04/22/21 6.2/1 RESOLUTION NO. 22220 Background

Total Page:16

File Type:pdf, Size:1020Kb

04/22/21 6.2/1 RESOLUTION NO. 22220 Background 04/22/21 6.2/1 RESOLUTION NO. 22220 Background The Illinois State Toll Highway Authority (“Tollway”) is interested in procuring Underground Fuel Storage Tank Monitoring System Services. Pursuant to the Tollway’s Invitation for Bid No. 19-0150R, the Tollway has determined that Stenstrom Petroleum Services Group is the lowest responsive and responsible bidder for Underground Fuel Storage Tank Monitoring System Services for an upper limit of compensation not to exceed $474,700.00 for an initial three-year term and an amount not to exceed $316,466.67 for a possible two-year renewal term. Resolution The bid from Stenstrom Petroleum Services Group for the purchase of Underground Fuel Storage Tank Monitoring System Services is accepted. Contract No. 19-0150R is approved in an amount not to exceed $474,700.00 for an initial three-year term and an amount not to exceed $316,466.67 for a possible two- year renewal term. The Chairman and Chief Executive Officer of the Tollway is authorized to execute the appropriate documents in connection therewith, subject to the approval of the General Counsel and the Chief Financial Officer. The Chief of Contract Services is authorized to issue the necessary purchase orders and contract purchase orders and any other necessary documents in connection therewith, and the Chief Financial Officer is authorized to issue warrants in payment thereof. Approved by: _________________________ Chairman 04/22/21 6.3/1 RESOLUTION NO. 22221 Background The Illinois State Toll Highway Authority (“Tollway”) advertised for sealed bids on Contract RR-21-4563 for Plaza Modifications on the Veterans Memorial Tollway (I-355) from Mile Post 1.90 to Mile Post 4.42 (Plaza 99 Spring Creek). The lowest responsive and responsible bidder on Contract No. RR-21-4563 is Robe, Inc. in the amount of $568,483.46. Resolution Contract No. RR-21-4563 is awarded to Robe, Inc. in the amount of $568,483.46, subject to all required approvals, the contractor satisfying applicable DBE, financial and all other contract award requirements, and execution of all contract documents by the bidder and the Tollway. The Chairman and Chief Executive Officer of the Tollway is authorized to execute the aforementioned Contract, subject to the approval of the General Counsel and the Chief Financial Officer, and the Chief Financial Officer is authorized to issue warrants in payment thereof. If the bidder fails to satisfy the contract award requirements, the Executive Director is authorized to approve an award to the next lowest responsible bidder in accordance with the applicable contract award requirements and execution of all contract documents by the bidder and the Tollway. The Chairman and Chief Executive Officer of the Tollway is authorized to execute any contract awarded to the next lowest bidder, subject to the approval of the General Counsel and the Chief Financial Officer, and the Chief Financial Officer is authorized to issue warrants in payment thereof. Approved by: _________________________ Chairman 04/22/21 6.3/2 RESOLUTION NO. 22222 Background The Illinois State Toll Highway Authority (“Tollway”) advertised for sealed bids on Contract RR-21-4573 for Plaza Improvements on the Jane Addams Memorial Tollway (I-90) from Mile Post 53.6 to Mile Post 79.5. The lowest responsive and responsible bidder on Contract No. RR-21-4573 is Robe, Inc. in the amount of $2,016,064.40. Resolution Contract RR-21-4573 is awarded to Robe, Inc. in the amount of $2,016,064.40, subject to all required approvals, the contractor satisfying applicable DBE, financial and all other contract award requirements, and execution of all contract documents by the bidder and the Tollway. The Chairman and Chief Executive Officer of the Tollway is authorized to execute the aforementioned Contract, subject to the approval of the General Counsel and the Chief Financial Officer, and the Chief Financial Officer is authorized to issue warrants in payment thereof. If the bidder fails to satisfy the contract award requirements, the Executive Director is authorized to approve an award to the next lowest responsible bidder in accordance with the applicable contract award requirements and execution of all contract documents by the bidder and the Tollway. The Chairman and Chief Executive Officer of the Tollway is authorized to execute any contract awarded to the next lowest bidder, subject to the approval of the General Counsel and the Chief Financial Officer, and the Chief Financial Officer is authorized to issue warrants in payment thereof. Approved by: _________________________ Chairman 04/22/21 6.3/3 RESOLUTION NO. 22223 Background The Illinois State Toll Highway Authority (“Tollway”) advertised for sealed bids on Contract RR-21-4574 for Plaza Improvements on the Tri-State Tollway (I-294) from Mile Post 38.25 (Plaza 29 Touhy Avenue) to