Tender Notice

Total Page:16

File Type:pdf, Size:1020Kb

Tender Notice TENDER NOTICE Sealed tenders under PRIME MINISTER’S GLOBAL SDGs ACHIEVEMENT PROGRAM 2016-17 as per PPRA Rules 2014 (Amended upto date) on items rate/MRS on T.S estimate, are hereby invited from the approved contractors / firms of Public Health Engg: Department, who have got their names enlisted / renewed and have deposited their enlistment / renewal fee for the year 2016-17 along with valid PEC License 2017 for the work mentioned below. The tender documents can be obtained from the date of publication from the Divisional Head Clerk of this office upto 27-03- 2017 during office hours. The bidding documents are available on the PPRA website & in the office of the undersigned against written request accompanied with attested copies of enlistment/upto date renewal letter and fee receipt, PEC license for the year 2017 authority letter on letter head pad from the contractor/firms. CNIC copy of contractor/managing partner of the firm along with registered power of attorney and on payment of prescribed tender printing charges (Non-Refundable). Schemes are Technically Sanctioned by the Executive Engineer, PHE Division Jhelum vide No.345/Sd,346/Sd,347/Sd & 348/Sd dated 07-03-2017. 1. The tenders will be received in the office of the undersigned upto 1:30 PM and will be opened on the same day at 2:00 PM respectively in the presence of tender opening committee and intending contractors or their authorized representatives, in the office of the undersigned PHE Division Jhelum. 2. The amount of earnest money in shape of deposit at call from a schedule Bank in the name of Executive Engineer, PHE Division Jhelum is required under rules, failing which the tender documents shall not be issued. 3. No tender will be issued to those contractor/firms whose performance on the works in hands is not up to the mark or previously their progress was lagging behind the schedule. 4. No tender will be issued on the date of receipt of tenders. 5. The works will be got completed strictly as per time limit mentioned against each. No claim of price variation will be entertained what ever be the reason. 6. Last date for submission of application for purchase of tender would be upto 27-03-2017. 7. Date of receipt/opening of tenders 28-03-2017. Rejection of bids. 1. The procuring agency may reject all bids or proposals at any time prior to the acceptance of a bid or proposal. 2. The procuring agency shall upon request communicate to any bidder, the grounds for its rejection of all bids or proposals, but shall not be required to justify those grounds. Cost in Earnest Time Tender Sr. No. Name of Scheme Million Money Limit Fees PP-25 i. Construction of PCC Streets / Drains in Village Rohtas (from GGHS to Masjid) ii. Construction of PCC Streets / Drains 1 1.973 2 Months 1000/- in Village Watalian (from H/O Raja Afzal 2 % to Masjid Mia Allah Rakha), with other allied work UC Badlot, Tehsil Dina. i. Construction of main PCC Path/Drain in Village Muftian Ismail (from main road to village) ii. 2 Construction of PCC Streets / Drains 2.946 2 % 2 Months 1000/- in Village Pasrali (from Graveyard to H/O Mian Khan), with other allied work UC Boken, Tehsil