Coastal Adaptation and Protection Grants Past grants awarded Coastal Adaptation and Protection Grants (2020/2021) Total: $1,056,540
Recipient Project Description Grant
City of Cockburn Cockburn Sound coastal Hydrographic survey and beach $48,500 survey scanning from Bathers Beach to Cape Peron
City of Fremantle Port Beach coastal adaptation Sand nourishment investigation $13,385.50 detailed design and report detailed design and final report update
City of Fremantle & Port, Leighton and Mosman Collection of site and remote time $18,750 Town of Mosman beaches coastal monitoring lapse photos, beach surveys, Park program – 2020/2021 data sediment samples and storm collection monitoring
City of Joondalup Coastal monitoring program Collection of site photos, time lapse $18,518.50 2020-2021 photos, shoreline movement and beach profile surveys of City’s coastline
City of Joondalup Sand bypassing program Sand bypassing from Sorrento $75,000 2020-21 Beach to Hillarys Beach
City of Rockingham Coastal survey – Cape Peron Hydrographic survey and beach $37,437.50 to Singleton scanning from Cape Peron to Singleton
City of Wanneroo Aerial survey of beaches and Aerial laser scan survey of the $21,711 coastal structures City’s coastline and coastal structures
City of Wanneroo Beach renourishment sand Investigate future sand $20,000 sourcing feasibility study nourishment sources, understand the associated potential environmental impacts and approval requirements
City of Wanneroo Quinns Beach and Yanchep Sand nourishment $150,000 Lagoon sand re-nourishment
Peron Naturaliste Regional coastal monitoring Review of PNP coastal data and $30,000 Partnership (PNP) program – review and analysis methodology
Page 1 of 19 Shire of Broome Shoreline monitoring of Beach surveys and collection of $12,500 and Nyamba Buru Broome townsite site photos Yawuru
Shire of Esperance Esperance Bay coordinated Sand nourishment trial utilising $300,000 dredging and sand back pumped dredged material passing trial
Shire of Gingin Condition assessment of Coastal structure inspection, $13,450 Ledge Point and Guilderton maintenance options and cost Groynes estimate
Shire of Gingin Gingin coastal erosion Obtain oblique aerial imagery, $19,835 hotspots monitoring project vertical aerial imagery and complete photogrammetry analysis
Shire of Murray Coastal Hazard Risk Coastal hazard assessment for $50,000 Management and Adaptation Peel Harvey Estuary Planning
Town of Port Protecting Hedland – coastal Detail design and construction of $227,452.50 Hedland seawalls project – West End seawall at West End
Page 2 of 19 Coastal Adaptation and Protection Grants (2019/2020) Total: $1,056,540
Recipient Project Description Grant
City of Albany Emu Point to Middleton Beach Beach monitoring and coastal $53,480 coastal adaptation and protection zone data collection strategy
City of Busselton Beach monitoring (Year 7) Collection of beach profile $51,000 surveys, aerial and site photos, and detailed aerial survey from Geographe Bay to Cape Naturaliste
City of Fremantle Port Beach coastal adaptation Detail design of preferred $50,000 option design coastal adaptation option with community and stakeholder’s consultation
City of Fremantle & Port, Leighton and Mosman Collection of site and remote $12,500 Town of Mosman beaches coastal monitoring time lapse photos, beach Park program (Year 2) surveys, sediment samples and storm monitoring
City of Greater Wave and current data collection Wave and current measurement $31,270 Geraldton at Sunset Beach off Sunset Beach for six months by two instruments
City of Joondalup Coastal monitoring program Collection of site photos, remote $24,450 2019-2020 time lapse photos, shoreline movement and beach profile surveys
City of Joondalup Sand bypassing 2019-2020 Sand bypassing from Sorrento $75,000 Beach to Hillarys Beach
City of Rockingham Coastal monitoring Coastal data collection including $32,500 beach surveys
City of Rockingham Point Peron spur groyne Review of data associated with $37,500 modification and upgrades Point Peron spur groyne and prepare concept and detail design for the groyne upgrade
City of Wanneroo Provision of aerial survey services Aerial LiDAR survey of the City’s $21,600 for beaches and coastal coastline and coastal structures structures
