Cartometro London Edition

Total Page:16

File Type:pdf, Size:1020Kb

Cartometro London Edition © 2012 - Franklin JARRIER Contact : [email protected] http://carto.metro.free.fr A B C D E F G H I J Pad 22/08/1865 London Underground : 25/09/1949 removed from London Underground : 30/03/1994 2 1 1 2 Blake Hall Closed 31/10/1981 North Weald Loco Pit Ron's Siding Spur Version 2.6 3 2 1 Ongar Metropolitan h t tp Chesham : 1 / r 2 Goods yard June 2012 /c f a . GREATER LONDON rto ree .metro.f 1 Central 27 1 Epping 2 Underground, Overground, DLR 1 Tracks map with platforms, connections & depots &Tramlink Map 24/04/1865 London Underground : 25/09/1949 to Brill & VerneyJunction (part of the metropolitan © 2012 - Franklin JARRIER - Reproduction prohibited without the permission of the author - [email protected] - http://carto.metro.free.fr from 1892 to 1936) Metropolitan Amersham 31 32 3 2 34 1 01/09/1892 2 Theydon Bois 1 Chalfont & Latimer 3 2 1 Watford north Junction 11 10 7 6 9 8 Overground Watford Yard 3 5 1 4 Watford Junction 2 Watford 08/07/1889 south Junction Metropolitan 21 22 1 Watford 23 2 24 2 Chorleywood Watford 1 High Street Piccadilly 2 Cockfosters 1 3 4 24 23 25 1 2 26 22 22 27 23 34 28 High Barnet Croxley Rail Link Extension Project Watford High Street 35 29 21 21 36 30 26 Northern 2 31 02/11/1925 3 Junction 1 Sidings 31/07/1933 Croxley Green 27 30 28 31 32 29 33 53 54 High Barnet 29A 51 52 50 48 49 Goods yard 46 47 45 43 44 41 42 39 40 Colne 37 38 36 15/06/1906 Junction 32 33 34 35 1 Watford Oakwood 1 2 Croxley Closed 30/03/2003 2 Croxley West Junction Cockfosters Depot 22 3 Loughton Closed 1865 Croxley 1 2 Debden 2 Croxley Mill 4 2 Watford Goods Watford Depot Bushey 1 Stadium 5 West Junction 6 2 Rickmansworth Rickmansworth South Sidings 35 East Junction 34 33 North Sidings 32 South Curve 31 to Croxley tip 4 3 1 21 22 North Curve 2 25 3 24 21 2 23 North Junction 1 South Junction Loughton Old Metropolitan to Brill & Verney Junction Rickmansworth Watford triangle 27 28 29 Verney Junction 30 31 32 Loughton 33 34 35 36 Sidings Rickmansworth Church Street Winslow Road 2 Goods yard 1 Southgate 22/08/1856 1 2 Totteridge & Whetstone London Underground : 21/11/1948 4 2 Moor Park 3 1 Grandborough Road 13/03/1933 Carpenders Park 2 1 Buckhurst Hill 2 1 01/04/1872 01/09/1887 London Underground : 14/04/1940 23/09/1868 Closed 04/07/1936 Jubilee Stanmore London Underground20/04/1903 : 21/11/1948 23 Goods yard 24 25 26 Goods yard 27 2 28 29 1 30 3 31 32 Chigwell 07/2011 Tamping Spur 2 1 2 1 Stanmore Sidings Woodside Park 2 removed from London Underground : 24/09/1982 1 2 4 Woodford London Overground : 11/11/2007 1 3 Junction 33 Arnos Grove Roding Valley Quainton Road 16/04/1917 Northern 23 22 21 Mount Pleasant tunnel Edgware 4 5 6 7 8 9 10 11 3 Waddesdon Manor 2 3 Edgware 1 2 2 Grange Hill 1 Sidings 1 71 70 31 Waddesdon 30 Arnos Grove Sidings 29 28 27 