gets washed away by ➢ The overall objective of the flyover is to provide an rain. Hence air pollution due to traffic can be controlled. equitable balance of safe and efficient movement of Particles get charged and then grounded which can be cleaned traffic through intersections. periodically. For the successful completion of the project, we ➢ The public felt inconvenience to cross Kallumthazham have mainly conducted the site survey and feasibility study of junction. As a solution to ease the transportation the region. Also; both traffic and rainfall data were collected. problem, the introduction of a flyover was very We further conducted tests for controlling air pollution and also necessary at the region. for water absorption. For water controlling measurements, ➢ To minimise the global air pollution and disturbances pavements with filtering type nature is to be provided. To due to traffic, an Echotechnic road system is prevent water logging, the pavements should be laid with implemented. permeable layers which act as a water absorbing or filtration ➢ The features of an Echotechnic roadway is such that unit beneath the top layer and hence the water will not be there can be an easy flow of traffic in the region and accumulated as such on the road surface. the chances of accidents can be very much decreased. ➢ Due to the commencement of the flyover at Keywords- Flyover , Ecotechnic road system , air pollution test, Kallumthazham, there will an easy path between water absorption test Alappuzha and Trivandrum. So emergency vehicles like ambulances can easily reach the medical hospitals 1. INTRODUCTION at different cities. A Flyover is a bridge constructed along an intersecting highway ➢ Moreover time can be very much saved due to the over an at-grade intersection. Flyover is one of the methods for absence of traffic signal at the region. solving traffic problems at-grade junctions on a highway including capacity, congestion, long delay and queue length. The area of the proposed flyover is at Kallumthazham, which is 1.2 SCOPE OF THE PROJECT the intersecting point of two national highways NH66 bypass, Kollam and NH744 passing through the Kollam city, Kerala. The traffic volume of the region can be largely Many educational institutions, hospitals and other important controlled since there is no signal system in the region. institutions of the city are located near to this region, As a result, Delay at Kallumthazham intersection can be reduced high traffic density is likely to be occurred here especially due to the absence of signal system. intersection, time during the morning and evening peak hours. From the traffic management can be done very efficiently and there study conducted on the region, it was seen that the present will not be wastage of travel time. system to be installed by the bypass authority, i.e. the traffic Due to the presence of certain materials in the signaling will not work satisfactorily there. By the completion of pavement, air pollution can be controlled to a great Kollam bypass road, the situation is likely to get worse. extend JETIR1806181 Journal of Emerging Technologies and Innovative Research (JETIR) www.jetir.org 411 © 2018 JETIR June 2018, Volume 5, Issue 6 www.jetir.org (ISSN-2349-5162) Replacing the normal pavement with permeable or PASSENGERCARS, 378 1 378 538 1 538 porous concrete can absorb water from the road surface AUTORICKSHAW, and can let the top surface of the road clean and dry quickly. PICKUPS MOTORCYCLE, 511 .5 255.5 678 .5 339 2. CASE STUDY AT KALLUMTHAZHAM SCOOTER JUNCTION AGRICULTURE 5 1.5 7.5 12 1.5 18 TRACTOR,LIGHT COMMERCIAL VEHICLE TRUCK,BUS 42 3 126 77 3 121 TRACTOR,TRUCK 0 4.5 0 0 4.5 0 TOTAL FAST 767 118 2 SLOW VEHICLES CYCLES 4 .5 2 2 .5 1 CYCLE RICKSHAWS 1.5 1.5 HANDCART 3 3 HORSE DRAWN 4 4 Fig : 2.1 Kallumthazham Junction 3. TRAFFIC STUDY 4. RAINFALL INTENSITY DATA The objective of rainfall intensity collection is useful in the It helps in geometric design and traffic control, which tend to design of urban drainage works example storm sewers, culverts, safe and efficient traffic movement. and other hydraulic structure. The intensity of rainfall is the Traffic studies for collection of data are also known as traffic measure of the amount of rain that fall over time. Intensity