Norwegian Future Value Chains for Liquid Hydrogen

Total Page:16

File Type:pdf, Size:1020Kb

Norwegian Future Value Chains for Liquid Hydrogen Norwegian future value chains for liquid hydrogen maritimecleantech.no Norwegian future value chains for liquid hydrogen NCE MARITIME CLEANTECH Table of content 1. Summary ........................................................................................................................................................ 4 2. Introduction ................................................................................................................................................... 5 3. Hydrogen today ............................................................................................................................................. 6 3.1 Future demand .............................................................................................................................................. 7 3.2 Liquid hydrogen ........................................................................................................................................... 9 3.3 Properties of hydrogen and other fuels ....................................................................................................... 10 3.4 Green hydrogen .......................................................................................................................................... 12 3.5 Current and future price of hydrogen ......................................................................................................... 13 4. Value chain liquid hydrogen (LH2) ............................................................................................................. 16 4.1 Production processes .................................................................................................................................. 17 4.2 Liquefaction ................................................................................................................................................ 21 4.3 Storage ........................................................................................................................................................ 26 4.4 Distribution ................................................................................................................................................. 27 4.5 Bunkering ................................................................................................................................................... 29 4.6 End users .................................................................................................................................................... 32 4.7 Energy efficiency throughout the value chain ............................................................................................ 35 5. Regulations, standards and codes for liquid hydrogen ................................................................................. 38 6. Marine bunkering today ............................................................................................................................... 42 6.1 Alternative zero-emission fuels to LH2 ...................................................................................................... 46 6.2 Price comparison between fuels ................................................................................................................. 49 6.3 Price development for liquid hydrogen ...................................................................................................... 50 7. Future demand for liquid hydrogen ............................................................................................................. 53 7.1 Car ferries ................................................................................................................................................... 54 7.2 High speed crafts ........................................................................................................................................ 54 7.3 Platform Supply Vessels ............................................................................................................................. 56 7.4 Summary – Demand of LH2 ...................................................................................................................... 