City of Wanneroo Quinns Beach long term coastal Extension of Quinns Beach $300,000 management stage 2 – extension groyne 3 by 15m, beach of Groyne 3 and beach renourishment works, dune renourishment rehabilitation and clean up
City of Wanneroo Quinns Beach and Yanchep Sand nourishment at Quinns $88,785 Lagoon renourishment Beach and Yanchep Lagoon
Page 3 of 19 Peron Naturaliste ‘CoastSnap’ community Implementation of first $35,150 Partnership (PNP) monitoring and analysis ‘CoastSnap’ project in WA at nine locations between Rockingham and Busselton
Shire of Broome Town Beach geotechnical and Geotechnical investigation $30,000 erodibility study followed by development of coastal adaptation options
Shire of Broome Shoreline monitoring of Broome Shoreline monitoring of Broome $12,000 and Nyamba Buru townsite townsite Yawuru (NBY)
Shire of Esperance Esperance Bay sand Annual sand nourishment along $150,000 renourishment Norseman Road
Shire of Gingin Shire of Gingin coastal inundation Coastal inundation investigation $29,305 study and impact assessment on Shire of Gingin’s coastal townsites
Shire of Shark Bay Denham coastal monitoring Photo monitoring, beach survey $11,000 and documentation of active coastal management activities.
Town of Cottesloe Coastal monitoring to improve Continuation of coastal data $11,000 understanding of long-term collection including beach coastal change (Year 6) surveys, remote photo monitoring and data analysis
Page 4 of 19 Coastal Adaptation and Protection Grants (2018/2019) Total: $1,056,540
Recipient Project Description Grant
City of Albany Emu Point to Middleton Beach Beach monitoring and coastal zone $60,163 coastal adaptation and data collection protection strategy
City of Busselton Beach monitoring (year 6) Collection of beach profile surveys, $26,000 aerial photos and site photos at Geographe Bay
City of Busselton Sand nourishment (year 6) Sand nourishment along Geographe $55,000 Bay
City of Busselton Maintenance of Craig Street Maintenance of Craig Street coastal $125,000 groyne and seawall protection structure
City of Busselton Broadwater Beach Coastal Relocation of vulnerable public $75,000 Adaptation assets and shoreline stabilisation investigation
City of Cockburn North Coogee (Rollinson Rd) Sand nourishment north of $47,500 beach nourishment Catherine Point groyne
City of Fremantle Port Beach asset condition Investigation and assessment of $40,000 assessment, analysis and coastal protection structures, development of maintenance/management program, management/maintenance adaptation options program.
City of Fremantle Port, Leighton and Mosman Coastal and photo monitoring. Data $25,000 & Town of beaches coastal monitoring register to collate and acquire long- Mosman Park program establishment and term information Year 1 data collection
City of Greater Whitehill Road sand Sand nourishment at Whitehill Road $52,658 Geraldton nourishment Foreshore
City of Joondalup Sand Bypassing 2018-19 Sand bypassing from Sorrento $75,000 Beach to Hillarys Beach
City of Joondalup Coastal monitoring program Collection of site photos, time lapse $14,600 2018-19 photos, shoreline movement and beach profile surveys at City coastal line
City of Mandurah Mandurah AWACs and wave Documentation and analysis of $20,000 buoy data collection review and oceanographic datasets collected analysis 2013-2018 from 2013 to 2018
City of Stirling Adaptation plan and defensive Investigation of adaptation options $60,000 works at Mettams Pool, Trigg for public infrastructures
City of Wanneroo Quinns Beach renourishment Sand nourishment at Quinns Beach $125,000
Page 5 of 19 Shire of Coastline dynamics, coastal Shoreline and coastal geophysical $40,000 Ashburton infrastructure impacts, and surveys, sediment collection and erosion hotspots along the shoreline movement analysis Ashburton coast
Shire of Broome Shoreline monitoring of Broome Shoreline monitoring of Broome $14,750 and Nyamba townsite townsite Buru Yawuru (NBY)
Shire of Broome Geotechnical investigation and Geotechnical investigation to $40,000 adaptation design improve understanding of the presence of rock formations under the main dune system