Jhelum i. Construction of PCC Streets / Drains in Village Chak Jamal (from main road to graveyard) ii. Construction of PCC Main Path in 3 8.339 2 % 4 Months 2000/- Village Porela (from Chokora Road to Graveyard) iii. Construction of PCC Streets / Drains in Village Sheikh Qureshan (from Hashmi Page 1 of 6 Cost in Earnest Time Tender Sr. No. Name of Scheme Million Money Limit Fees House to existing PCC Road), Tehsil, Jhelum iv. Construction of PCC Streets / Drains in Village Bhatial (from H/O Muhammad Aslam to Main Road), with other allied work UC Chak Jamal, Tehsil Jhelum. i. Construction of PCC Streets / Drains in Village Kala Dev (from H/O Baba Sherbaz to Sultania Karyana Store) ii. Construction of PCC Streets / 4 2.473 2 % 2 Months 1000/- Drains in Village Chak Khasa (from H/O Ch. Javed Mushtaq to Javed Karyana Store), with other allied work UC Chak Khasa, Tehsil Jhelum. i. Construction of PCC Streets / Drains & RCC Sewer in village Dhanyala (from H/O Fazal Ellahi to H/O Khadim Hussain, from Army Gate to Mohallah Shaikhan) ii. Construction of RCC 5 Sewer in Chak Darya (from Main 6.385 2 % 4 Months 2000/- Masjid to Kassi) iii. Construction of PCC Streets / Drains in Village Ranjha (near H/O Fazal), with other allied work UC Dhanyala, Tehsil Dina i. Construction of PCC Streets / Drains in Village Behram Pur (from H/O Ch. Khalil to H/O Warasat Hussain) ii. Construction of PCC Streets / Drains & storm water channel in 6 Village Neerkhian (from H/O Shafaat 2.375 2 % 2 Months 1000/- Rasool to H/O Ch. Hameed) iii. Construction of Main PCC Path in Village Tamma Ajaib (from Masjid to village),with other allied work UC Garh Mehal, Tehsil Dina i. Construction of PCC Streets / Drains and Storm water channel in Village Gurrah Ahmad (near GGPS and storm water channel from main street to 7 Nullah Ghan) ii. Construction of PCC 2.984 2 % 2 Months 1000/- Streets / Drains in Village Nathwala (from H/O Raja Hameed to main road), with other allied work UC Janjeel, Tehsil Dina Construction of PCC Streets / Drains & RCC Sewer in Village Chak Baraham 8 (from Darbar to Village),with other 2.457 2 % 2 Months 1000/- allied work UC Kala Gujran, Tehsil Jhelum Construction of PCC Streets in Village Gaggar Kalan (from main street to H/O 9 Ch. Shafaat Hussain & near 0.984 2 % 1 Month 1000/- Graveyard), with other allied work UC Khukha, Tehsil Page 2 of 6 Cost in Earnest Time Tender Sr. No. Name of Scheme Million Money Limit Fees Construction of PCC Streets / Drains in Village Chak Akka, Bura Jangle 10 (from H/O Muhammad Ashraf to 1.982 2 % 2 Months 1000/- Masjid), with other allied work UC Madhu Kalas, Tehsil Dina Construction of PCC Streets / Drains in Village Chak Budho (from Gondal 11 House to H/O Muhammad Asghar), 0.981 2 % 1 Month 1000/- with other allied work UC Monan, Tehsil Jhelum i. Construction of PCC Streets in Village Pind Rajwal (from H/O Master Zaman to H/O Tariq Mehmood) 12 ii. Construction of PCC Streets / 2.550 2 % 2 Months 1000/- Drains in Village Joian (from Dera Asif to H/O Sheraz), UC Mughalabad, Tehsil Dina i. Construction of Storm Water Channel in Village Khai Kulia (near H/O Habib ullah to Nullah Ghan) 13 ii. Construction of PCC Streets / 4.899 2 % 3 Months 1000/- Drains in Village