Flameproof & Equipment Safety (Fes) (Formerly Flp)

Total Page:16

File Type:pdf, Size:1020Kb

Flameproof & Equipment Safety (Fes) (Formerly Flp) FLAMEPROOF & EQUIPMENT SAFETY (FES) (FORMERLY FLP) (FY: 2019-2020) SL TESTING CELL CLIENT NAME DATE OF No. CODE REPORT DESPATCHED 01 FLP/01/19-20 Pyrotech Electronics Pvt Ltd, Udaipur 12-07-2019 FLP/01A/19-20 Pyrotech Electronics Pvt Ltd, Udaipur 06-08-2019 02 FLP/02/19-20 Haz-Loc Electrical Equipments, Gujarat 10-06-2019 03 FLP/04/19-20 Kanhaiya Brass Industries, Jamnagar 30-05-2019 FLP/04A/19-20 Kanhaiya Brass Industries, Jamnagar 30-05-2019 FLP/04B/19-20 Kanhaiya Brass Industries, Jamnagar 01-05-2019 FLP/04C/19-20 Kanhaiya Brass Industries, Jamnagar 07-05-2019 FLP/04D/19-20 Kanhaiya Brass Industries, Jamnagar 07-05-2019 04 FLP/05/19-20 Ex-Technologies, Anand, Guj. 14-08-2019 05 FLP/07/19-20 Prateek Explosion Proof Pvt. Ltd, Thane 10-04-2019 FLP/07A/19-20 Prateek Explosion Proof Pvt. Ltd, Thane 10-04-2019 FLP/07B/19-20 Prateek Explosion Proof Pvt. Ltd, Thane 10-04-2019 FLP/07C/19-20 Prateek Explosion Proof Pvt. Ltd, Thane 12-04-2019 FLP/07D/19-20 Prateek Explosion Proof Pvt. Ltd, Thane 12-04-2019 FLP/07E/19-20 Prateek Explosion Proof Pvt. Ltd, Thane 10-04-2019 FLP/07F/19-20 Prateek Explosion Proof Pvt. Ltd, Thane 10-04-2019 FLP/07G/19-20 Prateek Explosion Proof Pvt. Ltd, Thane 12-04-2019 FLP/07H/19-20 Prateek Explosion Proof Pvt. Ltd, Thane 12-04-2019 FLP/07(I)/19-20 Prateek Explosion Proof Pvt. Ltd, Thane 12-04-2019 FLP/07J/19-20 Prateek Explosion Proof Pvt. Ltd, Thane 15-04-2019 FLP/07K/19-20 Prateek Explosion Proof Pvt. Ltd, Thane 15-04-2019 FLP/07L/19-20 Prateek Explosion Proof Pvt. Ltd, Thane 15-04-2019 06 FLP/08/19-20 BCCL, Koyla Bhavan, Dhanbad 25-06-2019 07 FLP/10/19-20 Prompt Engg. Works, Mumbai 20-06-2019 08 FLP/11/19-20 BIS, Raipur Br. Office, Raipur, CG 12-07-2019 09 FLP/12/19-20 Electronic Equipment Mfg. Co., Kolkata 26-04-2019 10 FLP/13/19-20 I-FLP Exposionproof Pvt. Ltd.,Vadodara 17-01-2020 11 FLP/15/19-20 BIS Br. Office, Pune 17-07-2019 12 FLP/16/19-20 Megha Roto-Tech Pvt Ltd, Ahmedabad 31-05-2019 FLP/16A/19-20 Megha Roto-Tech Pvt Ltd, Ahmedabad 31-05-2019 13 FLP/17/19-20 Agnus Lighting Systems Pvt. Ltd, Ankleshwar 10-06-2019 14 FLP/18/19-20 A-Bond Strands, Chennai 09-07-2019 15 FLP/19/19-20 Marathon Electric Motors (India) Ltd, Kolkata 03-05-2019 16 FLP/20/19-20 Flexpro Electricals Pvt Ltd, Navsari, Gujarat 14-05-2019 FLP/20A/19-20 Flexpro Electricals Pvt Ltd, Navsari, Gujarat 21-05-2019 FLP/20B/19-20 Flexpro Electricals Pvt Ltd, Navsari, Gujarat 15-05-2019 FLP/20C/19-20 Flexpro Electricals Pvt Ltd, Navsari, Gujarat 15-05-2019 FLP/20D/19-20 Flexpro Electricals Pvt Ltd, Navsari, Gujarat 14-05-2019 FLP/20E/19-20 