Shire of Denmark Ocean Beach and Peaceful Bay Coastal monitoring and $25,000 coastal monitoring and geotechnical survey investigation
Shire of Esperance Bay sand Sand nourishment along Norseman $110,000 Esperance renourishment Road
Shire of Preparation of a coastal hazard Coastal hazard assessment at $10,020 Northampton assessment Horrocks
Town of Coastal monitoring to improve Continuation of the collection of $15,849 Cottesloe understanding of long-term beach surveys, remote photo coastal change (Year 5) and monitoring and data analysis post storm monitoring
Page 6 of 19 Coastal Adaptation and Protection Grants (2017/2018) Total: $756,540
Recipient Project Description Grant
City of Albany Emu Point to Middleton Beach Beach monitoring, coastal zone $65,128 Coastal Adaptation and Protection data collection and coastal Strategy protection structures maintenance
City of Busselton Beach Monitoring (Year 5) Collection of beach profile $26,000 surveys, aerial photos and site photos at Geographe Bay
City of Joondalup Coastal Monitoring Program Collection of beach profile $18,700 2017-18 surveys, remote and site photo monitoring and shoreline mapping of City’s coastline
City of Stirling Geophysical Investigation to Geophysical investigation to $60,000 Determine Location of Underlying determine extent of competent Rock Profile rock
City of Wanneroo Quinns Beach Long Term Coastal Construction of Groyne 4 at $299,212 Management - Groyne 4 Queenscliff Park Construction Works
City of Wanneroo Two Rocks Beach Access Design Design and construct beach $125,000 and Construction access north of Two Rock boat harbour
Shire of Augusta Coastal Monitoring, Planning and Beach monitoring, planning and $50,000 Margaret River Adaptation design for retreat of Prevelly- Gnarabup coastal walkway and beach access
Shire of Esperance Esperance Bay Sand Sand nourishment along $85,000 Nourishment Norseman Road
Shire of Shark Bay Denham Townsite CHRMAP Coastal hazard assessment of $15,000 Denham Townsite area
Town of Cottesloe Coastal Monitoring to Improve Continuation of the collection of $12,500 Understanding of Long-Term beach surveys, remote photo Coastal Change (Year 4) monitoring and data analysis
Page 7 of 19 Coastal Adaptation and Protection Grants (2016/2017) Total: $750,295
Recipient Project Description Grant
City of Albany Emu Point to Middleton Beach Beach monitoring, coastal zone $122,495 Coastal Adaptation and Protection data collection, detailed coastal Strategy process assessment, and sand nourishment to implement sustainable planning
City of Busselton Beach monitoring (year 4) Collection of beach profile $20,000 surveys, aerial photos and site photos at Geographe Bay
City of Busselton Maintenance of coastal protection Refurbish/repair/replace $22,500 structures deteriorated structures
City of Busselton Sand nourishment (year 4) Sand nourishment at various $55,000 locations along Geographe Bay
City of Busselton Storm surge inundation and Develop evacuation plan for $20,000 evacuation study coastal inundation by identifying points of coastal inundation, vulnerable access, and evacuation routes
City of Greater Greys Beach to Cape Burney Inundation and erosion study to $20,000 Geraldton coastal inundation and processes inform coastal management allowance study planning
City of Joondalup Condition inspection and inventory Create inventory of coastal $40,000 audit of Coastal Protection Assets protection assets plus condition inspections to identify defects and hazards
City of Wanneroo Quinns Beach long term coastal Construction of selected $300,000 management - Construction adaptation option for Quinns Stage 1 Beach
Peron Naturaliste Regional coastal monitoring project Implement a coastal monitoring $50,500 Partnership action plan, and train officers on monitoring techniques
Shire of Augusta Assessment of weakly lithified Geotechnical assessment and $30,000 Margaret River limestone cliffs survey of local cliff areas
Shire of Relationship between seagrass Collection of seagrass data and $10,200 Esperance distribution and coastal erosion at analysis of relationship between Esperance beach morphology and seagrass distribution
Page 8 of 19 Recipient Project Description Grant