35 26 36 25 16 siding Engineer’s siding 42 37 38 Engineer’s 39siding 40 Edgware LNER Engineer’s siding 41 Westcott Mill Hill Closed 29/05/1948 2 1 Northwood 23/09/1868 01/01/1897 (the Hale) Northern 1 Closed 30/11/1935 2 1 2 Mill Hill East 60 Wood Siding 59 50 Hainault 49 67 58 48 57 47 64 56 Hatch End 55 46 63 45 2 54 22 1 Depot 62 44 Gas Works Sidings 66 65 53 Canons Park 61 43 52 42 Goods yard 51 41 21 Wotton West Finchley 1 Bounds Green 2 3 22 2 23 24 Woodford 25 Brill 1 26 London Underground : 18/05/1941 31 Woodford 30 22/08/1867 29 28 27 26 Sidings 25 Aylesbury 2 Burnt Oak 3 1 2 1 Northumberland Park Depot Hainault 1 27/10/1924 25 22 2 18 21 Goods yard 19 20 21 22 23 23 Headstone Lane 22 24 Finchley Central 25 21 26 3 27 1 2 28 29 Northwood Hills Goods yard 19/09/1932 30 2 31 32 1 35 33 34 35 36 37 38 39 40 41 42 43 44 18/08/1924 45 46 Wood Green 47 2 54 55 1 56 Stoke Mandeville 57 60 2 1 Fairlop 2 Colindale 1 Alexandra Palace 48 49 50 Queensbury 51 2 London Underground : 14/04/1940 1 22/08/1867 52 53 Pinner 6 2 5 Harrow & Wealdstone 20/04/1903 1 4 3 London Underground : 31/5/1948 2 2 1 Wendover 1 South Woodford 10/12/1932 Muswell Hill branch Turnpike Lane Bakerloo 1 2 Muswell Hill Goods yard 25 Tottenham Hale 25/05/1885 East Finchley 1 4 2 2 Blackhorse Road 3 Cranley Burroughs tunnel 24 1 23 1 22 Gardens 21 2 Sidings 2 1 2 1 North Harrow Highgate 62 63 Barkingside 2 Victoria 1 22/08/1856 3 37 Sidings 1 2 Kingsbury Tamping spur Walthamstow Central Seven Sisters London Underground : 14/12/1947 Engineers siding 1 3 2 Hendon Central 9 8 7 6 5 4 3 2 1 3 1 11 Engineers siding Highgate Wood 4 2 10 Test track 5 Gidea Park Closed 10/09/1961 Sidings 23/09/1868 Wellington 2 Harrow North 1 Sidings South Tottenham 1 Junction Kenton 2 West Junction 03/07/1939 Park Junction 2 South Tottenham Snaresbrook St Ann’s Road 2 19/11/1923 1 East Junction 1 Harrow South Closed 08/08/1942 Walthamstow 6 West Harrow 2 5 Junction 1 4 South Tottenham Queen's Road 2 3 2 1 Highgate High Level 1872 1 1 NR Eastcote 2 2 Brent Cross Harringay 1 2 2 Harringay Junction 2 Harrow-on-the-Hill 1 1 Rayners Lane Highgate 2 Northwick Park London Overground : 11/11/2007 1 1 Great Missenden Harringay Curve Green Lanes 2 09/07/1894 14/12/1947 Romford 1 2 1 2 Crouch End Newbury Park Harringay Park 01/09/1968 1 Golders Green Depot Gants Hill 02/08/1880 30 31 32 Junction Redbridge 04/07/1904 25 26 27 28 29 Romford Ruislip Manor Rayners Lane 20 21 22 23 24 Stroud Green Wanstead Junction Junction 10 11 12 13 14 15 16 17 18 19 2 NR 1 Whìpps Cross tunnel 1 2 3 4 5 6 7 8 9 23 Section used for an aircraft factory 22 5 2 Ruislip 21 26 (4 siding) Central 3 4 during World War II 1 1 2 25 (2 siding) 27 33 24 (1 siding) 2 2 Romford engineers depot West Ruislip 1 1 King's Cross - St. Pancras Detail 01/03/1910 Golders Green Golders Green loop 2 Leyton 4 Crouch Hill 1 21 Preston Road 1 22 3 