Estimation of Pasture Productivity in Mongolian Grasslands

Total Page:16

File Type:pdf, Size:1020Kb

Estimation of Pasture Productivity in Mongolian Grasslands Full Paper J. Agric. Meteorol. (農業気象) 66 (1): 31-39, 2010 Estimation of pasture productivity in Mongolian grasslands: field survey and model simulation Tserenpurev BAT-OYUN†, Masato SHINODA, and Mitsuru TSUBO (Arid Land Research Center, Tottori University, Hamasaka, Tottori, 680–0001, Japan) Abstract The Mongolian economy depends critically on products of range-fed livestock. Pasture is the major food source for livestock grazing, and its productivity is strongly affected by climatic variability. Direct measurement of pasture productivity is time-consuming and difficult, especially in remote areas of a large country like Mongolia with sparse spatial distribution of pasture monitoring. Therefore, model- ing is a valuable tool to simulate pasture productivity. In this study, we used a remote sensing-based production efficiency model, that is, the Carnegie Ames Stanford Approach (CASA) model, to estimate pasture productivity in three main vegetation zones of Mongolia; desert steppe, steppe and forest steppe. The present study aimed to explore climatic and grazing effects on grassland productivity in Mongolian grasslands during 2005-2007, using ground-based measurements and simulation model outputs. The ground measurements showed that grazing caused a significant decrease in measured aboveground phytomass and plant height. Simulation results demonstrated that the highest net primary productivity (NPP) of 83.2 gC/m2 and the lowest NPP of 12.6 gC/m2 over the growing season (April-September) occurred at Darkhan (steppe) and Mandalgovi (desert steppe), respectively. Moreover, the comparison of temperature and water stresses on pasture productivity indicated that water stress was stronger down- regulator of NPP, verifying that drought is the major concern of pasture production. Based on the comparison between the measurements and simulation, the ratio of aboveground NPP to belowground NPP in the Mongolian perennial grasslands was estimated as 1:1.5. Key words: Aboveground phytomass, Drought, Grazing, Net primary productivity, Water stress. Ni, 2003; Shinoda et al., 2007; Suzuki et al., 2007; 1. Introduction Zhang et al., 2005). Pastoral animal husbandry plays a key role in the Continuous monitoring and modeling of grasslands' Mongolia's economy, producing 40% of gross domestic production can provide information on feed availability, product. Production and growth of livestock are greatly efficient management of livestock grazing, and natural dependent on the productivity of natural grasslands, hay preparation for winter; this information is very which cover 80% of the country (Batima and Dagva- useful for herders and decision-makers. However, due dorj, 2000). Currently, about half the population is to the large area of Mongolia, it is difficult to monitor dependent on livestock production for their livelihood vegetation conditions widely, using field measurements (Johnson et al., 2006). The production of grassland at specific locations, which makes it difficult to gain is regulated by many factors, such as precipitation, a comprehensive understanding of how the grasslands temperature, solar radiation, soil nutrient availability, respond to factors such as climate, grazing, fire and and grassland utilization and management. Water stress management. Modeling is an essential approach to is the most limiting factor for dryland vegetation due to improve our understanding of the complex dynamics of the region's low precipitation and high evapotranspira- ecosystems such as grasslands. In Mongolia, progress tion (Miyazaki et al., 2004; Munkhtsetseg et al., 2007; in estimating and modeling the carbon cycle of grass- land ecosystems has been seriously limited due to the Received; April 13, 2009. scarcity of observational data for the parameterization Accepted; September 9, 2009. and validation of model and the substantial uncertain- †E-mail: [email protected] 31 J. Agric. Meteorol. (農業気象) 66 (1), 2010 ties in net primary productivity (NPP) estimations pasture productivity in Mongolia, using ground-based based on field measurements. measurements and the CASA simulation model based Nakano et al. (2008) measured CO2 fluxes both on satellite data. inside and outside of a site of drought experiment that 2. Materials and