Office of the District Officer Buildings Jhelum Tender
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
National Assembly Polling Scheme
ELECTION COMMISSION OF PAKISTAN FORM-28 [see rule 50] LIST OF POLLING STATIONS FOR A CONSTITUENCY OF Election to the National Assembly of the NA-66 JHELUM-I Number of voters assigned to In Case of Rural Areas In Case of Urban Areas Number of polling booths polling station S. No. of voters on the Sr. No. No. and Name of Polling Station electoral roll in case electoral Name of Census Block Name of Census Block area is bifurcated Male Female Total Male Female Total Electoral Areas Code Electoral Areas Code 1 2 3 4 5 6 7 8 9 10 11 12 13 Govt Cap. Hasnat Ali Khan High School Moh Eid Gah 1 - - 125050101 1716 0 1716 4 0 4 Sohawa (M) (P) Sohawa 1 Total - - - 1716 0 1716 4 0 4 Govt Cap. Hasnat Ali Khan Shaheed High Moh Eid Gah 2 - - 125050101 0 1593 1593 0 4 4 School Sohawa (F) (P) Sohawa 2 Total - - - 0 1593 1593 0 4 4 Hydri Mohallah Govt Cap. Hasnat Ali Khan High School 3 - - High School 125050103 696 676 1372 2 2 4 Sohawa (C) (P) Sohawa 3 Total - - - 696 676 1372 2 2 4 Mohra Pari - - 125050102 407 0 407 Sohawa Moh Madni - - 125050104 679 0 679 Sohawa Govt. Cap. Hasnat Ali Khan Shaheed High Khurakha 4 4 0 4 School Sohawa (M) (P) - - Khengran 125050105 472 0 472 Sohawa Khurakha - - Khengran 125050106 226 0 226 Sohawa 4 Total - - - 1784 0 1784 4 0 4 Mohra Pari - - 125050102 0 413 413 Sohawa Moh Madni - - 125050104 0 680 680 Sohawa Govt. -
PAK: Jalalpur Irrigation Project
Environmental Impact Assessment July 2017 PAK: Jalalpur Irrigation Project Project No. 46528-002 Part 8 of 12 of the Appendices Prepared by Irrigation Department, Government of Punjab for the Asian Development Bank (ADB). This environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Detailed Design of Jalalpur Irrigation Project APPENDICES EIA Aman 4/28/2017 ADB PDA 6006: PAK Detailed Design of Jalalpur Irrigation project Environmental Impact Assessment (Updated) LIST OF APPENDICES Appendix-I: Project Area of Influence Map Appendix-II: Checklists and Performa used During EIA Appendix-III: Summer Environmental Monitoring Results 3.1 Ambient Air Monitoring 3.2 Noise Monitoring, 3.3 Surface and Ground Water Appendix-IV: Winter Environmental Monitoring Results at Detailed Design Stage Appendix-V: A list of Secondary Sources used in Compiling (Biological and Natural Environment) Segment of EIA Appendix-VI: A Detailed List of Flora and Fauna Prevalent in the Project Area Appendix-VII: PID’s Letter to Wildlife Department Appendix-VIII: Response Letters from Wildlife Department Appendix-IX: Socioeconomic -
Jalalpur Irrigation Project: Land Acquisition and Resettlement Plan
Land Acquisition and Resettlement Plan (LARP) Project number: 46528–002 June 2019 PAK: Jalalpur Irrigation Project Prepared by the Irrigation Department, Government of the Punjab for the Asian Development Bank (ADB). This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. IRRIGATION DEPARTMENT, GOVERNMENT OF THE PUNJAB JALALPUR IRRIGATION PROJECT Land Acquisition and Resettlement Plan (LARP) for JIP/WKS/ICB-P2 (RD 52+000 to RD 225+500) (PART-1) May 2019 NATIONAL ENGINEERING SERVICES PAKISTAN (PVT) LIMITED NESPAK House, 1-C, Block-N, Model Town Extension, Lahore-54700, Pakistan PABX: 92 42 99090000 Fax: 92 42 99231940 E-mail: [email protected] Website: www.nespak.com.pk Sub-Consultants INTEGRATED CONSULTING Technical Resource SERVICES (PVT) LIMITED766- Services (PVT) LIMITED13- G/4 JOHAR TOWN, LAHORE L Model Town Extension, Lahore PAKISTAN JIP-ADB PDA 6006: PAK Detailed Design Land Acquisition and Resettlement Plan of Jalalpur Irrigation Project ICB-P2 - RD 52+000 to RD 225+500 LAND ACQUISITION AND RESETTLEMENT PLAN TABLE OF CONTENTS Page No. LIST OF CONTENTS ............................................................................................................................... i LIST OF ANNEXURES ......................................................................................................................... -