58 7.5 Energy need – natural gas and electricity ................................................................................................... 64 8. Case studies ................................................................................................................................................. 66 8.1 Car ferry Halhjem-Sandvikvåg ................................................................................................................... 66 8.2 High-speed craft Bergen-Nordfjord ............................................................................................................ 69 8.3 PSV from Mongstad to Statfjord ................................................................................................................ 72 9. Summary: Barriers for a liquid hydrogen value chain ................................................................................. 75 10. Literature and references .......................................................................................................................... 77 11. Appendix .................................................................................................................................................. 87 1 2 Norwegian future value chains for liquid hydrogen NCE MARITIME CLEANTECH Acronyms and abbreviations Acronyms and AcronymsAbbreviationabbreviations and abbreviations Meaning AbbreviationAcronyms and ADRAbbreviationAcronymsabbreviations and a Meaningbbreviations EuropeanMeaning Agreement concerning the International ADRAbbreviation ADRAbbreviation EuropeanMeaning Agreement CarriageEuropeanMeaning concerning of Agreement Dangerous the International concerning Goods by theRoad International ADR ATRADR CarriageEuropean of Agreement Dangerous AutoCarriageEuropean concerning Goods Thermal of Agreementby Dangerous theRoad Reforming International concerning Goods by theRoad International ATR CCSATR AutoCarriage Thermal of Dangerous Reforming CarbonAutoCarriage Goods Thermal Capture of by Dangerous Road Reforming Storage Goods by Road ATR ATR Auto Thermal Reforming Auto Thermal Reforming CCS CCCS3 H8 Carbon Capture Storage CarbonPropane Capture Storage CCS CCS Carbon Capture Storage Carbon Capture Storage C3H8 CHC 3 H 3 OH8 Propane MethaPropanenol C3H8 C 3 H 8 Propane Propane CH3OH CH 43 OH Metha nol MethaMethanenol CH3OH CH 3 OH Metha nol Methanol CH4 COCH 24 Methane MethaneCarbon Dioxide CH4 CH 4 Methane Methane CO2 CO 2eq2 Carbon Dioxide Carbon Dioxide Equivalent CO2 CO 2 Carbon Dioxide Carbon Dioxide CO2eq FCHCO 2eq-JU Carbon Dioxide Equivalent FuelCarbon Cell Dioxide and Hydrogen Equivalent 2 Joint Undertaking FCHCO2eq-JU GHGFCHCO 2eq- JU FuelCarbon Cell Dioxide and Hydrogen Equivalent GreenFuelCarbon 2Cell JointHouse Dioxide and Undertaking GasHydrogen Equivalent Emissions 2 Joint Undertaking GHGFCH- JU GoOGHGFCH - JU GreenFuel Cell House and GasHydrogen Emissions GuaranteeGreenFuel 2Cell JointHouse and of Undertaking OriginGasHydrogen Emissions 2 Joint Undertaking GoOGHG HSCGoOGHG GuaranteeGreen House of OriginGas Emissions HighGuaranteeGreen-Speed House of Craft OriginGas Emissions HSCGoO HVOHSCGoO HighGuarantee -Speed of Craft Origin HydroHighGuarantee-Speed Treated of Craft Origin Vegetable Oils HVOHSC IEAHVOHSC HydroHigh -Speed Treated Craft Vegetable InternationalHydroHigh- OilsSpeed Treated Craft Energy Vegetable Agency Oils IEAHVO IEAGHGIEAHVO InternationalHydro Treated Energy Vegetable InternationalHydro Agency Oils Treated Energy Vegetable Agency Oils Greenhouse Gas IEAGHGIEA IRaSIEAGHGIEA International Energy IntegratedInternational Agency Greenhouse Refrigeration Energy Agency Gas and Storage Greenhouse Gas IRaSIEAGHG IRENAIRaSIEAGHG IntegratedInternational Refrigeration Energy TheIntegratedInternational Agency andInternational Storage Greenhouse Refrigeration Energy Renewable Agency Gas and Storage EnergyGreenhouse Agency Gas IRENAIRaS IRENAIRaSISO TheIntegrated International Refrigeration Renewable TheIntegratedInternational andInternational Storage Energy Refrigeration Organization Agency Renewable and for Storage Energy Standardization Agency IRENAISO IRENAKISO TheInternational International Organization Renewable TheKelvinInternational International for Energy Standardization Organization