Khai Kotli (near Graveyard), with other allied work UC Sanghoi Tehsil Jhelum Construction of PCC Streets / Drains in Pind Jata (from H/O Haji Shah 14 1.957 2 % 2 Months 1000/- Muhammad to Masjid), with other allied work UC Sohan, Tehsil Dina. Construction of Playground in Kala Gujran Ward No.12 (near GBHS), 15 3.960 2 % 3 Months 1000/- Earth filling with other allied work Tehsil Jhelum. Construction of PCC Streets in Nawab Colony from New Shine CNG Station 16 0.974 2 % 1 Month 1000/- GT Road, Ward No.13, with other allied work Tehsil Jhelum Construction of PCC Streets in Mohallah Islam Pura (Ward No.17) 17 0.988 2 % 1 Month 1000/- (near H/O of Zahoor Kayani), with other allied work Tehsil Jhelum PP-26 Construction of PCC streets in Village Dhoke Kanyal (from link Watalian road 1 2.451 2 % 2 Months 1000/- to Madrissa tun Nisa), with other allied work UC Badlot, Tehsil Jhelum Construction of PCC Streets / Drain in Village Khurd, UC Chotala, (from Main 2 road towards Mirza Mukhtar srteet / 2.451 2 % 2 Months 1000/- Mumyan link road) with other allied work Tehsil Jhelum i. Construction of PCC Streets / Drain in Village Darapur (Javed Sab wali Gali) 3 ii. Construction of PCC Streets / Drain 9.020 2 % 4 Months 2000/- /RCC Sewer in Village Kotli Syedan (from Imam bargah to Afza Haider) iii. Construction of PCC Streets / Drain Page 3 of 6 Cost in Earnest Time Tender Sr. No. Name of Scheme Million Money Limit Fees in Village Maryala, Bhai Luddan, (from P.D Khan road towards Main,street) i.v Construction of Culvert, Approach Path & Retaining Wall to village Phadiala, Old Darapur Kass, with other allied work UC Darapur, Tehsil Jhelum i. Construction of PCC Streets/ Drain & Nullah in village Gharmala (From Jamia Masjid to Old well) ii. Construction of PCC streets / 4 7.421 2 % 4 Months 2000/- retaining wall & nullah in village Gharmala, with other allied work UC Monan, (From Main road to Graveyard) Tehsil Jhelum Construction of PCC Streest / in Kala Gujran, Ward No 27, 28 (Near 5 Gujjran wali Masjid to house of 2.475 2 % 2 Months 1000/- Arshad), with other allied work Tehsil Jhelum Construction of PCC Streets in Mohallah Changer West Colony (from Waheed Bhatti 6 to Jamia Masjid Farooqia), with other 2.451 2 % 2 Months 1000/- allied work UC Kotla Faqir, Tehsil Jhelum Construction of PCC Streets / Drain in Village Khalaspur, UC Naka 7 2.451 2 % 2 Months 1000/- Khurd, (Near BHU) with other allied work Tehsil Jhelum i. Construction of PCC Street / Drain in Village Malu Sanghoi (near Graveyard/Kassi) 8 ii. Construction of PCC Street / Drain 5.392 2 % 3 Months 2000/- in Village Toor (from Main street towards Jamia Masjid), with other allied work UC Sanghoi, Tehsil Jhelum Construction of PCC Street / Drain Iqbal Town, Dhoke Firdous (from Main 9 2.461 2 % 2 Months 1000/- Street to Norani Masjid) with other allied work Ward No.1, Jhelum City Construction of PCC Streets / Drain / RCC Sewer in Dhoke Jumma, Ward No 10 2.451 2 % 2 Months 1000/- 11, (Near Fezan-e-Madina) with other allied work Jhelum Construction of PCC in Streets in Bilal Town, Ward No 2, Mohallah Shah pur (From House of Sufi 11 2.473 2 % 2 Months 1000/- Liaqat Ali to House of Muhammad Jamil) with other allied work Tehsil Jhelum Construction of PCC Streets / RCC Sewer in Mohallah Islampura, Dhok Jeven (Ward No.31), (from 12 2.452 2 % 2 Months 1000/- Muslim Girls High School to House of M.Waseem with other allied work Tehsil Jhelum 13 Construction of PCC Streets / Drain in 2.458 2 % 2 Months 1000/- Page 4 of 6 Cost in Earnest Time Tender Sr.
