Village of Wilmette Proposal for Engineering Services: Central Avenue - Phase One Rfp No
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Corporate Overview & Statement of Qualifications
Corporate Overview & Statement of Qualifications TRANSPORTATION To Our Prospective Client, I founded Milhouse Engineering & Construction, Inc. with the goal of building the best engineering company in the country. It was based on the belief that if I hired great people, challenged them to excel, and maintained laser focus on the needs of our clients, success would come; and so it has. Our portfolio of successful projects continues to grow; our family of highly satisfied clients continues to expand, and our staff, now numbering over 150 strong, just gets better and better. One of the things of which I am most proud is our 11th consecutive selection as one of the “101 Best and Brightest Companies to Work For” by The National Association of Business Resources. As you review this description of our company’s qualifications, please note that I have based our business model on combining the wisdom and experience of senior experts with the energy, vitality, and creativity of young professionals. The resulting powerful project teams have proven they can meet any challenge and produce great projects on schedule and under budget. I am proud of our people, and I know that Milhouse can present a project team that equals or exceeds the capabilities of any team from any competitor, be they new or old, large or small. We will listen carefully to your needs. We will work tirelessly to see that those needs are fulfilled. We will hold ourselves to the highest standards of integrity and professionalism. We understand the importance of your projects, and we know that we must earn your trust every day. -
River Mileages and Drainage Areas for Illinois Streams—Volume 2, Illinois River Basin
RIVER MILEAGES AND DRAINAGE AREAS FOR ILLINOIS STREAMS—VOLUME 2, ILLINOIS RIVER BASIN U.S. GEOLOGICAL SURVEY Water-Resources Investigations Report 79-111 Prepared in cooperation with the U.S. ARMY CORPS OF ENGINEERS RIVER MILEAGES AND DRAINAGE AREAS FOR ILLINOIS STREAMS—VOLUME 2, ILLINOIS RIVER BASIN By R. W. Healy U.S. GEOLOGICAL SURVEY Water-Resources Investigations Report 79-111 Prepared in cooperation with the U.S. ARMY CORPS OF ENGINEERS 1979 CONTENTS Conversion Table . .iv Abstract . .1 Introduction . .1 Methods . .2 Explanation of tables . .2 References . .3 Index . .291 ILLUSTRATIONS Figure 1. Map showing Illinois counties . .4 2. Map showing stream systems, hydrologic units, and major cities in Illinois. .6 TABLE Table 1. River mileages and drainage areas for Illinois streams . .8 i CONVERSION TABLE Multiply inch-pound unit By To obtain SI (metric) unit mile (mi) 1.609 kilometer (km) square mile (mi2) 2.590 square kilometer (km2) iv RIVER MILEAGES AND DRAINAGE FOR ILLINOIS STREAMS— Volume 2, Illinois River Basin By R. W. Healy ABSTRACT River mileages are presented for points of interest on Illinois streams draining 10 square miles or more. Points of interest include bridges, dams, gaging stations, county lines, hydrologic unit boundaries, and major tributaries. Drainage areas are presented for selected sites, including total drainage area for any streams draining at least 100 square miles. INTRODUCTION Expansion of water-resource investigations within the State of Illinois has amplified the need for a common index to locations on streams. A common index would aid in the coordination of various stream-related activities by facilitating data collection and interpretation. -
2020 Final Budget Book.Indb
456 PAGE INTENTIONALLY LEFT BLANK The Government Finance Offi cers Association of the United States and Canada (GFOA) presented a Distinguished Budget Presentation Award to the Illinois State Toll Highway Authority for the Annual Budget beginning January 2019. In order to receive this award, a governmental unit must publish a budget document that meets program criteria as a policy document, operations guide, fi nancial plan and communications device. For questions regarding the 2020 Budget Book, please contact: Michael Colsch Cathy Williams Sam Samra Chief Financial Offi cer Deputy Chief of Finance Capital Budget Manager Phone: 630-241-6800 TABLE OF CONTENTS TABLE OF CONTENTS Section Page Executive Lett er .......................................................................................................................................................................... 