Achievements Tamil Nadu Electricity Board Is a Pioneer

Total Page:16

File Type:pdf, Size:1020Kb

Achievements Tamil Nadu Electricity Board Is a Pioneer Achievements Tamil Nadu Electricity Board is a pioneer organization among the State Electricity Boards in India in promoting Renewable Energy Programme. Tamil Nadu is blessed with conducive natural metrological and topographical settings for wind power generation. Four passes namely Palghat pass, Shengottah pass, Aralvoimozhi pass and Cumbum Pass are endowed with heavy wind flows because of the tunneling effect during South west monsoon with an average wind speed of 18 to 22 Km/Hr. Initially during 1986, the first demo wind farm with 20 Nos. Wind Electric Generators each 55KW were erected at Mullaikadu in Tuticorin District, in association with Tamil Nadu Energy Development Agency (TEDA) under the aid of Ministry of Non Conventional Energy Sources (MNES), Government of India. Subsequently various windfarms were erected by TNEB at other places in Kayathar, Muppandal and Puliankulam areas including Kethanoor in Coimbatore. Totally 120 windmills were erected by TNEB from 1986 to 1993 totaling to a capacity of 19.355 MW. Based on the successful functioning of these demonstration wind farms, private developers had shown keen interest in this sector which has now led to an installed capacity of Private Wind Mills of about 7262 MW as on 31.05.2014 contributing to 34% of India’s total wind capacity . The Wind Electric Generators are installed in the Districts of Tirunelveli, Kanyakumari, Tuticorin, Ramnad, Coimbatore, Udumalpet, Dindigul, Theni, Tirupur and Erode. At present around 11,000 to 13,000 million units per annum are generated from the above windmills, contributing to about 14% of the yearly energy need of the State. Table - I Sl. Year Installed Capacity in MW No. During Year Cum Total 1 Upto 1997 0.000 676.155 2 1997-1998 31.140 707.295 3 1998-1999 17.765 725.060 4 1999-2000 45.675 770.735 5 2000 -2001 41.895 812.630 6 2001-2002 44.035 856.665 7 2002-2003 133.600 990.265 8 2003-2004 371.225 1361.490 9 2004-2005 678.735 2040.225 10 2005-2006 857.555 2897.780 11 2006-2007 577.910 3475.690 12 2007-2008 381.075 3856.765 13 2008-2009 430.975 4287.740 14 2009-2010 602.025 4889.765 15 2010-2011 997.400 5887.165 16 2011-2012 1083.460 6970.625 17 2012-2013 166.050 7136.675 18 2013-2014 107.380 7252.605 19 2014-2015 (up to May '14) 9.750 7262.355 Table-II YEAR GENERATION ( in M.U) BOARD PRIVATE TOTAL (1) (2) (3) (4) 1986-1993 96.458 29.790 126.248 1993 -1994 31.533 39.700 71.233 1994-1995 29.843 121.250 151.093 1995 -1996 22.763 434.900 457.663 1996-1997 19.489 659.646 679.135 1997-1998 18.822 747.032 765.854 1998-1999 23.273 905.592 928.865 1999-2000 27.228 1129.365 1156.593 2000 -2001 17.608 1076.567 1094.175 2001-2002 17.899 1239.211 1257.110 2002 -2003 19.456 1286.247 1305.703 2003-2004 24.346 1690.129 1714.475 2004-2005 18.036 2242.696 2260.732 2005-2006 14.581 3429.700 3444.281 2006-2007 17.591 5251.391 5268.982 2007-2008 12.058 6054.588 6066.646 2008 -2009 10.2 85 6644.865 6655.150 2009 -2010 11.092 8134.415 8145.508 2010-2011 12.675 8707.370 8720.046 2011-2012 12.148 9750.900 9763.048 2012 -2013 12.660 12935.578 12948.238 2013-2014 12.584 10917.653 10930.237 2014-2015 (up to April'14) 0.107 392.184 392.291 Total 482.535 83820.769 84303.304 Order a) The Tamil Nadu Electricity Regulatory Commission (TNERC) has issued order No.3, dt: 15.05.06 for “Tariff Related Issues for Non Conventional Energy Sources” and the purchase price of energy has been fixed as Rs.2.75/Kwhr for the wind mills commissioned prior to 15.05.06 and Rs.2.90/Kwhr for the wind mills installed and commissioned on or after 15.05.06.TNEB has implemented the power purchase price to encourage the Private Wind Mill Developers. (Refer www.tnercgov.in ) b) On 20.03.2009,TNERC has issued Tariff order for Wind Energy Order No:1, dt:20.03.2009. This order is applicable for the WEGs commissioned on or after 19.09.08.The power purchase rate fixed in the order is Rs.3.39 per unit from 01.04.2009. Now the power purchase rate fixed by TNERC is Rs.3.51 per unit from 01.08.2012 as wind tariff order no.6 dt.31.7.12. c) REC Pooled cost of wind energy is Rs.2.63 per unit for the year 2013-14. Banking The wind energy