Recommended publications
  • Askari Bank Limited List of Shareholders (W/Out Cnic) As of December 31, 2017
    ASKARI BANK LIMITED LIST OF SHAREHOLDERS (W/OUT CNIC) AS OF DECEMBER 31, 2017 S. NO. FOLIO NO. NAME OF SHAREHOLDERS ADDRESSES OF THE SHAREHOLDERS NO. OF SHARES 1 9 MR. MOHAMMAD SAEED KHAN 65, SCHOOL ROAD, F-7/4, ISLAMABAD. 336 2 10 MR. SHAHID HAFIZ AZMI 17/1 6TH GIZRI LANE, DEFENCE HOUSING AUTHORITY, PHASE-4, KARACHI. 3280 3 15 MR. SALEEM MIAN 344/7, ROSHAN MANSION, THATHAI COMPOUND, M.A. JINNAH ROAD, KARACHI. 439 4 21 MS. HINA SHEHZAD C/O MUHAMMAD ASIF THE BUREWALA TEXTILE MILLS LTD 1ST FLOOR, DAWOOD CENTRE, M.T. KHAN ROAD, P.O. 10426, KARACHI. 470 5 42 MR. M. RAFIQUE B.R.1/27, 1ST FLOOR, JAFFRY CHOWK, KHARADHAR, KARACHI. 9382 6 49 MR. JAN MOHAMMED H.NO. M.B.6-1728/733, RASHIDABAD, BILDIA TOWN, MAHAJIR CAMP, KARACHI. 557 7 55 MR. RAFIQ UR REHMAN PSIB PRIVATE LIMITED, 17-B, PAK CHAMBERS, WEST WHARF ROAD, KARACHI. 305 8 57 MR. MUHAMMAD SHUAIB AKHUNZADA 262, SHAMI ROAD, PESHAWAR CANTT. 1919 9 64 MR. TAUHEED JAN ROOM NO.435, BLOCK-A, PAK SECRETARIAT, ISLAMABAD. 8530 10 66 MS. NAUREEN FAROOQ KHAN 90, MARGALA ROAD, F-8/2, ISLAMABAD. 5945 11 67 MR. ERSHAD AHMED JAN C/O BANK OF AMERICA, BLUE AREA, ISLAMABAD. 2878 12 68 MR. WASEEM AHMED HOUSE NO.485, STREET NO.17, CHAKLALA SCHEME-III, RAWALPINDI. 5945 13 71 MS. SHAMEEM QUAVI SIDDIQUI 112/1, 13TH STREET, PHASE-VI, DEFENCE HOUSING AUTHORITY, KARACHI-75500. 2695 14 74 MS. YAZDANI BEGUM HOUSE NO.A-75, BLOCK-13, GULSHAN-E-IQBAL, KARACHI.
    [Show full text]
  • National Assembly Polling Scheme
    ELECTION COMMISSION OF PAKISTAN FORM-28 [see rule 50] LIST OF POLLING STATIONS FOR A CONSTITUENCY OF Election to the National Assembly of the NA-66 JHELUM-I Number of voters assigned to In Case of Rural Areas In Case of Urban Areas Number of polling booths polling station S. No. of voters on the Sr. No. No. and Name of Polling Station electoral roll in case electoral Name of Census Block Name of Census Block area is bifurcated Male Female Total Male Female Total Electoral Areas Code Electoral Areas Code 1 2 3 4 5 6 7 8 9 10 11 12 13 Govt Cap. Hasnat Ali Khan High School Moh Eid Gah 1 - - 125050101 1716 0 1716 4 0 4 Sohawa (M) (P) Sohawa 1 Total - - - 1716 0 1716 4 0 4 Govt Cap. Hasnat Ali Khan Shaheed High Moh Eid Gah 2 - - 125050101 0 1593 1593 0 4 4 School Sohawa (F) (P) Sohawa 2 Total - - - 0 1593 1593 0 4 4 Hydri Mohallah Govt Cap. Hasnat Ali Khan High School 3 - - High School 125050103 696 676 1372 2 2 4 Sohawa (C) (P) Sohawa 3 Total - - - 696 676 1372 2 2 4 Mohra Pari - - 125050102 407 0 407 Sohawa Moh Madni - - 125050104 679 0 679 Sohawa Govt. Cap. Hasnat Ali Khan Shaheed High Khurakha 4 4 0 4 School Sohawa (M) (P) - - Khengran 125050105 472 0 472 Sohawa Khurakha - - Khengran 125050106 226 0 226 Sohawa 4 Total - - - 1784 0 1784 4 0 4 Mohra Pari - - 125050102 0 413 413 Sohawa Moh Madni - - 125050104 0 680 680 Sohawa Govt.
