Character Places

Total Page:16

File Type:pdf, Size:1020Kb

Character Places Schedule 2—Character Places SCHEDULE 2—CHARACTER PLACES Part 1—Historic and Miscellaneous Places Address/Site Name Street No. Suburb RPD Description Extent of Significance Albert Street 15 North Ipswich L31 RP14724 Dwelling Whole Lot Alice Street 28-28A Goodna L4-5 RP22565 Dwelling Whole Lot Alice Street 69 Goodna L1 RP2461 Church Whole Lot excluding post ‘St. Alban's Anglican 1946 buildings & Church’ structures Bailey Street 27 Collingwood Park L1 RP22440 Colliery Complex Colliery facilities of the ‘Westfalen Colliery 1970’s No. 3’ Barclay Street 76-78 Bundamba L44-45 RP22527 Dwelling Whole Site Barclay Street 82 Bundamba L46 RP22527 Dwelling House only Bell Street 1 Ipswich L3 RP2654 Shop Whole Lot Bell Street 1 Ipswich L4 RP2654 Shop Whole Lot Bell Street 1 Ipswich L5 RP2654 Shop Whole Lot Berlins Road 223 Tallegalla L1 RP66966 Cemetery Fenced area containing ‘Muller private one headstone for the cemetery’ Muller family Blackall Street 100 Basin Pocket L31 RP23986 Dwelling Whole Lot Blackstone Road 9 Eastern Heights L16 RP24157 Shops Whole Lot Booval Street 16 Booval L22 RP23755 Dwelling Whole Lot ‘Violetville’ Boyles Rd Pine Mountain Part of road reserve Parkland Area outlined on attached ‘The Boghole’ Plan No. 1 Bremer River Ipswich Stone retaining To the extent of the Barry Street wall supporting remains of the stone Road Reserve the banks of the retaining wall ‘Stone retaining wall’ Bremer River in the area known as the Swing Basin Bremer Street Ipswich Road Reserve Memorial The extent of its concrete ‘First Queensland foundations in the Bremer Railway Centenary Bridge pier Memorial’ Bremer Street Ipswich Railway Reserve Bridge Area outlined on attached ‘Railway Bridge’ Plan No. 2 Bremer Street 10 Ipswich Memorial To the extent of the ‘Sesqui-Centenary memorial's concrete Discovery Memorial foundations Cairn within Transit Centre Carpark’ Bremer Street 14 Ipswich L1 RP54899 Archaeological Original sandstone ‘Johnston’s Brewery L1 RP812175 site foundations which can be Site’ relocated but are to remain on site February 2012 SCH2-1 Schedule 2—Character Places Address/Site Name Street No. Suburb RPD Description Extent of Significance Bridge Street 28 North Booval L14 RP23802 Dwelling Whole Lot Brisbane Road 47-49 Bundamba L2 RP123379 Dwelling Main House Andrew Duce’s House Brisbane Road 95A Booval L169 RP24111 Memorial To the extent of the Cameron’s Park concrete apron surrounding the memorial ‘ War Memorial & Surrounds’ Brisbane Road 17 Bundamba L10-11 B7002 Memorial To the extent of the ‘Bundamba War memorial's concrete apron Memorial & surrounds Memorial Park’ Brisbane Road 20 Bundamba L1 RP170587 Church Hall Whole Lot excluding post ‘Bundamba Methodist 1946 buildings & Church Hall’ structures Brisbane Road 73 Bundamba L2-3 RP22506 Dwelling Whole Site Brisbane Road 88 and 90 East Ipswich L10 RP53682 & Dwelling Whole Lot including ‘Duce House and L3 RP71500 boundary fences, internal Pergola’ stone retaining walls Brisbane Road 258 Bundamba L507 SL6935 Memorial To the extent of the Rotary Park: ‘Old concrete apron Ipswich Railway Bridge surrounding the memorial Memorial’ Brisbane Road 38 and 38a Dinmore L78 and L79 RP22376 Church Church building ‘Dinmore Murri Baptist Church’ Brisbane Road 44 Dinmore L121 