Taneycomo Hill Drive, from Grey Street to First Avenue, Esplanade

Total Page:16

File Type:pdf, Size:1020Kb

Taneycomo Hill Drive, from Grey Street to First Avenue, Esplanade Bill No. 2020- 20 Ordinance No. 20- 20 AN ORDINANCE TO AMEND TABLE II -A PROHIBITED PARKING OF THE CODE OF THE CITY OF HOLLISTER, MISSOURI. BE IT ORDAINED BY THE BOARD OF ALDERMEN OF THE CITY OF HOLLISTER, MISSOURI AS FOLLOWS: Table II -A Prohibited Parking. Ord. No. Street Prohibition CC 1983 § 76. 060, 305, 2nd Street, south side of street At all times 13- 11 Exception: From Walnut to Elm St. James Street, north side of street At all times St. James Street and Downing Street intersection, At all times southeast corner Esplanade Street, from Old Mill Road to Railroad Depot, At all times west side of street Evergreen Street, from Business Route 65 to school At all times turnoff, both sides 351 Railroad Avenue to Wilshire Drive on the pavement At all times 364, 13- 11 Taneycomo Hill Drive, from Grey Street to First Avenue, At all times on pavement on west side of street Maple Street, from Business Route 65 to Scott Street, At all times either side of street Presbyterian Street, from Business Route 65 to Knox At all times Avenue, south side of street 93- 12, 13- 11 Esplanade Street, from Second Street to City Hall, west At all times side Second Street, north side At all times 93- 12, 97- 19, 13- 11 White Hall and Downing Street intersection, southeast At all times corner Corner of White Hall and Downing, west side At all times Esplanade Street, Taneycomo Hill Drive, Maple Street to At all times First Avenue, on the pavement on west side Southwest Cedar Lane, either side At all times 97- 19 White River Mountain Boulevard from BB Highway to At all times Spring Valley Court, both sides of the street 00- 03, 13- 11 Brianna Drive from BB Highway to the alleyways 7: 00 A.M. immediately south of Toby Lane and Tyler Circle to 5: 00 P. M. Ord. No. Street Prohibition Monday through Friday when school is in session 03- 52 Hawthorne Street from Myrtle Street north to dead end, At all times either side. 06- 16 Maple Street from Scott Street to end of City limits, east At all times side of street. 10- 33 Knox Avenue, from State Highway BB north to east State At all times Highway 76 20-20 Trent Street, Woodside Street, Dogwood Lane South side at all times Scott Street, Mystic Avenue, Stonington Street, Daless North side at all times Court, Andro Circle READ THIS FIRST AND SECOND TIME AND PASSED BY THE BOARD OF ALDERMEN OF THE CITY OF HOLLISTER, MISSOURI THIS 19TH DAY OF NOVEMBER, 2020. David G. Tate, Mayor ATTEST: Bridget Epps, City Clerk.
