NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 1

Northeast Sector Area Transit Plan Appendix C Recommended Near-Term Priorities July 2015

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 2

Table of Contents

1. Recommended near-term priorities...... 3

2. Evergreen integration...... 4

Evergreen integration: 97 B-line, C24, New 7 ...... 4

Evergreen integration: 160, 190...... 6

Evergreen integration: 143, 151, 153, 157, New 3 ...... 8

Evergreen integration: 188...... 10

Evergreen integration: 159, 169, C40, New 6...... 12

Evergreen integration: C27, C28, C30, 178, New 7...... 14

Evergreen integration: C37, C38...... 16

3. Expansion: High priority...... 18

High priority: 152, 156, New 1, New 2 ...... 18

High priority: New 9...... 20

High priority: New 8...... 21

High priority: Lougheed Highway B-Line or better study...... 22

4. Expansion: Medium priority...... 23

Medium priority: C37, C38, New 4...... 23

Medium priority: C25 A/B, C26 A/B ...... 25

Medium priority: 701 local service...... 27

Medium priority: Infrastructures initiatives...... 29

5. Expansion: Low priority ...... 30

Low priority: C36...... 30

Low priority: New 5...... 32

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 3

1. Recommended near-term priorities

Recommended near-term priorities (categorized by priority level)

CA CB C

BEDWELL BAY RD

PLATEAU

CA BLVD CB CB BLVD PARKWAY Partner with municipalities to SUNNYSIDE RD HERITAGE WESTWOOD identify, prioritize and implement C MOUNTAIN PANORAMA PLATEAU C PRINCETON AVE improved mulitmodal integration DR JOHNSON ST BURKE CA HERITAGE MTN BLVD RAVINE DR ROBSON MOUNTAIN New  NOONS DR PIPELINE RD

and transit priority. CB CREEK DR ST ROCKLIN C

IOCO RD

LAFARGE LAKE C  GISLASON AVE GUILDFORD DOUGLAS DUNKIRK VICTORIA DR WAY COLLEGE AVE C PARK C New   PINETREE WAY MOODY CENTRE MURRAY ST LINCOLN

CECILE DR CECILE

PIPELINE RD

GLENAYRE DR GLENAYRE

INLET CENTRE SHAUGHNESSY ST ST FREMONT

ST JOHNS ST DR CEDAR  ST New  LOUGHEED HWY

SIMON FRASER DEWDNEY TRUNK RD WESTWOOD

COAST MERIDIAN RD OXFORD ST

UNIVERSITY  DR THERMAL  C New   AVE BIRCHLAND C PORT C MANOR CLARKE RD COQUITLAM SPURAWAY CENTRE New 

 ST LINTON C BURQUITLAM New  AVE  DOMINION MARINER WAY MARINER PORT

HILLCREST ST HILLCREST TRIANGLE COTTONWOOD CHILKO DR AVE COQUITLAM FOSTER AVE FOSTER   DOMINION AVE AVE POIRIER SHAUGHNESSY ST POIRIER  KINGSWAY AVE

NORTH RD AUSTIN HEIGHTS CENTRE FREMONTST C LOUGHEED  C TOWN CENTRE RIVERVIEW CR  MAILLARDVILLE  

Legend New  ST

New  WESTERN DR SkyTrain LECLAIR DR DR  MARMONT BRUNETTE AVE

HOUSE ST HOUSE

West Coast Express SCHOOL- MUNDY ST MUNDY  KEBET WAY LOUGHEED HWY Current Routes (2014) EASTERN DR

SkyTrain Station EDWARD EDWARD

UNITED KING KING LOUGHEED HWY

Transit Exchange BLVD ST UNITED BLVD Limited Service BRAID BRAID Complete detailed planning, Network Integration COQUITLAM WATERFRONTNew   advance towards Lougheed  Evergreen Integration SAPPERTON Network Expansion Hwy “B-Line or Better” service Map not to scale New   High Priority  Medium Priority  Low Priority

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 4

2. Evergreen integration

Evergreen integration: 97 B-line, C24, New 7

Current

COLLEGE PARK GUILDFORD WAY C IOCO RD MURRAY ST CECILE DR CECILE

GLENAYRE DR GLENAYRE

ST JOHNS ST WESTWOOD ST Map not COQUITLAM to scale CENTRAL  B-Line Legend SPURAWAY CLARKE RD AVE

COTTONWOOD AVE SkyTrain MARINER WAY MARINER

HILLCREST ST HILLCREST West Coast Express CHILKO DR FOSTER AVE  Current Route Current Limited 1 NORTH RD AUSTIN  Service Route POIRIER Current Bus Network PRODUCTION WAY- HEIGHTS CENTRE UNIVERSITY RIVERVIEWSkyTrain CR Station LOUGHEED Transit Exchange TOWN CENTRE

Recommended

LAFARGE LAKE DOUGLAS COLLEGE PARK UNGLESS IOCO RD WAY C New 

CECILE DR CECILE MOODY CENTRE MURRAY ST LINCOLN

GLENAYRE DR GLENAYRE

ST JOHNS ST INLET CENTRE Map not WESTWOOD ST to scale

CLARKE RD Legend SPURAWAY BURQUITLAM AVE COTTONWOOD AVE SkyTrain MARINER WAY MARINER West Coast Express CHILKO DR FOSTER AVE  Proposed Route Proposed Limited 1

NORTH RD  AUSTIN POIRIER Service Route PRODUCTION WAY- HEIGHTS CENTRE Current Bus Network UNIVERSITY SkyTrainRIVERVIEW CR Station LOUGHEED Transit Exchange TOWN CENTRE

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 5

Current Frequency (in Minutes) Current Vehicle Type

Route Non-Peak Peak Non-Peak Peak

C24 30/60 15 Minibus Minibus

97 B-Line 15 7 Bus Articulated

Target Frequency (in Minutes) Target Vehicle Type

Route Non-Peak Peak Non-Peak Peak

C24 30/60 15 Minibus Bus

New 7 15/30 10 Bus Articulated

RECOMMENDED CHANGES: OUTCOMES:

• Reduce duplicate routes by removing the 97 B-Line • SkyTrain extension introduces fast, more frequent once the Evergreen extension of the Millennium Line and reliable connections between Coquitlam, Port is operational. Moody and the regional rapid transit network.