SP130149 Dinmore Railway Passenger Station Station Building, Footbridge and northern Timber Platform Shelter. Brisbane Road Ebbw Vale L131 SP130151 Ebbw Vale Rail Passenger Station Railway Station Building, Timber Platform Shelters and Footbridge Brisbane Road 11 Ebbw Vale L1 RP40461 Memorial To the extent of the ‘Ebbw Vale War memorial's concrete apron Memorial & surrounds’ Brisbane Road 35 Ebbw Vale L2 RP83652 Dwelling Whole Lot ‘Sandhurst’ Brisbane Road Redbank Railway Reserve Railway Station To the extent of the Redbank Railway original railway station Station building Brisbane Road Redbank Outside the Redbank Road Distance Area outlined on attached ‘Ipswich – Brisbane Railway Station, Marker Plan No. 3 Road Distance Marker’ opposite 93 Brisbane Road Brisbane Road Redbank Road Reserve Stone kerbing and Area outlined on attached ‘Stone Kerbing and gutters Plan No. 4 Gutters’ Brisbane Road 7 & 9 Redbank L8 RP22523 School building & Whole Site excluding all ‘Redbank State School’ L390 SL6661 annexe post 1960's buildings and structures Brisbane Road 34 Redbank L2 RP59354 Shop Whole Lot Brisbane Road 70 Redbank L30 RP803123 Hotel Whole Lot excluding all ‘Commercial Hotel’ post 1946 buildings & structures SCH2-2 October 2017 Schedule 2—Character Places Address/Site Name Street No. Suburb RPD Description Extent of Significance Brisbane Road 71 Redbank L13-14 RP22316 School of Arts Whole Site and street ‘Redbank School of Arts’ awnings Brisbane Road 89 Riverview L10 RP87341 Dwelling Whole Lot Brisbane Street 5 Ipswich L2 RP61206 Dwelling Whole Lot ‘QCWA Girls' Hostel’ Brisbane Street 25 Ipswich L10 I122412 Hotel Whole Lot and the street ‘Ulster Hotel’ awning Brisbane Street 38 Ipswich L1 RP75715 Shop Whole Lot and the street ‘Suva House’ awning Brisbane Street 80 Ipswich L1 RP80199 Shop Whole Lot and the street awning Brisbane Street 86 Ipswich L0 BUP289 Shops Whole Site and the street L0 BUP 104426 awning L8 BUP104426 L1-4 BUP289 Brisbane Street 89 Ipswich L2 RP2652 Bank Whole Lot ‘Queensland National Bank’ Brisbane Street 91 Ipswich L1 RP2652 Shop Whole Lot Brisbane Street 93 Ipswich L2 RP2653 Shop Whole Lot Brisbane Street 94 Ipswich L3 RP93328 Shop Whole Lot Brisbane Street 96 Ipswich L2 RP162302 Shop Whole Lot Brisbane Street 97 Ipswich L203 I12241 Shop Whole Site and the street ‘Public Trustee’s Office’ L1 RP2653 awning Brisbane Street 100 Ipswich L1 RP93328 Shop Whole Lot Brisbane Street 102 Ipswich L3 RP166867 Bank Whole Lot Brisbane Street 106 Ipswich L1 RP46058 Shop Whole Lot 'Fox's Pharmacy' Brisbane Street 112 Ipswich L2 RP2713 Bank Whole Lot 'Former Bank of Australasia' Brisbane Street 114 Ipswich L9 RP68487 Post Office Whole Lot Limestone Street 63 & 65 L24 I12244 ‘Ipswich Post Office’ L25 RP68487 Brisbane Street 114B Ipswich L1 RP2713 Shop Whole Lot ‘London Pharmacy’ Brisbane Street 116 Ipswich L12 SP103223 School of Arts Whole Lot, excluding all 'School of Arts, Town Hall post 1946 buildings and Hall, St Paul's Young structures Men's Club' August 2013 SCH2-3 Schedule 2—Character Places Address/Site Name Street No. Suburb RPD Description Extent of Significance Brisbane Street 124 Ipswich L5 RP47364 Church, Rectory, Whole Lot including the ‘St Paul’s Anglican Memorial, Gates Church, Rectory, Memorial Church’ & Walls to Mavis Parkinson, the entry gates & all sandstone & limestone