1. Short Title and Commencement. 2. Definitions. 3. Application of the Act
An Act to provide for the levy and collection of tax on certain lands in the Punjab Preamble. WHEREAS it is expedient to provide for the levy and collection of improvement tax on certain lands in the Punjab: It is hereby enacted as follows:- 1. Short title and commencement. 1. Short title and commencement. (1) This Act may be called the Punjab Lands Improvement Tax Act, 1975. (2) It shall come into force at once. 2. Definitions. 2. Definitions. (1) In this Act, unless there is anything repugnant in the subject or context,- (a) and means the land assessed to land revenue; (b) ocal Area means the area specified in the Schedule; (c) chedule means the Schedule appended to this Act; and (d) ax means the tax levied under this Act. (2) The words and expression used but not defined shall bear the same meaning as they bear in the West Pakistan[2] Land Revenue Act, 1967. 3. Application of the Act. 3. Application of the Act. This Act shall apply to the lands situated in the local areas specified in the Schedule. 4. Tax on lands in the local areas. 4. Tax on lands in the local areas. There shall be levied and collected tax from the owners of the lands situated in the local areas at the rate of Rs. 3.75 per acre per annum for a period of 12 years. pd4ml evaluation copy. visit http://pd4ml.com 5. Levy, collection and recovery of tax. 5. Levy, collection and recovery of tax. Tax shall be levied and collected in such manner as may be prescribed and the arrears of it may be recovered as if it were arrears of land revenue. -
0 95 0 89 93.68 6 1 3 16 49 21 Science 53 0 53 0 52 98.11 1 0 15 4 27 6 Total 149 0 148 0 141 95.27 7 1 18 4 43 55 21 101006 Govt
BOARD OF INTERMEDIATE & SECONDARY EDUCATION, RAWALPINDI BISER COMPUTER SECTION INSTITUTION-WISE TOTAL CANDIDATES APPEARED / PASSED / PASS PERCENTAGE DATE: JULY 15, 2019 Page 1 of 148 GROUPS ENRO CANC APPE UFM/ PASS PASS FAI ABS --PASSING GRADE WISE-- LLED LLED ARED ETC ED %AGE LED ENT A A+ B C D E CODE INSTITUTE NAME 101001 GOVT. GIRLS HIGH SCHOOL NO. 1 ATTOCK GENERAL 151 0 151 0 91 60.26 60 0 7 23 34 27 SCIENCE 254 0 252 0 215 85.32 37 2 43 18 51 81 22 TOTAL 405 0 403 0 306 75.93 97 2 50 18 74 115 49 101002 GOVT. GIRLS HIGH SCHOOL NO. 2 ATTOCK GENERAL 61 0 60 0 37 61.67 23 1 5 1 9 10 12 SCIENCE 175 0 175 0 135 77.14 40 0 21 14 44 45 11 TOTAL 236 0 235 0 172 73.19 63 1 26 15 53 55 23 101003 GOVT. GIRLS HIGH SCHOOL BOLIANWAL (ATTOCK) GENERAL 31 0 30 0 20 66.67 10 1 2 7 8 3 SCIENCE 43 0 43 0 38 88.37 5 0 11 4 17 6 TOTAL 74 0 73 0 58 79.45 15 1 13 4 24 14 3 101004 GOVT. GIRLS HIGH SCHOOL GHOURGHUSHTI, GENERAL 79 0 79 0 62 78.48 17 0 12 2 25 20 3 (ATTOCK) SCIENCE 20 0 20 0 20 100 0 0 5 4 9 2 TOTAL 99 0 99 0 82 82.83 17 0 17 6 34 22 3 101005 GOVT. -
Flood Emergency Reconstruction and Resilience Project Project