Flexpro Electricals Pvt Ltd, Navsari, Gujarat 28-06-2019 FLP/20F/19-20 Flexpro Electricals Pvt Ltd, Navsari, Gujarat 14-05-2019 17 FLP/22/19-20 Kalyani Flameproof Switch Gear Kalyan (East) 10-06-2019 18 FLP/23/19-20 Speed-O-Controls Pvt Ltd, Mumbai 27-06-2019 19 FLP/24/19-20 Sarah Flameproof Control, Thane 18-06-2019 20 FLP/25/19-20 Haz-Loc Electrical Equipments, Gujarat 18-10-2019 FLP/25A/19-20 Haz-Loc Electrical Equipments, Gujarat 25-10-2019 21 FLP/26/19-20 EIP Enviro Level Controls Pvt Ltd , Noida 05-07-2019 22 FLP/27/19-20 Kalyani Flameproof Switch Gear Kalyan (East) 21-05-2019 23 FLP/28/19-20 Baliga Lighting Equipments Pvt Ltd, Chennai 19-12-2019 FLP/28A/19-20 Baliga Lighting Equipments Pvt Ltd, Chennai 12-06-2019 FLP/28B/19-20 Baliga Lighting Equipments Pvt Ltd, Chennai 25-05-2019 24 FLP/29/19-20 Flexpro Electricals Pvt Ltd, Navsari, Gujarat 12-06-2019 FLP/29A/19-20 Flexpro Electricals Pvt Ltd, Navsari, Gujarat 27-06-2019 FLP/29B/19-20 Flexpro Electricals Pvt Ltd, Navsari, Gujarat 27-06-2019 FLP/29C/19-20 Flexpro Electricals Pvt Ltd, Navsari, Gujarat 28-06-2019 25 FLP/32/19-20 Flame Pack,Vasai (E), Palghar 11-06-2019 FLP/32A/19-20 Flame Pack,Vasai (E), Palghar 31-05-2019 26 FLP/34/19-20 I-FLP Exposionproof Pvt. Ltd.,Vadodara 24-07-2019 27 FLP/35/19-20 Rajesh Control System , Palghar 29-08-2019 28 FLP/37/19-20 Super Electrical, Thane 29-11-2019 FLP/37A/19-20 Super Electrical, Thane 14-06-2019 FLP/37B/19-20 Super Electrical, Thane 07-06-2019 29 FLP/38/19-20 NRC Industries Ltd, Amritsar 19-06-2019 FLP/40/19-20 Fainger Engineering , Thane 17-06-2019 FLP/40A/19-20 Fainger Engineering , Thane 17-06-2019 30 FLP/41/19-20 Ideal Lighting Systems Pvt. Ltd.,Ankleshwar 12-07-2019 31 FLP/42/19-20 Flexpro Electricals Pvt Ltd, Navsari, Gujarat 01-07-2019 32 FLP/43/19-20 Shyam Switch Gears Pvt.Ltd.,Mumbai 09-07-2019 FLP/43A/19-20 Shyam Switch Gears Pvt.Ltd.,Mumbai 16-07-2019 FLP/43B/19-20 Shyam Switch Gears Pvt.Ltd.,Mumbai 08-07-2019 FLP/43C/19-20 Shyam Switch Gears Pvt.Ltd.,Mumbai 10-07-2019 33 FLP/44/19-20 Hi-Tech Flameproof Controls, Faridabad 29-07-2019 34 FLP/45/19-20 Spring Technologies LLP, Mumbai 23-08-2019 35 FLP/46/19-20 FCG Flameproof Control Gears Pvt Ltd, 07-06-2019 Mumbai 36 FLP/47/19-20 FCG Flameproof Control Gears Pvt Ltd, 21-06-2019 Mumbai FLP/47A/19-20 FCG Flameproof Control Gears Pvt Ltd, 21-06-2019 Mumbai FLP/47B/19-20 FCG Flameproof Control Gears Pvt Ltd, 24-07-2019 Mumbai FLP/47C/19-20 FCG Flameproof Control Gears Pvt Ltd, 21-06-2019 Mumbai FLP/47D/19-20 FCG Flameproof Control Gears Pvt Ltd, 30-01-2020 Mumbai FLP/47E/19-20 FCG Flameproof Control Gears Pvt Ltd, 19-09-2019 Mumbai 37 FLP/48A/19-20 Flexpro Electricals Pvt Ltd, Navsari, Gujarat 09-07-2019 38 FLP/49/19-20 