21/07/1868 2 2 Manor House Midland Road 2 1 South Kenton Bull & Bush Chadwell Heath 1 Emerson Park 23 London Overground : 11/11/2007 BR Link Road (never opened) 3 2 km 2 1 25 24 Leytonstone 27 26 Wembley Park Hornsey Road Amersham Closed 1943 to Paddington Sidings Finsbury Park 32 33 34 35 36 Underground situation Hotel Curve 56 57 P-Way sidings 58 until 03/10/1964 59 District line special 31 6 4 32 2 York Road Curve 33 1 31 2 3 4 Upminster 34 1 service to Southend 35 Archway 36 Finsbury Park 2 Wembley Park 2 5 3 1 37 South Harrow 6 Ilford Car Sheds 38 1 Depot and Shoeburyness 39 5 2 Leytonstone High Road Goodmayes 40 01/16/1861 41 1 42 4 Maiden (Ilford Depot) 43 2 GN&CR : 14/02/1904 21 44 22 from 1910 to 1939 45 2 3 1 Lane 23 46 LU : 15/12/1906 24 47 1 25 48 Curve 26 27 49 31 28 50 32 29 51 Upper Holloway 30 57 52 33 Finsbury Park 34 31 53 1 32 59 35 South Harrow 2 District 33 71 Seven Kings 36 72 34 64 73 Junction 35 74 Ickenham 65 75 4 36 66 106 3 103 22/08/1856 37 2 67 North Wembley 105 102 68 Sidings 38 1 11 Neasden Depot 1 2 104 70 69 10 39 76 12 40 13 41 Ruislip Gardens 14 Upminster 42 77 2 43 44 45 Ruislip Depot 19 London Underground : 05/05/1947 46 1 20 85 52 53 54 55 56 57 47 58 59 60 61 48 62 63 64 65 66 67 68 69 49 70 71 72 73 61 62 Southend Piccadilly Line 63 24 25 Northern City Line 26 27 28 29 30 31 32 33 6 34 35 36 37 5 51 4 Junction Road 3 Junction Road 2 Junction 1 1 2 1a 45 46 Closed 03/05/1943 Arsenal 47 48 Overground 1 21 22 23 Arsenal l'importer, deou l'importer, l'utiliser, d'enextraire des données sansl'autorisation deson auteur 2012© -Franklin JARRIERContact :[email protected] http://carto.metro.free.fr Sudbury Hill 2 South Ruislip Kings Cross loop Upminster 2 1 east Junction 2 Klondyke Sidings Hampstead Gospel Oak 2 Leyton 2 Ilford 1 1 38 39 40 41 1 Hampstead 2 Upminster Bridge 1 04/06/1888 Tufnell Park 12/09/1932 16/04/1917 Down Sidings Heath 3 Highbury Vale 2 Junction 5 Neasden Gospel Oak 2 1 Junction 1 Depot 1 4 Highgate Aldersbrook sidings Neasden South 3 Carriage Hillingdon 2 Drayton Park Drayton Junction 2 Road 22/06/1907 Shed 2 2 1 Park 1 1 Closed 1915 Hampstead Heath Holloway Road 2 Manor Park 6 Dollis Hill Tunnel superimposed tunnels section 1 Wanstead Park 5 Wembley Central 4 2 Forest Gate Hornchurch 21/11/1948 3 1 14/02/1904 2 Junction 12/09/1932 2 Finchley Road London Overground : 11/11/2007 1 Sudbury Town 1 Uxbridge 2 Neasden 1 Belsize Park Hackney Downs Closed 04/12/1938 & Frognal 2 Junction 2 2 1 1 North Junction Uxbridge Willesden Green 1860 Mildmay Park Hackney 1 4 Opened 01/10/1880 Kentish Town Closed 30/09/1934 Woodgrange Park 2 Canonbury 2 Sidings 3 1 2 28/06/1904 Woodgrange Park 1 38 Dalston Kingsland Downs 4 Stonebridge Park Depot 1 37 Northolt 24/11/1879 22/06/1907 Junction Canonbury 35 26 2 2 Navarino Hackney 34 25 2 26/09/1850 33 45 Curve 26/09/1850 3 24 1 44 London Overground : 11/11/2007 