• Introduce New 7 to maintain all day frequent and • Resources like buses and revenue hours from local stop service on Guildford Way in Coquitlam and discontinued 97 B-Line become available to help Murray Street in Port Moody. implement other recommended network changes.

• Use a conventional bus to increase capacity on the • Local bus service along the majority of North Road, Clarke C24 during peak periods. Road and St. Johns Street maintained using C24.

• Use of conventional bus during peak periods on C24 provides more seats for customers to help reduce overcrowding along Clarke Road, St. Johns Street and in College Park.

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 6

Evergreen integration: 160, 190

Current

HERITAGE MOUNTAIN IOCO RD  To Vancouver COLLEGE PIPELINE RD PARK MURRAY ST PORT MOODY BARNET HWY

CLARKE ST  

ST JOHNS ST WESTWOOD ST COQUITLAM LOUGHEED HWY CENTRAL Legend SkyTrain West Coast Express COMO LAKE AVE CENTRE PORT Current Route COQUITLAM Current Limited 1 Service Route Current Bus Network

SkyTrain Station SHAUGHNESSY ST POIRIER Map not Transit Exchange CENTRE to scale

PITT RIVER DR Recommended

HERITAGE MOUNTAIN LAFARGE LAKE DOUGLAS To Vancouver COLLEGE PARK MOODY CENTRE LINCOLN PIPELINE RD

IOCO RD IOCO INLET CENTRE

ST JOHNS ST  WESTWOOD ST

LOUGHEED HWY SHAUGHNESSY ST Legend SkyTrain PORT West Coast Express COQUITLAM COMO LAKE AVE Proposed Route CENTRE PORT Proposed Limited COQUITLAM 1 Service Route Current Bus Network SkyTrain Station

Map not SHAUGHNESSY ST Transit Exchange POIRIER CENTRE to scale

PITT RIVER DR

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 7

Current Frequency (in Minutes) Current Vehicle Type

Route Non-Peak Peak Non-Peak Peak

160 30 15 Bus Bus

190 - 30/60 - Bus

Target Frequency (in Minutes) Target Vehicle Type

Route Non-Peak Peak Non-Peak Peak

160 30/60 30 Bus Bus

RECOMMENDED CHANGES: OUTCOMES:

• Redesign 160 to travel between Port Coquitlam and • Direct, local bus connection between Port Kootenay Loop in Burnaby via Guildford Way, St. Coquitlam Centre and Downtown Vancouver is Johns Street, Barnet Highway and Hastings Street maintained during peak periods.

with local stop service along Hastings Street in • SkyTrain extension introduces fast, more frequent Burnaby. and reliable connections between Coquitlam, Port • Maintain one trip per hour on the 160 between Port Moody and the regional rapid transit network, Coquitlam and Downtown Vancouver during morning including Downtown Vancouver.

and afternoon peak periods only. • More consistent service throughout the day along • Eliminate 190 peak period service between Coquitlam Guildford Way where demand is high.

Central and Downtown Vancouver. Service along Barnett • Resources like buses and revenue hours from Highway will be maintained via redesigned C28. 190 and truncated 160 become available to help implement other recommended network changes.

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 8

Evergreen integration: 143, 151, 153, 157, New 3

Current

MURRAY ST PORT MOODY COQUITLAM CENTRAL ST JOHNS ST LOUGHEED HWY SIMON FRASER MARINER WAY UNIVERSITY

PORT NORTH RD COQUITLAM AVE CENTRE PORT SPURAWAY CENTRE

 ST LINTON COQUITLAM

COTTONWOOD AVE  FOSTER AVE ST HILLCREST AUSTIN POIRIER

CLARKE RD HEIGHTS CENTRE PRODUCTION WAY-

UNIVERSITY ST MUNDY Legend LOUGHEED HWY

SCHOOLHOUSE ST LOUGHEED SkyTrain TOWN CENTRE West Coast Express  Current Route PITT RIVER DR WESTERN DR

MARMONT ST Current Limited  1 BRUNETTE AVE Service Route EASTERN DR Current Bus Network MAILLARDVILLE SkyTrain Station BRAID Map not to scale Transit Exchange

Recommended

MOODY CENTRE MURRAY ST LINCOLN

GLENAYRE DR GLENAYRE INLET CENTRE ST JOHNS ST

SIMON FRASER

UNIVERSITY  DR THERMAL  LOUGHEED HWY

SHAUGHNESSY ST OXFORD ST New  COQUITLAM AVE PORT NORTH RD COQUITLAM SPURAWAY CENTRE PORT

 ST LINTON COQUITLAM BURQUITLAM AVE

COTTONWOOD AVE WAY MARINER HILLCREST ST HILLCREST CHILKO DR FOSTER AVE  FOSTER AVE AUSTIN POIRIER

CLARKE RD HEIGHTS CENTRE PRODUCTION WAY-

UNIVERSITY Legend MARMONT LOUGHEED  SkyTrain

MAILLARDVILLE ST TOWN CENTRE West Coast Express PITT RIVER DR BRUNETTE AVE Proposed Route WESTERN DR Proposed Limited 1 Service Route LOUGHEED EASTERN DR HWY Current Bus Network SkyTrain Station BRAID Transit Exchange UNITED BLVD Map not to scale