private developers are permitted to wheel the energy generated from their wind mills to their own /subsidiary HT Industrial and commercial concern, situated anywhere in Tamil Nadu with banking facility for their future use. The banking period is one year, from 1 st April to 31 st March of succeeding year. The Banking Charges is 94 paise per unit drawn for adjustment. The unutilized portion of banked energy if any available at the end of banking period i.e. 31st march of every year shall be purchased by TANGEDCO @ 75% of the relevant purchase rate of wind energy. Transmission Charges: Rs.789.20 per day per MW or part thereof (40% of Rs.1973 per day per MW, the rate applicable to conventional Generator). Wheeling Charges: 6.94 paise per unit (40% of 17.35 paise/unit) Scheduling and system operation charges: Rs.600/- per day for 2 MW. If the capacity is less than 2 MW, the charges shall be proportionate. Transmission and Distribution Loss : Actuals. PROCEDURE FOR OBTAINING APPROVAL AND TECHNICAL REQUIREMENTS TO BE COMPLIED WITH. 1. Registration of WEG application Applications shall be submitted to the CHIEF ENGINEER/NCES/TANGEDCO Chennai with the following documents: a) Request application b) Filled in Proforma c) Invoice for purchase of new WEG d) Land Sale deed documents / FMB. With the originals for verification e) Self certificate with power curve of WEG f) Manufacturer certificate for WEG g) If it is a firm, copy of Partnership deed / company, copy of Memorandum & Articles of Association with registration of Firm/Company Certificate. h) Indemnity bond in non judicial stamp paper of Rs.80/- i) Undertaking in non judicial stamp paper of Rs.80/- j) Copy of Purchase order with Order of acceptance. k) Electrical Schematic Single line diagram l) Copy of Type approvals/ Certificate issued by M/s C-WET 2. Payments at the time of Registration : a) Registration fees for 1 No. WEG : Rs.13,310/- (Non – refundable) b) Consultancy charges for 1 No. application irrespective of No. of WEGs : Rs.33,275/- (Non – refundable). c) Infrastructure Development Charges @ Rs.30 lakhs/MW d) Load flow study charges Rs.2,20,000/- + Service tax. The above charges shall be paid in the form of Demand Draft in favour of TANGEDCO/Chennai, payable at Chennai. Condition : • The application Registration is valid for a period of six months from the date of Registration. • Any request for change in survey Number will not be permitted. However it is permitted to change to any of the nearby location adjacent to the proposed location based on specific field recommendation and valid documents within the validity period of the application. 3. Feasibility Report from Field: After verifying the above documents and on receipt of the payments, the application is forwarded to the concerned field Superintending Engineer/NCES (Tirunelveli / Udumalpet). The concerned Superintending Engineer shall submit the Field feasibility report with recommendation in respect of ownership of the WEG land, Spacing distance 5D x 7D, feeder capacity and Substation capacity within a month from the date of Registration. Then the load flow study will be carried out. Based on the feasibility condition, the Noted for Record and grid tie up approval are issued by the Chief Engineer/NCES/TANGEDCO. The WEG shall be commissioned within Two years from the date of issue of Original “Noted for Record letter” and “Grid tie up” approval. 4) Name Transfer WEG application: • The WEG application registered in one name to be transferred to any other Name is permitted on production of necessary valid documents and on payment of Rs.1,00,000/- (Rupees One Lakh only) per application towards application name transfer fee. • The application will be name transferred only with the entire survey numbers notified in the original application and not as a part of survey numbers. • The above name transfer will not alter either the Date of Registration or the Registration number allotted to the first applicant and the Original seniority will be maintained. 5) Name Transfer of Noted for Record: The Noted for Record and Tie up approval issued to one Company will be name transferred to any other company on payment of Rs.1 Lakh and a fresh Noted for Record and Tie up approval will be issued in the new name. .