BCCL,ISO-HQ, Koyla Bhavan, Dhanbad 23-07-2019 39 FLP/50/19-20 Flameproof Equipments Pvt Ltd, Mumbai 24-06-2019 FLP/50A/19-20 Flameproof Equipments Pvt Ltd, Mumbai 26-07-2019 FLP/50B/19-20 Flameproof Equipments Pvt Ltd, Mumbai 21-08-2019 FLP/50C/19-20 Flameproof Equipments Pvt Ltd, Mumbai 31-08-2019 40 FLP/51/19-20 Sait Mine Line Pvt. Ltd.,Cal-33 10-07-2019 41 FLP/52/19-20 Jayashree Electron Pvt. Ltd., Pune 04-10-2019 42 FLP/53/19-20 Uniphos Envirotronic Pvt. Ltd., Valsad 23-08-2019 (Gujarat) 43 FLP/54/19-20 Flamepack, Palghar 12-07-2019 44 FLP/55/19-20 Velvex Engineering Pvt. Ltd., 06-03-2020 FLP/55A/19-20 Velvex Engineering Pvt. Ltd., 12-06-2020 FLP/55B/19-20 Velvex Engineering Pvt. Ltd., 10-02-2020 45 FES /56/19-20 Royal Arc Gastech, Vasai East 25-09-2019 FES /56A/19-20 Royal Arc Gastech, Vasai East 25-09-2019 46 FES /57/19-20 Baliga Lighting Equipments Pvt Ltd, Chennai 26-07-2019 47 FES /58/19-20 Amarama Enggrs. Mumbai 08-08-2019 FES /59/19-20 Hansu Controls, Navi Mumbai 23-12-2019 FES /59A/19-20 Hansu Controls, Navi Mumbai 02-01-2020 FES /59B/19-20 Hansu Controls, Navi Mumbai 14-01-2020 FES /59C/19-20 Hansu Controls, Navi Mumbai 23-12-2019 48 FES /60/19-20 Ambetronics Engineers Pvt Ltd, Mumbai 26-08-2019 49 FES /61/19-20 EIMCO Elecon (India) Ltd, Vallabh Vidyanagar 22-05-2019 50 FES /62/19-20 Voltech Manufacturing Co Ltd, Chennai 08-08-2019 51 FES /64/19-20 Megha Roto-Tech Pvt Ltd, Ahmedabad 23-08-2019 52 FES /65/19-20 Dag Process Instuments Pvt Ltd , Thane 08-08-2019 53 FES /66/19-20 Prompt Engg. Works, Mumbai 07-01-2021 FES /66A/19-20 Prompt Engg. Works, Mumbai 14-02-2020 FES /66B/19-20 Prompt Engg. Works, Mumbai 26-06-2019 FES /66C/19-20 Prompt Engg. Works, Mumbai 06-08-2019 54 FES /68/19-20 Technica , Mumbai 10-10-2019 55 FES /70A/19-20 Marathon Electric Motors (India) Ltd, Kolkata 31-07-2019 56 FES /71/19-20 Speed-O-Controls Pvt Ltd, Mumbai 21-11-2019 57 FES /72/19-20 Amarama Enggrs. Mumbai 23-08-2019 FES /72A/19-20 Amarama Enggrs. Mumbai 23-08-2019 58 FES /73/19-20 Nirmal Industrial Control Pvt Ltd, Thane 26-08-2019 59 FES /76/19-20 Flexpro Electricals Pvt Ltd, Navsari, Gujarat 27-08-2019 FES /76A/19-20 Flexpro Electricals Pvt Ltd, Navsari, Gujarat 05-09-2019 FES /76B/19-20 Flexpro Electricals Pvt Ltd, Navsari, Gujarat 05-09-2019 FES /76C/19-20 Flexpro Electricals Pvt Ltd, Navsari, Gujarat 31-07-2019 60 FES /77/19-20 Flameproof Equipments Pvt Ltd, Mumbai 02-08-2019 FES /77A/19-20 Flameproof Equipments Pvt Ltd, Mumbai 25-10-2019 61 FES /78/19-20 Voltech Manufacturing Co Ltd, Chennai 08-08-2019 FES /78A/19-20 Voltech Manufacturing Co Ltd, Chennai 08-08-2019 FES /78B/19-20 Voltech Manufacturing Co Ltd, Chennai 07-08-2019 62 FES /79/19-20 Agnus Lighting Systems Pvt.