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 9

Current Frequency (in Minutes) Current Vehicle Type

Route Non-Peak Peak Non-Peak Peak

151 30/60 20 Bus Bus

153 30/60 30 Bus Bus

157 30/60 30 Bus Bus

143 15/30 10 Bus Articulated

Target Frequency (in Minutes) Target Vehicle Type

Route Non-Peak Peak Non-Peak Peak

151 30/60 15 Bus Articulated

153 30/60 20 Minibus Minibus

157 30/60 30 Minibus Bus

New 3 15/30 10 Bus Articulated

RECOMMENDED CHANGES: OUTCOMES:

• Redesign 151 to provide direct, all-day service along • More direct connections to SkyTrain and local centres.

Como Lake Avenue between Port Coquitlam Centre • More consistent and more frequent service between and Burquitlam Station, replacing the 143. Port Coquitlam Centre and Coquitlam Central • Introduce New 3 peak frequent, limited stop service throughout the week provided by 151. between SFU and Burquitlam Station.

• Extend 153 to Moody Centre via Thermal Drive/Moray CONDITIONS FOR IMPLEMENTATION: Street and use a minibus for all trips. • Municipal partners, in partnership and cooperation • Extend 157 to connect to Burquitlam Station via with TransLink, may be required to implement transit Foster Avenue and Cottonwood Avenue. supportive infrastructure, like bus stops, sidewalks and crosswalks, in some areas along Thermal Drive.

• Traffic mitigation measures in congested areas should be considered.

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 10

Evergreen integration: 188

Current

RAVINE DR ROBSON BURKE DR MOUNTAIN NOONS CREEK DR 

VICTORIA DR

MURRAY ST PIPELINE RD

PINETREE WAY WESTWOOD ST LOUGHEED HWY

COQUITLAM OXFORD ST CENTRAL BIRCHLAND COQUITLAM AVE Legend PORT MANOR COQUITLAM COAST MERIDIAN RD SkyTrain SPURAWAY CENTRE West Coast Express AVE Current Route

Current LimitedWAY MARINER HILLCREST ST HILLCREST 1 PORT Service Route COQUITLAM Current Bus Network

PITT SHAUGHNESSY ST SkyTrain Station RIVER RD MCLEAN AVE Transit Exchange Map not to scale

Recommended

HERITAGE MTN BLVD ROBSON BURKE DR MOUNTAIN 

LAFARGE LAKE VICTORIA DR DOUGLAS

PINETREE WAY

MURRAY ST LINCOLN

SHAUGHNESSY ST

INLET CENTRE PIPELINE RD

WESTWOOD ST COAST MERIDIAN RD

LOUGHEED HWY OXFORD ST BIRCHLAND COQUITLAM AVE Legend PORT MANOR SkyTrain COQUITLAM West Coast ExpressSPURAWAY CENTRE Proposed RouteAVE Proposed Limited 1 WAY MARINER PORT HILLCREST ST HILLCREST Service Route COQUITLAM Current Bus Network

PITT SHAUGHNESSY ST SkyTrain Station RIVER RD MCLEAN AVE Transit Exchange Map not to scale

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 11

Current Frequency (in Minutes) Current Vehicle Type

Route Non-Peak Peak Non-Peak Peak

188 30 30 Bus Bus

Target Frequency (in Minutes) Target Vehicle Type

Route Non-Peak Peak Non-Peak Peak

188 30 15 Bus Bus

RECOMMENDED CHANGES: OUTCOMES:

• Increase frequency on 188 during peak periods to • Supports more frequent bus service to West Coast every 15 minutes. Express and SkyTrain.

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 12

Evergreen integration: 159, 169, C40, New 6

Current

DUNKIRK AVE

PORT MOODY COQUITLAM

CENTRAL COAST MERIDIAN RD

Legend OXFORD ST LOUGHEED HWY SkyTrain BIRCHLAND West Coast Express MANOR Current Route  PORT Current Limited COQUITLAM 1 SPURAWAY

Service Route ST LINTON CENTRE PORT Current Bus Network AVE COQUITLAM COTTONWOOD AVE

SkyTrain Station WAY MARINER HILLCREST ST HILLCREST CHILKO DR Transit Exchange

AUSTIN SHAUGHNESSY ST KINGSWAY AVE HEIGHTS

HOLLY DR C

BRUNETTE AVE PITT RIVER DR

MAILLARDVILLE KEBET WAY LOUGHEED HWY

LOUGHEED HWY EDWARD ST EDWARD

UNITED CITADEL DR KING

BRAID BLVD UNITED BLVD

COQUITLAM WATERFRONT  Map not to scale SAPPERTON

Recommended

MOODY CENTRE MURRAY ST LINCOLN INLET CENTRE ST JOHNS ST

Legend COAST MERIDIAN RD LOUGHEED HWY SkyTrain OXFORD ST BIRCHLAND West Coast Express COQUITLAM AVE C MANOR Proposed Route  KINGSWAY AVE Proposed Limited 1 SPURAWAY PORT PORT