1 Executive Summary ................................................................................................................................................................... 3 Tollway Organization and Background ................................................................................................................................. 7 Revenue Sources and Underlying Assumptions ................................................................................................................. 13 Fund Structure ......................................................................................................................................................................... -
Freight Can't Wait
Freight Can’t Wait Third Edition A list of America’s most critical infrastructure projects About the Coalition The Coalition for America’s Gateways and Trade Corridors (CAGTC) is a diverse coalition of more than 60 public and private organizations dedicated to increasing federal investment in America’s multimodal freight infrastructure. In contrast to single mode interests, CAGTC’s main mission is to promote a seamless goods movement transportation system across all modes to enhance capacity tradecorridors.org and economic growth. For more information on the Coalition for America’s Gateways and Trade Corridors, please visit 202.828.9100 www.tradecorridors.org. @CAGTC Freight Can’t Wait. Freight transportation is the backbone of America’s commerce. It is an economic engine, producing millions of jobs and a higher standard of living for our population. Without the ability to quickly and cost effectively move goods, American businesses struggle to remain competitive and the overall health of the economy suffers. A campaign of strategic investment to expand capacity and increase efficiency is needed to maintain – and grow – U.S. productivity and global competitiveness. This book contains a snapshot of freight projects that stand to benefit from federal partnership and investment. Federal support, in the form of a freight-specific competitive grant program, can incentivize states and localities to finance creatively and make use of public-private partnerships. Direct federal investment can leverage the state, local and private dollar, serving as the final piece in a funding package, and make projects like those in Freight Can’t Wait a reality. Third Edition April 2019 CAGTC | Freight Can’t Wait 1 West CAGTC | Freight Can’t Wait 3 Benefits Alameda Corridor-East The project would eliminate crossing collisions, queu- ing and congestion and reduce vehicle emissions at Project the underpass while the corridor improvements would improve safety at all four crossings in Montebello. -
County of Kane
COUNTY OF KANE Christopher J. Lauzen Kane County Government Center Kane County Board Chai rman 719 South Batavia Avenue Geneva, IL 60134 P: (630) 232-5930 F: (630) 232-9188 [email protected] www.countyofkane.org DOCUMENT VET SHEET for Christopher J. Lauzen Chairman, Kane County Board ~)) Name of Document: I DOT Local Agency Agreement Resolution No.: ...;..1.;:;...3-_..d'.____ _ For the Jurisdictional Transfer of Anderson Road from IL 38 to Prairie Valley Drive from Elburn to the Coun of Kane Submitted by: Linda Haines Date Submitted: June 19 2013 Dept. Head Sign-off Date: j ~ '1.. Lo\ S Examined by: RECEIVED I JUL 2 6 2013 I KANE COUNTY BOARD (Date) Post on the Web: YES / NO ____ Atty. lnitials d Comments: 13 Chairman signed: YES _____ NO _ ____ 1(31/ dfJ (Date) Document returned to: (Name/Department) STATE OF ILLINOIS COUNTY OF KANE RESOLUTION NO. 13- 235 APPROVING LOCAL AGENCY AGREEMENT FOR THE JURISDICTIONAL TRANSFER OF ANDERSON ROAD FROM ILLINOIS ROUTE 38 TO PRAIRIE VALLEY STREET FROM THE VILLAGE OF ELBURN TO THE COUNTY OF KANE WHEREAS, the Illinois Constitution of 1970, Article VII , Section 10 and the Illinois Compiled Statutes (5 IL9S 220/1 et seq.) authorizes the Village of Elburn (Village), the County of Kane (County) and the State of Illinois, acting through its Department of Transportation (lOOT) iO cooperate in the performance of their respective duties and responsibilities by contracts and other agreements; and WHEREAS, the Village has exclusive jurisdiction over Anderson Road and desires to transfer exclusive jurisdiction of Anderson Road from Illinois Route 38 to Prairie Valley Street in its entirety to the County under the terms and conditions as set forth in the Local Agency Agreement for Jurisdictional Transfer (a copy of which is on file with the Kane County Clerk); and WHEREAS, the County and the Village by County Board Resolution No. -