Recommended publications
  • Sl No Area Colliery Name Designation EIS No Mobile No EMAIL ID
    List of Nodal Officers of Public Grievances in BCCL Sl No Area Colliery Name Designation EIS No Mobile No EMAIL ID. 1 Koyla Bhawan HQ S K Singh GM(P)VIP/CPGRAM/Legal 90183591 7547835164 [email protected] 2 Koyla Bhawan HQ B K Das Dy Manager(P)VIP/CPGRAM 90295379 6287695458 [email protected] 3 Sijua SIJUA AREA SUNIL KUMAR CHIEF MGR (PERS.)/APM 90077751 6287697496 [email protected] 4 LOYABAD COLLIERY RAKESH MACHAL MANAGER (PERS.) 90210055 6287697305 [email protected] 5 REGIONAL HOSPITAL LOYABAD RAKESH MACHAL MANAGER (PERS.) 90210055 6287697305 [email protected] 6 SIJUA AREA CHANDAN KR SRIVASTAVA DY.MGR (PERS.) 90293994 9438877160 [email protected] 7 SENDRA BANSJRA COLLIERY NILESH JOSHI DY.MGR (PERS.) 90294224 9470596699 [email protected] 8 BASDEOPUR COLLIERY NILESH JOSHI DY.MGR (PERS.) 90294224 9470596699 [email protected] 9 NICHTPUR COLLIERY MUKESH KUMAR ASSTT.MGER (PERS.) 90311762 6287698708 [email protected] 10 MUDIDIH COLLIERY TARA SINGH MT(HR) 90368085 7310096226 [email protected] 11 KANKANEE COLLIERY TARA SINGH MT(HR) 90368085 7310096226 [email protected] 12 TETULMARI COLLIERY JOHN SINGH ASSTT.MGER (PERS.) 90294950 6287695898 [email protected] 13 Govindpur Area Office Manoj Kumar Saha CM(P)/APM 90042060 6287696411 [email protected] 14 Area Office O P Singh Dy Manager(P) 90292491 6287695891 [email protected] 15 New Akashkinree Colliery Rajesh Kumar Kar Manager(P) 90216466 6287696885 [email protected] 16 Area Office (Legal) Anant mishra Dy Manager(P) 90267659
    [Show full text]
  • Coalmine Methane Under Indian Mining Scenario
    Coalmine Methane Under Indian Mining Scenario CMM under Indian Mining Scenario • In India coal is a reliable energy resource due to limited availability of petroleum and natural gas. • Coal based non-conventional energy is poised to play a major role in India as : 9 It would bridge the gap between demand and availability of conventional energy source 9 International trading scenario in energy sector has been stormy 9 Environmental concerns has given impetus to clean coal technologies. • Under the scenario, Coalbed Methane (CBM) and its subsets like Coal Mine Methane (CMM) and Abandoned Mine Methane (AMM) may find important place in Indian Energy scenario in coming years. CMM under Indian Mining Scenario Development of CBM in India • Out of different sub-sets of Coalbed Methane (CBM), CBM from the deep lying coal deposits (VCBM) has been pursued. • So far 16 Coalbed Methane (VCBM) blocks have been allotted under CBM policy of GoI covering an area of 7807 sq. km and prognosticated CBM resource of 825 BCM. • 10 more blocks have been opened for global bidding. • Several core wells/pilot wells have been drilled in the allotted blocks and are giving encouraging results. • Few operators are planning commercial production from 2007- 08. • The total production potentiality in the allotted blocks is 23 MMSCMD, which is about 10% of the existing Natural Gas demand. CMM under Indian Mining Scenario Coal Mine Methane and Abandoned Mine Methane • Coal Mine Methane (CMM)/ Abandoned Mine Methane (AMM) also subset of CBM is related to mining activities and as per MOU between MoC and MoP&NG, coal producing companies have right of CBM exploitation in their working mines including pre and post mining operations.
    [Show full text]
  • Master Plan for Dealing with Fire, Subsidence and Rehabilitation in the Leasehold of Bccl
    STRICTLY RESTRICTED FOR COMPANY USE ONLY RESTRICTED The Information given in this report is not to be communicated either directly or indirectly to the press or to any person not holding an official position in the CIL/Government BHARAT COKING COAL LIMITED MASTER PLAN FOR DEALING WITH FIRE, SUBSIDENCE AND REHABILITATION IN THE LEASEHOLD OF BCCL UPDATED MARCH’ 2008. CENTRAL MINE PLANNING & DESIGN INSTITUTE LTD REGIONAL INSTITUTE – 2 DHANBAD - 1 - C O N T E N T SL PARTICULARS PAGE NO. NO. SUMMARISED DATA 4 1 INTRODUCTION 11 2 BRIEF OF MASTER PLAN ‘1999 16 3 BRIEF OF MASTER PLAN ‘2004 16 CHRONOLOGICAL EVENTS AND NECESSITY OF 4 17 REVISION OF MASTER PLAN 5 SCOPE OF WORK OF MASTER PLAN 2006 19 MASTER PLAN FOR DEALING WITH FIRE 6 21 MASTER PLAN FOR REHABILITATION OF 7 UNCONTROLLABLE SUBSIDENCE PRONE 49 INHABITATED AREAS 8 DIVERSION OF RAILS & ROADS 77 9 TOTAL INDICATIVE FUND REQUIREMENT 81 10 SOURCE OF FUNDING 82 ` - 2 - LIST OF PLATES SL. PLATE PARTICULARS NO. NO. 1 LOCATION OF JHARIA COALFIELD 1 2 COLLIERY WISE TENTATIVE LOCATIONS OF FIRE AREAS 2 3 PLAN SHOWING UNSTABLE UNCONTROLLABLE SITES 3 4 LOCATION OF PROPOSED RESETTLEMENT SITES 4 5 PROPOSED DIVERSION OF RAIL AND ROADS 5 - 3 - SUMMARISED DATA - 4 - SUMMARISED DATA SL PARTICULARS MASTER PLAN’04 MASTER PLAN’06 MASTER PLAN’08 NO A Dealing with fire 1 Total nos. of fires 70 70 70 identified at the time of nationalisation 2 Additional fires identified 6 7 7 after nationalisation 3 No. of fires extinguished 10 10 10 till date 4 Total no.