Methods was conducted at Bayan Unjuul in Mongolia (Shinoda et al., 2009), using a closed-chamber technique. They 2.1 Study sites demonstrated that the reduction of gross primary Fig. 1 illustrates four study sites; Mandalgovi production per unit aboveground biomass (GPP/AGB) (45.77°N, 106.28°E, desert steppe), Bayan Unjuul was caused by a combination of high vapor pressure (47.04°N, 105.95°E, steppe), Darkhan (49.47°N, deficit and low soil moisture. Bolortsetseg (2006) 105.98°E, steppe), and Bulgan (48.80°N, 103.55°E, analyzed the effects of climate change on AGB forest steppe) located in three vegetation zones of in Mongolia using the Century model (namely, a Mongolia. In general, during the growing season (April- model designed to simulate carbon, nutrient, and water September), precipitation decreases and temperature dynamics for different types of ecosystems including increases from the north to south, resulting in warmer grasslands). The sensitivity analysis indicated that AGB and more arid conditions in the south. The growing was more sensitive to changes in precipitation than season for the grasslands is very short and is limited those in temperature. by low temperature and precipitation. In particular, A number of models have been developed to simulate moisture availability is generally considered the most productivity of different ecosystems; among these important determinant for vegetation growth and the we selected the Carnegie Ames Stanford Approach large seasonal variations in precipitation are clearly (CASA) model, because it does not include complex reflected in plant growth (Gunin et al., 1999). ecophysiological parameters. The NPP component of Average (1995-2007) air temperature at the Institute the CASA model is based on the concept of radiation of Meteorology and Hydrology (IMH) station was use efficiency (RUE). In origin, Monteith (1972) 14.4℃ at Mandalgovi, 14.3℃ at Darkhan, 13.8℃ at explored that primary production was linearly related Bayan Unjuul and 11.8℃ at Bulgan during the growing to the amount of radiation received by plant stand. season. Average precipitation during the growing Later, this approach was theoretically and experimen- season was low at Mandalgovi (124 mm) and Bayan tally strengthened (Monteith, 1977); as a result, it has Unjuul (135 mm) and high at Darkhan (268 mm) and become the most commonly used method of analyzing Bulgan (291 mm). It should be noted that the study and modeling plant growth. It has been found that a years (2005-2007) were among the driest years during remote-sensing-based vegetation index is an indicator 1995-2007 for the study sites except for Darkhan. of absorbed photosynthetically active radiation (APAR) Plant composition varies among the different by green vegetation (Sellers, 1987; Sellers et al., 1992; ecosystems. The Bulgan and Darkhan sites are co- Goward and Huemmrich, 1992). In the CASA model, dominated by Stipa krylovii, Agropyron cristatum, the fraction of incoming photosynthetically active radia- Cleistogenes squarrosa, Leymus chinensis, and Carex tion (PAR) intercepted by green vegetation (FPAR) is spp., while Mandalgovi is co-dominated by Stipa estimated from normalized difference vegetation index (NDVI) data (Potter et al., 1993). Several studies have evaluated the performance of the CASA model for various regions. For instance, the CASA model successfully simulated the spatial and temporal distribution of NPP in northern China using Moderate Resolution Imaging Spectroradiometer (MODIS) data (Yuan et al., 2006), interannual variations of cropland NPP in the United States (Lobell et al., 2002), and maize production across China (Tao et al., 2005). However, there have been very few attempts to apply this kind of model to Mongolia. Given this background, Fig. 1. Vegetation zone map of Mongolia. Study site we aim to investigate climatic and grazing effects on locations are shown as black dots. 32 T. Bat-Oyun et al. : Estimation of pasture productivity in Mongolian grasslands krylovii, Cleistogenes squarrosa, Allium polyrrhizum, hereinafter called height. and Artemisia frigida (Bolortsetseg et al., 2002). Sixteen-day composite MODIS NDVI images with The Bayan Unjuul site is co-dominated by perennial the highest resolution (250 m×250 m) were obtained grasses such as Stipa krylovii, Agropyron cristatum, from the Earth Observation System data gateway and Cleistogenes squarrosa, by forbs such as Artemisia (https://wist.echo.nasa.gov/api/). The products were adamsii and Chenopodium aristatum, and by small corrected atmospherically, considering ozone absorp- shrubs (Caragana spp.) (Shinoda et al., 2009). tion and molecular scattering. 