1. Approved Action Plan for P-III & P
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Economic and Ecological Implications of Shifting Cultivation in Mizoram, India Environmental Science and Engineering
Environmental Science Vishwambhar Prasad Sati Economic and Ecological Implications of Shifting Cultivation in Mizoram, India Environmental Science and Engineering Environmental Science Series Editors Ulrich Förstner, Technical University of Hamburg-Harburg, Hamburg, Germany Wim H. Rulkens, Department of Environmental Technology, Wageningen, The Netherlands Wim Salomons, Institute for Environmental Studies, University of Amsterdam, Haren, The Netherlands The protection of our environment is one of the most important challenges facing today’s society. At the focus of efforts to solve environmental problems are strategies to determine the actual damage, to manage problems in a viable manner, and to provide technical protection. Similar to the companion subseries Environmental Engineering, Environmental Science reports the newest results of research. The subjects covered include: air pollution; water and soil pollution; renaturation of rivers; lakes and wet areas; biological ecological; and geochemical evaluation of larger regions undergoing rehabilitation; avoidance of environmental damage. The newest research results are presented in concise presentations written in easy to understand language, ready to be put into practice. More information about this subseries at http://www.springer.com/series/3234 Vishwambhar Prasad Sati Economic and Ecological Implications of Shifting Cultivation in Mizoram, India 123 Vishwambhar Prasad Sati Department of Geography and Resource Management Mizoram University (A Central University) Aizawl, Mizoram, India ISSN 1863-5520 ISSN 1863-5539 (electronic) Environmental Science and Engineering ISSN 1431-6250 ISSN 2661-8222 (electronic) Environmental Science ISBN 978-3-030-36601-8 ISBN 978-3-030-36602-5 (eBook) https://doi.org/10.1007/978-3-030-36602-5 © Springer Nature Switzerland AG 2020 This work is subject to copyright. -
World Bank Document
GOVERNMENT OF MIZORAM Public Disclosure Authorized PUBLIC WORKS DEPARTMENT WIDENING TO 2-LANE, RE-ALIGNMENT AND GEOMETRIC IMPROVEMENT OF CHAMPHAI- ZOKHAWTHAR ROAD Public Disclosure Authorized (00.000 KM to 27.247 KM) WITHIN MIZORAM STATE ROADS PROJECT II ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Public Disclosure Authorized 16 February 2014 Public Disclosure Authorized STUP Consultants Pvt TABLE OF CONTENTS TITLE PAGE NO CHAPTER 1 INTRODUCTION 1 1.1 Background: Mizoram State Road Project II 1 1.2 Project Objective, Location and Scope 3 1.3 Champhai-Zokawthar Road 4 1.4 Structure of EIA Report 7 1.5 Proponent and EIA Consultant 8 CHAPTER 2 PROJECT DESCRIPTION 9 2.1 Champhai-Zokawthar Road 9 2.2 Alignment 9 2.3 Width and gradient 17 2.4 Culvert and drains 18 2.5 Junction Improvement 18 2.6 Slope protection Works 18 2.7 Other Improvement Works 18 2.8 Traffic Diversion during Construction 19 2.9 Blasting 19 2.10 Cutting and Excavation 20 2.11 Construction materials and construction equipment 20 2.12 Construction workers and labour camps 21 2.13 Contractor’s camp, stockpiling material, and garage & maintenance 21 2.14 Land acquisition for the project 22 2.15 Project Cost 23 2.16 Construction Schedule 23 CHAPTER 3 Environmental legislation and Policies 32 3.1 Implementation and Regulatory Agencies 32 3.2 Key Applicable State level Laws and Regulation 34 3.3 Key Statutory Clearance Requirements 33 3.4 MORTH and IRC Specifications 37 3.5 Other Applicable Laws – Labour Laws 37 3.6 World Bank Policies 37 CHAPTER 4 METHODOLOGY 39 4.1 Influence Area -