    [Show full text]
  • LIST of REPORTS SENT to the SPONSORER from 1St JANUARY, 2016 to MARCH, 2021
    LIST OF REPORTS SENT TO THE SPONSORER FROM 1st JANUARY, 2016 TO MARCH, 2021 SL.NO. DATE OF SENDING PROJECT PROJECT NO. PROJECT TITLE SPONSOR SUBMISSION FINANCIAL FINANCIAL TO THE YEAR YEAR SPONSOR 1 08.01.16 2015-16 2013-14 CNP/3714/2013-14 Study and advice on safety of Patal Archaeological Survey of India, Bhubaneswar Cave Pithoragarh, Dehradun Uttarakhand 2 08.02.16 2015-16 2015-16 CNP/4312/2015-16 Assessment of winding ropes of Narwapahar Mines,UCIL, Narwapahar Mines, UCIL by Singhbhum (East) nondestructive method 3 19.02.16 2015-16 2011-12 CNP/2928/2011-12 Study and failure analysis of 32mm 10/12 Pits Colliery, BCCL, diameter guide rope of K.B. 10/12 pits Dhanbad colliery, BCCL, Dhanbad”. 4 23.03.16 2015-16 2015-16 CNP/4212/2015-16 In-Situ study and advice on the present Asia Resorts Limited, Parwanoo condition of four nos of track ropes and (H.P.) two nos. Of haulage ropes of passenger cable car aerial ropeway installation of M/s Timber Trail, Asia Resorts Limited, Parwanoo (H.P.) – Two visits 5 23.03.16 2015-16 2014-15 CNP/4121/2014-15 Scientific study and advice for status of The Singareni Collieries Company goaf atmosphere during extraction of Limited, Kothagudam Collieries- blasting gallery panel No.BG-J(3) in 507101, Bhadrachalam Road No.3 seam at GDK 11 Incline, Railway Station, Dist-Khammam Ramagundam Area -I, SCCL (A.P.) 6 28.03.16 2015-16 2015-16 CNP/4345/2015-16 Investigation into drop and spark Block II Area, BCCL, Nawagarh, sensitivity of Nonel tubes and VOD, Dhanbad Sensitivity and density parameters of cast boosters involved in the accidental initiation at Amalgamated Block-II OCP 7 05.05.16 2016-17 2010-11 CNP/2859/2010-11 Studies on failure of 25mm diameter Bastacolla Area-IX, BCCL, 6X8 FS construction winding rope of Dhanbad victory 2 pit (south side) Bastacolla Area,”.
    [Show full text]
  • CENTRAL INFORMATION COMMISSION August Kranti Bhawan, Bhikaji Cama Place, New Delhi-110066
    CENTRAL INFORMATION COMMISSION August Kranti Bhawan, Bhikaji Cama Place, New Delhi-110066 F. No.CIC/SS/A/2013/001232 Date of Hearing : 27.06.2017 Date of Decision : 27.06.2017 Appellant/Complainant : Shri Madan Prasad Singh Respondent : Sr Manager-Personnel/Lodna-10 Bharat Coking Coal Limited Through: Sh. Pramod Kumar -PIO Information Commissioner : Shri Yashovardhan Azad Relevant facts emerging from appeal: RTI application filed on : 11.02.2017 PIO replied on : - First Appeal filed on : 13.04.2012 First Appellate Order on : - 2nd Appeal/complaint received on : 17.04.2013 Information sought and background of the case: Vide RTI application dated 11.02.2017, the appellant sought copy of the work order vide which construction of water tank and connections of water tape connections, for the use of the habitants or residing the surroundings of old Jealgora Hospital was required. The CPIO/Senior Manager(P)I/C transferred the RTI application to Subordinate Engineer (Civil) Lodna Area and Engineering Asstt. (Civil) vide letter dated 14/16.03.2012. Having not received any information from PIO, the appellant filed first appeal. The FAA did not adjudicate in the matter. Feeling aggrieved, the appellant approached the Commission. Relevant facts emerging during hearing: Both parties are present during the hearing. The appellant has submitted that he received information sought after filing of the instant appeal and is satisfied with the same. The Respondent had nothing further to add. Decision: In view of the submissions of the parties and perusal of record, the Commission finds that there is no further cause of action to be adjudicated in this case.
