Form – I for Residential Building Complex Dugar Housing Limited
Total Page:16
File Type:pdf, Size:1020Kb
Form – I for Residential Building Complex Dugar Housing Limited FORM – I I. BASIC INFORMATION S. No. Item Details 1 Name of the project Residential Building Complex - “Sky Dugar" 2 S. no. in the schedule 8 (a) Area Details: 3 Proposed area Total land area: 13,240 Sqm Total built-up area: 30,594 Sqm 4 New/Expansion/Modernization New 5 Existing capacity/Area etc - 6 Category of project i.e. ‘A’ or ‘B’ B Does it attract the general condition? If 7 No yes, please specify Does it attract the specific condition? If 8 No yes, please specify Plot/Survey/Khasra No S.Nos: 117/1 & 119 Village Ayanambakkam 9 Tehsil Ambattur District Thiruvallur State Tamilnadu Railway station : Ambattur Railway Station Nearest railway station/airport along (5 km) 10 with distance in kms Airport : Chennai International Airport (19 km) Nearest town, city, district headquarters The project site falls within the developed 11 along with distance in kms Chennai City. Thiruverkadu Municipality, Village panchayats, Zilla parishad, No. 7, Vedapureswaram, municipal corporation, local body 12 Thiruverkadu, (Complete postal addresses with Chennai – 600077, telephone nos. to be given) Tel. No: (044) 26800437. 13 Name of the applicant Dugar Housing Limited New No. 34, Old No. 123 7th Floor, Dugar Towers, 14 Registered address Rukmani Lakshmipathi Road, Egmore, Chennai – 600008. Eco Services India Pvt. Ltd, Chennai – 600032 Form – I for Residential Building Complex Dugar Housing Limited Address for correspondence: Mr. Pradeep Jangra Name Vice President Designation New No. 34, Old No. 123 Address 7th Floor, Dugar Towers, 15 Rukmani Lakshmipathi Road, Egmore, Chennai – 600008. Pin code 600 008. E-mail [email protected] Telephone No. / Fax No. (044) 28587676 Details of alternative sites examined, if 16 any, Location of these sites should be No shown on a topo sheet 17 Interlinked projects No interlinked projects Whether separate application of 18 No interlinked project has been submitted? 19 If yes, date of submission - 20 If no, reason - Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) The forest (conservation) Act, 21 No 1980? (b) The wild life (Protection) Act, 1972? (c) The CRZ Notification 1991 Whether there is any government 22 No order/policy relevant/relating to the site 23 Forest land involved (hectares) No Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? a) Name of the Court 24 No b) Case No c) Orders/directions of the court, if any and its relevance with the proposed project Eco Services India Pvt. Ltd, Chennai – 600032 Form – I for Residential Building Complex Dugar Housing Limited II. ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies etc.) Details thereof (with approximate S. Information/Checklist Yes/No quantities /rates, wherever possible) with No. confirmation sources of information data Change in land use from vacant site to residential use. No change in topography as Permanent or temporary the existing land is a flat terrain. The Project change in land use, land site comes under General Industrial Zone cover or topography and the development of residential building 1.1 including increase in Yes complex is permitted under this zone. Also, intensity of land use (with the TNPCB concurrence has been obtained respect to local land use based on which the building plan approval is plan) given by CMDA. The documentary evidence of ownership and land use is enclosed as Annexure –II. The project site was vacant land without Clearance of existing land, 1.2 Yes trees and only clearance of ground shrubs vegetation and buildings? was carried out. The vacant land was converted into 1.3 Creation of new land uses? Yes residential building complex. Pre-construction Geo-technical investigations have been 1.4 investigations e.g. bore Yes carried out and the copy of the report is holes, soil testing ? enclosed as Annexure –III. Construction of residential building complex with following components: Block 1 S + 4 Floors Block 1 (LIG S + 4 Floors 1.5 Construction works? Yes Block) Block 2 S + 4 Floors Block 3 S / G + 4 Floors Block 4 S / G + 4 Floors 1.6 Démolition Works? No No Demolition works was carried out. Temporary sites used for No labour camps were proposed, since local 1.7 construction works or No laborers from nearby areas were hired for housing of construction the work. Adequate drinking water and Eco Services India Pvt. Ltd, Chennai – 600032 Form – I for Residential Building Complex Dugar Housing Limited workers? sanitation facilities were provided for them at the project site. 1.8 Above ground buildings, Construction of residential building complex structures or earthworks with following components: including linear structures, Block 1 S + 4 Floors cut and fill or excavations Block 1 (LIG S + 4 Floors Yes Block) Block 2 S + 4 Floors Block 3 S / G + 4 Floors Block 4 S / G + 4 Floors Underground works 1.9 including mining or No Nil tunneling? 