Mile Post 42.0 (Plaza 33 Irving Park Road). The lowest responsive and responsible bidder on Contract No. RR-21-4574 is Western Remac, Inc. in the amount of $1,104,175.60. Resolution Contract No. RR-21-4574 is awarded Western Remac, Inc. in the amount of $1,104,175.60, subject to all required approvals, the contractor satisfying applicable DBE, financial and all other contract award requirements, and execution of all contract documents by the bidder and the Tollway. The Chairman and Chief Executive Officer of the Tollway is authorized to execute the aforementioned Contract, subject to the approval of the General Counsel and the Chief Financial Officer, and the Chief Financial Officer is authorized to issue warrants in payment thereof. If the bidder fails to satisfy the contract award requirements, the Executive Director is authorized to approve an award to the next lowest responsible bidder in accordance with the applicable contract award requirements and execution of all contract documents by the bidder and the Tollway. The Chairman and Chief Executive Officer of the Tollway is authorized to execute any contract awarded to the next lowest bidder, subject to the approval of the General Counsel and the Chief Financial Officer, and the Chief Financial Officer is authorized to issue warrants in payment thereof. Approved by: _________________________ Chairman 04/22/21 6.3/4 RESOLUTION NO. 22224 Background The Illinois State Toll Highway Authority (“Tollway”) advertised for sealed bids on Contract RR-21-4562 for Plaza Modifications on the Reagan Memorial Tollway (I-88) from Mile Post 116.5 to Mile Post 119.0 (Plaza 61 Aurora), Mile Post 85.0 to Mile Post 86.25 (Plaza 66 DeKalb) and Mile Post 55.25 to Mile Post 57.75 (Plaza 69 Dixon). The lowest responsive and responsible bidder on Contract No. RR-21-4562 is Robe, Inc. in the amount of $1,778,909.58. Resolution Contract No. RR-21-4562 is awarded to Robe, Inc. in the amount of $1,778,909.58, subject to all required approvals, the contractor satisfying applicable DBE, financial and all other contract award requirements, and execution of all contract documents by the bidder and the Tollway. The Chairman and Chief Executive Officer of the Tollway is authorized to execute the aforementioned Contract, subject to the approval of the General Counsel and the Chief Financial Officer, and the Chief Financial Officer is authorized to issue warrants in payment thereof. If the bidder fails to satisfy the contract award requirements, the Executive Director is authorized to approve an award to the next lowest responsible bidder in accordance with the applicable contract award requirements and execution of all contract documents by the bidder and the Tollway. The Chairman and Chief Executive Officer of the Tollway is authorized to execute any contract awarded to the next lowest bidder, subject to the approval of the General Counsel and the Chief Financial Officer, and the Chief Financial Officer is authorized to issue warrants in payment thereof. Approved by: _________________________ Chairman 04/22/21 6.3/5 RESOLUTION NO. 22225 Background The Illinois State Toll Highway Authority (“Tollway”) advertised for sealed bids on Contract RR-20-4551 for Landscape Plantings on the Tri-State Tollway (I-294) from Mile Post 38.0 (O’Hare Oasis) to Mile Post 39.3 (UPRR). The lowest responsive and responsible bidder on Contract No. RR-20-4551 is City Escape Garden & Design, LLC in the amount of $233,274.59. Resolution Contract No. RR-20-4551 is awarded to City Escape Garden & Design, LLC in the amount of $233,274.59, subject to all required approvals, the contractor satisfying applicable DBE, financial and all other contract award requirements, and execution of all contract documents by the bidder and the Tollway. The Chairman and Chief Executive Officer of the Tollway is authorized to execute the aforementioned Contract, subject to the approval of the General Counsel and the Chief Financial Officer, and the Chief Financial Officer is authorized to issue warrants in payment thereof. If the bidder fails to satisfy the contract award requirements, the Executive Director is authorized to approve an award to the next lowest responsible bidder in accordance with the applicable contract award requirements and execution of all contract documents by the bidder and the Tollway. The Chairman and Chief Executive Officer of the Tollway is authorized to execute any contract awarded to the next lowest bidder, subject to the approval of the General Counsel and the Chief Financial Officer, and the Chief Financial Officer is authorized to issue warrants in payment thereof. Approved by: _________________________ Chairman 04/22/21 6.3/6 RESOLUTION NO. 22226 Background The Illinois State Toll Highway Authority (“Tollway”) advertised for sealed bids on Contract RR-20-4553 for Landscape Planting Improvements on the Reagan Memorial Tollway (I-88) from Mile Post 117.2 (Fox River) to Mile Post 140.0 (I-294).