Recommended publications
  • City Maintained Street Inventory
    City Maintained Streets Inventory DATE APPROX. AVG. STREET NAME ACCEPTED BEGINNING AT ENDING AT LENGTH WIDTH ACADEMYText0: ST Text6: HENDERSONVLText8: RD BROOKSHIREText10: ST T0.13 Tex20 ACADEMYText0: ST EXT Text6: FERNText8: ST MARIETTAText10: ST T0.06 Tex17 ACTONText0: WOODS RD Text6:9/1/1994 ACTONText8: CIRCLE DEADText10: END T0.24 Tex19 ADAMSText0: HILL RD Text6: BINGHAMText8: RD LOUISANAText10: AVE T0.17 Tex18 ADAMSText0: ST Text6: BARTLETText8: ST CHOCTAWText10: ST T0.16 Tex27 ADAMSWOODText0: RD Text6: CARIBOUText8: RD ENDText10: OF PAVEMENT T0.16 Tex26 AIKENText0: ALLEY Text6: TACOMAText8: CIR WESTOVERText10: ALLEY T0.05 Tex12 ALABAMAText0: AVE Text6: HANOVERText8: ST SWANNANOAText10: AVE T0.33 Tex24 ALBEMARLEText0: PL Text6: BAIRDText8: ST ENDText10: MAINT T0.09 Tex18 ALBEMARLEText0: RD Text6: BAIRDText8: ST ORCHARDText10: RD T0.2 Tex20 ALCLAREText0: CT Text6: ENDText8: C&G ENDText10: PVMT T0.06 Tex22 ALCLAREText0: DR Text6: CHANGEText8: IN WIDTH ENDText10: C&G T0.17 Tex18 ALCLAREText0: DR Text6: SAREVAText8: AVE CHANGEText10: IN WIDTH T0.18 Tex26 ALEXANDERText0: DR Text6: ARDIMONText8: PK WINDSWEPTText10: DR T0.37 Tex24 ALEXANDERText0: DR Text6: MARTINText8: LUTHER KING WEAVERText10: ST T0.02 Tex33 ALEXANDERText0: DR Text6: CURVEText8: ST ARDMIONText10: PK T0.42 Tex24 ALLENText0: AVE 0Text6:/18/1988 U.S.Text8: 25 ENDText10: PAV'T T0.23 Tex19 ALLENText0: ST Text6: STATEText8: ST HAYWOODText10: RD T0.19 Tex23 ALLESARNText0: RD Text6: ELKWOODText8: AVE ENDText10: PVMT T0.11 Tex22 ALLIANCEText0: CT 4Text6:/14/2009 RIDGEFIELDText8:
    [Show full text]
  • Traffic Signing and Pavement Markings General Notes
    TOWN OF QUEEN CREEK Development Services Department Traffic Engineering Program TRAFFIC SIGNING AND PAVEMENT 22358 S. Ellsworth Road Queen Creek, Arizona 85142 MARKINGS GENERAL NOTES Signing Plan General Notes 1. The Town Traffic Engineer shall be notified at 480-358-3132 at least five business days prior to beginning any signing work associated with these plans. 2. The Town Traffic Engineer may require the Contractor to adjust signing locations, off- sets and types of signs at the time of installation. 3. All signing materials and installation shall conform to Town requirements, the Arizona Department of Transportation Standard Drawings and Specifications, the Manual on Uniform Traffic Control Devices (latest ADOT approved edition) and direction from the Town Traffic Engineer at time of installation. 4. The Contractor shall coordinate with the Town Traffic Engineering Division prior to ordering any materials to obtain the latest signing requirements and specifications. 5. The Contractor shall notify the Traffic Engineering Division at 480-358-3132 upon completion of all signing work to schedule a final inspection. The Contractor shall supply all required warranty documents to the Town Traffic Engineering Division prior to final job acceptance. 6. All existing signs temporarily removed by the contractor shall be salvaged for reinstallation by the Contractor. All signs permanently removed by the Contractor shall be salvaged and returned to the Town. The Contractor shall be solely responsible for maintaining each sign that is removed, ensuring that the signs integrity is maintained. In the event the sign is damaged, the Contractor shall be responsible for its replacement. 7. All signs and sign posts shall be installed per ADOT Standard Drawing S-3.