    [Show full text]
  • Bharat Coking Coal Limited
    Bharat Coking Coal Limited (A Mini Ratna Company) (A Subsidiary of Coal India Ltd.) EoI Ref. No. : BCCL/IA/App./2019-20/255/N Date:18.12.19 Open e-Tender EoI Document For Appointment of Internal Auditor for a period of 3 years from 2020-21 Bharat Coking Coal Limited Regd. Off: Koyla Bhawan, Koyla Nagar, Dhanbad – 826005, Jharkhand, India Page 1 of 55 Invitation for EoI 1. Bharat Coking Coal Limited, a Miniratna Company (A Subsidiary of Coal India Limited & Govt. of India Undertaking) having its registered office at Koyla Bhawan, Koyla Nagar, Dhanbad – 826005, Jharkhand, India, invites online applications through e-tender on CIL’s e-procurement portal (https://coalindiatenders.nic.in) for empanelment of practicing Chartered Accountant or Cost Accountant or a Firm / LLP of Chartered Accountants / Cost Accountants registered with the Institute of Chartered Accountants of India / Institute of Cost Accountants of India for conducting Internal Audit in respect of different Areas/ units/ HQ of BCCL i.e. (i) BCCL (HQ) (ii) Barora Area (iii) Block-II Area (iv) Govindpur Area (v) Katras Area (vi) Sijua Area (vii) Kusunda Area (viii) P.B. Area (ix) Bastacolla Area (x) Lodna Area (xi) E.J. Area (xii) C.V. Area (xiii) W.J. Area and (xiv) Washery Division from which 14 Auditors will be selected for a period of 3 years from 2020-21. The selected candidates have to conduct monthly audit as specified in Scope of Audit (Annexure-A) and Terms of Reference (Annexure- B). 2. All supporting documents regarding Application Format (Annexure- C), such as Firm Profile, Constitution Certificate, Certificate of Practice, Membership Certificate, Mark Sheets/Certificate of IPCC/Inter Examination, Appointment letters and Statement of Accounts (in respect of SI.
    [Show full text]
  • Consultancy Projects Executed During Financial Year 2012-13
    CONSULTANCY PROJECTS EXECUTED DURING FINANCIAL YEAR 2012-13 A. Consultancy Projects carried forward from Previous Years: Sl. Consultancy Title of the Consultancy Project Consultant In- Dept. of Sponsoring No. Project Charge Consultant Organization Number In-Charge 1 0023 Mine air Analysis of CCL Prof. D. D. Pathak AC CCL 2 0028 Mine air Analysis of CCL, Karo Special Project Bokaro Thermal. Prof. D. D. Pathak AC CCL 3 0035 Mine air Analysis of CCL Prof. D. D. Pathak AC CCL 4 0056 Mine Air analysis of CCL, Hazaribag Area (Kedla Underground Project. Prof. D. D. Pathak AC CCL 5 0062 Modeling and simulation studies for designing the ventilation system of Prof. D. C. Panigrahi ME SCCL Peddampetta Shaft Project. 6 0063 Modeling and Simulation studies for designing the ventilation system of Prof. D. C. Panigrahi ME SCCL Kakatiya Longwall Project 7 0064 Modeling and simulation studies for designing the ventilation system of Prof. D. C. Panigrahi ME SCCL shantikhani longwall Project 8 0066 Modeling and Simulation studies for designing the ventilation system of Prof. D. C. Panigrahi ME SCCL Jallaram Shaft Project. 9 0069 Mine Air Analysis of BCCL, Maheshpur Colliery, Area-III, Gobindpur. Prof. D. D. Pathak ME BCCL 10 0073 Mine Air Analysis of CCL, Kargali (UG) Mine (BSI) B & KK Area, Prof. D. D. Pathak ME CCL Bokaro. 11 0078 Mine Air analysis of Shaft Mine, Sudamdih, E.J. Area, BCCL Prof. D. D. Pathak ME BCCL 12 0098 Mine Air Analysis of Kedla U/G Project Prof. G. Udayabhanu AC CCL 13 0131 A study of ventilation network of the existing mine (GDK011A) and Prof.
    [Show full text]
  • BHARAT COKING COAL LIMITED Lodna Area
    BHARAT COKING COAL LIMITED (A Subsidiary of Coal India Limited ) Office of the General Manager Lodna Area Ref. No. BCCL/LA/Survey/NIT/2011-12/3209 Dated: 18.08.2011 NOTICE INVITING TENDER Sealed tender in two parts (Part -A & B) on overall percentage rate basis are invited from experienced and eligible contractors for the following works (1) “Making drain for travelling road to No 1 pit district in Lodna Colliery under Lodna Area”. Sl.No. Estimated cost Earnest Money Cost of Tender Paper Time of completion (1) Rs. 22394.00 Rs.223.00 Rs. 50.00 10 Days Availability of tender document: from 01.09.2011 to 03.09.2011 Tender documents will be issued on all working days during working hours except on Sundays and holidays in the event of the specified date for submission/opening of bids being declared a holiday the bids will be received/opened on the appointed time on the next working day. The tender document is also available on website www.bccl.gov.in and can be download. Time and Date of receipt of opening of Tender a) The tender will be received on 05.09.2011 from 10:00 AM to 3:00 PM in tender box kept at - 1) CISF POST near KOYLA BHAWAN GATE, KOYLA NAGAR, BCCL, DHANBAD. 2) GM Office/ in Security Room, P.O. – Khas Jeenagora, Lodna Area No. –X Dhanbad. 3) GM office in Bastacola Area, Dhanbad. 4) GM office in EJ Area, Dhanbad b) The tender received will be opened on 07.09.2011 at 12:00 PM in the office of the ASO, Lodna Area Dhanbad.