43 2 1 Piccadilly 32 38 46 Canonbury Road Opened 26/09/1850 37 42 31 28/06/1893 36 41 47 1 35 40 Finchley Road 6 LO: 11/11/2007 1 Kilburn 5 30 West Junction Newington Road 39 Highbury 34 Kentish Homerton 4 Elm Park 29 33 2 3 Junction Closed 01/12/1870 Forest Gate 28 32 30/06/1879 4 DLR 31 27 Caledonian Road 1 1858 12/09/1932 04/12/1938 3 & Balls Pond 2 2 Maryland east 2 2 Opened 01/09/1858 Western London Overground13/04/1854 : 11/11/2007 3 2 Town West 1 2 & Islington 26/11/1850 1 1 1 Closed 01/12/1870 crossovers 4 1 1 1 Curve London Underground : 02/06/1902 2 Metropolitan 8 London Overground : 28/02/2011 Graham Stratford International 21 Overground 22 7 Road curve 2 Hackney 1 2 1 2 3 4 East Ham Loop Caledonian Road 1 4 2 Camden Victoria Park Wembley West Primrose Hill Opened 10/06/1852 3 North Junction 1 Hampstead South Kentish Town Reading Central Opened 14/06/1856 High Meads Overground Uxbridge Junction Junction Chalk Closed 21/11/1870 Dalston Junction Yard Tunnel Camden Closed 05/06/1924 Lane Closed
Recommended publications
  • Responses to the Rail Strategy Consultation Page 1 West Anglia
    Responses to the Rail Strategy Consultation Appendix1 West Anglia Mainline Organisation Consultation Comments - WAML HCC Response Action for Rail Strategy Broxbourne 4-tracking & CR2 to be given higher profile - Include CR2 on page 14 but Borough Council e.g. on pages 4 & 32 & in figure 2.2 on page not on pages 4 & 32 as 14. Include Ambition Broxbourne's aspiration these figures list existing of Cheshunt as strategic hub with CR2, links services and lines. Include to Stratford, London & Stansted, and reference to Ambition significant development around the station Broxbourne's aspiration of associated with a potential redevelopment of Cheshunt as strategic hub, Delamare Road. Include lobbying for early and of lobbying for early safeguarding of regional CR2 route. CR2 safeguarding of regional route. Cambridgeshire Include addressing single track tunnel at Single track tunnel at None. County Council Stansted to improve journey times & capacity Stansted as constraint for all services, from the north & south. already included in Strategy. East Herts District Objects to wording on page 41 re - HCC not pursuing Hertford Council investigation into the implementation of East as CR2 terminus and development around Hertford East branch so text will be removed. stations. Serious constraints of implementing Amend text on page 40 re CR2 in East Herts should be recognised. Ware platform. There was never a second platform at Ware (page 40). Hertford Town Appropriate service mix with more semi-fasts - Include reference to semi- Council to London, and longer term to Liverpool St. fasts including to Liverpool St. Hertfordshire Lobby for Hertford East & Harlow as northern HCC not pursuing Hertford None.
    [Show full text]
  • Property Guide – Welcome to Our Home!
