FORM I I. BASIC INFORMATION S. No Item Details 1. Name of the Project/S Proposed Construction of Residential Cum Shop Block
Total Page:16
File Type:pdf, Size:1020Kb
FORM I I. BASIC INFORMATION S. No Item Details Proposed Construction of Residential cum Shop block (A) and MLCP with existing block (B & C) at Survey Number 101/2A1, 106/1 of 1. Name of the project/s Adayalampattu village, Vanagaram - Ambattur Main Road, Ambattur Taluk, Tiruvallur District, Tamil Nadu The project is categorized under Schedule 8 (a) 2. S.No. in the schedule “Building and Large Construction projects” of EIA Notification 2006 and its subsequent amendment Proposed Built-up area is 2619.09 Sq.m. Proposed capacity / area / length / Total Built-up Area After Expansion – 22756.61 3. tonnage to be handled / command area / Sq.m lease area /number of wells to be drilled. Building wise area details are given in the Conceptual Plan 4. New/Expansion/Modernization New 5. Existing Capacity/ Area etc. Existing Built up Area - 1709.36 Sq.m 6. Category of Project i.e. ‘A’ or ‘B’ Category B2 Dose it attract the general condition? 7. No If yes, please specify. Dose it attract the specific condition? 8. Not Applicable If yes, please specify. Location Plot/Survey/ Khasra. No 101/2A1, 106/1 Village Adayalampattu 9. Taluk Ambattur District Thiruvallur State Tamil Nadu 10. Nearest railway station/airport along with Ambattur Railway station – 5.33 km (N) distance in Km. Chennai International Airport – 8.23 km (SSE) 11. Nearest town, city, district headquarters Mogappair – 2.7 km (NE) along with distance in Km. Ambattur – 4.5 km (NNE) Village Panchayats, Zilla parished, municipal corporation, local body 12. Villivakkam Panchayat (complete postal address with telephone nos. to be given) i 13. Name of the applicant M/s. Guru Ragavendra Foundations Pvt. Ltd. Old No. 96/1, New No. 35, ‘R’ Block, 14. Registered address 3rd Main Road, Anna Nagar, Chennai – 600 040. Address for correspondence Name B. Murugeswaran Designation (Owner/Partner/CEO) Managing Director Old No. 96/1, New No. 35, ‘R’ Block, Address 15. 3rd Main Road, Anna Nagar, Chennai – 600 040. Pin Code 600 040 E-Mail [email protected] Telephone/ Mobile No 044-26201405 Fax No - Details of Alternative Sites Examined, if 16. any, location of these sites should be No alternative sites examined shown on a Topo sheet. 17. Interlinked Projects Not Applicable Whether separate application of 18. Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable Whether the proposal involves approval / Clearance under the following acts: if yes, details of the same and their status to 21. be given. No (a)The Forest (Conservation) Act, 1980? (b)The Wildlife (Protection) Act, 1972? (c)The C.R.Z Notification, 1991? Whether there is any government order/ 22. No Police relevant/ relating to the site? 23. Forest land involved (hectares) No Whether there is any litigation pending against the land/ or land in which the Project is proposed to be set up? (a) Name of the Court 24. No (b) Case No. (c) Order/ directions of the Court, if any And its relevance with the proposed Project ii (II) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, and the like) Details thereof (with approximate Information/Checklist S.No. Yes/No quantities /rates, wherever possible) confirmation with source of information data Permanent or temporary change There will not be any change in the in land use, land cover or land use, land cover or topography as 1.1 topography including increase No the site is categorized as Primary intensity of land use (with Residential Use Zone as per the respect to local land use plan) Development control rules of CMDA. Clearance of existing land, Proposed construction is on vacant 1.2 No vegetation and Buildings? land Land use of the proposed site comes under Primary Residential Use Zone 1.3 Creation of new land uses? No and is permitted at the proposed site as per the regulations of CMDA. Geo technical investigation has been Pre-construction investigations done to find the suitability of soil for 1.4 Yes e.g. Bore Houses, Soil testing? providing adequate foundations (Refer Annexure IV) Construction of various buildings will be done systematically, with economy 1.5 Construction works? Yes of materials and with due care on environmental protection. No demolition works will be carried 1.6 Demolition works? No out as the land is vacant. Inside the proposed site, a small area will be utilized temporarily for Temporary sites used for construction of sheds for the workers construction works or housing 1.7 Yes and materials. Water supply and of construction workers? sanitation facilities will be provided for them. Mostly workers will be deployed from local area only. Excavation works will be carried out Above ground buildings, for foundation of the structures. Later structures or earthworks 1.8 Yes on, the cut and fill process will be including linear structures, cut required to the minimum extent for and fill or excavations leveling. Underground works mining or No underground works will be required 1.9 No tunneling? as the proposed project is the iii construction of Residential buildings including commercial activities. 