    [Show full text]
  • PAK: Jalalpur Irrigation Project
    Environmental Impact Assessment July 2017 PAK: Jalalpur Irrigation Project Project No. 46528-002 Part 10 of 12 of the Appendices Prepared by Irrigation Department, Government of Punjab for the Asian Development Bank (ADB). This environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Detailed Design of Jalalpur Irrigation Project APPENDICES EIA Aman 4/28/2017 ADB PDA 6006: PAK Detailed Design of Jalalpur Irrigation project Environmental Impact Assessment (Updated) LIST OF APPENDICES Appendix-I: Project Area of Influence Map Appendix-II: Checklists and Performa used During EIA Appendix-III: Summer Environmental Monitoring Results 3.1 Ambient Air Monitoring 3.2 Noise Monitoring, 3.3 Surface and Ground Water Appendix-IV: Winter Environmental Monitoring Results at Detailed Design Stage Appendix-V: A list of Secondary Sources used in Compiling (Biological and Natural Environment) Segment of EIA Appendix-VI: A Detailed List of Flora and Fauna Prevalent in the Project Area Appendix-VII: PID’s Letter to Wildlife Department Appendix-VIII: Response Letters from Wildlife Department Appendix-IX: Socioeconomic
    [Show full text]
  • Administrative Atlas , Punjab
    CENSUS OF INDIA 2001 PUNJAB ADMINISTRATIVE ATLAS f~.·~'\"'~ " ~ ..... ~ ~ - +, ~... 1/, 0\ \ ~ PE OPLE ORIENTED DIRECTORATE OF CENSUS OPERATIONS, PUNJAB , The maps included in this publication are based upon SUNey of India map with the permission of the SUNeyor General of India. The territorial waters of India extend into the sea to a distance of twelve nautical miles measured from the appropriate base line. The interstate boundaries between Arunachal Pradesh, Assam and Meghalaya shown in this publication are as interpreted from the North-Eastern Areas (Reorganisation) Act, 1971 but have yet to be verified. The state boundaries between Uttaranchal & Uttar Pradesh, Bihar & Jharkhand and Chhattisgarh & Madhya Pradesh have not been verified by government concerned. © Government of India, Copyright 2006. Data Product Number 03-010-2001 - Cen-Atlas (ii) FOREWORD "Few people realize, much less appreciate, that apart from Survey of India and Geological Survey, the Census of India has been perhaps the largest single producer of maps of the Indian sub-continent" - this is an observation made by Dr. Ashok Mitra, an illustrious Census Commissioner of India in 1961. The statement sums up the contribution of Census Organisation which has been working in the field of mapping in the country. The Census Commissionarate of India has been working in the field of cartography and mapping since 1872. A major shift was witnessed during Census 1961 when the office had got a permanent footing. For the first time, the census maps were published in the form of 'Census Atlases' in the decade 1961-71. Alongwith the national volume, atlases of states and union territories were also published.
    [Show full text]
  • Flood Emergency Reconstruction and Resilience Project, Loan No. 3264
    Due Diligence Report on Social Safeguards Loan 3264-PAK: Flood Emergency Reconstruction and Resilience Project (FERRP)–Punjab Roads Component Due Diligence Report on Social Safeguards on Reconstruction of Daska – Pasrur Road March 2017 Prepared by: Communication and Works Department, Government of the Punjab NOTES (i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June. (ii) In this report, "$" refers to US dollars. This Social Safeguards due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. GOVERNMENT OF THE PUNJAB COMMUNICATION & WORKS DEPARTMENT Flood Emergency Reconstruction and Resilience Project (FERRP) Social Due Diligence Report of Reconstruction of Daska- Pasrur Road (RD 0+000 – RD 30+000) March, 2017 Prepared by TA Resettlement Specialist for Communication and Works Department, Government of Punjab, Lahore Table of Contents CHAPTER 1 INTRODUCTION ................................................................................................................... 1 A. Background: .............................................................................................................