Recommended publications
  • River Mileages and Drainage Areas for Illinois Streams—Volume 2, Illinois River Basin
    RIVER MILEAGES AND DRAINAGE AREAS FOR ILLINOIS STREAMS—VOLUME 2, ILLINOIS RIVER BASIN U.S. GEOLOGICAL SURVEY Water-Resources Investigations Report 79-111 Prepared in cooperation with the U.S. ARMY CORPS OF ENGINEERS RIVER MILEAGES AND DRAINAGE AREAS FOR ILLINOIS STREAMS—VOLUME 2, ILLINOIS RIVER BASIN By R. W. Healy U.S. GEOLOGICAL SURVEY Water-Resources Investigations Report 79-111 Prepared in cooperation with the U.S. ARMY CORPS OF ENGINEERS 1979 CONTENTS Conversion Table . .iv Abstract . .1 Introduction . .1 Methods . .2 Explanation of tables . .2 References . .3 Index . .291 ILLUSTRATIONS Figure 1. Map showing Illinois counties . .4 2. Map showing stream systems, hydrologic units, and major cities in Illinois. .6 TABLE Table 1. River mileages and drainage areas for Illinois streams . .8 i CONVERSION TABLE Multiply inch-pound unit By To obtain SI (metric) unit mile (mi) 1.609 kilometer (km) square mile (mi2) 2.590 square kilometer (km2) iv RIVER MILEAGES AND DRAINAGE FOR ILLINOIS STREAMS— Volume 2, Illinois River Basin By R. W. Healy ABSTRACT River mileages are presented for points of interest on Illinois streams draining 10 square miles or more. Points of interest include bridges, dams, gaging stations, county lines, hydrologic unit boundaries, and major tributaries. Drainage areas are presented for selected sites, including total drainage area for any streams draining at least 100 square miles. INTRODUCTION Expansion of water-resource investigations within the State of Illinois has amplified the need for a common index to locations on streams. A common index would aid in the coordination of various stream-related activities by facilitating data collection and interpretation.
    [Show full text]
  • Freight Can't Wait
    Freight Can’t Wait Third Edition A list of America’s most critical infrastructure projects About the Coalition The Coalition for America’s Gateways and Trade Corridors (CAGTC) is a diverse coalition of more than 60 public and private organizations dedicated to increasing federal investment in America’s multimodal freight infrastructure. In contrast to single mode interests, CAGTC’s main mission is to promote a seamless goods movement transportation system across all modes to enhance capacity tradecorridors.org and economic growth. For more information on the Coalition for America’s Gateways and Trade Corridors, please visit 202.828.9100 www.tradecorridors.org. @CAGTC Freight Can’t Wait. Freight transportation is the backbone of America’s commerce. It is an economic engine, producing millions of jobs and a higher standard of living for our population. Without the ability to quickly and cost effectively move goods, American businesses struggle to remain competitive and the overall health of the economy suffers. A campaign of strategic investment to expand capacity and increase efficiency is needed to maintain – and grow – U.S. productivity and global competitiveness. This book contains a snapshot of freight projects that stand to benefit from federal partnership and investment. Federal support, in the form of a freight-specific competitive grant program, can incentivize states and localities to finance creatively and make use of public-private partnerships. Direct federal investment can leverage the state, local and private dollar, serving as the final piece in a funding package, and make projects like those in Freight Can’t Wait a reality. Third Edition April 2019 CAGTC | Freight Can’t Wait 1 West CAGTC | Freight Can’t Wait 3 Benefits Alameda Corridor-East The project would eliminate crossing collisions, queu- ing and congestion and reduce vehicle emissions at Project the underpass while the corridor improvements would improve safety at all four crossings in Montebello.
