Progress Report NH Ending March.Xlsx

Progress Report NH Ending March.Xlsx

REPORT‐V NH(O) REPORT‐V [ending March2017] REPORT‐V [ending March 2017] STATE: KERALA STATE: KERALA DETAILS OF ONGOING PROJECTS IN KERALA (P-7) DETAILS OF ONGOING PROJECTS IN KERALA (P-7) Expenditure Revised Cumulative Final Date of for Current Target date of Name of the Project NH No Old / Date of Original/ San. Cost Length Cumlv Physical Cost/Anticipat Financial expendit Rev / Date of Actual Date of Name of NH Division / Name of the contractor Sl No Length (km) Job No. Agreement/Com Financial completion as per New Revised Sanction Rs . in Cr Completed prog % ed cost in Rs. progress ure in Rs. Completion Completion Executive Enginee /PH No. mencement Year in Rs. contract crore (Rs. Crore) crore crore FS/Detailed Engineering Consultancy services for preparation of feasibility report Muvattupuzha/ cum Detailed Project Report (DPR) for widening to two 03.02.2016/ M/s C.V Kand 1 220/183 30.30 31.12.2015 850 0.85 NA 80% 0.85 0.42 0.42 14.08.2016 Smt.P.K.Rema - lane with paved shoulder from km 106/700 to km 137/00 15.03.2016 ConsultantsPvt Ltd 08086395223 (Kottayam to Mundakkayam) on NH 220(New NH-183) Consultancy services for preparation of feasibility report cum Detailed Project Report (DPR) for widening to two Malappuram/ M/S Dhruv 10.02.2016/ 03.03.2016/ 2 lane with paved shoulder from km 87/000 to km 213/966 53.96 852 1.52 NA 85% 1.52 1.21 1.21 31.08.2016 Sri Gokul Das - Consultancy Services 05.04.2016 15.03.2016 140/960(Nattukal to Chandra Nagar in Palakkad) on NH 08086395238 Pvt Ltd 966(Old NH 213) Consultancy services for preparation of feasibility report Kollam/ cum Detailed Project Report (DPR) for widening to two 28.03.2016/ 3 208/744 36 04.03.2016 854 0.7344 NA 90% 0.7344 0.072 0.072 19.09.2016 Smt.Cini.A- M/s KITCO lane with paved shoulder from km 45/0 to km 81/0(Punalur 20.04.2016 08086395216 to Kottavasal) on NH 744(Old NH 208) Consultancy services for preparation of feasibility report Kollam/ cum Detailed Project Report (DPR) for widening to two 07.04.2016/ M/s Mukesh 4 220/183 45 04.03.2016 853 1.1103 NA 90% 1.1103 0.11 0.11 26.09.2016 Smt.Cini.A- lane with paved shoulder from km0/000 to km 45/000 27.04.2016 &Associates 08086395216 (Kollam to Punalur ) on NH 744(Old NH 208) Being prepared Consultancy services for preparation of feasibility report by NHAI as 5 cum Detailed Project Report (DPR) for four lane 17/66 12.00 31.12.2015 851 0.34 03.03.2016/ NA 0.34 0.034 0.034 14.08.2016 M/s KITCO stand alone Thalassery-Mahe bypass on NH 17(New NH 66) project Widening to 2 lane 177.26 Improvement of safety by way of widening of existing 5.5mintermediate lane to 7.0m two lane with geometric Muvattupuzha/ M/s Reji Mathew 15.05.2015 / 14.05.2016 6 improvement of Hill track along with signages,road 220/183 5.72 23.12.2014 835 12.34 5.72 100% 12.04 9.65 11.89 - 30.06.2016 30.06.2016 Smt.P.K.Rema - &Co.Pamplaniyil, 23.05.2015 marking,retaining wall,construction of drains etc.from km 08086395223 Bharananganam 205/180 to km 210/900 on NH-220(New NH-183) Widening to 2 lane with paved shoulders from km 87/000 Malappuram/ Awarded on M/s ULCCS, 7 to km 133/720 (Nattukal to Thanau Jn in Palakkad) of NH 966/213 46.72 8/10.02.2017 870 294.26 294.26 Sri Gokul Das - 30.03.2017 Kozhikode 966(Old NH 213) on EPC mode 08086395238 Rehablitation and upgradation of NH-85 (Old NH 49) from Muvattupuzha/ km 119/017 to km 161/300 (Design chainage km 119/017 Financial bid 8 85/49 42.28 8/10.02.2017 869 380.76 380.76 0.05 0.05 Smt.P.K.Rema - to km 160/800)(Bodimettu to Munnar) to 2 lane with to be opened 08086395223 paved shoulders on EPC mode Improvement of Riding Quality (IRQP) Muvattupuzha/ M/s Antech IRQP from km 0/000 to km 16/000 of NH 185(newly 30.05.2016/ 9 185 16.00 04.03.2016 855 12.25 16.00 100% 12.25 8.62 8.62 06.03.2017 16.02.2017 Smt.P.K.Rema - Construction declared) 07.06.2016 08086395223 Company C:\Users\User\Downloads\Progress Report NH ending March 1 REPORT‐V NH(O) REPORT‐V [ending March2017] REPORT‐V [ending March 2017] STATE: KERALA STATE: KERALA DETAILS OF ONGOING PROJECTS IN KERALA (P-7) DETAILS OF