Shire of Harvey Geotechnical investigations and Geotechnical investigation at $45,000 hazard mapping review Binningup foreshore for hazard mapping review
Town of Cottesloe Coastal monitoring to improve Continuation of the collection of $14,600 understanding of long-term coastal beach surveys, remote photo change (year 3) monitoring and data analysis
Page 9 of 19 Coastal Adaptation and Protection Grants (2015/2016) Total: $1,057,500
Recipient Project Description Grant
City of Albany Emu Point to Middleton Beach Beach monitoring, data $54,543 coastal adaptation and protection collection, repair to rock strategy revetment and sand nourishment
City of Busselton Busselton Coastal Management Collection of beach profile $20,000 Program: Beach monitoring (Year surveys, aerial photos and site 3) photos at Geographe Bay
City of Busselton Busselton Coastal Management Offshore hydrographic survey of $21,000 Program: Hydrographic survey Geographe Bay including Dunn Bay sand bar and west of Busselton Jetty
City of Busselton Busselton Coastal Management Refurbishment of 2 timber $70,000 Program: Maintenance of coastal groynes at Beachlands protection structures
City of Cockburn C Y O'Connor Beach remediation Sand nourishment of C Y $75,000 O'Connor beach
City of Joondalup Implementation of coastal Establishment of monitoring $21,252 monitoring schedule, remote photo monitoring, on ground photo monitoring and beach profiling
City of Wanneroo Quinn's Beach long term coastal Collection of data, refinement of $65,000 management stage 3 - detailed numerical model and design development of detailed design for long term coastal adaptation options
City of Wanneroo Quinns Beach renourishment works Sand nourishment of Quinns $66,578 beach in front of car park and dog beach as interim measure for long term adaptation
Department of LiDAR bathymetry survey of the Collection of baseline LiDAR $300,000 Planning WA coast between Two Rocks to bathymetry from Two Rocks to Oakajee Oakajee
Shire of Augusta Prevelly Gnarabup coastal erosion Wave, water level and current $44,000 Margaret River investigation data collection and photo monitoring to understand coastal erosion
Shire of Esperance Esperance Bay sand renourishment Sand nourishment at Norseman $100,000 Rd
Page 10 of 19 Recipient Project Description Grant
Shire of Gingin Low impact interim adaptation Sand nourishment of beach at $37,500 solution for managing erosion at Grace Darling Park Lancelin Lancelin
Town of City Beach groyne maintenance Stage 3 of City Beach groyne $167,627 Cambridge stage 3 maintenance
Town of Cottesloe Coastal monitoring to improve Continuation of the collection of $15,000 understanding of long term coastal beach surveys, remote photo change monitoring and data analysis
Page 11 of 19 Coastal Adaptation and Protection Grants (2014/2015) Total: $1,057,500
Recipient Project Description Grant
City of Albany Emu Point to Middleton Beach Continuation of current beach $35,000 coastal adaptation and protection monitoring program strategy
City of Busselton Busselton Coastal Management Continuation of beach monitoring $26,250 Program: Beach monitoring (Year from year one to develop a 2) greater understanding of coastal erosion
City of Busselton Busselton Coastal Management Sand nourishment of various $52,500 Program: Sand nourishment locations along Geographe Bay (Year 2)
City of Busselton Busselton Coastal Management Condition inspection of coastal $26,750 Program: Coastal structures structures along the Busselton review coastline
City of Busselton Busselton Coastal Management Refurbishment of three rock $95,000 Program: Abbey Groynes 3,4 and groynes at Abbey Foreshore 5 refurbishment
City of Busselton Busselton Coastal Management Investigation to explore $31,500 Program: Broadwater Beach sustainable long term coastal investigation management options for the Broadwater Beach foreshore east of the existing groyne
City of Busselton Busselton Coastal Management Investigation to improve the $42,000 Program: Storm surge response understanding of the capacity to study predict, assess the impacts of and respond to storm surge events
City of Busselton Busselton Coastal Management Works to stabilise the foreshore at $259,000 Program: Locke Estate coastal Locke Estate protection stage 2