of census. Traffic survey was made on 29/01/2018 and 30/01/2018, rain is measured in the height of water layer covering the ground in the project site from 8:00 am to 10:00 am and 3:30 pm to 5:00 in a period of time. It means that if the rain stays where it falls it pm. This time was selected on the basis of the past traffic study form a layer of certain height. as an average of peak hour. All the three junctions of the site observed and number of vehicles Passed was converted to PCU These datas are used: ( passenger car unit) ● Design of hydraulic structures , roads, urban Identification of the Peak Hours drainage system The traffic flow along a road does not remain constant ● Land use planning and soil conservation throughout a day or week but varies with both space and time. studies The peak hour represents the most critical period for operations Management of municipal infrastructure and has the highest capacity requirements for a given location. including sewers ,storm water management, Two peak hours of the day were identified from the traffic data ponds and street curbs collected respectively for Kollam- Punalur route, Kollam Meravam junction and Mevaram Punalur route .Traffic surveys ● Design of safe and economical structures were carried out from 6:30 am to 9:30 am and 3.30 to 6.30 ● Risk assessment of dams and bridges Separation of the Traffic Flow ● Design of roof and storm water drainage To cause minimum disturbance to the traffic along Kollam system Kallumthazham road (the main traffic flow), a flyover was ● Flood plain management proposed. ● Soil conservation studies ENTERING TO KOLLAM FROM 6.30 AM TO 9.30 AM DAILY RAINFALL(MM) Sl ENTERING TO KOLLAM STATION : KOLLAM ENTERING MEVARAM PUNALOOR YEAR:2016 1 FAST VEHICLES NO PCU PCU NOS PCU PCU Da 1 2 3 4 5 6 7 8 9 10 11 12 te EQU EQU JETIR1806181 Journal of Emerging Technologies and Innovative Research (JETIR) www.jetir.org 412 © 2018 JETIR June 2018, Volume 5, Issue 6 www.jetir.org (ISSN-2349-5162) 01 0 0 0 0 0 6 0 3 0 0 4.5 0 02 0 0 0 0 0 20 27 0 0 0 5.1 0 5. ECHO TECHNIC ROAD SYSTEM 03 0 0 0 0 0 4 5 0 0 0 2 0 As rivers and mountains naturally reclaim the geographical 04 0 0 0 0 0 0 3.5 4 0 0 0 0 composition of continents, so ground transportation systems dominate the physical planning of landscapes and cities. These 05 0 0 0 0 0 0 4 1 0 0 0 0 2 man-made systems/barriers offer freedom of movement to people and goods in society on the one hand, while having 06 0 0 0 0 0 17 7 1 0 4 0 0 almost irreversible consequences for communities and natural 2 habitats along roads and railways on the other hand.
Recommended publications
  • Budget Speech 201 9-2020
    ',il,pstilittltanafit{c ilAHlfitr BUDGET SPEECH 201 9-2020 Dr. T.M. Thomas lsaac 31*t January, 2019 Minister for Finance BUDGET SPEFCH 2019-20 By Dr. T.M. THOMAS ISSAG FINANCE MINISTER 31st JANUARY, 2019 GOVERNMENT OF KERALA CONTENTS Pages Part - | Preface 1 Part - ll 25 Projects for a New Kerala I Part - lll Development Sectors 46 Part - lV FiscalAnalysis 84 Conclusion 101 4t35DOl9 - rA PREFACE Sir, 01. In the last year we have survived two disasters. The first one is extreme rainfall and the floods of Jury-August, which was the heaviest froods witnessed by this generation. The world watched in amazement the unity launched under the leadership of the Chief Minister with precise planning, resource mobilisation and speedy execution under constant vigil and supervision. Everyone, including fish workers, common peopte, the youth, Non-Resident Indians, and officials had joined hands with the sole aim to confront the disaster. The ensuing urgent rehabilitation activities were successfully implemented in an exemplary manner. Now is the phase of reconstruction. I am presenting the Budget 2O1g-20 ot this State Government, which has undertaken the responsibility of reconstruction, before this house. 02. The vision of Sree Narayana Guru that "whatever be the religion, attire or language their cast is one" is most relevant at this time. As envisaged by the Guru, the renaissance remoulded Malayalees as the "human castd," Along with modernizing its people, renaissance also attempted reforming the society of Kerala as a whole. That is why Narayana Guru persuaded the great poet Kumaran Asan to start a tile factory.