Recommended publications
  • Wind Turbine Design for a Hybrid System with the Emphasis on Generation Complementarity
    Wind Turbine Design for a Hybrid System with the emphasis on generation complementarity F. A. Qamar Wind Turbine Design for a Hybrid System with the emphasis on generation complementarity by Fadhil Ahmad Qamar to obtain the degree of Master of Science in Sustainable Energy Technology at the Delft University of Technology, to be defended publicly on Tuesday August 18, 2020 at 13.00 PM. Student number: 4741986 Project duration: October 17, 2019 – August 18, 2020 Thesis committee: Prof. dr. D. A. von Terzi, TU Delft, chairperson Dr. ir. M. L. Zaayer, TU Delft, First supervisor Dr. ir. J. Quist, TU Delft, Second supervisor An electronic version of this thesis is available at http://repository.tudelft.nl/. Summary Reason for this research The global issue on global warming and climate change are one of the motivations that led nations to reform their means of generating power and meeting the electricity demand. Decarbonisation of the power system is imperative to reduce the carbon emission, and the penetration of renewable energy to the power system is expected to rise in the future. However, as the nature of renewable energy source being weather dependent, high penetration of this technology in the power system will pose additional challenges to the utilities and system operators. The hybrid power plants that include multi- ple generation technologies can combine the strengths and weaknesses of different technologies and results in a power system with better performance. For instance, combining wind, solar or other gen- eration technologies can results in a more stable generation with a generation profile similar to the base-load generation technology.
    [Show full text]
  • 14.3 Review of Progress of Works on New 400 KV & 220 KV Sub
    : 1 : :1: 1. 30 जून 2016 को थापित क्षमता 'मे.वा.' मᴂ Southern Region Installed Capacity in MW as on 30th June 2016 (As per CEA) THERMAL STATE HYDRO THERMAL NUCLEAR (W M+R.E.S)** TOTAL COAL GAS DIESEL TOTAL Andhra Pradesh 1758.87 6075.91 3182.65 16.97 9275.53 0.00 2676.30 13710.70 Telangana 2135.66 5076.59 1697.75 19.83 6794.17 0.00 605.54 9535.37 Karnataka 3599.80 6280.00 0.00 234.42 6514.42 0.00 5105.52 15219.74 Kerala 1881.50 0.00 174.00 159.96 333.96 0.00 255.47 2470.93 Tamil Nadu 2182.20 7720.00 1027.18 411.66 9158.84 0.00 9511.26 20852.30 Puducherry 0.00 0.00 32.50 0.00 32.50 0.00 0.03 32.53 Central Sector 0.00 11890.00 359.58 0.00 12249.58 2320.00 0.00 14569.58 Southern Region 11558.03 37042.50 6473.66 842.84 44359.00 2320.00 18154.12 76391.15 The graphical representaion is in page IA 2. June 2016 मᴂ जोडी गई क्षमता Additions to Installed Capacity in MW Capacity Date of Synchronising/ State Type Sector Station (MW) commissioning Tamil Nadu Wind Private Wind 6.00 June 2016 MW 10000 11000 12000 13000 1000 2000 3000 4000 5000 6000 7000 8000 9000 0 Reference: Page Page No. Reference: Andhra Andhra Pradesh Hydro, 1,759 Thermal, 9276 Nuclear, 0 W.M + R.E.S, 2676 1 , Item No.