    PROPERTY GUIDE – WELCOME TO OUR HOME! We hope you enjoy your stay here and enjoy what London has to offer. Keys/Access to the property 1 key for the building, 2 keys for flat door. First unlock the bottom lock with the big key, then the top lock with the smaller key. Please ensure you always shut all windows and lock the bottom lock on your way out. PLEASE BE CAREFUL NOT TO LOSE THE KEYS OR LOCK THEM IN THE PROPERTY. Particular requests and information about the Bright and spacious duplex apartment situated in a quiet property green area near a vibrant high street with a variety of shops, an abundance of cafes and restaurants with cuisines from all over the world, whilst only a short tube journey away from central London. Two double bedrooms, 2 x bathrooms (1 en-suite), separate guest WC. Lounge room with a 55 x inch smart TV with Netflix and high speed internet connection, separate kitchen (with a Nutribullet blender and a Nespresso coffee machine), dining room overlooking a well maintained shared garden, off street parking in a private driveway. A short walk from Hampstead Heath and Golders Hill park which houses a butterfly house, a zoo, a deer enclosure, a number of ponds and tennis courts. Basic House Rules No Smoking – No Pets Allowed – No Partying or Loud Noises Keep the place clean and tidy – no dirty dishes left over please Fee for lost key from £50 and £100 for smoking WIFI Network Name VM1655733 Password 8gdnthqDvwzx Where is the modem kept Behind the TV in the lounge room How the heating & hot water Central heating or other? Central heating system works How the TV system works Remote controlled, the home entertainment system manual is on (if applicable) the TV stand.
    [Show full text]
  • Watford Station Closure Panel
    Watford Station Closure Panel Document L Final Report, 28 08 2012 Author: Vincent Stops Final report of the consideration by London TravelWatch of the proposed closure and discontinuance of services to and from Watford station 1 Purpose of report 1.1 To set out the background and process undertaken as part of the consideration of the proposed closure and discontinuance of services to and from Watford station. 1.2 To summarise London Underground Limited’s (LUL’s) case for the closure, the concerns of passengers and the conclusions of Panel members consideration of the issues. 1.3 To report to the Mayor of London any hardship that would result from the closure, should it proceed. 1.4 To report to the Mayor of London measures that would alleviate hardship resulting from the closure, should it proceed. 1.5 To report any other conclusions from London TravelWatch’s consideration of the closure. 2 Background 2.1 Watford station is one of the northern terminal stations on the Metropolitan line. There is a long-standing aspiration to divert the Metropolitan line, via the former Croxley Green branch line, to terminate at Watford Junction station. This would entail a short section of new railway being built to connect the Metropolitan line to the former Croxley Green branch line. The Link would have two new accessible stations at Ascot Road and Vicarage Road and connect to Watford Junction station via Watford High Street station. The project is known as the Croxley Rail Link. See Appendices A & B below for schematics of the existing and proposed Metropolitan line.
    [Show full text]
  • 50 Years Ago – a Postscript
    50 YEARS AGO – A POSTSCRIPT METROPOLITAN MODERNISATION Whilst some of us will recall the late-1950s and early 1960s as the period “when it all happened”, there was a lot going on much earlier. Here is a selection of what happened, details being obtained from the Traffic Circulars of the time. Some items may not be directly relevant but nevertheless are included for interest, if only that London Transport were bringing the Metropolitan Line up to date and ‘in line’ with the rest of the network. Date Brief details 02.01.50 “Stop-and-Proceed” abolished north of Harrow-on-the-Hill and all signals, semi- automatic and automatic, provided with signal post telephones. All trains to receive authority from relevant signalman before passing any signal at danger. Signal boxes affected were Watford Station (JL), Croxley (B), Watford Junction (C), Northwood (E), Pinner (G) and Harrow Station (JB). 01.50 Telephones provided on Chesham line (to signalmen at Chalfont & Latimer and Chesham) at One Mile Post, Two Mile Post and Three Mile Post. 04.06.50 Track slewed on a new alignment 30ft west of present from 1,000ft north of Watford South Junction to 1,500ft south of Watford South Junction, to allow bridges MR78, MR80 and MR81 to be taken out of use. 17.06.50 From midnight, maintenance responsibility for track, works & buildings and signalling between 28½ mile post (Mantles Wood) and 37 miles 195 yards, about ¾ mile south of Aylesbury South Junction, will be transferred from Railway Executive to London Transport. 25.06.50 London Transport to take over responsibility for management of ex-Joint Line from Harrow to Aylesbury South Junction including Watford and Chesham branches.
