Queensland Transport and Roads Investment Program (QTRIP) 2019-20 to 2022-23

Total Page:16

File Type:pdf, Size:1020Kb

Queensland Transport and Roads Investment Program (QTRIP) 2019-20 to 2022-23 Queensland Transport and Roads Investment Program 2019–20 to 2022–23 Darling Downs 79,530 km2 Area covered by district1 5.78% Population of Queensland1 3,846 km Other state-controlled road network 687 km National Land Transport Network 1Queensland Government Statistician’s Office (Queensland Treasury) Queensland Regional Profiles. www.qgso.qld.gov.au (retrieved 16 May 2019) Legend Toowoomba Office 1-5 Phillip Street | Toowoomba | Qld 4350 National road network Locked Bag 1 | Warwick | Qld 4370 State strategic road network (07) 4639 0777 | [email protected] State regional and other district road National rail network Warwick Office Other railway 306 Wood Street | Warwick | Qld 4370 Locked Bag 1 | Warwick | Qld 4370 Local government boundary (07) 4661 6333 | [email protected] Divider image: The viaduct and arch bridges of the Toowoomba Second Range Crossing facing south west near Toowoomba. District program highlights • continue upgrading existing shoulders, and widening • continue business case development for a package and applying wide-centre line treatments on the of safety works on the Gore Highway (Toowoomba – In 2018–19 we completed: Warrego Highway between Dalby and Miles, jointly Goondiwindi). funded by the Australian Government and Queensland • construction of a roundabout at the New England Government Link for TMR Project Page: Highway and Stanthorpe Connection Road southern https://www.tmr.qld.gov.au/Projects intersection • continue intersection improvements on the New England Highway (Yarraman – Toowoomba) at Ruthven • safety improvements on the Warrego Highway at Street and North Street various intersections and accesses on the western and eastern outskirts of Dalby, as part of the Warrego • complete upgrading the Emu Creek Bridge on New Highway Upgrade Program, jointly funded by the England Highway, jointly funded by the Australian Australian Government and Queensland Government Government and Queensland Government (Yarraman – Toowoomba) • construction of various overtaking lanes on the Warrego Highway between Dalby and Miles, as part • complete upgrading of package 4 of the Warrego of the Warrego Highway Upgrade Program, jointly Highway (Oakey – Miles) safety upgrades, which funded by the Australian Government and Queensland includes intersection upgrade and road widening in Government Chinchilla, as part of the Warrego Highway Upgrade Program, jointly funded by the Australian Government • packages 2, 3 and 5 of the Warrego Highway and Queensland Government (Oakey – Miles) safety upgrades, which included six intersection upgrades, road widening in some sections, • complete realignment of Oakey-Pittsworth Road and safety works such as removal of roadside hazards approaches at Toowoomba-Cecil Plains Road. and culvert drops, as part of the Warrego Highway Upgrade Program, jointly funded by the Australian Government and Queensland Government. Future plans In 2019–20 we will: We continue to plan for the future transport requirements of the Darling Downs District. • complete upgrading of the Chinchilla Rail Crossing on the Warrego Highway between Dalby and Miles, jointly In 2019–20 we plan to: funded by the Australian Government and Queensland Government • continue the Warrego Highway East Masterplan Darling • identify the preferred solution for the Accommodation • continue planning for cycleways in Central Toowoomba Downs Creek Crossing project located on the New England Highway (Warwick – Wallangarra), south of Stanthorpe Darling Downs | District profile Queensland Transport and Roads Investment Program 2019–20 to 2022–23 | Page 107 Page intentionally blank Darling Downs | District profile Queensland Transport and Roads Investment