 ST LINTON Service Route COQUITLAM AVE COQUITLAM

Current Bus Network CENTRE ST TYNER COTTONWOOD AVE

SkyTrain Station WAY MARINER HILLCREST ST HILLCREST CHILKO DR Transit Exchange

AUSTIN POIRIER KINGSWAY AVE SHAUGHNESSY ST LANGAN AVE HEIGHTS CENTRE

RIVERVIEW CR

HOLLY DR

PITT RIVER DR MARMONT

ST C

BRUNETTE AVE MUNDY ST MUNDY KEBET WAY MAILLARDVILLE LOUGHEED HWY

LOUGHEED HWY  EDWARD ST EDWARD

UNITED KING

BRAID BLVD UNITED BLVD CITADEL DR

COQUITLAM WATERFRONTNew  SAPPERTON  Map not to scale

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 13

Current Frequency (in Minutes) Current Vehicle Type

Route Non-Peak Peak Non-Peak Peak

159 30/60 20 Bus Bus

169 15/60 15 Bus Bus

C40 - 30 - Minibus

Target Frequency (in Minutes) Target Vehicle Type

Route Non-Peak Peak Non-Peak Peak

159 30/60 20 Bus Bus

169 30/60 30 Bus Bus

C40 30/60 15 Minibus Minibus

New 6 30 30 Minibus Bus

RECOMMENDED CHANGES: FUTURE CONSIDERATIONS:

• Remove 159 service to Mary Hill business area and • Opportunity for New 6 to use upgraded Braid Street United Boulevard. Bridge to establish a more direct connection between

• Extend C40 to Coquitlam Central and provide the Coquitlam Waterfront, United Boulevard and frequent peak service to Mary Hill business area. Braid Station.

• Introduce New 6 to provide expanded local service to • Opportunity for New 6 to be extend into Coquitlam Coquitlam Waterfront, United Boulevard and Mayfair Waterfront area as new development occurs. industrial area. • Opportunity to extend New 6 to Lougheed Highway to connect with 169. OUTCOMES: CONDITIONS FOR IMPLEMENTATION: • More direct service and faster travel times on transit between Port Coquitlam and Braid Station. • Municipal partners, in partnership and cooperation

• More consistent and reliable service for customers with TransLink, may be required to implement transit between Port Coquitlam Centre, Coquitlam Central supportive infrastructure, like bus stops, sidewalks and Mary Hill business area. and crosswalks, in some areas such as Coquitlam Waterfront and Lougheed Highway. • More transit access to United Boulevard industrial area (Hartley and Rogers Avenue).

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 14

Evergreen integration: C27, C28, C30, 178, New 7

Current

Legend

SkyTrain West Coast Express

PLATEAU  Current Route BLVD Current Limited 1  Service Route BLVD

PARKWAY SUNNYSIDECurrent RD Bus Network HERITAGE SkyTrain Station C WESTWOOD MOUNTAIN C Transit Exchange PLATEAU C PANORAMA C DR JOHNSON ST

HERITAGE MTN BLVD RAVINE DR ROBSON NOONS DR CREEK DR

 PIPELINE RD

LANSDOWNE

DR DUNKIRK AVE C

MURRAY ST RD IOCO PORT MOODY

ST JOHNS ST WESTWOOD ST COQUITLAM Map not to scale CENTRAL

Recommended

Legend C C C SkyTrain West Coast Express

PLATEAU

 Proposed Route BLVD Proposed Limited 1  Service Route BLVD

PARKWAY SUNNYSIDECurrent RD Bus Network HERITAGE SkyTrain Station C MOUNTAIN WESTWOOD Transit Exchange PLATEAU C C PANORAMA DR JOHNSON ST ROBSONDR

HERITAGE MTN BLVD RAVINE DR NOONS CREEK DR C

IOCO RD LAFARGE LANSDOWNE LAKE C DR DOUGLAS FALCON DR DUNKIRK New  AVE MOODY CENTRE MURRAY ST LINCOLN PIPELINE RD INLET CENTRE

ST JOHNS ST ST

WESTWOOD LOUGHEED HWY Map not to scale

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 15

Current Frequency (in Minutes) Current Vehicle Type

Route Non-Peak Peak Non-Peak Peak

C27 30 15 Minibus Minibus

C28 30/60 15 Minibus Minibus

C30 30/60 30 Minibus Minibus

178 - 30 - Minibus

Target Frequency (in Minutes) Target VehicleType

Route Non-Peak Peak Non-Peak Peak

C27 30/60 30 Bus Bus

C28 30/60 15 Minibus Minibus

C30 30/60 30 Minibus Bus

New 7 15/30 10 Bus Bus

RECOMMENDED CHANGES: OUTCOMES:

• Redesign C27 to travel on Panorama Drive between • More direct north-south connections to serve Coquitlam Central and Moody Centre and use a customers travelling to SkyTrain stations.

conventional bus to increase capacity throughout the day. • Continuous east-west service along Panorama • Replace 178 with redesigned C27 and C28 services. Drive and Robson Drive. Increases mobility through

• Extend C30 to Westwood Plateau area and use a additional opportunities to connect to other services. conventional bus to increase capacity during busy periods. • New 7 maintains frequent all-day service along

• Operate all C26 trips between Anmore/Belcarra and Guildford Way. Moody Centre via Ravine Drive. • Redesigned C28 maintains local service coverage on Barnett Highway.

CONDITIONS FOR IMPLEMENTATION:

• Municipal partners, in partnership and cooperation with TransLink, may be required to implement transit supportive infrastructure, like bus stops, sidewalks and crosswalks, in some areas such as Westwood Plateau and along Lansdowne Drive.