Agency Renewable for Energy Standardization Agency ISOK ISOLH2K InternationalKelvin Organization InternationalLiquefiedKelvin for HydrogenStandardization Organization for Standardization KLH2 KLNGLH2 KelvinLiquefied Hydrogen KelvinLiquidLiquefied Natural Hydrogen Gas LH2LNG LH2LPGLNG LiquefiedLiquid Natural Hydrogen Gas LiquefiedLiquid Natural HydrogenPetroleum Gas Gas LNGLPG LNGMGOLPG LiquidLiquefied Natural Petroleum Gas LiquidMarineLiquefied Gas NaturalGas Petroleum Oil Gas Gas LPGMGO LPGNASAMGO LiquefiedMarine Gas Petroleum Oil LiquefiedTheMarine Gas National Gas Petroleum Oil Aeronautics Gas and Space Administration MGONASA MGONCENASA MarineThe National Gas Oil Aeronautics MarineNorwegianThe National and Gas Space CentresOil Aeronautics Administration of Expertise and Space Administration NASA NASA The National Aeronautics The National and Space Aeronautics Administration and Space Administration NCE NHNCE 3 Norwegian Centres ofNorwegianAmmonia Expertise Centres of Expertise NCE NCE Norwegian Centres ofNorwegian Expertise Centres of Expertise
Recommended publications
  • Utviklingsprosjekt Ved Nordfjord Sjukehus
    Utviklingsprosjekt ved Nordfjord sjukehus Analyse av pasientstraumar og forbruksrater i Nordfjordregionen Bruk av somatiske spesialisthelsetenester i kommunane Selje, Vågsøy, Eid, Hornindal, Stryn, Gloppen og Bremanger Deloitte AS Føresetnader og informasjon om datagrunnlaget i pasientstraumanalysen Analysane for 2010 er basert på 3 ulike datauttrekk. 1. DRG-gruppert NPR-melding (fra NPR) for alle pasientar i Helse Vest RHF, på HF-nivå pr kommune 2. DRG-gruppert uttrekk innhenta frå Helse Førde HF, dette for å få data på sjukehusnivå i føretaket 3. DRG gruppert uttrekk innhenta frå Helse Møre og Romsdal HF, over aktivitet på Volda og Mork for pasienter fra Nordfjord-regionen Det er et marginalt avvik mellom datagrunnlag for Helse Vest RHF og datagrunnlaget vi har motteke direkte frå Helse Førde HF. Helse Førde HF rapporterar 41 (+1,4 %) flere dagopphald og 49 (-0,9 %), færre døgnopphald og 4 (-0,01 %) færre polikliniske konsultasjonar enn dei «lukka» filane for Helse Vest RHF. Datagrunnlag for 2011 er basert på grupperte NPR-meldingar innhenta fra Helse Førde HF, samt Volda sjukehus og Mork rehabiliteringssenter Tellar-eininga i datagrunnlaget, er sjukehusopphald/konsultasjonar som inngår i ISF-ordninga. Aktivitet som inngår i ISF-grunnlaget er noko lavare enn den totale aktiviteten. For pasientar frå Nordfjord- regionene og ved sjukehusa Førde sentralsjukehus, Nordfjord sjukehus, Volda sjukehus og Mork rehabiliteringssenter, er avvika som følgjer: Døgnopphald 0,2% lavare, Dagopphold 1,3 % lavare og Polikliniske konsultasjoner 9,9%
    [Show full text]
  • Bicycle Trips in Sunnhordland
    ENGLISH Bicycle trips in Sunnhordland visitsunnhordland.no 2 The Barony Rosendal, Kvinnherad Cycling in SunnhordlandE16 E39 Trondheim Hardanger Cascading waterfalls, flocks of sheep along the Kvanndal roadside and the smell of the sea. Experiences are Utne closer and more intense from the seat of a bike. Enjoy Samnanger 7 Bergen Norheimsund Kinsarvik local home-made food and drink en route, as cycling certainly uses up a lot of energy! Imagine returning Tørvikbygd E39 Jondal 550 from a holiday in better shape than when you left. It’s 48 a great feeling! Hatvik 49 Venjaneset Fusa 13 Sunnhordland is a region of contrast and variety. Halhjem You can experience islands and skerries one day Hufthamar Varaldsøy Sundal 48 and fjords and mountains the next. Several cycling AUSTE VOLL Gjermundshavn Odda 546 Våge Årsnes routes have been developed in Sunnhordland. Some n Husavik e T YS NES d Løfallstrand Bekkjarvik or Folgefonna of the cycling routes have been broken down into rfj ge 13 Sandvikvåg 49 an Rosendal rd appropriate daily stages, with pleasant breaks on an a H FITJ A R E39 K VINNHER A D express boat or ferry and lots of great experiences Hodnanes Jektavik E134 545 SUNNHORDLAND along the way. Nordhuglo Rubbestad- Sunde Oslo neset S TO R D Ranavik In Austevoll, Bømlo, Etne, Fitjar, Kvinnherad, Stord, Svortland Utåker Leirvik Halsnøy Matre E T N E Sveio and Tysnes, you can choose between long or Skjershlm. B ØMLO Sydnes 48 Moster- Fjellberg Skånevik short day trips. These trips start and end in the same hamn E134 place, so you don’t have to bring your luggage.
