The Future of Rail in Wrexham PDF
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
North West Region Cheshire and North Wales
NATIONS, REGIONS & GROUPS NORTH WEST REGION LONDON REGION CHESHIRE AND NORTH WALES GROUPS HEATHROW GROUP Borderlands (Wrexham to Bidston) rail line Crossrail becomes Elizabeth Line full house greeted speaker John Goldsmith, Community A Relations Manager for Crossrail. Some 43km of new tunnelling is now complete under central London, and 65 million tonnes of material have been excavated. Building work on the whole line is now 87% complete. The first trains of the new Elizabeth Line are now in service between Liverpool Street and Shenfield where a new platform has been built for them, and the roof garden at the seven-storey Canary Wharf station has been open for some time. The 70 trains, built in Derby by Bombardier, are some 10–15% lighter than those now in use and will be in nine-car sets, 200m long, seating 450 passengers, with an estimated total capacity including standing passengers of 1,500 at peak times, most of The Borderlands line runs from Wrexham Central Station to Bidston Station whom are expected to be short-journey passengers. Seats will be sideways, forward facing and backward facing, giving plenty of his event was held in the strategic location of Chester, circulating space. The early trains now in service between T close to the border between England and Wales. The Liverpool Street and Shenfield are only seven cars long, because location chosen was apt, as the Borderlands line is a key the main line platforms at Liverpool Street will not accept nine-car strategic passenger route between North Wales and Merseyside. trains, but this is an interim measure until the lower level new John Allcock, Chairman, Wrexham–Bidston Rail Users’ Association station is operative. -
Newsletter No. 51
Page 1 SARPA Newsletter 51 SARPA Newsletter 51 Page 1 Shrewsbury Newsletter Aberystwyth Rail No. 51 Passengers’ August 2010 Association The station with the hump. Aberdovey in the early 1960’s, with No.82033 arriving with a down train. Chairman’s Message..................................................................................................3 News in Brief...............................................................................................................4 When the Computer says No......................................................................................8 AUF WIEDERSEHEN Status Quo............................................................. ...............10 More Cambrian Railways Partnership leaflets..........................................................12 The view from milepost 61 by the Brigadier..............................................................13 Network Rail Reports................................................................................................15 Vale of Rheidol Railway upgrade...............................................................................17 SARPA meetings......................................................................................................18 Websites...................................................................................................................19 Useful addresses......................................................................................................20 Officers of the Association........................................................................................20 -
11797 Mersey Gateway Regeneration Map Plus[Proof]
IMPACT AREAS SUMMARY MERSEY GATEWAY 1 West Runcorn Employment Growth Area 6 Southern Widnes 8 Runcorn Old Town Centre plus Gorsey Point LCR Growth Sector Focus: Advanced Manufacturing LCR Growth Sector Focus: Advanced Manufacturing / LCR Growth Sector Focus: Visitor Economy / Financial & Widnes REGENERATION PLAN / Low Carbon Energy Financial & Professional Services Professional Services Waterfront New & Renewed Employment Land: 82 Hectares New & Renewed Employment Land: 12 Hectares New & Renewed Employment Land: 6.3 Hectares Link Key Sites: New Homes: 215 New Homes: 530 • 22 Ha Port Of Runcorn Expansion Land Key Sites: Key Sites: Everite Road Widnes Gorsey Point • 20 Ha Port Of Weston • 5 Ha Moor Lane Roadside Commercial Frontage • Runcorn Station Quarter, 4Ha Mixed Use Retail Employment Gyratory • 30 Ha+ INOVYN World Class Chemical & Energy • 3 Ha Moor Lane / Victoria Road Housing Opportunity Area & Commercial Development Renewal Area Remodelling Hub - Serviced Plots • 4 Ha Ditton Road East Employment Renewal Area • Runcorn Old Town Centre Retail, Leisure & Connectivity Opportunities: Connectivity Opportunities: Commercial Opportunities Widnes Golf Academy 5 • Weston Point Expressway Reconfiguration • Silver Jubilee Bridge Sustainable Transport • Old Town Catchment Residential Opportunities • Rail Freight Connectivity & Sidings Corridor (Victoria Road section) Connectivity Opportunities: 6 • Moor Lane Street Scene Enhancement • Runcorn Station Multi-Modal Passenger 3MG Phase 3 West Widnes Halton Lea Healthy New Town Transport Hub & Improved -
Rail Station Usage in Wales, 2018-19