    [Show full text]
  • American Title a Sociation ~ ~
    OFFICIAL PUBLICATION AMERICAN TITLE A SOCIATION ~ ~ VOUJME XXXVI JUNE, 1957 NUMBER 6 TITLE NEWS Official Publication of THE AMERICAN TITLE ASSOCIATION 3608 Guardian Building-Detroit 26, Michigan Volume XXXVI June, 1957 Number 6 Table of Contents Introduction-The Federal Highway Program ......... ... ................ .. .................... 2 J. E. Sheridan Highway Laws Relating to Controlled Access Roads ..... .. ....... ........... 6 Norman A. Erbe Title Companies and the Expanded Right of Way Problems ...... ............. .. 39 , Daniel W. Rosencrans Arthur A. Anderson Samuel J. Some William A . Thuma INTRODUCTION The Federal Highway Program J. E. SHERIDAN We are extremely grateful to Nor­ veloped its planning sufficiently to man A. Erbe, Attorney General of the show to the satisfaction of the dis­ State of Iowa, for permission to re­ trict engineer the effect of the pro­ print his splendid brief embracing posed construction upon adjace.nt the highway laws of various states property, the treatment of access con­ relating to the control in access roads. trol in the area of Federal acquisi­ Mr. Erbe originally presented this m tion, and that appropriate arrange­ narrative form before the convention ments have been made for mainte­ of the Iowa Title Association in May nance and supervision over the land of this year. As is readily ascertain­ to be acquired and held in the name able, this is the result of a compre­ of the United States pending transfer hensive study of various laws touch· of title and jurisdiction to the State ing on the incidents of highway regu­ or the proper subdivision thereof." lations. Additionally, we are privi­ It is suggested that our members leged to carry the panel discussion bring this quoted portion to the at­ of the American Right of Way Asso­ tention of officers of the Highway ciation Convention held in Chicago, Department and the office of its legal May 16 and 17, dealing with "Title division, plus the Office of the Attor­ Companies and the Expanded Right ney General within the members' ju­ of Way Problems".
    [Show full text]
  • East Midtown Waterfront Esplanade Community Working Group June 24, 2013
    East Midtown Waterfront Esplanade Community Working Group June 24, 2013 East Midtown Waterfront Esplanade Project : Community Working Group 06/24/13 1 Agenda I. Project Overview a) Project Goals b) Project Considerations c) Progress Update II. Pre-Concept Design a) Design Inspiration b) Community Working Group 1 Meeting Summary c) Responding to Community Aspirations III. Breakout Session IV. Reporting Back V. Project Timeline and Next Steps East Midtown Waterfront Esplanade Project : Community Working Group 06/24/13 2 I Project Overview Site Context East Midtown Waterfront Esplanade Project : Community Working Group 06/24/13 4 Project Overview Contemplated by State legislation in July 2011: . Sponsored by State Assemblymember Brian Kavanagh and State Senator Liz Krueger (locally by Councilmember Daniel Garodnick) Project purpose: . Construct a continuous greenway from East 38th – 60th Street along the East River to create a critical transportation connection and to provide new open space to alleviate chronic shortage in the immediate area East Midtown Waterfront Esplanade Project : Community Working Group 06/24/13 5 Project Goals Provide Critical Transportation Route Achieve major transportation need and policy goal by filling critical gap . East Side of Manhattan lacks dedicated greenway for non-motorized transportation; creating one is a major public policy goal . Improve transportation options for thousands of pedestrians, joggers, rollerbladers and cyclists . Support alternative forms of transportation for New Yorkers and improve air quality Bicyclist on 2nd Ave & 38th Street NYC Bike Map in 2016 East Midtown Waterfront Esplanade Project : Community Working Group 06/24/13 7 Provide Waterfront Access & Open Space Provide waterfront access and new open space for densely populated East Midtown communities .