    [Show full text]
  • Flood Insurance Study Users
    The Federal Emergency Management Agency in Cooperation with DuPage County, Illinois Presents: FLOOD INSURANCE STUDY A Report of Flood Hazards in: DUPAGE COUNTY, ILLINOIS AND INCORPORATED AREAS Prepared, in parts, by: FEMA Region V Nika Engineering 536 South Clark Street 421 Mill Street Chicago, Illinois 60605 and Batavia, Illiois 60510 March 2007 1 7043CV000A NOTICE TO FLOOD INSURANCE STUDY USERS Communities participating in the National Flood Insurance Program have established repositories of flood hazard data for floodplain management and flood insurance purposes. This Flood Insurance Study (FIS) may not contain all data available within the repository. It is advisable to contact the community repository for any additional data. Part or all of this FIS may be revised and republished at any time. In addition, part of this FIS may be revised by the Letter of Map Revision process, which does not involve republication or redistribution of the FIS. It is, therefore, the responsibility of the user to consult with community officials and to check the community repository to obtain the most current FIS components. Initial Countywide FIS Effective Date: December 4, 1985 Revised Countywide FIS Date: June 16, 2004 FLOOD INSURANCE STUDY DuPAGE COUNTY, ILLINOIS TABLE OF CONTENTS Page # 1. INTRODUCTION 1 1.1. Purpose of Study 1 1.2. Authority and Acknowledgments 1 1.3. Coordination 5 1.4. Regional Participation and Progress 7 2. AREA STUDIED 8 2.1. Scope of Study 8 2.2. Community Description 8 2.3. Watershed Description 8 2.3.1. DesPlaines River (DP) 9 2.3.1.1. Geographical Description 9 2.3.1.2.
    [Show full text]
  • Village Marketing Brochure
    DESTINATION Roosevelt Road, WINFIELD A Village like no other! The Roosevelt Road/Illinois Route 38 corridor, a major regional east-west commercial roadway connecting Wineld to nearby destinations and retail districts, is planned for future commercial and residential uses. Cantigny Source: Village of Wineld Comprehensive Plan 2014 Key Features Location Trac Counts Along the Roosevelt Road/Illinois Route 38 • Average daily trac counts of 20,800 along commercial corridor Roosevelt Road and 17,600 along Wineld Road Adjacent Uses Development Potential Cantigny (a 500 acre park, war museum and Retail, oce and residential uses. Village golf course) and residential uses of Wineld community goals and objectives for the Roosevelt Road Corridor are detailed in the Village’s Comprehensive Plan (www.villageofwineld.com). DESTINATION Roosevelt Road, WINFIELD A Village like no other! The Roosevelt Road/Illinois Route 38 corridor, a major regional east-west commercial roadway connecting Wineld to nearby destinations and retail districts, is planned for future commercial and residential uses. Cantigny Source: Village of Wineld Comprehensive Plan 2014 Key Features Location Trac Counts Along the Roosevelt Road/Illinois Route 38 • Average daily trac counts of 20,800 along commercial corridor Roosevelt Road and 17,600 along Wineld Road Adjacent Uses Development Potential Cantigny (a 500 acre park, war museum and Retail, oce and residential uses. Village golf course) and residential uses of Wineld community goals and objectives for the Roosevelt Road Corridor are detailed in the Village’s Comprehensive Plan (www.villageofwineld.com). 1 Mile Radius 3 Mile Radius 5 Mile Radius Population 3,115 67,962 178,131 Total Households 1,097 23,192 64,273 Average Household Size 2.81 2.85 2.70 Average Household Income $105,929 $110,207 $106,396 Average Home Value $326,556 $321,854 $328,340 Total Employees 1,407 33,914 92,614 Source: U.S.
    [Show full text]
  • Village of Wilmette Proposal for Engineering Services: Central Avenue - Phase One Rfp No
    VILLAGE OF WILMETTE PROPOSAL FOR ENGINEERING SERVICES: CENTRAL AVENUE - PHASE ONE RFP NO. 16-M-0001 March 24, 2016 Prepared By TranSystems 1475 E. Woodfield Road Suite 600 Schaumburg, IL 60173 Tel 847-605-9600 Fax 847-463-0565 www.transystems.com March 22, 2016 Mr. Stephen Lazarus Procurement Specialist Village of Wilmette 1200 Wilmette Ave Wilmette, IL 60091 Reference: Engineering Design Services for Central Avenue – Phase One – RFP No. 16-M-0001 Dear Mr. Lazarus, TranSystems is pleased to submit our proposal to furnish Professional Engineering Services for the Central Avenue Phase 1 Study. We are very familiar with the Central Avenue and Sheridan Road corridors. We prepared the STP funding application for Central Avenue and designed the Award-Winning Sheridan Road project. Our team understands the challenges, issues and more importantly opportunities that exist along this important corridor. TranSystems has an outstanding reputation and extensive experience in providing Phase 1 engineering services for roadway projects. We are well known at the Illinois Department of Transportation (IDOT) Bureau of Local Roads and Streets (BLRS) for our roadway planning and design capabilities. Our expertise allows us to deliver quality projects on time and within budget. We are uniquely qualified for Central Avenue Phase 1 assignment since: ► We are prequalified by IDOT in all areas needed for this project and possess a thorough understanding of the Federal Aid approval process. In the past 10 years we have completed over 30 similar Phase 1 projects. Our staff has developed trusted relationships with IDOT, FHWA, NSCM, and CMAP staff. These agencies oversee Phase 1 & 2 projects through the federal process.