    [Show full text]
  • 1. Introduction
    Tamil Nadu State Action Plan for Climate Change 1. INTRODUCTION 1.1 BACKGROUND Globally observations point towards a climate change scenario as temperatures are increasing, sea levels are rising, with a perceivable increase in severity and frequency of extreme events (IPCC 2007a; Special Report on Managing the Risks of Extreme Events and Disasters to Advance Climate Change Adaptation (SREX), 2012) and the speed of the change is evidently fast. This is leading to a complex situation, whereby all spheres of our existence are being impacted. Model projections; indicate a further escalation of the situation if greenhouse gas concentrations in the atmosphere from anthropogenic sources keep on rising unabated. It is surprising that solutions to adapt or mitigate the situation essentially are emerging from indigenous knowledge, State of art technology and research in all disciplines and fields. Due to global temperature rise and speed at which climate change is occurring, it is evident that countries are becoming vulnerable to climate change, which reduces the development path. Hence, capacity to adapt should be increased through implementation of suitable national adaptation plans. Future vulnerability depends not only on climate change but also on the type of development path that is pursued. Thus adaptation needs to be implemented in the context of national and global sustainable development efforts. The international community is identifying resources, tools, and approaches to support this effort. Adapting to climate change entails taking the right measures to reduce the negative effects of climate change (or exploit the positive ones) by making the appropriate adjustments and changes. There are many options and opportunities to adapt.
    [Show full text]
  • An Analysis of Wind Power Generation and Consumption Scenario in Tamil Nadu State of India Dr
    International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 02 Issue: 07 | Oct-2015 www.irjet.net p-ISSN: 2395-0072 An Analysis of Wind power generation and consumption scenario in Tamil Nadu State of India Dr. I. Arul, [email protected] Assistant Executive Engineer, Tamilnadu Electricity Board, TamilNadu, India Abstract reach a total of 22.5 GW. Among renewable, wind power accounted for almost two-thirds of the installed capacity. India is one of the most energy hungry The Indian government expects the share of renewable developing countries in the world. Around 300 million energy, presently at 6.9% of the total electricity Indians lack access to electricity in a country where per- production in the country, to grow to at least 15% in the capita electricity consumption is one-fourth of the next five years. India also wants to put in place world’s average. Tamil Nadu has 7,300 MW of installed 60,000MW of wind power capacity by then in a country wind energy capacity. Of this, nearly 90 MW was added that’s the world’s third largest emitter of greenhouse in 2014. Total capacity consists of 11,900 wind turbines gases, behind only the US and China. Wind energy’s and 110 pooling stations. Consumption of wind energy in share in the total power mix of the country was 2013-2014 was just 9000 million units as against more approximately 3% for the calendar year 2014 (National than 11000 million units in 2012-2013. This paper Load Dispatch Centre 2014, www.posco.in).
    [Show full text]
  • Wind Power Development in Tamil Nadu
    International Journal of Research in Social Sciences Vol. 8 Issue 3, March 2018, ISSN: 2249-2496 Impact Factor: 7.081 Journal Homepage: http://www.ijmra.us, Email: [email protected] Double-Blind Peer Reviewed Refereed Open Access International Journal - Included in the International Serial Directories Indexed & Listed at: Ulrich's Periodicals Directory ©, U.S.A., Open J-Gage as well as in Cabell’s Directories of Publishing Opportunities, U.S.A WIND POWER DEVELOPMENT IN TAMIL NADU Dr. T. Palaneeswari* Abstract Wind power is one of the oldest-exploited energy sources by humans and today is the most seasoned and efficient energy of all renewable energies. Wind energy does not contaminate, it is inexhaustible and reduces the use of fossil fuels, which are the origin of greenhouse gasses that cause global warming. In addition, wind energy is a native energy, because it is available practically everywhere on the plant, which contributes to reducing energy imports and to creating wealth and local employment. Tamil Nadu is the leading State in India in promoting and harnessing renewable sources of energy particularly wind. Tamil Nadu is endowed with rich wind energy potential in the country. In the Tirunelveli region in Tamil Nadu alone, there are two wind seasons – May to October and November to March, with the wind speeds higher during the first period. In Muppandal in Tamil Nadu, the wind speed exceed 43.2-46.8 km an hour during the peak period. Of the total installed capacity in the country of 26915 MW, the share of Tamil Nadu is 7654.17 MW as on 31st March, 2016.