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 16

Evergreen integration: C37, C38

Current

BURKE WELLINGDON ST WELLINGDON MOUNTAIN

VICTORIA DR

MERIDIAN RD MERIDIAN COAST

LINCOLN AVE C SHAUGHNESSY ST DR CEDAR

COQUITLAM LAURIER AVE

CENTRAL

FREMONT ST FREMONT OXFORD ST

BIRCHLAND COQUITLAM AVE MANOR RIVERSIDE

DR

Legend KINGSWAY AVE C PORT PORT SkyTrain COQUITLAM COQUITLAM CENTRE West Coast Express LOUGHEED HWY HILLCREST ST HILLCREST DOMINION  Current Route Current Limited TRIANGLE 1  Service Route Current Bus Network SkyTrain Station Transit Exchange Map not to scale

Recommended

BURKE MOUNTAIN

LAFARGE LAKE DOUGLAS C VICTORIA DR

LINCOLN

INLET CENTRE SHAUGHNESSY ST C

CEDAR DR CEDAR FREMONT ST FREMONT

LOUGHEED HWY COAST MERIDIAN RD OXFORD ST C BIRCHLAND COQUITLAM AVE PORT MANOR RIVERSIDE DR COQUITLAM Legend CENTRE PORT DOMINION SkyTrain COQUITLAM TRIANGLE West Coast Express C

HILLCREST ST HILLCREST DOMINION AVE  Proposed Route Proposed Limited 1  Service Route KINGSWAY AVE FREMONT ST Current Bus Network SkyTrain Station Transit Exchange Map not to scale

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 17

Current Frequency (in Minutes) Current Vehicle Type

Route Non-Peak Peak Non-Peak Peak

C37 30 30 Minibus Minibus

C38 30 15 Minibus Minibus

Target Frequency (in Minutes) Target Vehicle Type

Route Non-Peak Peak Non-Peak Peak

C37 30/60 15 Minibus Minibus

C38 30/60 30 Minibus Minibus

RECOMMENDED CHANGES: OUTCOMES:

• Redesign C37 to travel along Lougheed Highway, into • More direct connection between Coquitlam Central Dominion Triangle, Fremont Village and along and the Dominion Triangle area via Lougheed Highway. Prairie Avenue. • Higher frequencies maintained along Prairie Avenue • Redesign C38 to maintain coverage along where demand is highest. Coquitlam Avenue. • Connection between C37, C38 and 188 services at Coast Meridian Road and Prairie Avenue. • Direct service to Hyde Creek Recreation Centre eliminated. 188 service along Coast Meridian Avenue stops within reasonable walking distance to this facility.

CONDITIONS FOR IMPLEMENTATION:

• Municipal partners, in partnership and cooperation with TransLink, may be required to implement transit supportive infrastructure, like bus stops, sidewalks and crosswalks, in some areas such as Dominion Triangle and Fremont Village.

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 18

3. Expansion: High priority

High priority: 152, 156, New 1, New 2

Current

PORT MOODY COQUITLAM CENTRAL

LOUGHEED HWY

PORT

COQUITLAM SCHOOLHOUSE ST SCHOOLHOUSE SPURAWAY CENTRE PORT COQUITLAM AVE

COTTONWOOD AVE HILLCREST ST HILLCREST

FOSTER AVE CHILKO DR MARINER WAY MARINER

AUSTIN POIRIER SHAUGHNESSY ST HEIGHTS CENTRE PRODUCTION WAY- 

UNIVERSITY MUNDY ST MUNDY

LOUGHEED ROCHESTER AVE TOWN CENTRE HICKEY DR Legend MAILLARDVILLE BRUNETTE AVE SkyTrain West Coast Express  LOUGHEED HWY LOUGHEED HWY Current Route Current Limited 1 BRAID ServiceCITADEL Route DR Current Bus Network Map not to scale SkyTrain Station COQUITLAM WATERFRONT Transit Exchange SAPPERTON

Recommended

MURRAY ST INLET CENTRE LINCOLN

ST JOHNS ST MOODY CENTRE

GLENAYRE DR LOUGHEED HWY OXFORD ST COQUITLAM AVE PORT CLARKE RD COQUITLAM BURQUITLAM SPURAWAY CENTRE New  AVE COTTONWOOD AVE  PORT FOSTER AVE ST HILLCREST CHILKO DR COQUITLAM FOSTER AVE AUSTIN POIRIER HEIGHTS CENTRE

MARINER WAY PRODUCTION WAY- NORTH RD UNIVERSITY RIVERVIEW CR ROCHESTER AVE LOUGHEED  New TOWN CENTRE MAILLARDVILLE Legend ST BRUNETTE AVE BLUE LECLAIR DR

MOUNTAIN SkyTrain MUNDY ST MUNDY West Coast Express LOUGHEED HWY EASTERN DR Proposed Route Proposed Limited 1 BRAID Service Route Current Bus Network SkyTrain Station COQUITLAM WATERFRONT Transit Exchange SAPPERTON Map not to scale

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 19

Current Frequency (in Minutes) Current Vehicle Type

Route Non-Peak Peak Non-Peak Peak

152 30/60 15 Bus Bus

156 30/60 30 Bus Bus

Target Frequency (in Minutes) Target Vehicle Type

Route Non-Peak Peak Non-Peak Peak

152 30/60 15 Bus Bus

156 30/60 20 Bus Bus

New 1 30 30 Minibus Minibus

New 2 30/60 30 Minibus Minibus

RECOMMENDED CHANGES: OUTCOMES:

• Redesign 152 to provide direct, all day service along • Introduces 15 minute or better service throughout the full extent of Austin Avenue between Lougheed the day in busier areas like Maillardville and Town Centre and Coquitlam Central. Austin Heights.