    [Show full text]
  • Chapter 15 – Traffic and Vehicles
    Chapter 15 – Traffic and Vehicles Chapter 15 - TRAFFIC AND VEHICLES Sec. 15-A TRAFFIC CONTROL Sec. 15-A-1 Ratification of Existing Traffic Control Signs, Signals, Markings All traffic control signs, signals, devices and markings which are in place on the adoption of this Code are hereby ratified and confirmed. (Code 1979, § 14-1) State Law reference — Powers of local authorities generally, 625 ILCS 5/11-208; power of County Board to restrict use of highways due to climatic conditions, 625 ILCS 5/15-316(a); signs required, 625 ILCS 5/15-316(b). Sec. 15-A-2 Permits for Overwidth, Overlength and Overweight Vehicles A. The state has set maximum legal height, width, and weight limitations on all classes of highways in the state as published in the Illinois Vehicle Code 625 ILCS Chapter 15. B. The County highways are classified as class II, III and local road and streets and so designated and are under the jurisdiction and authority of the County Board. C. The Illinois Vehicle Code 625 ILCS Section 5/11-208 authorizes the County Board to enact restrictions as to the use of their highways concerning size, weight, and local regulations. As such vehicles weighing over 54,000 pounds gross weight, are prohibited from using the following roads when appropriate signage is posted at both ends of the following roads: 1. Perry Road from Shabbona Road to South First Street 2. Suydam Road from 701 feet west of Rollo Road proceeding on to West Suydam Road to South County Line. Such prohibition does not extend to police, fire or other emergency vehicles or school buses or those vehicles which are making service calls, pickups or deliveries to residences, farms and construction sites on or adjacent to the roadways.
    [Show full text]
  • We§'T Chicago
    ~llif~ @if WE§'T CHICAGO WHERE HISTORY & PROGRESS MEET INFRASTRUCTURE COMMITTEE Thursday, February 7, 2019 7:00 P.M. - Committee Room A AGENDA 1. Call to Order, Roll Call, and Establishment of a Quorum 2. Approval of Minutes A. Infrastructure Committee of January 3, 2019 3. Public Participation I Presentations 4. Items for Consent A. Ordinance No. 19-0-0005 - Authorizing the Disposal of Surplus Equipment, Stock Inventory, and/or Personal Property Owned By the City Of West Chicago B. Resolution No. 19-R-0007 -Providing for the City's Repair of State Highways in West Chicago which are Opened by the City of West Chicago During Years 2019 thru 2023 C. Resolution No. 19-R-0010 - IDOT Local Agency Agreement for Federal Participation for Construction Cost for the Washington Street Reconstruction Project D. Resolution No. 19-R-0011 -IDOT Resolution for Improvement Under the Illinois Highway Code for Use of Motor Fuel Tax Funds as City's Local Share of Construction Costs for the Washington Street Reconstruction Project E. Resolution No. l 9-R-0012 - A Resolution for Maintenance of Streets and Highways by the City of West Chicago Relating to FY2019 MFT Estimate of Maintenance Costs F. 2019 Forestry Maintenance Program-Rejection of Bids G. Knickerbocker Roofing & Paving Company, Inc. - Change Order No. 1 and Final for Services Related to the 2018 Wastewater Treatment Plant Roof Replacement Project H. Purchase of One 2019 Ford Escape SE 4WD-Currie Motors, Frankfort, Illinois 5. Items for Discussion 6. Unfinished Business 7. New Business 8. Reports from Staff A. Update on ComEd LED Light Replacement Program B.