walls. Excluding all post 1946 buildings and structures Brisbane Street 126 Ipswich L1 RP175271 Shop Whole Lot Brisbane Street 130 Ipswich L1 RP2758 Shop Whole Lot Brisbane Street 133 Ipswich L1-2 RP47496 Shop Whole Site Brisbane Street 135 Ipswich L3 RP112220 Shop Whole Lot Brisbane Street 137 Ipswich L2 RP112220 Shop Whole Lot Brisbane Street 138-140 Ipswich L1 RP47528 Shop Whole Lot and the street 'Voglers' L2 RP2760 awning Brisbane Street 141 Ipswich L1 RP112220 Shop Whole Lot and the street awning Brisbane Street 141 Ipswich L4 RP101770 Shop Whole Lot Brisbane Street 141 Ipswich L3 RP101770 Shop Whole Lot Brisbane Street 142 Ipswich L38 RP214352 Shop Whole Lot and the street awning Brisbane Street 144 Ipswich L2 RP74367 Shop Whole Lot and the street ‘Former Motor Garage' awning Brisbane Street 146 Ipswich L2 RP48335 Shop Whole Lot and the street awning Brisbane Street 150 Ipswich L3 RP2762 Shop Whole Lot and street awning Brisbane Street 152 Ipswich L1 RP2762 Shop Whole Lot and the street awning Brisbane Street 160 Ipswich L80 I12245 Shop Whole Lot and the street 'Big Whites' awning, excluding all post 1946 buildings and structures Brisbane Street 164 Ipswich L10 RP105860 Shop Whole Lot and the street ‘Hoey & Platz' awning, excluding all post 1946 buildings and structures Brisbane Street 169 Ipswich L0-6 BUP249 Shop Whole Site and the street ‘Bostock Chambers' awning Brisbane Street 178 Ipswich L2 RP95228 Shop Whole Lot Brisbane Street 183 Ipswich L1 RP2720 Shop Whole Lot and the street awning Brisbane Street 185 Ipswich L2 RP2717 Shop Shop front only including ‘Lutvey’s shop’ display windows Brisbane Street 187 Ipswich L1 RP2717 Shop Whole Lot and the street awning Brisbane Street 188 Ipswich L5 SP234330 Church & Whole Site including the 'Baptist Church' Memorial Gates retaining wall to Brisbane Street and memorial gates, excluding all post 1946 buildings and structures Brisbane Street 189 Ipswich L1 RP2738 Shop Whole Lot and the street awning Brisbane Street 196 Ipswich L818 I12245 Shop Whole Lot SCH2-4 October 2017 Schedule 2—Character Places Address/Site Name Street No. Suburb RPD Description Extent of Significance Brisbane Street 197 Ipswich L197 SP134638 Shop Whole Lot and the street awning Brisbane Street 199 Ipswich L199 SP134638 Shop Whole Lot and the street awning Brisbane Street 203 Ipswich L2 RP106090 Shop Whole Lot and the street awning Brisbane Street 205 Ipswich L714 I12246 Shop Whole Lot and the street 'Emporium' awning Brisbane Street 208 Ipswich L5 I1642 Shop Whole Lot Brisbane Street 211 Ipswich L2 RP93097 Shop Whole Lot Brisbane Street 214 Ipswich L1 RP167693 Hotel Whole Lot excluding all ‘Federal Hotel’ post 1946 buildings and structures Brisbane Street 215 Ipswich L2 RP2752 Hotel Whole Lot and the street 'Settlers Inn' awning Brisbane Street 219 Ipswich L2 RP43941 Shop Whole Lot Brisbane Street 221 Ipswich L1 RP43941 Shop Whole Lot Brisbane Street 223 Ipswich L2 RP91888 Shop Whole Lot including the Loetzschs
Recommended publications
  • Section 3.7 – Local Area Frameworks
