14.3 Review of Progress of Works on New 400 KV & 220 KV Sub
Total Page:16
File Type:pdf, Size:1020Kb
: 1 : :1: 1. 30 जून 2016 को थापित क्षमता 'मे.वा.' मᴂ Southern Region Installed Capacity in MW as on 30th June 2016 (As per CEA) THERMAL STATE HYDRO THERMAL NUCLEAR (W M+R.E.S)** TOTAL COAL GAS DIESEL TOTAL Andhra Pradesh 1758.87 6075.91 3182.65 16.97 9275.53 0.00 2676.30 13710.70 Telangana 2135.66 5076.59 1697.75 19.83 6794.17 0.00 605.54 9535.37 Karnataka 3599.80 6280.00 0.00 234.42 6514.42 0.00 5105.52 15219.74 Kerala 1881.50 0.00 174.00 159.96 333.96 0.00 255.47 2470.93 Tamil Nadu 2182.20 7720.00 1027.18 411.66 9158.84 0.00 9511.26 20852.30 Puducherry 0.00 0.00 32.50 0.00 32.50 0.00 0.03 32.53 Central Sector 0.00 11890.00 359.58 0.00 12249.58 2320.00 0.00 14569.58 Southern Region 11558.03 37042.50 6473.66 842.84 44359.00 2320.00 18154.12 76391.15 The graphical representaion is in page IA 2. June 2016 मᴂ जोडी गई क्षमता Additions to Installed Capacity in MW Capacity Date of Synchronising/ State Type Sector Station (MW) commissioning Tamil Nadu Wind Private Wind 6.00 June 2016 MW 10000 11000 12000 13000 1000 2000 3000 4000 5000 6000 7000 8000 9000 0 Reference: Page Page No. Reference: Andhra Andhra Pradesh Hydro, 1,759 Thermal, 9276 Nuclear, 0 W.M + R.E.S, 2676 1 , Item No. Item , Telangana Hydro, 2,136 Thermal, 6794 Nuclear, 0 1 W.M + R.E.S, 606 Karnataka Hydro, 3,600 SR Thermal, 6514 - Installed Capacity Capacity Installed Nuclear, 0 W.M + R.E.S, 5106 Hydro, 1,882 Kerala States / Sectors / States Thermal, 334 : Nuclear, 0 2 - : W.M + R.E.S, 255 June 2016 TamilNadu Hydro, 2,182 Thermal, 9159 Nuclear, 0 W.M + R.E.S, 9511 Puducherry Hydro, 0 Thermal, 33 Nuclear, 0 W.M + R.E.S, 0 Central Sector Central Hydro, 0 Thermal, 12250 Nuclear, 2,320 W.M + R.E.S, 0 :3: 3.बिजली कि आपूर्त ि कि स्थिर्त Power Supply Position 3.1 उपयोग एवं उपल녍धता Requirement Vs Availability 3.1.1 मांग (ए啍स िस) Ex-Bus Demand (MW) from revised PSP SL No. Description Andhra Pradesh Telangana Karnataka Kerala T.N. Puducherry S. Region Ex-Bus Peak Demand a) 7038 6114 8183 3565 14362 369 37079 (Maximum Unrestricted Requirement ) b) Ex -Bus Peak Met(Actuals) 7000 6082 8189 3494 14358 367 36817 c) Shortfall -38 -32 6 -71 -5 -2 -262 d) %age shortfall -1% -1% 0% -2% 0% -1% -1% e) Average of daily max shortage -28 -27 -35 -35 -53 -1 -169 f) Maximum of daily max shortage -53 -50 -65 -137 -99 -2 -294 Note: Item Nos.a, b & c are not for same day/hour. 3.1.2 मांग Demand Maximum & Minimum Demand and Peak Demand Met (MW) SL No. Description A.P. Telangana Karnataka Kerala T.N. Puducherry S. Region Max Unresrticted a) 7399 6293 8440 3567 14644 369 38087 Requirement (PSP: Gross) # $ b) Gross Peak Met(Actual) 7361 6261 8446 3496 14640 367 37825 (Ex-bus) 7000 6082 8189 Date 1-Jun-16 1-Jun-16 1-Jun-16 6-Jun-16 15-Jun-16 16-Jun-16 2-Jun-16 c) Unrestricted Requirement (LGBR) 7333 6750 9619 3920 13800 395 