Lunglei DDMP 2019
Lunglei District Disaster Management Plan, 2019 Office: 0372-2324121 Fax: 0372-2324021 DEPUTY COMMISSIONER LUNGLEI DISTRICT, MIZORAM PREFACE Natural hazards such as earthquakes, landslides, cyclones, hailstorms, flash floods and others have always caused major problems in the State and the District as well. Natural hazards are not considered as disasters until destruction in terms of damage to population and property is encountered. However, in recent years, the growths in population over hazardous areas have sharpened the impact of natural hazards. In addition, man-made hazards due to carelessness and accidental failures are growing threats to the community, posing a high risk in loss of life and property. Therefore, District Disaster Management Plan incorporating all possible preparedness, prevention and mitigation measures is prepared with a view that when the disasters strike, its impact on the community, risk in loss of life and property is reduced. District Disaster Management Plan, 2019 for Lunglei District is prepared such that when disasters strike, all responsible stakeholders shall render cooperation to the District Administration and join hands and to tackle the management of disasters as it is a work which cannot be performed alone. “Disaster maybe ruthless, but human compassion is overwhelming and the only source of solace in such difficult times” Dated Lunglei, K.LALRINZUALI The 12th December, 2019 Deputy Commissioner Lunglei District, Mizoram 1 Lunglei District Disaster Management Plan, 2019 Contents Chapters Items Page -
2. Executive Summary of Revised Action Plan for 9 Rivers in Mizoram
EXECUTIVE SUMMARY OF THE ACTION PLAN FOR CONSERVATION OF NINE RIVERS IN MIZORAM, 2019 In compliance of the orders of the Hon’ble NGT on OA No. 673/2018 dt. 20.09.2018, 19.12.2018 & 08.04.2019 Prepared by RIVER REJUVENATION COMMITTEE (RRC) GOVT. OF MIZORAM Contents Page 1. Introduction 1 2. Summary of Action Plan of Tiau River 5 3. Summary of Action Plan of Tlawng River 7 4. Summary of Action Plan of Tuipui River 9 5. Summary of Action Plan of Tuivawl River 11 6. Summary of Action Plan of Chite Stream 13 7. Summary of Action Plan of Mat River 15 8. Summary of Action Plan of Saikah Stream 17 9. Summary of Action Plan of Tuikual River 19 10. Summary of Action Plan of Tuirial River 21 11. Abstract of the financial requirement 23 EXECUTIVE SUMMARY OF THE ACTION PLAN FOR THE NINE(9) RIVERS OF MIZORAM In compliance to the orders of the Hon’ble NGT dated 20.09.2018, 19.12.2018 & 08.04.2019 in the matter of OA No. 673/2018 - M.C Mehta-Vrs-Union of India & Ors related to the News item dated 17.09.2018, published in ‘‘The Hindu” under the heading “More river stretches are now critically polluted ”, River Rejuvenation Committee (RRC), Govt. of Mizoram has prepared Action Plan for conservation of nine(9) rivers in Mizoram, which are identified to be polluted by CPCB based on BOD level during 2016 and 2017. The nine (9) identified polluted rivers are : i) 1 river (Tiau) - Priority III ii) 3 rivers (Tlawng, Tuipui and Tuivawl) - Priority IV iii) 5 rivers (Chite, Mat, Saikah, Tuikual and Tuirial)- Priority V The Action Plan is prepared for conservation, rather than rejuvenation of the rivers since the identified 9 polluted river stretches in Mizoram are already within the prescribed limits of BOD (Data annexed), preparation of action plan for rejuvenation of these rivers for bringing down the BOD level does not arise for these rivers. -