City of Cockburn Cockburn Sound Coastal Detailed reappraisal of the values $70,000 on behalf of Adaptation Planning project of coastal assets at risk and Cockburn Sound detailed adaptation options Coastal Alliance including optimal timing for the implementation and monitoring needs for incorporation into coastal plans and planning documents
City of Mandurah Peron Naturaliste Region Coastal Develop and implement a $20,000 on behalf of Peron monitoring program sustainable long term monitoring Naturaliste program for the PNP region to Partnership improve understanding of erosion hazards in the coastal zone
Page 12 of 19 Recipient Project Description Grant
City of Waikiki Foreshore adaptation and Investigation to understand the $30,000 Rockingham protection causes of erosion at Waikiki Foreshore
City of Stirling Beach profile surveying Continuation of the collection of $12,500 beach profile surveys from Trigg Island to south Sorrento
City of Wanneroo Quinns Beach numerical Beach monitoring and data $123,000 modelling and development of collection and numerical long term coastal protection modelling to develop long term coastal management options for Quinns Beach
Shire of Esperance Esperance Bay sand Sand nourishment at Norseman $100,000 renourishment Rd
Town of City Beach groyne maintenance Stage 2 of City Beach groyne $120,000 Cambridge stage 2 maintenance
Town of Cottesloe Coastal monitoring to improve Collection of beach profiles and $14,000 understanding long term coastal imagery to understand long term change shoreline change
Page 13 of 19 Coastal Adaptation and Protection Grants (2013/2014) Total: $1,055,500
Recipient Project Type Grant
City of Albany Emu Point to Middleton Beach coastal Adaptation planning $102,000 adaptation and protection strategy
City of Busselton Locke Estate coastal protection works Adaptation $262,500
City of Busselton Detailed beach and bathymetry survey Monitoring $65,000
City of Busselton Sand replenishment Adaptation $50,000
City of Busselton Beach monitoring Monitoring $35,000
City of Cockburn Relocation of dual use path at Adaptation $50,000 C.Y.O'Connor Reserve
City of Stirling Beach profile surveying Monitoring $12,500
City of Wanneroo Quinns Rocks coastal management Monitoring $50,000
Cockburn Sound Cockburn Sound coastal values, risk Adaptation planning $150,000 Coastal Alliance assessment and adaptation planning project
Northern Coastal hazard risk management for Adaptation planning $95,000 Agricultural Guilderton to Jurien Bay Catchments Council
Shire of Esperance Esperance Bay sand replenishment Adaptation $50,000
Shire of Manjimup Windy Harbour foreshore photo-monitoring Monitoring $13,500
Town of City Beach groyne maintenance Maintenance $120,000 Cambridge
Page 14 of 19 Coastal Protection Grants (2012/2013) Total: $1,053,500
Recipient Project Type Grant
City of Albany Erosion protection at Emu Point Investigation $47,500
City of Bunbury Bunbury beaches condition investigation Investigation $44,500
City of Busselton Harvest Road groyne refurbishment Construction $30,000
City of Busselton Sand nourishment Construction $25,000
City of Busselton Timber groyne refurbishment Construction $60,000
City of Cockburn Beach profile surveying Monitoring $11,500
City of Cockburn Relocation of Path Construction $25,000
City of Greater Beresford Foreshore coastal protection and Design $100,000 Geraldton enhancement project
City of Mandurah Coastal Monitoring Monitoring $90,000
City of Pt. Peron coastal protection Construction $265,000 Rockingham
City of Stirling Beach profile surveying Monitoring $15,000
City of Wanneroo Quinns coastal investigation and review Investigation $50,000
City of Wanneroo Two Rocks coastal investigation and Investigation $50,000 review
Shire of Ashburton Storm drain upgrade Construction $50,000
Shire of Esperance Norseman Rd. sand nourishment Construction $150,000
Town of Coastal vulnerability study Planning $40,000 Cambridge
Page 15 of 19 Coastal Protection Grants (2011/2012) Total: $1,065,000
Recipient Project Type Grant
City of Albany Erosion protection at Emu Point Investigation and design $35,000
City of Busselton Rock seawall refurbishment Construction $150,000