    Draft Ipswich Planning Scheme 2019 Statement of Proposals 3.7 Local Area Frameworks 3.7.1 Preliminary (1) The Ipswich Local Government Area has been divided into thirty local area strategic planning units based on geographically identifiable communities of interest (areas with identifiable boundaries and within which there are broad land use and planning commonalities) to which individual Local Area Frameworks apply. (2) The thirty Local Area Frameworks provide a more detailed spatial expression of the policies included in the Whole of City Strategic Framework (refer to sections 3.1 to 3.6) for each of the local area strategic planning units by: (a) including a description of the geographic extent of the strategic planning unit to which the Local Area Framework applies; (b) identifying the Valuable Features in the area that are of significance and are to be protected; (c) identifying the most significant Development Constraints that impact on development in the area and that need to be considered and addressed in allocating precincts and for development assessment; (d) setting out the Growth Management outcomes that are to be delivered in the area; (e) identifying the key Infrastructure that needs to be delivered to support growth and development in the area; (f) showing the preferred use of land in the area by including each property in a land use precinct designation; and (g) where there are different development options (including for example building heights, lot sizes, dwelling densities or different land uses) for an area or individual
    [Show full text]
  • Queensland Transport and Roads Investment Program (QTRIP) 2016
    Metropolitan Metropolitan | Map and Contact Details Brisbane office 313 Adelaide Street | Brisbane | Qld 4000 PO Box 70 | Spring Hill | Qld 4004 (07) 3066 5499 | [email protected] Divider Image: Moggill Road Cycle Bridge looking north east towards Brisbane central business district (bridge spans Moggill Road, Indooroopilly). Copyright © 2015 Department of Transport and Main Roads, the Queensland Government. Department of Transport and Main Roads Metropolitan Overview • A two-lane bus-only extension road from Warrigal Road • Commence intersection improvements on Mount Crosby through to Logan Road in Eight Mile Plains. Road, at the Delacy Street and Pine Street intersection. The Metropolitan District covers an area of about 2,968km2, or around 0.2% of Queensland1. It straddles the Brisbane In 2016-17 we will: • Continue to seek Australian Government funding River and extends from Mount Glorious in the north to Logan for the Pacific Motorway-Gateway Motorway merge City in the south, and from Point Lookout in the east to west • Continue construction of the Gateway Upgrade North upgrade (southbound lanes), with $42 million provided of Helidon and the major centre of Ipswich. project that will widen the Gateway Motorway to towards this $210 million project by the Queensland six lanes, between Nudgee and Bracken Ridge, jointly Government as part of the State Infrastructure Fund. The district has an estimated residential population of funded by the Australian Government and Queensland about 1,461,733 or around 31.4% of Queensland’s total Government. population1. Future plans • Commence the Ipswich Motorway (Rocklea to Darra) The district looks after about 414km of other state-controlled Stage 1 project, to construct additional lanes between We are continuing to plan for the future transport roads, about 112km of the National Land Transport Network, Oxley Road and Suscatand Street, jointly funded by the requirements of residents in the Metropolitan District.