Program 2019–20 to 2022–23 | Page 108 National Network Contributions Estimated Approved Indicative Indicative Queensland expenditure 2021-22 Local Investment Commonwealth Australian Investment name/Location Location description total cost Government to 30 June 2019-20 2020-21 to Beyond Work description government ID (1) number Government / Other 2019 2022-23 $’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000 Goondiwindi 702659(2) Gore Highway (Millmerran - Wyaga Creek Floodway (stage 1) 1,600 1,600 179 1,421 Rehabilitate bridge/s and culvert/s Regional Goondiwindi) (106.90 - 106.92km) Subtotal: Goondiwindi Regional 1,421 Lockyer Valley 735490 Warrego Highway (Ipswich - Helidon - Withcott (80.50 - 88.50km) 500 500 179 321 Undertake transport project planning Regional Toowoomba) 1202509(3) Warrego Highway (Ipswich - Toowoomba - Ipswich 60,000 60,000 700 10,320 48,980 Undertake miscellaneous works Toowoomba) 454771 Warrego Highway (Ipswich - Heise Road - Tabletop Drive (36.58 - 755 755 365 390 Undertake transport project planning Toowoomba) 88.83km) Subtotal: Lockyer Valley Regional 711 700 10,320 Southern Downs 1248007 Cunningham Highway (Ipswich - Eight Mile intersection 22,000 17,600 4,400 6,250 15,750 Improve intersection/s Regional Warwick) 1123130(4) New England Highway (Warwick - Sections : 60.00 - 78.90km 19,453 19,453 4,141 13,812 1,500 Widen pavement Wallangarra) 735504 New England Highway (Warwick - Various locations 452 452 2 200 250 Undertake transport project planning Wallangarra) 702680(2) New England Highway (Warwick - Accommodation Creek (79.00 - 2,000 2,000 63 1,937 Replace bridge/s and approaches Wallangarra) 86.70km) Subtotal: Southern Downs Regional 6,278 20,312 17,250 Toowoomba 1203047(5) Gore Highway (Toowoomba - Toowoomba - Goondiwindi 62,500 50,000 12,500 738 10,738 51,025 Undertake miscellaneous works Regional Millmerran) 703226 Gore Highway (Toowoomba - Warrego Highway 698 698 169 529 Improve intersection/s Millmerran) 735459 Warrego Highway (Ipswich - James Street / Hume Street 350 350 350 Undertake transport project planning Toowoomba) intersection (94.58km) 702589(6) Warrego Highway (Ipswich - East Creek culvert (93.73 - 93.74km) 10,500 8,400 2,100 375 5,237 4,888 Rehabilitate bridge/s and culvert/s Toowoomba) 1153158 Warrego Highway (Ipswich - Neil Street intersection 350 350 50 300 Undertake transport project planning Toowoomba) 702647(6) Warrego Highway (Toowoomba - West Creek culvert (0.34 - 0.42km) 6,400 5,120 1,280 371 4,889 1,139 Rehabilitate bridge/s and culvert/s Dalby) 454729 Warrego Highway (Toowoomba - Various locations 600 600 250 300 50 Corridor planning Dalby) Subtotal: Toowoomba Regional 11,355 7,115 10,738 Darling Downs | National Network Queensland Transport and Roads Investment Program 2019–20 to 2022–23 | Page 109 Contributions Estimated Approved Indicative Indicative Queensland expenditure 2021-22 Local Investment Commonwealth Australian Investment name/Location Location description total cost Government to 30 June 2019-20 2020-21 to Beyond Work description government ID (1) number Government / Other 2019 2022-23 $’000 $’000 $’000 $’000 $’000 $’000 $’000 $’000 Western Downs 9625(6) 054127-14QLD-NP Warrego Highway (Dalby - Miles) Various locations (Oakey - Miles) 43,510 34,808 8,702 33,208 8,195 2,107 Duplicate from two to four lanes Regional 10105(6) 054119-14QLD-NP Warrego Highway (Dalby - Miles) Chinchilla rail crossing 19,040 15,232 3,808 5,172 12,110 1,758 Improve intersection/s 119673(6) 097063-17QLD- Warrego Highway (Dalby - Miles) Various locations (Oakey - Miles) 11,653 9,322 2,331 1,865 8,277 1,511 Widen and seal shoulder/s NP 119679(6) 097061-17QLD- Warrego Highway (Dalby - Miles) Various locations 63,640 50,912 12,728 16,391 28,559 18,690 Widen and seal NP Subtotal: Western Downs Regional 57,141 24,066 Various local 735274 Gore Highway (Toowoomba - Various locations 