2.2 Data 2.3 Model description Data used for this study were provided by IMH The CASA production-efficiency model was used of Mongolia. The data included climate (temperature, to simulate NPP (gC/m2/month), which downregulates precipitation, and solar radiation), soil moisture, photosynthetic efficiency in response to adverse soil texture, and aboveground phytomass (AGP) temperature and dry soil conditions (Potter et al., 1993; in no grazing plots (fenced exclosures to prevent Field, 1995). The model is based on the RUE model livestock grazing) and grazing plots (unfenced areas) described by Monteith (1972, 1977). NPP is estimated
Recommended publications
  • Estimation of Pasture Productivity in Mongolian Grasslands: Field Survey and Model Simulation
    See discussions, stats, and author profiles for this publication at: https://www.researchgate.net/publication/240797895 Estimation of pasture productivity in Mongolian grasslands: Field survey and model simulation Article in Journal of Agricultural Meteorology · January 2010 DOI: 10.2480/agrmet.66.1.6 CITATIONS READS 11 336 3 authors: Tserenpurev Bat-Oyun Masato Shinoda Institute of Meteorology, Hydrology and Environment Nagoya University 14 PUBLICATIONS 95 CITATIONS 132 PUBLICATIONS 1,859 CITATIONS SEE PROFILE SEE PROFILE Mitsuru Tsubo Tottori University 116 PUBLICATIONS 2,727 CITATIONS SEE PROFILE Some of the authors of this publication are also working on these related projects: Migration ecology and conservation of Mongolian wild ungulates View project Sand fluxes and its vertical distribution in the southern Mongolia: A sand storm case study for 2011 View project All content following this page was uploaded by Tserenpurev Bat-Oyun on 06 January 2014. The user has requested enhancement of the downloaded file. Full Paper J. Agric. Meteorol. (農業気象) 66 (1): 31-39, 2010 Estimation of pasture productivity in Mongolian grasslands: field survey and model simulation Tserenpurev BAT-OYUN†, Masato SHINODA, and Mitsuru TSUBO (Arid Land Research Center, Tottori University, Hamasaka, Tottori, 680–0001, Japan) Abstract The Mongolian economy depends critically on products of range-fed livestock. Pasture is the major food source for livestock grazing, and its productivity is strongly affected by climatic variability. Direct measurement of pasture productivity is time-consuming and difficult, especially in remote areas of a large country like Mongolia with sparse spatial distribution of pasture monitoring. Therefore, model- ing is a valuable tool to simulate pasture productivity.
    [Show full text]
  • Appendix-3 Investigation Schedule Investigation Schedule (Master Plan Study for Rural Power Supply by Renewable in Mongolia)
    Appendix-3 Investigation Schedule Investigation Schedule (Master Plan Study for Rural Power Supply by Renewable in Mongolia) 123456789101112131415161718192021222324252627282930 Speciality Name 1998 1999 2000 910111212345678910111212345678910111212 (9) (75) (2) (28) (15) (60) (30) (15) (30) (15) (30) (12) Team Leader/ Yoshitomo WATANABE 1 Power Supply Planner 3 16 26 12 12 10 15 29 25 10 28 9 Demand Estimtor/ (9) (75) (30) (15) (60) (30) (15) (30) (15) (30) (12) 2 Power Supply System Tomoyasu FUKUCHI Specialist 3 16 26 12 12 10 15 29 25 10 28 9 (3) (69) (24) (15) (60) (21) (15) (24) (15) (15) (12) 3 Solar Power Planner Deepak B.BISTA 9 16 26 12 12 10 15 29 25 10 28 9 (3) (69) (24) (15) (60) (21) (15) (24) (15) (15) (12) 4 Wind Power Planner Tsutomu DEI 9 16 26 12 12 10 15 29 25 10 28 9 Tariff Analyst/ (3) (66) (24) (45) (21) (24) (15) (27) (12) 5 Economic and Hiroshi NISHIMAKI Financial Analyst 3 7 25 9 25 10 28 9 Social and (61) (24) (8) (45) (21) (15) (24) (15) (21) (12) Kiyofumi TANAKA 6 Organization Analyst 17 16 26 5 25 9 15 29 25 10 28 9 Appendix-3 (75) (60) (12) Kazuyuki TADA/ 7 Coordinator Norio UEDA 316 12 10 28 9 Investigation Sched ▲ ▲ ▲ ▲ ▲ ▲ Repors Repors Inception Report Progress Report 1 Progress Report 2 Interim Report Draft Final Report Final Report 910111212345678910111212345678910111212 Legend : In Mongolia In Japan u The Master Plan Study for Rural Power Supply by Renewable Energy in Mongolia The First Site Investigation Schedule No.