    [Show full text]
  • Case Studies of People with Disabilities ID Sohawa Sanghoi March
    The New Chapter Empowering Persons with Disabilities to Become Persons with Different Abilities in District Jehlum Case Studies of People with Disabilities December 2014 TABLE OF CONTENTS Our Approach to Mainstream Disability Preamble .......................................................... 4 1. Life’s Little Tests ............................................. 5 2. Nightmarish Reality ............................................. 7 3. Young Woes ...................................................... 8 4. Broken Threads ................................................. 10 5. The Cawing of the Crows ........................................ 12 6. Peering Through the Cracks ..................................... 14 7. Demeaning Demeanour ............................................ 16 8. Her First Words ................................................ 18 9. Loneliness ..................................................... 20 10. Glass Dolls ................................................... 22 11. Living in the Shadows ......................................... 24 12. Changing the Future ........................................... 26 OUR APPROACH FOR MAINSTREAMING DISABILITY We work at five levels simultaneously for mainstreaming disability in local development through social mobilization. It is believed that if our approach is implemented in its true letter and spirit each level produces a ripple effect, which eventually leads to change in the national policies, and practices and achieves inclusive development as an overall goal. The major
    [Show full text]
  • Pincode Officename Statename Minisectt Ropar S.O Thermal Plant
    pincode officename districtname statename 140001 Minisectt Ropar S.O Rupnagar PUNJAB 140001 Thermal Plant Colony Ropar S.O Rupnagar PUNJAB 140001 Ropar H.O Rupnagar PUNJAB 140101 Morinda S.O Ropar PUNJAB 140101 Bhamnara B.O Rupnagar PUNJAB 140101 Rattangarh Ii B.O Rupnagar PUNJAB 140101 Saheri B.O Rupnagar PUNJAB 140101 Dhangrali B.O Rupnagar PUNJAB 140101 Tajpura B.O Rupnagar PUNJAB 140102 Lutheri S.O Ropar PUNJAB 140102 Rollumajra B.O Ropar PUNJAB 140102 Kainaur B.O Ropar PUNJAB 140102 Makrauna Kalan B.O Rupnagar PUNJAB 140102 Samana Kalan B.O Rupnagar PUNJAB 140102 Barsalpur B.O Ropar PUNJAB 140102 Chaklan B.O Rupnagar PUNJAB 140102 Dumna B.O Ropar PUNJAB 140103 Kurali S.O Mohali PUNJAB 140103 Allahpur B.O Mohali PUNJAB 140103 Burmajra B.O Rupnagar PUNJAB 140103 Chintgarh B.O Rupnagar PUNJAB 140103 Dhanauri B.O Rupnagar PUNJAB 140103 Jhingran Kalan B.O Rupnagar PUNJAB 140103 Kalewal B.O Mohali PUNJAB 140103 Kaishanpura B.O Rupnagar PUNJAB 140103 Mundhon Kalan B.O Mohali PUNJAB 140103 Sihon Majra B.O Rupnagar PUNJAB 140103 Singhpura B.O Mohali PUNJAB 140103 Sotal B.O Rupnagar PUNJAB 140103 Sahauran B.O Mohali PUNJAB 140108 Mian Pur S.O Rupnagar PUNJAB 140108 Pathreri Jattan B.O Rupnagar PUNJAB 140108 Rangilpur B.O Rupnagar PUNJAB 140108 Sainfalpur B.O Rupnagar PUNJAB 140108 Singh Bhagwantpur B.O Rupnagar PUNJAB 140108 Kotla Nihang B.O Ropar PUNJAB 140108 Behrampur Zimidari B.O Rupnagar PUNJAB 140108 Ballamgarh B.O Rupnagar PUNJAB 140108 Purkhali B.O Rupnagar PUNJAB 140109 Khizrabad West S.O Mohali PUNJAB 140109 Kubaheri B.O Mohali PUNJAB
    [Show full text]
  • Tender Notice
    TENDER NOTICE Sealed tenders based on percentage rates/Market rate (MRS period 2nd BI-Annaual 1st July, 2017 to 31st December 2017) & (MRS period 1st BI-Annaual 1st January, 2018 to 30th June 2018 in Tender No.2) in regard of District Jhelum are hereby invited for the works mentioned below from the Contractors/Firms enlisted in Local Government (Engineering Wing) Jhelum for the year 2017-18. Tender document can be obtained from the office of the undersigned against written request accompanied original document of enlistment/ upto date renewal letter and fee receipt. PEC license for the year 2017-18, Identity Card of original Contractor/ Managing Partner of the firm along with registered Partnership deed and on payment on prescribed tender fee in term of CDR/Bank Draft of any schedule Bank. No tender should be issued to any representative of a Firm until & unless he possesses the registered power of attorney. Simple authority on company’s pad will not be entertained. Tendered rate and amount should be filled in figure as well as in word and tender should be signed as per general directions given in the tender document. No rebate on tendered rates will be acceptable. Tender will be issued up to 04-06-2018 till 9:30 AM To 3:00 PM and received on in the office of the undersigned up to 1:00 PM and will be opened at 2:00 PM as per PPRA Rule 30(i)of 2014 by the tender opening committee in the presence of intending contractors. Conditional tenders and the tenders not accompanied with earnest money in shape of deposit at call receipt from schedule bank (along with telephone numbers for its confirmation) and attested copies of registered partnership deed in case of firms will not be entertained.