    [Show full text]
  • Construction and Infrastructure- Mar'21
    Construction and Infrastructure- Mar’21 VP Research: Shravan Shah Associate: Maulik Shah/Parth Bhavsar Tel: +91 22 40969749 Tel: +91 22 40969775 E-mail: [email protected] E-mail: [email protected]/[email protected] April 09, 2021 April 09, 2021 2 Monthly Update - Mar 2021 Announcement of New Investments . New investments announced up by 75.4% YoY to Rs1,722 bn (up 60.3% MoM) ACIL in Mar’21, primarily due to increase in Roads/ Power which was partially offset CMP / Target by fall in Others/ Railway. New investments announced in FY21 decreased Rs293/Rs326 13.4% YoY to Rs10,595.1 bn owing to the fall in Others/ Railways which was 3 partially offset by rise in Manufacturing/ Roads. DBL . Manufacturing segment saw a major portion of new investments with 35.5% CMP / Target Rs 575 / Rs 569 share followed by Roads/ Power at 20.6%/ 15.0% in Mar’21 HG Infra . Higher concentration of new investments announced was seen in Odisha with 30.8% share followed by Uttar Pradesh with 14.2% share. CMP / Target Rs 2 83 / Rs 410 . Major Projects announced in Mar’21 includes Integrated Steel Plant (Kendrapada) (Rs500 bn), Ganga Expressway (Ubariya Khurd-Sarso) Project J Kumar (Group-III) (Rs58.1 bn) and Pumped Storage Hydel Power (Shahpur) Project CMP/ Target Rs 1 93 / Rs 267 (Rs118.8 bn) KNR Tenders Published CMP / Target Rs 218 / Rs 240 . Tenders issued increased 82.4% YoY to Rs835.7 bn in Mar’21 led by Roads/ Irrigation. Tenders published in FY21 increased 44.4% YoY to Rs7,981.7 bn, led NCC by rise in Roads/ Mining/ Water.
    [Show full text]
  • Damaged Houses Cases – Kollam Taluk
    Sheet1_2 FLOOD- DAMAGED HOUSES CASES – KOLLAM TALUK ward Sl No TALUK VILLAGE Localbody Name No House No Name Address Ration Card NoDamage Percentage 1 Kollam Adichanalloor Adichanalloor 5 136 Mani Mani. Mani mandiram 1207238523 15% Damage 2 Kollam Adichanalloor Adichanalloor 5 138 sathy sivan mambazhathu vayalil adichanalloor 1207134448 15% Damage 3 Kollam Adichanalloor Adichanalloor 5 143 surendran aryalayam 1207219978 15% Damage 4 Kollam Adichanalloor Adichanalloor 5 146 Ragesh Maphazhath veedu 1207136445 15% Damage Shamla 5 Kollam Adichanalloor Adichanalloor 5 147 beegum Shibina manzil Adichanalloor 1207237847 15% Damage 6 Kollam Adichanalloor Adichanalloor 5 158 Bhasura Thottathil veedu 1207136001 15% Damage 7 Kollam Adichanalloor Adichanalloor 5 161 Kunjamma Valliyathottathil 1207135966 15% Damage 8 Kollam Adichanalloor Adichanalloor 5 165 Kousalya Thottathil veedu 1207135948 15% Damage 9 Kollam Adichanalloor Adichanalloor 5 168 Mathew Saji bhavan. Adichanalloor 1207263813 15% Damage 10 Kollam Adichanalloor Adichanalloor 5 174 Santhy Thekkethottathil, Adichanalloor 1207204181 15% Damage 11 Kollam Adichanalloor Adichanalloor 5 184 Mariyamma Vayalil puthenveed Adichanalloor 1207135968 15% Damage 12 Kollam Adichanalloor Adichanalloor 5 187 Omana Sunil bhavan Adichanalloor 1207135580 15% Damage 13 Kollam Adichanalloor Adichanalloor 5 268 sreelatha akhil bhavanam, 1207139045 15% Damage 14 Kollam Adichanalloor Adichanalloor 5 560 Lali T thottathil veedu 1207263254 15% Damage 15 Kollam Adichanalloor Adichanalloor 5 576 Meherunniza Kuzhivila
    [Show full text]
  • Performance Evaluation of Kollam Bypass Road Construction Kavanad to Kallumthazham Stretch Dr
    Published by : International Journal of Engineering Research & Technology (IJERT) http://www.ijert.org ISSN: 2278-0181 Vol. 6 Issue 10, October - 2017 Performance Evaluation of Kollam Bypass Road Construction Kavanad to Kallumthazham Stretch Dr. Sudhi Mary Kurian Anjali Surendran Professor PG Student Civil Engineering dept. Civil Engineering dep TKMCE TKMCE Abstract: Performance evaluation of Kollam bypass road II. OBJECTIVES construction is done by using primavera p6 software and The main objectives are, survey and questionnaire method. Bypass road under To identify the construction sequence for bridge and construction in the NH 66, 13.141 km long bypass starts at kavanad in the north to mevaram in the south via Aravila, road construction Kadavur, Kallumthazham and Ayathil. Constructions of three To work out the practical duration required to carry out bridges are going on – a 900 m one at kandachira, 600 m one at the activities Aravila and a 100 m one at Kadavur. The importance of To develop schedule using primavera project planners kollam bypass is, it will touch 3 major National Highways , NH software 66(Panvel to Kanyakumari), NH 183(Kollam to Dindigul) and To evaluate the project by direct interview method and NH 744(Kollam to Madurai) passing through the state of analyze the reason for delays and variations in Kerala. Firstly collect the required information from PWD and then schedule the project by using primavera and do the estimated budget performance evaluation by survey and questionnaire method. To suggest suitable measures for improvement The performance evaluation includes whether the project is on schedule or behind the schedule or ahead of schedule and also III.