    [Show full text]
  • Eastern Corridor Study, Answer Questions, and Receive Input on the Alignments
    EASTERN DSATS CORRIDOR STUDY FINAL October 28, 2009 Executive Summary The DeKalb-Sycamore Area Transportation Study (DSATS) initiated this study to identify four possible alignments for a new north-south transportation corridor to service the eastern DSATS planning area. Initially, nine alternatives were created within termini specified by DSATS using Illinois Department of Transportation geometric design criteria and evaluating current land use, published future land use plans, topography, and floodplain and wetland maps within the study area. The termini of the proposed alignments for the corridor were Plank Road to the north and Gurler Road to the south. The following improvements were proposed for each corridor: a grade separated crossing with the Union Pacific Railroad; structures where the corridor crossed the East Branch Kishwaukee River and Union Ditches 1, 2, or 3; a full access interchange where the corridor intersects Interstate 88; and intersection improvements with the existing roadways. The nine potential alignments for an eastern DSATS corridor were evaluated at a design charrette that was attended by representatives from DSATS, the City of DeKalb, the City of Sycamore, the Town of Cortland, the Illinois State Toll Highway Authority, and the DeKalb County Highway Department. The alignments were ranked against screening criteria that included mobility, local access, compatibility with local land use plans, encouragement of economic development, regional access and system connectivity, environmental impacts, farmland impacts, and use of existing alignments. Based on the group discussion and the total scores obtained, several alignments were selected for further analysis. The Illinois Department of Transportation, Illinois State Toll Highway Authority and the Union Pacific Railroad were contacted to obtain their feedback on the eastern DSATS corridor study.
    [Show full text]
  • ELGIN O'hare WESTERN ACCESS PROJECT Overview
    ELGIN O’HARE WESTERN ACCESS PROJECT Overview Designated a "Project of National and Regional Significance" by federal transportation legislation , the $3.4 billion Elgin O’Hare Western Access Project represents a fiscally responsible approach to address the area’s diverse travel needs – improving travel efficiency, providing western access to O’Hare International Airport, creating opportunities for jobs and economic development, enhancing multi-modal connections and reducing congestion. The project includes 17 miles of new roads with 15 new or improved interchanges as part of a new, all-electronic toll road that includes rehabilitating and widening Illinois Route 390, formerly known as the Elgin O’Hare Expressway, and extending it east along Thorndale Avenue to O’Hare and building a new roadway around the western border of O’Hare linking the Jane Addams Memorial Tollway (I-90) and the Tri-State Tollway (I-294). Broadly supported by local governments, the project is the result of bipartisan consensus reached by the Elgin O’Hare Advisory Council in 2011, which brought together local communities, business, labor, public finance and regional planning and transportation experts. The project includes: Improvements to the existing Illinois Route 390 between Lake Street (U.S. Route 20) and Meacham/Medinah Road with ramp improvements at Irving Park Road and Roselle Road and an improved interchange at Meacham/ Medinah Road. Extending Illinois Route 390 to O’Hare and constructing or improving interchanges at Rohlwing Road (Illinois Route 53), I‐290, Park Boulevard, Arlington Heights Road/Prospect Avenue, Wood Dale Road and Illinois Route 83. Providing direct access to O’Hare property from York Road via a new ramp crossing over York Road and the Union Pacific Railroad and Canadian Pacific Railway.
    [Show full text]
  • Building the Fox River Line
    Issue 00-4, Fall 2000 Building the Fox River Line Editor's Note: This is part two of a three part-part article dealing with the "ROOTS" of the Fox River Trolley Museum's history. These articles along with those on the Batavia Power House help to reinforce an aspect of the Museum's Mission, preserving history. The first article appeared in Issue 00-2 of "Fox River Lines." Microfilms of many Fox River Valley newspapers provided the basis for this articles. Construction of the streetcar and interurban systems was BIG NEWS in Fox River Valley communities at the turn of the 20th Century! Media coverage was extensive and detailed. Local newspapers were the major media in this era that documented the history. Newspaper articles brought to light many interesting details about the development of the interurban trolley line our Fox River Trolley Museum calls "Home." Andy Roth deserves a huge round of applause and appreciation for persevering in this significant endeavor. - Ed. (Part 2) - Elgin to Geneva No 204 headed south on Third Street in Geneva, having just turned south from State Street, now Illinois Route 64. The local newspapers in the Fox River Valley Communities covered the construction of the interurban line from Elgin to Geneva in detail about whether or not the railway was to be built in their town. The trolley's construction was very interesting and had a number of investors nervous with anticipation and anxiety with the tension of a financial deadline looming over the project. Directors of the Elgin City Railway, who were also the Directors of the Carpentersville, Elgin and Aurora, (CE&A) wasted no time in implementing their plan to expand their company through the Fox River Valley.