    [Show full text]
  • Darling Downs 79,530 Km2 Area Covered by Location1
    Darling Downs 79,530 km2 Area covered by location1 5.72% Population of Queensland1 3,846 km Other state-controlled road network 687 km National Land Transport Network2 See references section (notes for map pages) for further details on footnotes. Toowoomba Office 1-5 Phillip Street | Toowoomba | Qld 4350 Locked Bag 1 | Warwick | Qld 4370 (07) 4639 0777 | [email protected] Warwick Office 306 Wood Street | Warwick | Qld 4370 Locked Bag 1 | Warwick | Qld 4370 (07) 4661 6333| [email protected] • continue pavement rehabilitation on the Gore Highway • continue planning for bikeways in Central Toowoomba Darling Downs between Toowoomba and Millmerran, jointly funded and the Warwick principal cycle network by the Australian Government and Queensland Government • commence planning to improve Toowoomba In 2020–21 we completed: Connection Road and Hursley Road intersection • continue bridge replacement on the Rocky Creek • upgrading of the Emu Creek bridge on the New England Bridge on Murphy’s Creek Road, as part of the • continue planning to identify a Toowoomba North Highway, jointly funded by the Australian Government Queensland Government’s COVID-19 economic South Transport Corridor. and Queensland Government recovery response Link for TMR Project Page: • construction of Stage 1 of the New England Highway • continue pavement strengthening and widening on https://www.tmr.qld.gov.au/Projects Cycleway between Highfields and Toowoomba CBD the New England Highway between Yarraman and Toowoomba, as part of the Queensland Government’s
    [Show full text]
  • F6 Integrated Transport and Movement
    F6 Integrated Transport and Movement Vision Statement and Action Plan Framework - November 2005 IPSWICH2020ANDBEYOND IPSWICH2020ANDBEYOND Integrated Transport and Movement Ipswich City is the Motorway is now up to Ø Cunningham Highway to 6.2 Summary of Ø Identify and align the transport Strategy ITM 1.4 100 000 vehicles a day during the Warrego Highway connection priorities and objectives for well-serviced by busiest days of the week, The (pending Goodna Bypass and Goals and Ipswich of all stakeholders. A Safe Transport Network: Ensure mixture of cars and freight River Road Investigation). that residents feel safe travelling an integrated transport vehicles is problematic. Strategies - throughout Ipswich. Ø Extension of Centenary Strategy ITM 1.2 public transport To address the transport issues in Highway - Springfield to Ripley Integrated Ipswich a number of major Ø Develop and implement Bus and roads system to Yamanto. infrastructure projects have been Transport Connected Centres: Ensure that Stop and Station Design that effectively proposed in the State SEQ centres are connected and enable Guidelines. Infrastructure Plan and Program Ø Centenary Highway four and efficient movement between eliminates (2005) including: lanes - Ipswich Motorway to communities. Ø Provide real time service Springfield. Movement updates at major bus stops. congestion, Ø Ø Ipswich rail line third track Provide a loop bus service that conserves Corinda-Darra and Darra- Ø Western Ipswich Bypass ITM Goal 1 - connects major centres in Ø Identify and implement safety Ipswich. community Redbank. (Haigslea to Amberley). Connected measures around transport interchanges and rail stations. Ø character and Ø Springfield passenger rail line. Ø Cunningham Highway four Communities Investigate and implement lanes - Ripley Road to public transport services to Ø Improve security services on enhances Ebenezer.
    [Show full text]
  • Cunningham Highway/Amberley Intersection Planning Study Newsletter 02 • August 2011
    Cunningham Highway/Amberley Intersection Planning Study Newsletter 02 • August 2011 Draft plan released The Department of Transport and Main Roads is encouraging Get involved the community to get involved and have their say on the draft plan to realign the Cunningham Highway. The draft plan Transport and Main Roads would like your feedback to develop a preferred plan that best caters for details proposed changes between the Yamanto Interchange future traffic growth and addresses the needs of the and Ebenezer Creek and the upgrade of the Cunningham community as well as existing and future road users. Highway/Ipswich-Rosewood Road intersection. To provide your feedback or to contact the project team: The upgrade project aims to reduce congestion and improve safety • visit the project team at one of the staffed along this section of the highway. It will also service additional traffic displays (see the back page for a list of public expected to be generated from the proposed Aerospace Defence display dates and locations) Support Centre, ongoing expansion of the RAAF Airbase at Amberley • e-mail your feedback to and the proposed Ebenezer Regional Industrial Area. [email protected] • freecall 1800 991 879* The Cunningham Highway forms part of the Australian Government’s • Post: National Land Transport Network. This upgrade will provide greater The Department of Transport and Main Roads efficiency in the movement of interstate and interregional freight to the Cunningham Highway/Amberley Intersection Port of Brisbane and the Australia Trade Coast precinct. Planning Study PO Box 70 Detailed investigations including engineering and traffic analysis as Spring Hill Qld 4004 well as flora and fauna surveys have helped develop a draft plan that suits the identified needs and minimises impact to the surrounding environment.