    [Show full text]
  • S. No Name of the Company Telephone Number & Fax Number
    List of Suppliers/Manufacturers enlisted with TEDA for SPV/Solar Thermal Systems Note: The purchaser shall ensure the quality and standards of system/components as per MNRE/BIS/IEC standards before purchase. TEDA does not certify the quality & prices of enlisted Suppliers/Manufacturers/System Integrators Tamil Nadu Energy Development Agency (A unit of Government of Tamil Nadu) List of Manufacturers/Suppliers of Solar Products Enlisted with TEDA 5th Floor EVK Sampath Maaligai, 68 College Road, Chennai 600 006 Phone: 044-28242800, Fax No.: 28222971 Emai: [email protected], www.teda.in Telephone Manufacturer/ Name of the Products Number Supplier/ S. No Company Valid upto & Fax Number System Integrator [email protected] Solar Lantern(LED), 30.04.2020 M/s. Nova Energy Corp., [email protected] Solar street lighting Manufacturer No.132,Nehru Street, Indira M: 9159111888/8940500641 System(LED & CFL), Solar 1 Nagar, Perumugai, Home Vellore-632 009 Lighting System (M2) M/s. Aargee Equipments 044-42834477 SPV(Solar Lantern 31.3.2017 Manufacturer Pvt.Ltd., M: 9442242398 (2A), Solar Street No.197/7A, 10 th [email protected] Lighting System 2 Street, Jain Nagar, [email protected] (CFL), Solar Home Arumbakkam, Lighting System (M4) Chennai 600 106 0427- Solar Photovoltaic Systems 31.5.2020 Supplier M/s. Annai Solar Systems & 4037295/4037018 & Fabricators 9443217945/ Solar Water Heating Systems 3 19/82 G, Ramalinga 9965517945 Madalayam Street [email protected] Gugai, Salem – 636 006 0422-2901468/ SLS-CFL 30.4.2017 Manufacturer M/s. KL Solar Company Pvt Ltd 0422-6563638 SHL (CFL) –Model 1/482, Transport F:0422-2567562 IV 4 Nagar,Neelambur Cell:9894028393 - Coimbatore [email protected] Pin Code 641 062 044-42129378 Solar Photovoltaic Systems 31.03.2020 Supplier/ M/s.
    [Show full text]
  • Electricity Sector Transformation in India, a Case Study Of
    Electricity Sector Transformation in India A Case Study of Tamil Nadu 7th February 2018 Tim Buckley, Director of Energy Finance Studies, Australasia ([email protected]) and Kashish Shah, Research Associate ([email protected]) Indian Electricity Sector Transformation – Tamil Nadu 0 Table of Contents Executive Summary ............................................................................................................... 2 Introduction ............................................................................................................................ 4 1. India’s Electricity Sector .................................................................................................... 6 2. Tamil Nadu: Economic Overview ................................................................................... 10 3. Tamil Nadu Electricity Market ......................................................................................... 12 A Leading Indian State for Renewables ...................................................................................... 12 Structure of Tamil Nadu’s Electricity Board .................................................................................. 14 Interstate Green Power Corridor ................................................................................................... 14 4. Thermal Power Generation ............................................................................................. 15 Coal Power: An Expensive Option for TN ....................................................................................