    [Show full text]
  • Fv. 606 Ytre Steinsund Bru Ingar Hals, Statens Vegvesen Ingar Hals, Statens Solund Kommune
    Solund kommune REGULERINGSPLAN Teksthefte og plankart Fv. 606 Ytre Steinsund bru Ingar Hals, Statens vegvesen Ingar Hals, Statens Solund kommune Planid.: 1412-201702 Prof. nr.: 14606R_003 Planforslaget datert: 30. oktober 2017 Reguleringsplan godkjent: 19.desember 2017 Region vest Leikanger kontorstad Dato: 19. desember 2017 Detaljreguleringsplan for fv. 606 Ytre Steinsund bru m/konsekvensutgreiing Forord Solund kommune legg med dette forslag til reguleringsplan for fv. 606 Ytre Steinsund bru med konsekvensutgreiing fram for planvedtak i samsvar med §§12-3, 12-10 og 4-2 i Plan- og bygningslova. Dokumenta ligg på heimesida til Solund kommune https://www.solund.kommune.no og i papirutgåve på kommunehuset på Hardbakke. Dei vil og bli lagt ut på Statens vegvesen sine nettsider. Ope møte I høyringsperioden vart det arrangert ope møte 22. november på Hardbakke. Høyringsfrist Fristen til å komme med merknader til planen var 13. desember. Vurdering av merknadene og ei oppsummering av tilrådde endringar i planen går fram av kap. 9 i planomtalen. Spørsmål til planen kan stillast til: Solund kommune Helge Alme 95956144 [email protected] Statens vegvesen Ingar Hals 97473361 [email protected] Planforslaget er utarbeidd av Statens vegvesen i samarbeid med Solund kommune. Solund kommune/Statens vegvesen Region vest Desember 2017 I Detaljreguleringsplan for fv. 606 Ytre Steinsund bru m/konsekvensutgreiing Innhald Forord Planomtale Reguleringsføresegner (juridisk bindande) Oversiktskart B1 Reguleringsplanteikningar R1, R2, R3, R3-1, R4, R4-1, R5, R6, R7 (juridisk bindande) Vedlegg: Konsekvensutgreiing, deltema Naturmangfald Konsekvensutgreiing, deltema Landskapsbilete ROS-analyse Teknisk teikningshefte II Detaljreguleringsplan for fv. 606 Ytre Steinsund bru m/konsekvensutgreiing 6.6 STØY FRÅ TRAFIKK PÅ VEGEN ...............................................................................................................................................
    [Show full text]
  • Glaciotectonic Structure and Genesis of the Herdla Moraines, Western Norway
    Glaciotectonic structure and genesis of the Herdla Moraines, western Norway JAMES S. ABER & INGE AARSETH Aber, J. S. & Aarseth, 1.: Glaciotectonic structure and genesis of the Herdla Moraines, western Norway. Norsk Geologisk Tidsskrift, Vol. 68, pp. 99-106. Oslo 1988. ISSN 0029-196X. At its type locality, glaciomarine sediment of the Herdla Moraines was deformed and consolidated by overriding ice. Two phases of moraine development took place in conjunction with ice movement coming first from the east-northeast and later from the southeast. The early phase is related to development of a local ice dome on Stølsheimen during the middle Younger Dryas (about 10,500 BP), when the ice sheet reached its late glacial maximum thickness in the region. The ice sheet then thinned rapidly, due to climatic amelioration and increased calving, and shifted to southeasterly movement at Herdla. Most glaciotectonic disturbance and consolidation of sediment at Herdla happened during this late phase, perhaps as a result of a glacier surge along Herdlafjord. The glaciotectonic structures at Herdla are local in character and cannot be used for regional correlation of glacial advances in western Norway. J. S. Aber, Earth Science Department, Emporia State University, Emporia, Kansas, 66801, USA; l. Aarseth, Universitetet i Bergen, Geologisk Institutt, Avd. B. A/legt, 41. N-5007 Bergen, Norway. Y ounger Dry as moraines of western Norway Aarseth & Mangerud (1974) defined the Herdla Moraines as a morphostratigraphic unit with a type locality at Herdla island (Fig. 1). Sediments of the Herdla Moraines are part of a conspicuous system of ice marginal deposits of Younger Dryas age (10,000-11,000 BP) that has been mapped around the periphery of southern and western Norway (Mangerud et al.