    [Show full text]
  • Boulevards and Parkways Seattle Open Space 2100 Boulevards + Parkways Diego Velasco
    Boulevards and Parkways Seattle Open Space 2100 Boulevards + Parkways Diego Velasco Ocean Parkway, Brooklyn in 1890 - Jacobs, Macdonald, Rofe, The Boulevard Book, 2002 Photo Jacobs, Macdonald, Rofe, The Boulevard Book, 2002 A multiway boulevard is a “ mixed-use public way that is by its very nature complex” Alan Jacobs, 2002 A boulevard or parkway is a wide urban street with tree-lined sidewalks and often multiple lanes of both fast and slow moving traffic. Boulevards are usually pleasant and grand promenades, flanked by rich, monumental architecture and supporting a variety of street uses. They are often “monumental links between important destina- tions.” 1 More importantly, boulevards can be open space systems that serve multiple functions at once: movement of traffic, provision of green space in the city, relief of congestion in overcrowded areas, accommodation of pedestrians and bicycles, and the nurturing of vital street life and activity in the city. Boulevards date back to the 16th century, when medieval towns abandoned their fortified walls and converted them to tree-lined walkways for public recreation. Cities like Amsterdam and Strasbourg were among the first to develop obsolete ramparts into pleasure promenades. In 1670, Louis XIV abandoned the walls of Paris and replaced these with promenades that served as the parade grounds of aristocrats and the well-to-do. These were also known as cours or allees, such as the Cour de la Reine, which extended alongside the palatial gardens of the Tuileries.1 In the mid-19th to early-20th century, boulevards came to be associated with large- scale planning efforts, such as those of Napoleon III and Baron Haussmann in Paris or City Beautiful movements in the United States.
    [Show full text]
  • Copy of Alley List 2018 (Final)Test.Xlsx
    Houston Alleys Accepted By the City of houston for Maintenance Block No. (of Parallel Streets) Parallel To Parallel To Beginning End Length Key Map Date Accepted* Hammersmith (13) 7500 Del Monte Dr. Chevy Chase Dr. Alley Amberly Ct. 600 490V Jun‐05 7600 Del Monte Dr. Chevy Chase Dr. Amberly Ct. Fulham Ct. 600 490V Jun‐05 7500 Chevy Chase Amberly Ct. Del Monte Dr. Chevy Chase Dr. 450 490V Jun‐05 7500 Chevy Chase Amberly Ct. Olympia Dr. Chevy Chase Dr. 450 490V Jun‐05 7500 Olympia Dr. Chevy Chase Dr. S. Voss Rd. Amberly Ct. 600 490V Jun‐05 7600 Olympia Dr. Chevy Chase Dr. Amberly Ct. Fulham Ct. 600 490V Jun‐05 2100 Fulham Ct. Amberly Ct. Olympia Dr. Del Monte Dr. 765 490V Jun‐05 N/A Fulham Ct. S. Voss Rd. Olympia Dr. Alley 110 490V Jun‐05 N/A Fulham Ct. S. Voss Rd. Del Monte Dr. Alley 110 490V Jun‐05 7500 Amberly Ct. S. Voss Rd. Del Monte Dr. Chevy Chase Dr. 450 490V Jun‐05 7500 Amberly Ct. S. Voss Rd. Olympia Dr. Chevy Chase Dr. 450 490V Jun‐05 N/A Amberly Ct. S. Voss Rd. Olympia Dr. Alley 110 490V Jun‐05 N/A Amberly Ct. S. Voss Rd. Del Monte Dr. Alley 110 490V Jun‐05 Total: 5405 ft, 1.02 Miles Houston Heights (3) 300 W 19th W 20th Rutland Ashland 624 452V N/A 300 W 20th W 21th Rutland Ashland 639 452V N/A 600 W 20th W 21th Lawrence N Shepherd 610 452V N/A Total: 1873 ft, 0.35 Miles Villa del Parque (2) N/A Carla Normeadow Benbrook Lesue Ann 786 413Y Jun‐05 N/A Stabler Carla Rittenhouse Benbrook 954 413Y Jun‐05 Total: 1740 ft, 0.33 Miles Willowick Place (2) 3000 Essex Terrace Westgrove Weslayan Weslayan 1428 492S Jul‐73 2700 Essex Green Weslayan Essex Terrace Essex Green 293 492S Jul‐73 Houston Alleys Accepted By the City of houston for Maintenance Block No.