Rail station usage in Wales, 2018-19 19 February 2020 SB 5/2020 About this bulletin Summary This bulletin reports on There was a 9.4 per cent increase in the number of station entries and exits the usage of rail stations in Wales in 2018-19 compared with the previous year, the largest year on in Wales. Information year percentage increase since 2007-08. (Table 1). covers stations in Wales from 2004-05 to 2018-19 A number of factors are likely to have contributed to this increase. During this and the UK for 2018-19. period the Wales and Borders rail franchise changed from Arriva Trains The bulletin is based on Wales to Transport for Wales (TfW), although TfW did not make any the annual station usage significant timetable changes until after 2018-19. report published by the Most of the largest increases in 2018-19 occurred in South East Wales, Office of Rail and Road especially on the City Line in Cardiff, and at stations on the Valleys Line close (ORR). This report to or in Cardiff. Between the year ending March 2018 and March 2019, the includes a spreadsheet level of employment in Cardiff increased by over 13,000 people. which gives estimated The number of station entries and exits in Wales has risen every year since station entries and station 2004-05, and by 75 per cent over that period. exits based on ticket sales for each station on Cardiff Central remains the busiest station in Wales with 25 per cent of all the UK rail network. -
Issue 15 15 July 2005 Contents
RailwayThe Herald 15 July 2005 No.15 TheThe complimentarycomplimentary UKUK railway railway journaljournal forfor thethe railwayrailway enthusiastenthusiast In This Issue Silverlink launch Class 350 ‘Desiro’ New Track Machine for Network Rail Hull Trains names second ‘Pioneer’ plus Notable Workings and more! RailwayThe Herald Issue 15 15 July 2005 Contents Editor’s comment Newsdesk 3 Welcome to this weeks issue of All the latest news from around the UK network. Including launch of Class 350 Railway Herald. Despite the fact ‘Desiro’ EMUs on Silverlink, Hull Trains names second Class 222 unit and that the physical number of Ribblehead Viaduct memorial is refurbished. locomotives on the National Network continues to reduce, the variety of movements and operations Rolling Stock News 6 that occur each week is quite A brand new section of Railway Herald, dedicated to news and information on the astounding, as our Notable Workings UK Rolling Stock scene. Included this issue are details of Network Rail’s new column shows. Dynamic Track Stablizer, which is now being commissioned. The new look Herald continues to receive praise from readers across the globe - thank you! Please do feel free to pass the journal on to any friends or Notable Workings 7 colleagues who you think would be Areview of some of the more notable, newsworthy and rare workings from the past week interested. All of our back-issues are across the UK rail network. available from the website. We always enjoy hearing from readers on their opinions about the Charter Workings 11 journal as well as the magazine. The Part of our popular ‘Notable Workings’ section now has its own column! Charter aim with Railway Herald still Workings will be a regular part of Railway Herald, providing details of the charters remains to publish the journal which have worked during the period covered by this issue and the motive power. -
Chester Shrewsbury Rail Partnership Rheilffordd
Cynulliad Cenedlaethol Cymru National Assembly for Wales Y Pwyllgor Menter a Busnes Enterprise and Business Committee Ymchwiliad i’r Blaenoriaethau ar gyfer Inquiry into the Priorities for the future dyfodol Seilwaith y Rheilffyrdd yng of Welsh Rail Infrastructure Nghymru WRI 25 WRI 25 Caer Yr Amwythig Partneriaeth Chester Shrewsbury Rail Partnership Rheilffordd Martha Da Gama Howells Clerk, Enterprise and Business Committee National Assembly for Wales Cardiff Bay CF99 1NA. E-mail: [email protected] 14th January 2016 Sheila Dee Re: Enterprise & Business Committee Inquiry into the Priorities for the future Community Rail Officer Swyddog Rheilffyrdd of Welsh Rail Infrastructure Cymunedol Direct Dial / Rhif Union On behalf of the Chester - Shrewsbury Rail Partnership we would like to express our full 01691 772784 support to the submissions below from both Wrexham County Borough Council and the Email / E-bost Shrewsbury to Chester Rail Users Committee (SCRUA). [email protected] Sheila Dee Partnership Officer _____________________________________________________________________________________________________ Copy of Wrexham County Borough Council Submission) High level priorities for the development of rail infrastructure to provide the ca- pacity and connectivity necessary to support the social and economic well-being of Wales; In planning its long term rail infrastructure Wales needs not only to look to develop- ments within Wales but those cross border in England and also to Ireland which can bring social and economic benefits to Wales. Connectivity to international gateways such as Holyhead and its links to Ireland, Manchester, Liverpool and Birmingham with their airports is vitally important to north and mid Wales. With the plans to have a HS2 hub at Crewe we need to ensure we are ready in Wales with infrastructure that can maximise any opportunities and benefits that HS2 will bring. -
Merseytravel’S Ambitions