    [Show full text]
  • Part-I: Post Code Directory of Delivery Post Offices
    PART-I POST CODE DIRECTORY OF DELIVERY POST OFFICES POST CODE OF NAME OF DELIVERY POST OFFICE POST CODE ACCOUNT OFFICE PROVINCE ATTACHED BRANCH OFFICES ABAZAI 24550 Charsadda GPO Khyber Pakhtunkhwa 24551 ABBA KHEL 28440 Lakki Marwat GPO Khyber Pakhtunkhwa 28441 ABBAS PUR 12200 Rawalakot GPO Azad Kashmir 12201 ABBOTTABAD GPO 22010 Abbottabad GPO Khyber Pakhtunkhwa 22011 ABBOTTABAD PUBLIC SCHOOL 22030 Abbottabad GPO Khyber Pakhtunkhwa 22031 ABDUL GHAFOOR LEHRI 80820 Sibi GPO Balochistan 80821 ABDUL HAKIM 58180 Khanewal GPO Punjab 58181 ACHORI 16320 Skardu GPO Gilgit Baltistan 16321 ADAMJEE PAPER BOARD MILLS NOWSHERA 24170 Nowshera GPO Khyber Pakhtunkhwa 24171 ADDA GAMBEER 57460 Sahiwal GPO Punjab 57461 ADDA MIR ABBAS 28300 Bannu GPO Khyber Pakhtunkhwa 28301 ADHI KOT 41260 Khushab GPO Punjab 41261 ADHIAN 39060 Qila Sheikhupura GPO Punjab 39061 ADIL PUR 65080 Sukkur GPO Sindh 65081 ADOWAL 50730 Gujrat GPO Punjab 50731 ADRANA 49304 Jhelum GPO Punjab 49305 AFZAL PUR 10360 Mirpur GPO Azad Kashmir 10361 AGRA 66074 Khairpur GPO Sindh 66075 AGRICULTUR INSTITUTE NAWABSHAH 67230 Nawabshah GPO Sindh 67231 AHAMED PUR SIAL 35090 Jhang GPO Punjab 35091 AHATA FAROOQIA 47066 Wah Cantt. GPO Punjab 47067 AHDI 47750 Gujar Khan GPO Punjab 47751 AHMAD NAGAR 52070 Gujranwala GPO Punjab 52071 AHMAD PUR EAST 63350 Bahawalpur GPO Punjab 63351 AHMADOON 96100 Quetta GPO Balochistan 96101 AHMADPUR LAMA 64380 Rahimyar Khan GPO Punjab 64381 AHMED PUR 66040 Khairpur GPO Sindh 66041 AHMED PUR 40120 Sargodha GPO Punjab 40121 AHMEDWAL 95150 Quetta GPO Balochistan 95151
    [Show full text]
  • FLOOD RISK ASSESSMENT REPORT a Hi-Tech Knowledge Management Tool for Disaster Risk Assessment at UNION COUNCIL Level
    2015 FLOOD RISK ASSESSMENT REPORT A Hi-Tech Knowledge Management Tool for Disaster Risk Assessment at UNION COUNCIL Level A PROPOSAL IN VIEW OF LESSONS LEARNED ISBN (P) 978-969-638-093-1 ISBN (D) 978-969-638-094-8 205-C 2nd Floor, Evacuee Trust Complex, F-5/1, Islamabad 195-1st Floor, Deans Trade Center, Peshawar Cantt; Peshawar Landline: +92.51.282.0449, +92.91.525.3347 E-mail: [email protected], Website: www.alhasan.com ALHASAN SYSTEMS PRIVATE LIMITED A Hi-Tech Knowledge Management, Business Psychology Modeling, and Publishing Company 205-C, 2nd Floor, Evacuee Trust Complex, Sector F-5/1, Islamabad, Pakistan 44000 195-1st Floor, Dean Trade Center, Peshawar Can ; Peshawar, Pakistan 25000 Landline: +92.51.282.0449, +92.91.525.3347 Fax: +92.51.835.9287 Email: [email protected] Website: www.alhasan.com Facebook: www.facebook.com/alhasan.com Twi er: @alhasansystems w3w address: *Alhasan COPYRIGHT © 2015 BY ALHASAN SYSTEMS All rights reserved. No part of this publica on may be reproduced, stored in a retrieval system, or transmi ed, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior wri en permission of ALHASAN SYSTEMS. 58 p.; 8.5x11.5 = A3 Size Map ISBN (P) 978-969-638-093-1 ISBN (D) 978-969-638-094-8 CATALOGING REFERENCE: Disaster Risk Reduc on – Disaster Risk Management – Disaster Risk Assessment Hyogo Framework for Ac on 2005-2015 Building the Resilience of Na ons and Communi es to Disasters IDENTIFY, ACCESS, AND MONITOR DISASTER RISKS AND ENHANCE EARLY WARNING x Risk assessments