300 300 150 150 Undertake transport project planning governments Goondiwindi) Subtotal: Various local governments 150 150 Other works Construction Works 103,800 20,728 29,251 95,276 Corridor and Minor Safety Enhancements 468 2,216 2,333 117 234 Programmed Maintenance 8,130 1,989 2,047 4,094 Rehabilitation 12,610 3,593 3,766 6,177 6,260 Routine Maintenance 12,743 2,645 6,661 2,909 5,818 Traffic Management Enhancements 3,176 769 1,416 991 Traffic Operations 1,600 1,389 1,489 700 800 Transport Planning 525 175 100 250 Warrego Highway funding commitment(7) 320,000 80,000 37,500 362,500 Subtotal: Other works 46,433 108,742 55,947 Total: Darling Downs National Network 123,489 161,085 94,255 Darling Downs | National Network Queensland Transport and Roads Investment Program 2019–20 to 2022–23 | Page 110 Endnotes (1) For other Australian Government funded projects, see ‘Statewide commitments’ section or the relevant district’s ‘National Network’, ‘State Network’ and ‘Local Network’ tables. (2) Funding for this project is for pre-construction activities only. (3) Represents Australian Government funding commitment under the Roads of Strategic Importance. Project details and timing subject to further planning and negotiation with the Australian Government. (4) Funded through the Queensland Government’s High Risk Roads Initiative, as part of the Targeted Road Safety Program. (5) Jointly funded under the Australian Government’s Roads of Strategic Importance. Project details and timing subject to further planning and negotiation with the Australian Government. (6) Part of the Australian Government’s Warrego Highway Upgrade Program, jointly funded by the Australian Government and Queensland Government. (7) Jointly funded by the Australian Government and Queensland Government. Project details and timing subject to further planning and negotiation with the Australian Government, noting the Queensland Government’s initial priority is upgrading the Mount Crosby
Recommended publications
  • Warrego Highway, Helidon Spa TOOWOOMBA SECOND RANGE CROSSING
    Gowrie Junction Murphys Creek Mt Cranley Kynoch Ballard Charlton Harlaxton Postmans Ridge Wellcamp Withcott Helidon Spa Warrego Highway, Helidon Spa TOOWOOMBA SECOND RANGE CROSSING Athol As part of work on the Toowoomba Second Range Crossing (TSRC), an Stay in touch interchange will be constructed at the eastern entry to the TSRC on the Residents can visit the TSRC Visitor Warrego Highway at Helidon Spa. Information Centre located at the Traffic impacts project’s site office on Bedford Street, Cranley. Opening hours This involves: In early 2017, east and westbound lane are Monday to Friday, 9:00am to • constructing a bridge from the closures will commence on the Warrego 5:00pm. The centre is also open Warrego Highway at Helidon Highway for bridge construction outside these times by appointment. Spa, with two eastbound lanes (approximately 4.3km west of the Visitor Information Booths are open and two westbound lanes, Lockyer Creek Bridge at Helidon). at the Lockyer Valley Cultural Centre enabling motorists to enter and and Toowoomba City Library. These exit the TSRC Intermittent hold and release traffic displays are open as per each centre’s opening hours and will be regularly • closing the Warrego Highway control measures and temporary lane median break between Postmans updated with the latest project closures will allow for construction information. For employment and Ridge Road and Twidales Road materials to be delivered safely. at Helidon Spa (due to the safety procurement enquiries, please visit the website for further information. impacts of merging and weaving In late 2018, the Warrego Highway traffic at the Warrego Highway median break between Postmans Ridge 1800 198 878 East interchange and right-turning Road and Twidales Road at Helidon Spa [email protected] traffic at the intersection).