    [Show full text]
  • Ministry of Road Transport & Highways (2020-21)
    7 MINISTRY OF ROAD TRANSPORT & HIGHWAYS ESTIMATES AND FUNCTIONING OF NATIONAL HIGHWAY PROJECTS INCLUDING BHARATMALA PROJECTS COMMITTEE ON ESTIMATES (2020-21) SEVENTH REPORT ___________________________________________ (SEVENTEENTH LOK SABHA) LOK SABHA SECRETARIAT NEW DELHI SEVENTH REPORT COMMITTEE ON ESTIMATES (2020-21) (SEVENTEENTH LOK SABHA) MINISTRY OF ROAD TRANSPORT & HIGHWAYS ESTIMATES AND FUNCTIONING OF NATIONAL HIGHWAY PROJECTS INCLUDING BHARATMALA PROJECTS Presented to Lok Sabha on 09 February, 2021 _______ LOK SABHA SECRETARIAT NEW DELHI February, 2021/ Magha, 1942(S) ________________________________________________________ CONTENTS PAGE COMPOSITION OF THE COMMITTEE ON ESTIMATES (2019-20) (iii) COMPOSITION OF THE COMMITTEE ON ESTIMATES (2020-21) (iv) INTRODUCTION (v) PART - I CHAPTER I Introductory 1 Associated Offices of MoRTH 1 Plan-wise increase in National Highway (NH) length 3 CHAPTER II Financial Performance 5 Financial Plan indicating the source of funds upto 2020-21 5 for Phase-I of Bharatmala Pariyojana and other schemes for development of roads/NHs Central Road and Infrastructure Fund (CRIF) 7 CHAPTER III Physical Performance 9 Details of physical performance of construction of NHs 9 Details of progress of other ongoing schemes apart from 10 Bharatmala Pariyojana/NHDP Reasons for delays NH projects and steps taken to expedite 10 the process Details of NHs included under Bharatmala Pariyojana 13 Consideration for approving State roads as new NHs 15 State-wise details of DPR works awarded for State roads 17 approved in-principle
    [Show full text]
  • Accused Persons Arrested in Kollam City District from 21.06.2020To27.06.2020
    Accused Persons arrested in Kollam City district from 21.06.2020to27.06.2020 Name of Name of the Name of the Place at Date & Arresting Court at Sl. Name of the Age & Address of Cr. No & Sec Police father of which Time of Officer, which No. Accused Sex Accused of Law Station Accused Arrested Arrest Rank & accused Designation produced 1 2 3 4 5 6 7 8 9 10 11 1 2 3 4 5 6 7 8 9 10 11 Cr.2120/2020 U/S 269, 188, SHEMEERA 270 IPC & MANZIL, 4(2)(a) r/w 5 MUHAMMED Male, 1 SABU PEOPELES NAGAR Kadappakkada 21.06.2020 of Kerala Kollam East SI of Police Station Bail HANEEFA Age:37 337, Epidemic KADAPPAKKADA Disease Ordinance 2020 Cr.2121/2020 U/S 269, 188, ANUGRAHA 270 IPC & NAGAR 190, 4(2)(a) r/w 5 Male, 2 JOSE VARGEESE PALLITHOTTAM, Kadappakkada 21.06.2020 of Kerala Kollam East SI of Police Station Bail Age:27 KOLLAM EAST Epidemic Police Station Disease Ordinance 2020 Cr.2122/2020 U/S 269, 188, 270 IPC & BHDRADEEPAM, 4(2)(a) r/w 5 Male, 3 GLEN MARY DALE, Kadappakkada 21.06.2020 of Kerala Kollam East SI of Police Station Bail CHRISTPHER Age:32 NrVANCHKOVIL Epidemic Disease Ordinance 2020 Cr.2123/2020 U/S 269, 188, PEROOR 270 IPC & VADAKKATHIL, 4(2)(a) r/w 5 Male, 4 SHEFEEK SHARAFUDE VALANTHUNGAL, Pulimoodu 21.06.2020 of Kerala Kollam East SI of Police Station Bail Age:31 EN ERAVIPURAM Epidemic Police Station Disease Ordinance 2020 Cr.2125/2020 U/S 269, 188, PUTHUVAL 270 IPC & PURAYIDOM, 4(2)(a) r/w 5 Male, 5 NISHAD RAJU BEECH NAGAR58 Mundakkal 21.06.2020 of Kerala Kollam East SI of Police Station Bail Age:20 MUNDAKKAL, Epidemic KOLLAM Disease Ordinance