39970 d) Minimum Demand 4092 3692 4626 1689 9273 202 24578 Date 26-Jun-16 7-Jun-16 4-Jun-16 30-Jun-16 27-Jun-16 26-Jun-16 30-Jun-16 Maximum Demand e) 6872 6054 8415 3456 13278 350 35837 ( June 2015) (Ex-bus) 6620 5912 8235 Date 28-Jun-15 05-Jun-15 30-Jun-15 2-Jun-15 30-Jun-15 23/6 & 24/6/15 30-Jun-15 Note: Item Nos. a & b are not for same day/hour. The hourly Southern Regional Grid Demand for the maximum and minimum demand days are shown in Annexures-II A, II B & II C. # Frequency Correction , Effect of Load Shedding and Power Cuts taken into account. $ Actual figures for AP & Karnataka are ex-bus, for Kerala, TN, Puducherry & SR actual figures are gross Note: State-wise daily Maximun & Minimum Demand and load factor has been shown in Annexure-I A, B, C, D & Load pattern of Southern Region on maximum and minimum demand day in Annexure-II A, B & C :4: Maximum & Minimum Demand and Peak Demand Met in June 2016 087 40000 , 38 37,825 35000 30000 578 , 24 25000 MW 20000 644 640 , , 14 15000 14 9,273 8,446 10000 8,440 7,399 7,361 6,293 6,261 4,626 4,092 3,692 3,567 5000 3,496 1,689 369 367 202 0 A.P. Telangana Karnataka Kerala T.N. Puducherry S. Region Max Unresrticted Gross Peak Met(Actual) $ Minimum Demand Requirement (PSP: Gross) # Reference: Page No.2,No.2, Item No.3.1.2No.3.1.2 :5: 3.2.1.ऊजाि (ए啍स-िस) Energy (Ex-Bus) - (PSP Figures) Figures in MU State A.P. TS Karnataka Kerala T.N. Puducherry S. Region a) Unrestricted Energy 3,940.41 3,608.55 4,408.39 1,795.61 8,729.20 217.50 22,699.66 requirement b) Actual Energy Supplied 3,939.20 3,607.41 4,406.89 1,794.70 8,726.92 217.38 22,692.51 c) Surplus+/Deficit- -1.21 -1.14 -1.49 -0.91 -2.27 -0.12 -7.14 d) Percentage -0.03 -0.03 -0.03 -0.05 -0.03 -0.05 -0.03 3.2.2 ववधतु उपयोग Gross Energy Consumption (in MU) - (Constituent figures) Puducherry Southern State AP TS Karnataka Kerala Tamil Nadu ** Region # # # # # # Unrestricted Requirement # 4171 3812 4576 1781 8900 217 23458 Unrestricted Requirement (LGBR ) 4567 3985 5610 1871 8732 220 25067 Actual 4169 3997 3811 3691 4575 4504 1780 8898 217 23451 Average/ Day 139 133 127 123 153 150 59 297 7 782 Actual -June 2015 4090 3904 3646 3551 4667 4553 1758 8355 207 22723 Average/ Day 136 130 122 118 156 152 59 279 7 757 June 2015 AP consumption includes Srisailam Pump Mode consumption of 0 MU Kadamparai Pump mode consumption is 0.00 MU ## Ex-bus figure # Frequency Correction , Effect of Load Shedding and Power Cuts taken into account. ** Puducherry Energy Consumption Actual (Gross) is REA/ABT figure : 6: Energy Requirement Vs Availability - June 2016 25000 22,700 22,693 20000 15000 MU 729 727 , 10000 , 8 8 4,408 5000 4,407 3,940 3,939 3,609 3,607 795 , 1,796 1 218 217 0 A.P. TS Karnataka Kerala T.N. Puducherry S. Region a) Unrestricted Energy b) Actual Energy Supplied requirement Reference: Page No.3, Item No.3.2.1 : :7 : Gross Energy Consumption (Actual) June 2016 