    [Show full text]
  • Section 3.7 – Local Area Frameworks
    Draft Ipswich Planning Scheme 2019 Statement of Proposals 3.7 Local Area Frameworks 3.7.1 Preliminary (1) The Ipswich Local Government Area has been divided into thirty local area strategic planning units based on geographically identifiable communities of interest (areas with identifiable boundaries and within which there are broad land use and planning commonalities) to which individual Local Area Frameworks apply. (2) The thirty Local Area Frameworks provide a more detailed spatial expression of the policies included in the Whole of City Strategic Framework (refer to sections 3.1 to 3.6) for each of the local area strategic planning units by: (a) including a description of the geographic extent of the strategic planning unit to which the Local Area Framework applies; (b) identifying the Valuable Features in the area that are of significance and are to be protected; (c) identifying the most significant Development Constraints that impact on development in the area and that need to be considered and addressed in allocating precincts and for development assessment; (d) setting out the Growth Management outcomes that are to be delivered in the area; (e) identifying the key Infrastructure that needs to be delivered to support growth and development in the area; (f) showing the preferred use of land in the area by including each property in a land use precinct designation; and (g) where there are different development options (including for example building heights, lot sizes, dwelling densities or different land uses) for an area or individual
    [Show full text]
  • Queensland Parliamentary Service Annual Report 2003 - 04
    Queensland Parliamentary Service Annual Report 2003 - 04 www.parliament.qld.gov.au Communication Objective .............................................................................................................................................................. 1 About Us .......................................................................................................................................................................................... 3 Mission ........................................................................................................................................................................................... 3 Values ............................................................................................................................................................................................. 3 Message from the Speaker ............................................................................................................................................................ 4 Clerk’s Report ................................................................................................................................................................................ 5 Management Profi les .................................................................................................................................................................... 6 Corporate Governance ..................................................................................................................................................................
    [Show full text]
  • FAULTS and FRACTURES in the SURAT BASIN Relationships With
    FAULTS AND FRACTURES IN THE SURAT BASIN Relationships with Permeability Final Report Celoxis System ID: 149310 Report release date: 22 September 2017 Short Range Permeability Variations Seismic Analysis and Geological Framework 1 Research Team J. Copley, S. Mukherjee, A. Babaahmadi, F. Zhou, K. Barbosa, S. Hurter, S. Tyson School of Earth and Environmental Sciences Acknowledgements The authors would like to thank the CCSG and member companies (Shell/QGC, Santos, Arrow, Origin) for funding the project. The Queensland Geological Survey and Department of Natural Resources and Mines, Integrated Geoscience as well as the participating companies provided data and discussion about the content of this report. The project was conceived and initiated by J. Esterle and R. Sliwa of Integrated Geoscience. Special thanks to Owen Dixon (GSQ) and Andrew Aouad (Origin) for their contributions. Disclosure This research was undertaken during Term 1 of the UQ Centre for Coal Seam Gas. Term 1 funding was provided by The University of Queensland 22% ($5 million) and the industry members 78% (17.5 million) over 5 years. An additional $3.0 million was provided by industry members for research infrastructure costs. The industry members are Shell (QGC), Santos, Arrow Energy and APLNG. The Centre conducts research across Water, Geoscience, Petroleum Engineering and Social Performance themes. For more information about the Centre’s activities and governance see https://ccsg.centre.uq.edu.au/ Disclaimer The information, opinions and views expressed in this report do not necessarily represent those of The University of Queensland, the Centre for Coal Seam Gas or its constituent members or associated companies.