    [Show full text]
  • State of Kerala & Mahe District of UT of Puducherry In
    Notice for appointment of Regular / Rural Retail Outlet Dealerships - State of Kerala & Mahe District of UT of Puducherry Indian Oil Corporation proposes to appoint Retail Outlet dealers in the State of Kerala & Mahe District of UT of Puducherry, as per following details: Minimum Dimension Finance to be Fixed fee/Minimum Bid Estimated monthly Type of Mode of Security deposit Sl. Name of location Revenue District Type of RO Category (in M.)/Area of the site arranged amont sales Potential # site* Selection (Rs in lakhs) No. ( in Sq.M.)* by the Applicant (Rs. In lakhs) 1 2 3 4 5 6 7 8 9a 9b 10 11 12 Regular/Rural MS + HSD in Kls SC, SC Cc1, CC/DC/CFS Frontage Depth Area Estimated Estimated fund Draw of Lots/Bidding SC CC2,SC PH, working capital required for ST, ST CC1, ST requirement for development of CC2, ST PH, operation of infrastructure OBC, OBC Cc1, RO at RO OBC CC2, OBC PH, OPEN, OPEN CC1, OPEN CC2, OPEN PH 1 Punnumoodu Alappuzha Regular 160 SC CFS 25 25 625 0 0 Draw of Lots 0 3 2 Mararikulam to Thaikkal Beach on SH 66 Alappuzha Regular 130 SC CFS 30 30 900 0 0 Draw of Lots 0 3 3 Kavalam - Kidangara Road Alappuzha Rural 100 SC CFS 20 20 400 0 0 Draw of Lots 0 2 4 Angamaly Jn - Adlux International (NH - LHS) Ernakulam Regular 150 SC CFS 35 45 1575 0 0 Draw of Lots 0 3 5 Kunnumpuram Jn, Kakkanad to Thrikkakara Ernakulam Regular 160 SC CFS 25 25 625 0 0 Draw of Lots 0 3 on Kunnumpuram NGO Quarters Road 6 Fort Kochi to Mattancherry Ernakulam Regular 160 SC CFS 25 25 625 0 0 Draw of Lots 0 3 7 Puthencruz to Kolenchery Ernakulam Regular
    [Show full text]
  • NHAI-RO Kerala-Six Laning of Start of Kollam Bypass to Kadambattukonam Section of NH-47 (New NH-66) (From Design Ch.486+000 to Design Ch
    File No.11246/RO-Kerala/Utilitylaying-Part(3) 11246/RO-Kerala/Utility laying/0073 17.01.2021 INVITATION OF PUBLIC COMMENTS Sub: NHAI-RO Kerala-Six laning of Start of Kollam bypass to Kadambattukonam Section of NH-47 (New NH-66) (from Design Ch.486+000 to Design Ch. 517+250) (Total length 31.25 km) in the State of Kerala on Hybrid annuity Mode under Bharatmala Pariyojna-Request for laying of OFC cable from Km 494+320 to Km 494+920 and from Km 496+300 to Km 499+500 by Reliance Jio Infocom Ltd.- Approval-Reg. The proposal is regarding permission sought by M/s Reliance Jio Infocom Ltd. for laying of OFC cable from Km 494+320 to Km 494+920 and from Km 496+300 to Km 499+500 in the subject project stretch in the State of Kerala. 2. M/s Reliance Jio Infocom Ltd. has furnished an undertaking to shift the OFC as and when required by NHAI at the cost of the applicant at their own cost at an alternate location whenever NHAI make a request for shifting of the same. Further, the applicant has undertaken to confirm with all standard conditions in the Ministry’s Circular No. RW/NH-33044/29/2015-S&R dated 22.11.2016. 3. Further, M/s Reliance Jio Infocom Ltd. has undertaken that they will not damage any other utilities during the process on laying and in case, if damaged, then to pay the losses either to NHAI or to the agency concerned. Further, M/s Reliance Jio Infocom Ltd.