    [Show full text]
  • Infrastructure Strategy Review Making Choices in Provision of Infrastructure Services
    MONGOLIA Infrastructure Strategy Review Making Choices in Provision of Infrastructure Services S. Rivera East Asia & Pacific The World Bank Government of Mongolia: Working Group Technical Donors Meeting October, 2006. 1 Mongolia: Infrastructure Strategy The Process and Outputs Factors Shaping Infrastructure Strategy Demand Key Choices to discuss this morning 2 Process and Outcome The Process – An interactive process, bringing together international practices: Meeting in Washington, March 2005. Field work in the late 2005. Preparation of about 12 background notes in sector and themes, discussed in Washington on June 2006. Submission of final draft report in November, 2006 Launching of Infrastructure Strategy report in a two day meeting in early 2007. Outcome A live document that can shape and form policy discussions on PIP, National Development Plan, and Regional Development Strategy….it has been difficult for the team to assess choices as well. 3 Factors Shaping the IS • Urban led Size and Growth of Ulaanbaatar and Selected Aimag (Pillar) Centers Size of the Circle=Total Population ('000) Infrastructure 6% 5% 869.9 Investments ) l 4% ua nn 3% a Ulaanbaatar (%, 2% h t Darkhan w Erdenet o 1% r G n 0% o i -10 0 10 20 30 40 50 60 70 80 at l -1% Choibalsan Kharkhorin opu Ondorkhaan P -2% Khovd Uliastai -3% Zuunmod -4% Share of Total Urban Population (%) 4 Factors Shaping the IS: Connectivity, with the World and in Mongolia Khankh Khandgait Ulaanbaishint Ereentsav Khatgal Altanbulag ULAANGOM Nogoonnuur UVS KHUVSGUL Tsagaannuur ÒýñTes
    [Show full text]
  • Population and Economic Activities of Ulaanbaatar
    POPULATION AND ECONOMIC ACTIVITIES OF ULAANBAATAR Bayanchimeg Chilkhaasuren, Head of Statistics Department UB. Batbayar Baasankhuu, Chief of Division Economic statistics of Statistics Department UB. POPULATION Urbanization in Mongolia has developed sharply since the second half of the last century and the percentage of people in urban areas from the total population has been increasing. According to the census conducted in 2010, two of every three citizens in Mongolia live in urban areas. Around 44.0% of the total population of Mongolia lived in urban areas in 1969. However, this number increased to 67.9% in 2010. This increase of population of the urban areas of Mongolia within the last decade is approximate to the population increase in 30 years before this decade. According to the urbanization of the population, the majority of people are living in Ulaanbaatar city and Central region. For instance: Darkhan-uul, Dornogobi and South-Gobi where there is better infrastructure systems such as the development of mining and other services and they have tar roads and railways as well as bordering China is also a key of the population attraction. The western area of Mongolia is not under-populated and urbanization is not at an intensive level. The main attractions of urban areas are that the development of social sectors such as production, services, education and health care in Ulaanbaatar city and province centers are better than in rural areas. Therefore, many people are moving to urban areas, which increases the size of the urban population from the total population of Mongolia. The majority of the Mongolian population, around 64.2%, is living only in Ulaanbaatar city.