    [Show full text]
  • Queensland Transport and Roads Investment Program (QTRIP) 2016
    Metropolitan Metropolitan | Map and Contact Details Brisbane office 313 Adelaide Street | Brisbane | Qld 4000 PO Box 70 | Spring Hill | Qld 4004 (07) 3066 5499 | [email protected] Divider Image: Moggill Road Cycle Bridge looking north east towards Brisbane central business district (bridge spans Moggill Road, Indooroopilly). Copyright © 2015 Department of Transport and Main Roads, the Queensland Government. Department of Transport and Main Roads Metropolitan Overview • A two-lane bus-only extension road from Warrigal Road • Commence intersection improvements on Mount Crosby through to Logan Road in Eight Mile Plains. Road, at the Delacy Street and Pine Street intersection. The Metropolitan District covers an area of about 2,968km2, or around 0.2% of Queensland1. It straddles the Brisbane In 2016-17 we will: • Continue to seek Australian Government funding River and extends from Mount Glorious in the north to Logan for the Pacific Motorway-Gateway Motorway merge City in the south, and from Point Lookout in the east to west • Continue construction of the Gateway Upgrade North upgrade (southbound lanes), with $42 million provided of Helidon and the major centre of Ipswich. project that will widen the Gateway Motorway to towards this $210 million project by the Queensland six lanes, between Nudgee and Bracken Ridge, jointly Government as part of the State Infrastructure Fund. The district has an estimated residential population of funded by the Australian Government and Queensland about 1,461,733 or around 31.4% of Queensland’s total Government. population1. Future plans • Commence the Ipswich Motorway (Rocklea to Darra) The district looks after about 414km of other state-controlled Stage 1 project, to construct additional lanes between We are continuing to plan for the future transport roads, about 112km of the National Land Transport Network, Oxley Road and Suscatand Street, jointly funded by the requirements of residents in the Metropolitan District.
    [Show full text]
  • Darling Downs 79,530 Km2 Area Covered by Location1
    Darling Downs 79,530 km2 Area covered by location1 5.72% Population of Queensland1 3,846 km Other state-controlled road network 687 km National Land Transport Network2 See references section (notes for map pages) for further details on footnotes. Toowoomba Office 1-5 Phillip Street | Toowoomba | Qld 4350 Locked Bag 1 | Warwick | Qld 4370 (07) 4639 0777 | [email protected] Warwick Office 306 Wood Street | Warwick | Qld 4370 Locked Bag 1 | Warwick | Qld 4370 (07) 4661 6333| [email protected] • continue pavement rehabilitation on the Gore Highway • continue planning for bikeways in Central Toowoomba Darling Downs between Toowoomba and Millmerran, jointly funded and the Warwick principal cycle network by the Australian Government and Queensland Government • commence planning to improve Toowoomba In 2020–21 we completed: Connection Road and Hursley Road intersection • continue bridge replacement on the Rocky Creek • upgrading of the Emu Creek bridge on the New England Bridge on Murphy’s Creek Road, as part of the • continue planning to identify a Toowoomba North Highway, jointly funded by the Australian Government Queensland Government’s COVID-19 economic South Transport Corridor. and Queensland Government recovery response Link for TMR Project Page: • construction of Stage 1 of the New England Highway • continue pavement strengthening and widening on https://www.tmr.qld.gov.au/Projects Cycleway between Highfields and Toowoomba CBD the New England Highway between Yarraman and Toowoomba, as part of the Queensland Government’s
    [Show full text]
  • The Modelled Distribution of the Five-Clawed Worm-Skink (Anomalopus Mackayii)
    Map 2: The modelled distribution of the five-clawed worm-skink (Anomalopus mackayii) Injune Koko SF Allies Creek SF Kilkivan Wandoan Proston Gympie Jarrah SF Goomeri Barakula SF Wondai SF Gurulmundi SF Mitchell Wallumbilla Roma Diamondy SF Kingaroy Yuleba Nudley SF Miles Chinchilla Conondale FR Yuleba SF Jandowae Blackbutt Bunya Mountains NP Kilcoy Benarkin SF Toogoolawah Surat Braemar SF Dalby Esk Tara Kumbarilla SF Toowoomba Dunmore SF Laidley Western Creek SF Boondandilla SF Millmerran Boonah St George Main Range NP Warwick Whetstone SF State Forest Durikai SF Border Ranges NP Inglewood Goondiwindi Toonumbar NP Boggabilla Yelarbon Stanthorpe Dthinna Dthinnawan CCAZ Texas Girraween NP Sundown NP Wallangarra Mungindi Girard SF Tenterfield Torrington SCA Ashford Lightning Ridge Moree Deepwater Collarenebri Warialda Glen Innes Inverell Bingara Walgett Guy Fawkes River NP Bundarra Wee Waa Mt Kaputar NP Dorrigo Narrabri Barraba Pilliga West CCAZ Pilliga CCAZ Armidale Pilliga East SF Pilliga West SF Euligal SF Pilliga East CCAZ Manilla Timallallie CCAZ Oxley Wild Rivers NP Coonamble Baradine Pilliga NR INDICATIVE MAP ONLY: For the latest departmental information, please refer to the Protected Matters Search Tool at www.environment.gov.au/epbc/index.html km 0 20 40 60 80 100 Legend Species Known/Likely to Occur Species May Occur Brigalow Belt IBRA Region ! Cities & Towns Roads Major Rivers Perennial Lake ! ! ! ! ! ! !! ! ! !! ! ! ! !! ! ! ! ! ! ! !! ! ! !! ! !! ! Non-perennial Lake Produced by: Environmental Resources Information Network (ERIN) Conservation Areas COPYRIGHT Commonwealth of Australia, 2011 Forestry & Indigenous Lands Contextual data sources: DEWHA (2006), Collaborative Australian Protected Areas Database Geoscience Australia (2006), Geodata Topo 250K Topographic Data CAVEAT: The information presented in this map has been provided by a range of groups and agencies.