    [Show full text]
  • Tneb Limited Tangedco Tantransco Bulletin
    TNEB LIMITED TANGEDCO TANTRANSCO BULLETIN JANUARY - 2018 CONTENTS Page No 1. PART - I NEWS & NOTES ... ... ... 2 2. PART - II GENERAL ADMINISTRATION & SERVICES ... ... ... 12 3. PART - III FINANCE ... ... ... 20 4. PART - IV TECHNICAL ... ... ... 24 5. INDEX ... ... ... 53 NEWS & NOTES PART – I I. GENERATION / RELIEF PARTICULARS: The Generation / Relief particulars for the month of January 2018 were as follows: Sl.No. Particulars In Million Units I. TNEB GENERATION (Gross) Hydro 335.980 Thermal 1854.751 Gas 166.177 Wind 0.100 TNEB TOTAL 2357.008 II NETT PURCHASES FROM CGS 3058.835 III PURCHASES IPP 157.140 Windmill Private 319.255 CPP, Co-generation & Bio-Mass (Provisional) 93.000 Solar (Private) 260.492 Through Traders (nett purchase) 1656.360 TOTAL PURCHASES 2486.248 IV Total Wheeling Quantum by HT consumers 630.801 Total Wheeling Quantum to Other States by Pvt. Generators 21.169 Total TNEB Power generation for sale 0.443 Total Wheeling 651.970 Power Sale by TANGEDCO (Exchange) (-) 0.443 Power Sale by TANGEDCO(STOA under Bilateral) 0.000 Power Sale by Private Generators (Exchange) (-) 16.193 Power Sale by Private Generators (Bilateral) (-) 4.977 Power blance under SWAP 231.785 V TOTAL (TNEB Own Gen+Purchase + wheeling quantum+SWAP) 8764.677 VI Load shedding & Power cut relief (Approx) 0 VII Less energy used for Kadamparai pump 60.210 Less Aux. consumption for Hydro, Thermal & Gas 168.744 VIII AVERAGE PER DAY REQUIREMENT 283 IX DETAILS OF NETT PURCHASES FROM CGS & OTHER REGIONS: Neyveli TS-I 217.629 Neyveli TS-I Expansion 91.939 Neyveli
    [Show full text]
  • PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03
    PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03 CDM – Executive Board CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS A. General description of the small scale project activity B. Application of a baseline and monitoring methodology C. Duration of the project activity / crediting period D. Environmental impacts E. Stakeholders’ comments Annexes Annex 1: Contact information on participants in the proposed small scale project activity Annex 2: Information regarding public funding Annex 3: Baseline information Annex 4: Monitoring Information 1 PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03 CDM – Executive Board Revision history of this document Version Date Description and reason of revision Number 01 21 January Initial adoption 2003 02 8 July 2005 • The Board agreed to revise the CDM SSC PDD to reflect guidance and clarifications provided by the Board since version 01 of this document. • As a consequence, the guidelines for completing CDM SSC PDD have been revised accordingly to version 2. The latest version can be found at <http://cdm.unfccc.int/Reference/Documents>. 03 22 December • The Board agreed to revise the CDM project design document 2006 for small-scale activities (CDM-SSC-PDD), taking into account CDM-PDD and CDM-NM. 2 PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) - Version 03 CDM – Executive Board SECTION A. General description of small-scale project activity A.1 Title of the small-scale project activity: 2.85 MW Bundled Wind Power Project by Ramraj Handlooms in Tamil Nadu (India) Version - 02 Date: 04/10/07 A.2 Description of the small-scale project activity: 2.85 MW Bundled Wind Power Project (hereafter referred as the ‘project’) is a grid connected renewable energy project located at Tamil Nadu state, India.
    [Show full text]
  • Wind Farm/Park - Meaning & Types
    Wind energy is an important source of renewable energy in India. Many of the largest operational onshore wind farms are located in the United States, India and China. This article throws light on the advantages and disadvantages of wind parks. Wind Farm/Park - Meaning & Types A wind farm or wind park, also called a wind power station or wind power plant, is a group of wind turbines in the same location used to produce electricity. Wind farms vary in size from a small number of turbines to several hundred wind turbines covering an extensive area. Types of Wind Farm/Parks 1. Onshore - Wind turbines harness the energy of moving air to generate electricity. Onshore wind refers to turbines located on land 2. Offshore - offshore turbines are located out at sea or in freshwater. List of 10 Largest Wind Power Plants in India Below-table shares the list of 10 largest wind power plants in India Wind Power Plant Megawatt (MW) Location Muppandal wind farm 1500 Tamil Nadu, Kanyakumari Jaisalmer Wind Park 1064 Rajasthan, Jaisalmer Brahmanvel wind farm 528 Maharashtra, Dhule Dhalgaon wind farm 278 Maharashtra, Sangli Vankusawade Wind Park 259 Maharashtra, Satara District. Vaspet 144 Maharashtra, Vaspet Tuljapur 126 Maharashtra, Osmanabad Beluguppa Wind Park 100.8 Beluguppa, Andhra Pradesh Mamatkheda Wind Park 100.5 Madhya Pradesh, Mamatkheda Anantapur Wind Park 100 Andhra Pradesh, Nimbagallu Muppandal Wind Farm 1. The project was developed by Tamil Nadu Energy Development Agency. 2. The Muppandal Wind Farm is India's largest operational onshore wind farm. Jaisalmer Wind Park 1. This project is located in Jaisalmer district, Rajasthan, Western India.