• Redesign 156 to provide service along Austin Avenue • More direct connections to local centres and with access to Poirier Centre maintained. the SkyTrain.

• Introduce New 1 to expand coverage to Schoolhouse Street and better match customer demand on Hickey FUTURE CONSIDERATIONS: Drive and area around Chilko Drive. • To accommodate renovation plans at Lougheed Town • Introduce New 2 to provide local service to Blue Centre, the access for the 156 is to be confirmed. Mountain Street, Schoolhouse Street and Como Lake Avenue. • Exact routing for New 1 service to be determined at implementation.

CONDITIONS FOR IMPLEMENTATION:

• Municipal partners, in partnership and cooperation with TransLink, may be required to implement transit supportive infrastructure, like bus stops, sidewalks and crosswalks, in some areas such as along Schoolhouse Street, Austin Avenue, Riverview Crescent, Robinson Street and Foster Avenue.

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 20

High priority: New 9

PLATEAU

RecommendedBLVD

BLVD

PARKWAY SUNNYSIDE RD HERITAGE WESTWOOD

MOUNTAIN PANORAMA PLATEAU PRINCETON AVE DR BURKE HERITAGE MTN BLVD RAVINE DR New  MOUNTAIN

NOONS CREEK DR

IOCO RD LAFARGE LAKE DOUGLAS DUNKIRK AVE VICTORIA DR PIPELINE RD

MOODY CENTRE COAST MERIDIAN RD MURRAY ST LINCOLN INLET CENTRE SHAUGHNESSY ST

ST JOHNS ST ST

WESTWOOD LOUGHEED HWY

BIRCHLAND THERMAL DR THERMAL

OXFORD ST MANOR PORT Legend COQUITLAM

CENTRE SkyTrain DR LINTON ST LINTON West CoastRIVERSIDE Express Proposed Route PORT  HILLCREST ST HILLCREST Proposed Limited COQUITLAM 1 FOSTER  Service Route AVE AUSTIN POIRIER CurrentDOMINION Bus Network HEIGHTS CENTRE SkyTrainTRIANGLE Station

MUNDY ST MUNDY Map not to scale Transit Exchange

MARMONT ST

BRUNETTE AVE DAWES HILL RD Target Frequency (in Minutes) TargetKEBET WAY Vehicle Type LOUGHEED MAILLARDVILLE EASTERN DR HWY Route Non-Peak Peak Non-Peak Peak

New 9 30 30 Minibus Minibus

RECOMMENDED CHANGES: FUTURE CONSIDERATIONS:

• Introduce New 9 service, connecting to the SkyTrain • Exact routing in Burke Mountain and Partington Creek and Coquitlam Central with Burke Mountain area to be determined closer to implementation.

northeast of Coast Meridian Road and David Avenue. • Future development in Burke Mountain and Partington Creek area may alter recommended OUTCOMES: routing and hours of operation.

• Improves transit access for Burke Mountain residents. CONDITIONS FOR IMPLEMENTATION:

• Municipal partners, in partnership and cooperation with TransLink, may be required to implement transit supportive infrastructure, like bus stops, sidewalks and crosswalks, in Burke Mountain and Partington Creek area.

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. PLATEAU

BLVD BEDWELL BAY RD

NORTHEAST SECTOR AREA TRANSIT PLAN BLVD

PARKWAY APPENDIX C: RECOMMENDED NEAR-TERMSUNNYSIDE RD PRIORITIES 21 HERITAGE WESTWOOD

MOUNTAIN PANORAMA PLATEAU BURKE PRINCETON AVE JOHNSON ST DR MOUNTAIN HERITAGE MTN BLVD RAVINE DR ROBSON

DR High priority: New 8 ST ROCKLIN NOONS CREEK DR

PIPELINE RD IOCO RD

GISLASON AVE LAFARGE LAKE COLLEGE PARK DUNKIRK AVE VICTORIA DR Recommended DOUGLAS MOODY CENTRE MURRAY ST LINCOLN

GLENAYRE DR GLENAYRE INLET CENTRE FREMONT ST FREMONT

ST JOHNS ST DR CEDAR

SIMON FRASER LOUGHEED HWY

UNIVERSITY OXFORD ST COQUITLAM AVE PORT COQUITLAM PORT DR SPURAWAY CENTRE

COQUITLAM RIVERSIDE AVE DOMINION

MARINER WAY MARINER TRIANGLE CHILKO DR DOMINION AVE FOSTER AVE FOSTER AVE AUSTIN POIRIER KINGSWAY AVE HEIGHTS CENTRE FREMONTST PRODUCTION WAY- UNIVERSITY New 

LOUGHEED TOWN CENTRE

BRUNETTE AVE MAILLARDVILLE LOUGHEED LOUGHEED HWY HWY Legend

UNITED

BRAID BLVD SkyTrain West Coast Express UNITED BLVD Proposed Route COQUITLAM WATERFRONT HIGHWAY 

PORT MANN BRIDGE Proposed Limited 1 SAPPERTON Service Route Current Bus Network Map not to scale To Surrey SkyTrain Station Transit Exchange

Target Frequency (in Minutes) Target Vehicle Type

Route Non-Peak Peak Non-Peak Peak

New 8 - 15 - Highway Coach

RECOMMENDED CHANGES: FUTURE CONSIDERATIONS:

• Introduce frequent, peak period service connecting • Exact routing and hours of operation to be Coquitlam Central and Surrey Central using Highway 1. determined at implementation.

• Opportunity to connect to the 555 at Highway 1 OUTCOMES: and 156 off-ramp stop for connection to Carvolth Exchange in Langley. • Faster and more reliable peak period connection between Northeast Sector and areas south of the Fraser River.