ZOKHAWTHAR ROAD (00.000 KM to 27.247 KM) WITHIN MIZORAM STATE ROADS PROJECT II
Mizoram State Road Project –II GOVERNMENT OF MIZORAM PUBLIC WORKS DEPARTMENT WIDENING TO 2-LANE, RE- ALIGNMENT AND GEOMETRIC IMPROVEMENT OF CHAMPHAI- ZOKHAWTHAR ROAD (00.000 KM to 27.247 KM) WITHIN MIZORAM STATE ROADS PROJECT II ENVIRONMENTAL IMPACT ASSESSMENT (EIA) DECEMBER 2013 STUP Consultants Pvt 2-1 PWD, Mizoram Mizoram State Road Project –II CHAPTER-1 : THE MIZORAM STATE ROADS PROJECT This chapter describes the Mizoram State Roads Project 2 (MSRP 2) background and the need for the project. After describing in brief the various studies that have led to the identification, prioritisation and selection of the project corridors, this chapter presents the various improvement options proposed. The setting in terms of the preparation of EA for the project and the EA process adopted has been discussed. The last section presents the outline of the various chapters of this report. 1.1 MIZORAM STATE ROADS PROJECT 2 The Government of India has requested World Bank financing for the improvement and rehabilitation of State Highways and Major District Roads in the State of Mizoram that enhance connectivity to Bangladesh and Myanmar. The proposed roads project includes a 336 km north-south alignment starting at the NH44A junction between Aizawl and Tripura State passing through Thenhlum, Phairuangkai,Chawngte, and connecting to the Multi-modal Kaladan Road at the southern end. Other road links in the project include the 112 km east-west Lunglei-Lungsen-Tlabung-Kawrpuichhuah road which links to nearby Chittagong Port (through Rangamati) in Bangladesh and the east-west 28km Champhai-Zowthowkar road and 42 km Chumkhum- chongte road . -
New Sites for Mrs Hume's Pheasant Syrmaticus Humiae in North-East
Forktail 21 (2005) SHORT NOTES 183 New sites for Mrs Hume’s Pheasant Syrmaticus humiae in north-east India based on hunters’ specimens and local reports ANWARUDDIN CHOUDHURY Mrs Hume’s Pheasant Syrmaticus humiae is a poorly DISTRIBUTION known globally threatened (Vulnerable) species (BirdLife International 2004). It is thinly distributed in I observed the species at three previously known sites the hill tracts of north-eastern India, north and west (Shiroi, Murlen and Phawngpui), recorded 20 new Myanmar, south-west China and north Thailand (Ali sites based on live captured birds or preserved speci- and Ripley 1987, Fuller and Garson 2000, Han Lian- mens in villages, and identified an additional 24 new xian 1997).Very little current information on its status sites where villagers reported the species (Appendix, and distribution is available (Fuller and Garson 2000, Fig. 1). In Nagaland, BirdLife International (2001) BirdLife International 2001). Recent fieldwork in north-east India prior to this study had resulted in few records (Katju 1996, Kaul et al. 1996, Choudhury 1997, 1998, 2000, 2001, Robson 1999). No previous survey had specifically targeted the species. I carried