Merseytravel’s Ambitions Cllr Liam Robinson LCRCA Transport Portfolio Holder LCR Devolution Deal • Combined Authority established April 2014 • Population of 1.5million people with 2.4million within the travel to work area • Responsible for; • Transport • Economic Development • Employment and Skills • Strategic Planning and Housing • Formed of; • 5 leaders • Liverpool Mayor • Chair of LEP • City Region Mayor (from 2017) • Co-opted members and Mayoral advisers Transport Aspects of the Devolution Deal • Devolved Multi-year transport budget • Creation of a Single Investment Fund (SIF) • Powers for the CA to manage a Key Route Network of local roads • Ability to franchise bus service, subject to Bus Service Act • Long term Special Rail Grant (SRG) settlement to Merseyrail to assist in Rolling Stock Procurement • Ability to manage local rail network in alternative ways – station ownership • Government to work with Combined Authority on its Mersey Tunnels tolls review • Explore ways LCR Mayor can implement measures to achieve better air quality Integrating transport: Key to Economic Growth NPR/HS2: Benefits at LCR Level • A full, direct North-South HS2 and East-West Northern Powerhouse Rail connection would deliver major economic benefits to LCR Rebalancing the economy: the opportunity for freight & logistics • ‘Superport’ developments, delivering a step change in the economy • Liverpool 2 open • Potential to remove over 150 million HGV miles per year from the congested roads in the South East • But new rail capacity is vital Strengthening our -
Route Utilisation Strategy November 2008 Foreword
Wales Route Utilisation Strategy November 2008 2 Foreword I am delighted to present Network Rail’s Route Principally this is in south Wales, where capacity Utilisation Strategy (RUS) for Wales. This use is at its highest. This is a result of a growth covers the entire rail network in Wales, as well in the number of trains serving Cardiff and the as some parts of the network in the English building of a number of new stations. On this border counties. part of the network, in the most populous part of the country, the RUS builds on the successful This network is extensive and diverse. past introduction of more services and the There are main line links from Wales into selective growth of the network. England, a long-distance line along the border connecting north and south Wales, a busy A major programme to renew signalling urban passenger network serving Cardiff, and equipment in the Newport and Cardiff areas branches traversing sparsely populated rural will take place in the next five to seven years, areas. Some parts of the network are subject and much of the work described in this to fluctuating demand according to the time of strategy to enhance the network is planned year, most notably on the Cambrian Coast and in conjunction with this signalling work to in the Conwy Valley. increase cost-effectiveness. The High Level Output Specification (HLOS), published in The context in which this RUS has been July 2007, contained a specific requirement to produced, as has often been the case with increase seating capacity into Cardiff during other RUSs, is one of growing demand for the morning peak. -
Head of Customer Services Arriva Trains Wales April 2011 to The
Head of Customer Services Arriva Trains Wales April 2011 To the Head of Customer Services Re: Arriva Trains Wales Summer Timetable Changes Adversely Affecting Commuters I write to you on behalf of fellow passengers in protest of the timetable changes being made to the service which starts at Carmarthen at 05:50 destined for Manchester Piccadilly. Like many other customers, I commute to Cardiff on this service daily. I board at Llanelli at 06:18 but this petition speaks for customers boarding at all stations between Carmarthen and Cardiff. Currently, the service arrives at Cardiff at 07:40, giving those who start work by 08:00 enough time to travel by foot or by bus to their place of work in Cardiff. The proposed changes see this service arriving at Cardiff at 08:01, rendering the service useless to almost all passengers who currently board the train West of Cardiff. For those who have the option, Arriva Trains Wales will lose customers to the First Great Western Service leaving Swansea at 06:58, however this service is not available to those boarding West of Swansea or at Pyle or Llanharan. However, since the First Great Western Service arrives at Cardiff 12 minutes later than current Arriva Trains Wales service, this solution may not be viable even for those who have the option of using it. There is further outrage amongst customers regarding the following issues: Trains stopping less frequently at stations in West Wales on some services The 16:04 train from Cardiff to Milford Haven (used on the way home by many commuters who catch the service arriving at Cardiff at 07:40) will be leaving at 15:54 after the timetable changes. -
Deadline for the May Issue of Frodsham Life Is April 23