    [Show full text]
  • Gateway to the Glaciers Port Information ATM: Yes – in Olden 10 Min
    Briksdal Glacier Photo: Thomas Bickhardt/BickFoto OLDeN CruiSe POrT - NOrdfjorD Events: Olden Days (July), Stryn Summer Festival (June – August), Summer Shopping in Nordfjordeid (June - Aug), Nordfjord Walking Festival (August) Glaciers: Yes. Cruise Season: April - September Average temperature: May 15, June 19, July 20, August 20, September 15. Cruise Information: www.nordfjord.no/cruise Port Information: www.nordfjord.no/cruise Tourist information: www.nordfjord.no | www.visitnorway.com | Page 40 | Page | www.visitnorway.com West Cape Photo: Terje Rakke/Nordic Life/Fjord Norway Glacier Walk Terje Rakke/Nordic Life/Fjord Norway Helicopter Tystigen/Videseter The Home of William Singer Duration: 15 – 20 min in air Along scenic Stryn Lake to Videseter and the The Singerheimen was the home of the American Explore Nordfjord, glaciers and mountains from above. Summer Ski Centre at Tystigen/Mt. Stryn. artis and multimillionaire W. Singer, and consists High mountains and stunning views. of several buildings of cultural and historical interest Hikes in Olden – art and artefacts. Duration: 2.5 – 6 hours Crayfishing in the fjord Refreshing hikes in Olden to i.e. Mt. Huaren close Combine an exciting Rib boat ride with crayfishing Hike to farm Sigdestad to the pier, or to the gleaming glaciers of Olden Valley. and a delicious meal of the catch on the banks A hike to the abandoned and remote mountain farm of beautiful Nordfjord. Sigdestad – situated on a mountain shelf high above Fjord Fishing Lake Stryn. Duration: 2.5 hours Wild water rafting Relaxing fishing trip on the famous Nordfjord on board Downstream the many long and exciting rapids of the small vessel “Isabella”.
    [Show full text]
  • 309 Rådgivende Biologer AS
    R Kalkingsplan A for Solund kommune 1997 P P O R T Rådgivende Biologer AS 309 Rådgivende Biologer AS RAPPORTENS TITTEL: Kalkingsplan for Solund kommune, 1997. FORFATTERE: Annie Elisabeth Bjørklund & Bjart Are Hellen OPPDRAGSGIVER: Solund kommune, ved miljø-og plansjef Tor Arne Hauge, Postboks 68, 5980 Hardbakke OPPDRAGET GITT: ARBEIDET UTFØRT: RAPPORT DATO: Høsten 1996 1996 - 1997 12. november 1997 RAPPORT NR: ANTALL SIDER: ISBN NR: 309 44 ISBN 82-7658-171-4 RAPPORT SAMMENDRAG: I et par områder i Solund er vannkvaliteten relativt stabilt sur hele året. Et området ligger helt øst i kommunen og omfatter øya Losna og den nordøstre delen av Sula, øst for Dumbefjorden. Det andre området omfatter de høyereliggende deler vest på Sula; vest for Hagefjorden. I resten av kommunen er vannkvaliteten stort sett moderat sur og kan periodevis forvente å være marginal for fisk. Kun i et lite område langs kysten i nordvest, kan en forvente lite sure områder. Tilstanden i fiskebestandene i 45 av kommunens innsjøer er kartlagt gjennom spørreundersøkelser. Forsuringsskadde fiskebestander er fordelt på området ved Krakksnova nordøst i kommunen, mellom Dyrefjellet og Hamnafjellet øst på Sula og de høyere liggende delene av Sula. Det har ikke vært kalking i offentlig regi i Solund kommune. I denne rapporten er 11 innsjøer vurdert for kalking. Disse er gjennomgått vassdragsvis i rapportens del 4. EMNEORD: SUBJECT ITEMS: - Forsuringstilstand - Fiskestatus - Kalkingsplan - Solund kommune RÅDGIVENDE BIOLOGER AS Bredsgården, Bryggen, N-5003 Bergen Foretaksnummer 843667082 Telefon: 55 31 02 78 Telefax: 55 31 62 75 1 FORORD Rådgivende Biologer as. har utarbeidet en kalkingsplan for Solund kommune.