Flood Insurance Study Users
The Federal Emergency Management Agency in Cooperation with DuPage County, Illinois Presents: FLOOD INSURANCE STUDY A Report of Flood Hazards in: DUPAGE COUNTY, ILLINOIS AND INCORPORATED AREAS Prepared, in parts, by: FEMA Region V Nika Engineering 536 South Clark Street 421 Mill Street Chicago, Illinois 60605 and Batavia, Illiois 60510 March 2007 1 7043CV000A NOTICE TO FLOOD INSURANCE STUDY USERS Communities participating in the National Flood Insurance Program have established repositories of flood hazard data for floodplain management and flood insurance purposes. This Flood Insurance Study (FIS) may not contain all data available within the repository. It is advisable to contact the community repository for any additional data. Part or all of this FIS may be revised and republished at any time. In addition, part of this FIS may be revised by the Letter of Map Revision process, which does not involve republication or redistribution of the FIS. It is, therefore, the responsibility of the user to consult with community officials and to check the community repository to obtain the most current FIS components. Initial Countywide FIS Effective Date: December 4, 1985 Revised Countywide FIS Date: June 16, 2004 FLOOD INSURANCE STUDY DuPAGE COUNTY, ILLINOIS TABLE OF CONTENTS Page # 1. INTRODUCTION 1 1.1. Purpose of Study 1 1.2. Authority and Acknowledgments 1 1.3. Coordination 5 1.4. Regional Participation and Progress 7 2. AREA STUDIED 8 2.1. Scope of Study 8 2.2. Community Description 8 2.3. Watershed Description 8 2.3.1. DesPlaines River (DP) 9 2.3.1.1. Geographical Description 9 2.3.1.2. -
Village Marketing Brochure
DESTINATION Roosevelt Road, WINFIELD A Village like no other! The Roosevelt Road/Illinois Route 38 corridor, a major regional east-west commercial roadway connecting Wineld to nearby destinations and retail districts, is planned for future commercial and residential uses. Cantigny Source: Village of Wineld Comprehensive Plan 2014 Key Features Location Trac Counts Along the Roosevelt Road/Illinois Route 38 • Average daily trac counts of 20,800 along commercial corridor Roosevelt Road and 17,600 along Wineld Road Adjacent Uses Development Potential Cantigny (a 500 acre park, war museum and Retail, oce and residential uses. Village golf course) and residential uses of Wineld community goals and objectives for the Roosevelt Road Corridor are detailed in the Village’s Comprehensive Plan (www.villageofwineld.com). DESTINATION Roosevelt Road, WINFIELD A Village like no other! The Roosevelt Road/Illinois Route 38 corridor, a major regional east-west commercial roadway connecting Wineld to nearby destinations and retail districts, is planned for future commercial and residential uses. Cantigny Source: Village of Wineld Comprehensive Plan 2014 Key Features Location Trac Counts Along the Roosevelt Road/Illinois Route 38 • Average daily trac counts of 20,800 along commercial corridor Roosevelt Road and 17,600 along Wineld Road Adjacent Uses Development Potential Cantigny (a 500 acre park, war museum and Retail, oce and residential uses. Village golf course) and residential uses of Wineld community goals and objectives for the Roosevelt Road Corridor are detailed in the Village’s Comprehensive Plan (www.villageofwineld.com). 1 Mile Radius 3 Mile Radius 5 Mile Radius Population 3,115 67,962 178,131 Total Households 1,097 23,192 64,273 Average Household Size 2.81 2.85 2.70 Average Household Income $105,929 $110,207 $106,396 Average Home Value $326,556 $321,854 $328,340 Total Employees 1,407 33,914 92,614 Source: U.S. -
Chapter 15 – Traffic and Vehicles