    [Show full text]
  • (Additional Financing): Project Administration Manual
    Additional Financing for the Southeast Gobi Urban and Border Town Development Project (RRP MON 42184-027) Project Administration Manual Project Number: 42184-027 Loan Number: 3388-MON September 2018 Mongolia: Additional Financing for Southeast Gobi Urban and Border Town Development Project ABBREVIATIONS ADB – Asian Development Bank ADF – Asian Development Fund DMF – design and monitoring framework EIA – environmental impact assessment EMP – environmental management plan IEE – initial environmental examination MCUD – Ministry of Construction and Urban Development MOF – Ministry of Finance NCB – national competitive bidding PAM – project administration manual PMU – project management unit PPMS – project performance management system PUSO – public utility service organization QCBS – quality- and cost-based selection RRP – report and recommendation of the President SGAP – social and gender action plan SOE – statement of expenditure TOR – terms of reference TSA – Treasury single account WSRC – Water Services Regulatory Commission WWTP – wastewater treatment plant CONTENTS Page I. PROJECT DESCRIPTION 1 A. Rationale 1 B. Impact and Outcome 4 C. Outputs 5 II. IMPLEMENTATION PLANS 6 A. Project Readiness Activities 6 B. Overall Project Implementation Plan 6 III. PROJECT MANAGEMENT ARRANGEMENTS 7 A. Project Implementation Organizations: Roles and Responsibilities 8 B. Key Persons Involved in Implementation 10 C. Project Organization Structure 11 IV. COSTS AND FINANCING 12 A. Cost Estimates 12 B. Key Assumptions 12 C. Revised Project and Financing Plan 13 D. Detailed Cost Estimates by Expenditure Category 15 E. Allocation and Withdrawal of Loan Proceeds 16 F. Detailed Cost Estimates by Financier ($ million) 17 G. Detailed Cost Estimates by Output ($ million) 18 H. Detailed Cost Estimates by Year ($ million) 19 I. Contract and Disbursement S-Curve 20 J.
    [Show full text]
  • MONGOLIA: Systematic Country Diagnostic Public Disclosure Authorized
    MONGOLIA: Systematic Country Diagnostic Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Acknowledgements This Mongolia Strategic Country Diagnostic was led by Samuel Freije-Rodríguez (lead economist, GPV02) and Tuyen Nguyen (resident representative, IFC Mongolia). The following World Bank Group experts participated in different stages of the production of this diagnostics by providing data, analytical briefs, revisions to several versions of the document, as well as participating in several internal and external seminars: Rabia Ali (senior economist, GED02), Anar Aliyev (corporate governance officer, CESEA), Indra Baatarkhuu (communications associate, EAPEC), Erdene Badarch (operations officer, GSU02), Julie M. Bayking (investment officer, CASPE), Davaadalai Batsuuri (economist, GMTP1), Batmunkh Batbold (senior financial sector specialist, GFCP1), Eileen Burke (senior water resources management specialist, GWA02), Burmaa Chadraaval (investment officer, CM4P4), Yang Chen (urban transport specialist, GTD10), Tungalag Chuluun (senior social protection specialist, GSP02), Badamchimeg Dondog (public sector specialist, GGOEA), Jigjidmaa Dugeree (senior private sector specialist, GMTIP), Bolormaa Enkhbat (WBG analyst, GCCSO), Nicolaus von der Goltz (senior country officer, EACCF), Peter Johansen (senior energy specialist, GEE09), Julian Latimer (senior economist, GMTP1), Ulle Lohmus (senior financial sector specialist, GFCPN), Sitaramachandra Machiraju (senior agribusiness specialist,
    [Show full text]
  • Southeast Gobi Urban and Border Town Development Project
    Report and Recommendation of the President to the Board of Directors Project Number: 42184-027 Loan Number: 3388-MON September 2018 Proposed Loan for Additional Financing Mongolia: Southeast Gobi Urban and Border Town Development Project Distribution of this document is restricted until it has been approved by the Board of Directors. Following such approval, ADB will disclose the document to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (as of 23 August 2018) Currency unit – togrog (MNT) MNT1.00 = $0.000405 $1.00 = MNT2,467.00 ABBREVIATIONS ADB – Asian Development Bank IFAS – integrated fixed-film activated sludge m3 – cubic meter MCUD – Ministry of Construction and Urban Development PAM – project administration manual PMU – project management unit PUSO – public utility service organization SGAP – social and gender action plan TA – technical assistance WWTP – wastewater treatment plant GLOSSARY aimag – provincial administrative unit aimag center – aimag capital ger – traditional felt tent khural – citizens' representative committee soum – administrative subunit of aimag NOTE In this report, "$" refers to United States dollars. Vice-President Stephen Groff, Operations 2 Director General Amy S.P. Leung, East Asia Department (EARD) Director Sangay Penjor, Urban and Social Sectors Division, EARD Team leader Antonio Ressano Garcia, Principal Urban Development Specialist, EARD Deputy team leader Tuul Badarch, Senior Project Officer (Infrastructure), EARD Team members Baurzhan Konysbayev, Principal
    [Show full text]
  • Possibility of Mongolia to Regional Integration North East Asia Based on Sustainable Urban Development
    Possibility of Mongolia to regional integration North East Asia based on sustainable urban development Eleventh Intergovernmental Regional Environmentally Sustainable Transport (EST) Forum in Asia S.Davaanyam, Head of Human settlement and Regional Study and Planning, CDC, MCUD Ulaanbaatar 2018.10.02 Main development indicators of NEA countries GDP, by billion US$ Population, Land, by GDP per Annual Countries by millions, million km2, capita, US$, 2007 2016 growth, % 2016 2016 2016 2007/2016 Russia 146,8 17,098 1299,7 1283,2 -0,1 8748 Far East Russia 6,2 6,169 89,5 1005 Siberia 19,3 5,145 169,6 3743 China 1373,5 9,563 3552,2 11199,1 21,5 8123 Japan 126,7 0,378 4515,3 4939,4 0,9 38894 South Korea 51,4 0,100 1122,7 1411,2 2,6 27539,0 North Korea 25,1 0,120 25,000 25,0 0,0 1000 Taiwan, Chinese 23,5 0,036 490 529,6 0,8 22598 Mongolia 3,1 1,564 4,235 11,2 16,4 3686 Hong Kong, China 7,3 0,003 211,6 320,7 5,2 43681 total NEA 1636,056 28,862 11220,74 19719,4 7,6 12,053 Source: World Bank. 2017. World Development Indicators Trade is the most fundamental of cooperation for Mongolia. NEA countries role on the world and regional intra-trade, 2016 Source: ITC (International trade Centre). 2017. Trade statistics of world countries Total trade share in the Regional intra-trade share, % world, % Export Import Total share of share of share of Share Share Share World country's country's country's in NEA in NEA in NEA 100 100 100 export to import trade export import trade NEA from NEA with NEA China 13.2 9.9 11.5 28.2 31.1 29.5 38.1 35.6 36.9 Russia 1.8
    [Show full text]
  • Part I Master Plan
    PART I MASTER PLAN CHAPTER 1 INTRODUCTION I MASTER PLAN PART I MASTER PLAN CHAPTER 1 INTRODUCTION 1.1 Background of the Study In Mongolia some 50% of the total population of about 2.4 million are nomadic families. For the nomadic families Sum centers are key places for supplying their vital goods, and also for receiving public services such as administration, medical care, education, etc. As of November 1997, the electric power at 117 out of 314 Sum centers in total in Mongolia is being supplied from the national power transmission network. At the remaining 197 Sum centers, the electric power is supplied by the diesel engine generators by Sum center independently. Most of these diesels generating facilities were manufactured during the former Soviet Union era and installed long ago from 1963 to 1990. During the Social Republic era of the country, Mongolia depended on the Soviet Union for the supply of spare parts necessary for maintenance of the generating equipment and technical guidance. Due to the corruption of the Soviet Union's economy in 1991 and associated transition to a market economy, the following four factors caused troubles to the operation and maintenance of the Sum's generating facilities, i.e. (1) the lack of business operating senses, (2) the interruption of spare parts supply, (3) the lack of technical capability and (4) shortage of management budget. The operation of much equipment has been obliged to be kept stopped after failure, as operators cannot repair them. The affected generation quantity, and aggravated the conditions of daily lives of people in Sum center and caused serious effects to the socio-economic activities of the Sum centers.