out surveys in Nagaland, Manipur and Mizoram during 1996–2004 to assess the current distribution and status of the species, mainly from hunters’ specimens and local reports. METHODS I carried out surveys in: Nagaland in June 1996, January, February, April and October 2001, February 2002 and February 2004; Manipur in January 1996, January 2001, October 2001 and February 2002; and Mizoram in April 2000 and February 2001. These states are almost entirely mountainous. The climate is monsoonal with hot wet summers and cool dry winters (although winter rains are also not uncommon); annual rainfall is 1,000–6,000 mm. -
November 2020
Water Quality Data of 9 (NINE) Polluted River stretches in Mizoram (OA - No. 673 of 2018) NOVEMBER 2020 MIZORAM STATE POLLUTION CONTROL BOARD DETAILS OF POLLUTED LOCATIONS & RESULTS OF FIELD PARAMETERS FOR THE MONTH OF NOVEMBER, 2020 A. STATIONS DETAILS Use of water in Down Stream Human activities (Bathing, Washing, Used Major Visibility Sl. Station Co-Ordinates Sampling Sampling (irrigation, industrial, domestic, drinking Depth of Water Cultivation, Fishing, Boating, Floating Loc ationName of Station LocationName Based Polluting Effluent Weather Colour Odour Flow (m/s) No. Code Date Time water source, organised water source, Body (m) Gardening, Tourist spot, cattle matter Class Sources Discharge cultivation, fishing, bathing ghat, others) wedding, others) Longitude Latitude Elevation 1 2 3 4 5 6 7 8 9 10 11 12 13 Near Boundary Tiau Bridge, 1 3756 Tiau River Zokhawthar Village, 93023′31.0″E 23021′42.8″N 720m 14-11-2020 10.20 Domestic Clear 1.12 Washing Pale Yellow Odour free 1.22 Champhai District, Mizoram Sairang Village, 3709 Tlawng River, Sairang 0 0 80m 12-11-2020 12.13 Agriculture Clear 3 Sand collection Pale Yellow Odour free 0.5 Aizawl District, Mizoram 92 39′10″E 23 48′49″N Tlawng River, Near Tlawng Bridge, Mausen Village, 3734 920 0 1080m 19-11-2020 1.45 Agriculture Washing, Bathing Clear 1 Washing, Domestic Purpose Clear Odour free 1 Upper Stream, Lunglei Lunglei District, Mizoram 49′15.0″E 22 51′21.2″N 2 Tlawng River, Near P.H.E Water Treatment Plant, 3736 920 0 800m 19-11-2020 2.30 Agriculture Drinking Water Source Clear 3.1 -
!The Mizoram Gazette , Published by Authority
Regd. No. NE 907 !The Mizoram Gazette , Published by Authority ... --'Y"OT},X'- -Au"wffi'ldiy-i4.8.81 Sf"Vam 2r,--S.E. i903IS.ue N-O:-33 --- .� .Government of Mlzoram � $'- 'PART I Appointrnents. l"ostln9s. Transfers, Powers, Leave and other . ' I ,... ... -'l...Personal Notices and Orders. "� ... • NOTIFICATION , No, A, 19011 / 1/8()-APT(A). the lot Augus, 1981. Till: Lt. Governor (Admini.trator) of Mize.am i. pleased to sanctiOl:ed c;�tcu ,ion of Commuted Leave on ....: . >u.l ground .sanct;oned under this Depart· ment's Notification eve;; number dated 24.7.1981 to Shri A. J. Lundall. Chief �ecretary to the Govt of Mizoram by 20 (tweent,\') (;ays with effect from lst August to 20th August. '81 (both days inclusive) under A. I. S. (Leave) Rules. 1955 as amended from time to time. During the period of leave of the Chief Secretary, Shri Gorakh Ram. Development Commissioner will continue to take charge of lhe post of Chlef Secretary, Mizoram in addition to his own duties. The Officer would have continued to hold the same post but for his proceeding on leave and there is every likelihood of his returning to {he same post on the expiry of his leave. �l.Jo. A. 19013/30/80"--APT(A), the 3rd. August, 1981. The Lt. Governor (Adninistrator) of Miwram is pleased to grallt 25 (twenty five) <iays Earned Leave w,th eiieet from 21. 10. 1980 to 14. II. 80 (both days inclusive) to Shri J. C. SCDgluaia, District Civil Supply Officer. Lunglei on private ground under C.c. -