    [Show full text]
  • RACQ Unroadworthy Roads Technical Appendix
    RACQ Unroadworthy Roads Technical Appendix Author Public Policy Date March 2016 Title: RACQ Unroadworthy Roads Technical Appendix Issued Date: March 2016 Page: 1 of 104 List of roads with number of responses to identified problems cont’d IDENTIFIED PROBLEMS Tight Vegetation Poor or Slippery / curves / Narrow Narrow Poor Hazardous Poor or or objects Lack of inadequate Rough Loose blind road / bridge / road Poor Poor roadside no guard block overtaking Flood Poor road Steep Road Name # Responses Surface surface crests lanes culvert markings signing shoulders objects rails visibility opportunities prone drainage lighting grade Bruce Highway 67 38 9 10 27 17 14 8 27 8 11 8 30 22 15 11 1 Pacific Motorway 32 8 1 1 6 1 3 - 4 - - 1 4 - 2 - - Mount Lindesay Highway 21 5 - - 5 - 1 2 4 1 1 - 14 4 2 3 1 Captain Cook Highway 19 5 2 2 2 1 2 - 2 2 1 1 1 4 5 - - Rickertt Road 19 18 3 - 8 3 6 1 13 3 2 - 6 16 9 10 - D'Aguilar Highway 16 12 5 4 6 1 4 1 6 2 1 3 12 2 5 1 1 Kennedy Highway 15 2 5 7 6 1 - - 6 1 5 2 13 1 - 1 1 Warrego Highway 14 11 3 3 5 2 3 2 6 2 - 2 3 3 3 2 - New England Highway 11 9 2 2 4 2 1 1 4 2 2 1 5 2 1 - - Telegraph Road 11 4 - - - - - - 2 - - - - 1 1 - - Kingsford Smith Drive 10 8 2 - 4 - 3 - 2 - - - - - 1 - - Maleny-Kenilworth Road 10 10 2 4 10 4 2 1 8 4 - 1 5 - 2 - - Gore Highway 9 8 1 - 5 - - - 5 1 2 - 2 2 - - - Samford Road 9 7 2 3 6 - 1 1 1 2 - - 2 - 2 - - Tinaburra Drive 9 7 3 5 9 2 4 2 6 2 - 1 3 - - 4 - Burnett Highway 8 8 - 3 4 4 2 2 7 2 1 2 5 3 4 1 - Beachmere Road 7 6 1 2 7 6 1 2 7 - 1 2 2 6 3 3 - Beechmont Road 7 1 2 7 7
    [Show full text]
  • F6 Integrated Transport and Movement
    F6 Integrated Transport and Movement Vision Statement and Action Plan Framework - November 2005 IPSWICH2020ANDBEYOND IPSWICH2020ANDBEYOND Integrated Transport and Movement Ipswich City is the Motorway is now up to Ø Cunningham Highway to 6.2 Summary of Ø Identify and align the transport Strategy ITM 1.4 100 000 vehicles a day during the Warrego Highway connection priorities and objectives for well-serviced by busiest days of the week, The (pending Goodna Bypass and Goals and Ipswich of all stakeholders. A Safe Transport Network: Ensure mixture of cars and freight River Road Investigation). that residents feel safe travelling an integrated transport vehicles is problematic. Strategies - throughout Ipswich. Ø Extension of Centenary Strategy ITM 1.2 public transport To address the transport issues in Highway - Springfield to Ripley Integrated Ipswich a number of major Ø Develop and implement Bus and roads system to Yamanto. infrastructure projects have been Transport Connected Centres: Ensure that Stop and Station Design that effectively proposed in the State SEQ centres are connected and enable Guidelines. Infrastructure Plan and Program Ø Centenary Highway four and efficient movement between eliminates (2005) including: lanes - Ipswich Motorway to communities. Ø Provide real time service Springfield. Movement