City of Busselton Locke Estate - future coastal work Investigation and design $20,000
City of Cockburn Catherine Point groyne repair Construction $300,000
City of Geraldton- Beresford design options Investigation and design $50,000 Greenough
City of Joondalup Vulnerability Study - North of Hillarys Investigation and design $30,000
City of Stirling Scarborough to Sorrento Beach profile Investigation and design $25,000 surveying
Cockburn Sound Cockburn Sound coastal adaptation Investigation and design $70,000 (Consortium of pathways project local governments)
Esperance Port Town Beach sand nourishment Construction $45,000 Authority
Geraldton Sediment transport study Investigation and design $120,000 (University of Curtin)
Point Peron to Coastal adaptation decision pathways Investigation and design $50,000 Naturaliste project (Consortium of local governments)
Shire of Broome Pindan cliff erosion protection options Investigation and design $60,000
Shire of Carnarvon Pelican Point remediation and protection Construction $30,000
Town of Kwinana Kwinana beach seawall repairs Investigation and design $10,000
University of Statistical State-wide tropical cyclone Investigation and design $70,000 Western Australia database
Page 16 of 19 Coastal Protection Grants (2010/2011) Total: $1,085,389
Recipient Project Type Grant
City of Busselton Dunsborough and Scout Road sand Construction $50,000 nourishment
City of Busselton Busselton Jetty rock abutment Construction $80,000
City of Busselton Busselton Scout Road coastal protection Construction $20,000
City of Busselton Busselton Town Beach seawall Maintenance $100,000 maintenance
City of Fremantle Island Street groyne maintenance Maintenance $75,000
City of Joondalup Sorrento-Marmion coastal protection study Investigation $15,000
Curtin University Batavia Coast sediment transport study Investigation $120,000
Department of Penguin Island erosion investigation Investigation $50,000 Environment and Conservation
Department of Midwest/Gascoyne sediment cell analysis Investigation $91,889 Planning
Esperance Port Esperance (Town Beach) Sand Construction $100,000 Authority Nourishment
Shire of Esperance Esperance (Norseman Road) sand Construction $123,500 nourishment
Shire of Irwin Grannies and Surf Beach seawall and sand Construction $220,000 nourishment Port Denison
Town of Cottesloe Cottesloe geotechnical investigation Investigation $40,000
Page 17 of 19 Coastal Protection Grants (2009/2010) Total: $1,048,117
Recipient Project Type Grant
City of Geraldton- Coastal vulnerability and risk assessment Investigation $26,667 Greenough program - Northern beaches erosion study
City of Geraldton- Coastal vulnerability and risk assessment Investigation $100,000 Greenough program - sediment budgets characteristics and distribution
City of Geraldton- Extension of seawall - Town Beach Construction $100,000 Greenough
City of Joondalup Reconstruction of the Burns Beach groyne Maintenance $50,000
City of Sand nourishment - Hymus Street, Construction $40,000 Rockingham Esplanade
City of Coastal erosion study - Hymus Street, Investigation $40,000 Rockingham Esplanade
City of Stirling Coastal erosion study - Stirling coast Investigation $31,450
City of Stirling Emergency protection works - Watermans Construction $250,000 Beach
Department of WA sediment compartments and cells Investigation $50,000 Environment and Conservation
Esperance Port Emergency sand nourishment - Town Construction $50,000 Authority Beach
General State-wide wave buoy program Monitoring $50,000
Northern Coastal vulnerability and risk assessment Investigation $15,000 Agricultural program - Information sources and gap Catchment Council analysis project - Lancelin to Kalbarri
Shire of Construction of a dune - Thirsty Point Construction $4,000 Dandaragan Cervantes
Shire of Esperance Emergency sand renourishment - Norman Construction $112,500 Road
Shire of Irwin Coastal protection works - Grannies Beach Construction $100,000 Port Denison
Page 18 of 19 Recipient Project Type Grant
Shire of Irwin Emergency protection works - Grannies Construction $15,000 Beach Port Denison
Shire of Shark Bay Extend rock wall Construction $10,000
Town of Condition inspection - City Beach groyne Investigation $3,500 Cambridge
Page 19 of 19