    [Show full text]
  • Sl NO Name of Post Applied Name of Applicant Address Status 1 Clinical
    LIST OF CANDIDATES REJECTED UNDER VARIOUS CATEGORIES Sl Name of Post Name of Applicant Address Status NO applied 1 Clinical Vaishnu V Mangalathu Puthen Veedu. No Prescribed Psychologist Poredom. experience Chadayamangalam (po) Kollam.691534 SANDHYA GANESH K MAMOOTTU VEEDU, VELIYANNOOR P.O, Clinical VELLANAD, No Prescribed 2 Psychologist THIRUVANANTHAPURA experience M. PIN:695543 DR PRASANNAN E K Anada Medical Officer 3 Bhavan,Thangasseri,kollam, Age Limit Exceeded (Palliative Care) kerala. ASHA KRISHNAN L GOKULAM, EZHUKONE, No Prescribed Medical Officer 4 KOLLAM 691506 Qualification (Palliative Care) 5 PRO RESHMA C K CHIRAYIL HOUSE No Prescribed VILLOONNI P O experience ARPOOKARA KOTTAYAM PIN:686008 Parackal(h) Poothakuzhy No Prescribed 6 PRO Priya Prasad P.O Pampady Kottayam 686521 experience 7 PRO MELVIN CHARLY PORATHUR HOUSE PO No Certificate CHITTILAPPILLY 680 551 No Prescribed THRISSUR DISTRICT experience 8 PRO Pranav Christeen Praveen M26 A/64 KSHB Colony No Prescribed Malaparamba post,Kozhikode, experience Kerala- 673009 9 PRO Ananthu kumar A Lekshmi Vilasam, No Prescribed Padinjattinkara, Kottarakara experience (P.O), Kollam, PIN: 691506 10 PRO Kiran Sathyan Pulari,Kadampanadu South No Prescribed P.O,Adoor,Pathanamthitta- experience 691552 11 PRO POURNYA H Kumar buildings Ezhukone No Prescribed KUMAR p.o Kollam 691505 experience 12 PRO Silpa V Vallamare (H) pottassery(P.O) No Prescribed palampatta, mannarkkad, experience palakkad, pin- 678598 MANALUVILA VEEDU, PERUNGUZHI. P. O, PERUNGUZHI, No Prescribed 13 PRO ABHISHEK. R. S THIRUVANANTHAPURA experience M, 695305 Thondungal (House), Chettikkulam, Vattapparambu No Prescribed 14 PRO Jesno T John (Post), Angamaly, Ernakulam, PIN experience 683579. 15 PRO Anju Krishna Krishna Mandiram No Certificate Kochanjilimoodu Ezhukone PO No Prescribed Kollam 691505 experience 16 PRO SURESH BABU SURESH COTTAGE No Prescribed PANAMKALA Qualification MARIYAPURAM P.O.
    [Show full text]
  • Progress-Report-Kerala Government.Pdf
    PROGRESS REPORT OF PINARAYI VIJAYAN GOVERNMENT May 2016-May 2019 Progress of Implementation of Programmes Promised by the Government Information-Public Relations Department Government of Kerala English PROGRESS REPORT OF PINARAYI VIJAYAN GOVERNMENT (Progress of Implementation of Programmes Promised by the Government) Chief Editor: U.V. Jose IAS Director, I&PRD Coordinating Editor: K.Santhosh Kumar Additional Director, I&PRD Deputy Chief Editor: K.P. Saritha Deputy Director (Publications) Editor: C. Rajesh Assistant Editor: P.K. Velayudhan Assistant Information Offficer: A. Anchitha Cover: Godfrey's Graphics Layout & Design: Maya Santhosh Distribution: Unnikrishnan Kunnath Information Officer, (Circulation & Distribution) Printing: Government Press, Mannathala,Thiruvananthapuram Printer & Publisher: Director, I&PRD, Govt. of Kerala Copies: 500 For free distribution 2019 August 14 FOREWORD he LDF Election Manifesto had given word to the people of Kerala that every year they would be provided an account of the extent to which the promises made during the time of elections have been kept. The publication of this TProgress Report seeks to fulfil that assurance. The Government has been publishing such Annual Progress Reports every year. People have the right to know how many of the election promises have been implemented. The Progress Report upholds and justifies such a democratic viewpoint. And with this act, the state of Kerala, which has served as a model to the rest of India in several fields, has taken another step forward. The formulation of an Election Manifesto on the basis of opinions solicited from the people was itself a progressive initiative. Needless to say, it was influenced largely by the views and needs that had crystallized during those circumstances.