Chapter 15 – Traffic and Vehicles Chapter 15 - TRAFFIC AND VEHICLES Sec. 15-A TRAFFIC CONTROL Sec. 15-A-1 Ratification of Existing Traffic Control Signs, Signals, Markings All traffic control signs, signals, devices and markings which are in place on the adoption of this Code are hereby ratified and confirmed. (Code 1979, § 14-1) State Law reference — Powers of local authorities generally, 625 ILCS 5/11-208; power of County Board to restrict use of highways due to climatic conditions, 625 ILCS 5/15-316(a); signs required, 625 ILCS 5/15-316(b). Sec. 15-A-2 Permits for Overwidth, Overlength and Overweight Vehicles A. The state has set maximum legal height, width, and weight limitations on all classes of highways in the state as published in the Illinois Vehicle Code 625 ILCS Chapter 15. B. The County highways are classified as class II, III and local road and streets and so designated and are under the jurisdiction and authority of the County Board. C. The Illinois Vehicle Code 625 ILCS Section 5/11-208 authorizes the County Board to enact restrictions as to the use of their highways concerning size, weight, and local regulations. As such vehicles weighing over 54,000 pounds gross weight, are prohibited from using the following roads when appropriate signage is posted at both ends of the following roads: 1. Perry Road from Shabbona Road to South First Street 2. Suydam Road from 701 feet west of Rollo Road proceeding on to West Suydam Road to South County Line. Such prohibition does not extend to police, fire or other emergency vehicles or school buses or those vehicles which are making service calls, pickups or deliveries to residences, farms and construction sites on or adjacent to the roadways. -
2016 IL Tollway Traffic Data Report
2016 Traffic Data Report For The Illinois Tollway System Prepared for Illinois State Highway Authority Prepared by: Illinois State Toll Highway Authority | Traffic Data Report 2016 C O N T E N T S SECTION 1: THE ILLINOIS TOLLWAY SYSTEM SECTION 2: JANE ADDAMS MEMORIAL TOLLWAY SECTION 3: TRI-STATE TOLLWAY SECTION 4: REAGAN MEMORIAL TOLLWAY SECTION 5: VETERANS MEMORIAL TOLLWAY SECTION 6: ILLINOIS ROUTE 390 TOLLWAY APPENDICES: APPENDIX – A: 2016 SYSTEMWIDE ANNUAL AVERAGE DAILY TRAFFIC SCHEMATICS APPENDIX – B: 2016 SYSTEMWIDE AM AND PM PEAK HOUR TRAFFIC SCHEMATICS APPENDIX – C: 2016 LANE CONFIGURATION SCHEMATICS APPENDIX – D: PLAZA LANE LISTING (Please refer to individual sections for detailed Table of Contents) Illinois State Toll Highway Authority | Traffic Data Report 2016 Section 1 The Illinois Tollway System The Illinois Tollway System Illinois State Toll Highway Authority | Traffic Data Report 2016 SECTION 1 The Illinois Tollway System General Information 1-2 TABULATIONS TABLE PAGE 1-A Systemwide Average Daily Traffic Data 1-7 1-B Annual Traffic Totals 1-8 1-C Average Daily Traffic Totals 1-8 1-D Systemwide Monthly Factors 1-8 1-E Annual Transactions by Vehicle 2015-2016 1-9 1-F I-PASS Participation Rate 2015-2016 1-9 1-G History of Tollway Additions by Mileage 1959 - 2016 1-10 1-H History of Tollway Additions by Location 1959 - 2016 1-11 1-I Summary of Traffic Characteristics at Plazas (Annual Transactions) 1-14 ILLUSTRATIONS FIGURE PAGE 1-A The Illinois Tollway System 2016 1-16 1-B Average Annual Daily Traffic 2016 1-17 1-C Average -
337 Acre Cortland Farms Parcels 3 and 4 Multiple Cortland IL 60112
337 Acre Cortland Farms Parcels 3 and 4 Multiple Cortland IL 60112 337 ACRE CORTLAND FARMS PARCELS 3 AND 4 Multiple Cortland IL 60112 For more information contact: Mark Goodwin 1-815-741-2226 [email protected] Goodwin & Associates Real Estate, LLC is an AGENT of the SELLERS. County: DeKalb Township: Cortland Gross Land Area: 337.5 Total Acres Property Type: Vacant Farm Land Possible Uses: Agricultural Production/Future Development Total Investment: $3,543,750 Unit Price: $10,500 per acre Productivity Index (PI): 135.8 Buildings: There are no buildings on these farms. Utilities: Utilities are near the site Zoning: Agriculture Parcels 1 & 2 are under contract leaving 337.5 acres. The 337.50 acre Cortland Farms is located in Dekalb County. Cortland is east of Dekalb (home of Northern Illinois University) along IL Rt. 38. and is approximately 40 miles to the west of Chicago O'Hare International Airport. Both parcels are class A farms with an average soil PI of 135.8. The towns of Cortland, Dekalb, Maple Park. and Sycamore provide many restaurant and entertainment choices. The Dekalb Taylor