ONGOING PROJECTS IN KERALA (P-7) Expenditure Revised Cumulative Final Date of for Current Target date of Name of the Project NH No Old / Date of Original/ San. Cost Length Cumlv Physical Cost/Anticipat Financial expendit Rev / Date of Actual Date of Name of NH Division / Name of the contractor Sl No Length (km) Job No. Agreement/Com Financial completion as per New Revised Sanction Rs . in Cr Completed prog % ed cost in Rs. progress ure in Rs. Completion Completion Executive Enginee /PH No. mencement Year in Rs. contract crore (Rs. Crore) crore crore LOA issued on Kollam/ IRQP from km 0/000 to km 16/100 of NH 183A(newly 20.12.2016. LOA 10 183A 16.10 04.03.2016 856 13.68 0.00 13.68 0 0 NA Smt.Cini.A- M/S Metaguard declared) not accepted by the lowest bidder. 08086395216 M/s. Raji Mathew & Muvattupuzha/ IRQP including geometric improvements from km 73/200 30.05.2016/ Co. 11 185 22.80 04.03.2016 857 18.56 15.00 75% 18.56 8.71 8.71 06.03.2017 Sri.Issac Varghese - to km 96/000 of NH 185(newly declared) 07.06.2016 Pamplaniyil, 08086395223 Bharananganam M/s. Raji Mathew & Muvattupuzha/ IRQP from km 41/500 to 55/250 of NH 185 (Newly 01.03.16/ WorkCompleted Co. 12 185 13.75 30.12.2015 848 8.92 13.75 100% 9.06 8.55 8.55 02.11.2016 Sri.Issac Varghese - declared) 03.03.16 on 15.01.2017 Pamplaniyil, 08086395223 Bharananganam Kollam/ Shri Abdul Faizy, IRQP from km 482/000 to 520/400 of NH47 (new 03.10.2015/ Work completed on 13 47/66 38.40 17.02.2015 839 30.58 38.40 100% 31.15 25.95 29.13 0 18.06.2016 NA Smt.Cini.A- M/s. Tarmac NH66) in State of Kerala under PBFF 19.12.15 Dec 2016 08086395216 Builders (india) Kannur/ 20.06.2015 / Shri Moideen kutty 14 IRQP from Km 63/000 to 94/000 of NH 17(NH-66) 17/66 31.00 24.03.2015 842 15.34 31.00 100% 16.6604 12.1 16.64 0 24.06.2016 NA 24.06.2016 Smt.Mini.P.K - 25.06.2015 Haji 08086395242 Alappuzha/ M/s Begora Improvement from km 390/570 to km 406/600 on NH 47 18.03.17/ 15 47/66 16.03 17.10.2016 866 17.00 0.00 1% 17.00 0 17.06.2017 Sri Ajith Kumar.V.V- Infrastructure and [PBFF] 01.04.2017 08086395220 development Pvt Ltd Construction of Bypasses 154.08 114.15 Construction of 6.80 km 2 lane with paved shoulders Alappuzha bypass on NH47 (New NH 66) from km Alappuzha/ 11.02.2015 / 16 408/100 to 414/900 in the State of Kerala on EPC basis 47/66 6.80 17-01-2014 817 255.75 0.00 55% 348.43 55.05 116.06 - 15.09.2017 NA NA Sri Ajith Kumar.V.V- M/s RDS-CVCC (JV) 16.03.2015 with 50:50 cost sharing between Government of Kerala and 08086395220 Government of India (MORTH) Construction of 13.0 km 2 lane with paved shoulders Kollam bypass on NH47 (New NH 66) from km 486/500 Kollam/ 11.02.2015 / 17 to 499/500 in the State of Kerala on EPC basis with 50:50 47/66 13.00 17-01-2014 818 267.16 0.00 56% 352.05 53.09 123.96 - 26.11.2017 NA NA Smt.Cini.A- M/s RDS-CVCC (JV) 27.05.2015 cost sharing between Government of Kerala and 08086395216 Government of India (MORTH) C:\Users\User\Downloads\Progress Report NH ending March 2 REPORT‐V NH(O) REPORT‐V [ending March2017] REPORT‐V [ending March 2017] STATE: KERALA STATE: KERALA DETAILS OF ONGOING PROJECTS IN KERALA (P-7) DETAILS OF ONGOING PROJECTS IN KERALA (P-7) Expenditure Revised Cumulative Final Date of for Current Target date of Name of the Project NH No Old / Date of Original/ San. Cost Length Cumlv Physical Cost/Anticipat Financial expendit Rev / Date of Actual Date of Name of NH Division / Name of the contractor Sl No Length (km) Job No. Agreement/Com Financial completion as per New Revised Sanction Rs . in Cr Completed prog % ed cost in Rs. progress ure in Rs. Completion Completion Executive Enginee /PH No. mencement Year in Rs. contract crore (Rs. Crore) crore crore Construction of balance portion of service road left out Time extension up from km 402/500 to 404/580, Extension of Box culvert to 6 months or Kodungalloor/ Shri Abdul Faizy, at km 402/810, Construction of 3.08km CCdrain, 14.11.2014 / 18 47/66 2.00 07.08.2014 832 15.13 0.00 95% 15.13 2.68 12.09 - 19.05.2016 subject to the NA Smt.Sreemala - M/s.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    6 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us