    [Show full text]
  • Darling Downs Rest Area Upgrades Encouraging Motorists to Stop, Revive and Survive on the Darling Downs
    April 202 1 Darling Downs rest area upgrades Encouraging motorists to stop, revive and survive on the Darling Downs Rest areas across the Darling Downs are being upgraded over the next few months to improve facilities and encourage people to stop and rest. The Southern Queensland Regional Director, Kym Murphy, said the Department of Transport and Main Roads is starting work to improve motorist and heavy vehicle rest areas across the Darling Downs. “Rest areas are important to encourage motorists to stop and take a break, which helps reduce driver fatigue and the risk of crashes on our roads," she said. "We will be upgrading facilities such as toilets, shelters, picnic areas, parking and pedestrian pathways, to improve amenity and accessibility for all travellers. "The program is scheduled to upgrade 18 rest areas across the Darling Downs by the end of June 2021. "Starting with the Mary Park rest area on the Cunningham Highway at Tregony, which started works this week," Ms Murphy said. Below is a list of the sites being upgraded across the Darling Downs: • Mary Park rest area at Tregony, Cunningham Highway • Gladfield Driver Reviver rest area, Cunningham Highway • Cunningham rest areas at Thane (2 facilities), Cunningham Highway • The Glen rest area, New England Highway • Lions Park at Stanthorpe, Stanthorpe Connection Road • Federation Park at Ravensbourne, Esk-Hampton Road • Biddeston township facilities, Toowoomba-Cecil Plains Road • Munda Reserve at Woomera (2 facilities), Cunningham Highway • Millmerran rest area, Gore Highway • Wyaga Road intersection rest area at Wyaga, Gore Highway • Wyaga Creek rest area at Kilbronae, Gore Highway • Gatton Bypass truck stop, Warrego Highway • Richard Best Memorial Park at Warra, Warrego Highway • Monte Cristo at Condamine, Leichhardt Highway • Moonie Arts and Craft Centre Information Centre, Leichhardt Highway • Brigalow Creek north of Goondiwindi, Leichhardt Highway The impacts from the rest area upgrades will vary between sites.
    [Show full text]
  • Northern Link Road Tunnel
    Coordinator-General’s report Northern Link Road Tunnel Released: April 2010 Report evaluating the Environmental Impact Statement pursuant to section 35(3) of the State Development and Public Works Organisation Act 1971 Coordinator-General’s report – Northern Link Road Tunnel project Contents Synopsis.........................................................................................................4 1. Introduction.............................................................................................6 2. Project description .................................................................................7 2.1 The proponent ...................................................................................7 2.2 Project description .............................................................................7 2.3 Rationale for the project.....................................................................8 3. The impact assessment process............................................................11 3.1 Significant project declaration and controlled action........................11 3.2 Terms of reference for the EIS ........................................................11 3.3 Public notification of the EIS ............................................................12 3.4 Submissions on the EIS...................................................................12 3.5 Change to the project after the EIS..................................................13 3.6 Review of the further information provided (supplementary report to
    [Show full text]
  • Mt Lindesay/Beaudesert Strategic Transport Network Investigation Draft Report for Consultation, 2009 38