updates at major bus stops. congestion, Ø Ø Ipswich rail line third track Provide a loop bus service that conserves Corinda-Darra and Darra- Ø Western Ipswich Bypass ITM Goal 1 - connects major centres in Ø Identify and implement safety Ipswich. community Redbank. (Haigslea to Amberley). Connected measures around transport interchanges and rail stations. Ø character and Ø Springfield passenger rail line. Ø Cunningham Highway four Communities Investigate and implement lanes - Ripley Road to public transport services to Ø Improve security services on enhances Ebenezer.
    [Show full text]
  • Brisbane – Mt Isa Mt Isa ‐ Brisbane
    E As at 02nd February 2015 BARCALDINE NEWS & TRAVEL For Bookings or Enquires please contact Colleen or Kayla 07 4651 1104 / [email protected] BRISBANE – MT ISA MT ISA ‐ BRISBANE TOWN Departure Time Pick up and Set down point TOWN Departure Pick up and Set down point Brisbane 4.00pm Brisbane Transit Centre, Roma st Time Mt Isa 6.50am Outback at Isa Centre, 19 Marian St Ipswich 4.50pm Bus Bay, Bell Street Cloncurry 8.10am Cloncurry Agencies, 45 Ramsay St Cloncurry Meal 9.00am BP Ausfiel, Ramsey Street Haigslea 5.07pm Sundowner Hotel Stop Mckinlay 10.00 BP Roadhouse, Landsborough H/way Minden/Crossroad 5.15pm Front of Service Station Kynuna 11.00 Kynuna Roadhouse, Landsborough h/way Plainland 5.26pm Bus Stop, Plainlands Hotel Winton Meal Stop 1.20 Waltzing Matilda Centre, Elderslie St Gatton College 5.30pm Bus Shelter Winton 1.25 Newsagents, 75 Elderslie St Lorraine Stn 2.15 Lorraine Station Gatton 5.35pm Bus Stop on Highway Longreach 3.25 Cnr Ealge & Duck Street (Commercial Hotel) Withcott 5.55pm Civic Centre Ilfracombe 3.45 Post Office Toowoomba 6.45pm Toowoomba Bus Interchange, Neil St Barcaldine 5.00 Choice Roadhouse Oakey 7.05pm Railway Station Blackall 6.40 BP Blackall, 10 Shamrock St Jondaryan 7.15pm Cobb & Co Roadhouse Tambo 7.50 Post Office Dalby 7.55pm Shell Roadhouse Augathella 9.10 BP Roadhouse, Warrego H/way Warra 8.20pm Old Service Station Charleville 10.40 Railway Station, Mitchell H/way Brigalow 8.30pm General Store Morven 11.44 Opposite Newsagent, Albert St Chinchilla 8.50pm Bus Shelter Mungallala 12.05 General Store,
    [Show full text]
  • Toowoomba to Goondiwindi 3 Days / 2 Nights
    SELF DRIVE ITINERARIES Toowoomba to Goondiwindi 3 days / 2 nights DAY 1: Toowooomba to Goondiwindi [APPROX. 221 KM / 2 HRS 30 MINS] Somewhere to stay Start the drive on Anzac Ave to head to in Toowoomba? Millmerran, stopping for morning tea. Do a City accommodation on the west walking tour of the historical murals in the side includes the Historic Vacy Hall. township. Continue to Goondiwindi on the As you head to Millmerran, stop at A39, book into your accommodation and the Royal Bulls Head Inn at Drayton, take a late afternoon stroll along the river. a 19th Century Inn built by an ex- Grab a sundowner at the historic Royal Hotel. convict. (Opening times vary, please check the website). DAY 2: Goondiwindi to Warwick [APPROX. 