    [Show full text]
  • The Evolution of Train Services on the Met and Gc Line
    THE EVOLUTION OF TRAIN SERVICES ON THE MET AND GC LINE by Eric Stuart (Readers may find reference to the Four-Tracking article in the July 2018 issue of Underground News helpful) After the Great Central (GC) arrived at Quainton Road and the service south thereof became established, both the GC and the Metropolitan Railway (Met.) provided services. However, the personalities at the heads of the two companies did not enjoy the best of relationships. Matters came to a head when a GC train crashed when failing to reduce speed over the (then) reverse curve into Aylesbury station in 1904. About that time, both the leaders retired and a period of better relations between the companies began. On 2 April 1906, the Metropolitan & Great Central Joint Railway (MGCJR) was created. This latter took over the lines of the Metropolitan Railway north and west of Harrow South Junction, with the exception of the branch to Uxbridge. These included the main line between Harrow-on-the-Hill and Verney Junction and the branch from Chalfont & Latimer to Chesham. The MGCJR was created under the terms of the Metropolitan & Great Central Railway Act, which received Royal Assent on 4 August 1905. At the same time, the Great Central and Great Western Joint Railway was formed, covering the lines south of Aylesbury via Princes Risborough to Northolt Junction. This was the result of a new line that aided the GC by partly avoiding congestion on the Met. and also giving the Great Western a shorter route to Birmingham1. One curiosity was that a Joint Committee was set up to manage a new Aylesbury station, jointly owned by two joint railways! Some points on terminology: The new line was commonly called just ‘The Joint Line’ and, even in later LT days, some staff still belonged to a particular class that made them feel superior to others2.
    [Show full text]
  • Steeple Claydon and Verney Junction EWR Phase 2 Newsletter
    East West Rail Phase Two Project Newsletter Steeple Claydon & Verney Junction, Autumn 2020 Welcome! Enabling works underway Welcome to the Autumn issue of the East West Rail Alliance project newsletter. I wanted to start by thanking everyone who took the time to read and share the last issue of the newsletter. We have seen an increase in the readership of the newsletter and have received feedback on the format with the level of information in the local update sections we introduced in issue two being positive. As you’ll read below, perhaps the most obvious progress we have made since the last newsletter can be seen in Bletchley, where our team has dismantled sections of the Bletchley Flyover ready for it to be rebuilt to modern standards. The dismantling has demanded a meticulous amount of Since the last issue of our newsletter, the Alliance has planning from our team, Network Rail operations, the been preparing many areas across the project footprint for train operating companies, local authorities and our main construction activities to begin. Highways environment agencies and I’m delighted to report all the improvements have been made, with roads widened, lifts were safely completed in line with our programme. passing bays on narrow roads put in place, and access We are now in the process of removing the final points for our site compounds installed. In addition, we elements of the structure that need to be removed have been constructing ‘haul roads’, which will enable before we can start the rebuild process in construction traffic to travel between certain areas of the November/later this year.
    [Show full text]
  • Strategic Spatial Planning Officer Liaison Group Fifth Meeting – Tuesday, 05 May 2015, 9.30 Am Committee Room 3, City Hall, Queen’S Walk, London
    Strategic Spatial Planning Officer Liaison Group Fifth meeting – Tuesday, 05 May 2015, 9.30 am Committee Room 3, City Hall, Queen’s Walk, London Agenda 1 Apologies 2 Notes of 30 Jan 2015 meeting (Richard Linton, GLA) http://www.london.gov.uk/sites/default/files/Action%20Notes.pdf 3 2015 London Plan (Richard Linton, GLA) and 2050 Infrastructure Plan published (Jeremy Skinner, GLA) http://www.london.gov.uk/priorities/planning/london-plan/further-alterations-to-the- london-plan http://www.london.gov.uk/priorities/business-economy/vision-and-strategy/infrastructure- plan-2050 4 Review of LEP’s Strategic Economic Plans (Lee Searles) Final report herewith 5 Summit follow-up: Roundtable Discussion Note (John Lett, GLA) Views? – Roundtable Note plus Notes of Wider South East Summit herewith 6 Possible SSPOLG Work Programme (All) Potential items for discussion: 1) Towards consistent demographics (ONS / CLG 5 or 10 years / GLA Demographics) 2) Towards consistent employment projections (Oxford Economics / GLA / others?) 