    [Show full text]
  • Vulnerability of Illinois Nature Preserves to Potential Ground-Water
    Contract Report 612A Vulnerability of Illinois Nature Preserves to Potential Ground-Water Contamination Volume II: Selected Site Data from Vulnerability Assessments and Sensitivity Classifications by Randall A. Locke II Illinois State Water Survey Richard C. Berg Illinois State Geological Survey Mary J. Mushrush Illinois State Geological Survey Prepared for the Illinois Nature Preserves Commission November 1997 Illinois State Water Survey Hydrology Division Champaign, Illinois A Division of the Illinois Department of Natural Resources Vulnerability of Illinois Nature Preserves to Potential Ground-Water Contamination Volume II: Selected Site Data from Vulnerability Assessments and Sensitivity Classifications by Randall A. Locke II, ISWS Richard C. Berg, ISGS Mary Mushrush, ISGS with contributions from H. Allen Wehrmann, ISWS Michael V. Miller, ISGS Daniel C. Barnstable, ISGS Madalene Tierney Cartwright, ISGS Scott C. Meyer, ISWS Final report prepared for the Illinois Nature Preserves Commission November 1997 CONTENTS Page VOLUME II: Selected Site Data from Vulnerability Assessments and Sensitivity Classifications APPENDICES H. GIS Analysis of Sensitivities of Nature Preserves Where Vulnerability Assessments Were Not Made 1 I. Output of Vulnerability Assessment Data from the GROVA Database and Representative Geologic Columns 11 Almond Marsh 18 Armin Krueger Speleological 22 Baker's Lake 26 Barber Fen 30 Barrington Bog 36 Bates Fen 40 Bennett's Terraqueous Gardens 45 Bluff Springs 50 Bonnie's Prairie 54 Braidwood Dunes and Savanna 58 Calamus Lake 64 Cedar Lake Bog : 68 Chauncey Marsh 74 Churchill Prairie 79 Cotton Creek Marsh 83 Cranberry Slough 88 Cretaceous Hills 92 Dean Hills 96 Elizabeth Lake 101 Exner Marsh 107 Farm Trails North 112 Ferson's Creek 117 Fogelpole Cave 121 Forest Glen Seep 125 Fox River Fen 130 Franklin Creek 135 Gavin Bog and Prairie 140 i Page APPENDICES (continued) I.
    [Show full text]
  • Elgin O'hare Western Access City of Elmhurst
    Elgin O’Hare Western Access City of Elmhurst June 17, 2013 1 Project Features Extend Elgin O'Hare Expressway east to O’Hare Airport as a toll road with new or improved interchanges at Illinois Route 53 (Rohlwing Road), I-290, Park Boulevard/ Arlington Heights Road/Prospect Avenue, Wood Dale Road, Illinois Route 83. Two additional lanes from Illinois Route 19 to Meacham/ Medinah Road with minor interchange improvements at Illinois Route 19, Roselle Road and an improved interchange at Meacham/Medinah Road. Convert to toll road. Build new toll road connecting I-90 and I-294 west of O'Hare with new interchanges at I-294, Franklin Avenue/Green Street, Illinois Route 19, Elgin O'Hare extension, Illinois Route 72, I-90; new full access interchange at I-90/Elmhurst Road. 2 June 2013 Project Features O’Hare Access from York Road Direct access to O’Hare Airport provided from York Road Existing Conditions Proposed 3 June 2013 South Section Features I-294 at Illinois Route 64 (North Avenue) New southbound access to North Avenue from I-294 via County Line Road Existing Conditions Proposed 3 June 2013 South Section Features Taft Avenue Connector Existing Conditions Taft Avenue Connector across Bensenville Yard between Franklin Avenue and Illinois Route 19 Proposed 3 June 2013 Travel Benefits Accommodates three times as many vehicles per day as local roads carry now Reduces travel delays on arterial roads by 24 percent Reduces travel time by more than 7 minutes for the 11-mile trip between the west side of O’Hare Airport and U.S.
    [Show full text]