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 22

High priority: Lougheed Highway B-Line or better study

Complete detailed planning study for Lougheed Highway B-Line or better service

Recommended

LAFARGE LAKE VICTORIA DR DOUGLAS

LINCOLN Complete detailed INLET CENTRE planning study for Lougheed Highway B-Line or better service.

SHAUGHNESSY ST BIRCHLAND PORT MANOR COQUITLAM CENTRE LOUGHEED HWY

PORT DOMINION COQUITLAM TRIANGLE KINGSWAY AVE Legend 

SkyTrain West Coast Express  Proposed Route Proposed Limited 1 PITT RIVER DR Service RouteWESTERN DR To Maple Ridge Current Bus Network EASTERNSkyTrain DR Station Transit Exchange Map not to scale

This detailed planning study will provide guidance and recommendation on a B-Line or better service along portions of Lougheed Highway to connect urban centres and the SkyTrain.

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 23

4. Expansion: Medium priority

Medium priority: C37, C38, New 4

Recommended

BURKE

MOUNTAIN ROCKLIN ST ROCKLIN

LAFARGE LAKE DOUGLAS GISLASON AVE C VICTORIA DR

LINCOLN New 

SHAUGHNESSY ST CEDAR

INLET CENTRE LINCOLN AVE DR

RD COAST

LOUGHEED HWY MERIDIAN C OXFORD ST C BIRCHLAND

PORT COQUITLAM AVE MANOR

COQUITLAM ST FREMONT Legend CENTRE PORT DOMINION SkyTrain COQUITLAM TRIANGLE West Coast Express C HILLCREST ST HILLCREST  Proposed Route DOMINION AVE Proposed Limited 1 ST  Service Route KINGSWAY AVE HAWKINS Current Bus Network SkyTrain Station FREMONT ST Transit Exchange Map not to scale

Target Frequency (in Minutes) Target Vehicle Type

Route Non-Peak Peak Non-Peak Peak

C37 30/60 15 Minibus Minibus

C38 30/60 30 Minibus Minibus

New 4 30 30 Minibus Minibus

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 24

RECOMMENDED CHANGES: FUTURE CONSIDERATIONS:

• Further redesign of the C37 to utilize future Hawkins • Exact routing for New 4 to be determined based on Street extension to improve service coverage within future development and road network changes in Dominion Triangle and to use the Lincoln Avenue Burke Mountain, Partington Creek and Dominion Connector for a new connection to Lincoln Station Triangle at time of implementation. from Port Coquitlam.

• Introduce New 4 between Dominion Triangle, Burke CONDITIONS FOR IMPLEMENTATION: Mountain and Port Coquitlam. • Municipal partners, in partnership and cooperation OUTCOMES: with TransLink, may be required to implement transit supportive infrastructure, like bus stops, sidewalks

• More direct connections to the SkyTrain from North and crosswalks, in some areas such as Burke Port Coquitlam. Mountain, Partington Creek and Dominion Triangle.

• Expanded transit service coverage to growing areas.

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 25

Medium priority: C25 A/B, C26 A/B

Current

BEDWELL BAY RD C

SUNNYSIDE RD

FIRST AVE HERITAGE MOUNTAIN

HERITAGE MTN BLVD RAVINE DR Legend C SkyTrain IOCO RD West Coast Express  Current Route Current Limited 1  Service Route MURRAY ST Current Bus Network PORT MOODY SkyTrain Station Map not ST JOHNS ST Transit Exchange to scale

Recommended

CA CB BEDWELL BAY RD CB

SUNNYSIDE RD

FIRST AVE HERITAGE MOUNTAIN CA HERITAGE MTN BLVD RAVINE DR Legend SkyTrain IOCO RD West Coast Express  Proposed Route Proposed Limited 1 Service Route MURRAY ST Current Bus Network MOODY CENTRE INLET CENTRE SkyTrain Station Map not ST JOHNS ST Transit Exchange to scale

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 26

Current Frequency (in Minutes) Current Vehicle Type

Route Non-Peak Peak Non-Peak Peak

C25 60 30 Minibus Minibus

C26 60 30 Minibus Minibus

Target Frequency (in Minutes) Target Vehicle Type

Route Non-Peak Peak Non-Peak Peak

C25A 60 60 Minibus Minibus

C25B 60 60 Minibus Minibus

C26A 60 60 Minibus Minibus

C26B 60 60 Minibus Minibus

RECOMMENDED CHANGES: OUTCOMES:

• Redesign C25 to provide alternating connections • Direct service for customer travelling between and expanded span of service to Ioco (C25A) and Belcarra, Anmore, Newport Village and Port Moody.

Belcarra (C25B). • 30 minute frequencies are maintained in • Redesign C26 to provide alternating connections to busier sections along Ioco Road and Heritage Anmore (C26A) and Sunnyside Road (C26B). Mountain Boulevard.

• Seasonal service to Buntzen Lake and White Pine • More consistent and reliable service for people Beach is maintained. travelling to and from Ravine Drive.

• Opportunity for timed connection between C25 and C26 at Ioco Road and First Avenue.

• Improves late night service to Anmore and Belcarra.

FUTURE CONSIDERATIONS:

• Consistent service along Ravine Drive allows C27 to provide more direct service along Heritage Mountain Boulevard.