    [Show full text]
  • SL. No. EMAIL ID DISPLAY NAME DESIGNATION DEPARTMENT
    MAIL INET ACCOUNT DEPARTMENT/ TELEPHONE USERST USERSTAT CREATION- SL. No. EMAIL ID DISPLAY NAME DESIGNATION MINISTRY ADDRESS STATE MOBILE NUMBER EMAIL ADDRESS ATUS US DATE DOR 1 cmd.bccl.cil Nagendra Kumar CMD BCCL Level III Koyla Bhawan Koyla Nagar Jharkhand +919830556002 03262-2230112 [email protected] active Active 09-09-2015 30-04-2019 2 tscmd.bccl.cil Sunil Roy TS to CMD BCCL CMD's Secretariat ; Level III; Koyla Bhawan;Koyla Nagar Jharkhand +919470595003 0326-22030158 [email protected] active Active 09-09-2015 30-09-2025 3 dtop.bccl.cil Dinesh Jha DTOP BCCL Koyla Bhavan, Bharat Coking Coal Ltd.,Koyla Nagar,Dhanbad, Jharkhand-826005Jharkhand +919470595777 0326-2230163 [email protected] active Active 09-09-2015 31-08-2016 4 cmepnp.bccl.cil Pramod Gupta CME(P&P) BCCL BCCL Jharkhand +919470595115 0326-2236324 [email protected] active Active 09-09-2015 31-12-2020 5 seent.bccl.cil Tushar Singh SE(E&T) BCCL Jharkhand +919470595688 [email protected] active Active 09-09-2015 30-06-2025 6 df.bccl.cil k Rajashekar Director(Finance) BCCL BHARAT COKING COAL LIMITED,KOYLA NAGAR, DHANBAD, JHARKHANDJharkhand 826005+919470599400 0326-2230217 [email protected] active Active 09-09-2015 31-05-2019 7 dtpp.bccl.cil D Gangopadhyay DTP&P BCCL Jharkhand 919470597701 [email protected] active Active 09-09-2015 31-01-2016 8 dp.bccl.cil Binay Panda DP BCCL BCCL, Koyla Bhawan, Koylanagar, P.O. BCCL Township Jharkhand +919470597999 0326-2230170 [email protected] active Active 17-09-2015 30-06-2017
    [Show full text]
  • Projects Executed During Financial Year 2016-17
    PROJECTS EXECUTED DURING FINANCIAL YEAR 2016-17 A. Consultancy Projects carried forward from Previous Years: Sl. Consultancy Title of the Consultancy Project Consultant Consultant Sponsoring No. Project Number In-Charge In-Charge in Organizati the Deptt. on 1. 0023 Mine air Analysis of CCL Prof. D. D. Pathak AC CCL Mine air Analysis of CCL, Karo Special Project Bokaro 2. 0028 Prof. D. D. Pathak AC CCL Thermal. 3. 0035 Mine air Analysis of CCL Prof. D. D. Pathak AC CCL Mine Air analysis of CCL, Hazaribag Area (Kedla Underground 4. 0056 Prof. D. D. Pathak AC CCL Project. Modeling and simulation studies for designing the ventilation 5. 0062 system of Peddampetta Shaft Project. Prof. D. C. Panigrahi ME SCCL Modeling and simulation studies for designing the ventilation 6. 0064 system of Shantikhani Longwall Project Prof. D. C. Panigrahi ME SCCL Modilling and Simulation studies for designing the ventilation 7. 0066 system of Jallaram Shaft Project. Prof. D. C. Panigrahi ME SCCL Mine Air Analysis of BCCL, Maheshpur Colliery, Area-III, 8. 0069 Prof. D. D. Pathak AC BCCL Gobindpur. Mine Air Analysis of CCL, Kargali (UG) Mine (BSI) B & KK 9. 0073 Area, Bokaro. Prof. D. D. Pathak AC CCL 10. 0078 Mine Air analysis of Shaft Mine, Sudamdih, E.J. Area, BCCL Prof. D. D. Pathak AC BCCL Mine Air Analysis of Kedla U/G Project 11. 0098 Prof. G. Udayabhanu AC CCL A study of ventilation network of the existing mine (GDK011A) 12. 0131 and establishing an integrated ventilation network for designing Prof. D. C. Panigrahi ME SCCL the ventilation system of peddampetta shaft Block Project.