April 2019 www.frodshamlife.co.uk 1 2 www.frodshamlife.co.uk April 2019 Editor Gary Skentelbery Production Paul Walker Editor’s Comment Advertising NOMINATIONS for the local CCTV, the neighbourhood plan, Advertising elections on May 2 had still etc – will, for a while, give local James Balme Nick White not closed when this issue of electors something other than Brexit TonyTelephone Record Frodsham Life went to press, to focus on. Freephone01928 761045 so we are not able to provide Or it could be that dismay over every area, resulting in committed you with a list of candidates 0800Sales: 955option 5247 1 the long-running Brexit shambles councillors representing every Editorial: option 2 standing for election to either will have led to disillusionment Editorial the Town Council or Cheshire among the electorate sweeping ward. Artwork: option 3 Frodsham is a great place to live, Accounts:01925 623631 option 4 West and Chester Council. down to grassroots level and work and it deserves a committed GeneralEmail Enquiries: option 0 Nominations closed at 4pm on resulting in a low turnout. info@warrington- Wednesday April 3 and we would We hope not. We would like team of councillors to ensure it worldwide.co.ukEmail recommend readers anxious to to see meaningful contests in continues to be so. [email protected] find out who they will be able to Websites vote for to visit our website, www. www.culchethlife.comWebsites frodshamlife.co.uk for the very www.frodshamlife.co.ukwww.culchethlife.com latest information. www.lymmlife.co.ukwww.frodshamlife.co.uk In this column a month ago Deadline for the May www.warrington.tvwww.lymmlife.co.uk we expressed the hope that there www.warrington-www.warrington.tv would be plenty of people coming worldwide.co.ukwww.warrington- forward to seek election. -
Core Strategy for Wirral – Proposed Delivery Framework – Draft for Consultation
Core Strategy for Wirral – Proposed Delivery Framework – Draft for Consultation A comprehensive delivery framework will need to be agreed as the preparation of the Core Strategy progresses. This section sets out a preliminary list of some existing proposals and provides an indication of the how some of the elements identified in the Preferred Options Report are likely to be delivered over the plan period. A more detailed programme will need to be included in the next stage of the Core Strategy: Settlement Area 1 - Wallasey Expected Item Delivery Partner(s) Evidence Timescale Transport • Wirral Council Bidston Moss Viaduct – works to resolve serious structural Completion due • Highways Agency Regional Funding Allocation deficiencies on April 2012 • Merseytunnels Ongoing (2009) Wallasey Cycle Network Wirral Council Wirral LTP Programme – 2011/12 Utilities Major pumping station at Scotts Field Seacombe, detention tanks at Coastal Drive and Tower Grounds in New Brighton United Utilities n/a n/a and a reservoir at Gorse Hill Education, Health and Community Park Primary School Wallasey – 12 classroom primary Feb 2010 – Dec Wirral Council Primary Capital Wirral Council school plus nursery 2010 Programme Green Infrastructure • Newlands • Forestry Cross Lane Landfill Restoration Completed Newlands 1 Programme Commission • Wirral Council Page 1 of 31 Core Strategy for Wirral – Proposed Delivery Framework – Draft for Consultation Expected Item Delivery Partner(s) Evidence Timescale Housing Land Rear of 11-25 Mossy Bank, 26-42 Guildford Street & Cosmopolitan -
1. Rail Staff Survey: Respondent Demographics 1.1
PROTECTIVE MARKING: NOT PROTECTIVELY MARKED BRITISH TRANSPORT POLICE Appendix A: Demographic data 1. RAIL STAFF SURVEY: RESPONDENT DEMOGRAPHICS 1.1. 20,000 surveys were distributed of which over 2,000 surveys have been returned representing a return of 10.7%. 1.2. In total 2,142 rail staff took part in the survey: 1,148 respondents train crew and 994 station staff respondents. 1.3. The majority of respondents were male, and described their ethnicity as ‘White’ for both datasets. 1.4. Within BME respondents the three largest groups were African (1%), Pakistani (1%) and Indian (1%) for train crew; and Indian (2%), African (2%) and Caribbean (2%) for station staff. Train Crew Station Staff Respondents 1148 994 Gender (%) Male 83.0 69.0 Female 16.0 22.0 Undisclosed 1.0 9.0 Ethnicity (%) White 90.0 80.0 BME 4.0 9.0 Undisclosed 3.0 11.0 Disability (%) Disability 1.0 3.0 Table 1 Demographics data 1.5. There was a good spread of respondents from different job roles (see Tables 2 and 3). Conductors made up the largest percentage of train crew respondents (66%) followed by Drivers/Shunters (22%). Sales point/Ticket sales staff made up the largest percentage of station staff respondents (35%) followed by Platform staff (24%) and Customer service (23%). 1.6. The train crew sample was made up of respondents from 18 TOCs (see Table 4); the highest number of respondents work for Northern Rail (17%), First Great Western (15%), South West Trains (13%) and SouthEastern (10%). 1 PROTECTIVE MARKING: NOT PROTECTIVELY MARKED BRITISH TRANSPORT POLICE Appendix A: Demographic data Train Crew Job Roles (%) Station Staff Job Role (%) Conductor/Guard 65.5 Sales point/Ticket sales 34.6 Driver/Shunter 22.4 Platform Staff 24.2 Catering/On board services 5.3 Customer Service 23.1 Ticket inspection/Ticket sales 2.8 Train Dispatch 19.6 Managerial 2.3 Revenue protection 6.9 Revenue protection 2.0 Gateline Staff 6.9 Security 0.5 Managerial 5.3 Cleaning/Train environment 0.3 Security 4.2 Other 0.3 Cleaning/Train environment 3.8 Other 3.2 Maintenance 1.2 Table 2 Job role N.B.