    [Show full text]
  • The Jacobson Family from Laerdal Parish, Sogn Og Fjordane County, Norway; Pioneer Norwegian Settlers in Greenwood Township, Vernon County, Wisconsin
    THE JACOBSON FAMILY FROM LAERDAL PARISH, SOGN OG FJORDANE COUNTY, NORWAY PIONEER NORWEGIAN SETTLERS IN GREENWOOD TOWNSHIP, VERNON COUNTY, WISCONSIN BY LAWRENCE W. ONSAGER THE LEMONWEIR VALLEY PRESS Mauston, Wisconsin and Berrien Springs, Michigan 2018 COPYRIGHT © 2018 by Lawrence W. Onsager All rights reserved including the right of reproduction in whole or in part in any form, including electronic or mechanical means, information storage and retrieval systems, without permission in writing from the author. Manufactured in the United States of America. -----------------------------------Cataloging in Publication Data----------------------------------- Onsager, Lawrence William, 1944- The Jacobson Family from Laerdal Parish, Sogn og Fjordane County, Norway; Pioneer Norwegian Settlers in Greenwood Township, Vernon County, Wisconsin. Mauston, Wisconsin and Berrien Springs, Michigan: The Lemonweir Valley Press, 2018. 1. Greenwood Township, Vernon County, Wisconsin 2. Jacobson Family 3. Laerdal Township, Sogn og Fjordane County, Norway 4. Greenwood Norwegian-American Settlement in Vernon County, Wisconsin I. Title Tradition claims that the Lemonweir River was named for a dream. Prior to the War of 1812, an Indian runner was dispatched with a war belt of wampum with a request for the Dakotas and Chippewas to meet at the big bend of the Wisconsin River (Portage). While camped on the banks of the Lemonweir, the runner dreamed that he had lost his belt of wampum at his last sleeping place. On waking in the morning, he found his dream to be a reality and he hastened back to retrieve the belt. During the 1820's, the French-Canadian fur traders called the river, La memoire - the memory. The Lemonweir rises in the extensive swamps and marshes in Monroe County.
    [Show full text]
  • Nordfjordtravelguide 2013
    Nordfjord TRAVELGUIDE 2013 Stryn-Hornindal-Gloppen-Eid-Vågsøy-Selje nordfjord.no Breng © O.J. Tveitk WELCOME TO NORDFJORD Short distances – big experiences Contents Lots of exciting activities Tourist information .....................................................2 Nordfjord is the destination for you if The tourist information staff can provide Transport ...............................................................................3 you are looking for an active holiday. In a information about activities, attractions, Scenic highlights ..........................................................5 magnificent, varied landscape between gla- events and accommodation. Hiking ......................................................................................6 ciers, fjords and the ocean, you can enjoy We also sell postcards, books and walking Outdoor Adventures ..............................................10 mountain walks, coastal walks, boat trips, maps. Bikes can also be hired in Stryn. kayaking, fishing, horse riding in fjord horse Culture ..................................................................................14 country, and lots more. Waymarked trails Shopping .............................................................................17 guide you to impressive mountain summits, Events ..................................................................................19 idyllic summer pasture farms, lush valleys Ski & Winter ...................................................................20 and a distinctive coastal
    [Show full text]
  • Årsmelding 2016