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 27

Medium priority: 701 local service

Recommended

LAFARGE LAKE DOUGLAS

Improve stop andVICTORIA DR pedestrian infrastructure LINCOLN INLET CENTRE to allow better connections at Lougheed and Shaughnessy. Introduce new transit stop to allow

SHAUGHNESSY ST PORT better connections COQUITLAM CENTRE at Lougheed and LOUGHEED HWY Fremont. PORT DOMINION COQUITLAM TRIANGLE KINGSWAY AVE Legend 

SkyTrain West Coast Express  Proposed Route Proposed Limited 1 PITT RIVER DR Service RouteWESTERN DR To Maple Ridge Current Bus Network Pitt Meadows EASTERNSkyTrain DR Station Transit Exchange Map not to scale

Target Frequency (in Minutes) Target Vehicle Type

Route Non-Peak Peak Non-Peak Peak

701 15/30 15 Bus Bus

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 28

RECOMMENDED CHANGES: FUTURE CONSIDERATIONS:

• Implement improved stop/connection at • Other services connecting east of Pitt River to be Shaughnessy Street and Lougheed Highway and developed and evaluated at a later time.

new stop/connection at Fremont Street and • Additional service improvements along Lougheed Lougheed Highway. Highway to be developed and evaluated at a • Expand 701 hours of operation to meet first and last later time. trips on SkyTrain. CONDITIONS FOR IMPLEMENTATION: OUTCOMES: • Municipal partners, in partnership and cooperation • Better connection to services on Lougheed Highway with TransLink, may be required to implement transit from other transit service. supportive infrastructure, like bus stops, sidewalks and crosswalks, in some areas.

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 29

Medium priority: Infrastructures initiatives

Partner with municipalities to identify, prioritize and transit by walking and cycling more seamlessly and implement improved multimodal integration and comfortably. Amenities to consider include:

transit priority. a. Bike Parkade b. Bicycle lockers 1. Work with municipal partners to identify and c. Bicycle racks prioritize new Park and Ride facility investments or d. Street furniture upgrades. Park and Ride facilities provide a vital link

to the transit network from areas with low transit 3. Partner with municipalities to identify, prioritize and access. Providing these at key transit hubs result in implement transit priority measures at key points more people having access to the transit system and across the sub-region to help increase transit speed the transit system will become more efficient. and reliability. Transit priority improves transit 2. Partner with municipalities to provide expanded reliability and travel time, therefore making transit a pedestrian and cycling amenities at key connections more competitive option. Transit priority should be points, including future SkyTrain stations, bus implemented in corridors with high bus and vehicle exchanges, or other locations. Pedestrian and traffic and at major access points to town centres or cycling amenities at transit stations support multi- major transit exchanges. modal integration and allow customers to access

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 30

5. Expansion: Low priority

Low priority: C36

Current

PORT COQUITLAM ST SHAUGHNESSY PORT CENTRE COQUITLAM

REEVE ST

PITT RIVER RD

KINGSWAY AVE

LegendMUNDY

SkyTrain WESTERN DR EASTERN DR West Coast Express  Current Route C Current Limited 1  Service Route Current Bus Network SkyTrain Station Transit Exchange Map not to scale

Recommended

PORT COQUITLAM PORT

CENTRE COQUITLAM SHAUGHNESSY ST Legend C SkyTrain West Coast Express  Proposed Route WESTERN DR Proposed Limited 1  Service Route

Current Bus Network EASTERN DR

SkyTrain Station DR Transit Exchange Map not to scale CONFEDERATION

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 31

Current Frequency (in Minutes) Current Vehicle Type

Route Non-Peak Peak Non-Peak Peak

C36 30 15 Minibus Minibus

Target Frequency (in Minutes) Target Vehicle Type

Route Non-Peak Peak Non-Peak Peak

C36 30/60 15 Minibus Minibus

RECOMMENDED CHANGES: FUTURE CONSIDERATIONS:

• Redesign C36 to introduce two-way service on • Exact routing in Citadel Heights to be determined at Western Drive and expand service to time of implementation. Confederation Drive. CONDITIONS FOR IMPLEMENTATION: OUTCOMES: • Municipal partners, in partnership and cooperation • Expands service to Citadel Heights. with TransLink, may be required to implement transit supportive infrastructure, like bus stops, sidewalks and crosswalks, in the Citadel Heights area.

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation. NORTHEAST SECTOR AREA TRANSIT PLAN APPENDIX C: RECOMMENDED NEAR-TERM PRIORITIES 32

Low priority: New 5

Recommended ROBSON DR

LAFARGE LAKE DOUGLAS

IOCO RD

MOODY CENTRE GUILDFORD WAY MURRAY ST LINCOLN INLET CENTRE PIPELINE RD ST JOHNS ST

New  DEWDNEY Legend TRUNK RD

MARINER WAY MARINER LOUGHEED HWY SkyTrain West Coast Express  Proposed Route PORT Proposed Limited COQUITLAM 1 SPURAWAY  Service Route ST LINTON CENTRE Current Bus Network AVE SkyTrain Station Transit Exchange Map not to scale

Target Frequency (in Minutes) Target Vehicle Type

Route Non-Peak Peak Non-Peak Peak

New 5 30 30 Minibus Minibus

RECOMMENDED CHANGES: CONDITIONS FOR IMPLEMENTATION:

• Introduce new service between Coquitlam Central • Municipal partners, in partnership and cooperation and Moody Centre via Dewdney Trunk Road, Ioco with TransLink, may be required to implement transit Road and Murray Street. supportive infrastructure, like bus stops, sidewalks and crosswalks, along Dewdney Trunk Road. OUTCOMES:

• Improves transit access along Dewdney Trunk Road.

translink.ca *All recommended projects are subjected to resource availability and other factors and may be revised or modified based on condition at the time of implementation.