    [Show full text]
  • Subdivision Street Standards Manual
    TOWN OF MARANA Subdivision Street Standards Manual May 2013 TABLE OF CONTENTS CHAPTER & SECTION 1.0 INTRODUCTION AND PURPOSE………………………………………………. 1 1.1 Introduction………………………………………………………………… 1 1.2 Purpose……………………………………………………………………... 1 1.3 Applicability……………………………………………………………….. 2 2.0 FUNCTIONAL CLASSIFICATION AND REGULATIONS…………………….. 2 2.1 Functional Classification………………………………………….………... 2 2.2 Incorporated Regulations Adopted by Reference…………………………... 3 3.0 TRAFFIC STUDIES………………………………………………………………. 3 4.0 STREET LAYOUT AND GEOMETRIC DESIGN………………………………... 4 4.1 Street Layout………………………………………………………………… 4 4.2 Cul-de-sacs………………………………………………………………….. 5 4.3 Design Speed………………………………………………………………... 6 4.4 Design Vehicle…………………………………………………….………… 6 4.5 Horizontal Alignment……………………………………………………….. 7 4.6 Vertical Alignment………………………………………………………….. 7 4.7 Intersection Alignment…………………………………………….………… 8 4.8 Intersection Sight Distance…………………………………………………. 9 4.9 Residential and Commercial Drive Entrances………………………………. 10 4.10 Roadway Superelevation…………………………………………………….. 11 4.11 Roadway Drainage Crossings……………………………………………….. 11 4.12 Mountainous Terrain………………………………………………………… 11 4.13 Environmentally Sensitive Roadways………………………………………. 12 4.14 Alternative Access…………………………………………………………… 12 5.0 RIGHT OF WAY……………………………………………………………………. 13 6.0 ELEMENTS IN THE CROSS SECTION…………………………………………... 14 6.1 Travel Lanes……………………………………………………….………… 14 6.2 Curbing……………………………………………………………………… 14 6.3 Sidewalks………………………………………………………….………… 15 6.4 Shoulders………………………………………………………….………… 16 6.5 Roadside
    [Show full text]
  • Oakmont Phase 2 Selection Sheet
    Oakmont Phase 2 Selection Sheet Lot #: ________ Address: ______________________________ Brick: CHOOSE ONE (White Mortar $1,000 upgrade) Annandale Canal Street Stone Chase Forest Glen Charleston Nottingham Tudor Old Waverly Hardy Plank Color (Sherwin Williams) (CHOOSE ONE): _______________________________ Exterior Trim (Sherwin Williams) (CHOOSE ONE): _______________________________ Window Color (CHOOSE ONE): White Almond Front Door & Shutters (if applicable) (CHOOSE ONE): _______________________ Interior Wall Paint Colors: SHERWIN WILLIAMS FLAT LATEX PAINT (Please include name & number) (2 COLORS MAXIMUM) Color #1:___________________________________ Location:__________________________________ Color #2:___________________________________ Location: _________________________________ Interior Trim Color (CHOOSE ONE) : ______________________________ Gutters Color (CHOOSE ONE) : ______________________________ Bronze Tuxedo Gray Dark Gray Pearl Gray All selections are to be approved by builder and subject to change without notice due to supplier availability. Cabinet Style (CHOOSE ONE) : Bella Sedona Cabinet Color (CHOOSE ONE) : Bistro White White Fog Taupe Graphite Ebony Willow Cappucino Smoke Coffee Hardware (CHOOSE ONE PULL AND CHOOSE ONE KNOB): Knob Style #:__________________ Pull Style#:__________________ Plumbing Fixtures (CHOOSE ONE): Oil Rubbed Bronze Brushed Nickel Countertops (CHOOSE ONE GRANITE FOR THE KITCHEN & CHOOSE ONE GRANITE FOR ALL BATHROOMS): Colonial White Black Pearl Black Pearl Leathered Ash Blue White Shadow Stormy Night
    [Show full text]
  • Regional Freight Mobility Study, Phase II Report