9000 8000 7000 MU - 6000 8898 5000 4000 3000 Energy Consumption Energy 2000 4575 4169 1000 3811 217 1780 0 AP TS Karnataka Kerala Tamil Nadu Puducherry** ** Puducherry Energy Consumption Actual (Gross) is REA/ABT figure Reference: Page No.3, Item No.3.2.2 :8: 3.3 लोड शडे डगं ,मम य ू मᴂ Load shedding in MU Andhra Tamil Puducherr Southern State Telangana Karnataka Kerala Pradesh Nadu y Region Load Shedding (MU) 0.00 0.00 0.00 0.35 0.00 0.06 0.41 Load Shedding (MW) 0 0 0 125 0 15 3.4 ि• ᴂ द्रीय उ配पादन िᴂ द्र Central Generating Stations Generation & Relief to the Grid Local Loads + Auxiliaries STATION Gross Generation(MU) Relief to the Grid(MU) (Actuals) MU ISGS/CGS NTPC Ramagundam STPS,NTPC 1367.71 1274.33 93.38 Talcher Stage II NTPC 1237.36 1163.27 74.09 Simhadri Stage -I NTPC 552.816 512.04 40.77 (for Andra Pradesh & Telangana) Simhadri Stage II NTPC 539.55 508.42 31.13 Vallur JV, NTECL(NTPC_TANGEDCO) 554.98 516.43 38.55 RGCCPP 0.000 0.00 0.00 NLC Neyveli TS-I(CGS) 279.034 220.95 58.08 (for Tamil Nadu) Neyveli TS-II 799.39 654.29 145.11 Neyveli TS I Expn 284.77 259.99 24.77 Neyveli TS II Expn. 128.81 106.13 22.68 NTPL(JV_NLC & TANGEDCO) 295.47 268.39 27.08 NPCIL MAPS 272.23 232.06 40.17 Kaiga GS 430.81 388.90 41.91 Kudankulam NPP 721.38 670.85 50.53 : 9 : 3.5 Schedule (as per LGBR), Actuals And Ex-Bus Consumption of Energy in MU (as per PSP) Schedule as per LGBR (ex Bus) STATE AP TS KAR KER TN PUDU Southern Region जल / Hydro 137 50 611 509 354 1661 तापीय /Thermal 1789 1350 1367 3 1890 6399 डीजल / Diesel 0 0 4 4 गैस / Gas 31 25 0 136 192 Sim(AP)/RGCCPP, KYM(KER)/ 235 NLC TS-I(TN) 274 320 829 IPPs 546 64 1215 706 2760 5291 Captive Plants 0 0 40 40 Wind Mill 0 0 0 0 2260 2260 Allocation of power from ISGS 721 815 1749 815 2539 6639 ER/ Bilateral 542 1212 685 22 241 2702 Total 4040 3836 5631 2033 10236 241 26017 ACTUALS (Gross) 53.98 9.47 461.13 350.03 129.24 1003.86 जल / Hydro 2091.58 1460.88 1003.71 1796.17 6352.35 तापीय /Thermal 0.00 0.00 डीजल / Diesel 104.40 117.22 221.62 गैस / Gas Total 2249.96 1470.36 1464.85 350.03 2042.63 7577.83 वाथतव मᴂ आपूर्त ि िी गई ववधतु मम यू मᴂ/ Actual Energy Supplied in MU Hydro Ex-bus 53.44 9.38 456.52 346.53 127.95 0.00 993.82 Thermal Ex-bus 1903.34 1329.41 1003.71 0.00 1634.51 0.00 5870.97 Diesel Ex-bus 0.00 0.00 Gas Ex-bus 101.27 113.71 214.97 Sim(AP)/RGCCPP, KYM(KER)/ NLC TS-I(TN) 512.04 0.00 220.95 733.00 IPPs Ex-bus 592.71 120.40 1061.50 0.00 178.36 1952.97 Captive Plants Ex-bus 165.68 16.00 19.32 4.05 713.28 918.33 Wind Mill 339.05 21.96 203.80 10.37 2087.35 2662.52 Total 3667.53 1497.15 2744.86 360.94 5076.10 0.00 13346.57 Actual Drawls from CPSUs +Bilateral Power+Inter- Regional Power (Ex-bus including losses)** 271.68 2110.26 1662.04 1433.76 3650.82 217.38 9345.94 Total Actual Energy Supplied in MU 3939.20 3607.41 4406.89 1794.70 8726.92 217.38 22692.51 ** Losses are transmission losses in CTU / wheeling losses.