    [Show full text]
  • The Drive of Renewable Energy in Tamilnadu Status, Barriers And
    Renewable and Sustainable Energy Reviews 73 (2017) 115–124 Contents lists available at ScienceDirect Renewable and Sustainable Energy Reviews journal homepage: www.elsevier.com/locate/rser The drive of renewable energy in Tamilnadu: Status, barriers and future MARK prospect ⁎ J. Jeslin Drusila Nesamalar , P. Venkatesh, S. Charles Raja Department of Electrical and Electronics Engineering, Thiagarajar College of Engineering, Madurai, Tamilnadu 625015, India ARTICLE INFO ABSTRACT Keywords: This article provides a comprehensive review on Tamilnadu's achievement in extracting renewable energy. It Renewable energy discusses the initiatives and policies framed to exploit the renewable natural resources. It also analyzes the Tamilnadu various barriers in exploiting renewable energy and the future prospects of Tamilnadu. The core findings are: Wind Tamilnadu, the southernmost state of India is immensely blessed with renewable energy sources mainly wind, Solar solar, hydro and bio-mass. As a result of proper planning and immense investment, Tamilnadu has the highest Small-hydro installed capacity of grid connected renewable power in India and has a share of 35% of India's installed Cogeneration Bio-derived energy capacity of wind energy. Presently, the capacity addition is not up to the mark. Meanwhile, Tamilnadu leads the country in polluting the environment by emitting greener house gas. Also, there is an alarm in the depletion of conventional energy resources of Tamilnadu. It should not be satisfied with new promotional policies or projects but also, the progress of renewable energy utilization and installation must be monitored. To ensure continuous growth in renewable sector, more public awareness and Research and Development sector should be encouraged in Tamilnadu.
    [Show full text]
  • Avvaiyar - Poems
    Classic Poetry Series Avvaiyar - poems - Publication Date: 2012 Publisher: Poemhunter.com - The World's Poetry Archive Avvaiyar(1st - 2nd Century CE) The Avvaiyars (Tamil: ???????) "respectable women" was the title of more than one poet who was active during different periods of Tamil literature. The Avvaiyar were some of the most famous and important female poets of the Tamil canon. Abithana Chintamani states that there were three female poets titled Avvaiyar. Among them, Avvaiyar I lived during the Sangam period (c. 1st and 2nd century CE) and had cordial relation with the Tamil chieftains Paari and Athiyaman. She wrote 59 poems in the Pu?ana?u?u. Avvaiyar II lived during the period of Kambar and Ottakoothar during the reign of the Chola dynasty in the 13th century. She is often imagined as an old and intelligent lady by Tamil people. She wrote many of the poems that remain very popular even now and are inculcated in school textbooks in Tamil Nadu. These books include a list of dos and don'ts, useful for daily life, arranged in simple and short sentences. There is a very famous legend that is associated with Auvaiyar (also Auvayar) (Tamil: ???????), a prominent female poets/ethicist/political activist of Sangam period (Tamil literature), and Naaval Pazham (Jambu) in Tamil Nadu. Auvaiyar, believing to have achieved everything that is to be achieved, is said to have been pondering her retirement from Tamil literary work while resting under Naaval Pazham tree. But she is met with and was wittily jousted by a disguised Lord Murugan (regarded as one of the guardian deities of Tamil language), who later revealed himself and made her realize that there was still a lot more to be done and learnt.
    [Show full text]