    Corpus Christi – Yoakum Regional Freight Mobility Study, Phase II Report TABLE OF CONTENTS EXECUTIVE SUMMARY ........................................................................................................ES-1 SECTION 7 - ANALYSIS OF RAIL/ROADWAY INTERFACE ISSUES .....................................7-1 7.1 METHODOLOGY.......................................................................................................7-1 7.1.1 Crossing Selection Criteria.............................................................................7-1 7.1.2 Rail Occupancy ..............................................................................................7-4 7.1.3 Analysis of Results .........................................................................................7-8 7.2 GRADE CROSSING COST/BENEFIT ANALYSIS...................................................7-10 7.2.1 Construction Cost Estimates ........................................................................7-10 7.2.2 Benefit-Cost Analysis ...................................................................................7-26 7.3 RECOMMENDATIONS ............................................................................................7-31 SECTION 8 - BOTTLENECK IMPROVEMENTS EVALUATION AND MODELING ..................8-1 8.1 PROJECTED TRAFFIC GROWTH ............................................................................8-1 8.1.1 2035 Train Forecasts......................................................................................8-1 8.1.2 Results............................................................................................................8-2
    [Show full text]
  • Street Names - in Alphabetical Order
    Street Names - In Alphabetical Order District / MC-ID NO. Street Name Location County Area Aalto Place Sumter - Unit 692 (Villa San Antonio) 1 Sumter County Abaco Path Sumter - Unit 197 9 Sumter County Abana Path Sumter - Unit 206 9 Sumter County Abasco Court Sumter - Unit 821 (Mangrove Villas) 8 Sumter County Abbeville Loop Sumter - Unit 80 5 Sumter County Abbey Way Sumter - Unit 164 8 Sumter County Abdella Way Sumter - Unit 180 9 Sumter County Abdella Way Sumter - Unit 181 9 Sumter County Abel Place Sumter - Unit 195 10 Sumter County Aber Lane Sumter - Unit 967 (Ventura Villas) 10 Sumter County SE 84TH Abercorn Court Marion - Unit 45 4 Marion County Abercrombie Way Sumter - Unit 98 5 Sumter County Aberdeen Run Sumter - Unit 139 7 Sumter County Abernethy Place Sumter - Unit 99 5 Sumter County Abner Street Sumter - Unit 130 6 Sumter County Abney Avenue VOF - Unit 8 12 Sumter County Abordale Lane Sumter - Unit 158 8 Sumter County Acorn Court Sumter - Unit 146 7 Sumter County Acosta Court Sumter - Unit 601 (Villa De Leon) 2 Sumter County Adair Lane Sumter - Unit 818 (Jacaranda Villas) 8 Sumter County Adams Lane Sumter - Unit 105 6 Sumter County Adamsville Avenue VOF - Unit 13 12 Sumter County Addison Avenue Sumter - Unit 37 3 Sumter County Adeline Way Sumter - Unit 713 (Hillcrest Villas) 7 Sumter County Adelphi Avenue Sumter - Unit 151 8 Sumter County Adler Court Sumter - Unit 134 7 Sumter County Adriana Way Sumter - Unit 711 (Adriana Villas) 7 Sumter County Adrienne Way Sumter - Unit 176 9 Sumter County Adrienne Way Sumter - Unit 949 (Megan
    [Show full text]
  • Yeager Road Roundabout Safety Benefits Signs Specific to Double-Lane Roundabouts