    [Show full text]
  • 20.11.2018 REPORT for WEBSITE.Xlsx
    LIST OF REPORTS SENT TO THE SPONSORER FROM 1st JANUARY, 2016 TO OCTOBER'2018 SL.NO. DATE OF SENDING PROJECT PROJECT NO. PROJECT TITLE SPONSOR SUBMISSION FINANCIAL FINANCIAL TO THE YEAR YEAR SPONSOR 1 08.01.16 2015-16 2013-14 CNP/3714/2013-14 Study and advice on safety of Patal Archaeological Survey of India, Bhubaneswar Cave Pithoragarh, Dehradun Uttarakhand 2 08.02.16 2015-16 2015-16 CNP/4312/2015-16 Assessment of winding ropes of Narwapahar Mines,UCIL, Narwapahar Mines, UCIL by Singhbhum (East) nondestructive method 3 19.02.16 2015-16 2011-12 CNP/2928/2011-12 Study and failure analysis of 32mm 10/12 Pits Colliery, BCCL, diameter guide rope of K.B. 10/12 pits Dhanbad colliery, BCCL, Dhanbad”. 4 23.03.16 2015-16 2015-16 CNP/4212/2015-16 In-Situ study and advice on the present Asia Resorts Limited, Parwanoo condition of four nos of track ropes and (H.P.) two nos. Of haulage ropes of passenger cable car aerial ropeway installation of M/s Timber Trail, Asia Resorts Limited, Parwanoo (H.P.) – Two visits 5 23.03.16 2015-16 2014-15 CNP/4121/2014-15 Scientific study and advice for status of The Singareni Collieries Company goaf atmosphere during extraction of Limited, Kothagudam Collieries- blasting gallery panel No.BG-J(3) in 507101, Bhadrachalam Road No.3 seam at GDK 11 Incline, Railway Station, Dist-Khammam Ramagundam Area -I, SCCL (A.P.) 6 28.03.16 2015-16 2015-16 CNP/4345/2015-16 Investigation into drop and spark Block II Area, BCCL, Nawagarh, sensitivity of Nonel tubes and VOD, Dhanbad Sensitivity and density parameters of cast boosters involved in the accidental initiation at Amalgamated Block-II OCP 7 05.05.16 2016-17 2010-11 CNP/2859/2010-11 Studies on failure of 25mm diameter Bastacolla Area-IX, BCCL, 6X8 FS construction winding rope of Dhanbad victory 2 pit (south side) Bastacolla Area,”.
    [Show full text]
  • Alumni Directory Department of Mining
    ALUMNI DIRECTORY DEPARTMENT OF MINING ENGINEERING INDIAN INSTITUTION OF TECHNOLOGY (BANARAS HINDU UNIVERSITY) VARANASI-221005 Sl. Contact & Details Year of Sl. Contact & Details Year of No. Graduation No. Graduation 1. Shri S.P. Dandona 1927 16. Shri C.S. Mukherjee 1933 2. Shri B.L. Saxena 1927 17. Shri S.V. Pai 1933 3. Shri S.K. Chatterjee 1927 18. Shri P. Satyanarayana 1933 4. Shri A.K. Chakraborty 1928 19. Shri K.C. Mathur 1933 5. Shri S.K. Dey 1928 20. Shri B.R. Rai 1934 6. Shri A.N. Verma 1928 21. Shri K. Sen Gupta 1934 7. Shri Ram Avtar 1928 22. Shri H.K. Bhatt 1934 8. Shri D.R Sabharwal 1929 23. Shri K.C. Roy 1935 9. Shri M. Mukherjee 1929 24. Shri B.M. Prasad 1935 10. Shri R.A. Sarana 1929 25. Shri R.D. Bhatnagar 1935 11. Shri R.L. Sharma 1930 26. Shri G.M. Mehta 1935 12. Shri S.K. Gupta 1931 27. Shri T. V. George 1936 13. Shri R.L. Agarwal, Udaipur 1931 28. Shri F.S. Watcha 1936 (Expired) Cuffe Castle, Cuffe Parade, Colaba, Bombay-l. 14. Shri V.V.RK. Rao 1932 29. Dr. M.P. Netarwala (Expired) 1936 15. Shri V. Nagarathanam 1932 Mehradad, Fit No. 112, (Expired in 1975) Cuffe Parade, Colaba, Bombay-400 005. 1 1 Sl. Contact & Details Year of Sl. Contact & Details Year of No. Graduation No. Graduation Shri D.G. Lothe 1937 44. Shri R. Venkataraman 1941 Mls D.G. Lothe Dhantoli, Nagpur 45. Shri P.B. Malla 1941 21/538, Dilli Bazar, Shri V.K.
    [Show full text]