Crossing the Line: Geopolitics and Criminality at the India-Myanmar Border
RESEARCH REPORT CROSSING THE LINE Geopolitics and criminality at the India–Myanmar border PREM MAHADEVAN NOVEMBER 2020 CROSSING THE LINE CROSSING THE LINE Geopolitics and criminality at the India–Myanmar border ww Prem Mahadevan November 2020 ACKNOWLEDGEMENTS The author would like to thank Mark Shaw and Tuesday Reitano for invaluable feedback provided during the course of this research project. Thanks also to Mark Ronan and his team for a speedy and efficient editorial process. The author expresses gratitude to the Government of Norway for funding the research. ABOUT THE AUTHOR Before joining the Global Initiative Against Transnational Organized Crime, Prem Mahadevan was a senior researcher with the Center for Security Studies at the Swiss Federal Institute of Technology. He specialized in research on organized crime, intelligence and irregular warfare. He has co-authored policy studies for the Swiss foreign ministry and written a book on counter-terrorist operations for the Indian Army. His academic publications include two books on intelligence and terrorism. © 2020 Global Initiative Against Transnational Organized Crime. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means without permission in writing from the Global Initiative. Cover: View of the remote Zokhawthar–Rihkhawdar border crossing, a hotspot for the illicit smuggling of goods between India and Myanmar. © Eric Winny via Wikimedia Commons Design: Elné Potgieter Cartography: Rudi de Lange Please direct inquiries to: -
1St Mizoram Finance Commission Report Mizo
CONTENT S Thuhma i-ii List of Annex iii List of Tables iv-vi Glossary vii-x Chapter – 1 A Khuhhawnna 1-12 Chapter – 2 Village Council-te Hnathawh Dan Kalphung 13-28 Bihchianna leh Ruahmanna Chapter – 3 Aizawl Municipal Council Hnathawh Dan 29-40 Kalphung Bihchianna leh Ruahmanna Chapter – 4 Autonomous District Council-te Hnathawh Dan 41-63 Kalphung Bihchianna leh Ruahmanna Chapter – 5 Mizoram Sum leh Pai Dinhmun 64-105 Chapter – 6 Village Council-te Sum leh Pai Dinhmun 106-126 Chapter – 7 Aizawl Municipal Council Sum leh Pai Dinhmun 127-141 Chapter – 8 Autonomous District Council-te Sum leh Pai 142-170 Dinhmun Chapter – 9 Sum leh Pai Inhlanchawn/Sem leh Indaihlohna 171-188 Phuhruk Dan Tur Chapter – 10 Terms of Reference-a Tul Dangte 189-202 Chapter – 11 Thil Pawimawh leh Kaihhnawih Dangte 203-220 Chapter – 12 Rawtna Hrang Hrang Khaikhawmna 221-250 Annex 251-365 THUHMA India Sawrkar hian tun hma atang tawhin thingtlang khua (Village) leh khawpui (Municipality) te inawp dan tihchangtlunna atan rawtna siamtu tur Committee/Commission te a lo din fo tawh a. Central Sawrkar Policy chu thlante (elected bodies) ngei thuam chaka Village leh Municipality-a thuneihna chan tir hi a ni. Chumi awmzia chu, Central Sawrkar chuan, thlante (elected bodies) hian sawrkar te zawk (mini government) anga hna an thawh theih nan, thuneihna semzai hi a duh a ni. 2. Mahse heng rawtna siam tam ber te hi sawrkar hnathawkte hian an kut atanga thuneihna pek chhuah chu uiin an dodala, bawhzuia tihhlawhtlin theih lohin an hup bet thin. 3. -