    4.0 EXISTING STUDY AREA 4.1 Existing Land Use and Demographics The network analysis has been undertaken using the South East Queensland Regional Strategic Transport Model developed by the “ConnectWest” consortium for the Department of Transport and Main Roads. The model is referred to as the South East Queensland Strategic Transport Model in this report. The 2005 demographic data for South East Queensland from the South East Queensland Strategic Transport Model is summarised in Table 4.1 below. Table 4.1 South East Queensland Strategic Transport Model 2005 Population and Jobs Localities (based on former local 2005 government boundaries) Population Employment NORSROC 649,260 178,653 WESROC 183,222 62,178 Ipswich Local Government 140,752 46,102 Other Local Governments 42,470 16,075 SouthROC 844,129 265,379 Gold Coast City Council North 69,456 17,754 Gold Coast City Council South 413,110 152,651 Beaudesert Shire (now part of Logan City) 56,776 13,025 Yarrabilba 5,040 1,282 Flagstone 3,220 2,062 Beaudesert Town 5,147 292 Bromelton - - Greenbank 5,331 1,002 Beaudesert Remainder 38,038 8,387 Redland and Balance of SouthROC 304,787 81,948 Brisbane City Council 971,757 587,132 TOTAL 2,648,368 1,093,341 Planning Information and Forecasting Unit (PIFU) have recently updated the above population numbers, based on the latest 2006 ABS Census, and these can be found at Appendix M. Population across the region at 2006 is 2.8 million. Department of Transport and Main Roads, Mt Lindesay/Beaudesert Strategic Transport Network Investigation Draft Report for Consultation, 2009 38 The South East Queensland Strategic Transport Model uses a 2005 population for the Study Focus Area of approximately 47,000.
    [Show full text]
  • RACQ Recommended Projects for Acceleration and Funding
    RACQ Recommended Projects for Acceleration and Funding Project Comments Program Accelerate Centenary Bridge duplication SRN Centenary Motorway Darra to Toowong upgrade SRN Upgrade Centenary Mwy at Carole Park / Logan Motorway interchange to four lanes SRN Gateway Motorway North - Bruce Highway to Deagon Deviation project NHN Gateway Motorway Old Cleveland Road Interchange - Deliver minor upgrade project and accelerate planning/funding for major interchange upgrade NHN Daisy Hill to Logan Motorway project NHN Pacific Motorway Interchange upgrades (Exit 38, 41, 45 and 49) NHN Ipswich Motorway upgrade Complete Stage 1 and Stage 2, Oxley to Darra project NHN Coomera Connector Stage 1 - Coomera to Nerang SRN Fast track all projects under BHUP safety, capacity and flooding streams NHN Bruce Highway Upgrade Program Bruce Highway six lane upgrade between Pine River and Caloundra Road NHN Bruce Highway Maroochydore Road to Mons Road upgrade NHN Shaw Road/North Shore Blvd, Townsville intersection/s upgrade NHN Gympie Arterial Road Accelerate Beams Road to Gateway Motorway project SRN Nicklin Way roundabout SRN Caloundra Road Kawana Way roundabout SRN North West Transport Corridor (Stafford Road to Carseldine), North Brisbane Bruce Highway Western Transport corridor projects Alternative, North South Urban Arterial (NSUA) SRN Fast track business case and project funding for Mooloolah River Interchange upgrade at Mountain Creek SRN Sunshine Motorway Investigate interchange upgrade at Coolum Beach SRN Duplicate (four lanes) between Pacific Paradise
    [Show full text]
  • Queensland Transport and Roads Investment Program for 2021–22 To
    Metropolitan 2,965 km2 Area covered by location1 32.10% Population of Queensland1 438 km Other state-controlled road network 89 km National Land Transport Network2 88 km National rail network See references section (notes for map pages) for further details on footnotes. Brisbane Office 313 Adelaide Street | Brisbane | Qld 4000 PO Box 70 | Brisbane | Qld 4000 (07) 3066 4338 | [email protected] Program Highlights • continue design and construction of the Salisbury Future Plans park ‘n’ ride upgrade We continue to plan for the future transport requirements of Metropolitan. In 2020–21 we completed: • complete construction of the Carseldine park ‘n’ ride upgrade In 2021–22 key planning includes: • the Ipswich Motorway (Rocklea – Darra) Stage 1 project, to upgrade the motorway from four to six • commence construction for the upgrade of • continue planning of the Boundary Road rail level lanes from just east of the Oxley Road roundabout Cleveland – Redland Bay Road between Anita Street crossing removal at Coopers Plains to the Granard Road interchange at Rocklea, jointly and Magnolia Parade, as part of the Queensland funded by the Australian Government and Queensland Government’s COVID-19 economic recovery response • continue planning of the Beams Road rail level Government crossing at Carseldine and Fitzgibbon • continue planning for the upgrade of the Centenary • the Sumners Road interchange upgrade over the Motorway and Logan Motorway interchange, as part • continue planning for six lanes on the Gateway Centenary Motorway of the Queensland Government’s COVID-19 economic Motorway from Bracken Ridge to Pine River recovery response • strengthening work on the Gateway Motorway Flyover, • continue planning for the Lindum station precinct.