    NORDFJORD JORDSKIFTERETT ÅRSMELDING 2016 ORGANISASJON OG PERSONELL SØRVIS OG INFORMASJON Jordskifteretten er ein spesialdomstol for eigedom.. Retten har over år greidd å redusere ventetida for Informasjon om arbeidsoppgåvene ligg på nye saker. Om naudsynt prioriterer retten framleis www.jordskifte.no . saker med stor samfunns- eller privat nytte, t.d. fallrettssaker, grensetvistar og tilleggsjord- Nordfjord jordskifterett femner om kommunane /delingssaker. Stryn, Hornindal, Eid, Gloppen, Vågsøy og Selje. Nordfjord jordskifterett har i løpet av fjoråret vore til Domstolen held til i Postgarden på Nordfjordeid. dels sterkt prega av kampen mot sentralisering. Jordskifteretten prioriterte i fjor vekk stand på Domstolen hadde i 2016 6 tilsette: ungdomsarrangementet til nordfjordregionen i Overingeniør Ørjan Haugland påska, og det har vore lite deltaking på lokale Overingeniør Olina Mardal arrangement. Førstekonsulent Reidun Britt Holmøy Retten fokuserer på jordskifteretten si særstilling Førstekonsulent Per Lyder Holme som domstol som gjer at ein t.d. kan avklare Jordskifterettsleiar Eivind Helleland eigedomsrettslege forhold utan at det treng vere Jordskiftedommar Alexis Thingnes nokon tvist mellom partane. Jordskifteretten kan løyse eigedomsproblem i tettstader og hytteområde SAKSARBEIDET på same måte som i landbruksområde. Ved å I 2016 kom det inn 33 nye sakskrav, medan 20 kombinere arealplanlegging med jordskifteretten saker vart slutta. 2016 var året med store sine verkemedel, kan t.d. bustad- og hytteutbygging forventningar knytt til seg. med infrastruktur, skje uavhengig av Ny jordskiftelov og nytt sakshandsamingsverktøy eigedomsgrenser i området. vart introdusert. Ny lov gav ikkje store utfordringar, men dataverktøyet sette effektiviteten til retten sterkt attende. Uferdig programvare og manglande opplæringsplan har gått sterkt utover saksavviklinga. I alt vart det avmerka 8 km grenser (80 km året før) og innmålt 207 grensemerke (982 i 2015).
    [Show full text]
  • Årsmelding 2020 Årsmelding 2020
    Årsmelding 2020 Årsmelding 2020 Årsmeldinga er utarbeidd i samsvar med § 14-7 i kommunelova. Ho viser resultat som er oppnådde i Vestland fylkeskommune i 2020. Fylkesrådmannen er ansvarleg for publikasjonen. Redaksjon er kommunikasjonsseksjonen, med tekstgrunnlag frå organisasjonen. Framsidefoto viser delar av fylkesordførarkjeda for Vestland. Ho har 16 motiv frå heile fylket, som er nøye valde og som alle kan kjenne seg igjen i. Fylkesordføraren bruker kjeda under politiske møte og i samband med representasjon og arrangement. Les meir om kjeda og alle motiva på side 148. Foto utan spesiell kreditering tilhøyrer Vestland fylkeskommune. Årsmeldinga er avslutta mars 2021. 2. utgåve, april 2021: Tabellar på side 16 og 17 er sette inn. Elles berre mindre korrekturendringar. 2 Årsmelding 2020 Innhald Hendingar 2020 4 Fylkesrådmannen: Sterkare saman 9 Styring og kontroll av verksemda 12 Sentrale nøkkeltal og rapportering 16 Samfunnsoppdrag – visjon – verdiar 22 Overblikk – vår visuelle identitet 24 Vi utviklar Vestland 27 Utviklingsplan for Vestland 2020–2024 28 Godt økonomisk resultat 30 KOSTRA – Kommune – stat – rapportering 38 Klima 40 Folkehelse 50 Infrastruktur og veg 55 Innovasjon og næringsutvikling 67 Kultur, idrett og inkludering 81 Mobilitet og kollektivtransport 95 Opplæring og kompetanse 109 Organisasjon og økonomi 121 Strategisk utvikling og digitalisering 131 Politisk organisering 145 Fylkesordføraren: Eit annleis år 153 3 Årsmelding 2020 – Hendingar 2020 Hendingar 2020 – Vi skal få fleire opp- Rundt 230 nye fagarbei- Vestland fylkesting gåver, bygge Vestland darar fekk utdelt fag-, vedtok å innføre ut- saman og bli det beste sveine-, kompetanse- sleppsfrie drosjar i alle fylket i landet. Dette eller meisterbrev under kommunar i Horda- er historisk, sa den ein høgtideleg seremoni land frå 1.