3) Productivity and skills – regional dimension 4) Transport infrastructure (2005 Commuter Study update / TfL Work Programme) and other e.g. digital infrastructure 5) Regional freight issues (road / rail / ports) 6) Local Economic Partnerships’ infrastructure asks – regional / sub-regional 7) What could ‘devolution’ mean for the wider South East? 8) Environment: water / waste / energy / climate change – regional dimension 9) Potential future geographies of growth 7 AOB / next meeting Working Group members Richard Linton GLA (Chair)
    [Show full text]
  • Brent Cross Cricklewood in the London Borough of Barnet
    planning report PDU/1483/02 12 March 2010 Brent Cross Cricklewood in the London Borough of Barnet planning application no. C/17559/08 Strategic planning application stage II referral (old powers) Town & Country Planning Act 1990 (as amended); Greater London Authority Acts 1999 and 2007; Town & Country Planning (Mayor of London) Order 2000 The proposal Outline application for comprehensive mixed use redevelopment of the Brent Cross Cricklewood regeneration area comprising residential, town centre uses including retail, leisure, hotel and conference facilities, offices, industrial and other business uses, rail-based freight facilities, waste handling facility, petrol filling station, community, health and education facilities, private hospital, open space and public realm, landscaping and recreation facilities, new rail and bus stations, vehicular and pedestrian bridges, underground and multi-storey car parking, works to the River Brent and Clitterhouse Stream and associated infrastructure, demolition and alterations of existing building structures, electricity generation stations, relocated electricity substation, free standing or building mounted wind turbines, alterations to existing railway infrastructure including Cricklewood railway track and station and Brent Cross London Underground station, creation of new strategic accesses and internal road layout, at grade or underground conveyor from waste handling facility to combined heat and power plant, infrastructure and associated facilities together with any required temporary works or structures and associated utilities/services required by the development. The applicant The applicants are Hammerson, Standard Life Investments and Brookfield Europe (“the Brent Cross Development Partners”), and the architect is Allies & Morrison Architects. Strategic issues Outstanding issues relating to retail, affordable housing, urban design and inclusive access, transport, waste, energy, noise, phasing and infrastructure triggers have been addressed.
    [Show full text]
  • Verney Junction — Bletchley Branch of the L.N.W.R
    Brackley Central Station just after closure, looking south through the arch shown 67 years earlier on page 164. The station building on the right is still (2008) extant, but everything else has been swept away. The footbridge crosses the north-bound 'down' line to give access to the stairs leading down to the single 'island' platform, on each end of which stand water tanks. At the town's south end Brackley also had a station on the Banbury — Verney Junction — Bletchley branch of the L.N.W.R. The two stations were known, logically enough, respectively as the Top Station and the Bottom Station. The new line crossed over the branch line about a mile further on. Finmere station followed (about a mile from that village, but later to do good business with Stowe School). Calvert Station was reached shortly after the new line crossed the Oxford — Verney Junction — Bletchley branch line of the L.N.W.R., and about five miles further on the junction was made at Quainton Road. Not one of the railway lines mentioned now exists, except for the West Coast main line at Rugby. For reasons of economy, the G.C.'s smaller stations, including all the ones mentioned, were constructed with a single 'island' platform instead of the traditional two platform affairs which have one for each track. At an 'island' station the two tracks diverged, with a single platform lying between them. This gave problems of access, so that a staircase usually led down to platform level from a bridge above the line (as, for example, at Rugby and Brackley) although at Woodford there was a subway with steps leading up.