Flood Emergency Reconstruction and Resilience Project (RRP PAK 49038) Project Administration Manual Project Number: 49038-001 Loan and Technical Assistance Numbers: {LXXXX; TAXXXX} June 2015 Islamic Republic of Pakistan: Flood Emergency Reconstruction and Resilience Project i Project Administration Manual Purpose and Process The project administration manual (PAM) describes the essential administrative and management requirements to implement the project on time, within budget, and in accordance with Government and Asian Development Bank (ADB) policies and procedures. The PAM should include references to all available templates and instructions either through linkages to relevant URLs or directly incorporated in the PAM. The executing and implementing agencies are wholly responsible for the implementation of ADB financed projects, as agreed jointly between the borrower and ADB, and in accordance with Government and ADB’s policies and procedures. ADB staff is responsible to support implementation including compliance by executing and implementing agencies of their obligations and responsibilities for project implementation in accordance with ADB’s policies and procedures. At Loan Negotiations the borrower and ADB shall agree to the PAM and ensure consistency with the Loan and Project agreements. Such agreement shall be reflected in the minutes of the Loan Negotiations. In the event of any discrepancy or contradiction between the PAM and the Loan and Project Agreements, the provisions of the Loan and Project Agreements shall prevail. After ADB Board approval of the project's report and recommendations of the President (RRP) changes in implementation arrangements are subject to agreement and approval pursuant to relevant Government and ADB administrative procedures (including the Project Administration Instructions) and upon such approval they will be subsequently incorporated in the PAM. -
Public Notice Auction of Gold Ornaments and Valuables
PUBLIC NOTICE AUCTION OF GOLD ORNAMENTS AND VALUABLES Finance facilities were extended by JS Bank Limited to its customers mentioned below against the security of deposit and pledge of Gold ornaments/valuables. The customers have neglected and failed to repay the finances extended to them by JS Bank Limited along with the mark-up thereon. The current outstanding liability of such customers is mentioned below. Notice is hereby given to the under mentioned customers that if payment of the entire outstanding amount of finance along with mark-up is not made by them to JS Bank Limited within 15 days of the publication of this notice, JS Bank Limited shall auction the Gold ornaments/valuables after issuing public notice regarding the date and time of the public auction and the proceeds realized from such auction shall be applied towards the outstanding amount due and payable by the customers to JS Bank Limited. No further public notice shall be issued to call upon the customers to make payment of the outstanding amounts due and payable to JS Bank as mentioned hereunder: Total Outstanding as ACCOUNT Customer Name Address of 8th March, 2020 1419730 TASNEEM 698,499 HOUSE NO E 37 MOHALL AH GULISTAN E SAJJAD QASIMABAD HYDERABAD HYDERABAD 1263339 MIR MUHAMMAD ALI 362,212 H NO 52 PARO CIVIL L INES HYDERABAD HYDERABAD 1299330 AHSAN ALI 261,430 KHALIFO FILLING STAT ION NEAR ALFALAH BANK KACHERY ROAD KHAIRPUR KHAIRPUR 1346800 MUHAMMAD SHAHBAN 248,049 VILLAGE BANGHAO BULL O BULLA PO KOT BULLO TAL PANOA KIL DISTT SUKKUR SUKKUR 1250313 SIDRA TALAT 234,822 -
0 95 0 89 93.68 6 1 3 16 49 21 Science 53 0 53 0 52 98.11 1 0 15 4 27 6 Total 149 0 148 0 141 95.27 7 1 18 4 43 55 21 101006 Govt