    [Show full text]
  • Build? “Eco-Friendly” in Mongolia
    WHAT WILL YOU BUILD? VOLUNTEER. BUILD “ECO-Friendly” IN MONGOLIA IN 2012 BUILD DATES 1st July - 7th July 2012 About Mongolia Flanked by giant neighbors Russia and China, Mongolia is a vast country with wide open steppes, deert lands and snow capped mountains. Known as the Land of the Blue Sky, this is a country with rich traditions and a cultural legacy going back to Chinggis (Genghis) fter the success of the first BLUE SKY BUILD in 2010, Habitat for Humanity Khan and beyond. Mongolia is also a Mongolia is once again bringing together corporations, individu als and part- country in transition. The three million ner organizations to build homes with local families in need. Next summer, inhabitants, many of whose lives still volunteersA from all over the world will join to gether to shine a light on the scourge of revolve round nomadic herding, substandard housing and demonstrate what can be accomplished when families, com- today battle more than the hardships of munities and nations come together to build a future where every man, woman and brutal weather conditions and extreme child has a decent place to live. temperatures. Sincethe fall of the Soviet- style communism in 1990, the planned BLUE SKY BUILD 2012 emphasizes building environmentally-friendly, energy-effi- economy has givenway to a market cient homes. Structures are designed take less wood to build. More importantly, the economy. Investors now flock to the homes use less fossil fuels to keep warm in the harsh Mongolian winters. That means mineral wealth; tourists to the natural reduced carbon and toxic emissions.
    [Show full text]
  • Country Analysis Paper <Mongolia>
    Fourth Regional 3R Forum in Asia “3Rs in the Context of Rio+20 Outcomes – The Future We Want” Ha Noi, Viet Nam, 18-20 March 2013 Country Analysis Paper (Draft) <Mongolia > ------------------------------------- This country analysis paper was prepared by Mongolia as an input for the Fourth Regional 3R Forum in Asia. The views expressed herein do not necessarily reflect the views of the United Nations. MONGOLIA: Waste Management Country Report The Government of Mongolia attaches a high priority to sustainable development and low carbon green growth. About 2 percent of gross domestic product (GDP) is allocated annually for the environmental protection including energy efficiency, sustainable use of resources, and reduction of environmental pollution and promotion of environmental public education programs. In 2011, GDP was 10.8 billion USD. Even with a population that accounts for only 0.04% of the total world population, Mongolia is a leader in economic growth. Mongolia experienced the highest growth rate in GDP in 2011 recording over 17%. This is a reflection of the growing demand for commodities like coal, copper and gold, all of which are abundantly available in Mongolia. Currently 58% of the total of Mongolian revenue comes from the natural resource sectors. Mongolia is one of the most sparsely populated countries in the world with 1.67 persons per square kilometer. Yet, the population is also remarkably urbanized. According to 2010 population census, the total population is 2.7 million. About 60 percent of the population lives in urban areas. The Capital city of Ulaanbaatar alone has over 1 million people. There are few cities including Darkhan and Erdenet have large number of population compare to other major cities.
    [Show full text]
  • Adb Ta 8727 Reg
    ADB TA 8727 REG CAREC: Study for Power Sector Financing Road Map Mobilizing Financing for Priority Projects Mongolia September 2016 This consultant's report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. List of Abbreviations List of Abbreviations ADB Asian Development Bank ADO Asian Development Outlook AT&C Aggregate Technical & Commercial Losses AuES Altai-Uliastai Energy System BOO Build-Own-Operate BOOT Build-Own-Operate-Transfer BOT Build-Operate-Transfer CAIFI Customer Average Interruption Frequency Index CAPS Central Asian Power System CAREC Central Asia Regional Economic Cooperation CES Central Energy System CHP Combined Heat and Power CIS Commonwealth of Independent States CRET Central Regional Electricity Transmission Company CTG Coal-to-Gas CTL Coal-to-Liquid DBM Development Bank of Mongolia DBOT Design-Build-Operate-Transfer EAP Energy Action Plan EBRD European Bank for Reconstruction and Development ECA Export Credit Agency E-CASAREM East-Central-South Asia Regional Electricity Market EES Eastern Energy System ERC Energy Regulatory Commission ES Energy System ESCC Energy Sector Coordinating Committee ESO Energy Supplying Organizations FDI Foreign Direct Investment FSL Fiscal Stability Law FSU Former Soviet Union ADB TA 8727 REG: Study for a Power Sector Financing Road Map within Central Asia Regional Economic Cooperation - Final Report: Mongolia PwC 2 List of Abbreviations GDP Gross Domestic Product GOM Government of Mongolia G-T-D
    [Show full text]