1.10 Reclamation works? No Only levelling of ground if required. 1.11 Dredging? No No need for dredging 1.12 Off shore structures? No Not required Production and manufacturing It’s a construction project. Hence not 1.13 No processes? applicable Temporary sheds will be constructed Facilities for storage of goods within the site for the storage of 1.14 Yes or materials? cement, sand and other materials during construction phase. Sewage generated shall be treated in STP of capacity 130 KLD. The treated wastewater will be reused for toilet flushing, greenbelt development and Facilities for treatment or excess treated water will be disposed to 1.15 disposal of solid waste or liquid Yes CMWSSB. effluents? Municipal Solid Waste will be collected, Segregated, treated (OWC) and disposed to Chennai corporation by garbage vehicle. There is no residential facility for Facilities for long term housing 1.16 No operational workers as they will be of operational workers? deployed from local area. The project site is abutting Vanagaram – Ambattur road on west boundary and New road, rail or sea traffic Poonamalee High Road at a distance of 1.17 during Construction or No 300m which on South direction. The operation? nearest railway station is Ambattur railway station located at the distance of 5.33 km on North direction. New road, rail, air, waterborne The existing infrastructure will be or other transport infrastructure 1.18 No made use during construction and including new or altered routes operation phase. and stations, ports, airports etc? As construction works will be within a Closure or diversion of existing specified area, there is no need for transport routes or infrastructure 1.19 No closure or diversion of existing leading to changes in Traffic transport routes. The existing transport movements? infrastructure will be made use of. New or diverted transmission Existing Transmission lines or pipe 1.20 No lines or pipelines? lines will be used without any iv diversion as per the requirements. Impoundment, damming, There will be no impoundment, culverting, realignment or other damming, culverting, realignment or 1.21 No changes to the hydrology of other changes to the hydrology of watercourses or aquifers? watercourses or aquifer. 1.22 Stream crossings? No No Stream crossings No Ground water shall be abstracted. Abstraction or transfers of water No In future may be abstract after 1.23 form ground or surface waters? obtaining NOC from SG & SWRDC, Taramani. There shall be no change in water bodies or the land surface. It is proposed to collect all the rain water within the proposed development to the Changes in water bodies or land rain water harvesting trenches along 1.24 surface affecting drainage or No the boundary and the overflow will be runoff? collected in the exclusive sumps to be provided for collection of rain water. Excess water will be discharged accordingly. Transport of personnel or Transport of personnel or construction 1.25 materials for construction, No materials during construction phase operation or decommissioning? will be through existing roads. Long-term dismantling or No long term works involved in the 1.26 decommissioning or restoration No proposed activity works? Ongoing activity during Only temporary thatched sheds will be decommissioning which could built for storing cement and other 1.27 No have an impact on the materials. So there will be no environment? decommissioning works. Influx of people to an area During construction period workers 1.28 either temporarily or No will be deployed locally. permanently? 1.29 Introduction of alien species? No No such alien species are envisaged Loss of native species or No loss of native species will occur as 1.30 No genetic diversity? the site is plain Only eco-friendly activities like tree 1.31 Any other actions? No plantation will be undertaken v 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply) Details thereof (with approximate S. Information/Checklist Yes/No quantities /rates, wherever possible) No. confirmation with source of information data Land especially undeveloped or 2.1 No There is no agricultural land. agricultural land (ha) Total water Requirement 140 KLD of which recycled water for flushing (46.2 KLD) and Green belt Water (expected source & 2.2 Yes development (3 KLD) will be made competing users) unit: KLD available through in-house STP. Fresh water requirement of 94 KLD shall be met by CMWSSB.