    [Show full text]
  • 1 a Report by Sawtag Opposing
    A REPORT BY SAWTAG OPPOSING THE CLOSURE OF WATFORD METROPOLITAN STATION AND ITS ASSOCIATED ROUTE. ALL OF THESE ARE TO BE SAFEGUARDED UNDER EXTRACTED GOVERNMENT POLICY. This report opposes the closure of Watford (Metropolitan Line) Station on three major grounds. 1 Retaining peak, football and special traffic, and positively building up traffic. Both the Metropolitan Line and WCML/Watford Suburban Lines serve nearby Wembley Stadium extremely well already. Also, train portion working must be advanced to best practice elsewhere. 2 Facilitating the forming of an extended London Overground network, through the extracted Government Policy of better protection, critical in developing rail infrastructure and interchange. 3 Essential safeguards are to be put in place to protect the truncated alignment through Watford (Metropolitan Line) Station. Firstly , it is essential the latter station is retained at least for continued peak hours services, in view of the steadily increasing peak and general use of both the London Metropolitan Underground and Network Rail West Coast Main Line centered system. Safeguarding is also essential in order to serve during the interim for Watford Football Club traffic attending the Vicarage Road Stadium. Pending the establishment of a new station; immediately South of the Stadium on the new Croxley Link Line; Watford (Met) Station is to be kept open for both peak and Football traffic with requisite direct connecting buses. These connecting buses will run from a retained Watford Metropolitan Station direct to the Stadium. There was a railway triangle immediately South of the Stadium, and Croxley Moor alternatives (reference no. 8) to the Croxley Link Project; investigated both linking the Rickmansworth LNWR branch corridor west to the Rickmansworth (Met) Main Line towards Aylesbury, and generally reinstating the pre-Beeching railway triangle inter alia.
    [Show full text]
  • London Transport Railways
    London Transport Railways The following selection of images is of the stock displayed in the “Underground Centenary” exhibition held at Neasden Depot, which we visited on Saturday 25th May 1963...... Sadly and inexplicably the Metropolitan Railway F class 0-6-2T locomotive L52 featured here was scrapped soon afterwards, but most of the other items, or examples of them were preserved at the later London Transport Museum, on the Bluebell and Worth Valley Railways, and elsewhere. In 1963 and for about 10 years afterwards, there was still plenty of vintage interest to be seen out and about on the London Transport lines. The picture (right) shows a train of Metropolitan F stock at New Cross Gate, East London Line, on 17th August 1963...... and here is an old G stock motor car trailing a District line train out of Richmond station on a very wet and misty morning of 4th April 1964...... On that day we travelled extensively around the extremities of the system on a “Combined Rover” day ticket. At the former Great Eastern Railway station of Woodford, Essex we were surprised to find an “automatic” or “driverless” train trial in progress using one of the experimental units, on the Hainault Loop line. These were the first tests of the system later used on the new Victoria Line. Note the aerial on the front of the cab, and temporary wiring...... The weather did not improve as we ventured on to Epping, then to Ongar....... The latter still retaining its air of a country branch terminus despite the use of modern stock (right) A contrast between station architectures is seen at Cockfosters (below left), an iconic LT 1930s design, and High Barnet (right) almost unaltered from its origins as a Great Northern Railway branch terminus...
    [Show full text]
  • The Saving Of
    THE SAVING OF L44 (METROPOLITAN RAILWAY LOCOMOTIVE – NO.1) by Jim Stringer It was the winter of 1962-63, which, as those able to recall, was a winter which was noted for its heavy and prolonged falls of snow, which started late on Christmas day (1962) and, if I recall, lasted almost through to March. I was in the third year of my apprenticeship with London Transport (Underground) and having just completed a placement at the Lille Bridge Steam Shed, was now stationed out at Neasden Depot for a period of six months. Working under Tube Trains in that weather was no fun, with the shutters open at either end of the sheds, the wind, and what it brings, blew mercilessly through the pitted roads where my fitter and I were engaged in changing some piece of defective equipment or another on an ‘F’ or ‘T’ stock train. The only heating in those days were cast iron coal/wood-burning stoves which stood at either end of the roads – which were only really effective if you stood right on top of them when they were glowing red. So it was inevitable that to keep warm I should make my way over to the Steam Shed where at least they kept the doors and shutters closed and the heat from the locomotives together with their stoves guaranteed to keep me warm. At that time London Underground still had a small fleet of steam locomotives amongst which were a couple of 0-6-0 Hunslet Locos which formerly belonged to the District Railway, L30 & L31 – (see below).
    [Show full text]