    [Show full text]
  • Sykkel- Streif I
    Til Flesland Til Halhjem Til Halhjem og Bergen Kaldafoss Lukksund VERNØY Malkenes Til Flesland Solstråleøya Til Halhjem Til Halhjem og Bergen Gjøvåg Godøysund Til Flesland Voss Til Halhjem Hope Til Halhjem og Bergen Lukksund Kaldafoss Bergen Tysnes * Lukksund Lunde FUSA VERNØY Malkenes Kaldafoss 1 2 REKSTEREN 3 4 Solstråleøya 5 6 7 Tysneset Årbakka Bruntveit Flakke Rv49kalkomn Flatråkervassdraget Flygansvær Fort Hope Kyrkjegard Gjøvåg Uggdalsdalen Norheimsund VERNØY Malkenes Våge Solstråleøya Vevatnet Gjøvåg Godøysund 6 Godøysund Gjøvåg Kultplass, soldyrking, ekserserplass med Gravfelt og Handelsplass Dalstuva Kalkbrenning, ei stor næring Rundtur med sykkel eller kajakk & kano Kanonstillingar frå 2. verdenskrig «The spooky churchyard»; avkristna og Du kan velja å sykle Oldtidsvegen mellom Uggdal og Hope * Myrdal Hope Tysnes Til Flesland 336 m Til Flesland Tysnes 1 gapestokk,Til Halhjem minne frå fleire kyrkjer. blant ferskvassholmar!Tysnes gløymd i 1922. vidare nokre få Til Halhjem Onarheim. * Lunde FUSA Til Halhjem og Bergen Til Halhjem og Bergen Tysnessåto * FUSA Os REKSTEREN Rv49 Lunde Bruntveit Våge Vevatnet Rett etter Lunde tek duFlygansvær av frå RV 49 og Med utsyn mot Kvinnheradsfjella753 m * kjemSkaretREKSTEREN du Nå skal du ut til pittoreske Reksteren, som kilometer, over ein Frå Våge tek du av mot Lunde i rundkjøyringa, Nymark KVINN- Bruntveit Rv49 Dalstuva Dalen Våge Vevatnet Ein skoddefull vinterdag i 2008 fann me syklar forbi Vevatnet på ein pittoresk veg, fyrst til Onarheim og så til Flakke kalkomn, HERAD Til Flatråker er det 12,2 km. På Hodnaneset fekk bru på slutten av 1970 talet. Frå krysset mikro fjellovergang Kulturmiljø og spor etter eldre vegfar. Lukksund * Lukksund 336 m Myrdal RV 49.
    [Show full text]
  • Shear Heating in Extensional Detachments: Implications for the Thermal History of the Devonian Basins of W Norway
    Tectonophysics 608 (2013) 1073–1085 Contents lists available at ScienceDirect Tectonophysics journal homepage: www.elsevier.com/locate/tecto Shear heating in extensional detachments: Implications for the thermal history of the Devonian basins of W Norway Alban Souche ⁎, Sergei Medvedev 1, Torgeir B. Andersen 1, Marcin Dabrowski 2 Physics of Geological Processes (PGP), University of Oslo, P.O. Box 1048, Blindern, 0316 Oslo, Norway article info abstract Article history: The supra-detachment basins in western Norway were formed during Lower to Middle Devonian in the Received 9 July 2012 hangingwall of the extensional system of detachments known as the Nordfjord-Sogn Detachment Zone Received in revised form 27 May 2013 (NSDZ). The basins experienced elevated peak temperatures (up to 345 °C adjacent to the main detachment Accepted 4 July 2013 fault) during the terminal stages of the extension. In this study, we show that the heat generated by the de- Available online 12 July 2013 formation of the rocks within the shear zone of the detachment, also known as shear heating, played a role in the thermal evolution of the entire region during the extension and could have induced the elevated peak Keywords: fl Shear heating temperatures of the supra-detachment basins. We numerically analyse the in uence of the rheology and Supra-detachment basins the deformation style within the shear zone, the rate of exhumation of the footwall, and the thickness of Numerical modelling the sedimentary accumulation on the top of the system. The model reproduces the elevated temperatures Post-Caledonian extension recorded in the supra-detachment basins where locally 100 °C and 25% of the total heat budget can be attrib- uted to shear heating.
    [Show full text]