    [Show full text]
  • Part 3 BOUNDARY DESCRIPTIONS of the PROPOSED DISTRICTS
    Part 3 BOUNDARY DESCRIPTIONS OF THE PROPOSED DISTRICTS ELECTORAL DISTRICT OF ALGESTER Commencing at the point where Logan Motorway crosses Blunder Creek in the locality of Forest Lake, by Blunder Creek in a generally north direction to Ipswich Motorway, by that motorway in a north-east direction to Granard Road, by that road in a south-east direction to Beaudesert Road, by that road in a south direction to Acacia Ridge locality boundary, by that locality boundary in an east direction to Weaver Street, by that street in an east direction then by a line in an east direction to the Brisbane-Sydney Rail Line, by that rail line in a south direction to Beaudesert Road, by that road in a generally south-east direction to Mount Lindesay Highway, by that highway in a south direction to Browns Plains locality boundary, by that locality boundary in an east direction to Lot 13 on Plan RP103534, by the southern boundary of that lot in an east direction to Wembley Road, by that road a south direction to Browns Plains Road, by that road in a west direction to an unnamed creek, by that creek in a south direction to Scrubby Creek, by that creek in a south-west direction to the southern boundary of Lot 907 on Plan RP224980, by the southern boundaries of that lot then Lot 902 on Plan RP858729 in a west direction to Emerald Drive, by that drive in a south-west direction to Lamberth Road, by that road in a west direction then continue by a line to Lot 1 on Plan RP112275, by the southern boundary of that lot in a west direction then continue by a line in a
    [Show full text]
  • Southern Queensland Region 2020–21 Project Pipeline Industry Briefing
    Southern Queensland Region 2020–21 Project Pipeline Industry Briefing Ms Kym Murphy Southern Queensland Regional Director 1 | Our region Southern Queensland Region Ms Kym Murphy Regional Director Mr Dereck Sanderson District Director Darling Downs Mr Roger Hacquoil District Director South West Mr Hendrik Roux District Director Wide Bay/Burnett 2 | *Stanthorpe Connection Road Roundabout Construction Southern Queensland Region 2020–21 Project Pipeline Industry Briefing Our program – focus areas of investment • Bruce Highway Upgrade Program • Warrego Highway East Masterplan • Targeted Road Safety Program • Roads of Strategic Importance (ROSI) Program • Stimulus Works Program. 3 | SouthernSouthern QueenslandQueensland RegionRegion 20202020–-21 Project Pipeline Industry Briefing Our program approach – associated challenges Top challenges Description PUP investigations • Services found during construction phase not identified in design. inadequate People • Internal TMR capacity – Planning and Contract Administration • Availability of suitable external resources (via ECS*) to assist in the delivery of the Planning Program • Infrastructure projects in the market concurrently (including infrastructure projects in other states) – high demand for quality human resources • Contract resourcing – a limited pool of contract resources with the necessary skills and experience. High demand of specialised skills in Delivery and Operations, Materials Lab and Survey Resources. *ECS – Engineering Consultancy Scheme 4 | Southern Queensland Region 2020–21 Project
    [Show full text]