    [Show full text]
  • 1. Short Title and Commencement. 2. Definitions. 3. Application of the Act
    An Act to provide for the levy and collection of tax on certain lands in the Punjab Preamble. WHEREAS it is expedient to provide for the levy and collection of improvement tax on certain lands in the Punjab: It is hereby enacted as follows:- 1. Short title and commencement. 1. Short title and commencement. (1) This Act may be called the Punjab Lands Improvement Tax Act, 1975. (2) It shall come into force at once. 2. Definitions. 2. Definitions. (1) In this Act, unless there is anything repugnant in the subject or context,- (a) and means the land assessed to land revenue; (b) ocal Area means the area specified in the Schedule; (c) chedule means the Schedule appended to this Act; and (d) ax means the tax levied under this Act. (2) The words and expression used but not defined shall bear the same meaning as they bear in the West Pakistan[2] Land Revenue Act, 1967. 3. Application of the Act. 3. Application of the Act. This Act shall apply to the lands situated in the local areas specified in the Schedule. 4. Tax on lands in the local areas. 4. Tax on lands in the local areas. There shall be levied and collected tax from the owners of the lands situated in the local areas at the rate of Rs. 3.75 per acre per annum for a period of 12 years. pd4ml evaluation copy. visit http://pd4ml.com 5. Levy, collection and recovery of tax. 5. Levy, collection and recovery of tax. Tax shall be levied and collected in such manner as may be prescribed and the arrears of it may be recovered as if it were arrears of land revenue.
    [Show full text]
  • 0 95 0 89 93.68 6 1 3 16 49 21 Science 53 0 53 0 52 98.11 1 0 15 4 27 6 Total 149 0 148 0 141 95.27 7 1 18 4 43 55 21 101006 Govt
    BOARD OF INTERMEDIATE & SECONDARY EDUCATION, RAWALPINDI BISER COMPUTER SECTION INSTITUTION-WISE TOTAL CANDIDATES APPEARED / PASSED / PASS PERCENTAGE DATE: JULY 15, 2019 Page 1 of 148 GROUPS ENRO CANC APPE UFM/ PASS PASS FAI ABS --PASSING GRADE WISE-- LLED LLED ARED ETC ED %AGE LED ENT A A+ B C D E CODE INSTITUTE NAME 101001 GOVT. GIRLS HIGH SCHOOL NO. 1 ATTOCK GENERAL 151 0 151 0 91 60.26 60 0 7 23 34 27 SCIENCE 254 0 252 0 215 85.32 37 2 43 18 51 81 22 TOTAL 405 0 403 0 306 75.93 97 2 50 18 74 115 49 101002 GOVT. GIRLS HIGH SCHOOL NO. 2 ATTOCK GENERAL 61 0 60 0 37 61.67 23 1 5 1 9 10 12 SCIENCE 175 0 175 0 135 77.14 40 0 21 14 44 45 11 TOTAL 236 0 235 0 172 73.19 63 1 26 15 53 55 23 101003 GOVT. GIRLS HIGH SCHOOL BOLIANWAL (ATTOCK) GENERAL 31 0 30 0 20 66.67 10 1 2 7 8 3 SCIENCE 43 0 43 0 38 88.37 5 0 11 4 17 6 TOTAL 74 0 73 0 58 79.45 15 1 13 4 24 14 3 101004 GOVT. GIRLS HIGH SCHOOL GHOURGHUSHTI, GENERAL 79 0 79 0 62 78.48 17 0 12 2 25 20 3 (ATTOCK) SCIENCE 20 0 20 0 20 100 0 0 5 4 9 2 TOTAL 99 0 99 0 82 82.83 17 0 17 6 34 22 3 101005 GOVT.
    [Show full text]