    YEAGER ROAD AND NORTHWESTERN AVENUE ROUNDABOUT Approximate Opening Date: Early to Mid August HOW TO DRIVE THE YEAGER ROAD AND NORTHWESTERN AVENUE ROUNDABOUT » As you approach the roundabout, slow your vehicle to the posted advisory speed. » Use lane choice signs and arrows on the pavement to choose the appropriate lane before entering the roundabout. » Yield to any pedestrians in crosswalks » Yield to traffic circulating in the roundabout. Do not stop unless it is necessary. » Once inside the roundabout, circulate counterclockwise around the central island to your desired exit. Do not change lanes within the roundabout. N N N NORTHWESTERN AVENUE NORTHWESTERN AVENUE NORTHWESTERN AVENUE YEAGER ROAD YEAGER ROAD YEAGER ROAD ROUNDABOUT SAFETY BENEFITS SIGNS SPECIFIC TO DOUBLE-LANE ROUNDABOUTS » Reduction of traffic speeds (15 to 25 mph) » Drastic reductions in crash rates when compared to a traditional intersection: - Up to 90% reduction in fatalities - 76% reduction in crashes resulting in injury - 30 to 40% reduction in crashes involving pedestrians » Reduction in conflict points (point at which two opposing vehicle paths cross, and thus a potential for a collision exists) YEAGER RD 15 MPH Roundabout Ahead: This sign is posted in advance of the roundabout to alert drivers that they are approaching a roundabout. Underneath the roundabout ahead sign, as shown here, two optional signs may be used. One is the cross-street sign, which tells the motorist the name of the intersecting street in advance of the intersection. The other is an advisory speed. Conflict Point Comparison OTHER BENEFITS OF ROUNDABOUTS » Efficiency: Because traffic flow is smooth at a roundabout, the total Chevron (black arrows on white background) and One- number of vehicles that must stop is drastically .
    [Show full text]
  • 130514-CITY COUNCIL MEETING Revised Package.Indd
    COLORADO ESPLANADE | CITY COUNCIL INFORMATION PACKAGE PWP LANDSCAPE ARCHITECTURE 739 ALLSTON WAY BERKELEY, CALIFORNIA 94710 MAY 14, 2013 COLORADO ESPLANADE The Colorado Esplanade has been designed as a gateway to the heart of Santa Monica LANDSCAPE ARCHITECTURE and its major destinations. The Esplanade 739 ALLSTON WAY BERKELEY, CA 94710 THE SITE PLAN COORDINATES AND INCLUDES: will connect the new EXPO Station to points • A HIGHLY VISIBLE AND ICONIC INTEGRATED DESIGN OF UNIQUE ELEMENTS. North, South, East, and West, and will create • ONE-WAY VEHICULAR TRAFFIC FROM 4TH STREET TO OCEAN AVENUE. a landmark identity for the city that will be • A WIDE PEDESTRIAN ZONE. seen by pedestrians, cyclists, drivers, and bus • INTEGRATED WAY FINDING. and light rail riders that approach it on city • ENHANCED, BALANCED, AND ACCESSIBLE MOVEMENT ROUTES FOR ALL MODES. streets, as well as from the freeway. SANTA MONICA PLACE CITY OF SANTA MONICA OF SANTA CITY COLORADO ESPLANADE 2ND STREET PALISADES PARK PALISADES BANK OF PASEO DEL MAR 101 COLORADO PARKING STRUCTURE 8 BLOOMINGDALE’S THE WEST MIDAS AVENUE COLORADO AVENUE HOLIDAY INN GATEWAY TRIANGLE EXPO STATION PACIFIC COAST HIGHWAY SEARS -BY OTHERS POTENTIAL TOD SITE OCEAN AVENUE 4TH STREET PALISADES GARDEN MAIN STREET WALK OVERALL SITE PLAN OVERALL 5TH STREET 2 CITY HALL LANDSCAPE ARCHITECTURE BERKELEY, CA 94710 CITY OF SANTA MONICA OF SANTA CITY COLORADO ESPLANADE LOOKING WEST DOWN THE ESPLANADE DOWN LOOKING WEST VIEW LOOKING WEST FROM EXPO STATION 3 FRAMING THE VIEW LANDSCAPE ARCHITECTURE Preserving the view to the Pier Sign BERKELEY, CA 94710 was a desire of all the constituents. As a new multi-model corridor, we thought it important that all modes of movement be able to participate in the view corridor to the Pier Sign.
    [Show full text]