BOARD OF INTERMEDIATE & SECONDARY EDUCATION, RAWALPINDI BISER COMPUTER SECTION INSTITUTION-WISE TOTAL CANDIDATES APPEARED / PASSED / PASS PERCENTAGE DATE: JULY 15, 2019 Page 1 of 148 GROUPS ENRO CANC APPE UFM/ PASS PASS FAI ABS --PASSING GRADE WISE-- LLED LLED ARED ETC ED %AGE LED ENT A A+ B C D E CODE INSTITUTE NAME 101001 GOVT. GIRLS HIGH SCHOOL NO. 1 ATTOCK GENERAL 151 0 151 0 91 60.26 60 0 7 23 34 27 SCIENCE 254 0 252 0 215 85.32 37 2 43 18 51 81 22 TOTAL 405 0 403 0 306 75.93 97 2 50 18 74 115 49 101002 GOVT. GIRLS HIGH SCHOOL NO. 2 ATTOCK GENERAL 61 0 60 0 37 61.67 23 1 5 1 9 10 12 SCIENCE 175 0 175 0 135 77.14 40 0 21 14 44 45 11 TOTAL 236 0 235 0 172 73.19 63 1 26 15 53 55 23 101003 GOVT. GIRLS HIGH SCHOOL BOLIANWAL (ATTOCK) GENERAL 31 0 30 0 20 66.67 10 1 2 7 8 3 SCIENCE 43 0 43 0 38 88.37 5 0 11 4 17 6 TOTAL 74 0 73 0 58 79.45 15 1 13 4 24 14 3 101004 GOVT. GIRLS HIGH SCHOOL GHOURGHUSHTI, GENERAL 79 0 79 0 62 78.48 17 0 12 2 25 20 3 (ATTOCK) SCIENCE 20 0 20 0 20 100 0 0 5 4 9 2 TOTAL 99 0 99 0 82 82.83 17 0 17 6 34 22 3 101005 GOVT. -
District JHELUM CRITERIA for RESULT of GRADE 8
Notes, Books, Past Papers, Test Series, Guess Papers & Many More Pakistan's Educational Network - SEDiNFO.NET - StudyNowPK.com - EduWorldPK.com 3/31/2020 Punjab Examination Commission Gazette 2020 - Grade 8 District JHELUM CRITERIA FOR RESULT OF GRADE 8 Criteria JHELUM Punjab Status Minimum 33% marks in all subjects 84.88% 87.33% PASS Pass + Minimum 33% marks in four subjects and 28 to 32 marks Pass + Pass with 86.57% 89.08% in one subject Grace Marks Pass + Pass with Pass + Pass with grace marks + Minimum 33% marks in four Grace Marks + 95.59% 96.66% subjects and 10 to 27 marks in one subject Promoted to Next Class Candidate scoring minimum 33% marks in all subjects will be considered "Pass" One star (*) on total marks indicates that the candidate has passed with grace marks. Two stars (**) on total marks indicate that the candidate is promoted to next class. WWW.SEDiNFO.NET osrs.punjab.gov.pk 1/161 Notes, Books, Past Papers, Test Series, Guess Papers & Many More Pakistan's Educational Network - SEDiNFO.NET - StudyNowPK.com - EduWorldPK.com Notes, Books, Past Papers, Test Series, Guess Papers & Many More Pakistan's Educational Network - SEDiNFO.NET - StudyNowPK.com - EduWorldPK.com 3/31/2020 Punjab Examination Commission Gazette 2020 - Grade 8 PUNJAB EXAMINATION COMMISSION, RESULT INFORMATION GRADE 8 EXAMINATION, 2020 DISTRICT: JHELUM Pass + Students Students Students Pass % with Pass + Gender Promoted Registered Appeared Pass 33% marks Promoted % Students Male 7073 6979 6192 88.72 6782 97.18 Public School Female 8027 7945 6456 81.26 -
JHELUM-Ren8c3.Pdf
Renewal List S/NO REN# / NAME FATHER'S PRESENT ADDRESS DATE OF ACADEMIC REN DATE NAME BIRTH QUALIFICATION 1 47418 SHAMREZ SAJJAD SAJJAD AHMED MARKAZI JAMIA MASJID SOHAWA DISTT,, 15-3-1981 MATRIC 29/02/2015 JHELUM, PUNJAB 2 40771 IKHLAQ AHMED FAQIR ISLAM PURA TEH, DINA DISTT. JHELUM , 24-2-1982 MATRIC 11/7/2014 MUHAMMAD JHELUM, PUNJAB 3 31608 MUHAMMAD YAQUB DAULAT ALI VILL & P/O BEHLOLA VIA KALA GUJRAN TEH & 4-9-1963 MATRIC 11/07/2014 DISTT. JHELUM , JHELUM, PUNJAB 4 21324 ILYAS AHMED ARJASAB KHAN V.P.O. SAHAL VIA BARAGOWAHTEH SOHAWA 1/8/1959 MATRIC 13/07/2014 DIST, JHELUM, PUNJAB 5 22038 MUHAMMAD MUHAMMAD H.B-230MOH MAJAHID ABAD, JHELUM, PUNJAB 5/2/1959 F.A 14/07/2014 KHAWAR MAHMOOD KHAN 6 30123 ABDUL MAJEED HAFIZ GHULAM VILL KANTRILLA VIA KAL GUJRAN DISTT, 12-12- MATRIC 15/07/2014 RASUL JHELUM , JHELUM, PUNJAB 1961 7 27020 MEHWISH TAJ TAJ MUHAMMAD D-288, BILAL TOWN, JHELUM, PUNJAB 7-3-1982 MATRIC 16/07/2014 8 25314 SHABBIR HUSSAIN MUHD. SIDDIQ NEW MOH. G.T. ROAD. DINA., JHELUM, PUNJAB 6/6/1958 MATRIC 18/07/2014 SHAH SHAH 9 37458 NISHAT JAVEED SULTAN THATHI GUJRAN P/O KASHMIR COLONY TEH, & 10-5-1973 MATRIC 9/8/2014 MEHMOOD DISTT, JHELUM, JHELUM, PUNJAB 10 35342 MUHAMMAD IQBAL MAIN SAKHI VILLAGE & P.O. SANGHOL,JHELUM., JHELUM, 10/11/1941 B.Sc. 27/8/2014 MIRZA MUHAMMAD PUNJAB 11 22077 MUHAMMAD AMIN MUHAMMAD VILL. SHEIKHA UBE-E-DRYAP.O. CHAK DOULAT, 20/5/1976 MATRIC 03/09/2014 AKBAR JHELUM, PUNJAB 12 37009 RAHAT KAYANI MUHAMMAD VILLAGE AND P/O BARAGOWAH TEH, SOHAWA 11-3-1981 MATRIC 7/9/2014 ZULFIQAR DISTT, , JHELUM, PUNJAB 13 22160 ADNAN WAHEED ALLAH DITTA V.P.O. -