Municipal airport is with in a few miles of these farms. Parcel #3 175.9 Acres Parcel #4 151.6 Acres Mark Goodwin Phone: 815-741-2226 [email protected] Page 1 of 21 337 Acre Cortland Farms Parcels 3 and 4 Multiple Cortland IL 60112 LISTING DETAILS GENERAL INFORMATION Listing Name: 337.5 Acre Cortland Farms Parcels 3 and 4 Tax ID Number/APN: 09-28-200-005 (Parcel 3) 09-27-100-005 (Parcel 3) 09-27-100-006 (Parcel 3) 09-27-226-006 (Parcel 3) 09-26-100-001 (Parcel 4) 09-27-226-007 (Parcel 4) 09-22-400-004 (Parcel 4) 09-23-300-002 (Parcel 4) Possible Uses: Agriculture and Possible Development AREA & LOCATION School District: Parcels 3 & 4 acre in the Kaneland Community Unit School District #302 Market Type: Rural Residential Location Description: The 337.5 acre Cortland Farms is located approximately 40 miles to the west of Chicago Ohare International Airport, within the towns of Cortland in Cortland Township, Dekalb County. -
We§'T Chicago
~llif~ @if WE§'T CHICAGO WHERE HISTORY & PROGRESS MEET INFRASTRUCTURE COMMITTEE Thursday, February 7, 2019 7:00 P.M. - Committee Room A AGENDA 1. Call to Order, Roll Call, and Establishment of a Quorum 2. Approval of Minutes A. Infrastructure Committee of January 3, 2019 3. Public Participation I Presentations 4. Items for Consent A. Ordinance No. 19-0-0005 - Authorizing the Disposal of Surplus Equipment, Stock Inventory, and/or Personal Property Owned By the City Of West Chicago B. Resolution No. 19-R-0007 -Providing for the City's Repair of State Highways in West Chicago which are Opened by the City of West Chicago During Years 2019 thru 2023 C. Resolution No. 19-R-0010 - IDOT Local Agency Agreement for Federal Participation for Construction Cost for the Washington Street Reconstruction Project D. Resolution No. 19-R-0011 -IDOT Resolution for Improvement Under the Illinois Highway Code for Use of Motor Fuel Tax Funds as City's Local Share of Construction Costs for the Washington Street Reconstruction Project E. Resolution No. l 9-R-0012 - A Resolution for Maintenance of Streets and Highways by the City of West Chicago Relating to FY2019 MFT Estimate of Maintenance Costs F. 2019 Forestry Maintenance Program-Rejection of Bids G. Knickerbocker Roofing & Paving Company, Inc. - Change Order No. 1 and Final for Services Related to the 2018 Wastewater Treatment Plant Roof Replacement Project H. Purchase of One 2019 Ford Escape SE 4WD-Currie Motors, Frankfort, Illinois 5. Items for Discussion 6. Unfinished Business 7. New Business 8. Reports from Staff A. Update on ComEd LED Light Replacement Program B. -
Move Illinois: the Illinois Tollway Driving the Future NEWS
Move Illinois: The Illinois Tollway Driving the Future NEWS FOR IMMEDIATE RELEASE September 17, 2018 EXTENDED RAMP CLOSURE SCHEDULED TO BEGIN THIS WEEK ON SOUTHBOUND VETERANS MEMORIAL TOLLWAY (I-355) AT 63RD STREET Closure needed for repair work, detour will be posted DOWNERS GROVE, IL – An extended ramp closure with detour is scheduled to begin this week and continue through early October for pavement and bridge repair work on the ramp connecting the southbound Veterans Memorial Tollway (I-355) to 63rd Street. Electronic message signs and construction signage will be put in place in advance to alert drivers to the ramp closure and detour. The closure is necessary to safely provide a work zone for pavement patching on the ramp, as well as repairs on the ramp bridge over Jackson Drive. Weather permitting, on Thursday, September 20, the ramp connecting southbound I-355 to 63rd Street is scheduled to close with a posted detour. The detour will direct traffic to continue south to the 75th Street Interchange and then route traffic via Illinois Route 53 to reach Hobson Road/63rd Street. The project is being coordinated with the Illinois Department of Transportation, DuPage County, Village of Woodridge and local fire and police departments. -more- I-355 63rd Street Ramp Closure and Detour - page 2 In 2018, the Illinois Tollway has scheduled roadway, bridge and ramp work on throughout the Veterans Memorial Tollway (I-355). Between Army Trail Road and I-55, work includes resurfacing to provide a smoother riding surface for the traveling public, including widening of the roadway between Butterfield Road (Illinois Route 56) and Roosevelt Road (Illinois Route 38).