200 KM / 2 HRS 16 MINS] Explore the town of Goondiwindi before departing via the Yelarbon Silos. Take the National Route 42 for a stop at Coolmunda Olives near Inglewood to then continue to make your way to Warwick. Book a night at the historic Abbey Boutique Hotel and take in the history of this town. DAY 2: Warwick to Toowoomba [APPROX. 283 KM / 3 HRS 18 MINS] Take the back roads back to Toowoomba, meandering your way through seasonal crops such as sunflowers or sorghum depending on the time of year. Stop at the historic Nobby Pub for lunch and calling into the beautifully restored Bull and Barley Inn in Cambooya. southernqueenslandcountry.com.au KINGAROY Drillham MILES NANANGO Maidenwell CHINCHILLA Jandowae Blackbutt Jimbour Bunya Condamine Mountains NP Bell Cooyar Macalister DALBY Crows Nest TARA ESK The Gums Crows Nest NP Jondaryan Cecil Hampton Plains TOOWOOMBA Moonie Cambooya Yandilla Millmerran Clifton Leyburn Allora Wyaga Maryvale Karara Yangan WARWICK INGLEWOOD Killarney GOONDIWINDI Thulimbah STANTHORPE Looking for more? Ballandean Check out more road TEXAS trips on our website.
    [Show full text]
  • Land Management Manual: Shire of Inglewood
    LA MANAGEM NT MANUAL S ire of Inglewood Written and Compiled by Members of THE INGLEWOOD SHIRE BICENTENNIAL LAND MANAGEMENT COMMITTEE EDITOR G. J. CASSIDY Published by the Inglewood Shire Bicentennial Land Management Committee Library Netlional of Australia Card Number and ISBN 0 7316 u.i33 9 ~Australia 1788-rel\ This publication has been funded by grants from The National Soil Conservation Programme and the Australian Bicentennial Authority to celebrate Australia's Bicentenary in 1988 Ill ACKNOWLEDGEMENTS The committee acknowledges the continuing support of Members of the Inglewood Bicentennial Land the Inglewood Shire Council in providing meeting venues and Management Committee were as follows: secretarial services. Noel Biggs "Woodsprings" Inglewood The support of members of the Queensland Department Bruce Carey Soil Conservation Services Branch, of PrimaryIndustries, in particular Messrs. Tom Crothers and Old DPI Bruce Carey of Soil Conservation Services and Mr. Graham Linden Charles "Angle C" Inglewood Harris, Agriculture Branch, has been vital to the committee's Ross Chester Master Q'land Dept. of Forestry Inglewood success. Des Cowley "Wongalea" Inglewood John Crombie "Weyunga" Gore Also acknowledged is the valuable assistance of:­ Tom Crothers Soil Conservation Services Branch, Mr. Malcolm Taylor, Forester at Inglewood - for his contri­ Old. DPI bution and advice ian Dawson "Talbragar" Inglewood Dr. Tom Kirkpatrick, Queensland National Parks and Wildlife, Gordon Donovan "Kiltymaugh" Omanama for assistance in preliminary editing Frank Duggan '' Carawatha' ' Inglewood Dr. Colin Owen - for information on Tree Planting. Ron Elsley "Karara" Yelarbon Bruce Finlay "Emu Plains" Texas Members of the committee who contributed to chapters Max Fitzgerald "Glenelg" Cement Mills in this manual are: Russell Garthe Old Dept.
    [Show full text]