    [Show full text]
  • LOK SABHA DEBATES (English Version)
    Eleventh Series, Vol. XV, No. 9 Monday, August 4, 1997 Shravana 13, 1919 (Saka) LOK SABHA DEBATES (English Version) Fifth Session (Eleventh Lok Sabha) > ' V :. ‘ 1 PARLIAMENT L!BE.AfY v * R i t a ..... (I: I, (Vol. XV contains Nos. 1 to 10) LOK SABHA SECRETARIAT NEW DELHI Price : Rs. 50.00 EDITORIAL BOARD Shri S. Gopalan Secretary-General Lok Sabha Shri Surendra Mishra Additional Secretary Lok Sabha Secretariat Shri P.C. Bhatt Chief Editor Lok Sabha Secretariat Shri A. P. Chakravarti Senior Editor Lok Sabha Secretariat [Original English proceedings included in English Version and O riginal Hindiproceedings included in Hindi VERSION WILL UK treated as authoritative and not the translation thereof] CONTENTS [Eleventh Series, Vol. XV, Fifth Session, (Part-1). 1997/1919 (Saka)] No. 9, Monday, August 4, 1997/Shravana 13, 1919 (Saka) bUR,,FCT Columns ORAL ANSWERS TO QUESTIONS : ‘ Starred Questions Nos. 161 — 1 6 5 ........................................................................................................ 1__ 24 WRITTEN ANSWERS TO QUESTIONS : Starred Questions Nos. 166— 180 .......................................................................................................... 24—40 Unstarred Questions Nos. 1776 — 2005 ................................................................................................ 40— 193 PAPERS LAID ON THE TABLE............................................................................................................................ 194— 197 STATEMENT BY MINISTER Recommendation of the Governing
    [Show full text]
  • Kerala Development Report
    GOVERNMENT OF KERALA KERALA DEVELOPMENT REPORT INITIATIVES ACHIEVEMENTS CHALLENGES KERALA STATE PLANNING BOARD FEBRUARY 2021 KERALA DEVELOPMENT REPORT: INITIATIVES, ACHIEVEMENTS, AND CHALLENGES KERALA STATE PLANNING BOARD FEBRUARY 2021 | iii CONTENTS List of Tables List of Figures List of Boxes Foreword 1 Introduction and Macro Developments 1 2 Agriculture and Allied Activities 10 Agriculture in Kerala: An Assessment of Progress and a Road Map for the Future 10 Fisheries in Kerala: Prospects for Growth of Production and Income 32 Animal Resources in Kerala: An Assessment of Progress and a Road Map for the Future 37 Forest Governance: Initiatives and Priorities 52 3 Food Security and Public Distribution in Kerala 63 4 Water for Kerala's Development: Status, Challenges, and the Future 68 5 Industry: A New Way Forward 82 Structure and Growth of the Industrial Sector 82 Sources of Growth 87 Industrial Policy and Agencies for Transformation 96 Industrial Sector in Kerala: Major Achievements in the 13th Plan 99 6 Information Technology: The Highway to Growth 107 7 Leveraging Science and Technology for Development 121 8 Tourism in Kerala 131 9 Cooperatives in Kerala: The Movement, Positioning, and the Way Forward 142 10 Human Development 147 School Education Surges Ahead 147 Higher Education 151 Kerala's Health: Some Perspectives 155 11 Infrastructure 163 Bridging the Infrastructure Gap in Transport Sector 163 Sustainable Energy Infrastructure 168 12 Environment and Growth: Achieving the Balance 189 13 Local Governments 198 Decentralisation
    [Show full text]