1.10 Reclamation Works? No Nil 1.11 Dredging? No Nil 1.12 Offshore structures? No Nil Production and Nil 1.13 No manufacturing processes? Construction material storage/handling yard was located within the project site and Facilities for storage of separated by enclosures/barricades. Cement 1.14 Yes goods or materials? was stored under cover in bales. Sand wasbe stacked under tarpaulin cover. Bricks/blocks and steel was laid in the open. Solid Waste: Wastes generated in the project site during construction (debris) was used for backfilling and leveling within the site. Solid waste during operation phase is being collected and segregated. The biodegradable waste will be collected and treated through Facilities for treatment or Organic Waste Converter (OWC). Non bio 1.15 disposal of solid waste or Yes degradable waste will be segregated liquid effluents? according to its characteristics & handed over to recyclers for disposal. Liquid Effluent: During the construction phase, sewage from temporary toilets was disposed through septic tanks with soak pits. During the operation phase, the sewage generated will be treated in installed Sewage Eco Services India Pvt. Ltd, Chennai – 600032 Form – I for Residential Building Complex Dugar Housing Limited Treatment Plant and reused within the premises. Facilities for long term No No facilities for long term housing of 1.16 housing of operational operational workers are proposed. workers? New road, rail or sea traffic 1.17 during construction or No Existing infrastructure will be used. operation? New road, rail, air waterborne or other transport infrastructure 1.18 No Nil including new or altered routes and stations, ports, airports etc? Closure or diversion of existing transport routes or 1.19 infrastructure leading to No Nil changes in traffic movements? New or diverted Power Supply from TANGEDCO & Water 1.20 transmission lines or No Supply connection from local body will be pipelines? obtained prior to occupancy Impoundment, damming, culverting, realignment or 1.21 other changes to the No Nil hydrology of watercourses or aquifers? 1.22 Stream crossings? No Nil Abstraction or transfers of The private tanker water supply / through 1.23 water from ground or No local body connection available in the surface waters? project area. Changes in water bodies or 1.24 the land surface affecting No Nil drainage or run-off? Transport of personnel or materials for construction, There was movement of men and materials 1.25 Yes operation or during construction & operational phases. decommissioning? Long-term dismantling or 1.26 No - decommissioning which Eco Services India Pvt. Ltd, Chennai – 600032 Form – I for Residential Building Complex Dugar Housing Limited could have an impact on the environment? Ongoing activity during decommissioning which 1.27 No - could have an impact on the environment? There will be a daily movement of people Influx of people to an area during the operation phase as the 1.28 in either temporarily or Yes development is a residential building permanently? complex. Introduction of alien 1.29 No - species? The existing land was devoid of trees. Only Loss of native species or No 1.30 ground shrubs exists was cleared during genetic diversity? construction. 1.31 Any other actions? No - 2. Use of Natural resources for construction or operation of the Project (Such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate quantities / S. Information/Checklist Yes/ rates, wherever possible) with sources of No. confirmation No information data Land especially undeveloped 2.1 No The land was vacant when it was acquired. or agricultural land (ha) 25-30 KLD of water was used during peak construction period. The daily fresh water requirement during operation phase is estimated Water (expected source & 2.2 Yes to be about 112 KLD upon full occupancy and competing users) Unit: KLD this is sourced from private tanker water supply system prevailing in the area / through the local body connection. Minerals like Limestone, Clay, Shale, Gypsum, 2.3 Minerals (MT) Yes Aggregate were used in construction materials Cement (10974 tons), Sand (783787 CFT). Construction materials were sourced from the Construction material – stone, 2.4 local market. Materials with good post industrial aggregates, and / soil (expected Yes recycle content like aerocon blocks (Fly ash), source- cum) steel etc. were used in the projects. Forests and timber (source– Plywoods (90 tons) with good recycled content 2.5 Yes MT) was used in the residential buildings. Eco Services India Pvt. Ltd, Chennai – 600032 Form – I for Residential Building Complex Dugar Housing Limited The estimated power requirement during operation phase is about 2500 kVA and it will be Energy including electricity sourced from the nearby TNEB grid.