Part 8 of 9 of the Main Report
Environmental Impact Assessment July 2017 PAK: Jalalpur Irrigation Project Project No. 46528-002 Part 8 of 9 of the Main Report Prepared by Irrigation Department, Government of Punjab for the Asian Development Bank (ADB). This environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. ADB PDA 6006: PAK Detailed Design of Jalalpur Irrigation Project Environmental Impact Assessment (Updated) CHAPTER-7 STAKEHOLDER CONSULTATION 7.1. Introduction 393. The basic purpose of conducting the stakeholder consultation was to involve the key stakeholders and locals into the process of Project design and to incorporate the appropriate environmental and social concerns into the process. Moreover, Pak-EPA’s IEE/EIA Regulations specify that the stakeholder consultation process shall be an integral part of environmental assessment, and thus makes it mandatory. This Chapter presents the details of the stakeholder consultation process carried out for the proposed Project. Consultations which were initiated at the Project preparatory/feasibility stage for the EIA were continued at the detailed design stage. 394. Stakeholders of the Project were identified, categorized and accessed at selected federal, provincial, district and village levels (including those who will be directly and indirectly affected by the Project). -
Tender Notice
TENDER NOTICE Sealed tenders under PRIME MINISTER’S GLOBAL SDGs ACHIEVEMENT PROGRAM 2016-17 as per PPRA Rules 2014 (Amended upto date) on items rate/MRS on T.S estimate, are hereby invited from the approved contractors / firms of Public Health Engg: Department, who have got their names enlisted / renewed and have deposited their enlistment / renewal fee for the year 2016-17 along with valid PEC License 2017 for the work mentioned below. The tender documents can be obtained from the date of publication from the Divisional Head Clerk of this office upto 27-03- 2017 during office hours. The bidding documents are available on the PPRA website & in the office of the undersigned against written request accompanied with attested copies of enlistment/upto date renewal letter and fee receipt, PEC license for the year 2017 authority letter on letter head pad from the contractor/firms. CNIC copy of contractor/managing partner of the firm along with registered power of attorney and on payment of prescribed tender printing charges (Non-Refundable). Schemes are Technically Sanctioned by the Executive Engineer, PHE Division Jhelum vide No.345/Sd,346/Sd,347/Sd & 348/Sd dated 07-03-2017. 1. The tenders will be received in the office of the undersigned upto 1:30 PM and will be opened on the same day at 2:00 PM respectively in the presence of tender opening committee and intending contractors or their authorized representatives, in the office of the undersigned PHE Division Jhelum. 2. The amount of earnest money in shape of deposit at call from a schedule Bank in the name of Executive Engineer, PHE Division Jhelum is required under rules, failing which the tender documents shall not be issued.