DISTRICT ELEMENTARY EDUCATION PLAN N
SARVA SHIKSHA ABHIYAN DISTRICT ELEMENTARY EDUCATION PLAN n . y '■ INDIA \ ( CHAIVIPHAI DISTRICT MIZORAM ^ "Z r'y'iw w )T 'V r • a “ ii'jc®fvx-A<rnrt.^?fi=- yt-wnaurnt.wn%rmmm *^(ru*m^mntwu m . i i i H n i * f i \\m*»wwm »^iimi»r HAP of ' cifAMPilAi hiifrffcf ’ M A n 1 p u II „ , • A'/ /^ |9<i / >y I rt t I ^ S^ltx^rA,' \ \ y n P^tnlyan r ' ' . • r^ziLW V \ r% N C- ft uaj j-ntl , ArtirA./1 I 4 \{(ktC^itKW //,!, ^ * t/ I I /< / • ,, ^ ^'enfsM fV X a e N b it fnfkvrtrtii 4»K«J ^ tJk«U «( M-rt^ ” "* * 4- Shtfi A«<aa<^a ^ •— • • •—• • • .i J hizfZttf' 6»ixi »f —» •• • •—• • • • •—' (itfftl. Clrcf*. f». oU*- c/Avy ^ . --- S'. Mti^iUdA C. Unm^taU*4 R»«.4 '~r^j: f. fi*>aM lrtn H.^r\'j I g hut^c/- Cnf^ltkJ I \ . V <7- C»AsJr4u.<iAt0 j ( t. \B \ *^^*“*7^?^''''l afmctc (S) '/ > • y A ^ ^ i , . t i » • ^i^^-^AfcnuOA'•^A.4AfcnuOA /^ •o. l\>aH tf»i I' *■ '|-*»‘" . ■ S’ V 'k t 'fJ' •■'*.;'• • I i Vfi- ' 4 ' 4i. ‘ - f*J. ,■» ' ijjuJ .J.’ <(1 Vk , ,,». M* J* ;r:^- V . j ‘ f- ' B 1 iHa it .«u’.*!# .4 4 ’.% ^ ,* . 'i*-^ ‘ *■> " 1 ■ ' '^ V " » / "i . .’ . 4* ■ ' . , t,-f* f- / i* 'h 'if' , ' . - >s ^ ' % T ’ ^ . S, i.t* 14 % 1 » . J r • « < t l , i I- . I " I %' « \ htf %" I ', l,l,l!»\i!!.S!i!.*II.< . ^ ^ “ .-I. — ^==- /»-.* * V 1 ^ : . FOREWORD DistiicI Eleiiienlary Bdiicatioii IMaii (DEIiP) (!lminpliai District, Mizoram, has been f)repare(l under the perseverance and hard work of the Kducation Staff, Chaniphai District, Mizoram. -
Bamboo and Mizo Society: a Historical Study by Pc
BAMBOO AND MIZO SOCIETY: A HISTORICAL STUDY BY PC. LALRINDIKA HISTORY & ETHNOGRAPHY DEPARTMENT Submitted in partial fulfillment of the requirement of the Degree of Master of Philosophy in Department of History & Ethnography of Mizoram University, Aizawl. DEPARTMENT OF HISTORY & ETHNOGRAPHY MIZORAM UNIVERSITY AIZAWL: MIZORAM Phone: 0389-2330531/0389-2330410 Mizoram University A Central university established by an Act of Parliament Accredited ‘A’ Grade by NAAC in 2014 DECLARATION I, PC. LALRINDIKA, hereby declared that the subject matter of this thesis is the record of work done by me, that the contents of this thesis did not form basis of the award of any previous degree to me or to do the best of my knowledge to anybody else, and that the thesis has not been submitted by me for any research degree in any other University/Institute. This is being submitted to the Mizoram University for the degree of Master of Philosophy in Department of History & Ethnography. Date: 29.01.2020 (PC. LALRINDIKA) Aizawl, Mizoram (Prof. K. ROBIN) (Prof. K. ROBIN) HEAD OF DEPARTMENT SUPERVISOR i DEPARTMENT OF HISTORY & ETHNOGRAPHY MIZORAM UNIVERSITY AIZAWL: MIZORAM Phone: 0389-2330531/0389-2330410 Mizoram University A Central university established by an Act of Parliament Accredited ‘A’ Grade by NAAC in 2014 CERTIFICATE This is to certify that the dissertation entitled “ Bamboo and Mizo Society: A Historical Study”submitted by PC. Lalrindika for the award of the degree of MASTER OF PHILOSOPHY, is a research work, done under my supervision and guidance. The dissertation, submitted by him has not formed the basis for the award to the scholar for any degree or any other similar title and it has not yet been submitted as a dissertation or thesis in any University.