: 1 :

:1: 1. 30 जून 2016 को थापित क्षमता 'मे.वा.' मᴂ Southern Region Installed Capacity in MW as on 30th June 2016 (As per CEA) THERMAL STATE HYDRO THERMAL NUCLEAR (W M+R.E.S)** TOTAL COAL GAS DIESEL TOTAL

Andhra Pradesh 1758.87 6075.91 3182.65 16.97 9275.53 0.00 2676.30 13710.70

Telangana 2135.66 5076.59 1697.75 19.83 6794.17 0.00 605.54 9535.37

Karnataka 3599.80 6280.00 0.00 234.42 6514.42 0.00 5105.52 15219.74

Kerala 1881.50 0.00 174.00 159.96 333.96 0.00 255.47 2470.93

Tamil Nadu 2182.20 7720.00 1027.18 411.66 9158.84 0.00 9511.26 20852.30

Puducherry 0.00 0.00 32.50 0.00 32.50 0.00 0.03 32.53

Central Sector 0.00 11890.00 359.58 0.00 12249.58 2320.00 0.00 14569.58

Southern Region 11558.03 37042.50 6473.66 842.84 44359.00 2320.00 18154.12 76391.15

The graphical representaion is in page IA

2. June 2016 मᴂ जोडी गई क्षमता Additions to Installed Capacity in MW Capacity Date of Synchronising/ State Type Sector Station (MW) commissioning Wind Private Wind 6.00 June 2016 MW 10000 11000 12000 13000 1000 2000 3000 4000 5000 6000 7000 8000 9000 0

Reference: PageNo. AndhraPradesh Hydro, 1,759 Thermal, 9276 Nuclear, 0 W.M + R.E.S, 2676

1 , Item No. Telangana Hydro, 2,136 Thermal, 6794 Nuclear, 0

1

W.M + R.E.S, 606

Karnataka Hydro, 3,600 SR Thermal, 6514 - Installed Installed Capacity Nuclear, 0

W.M + R.E.S, 5106

Hydro, 1,882 Kerala

States / Sectors Thermal, 334

:

Nuclear, 0 2

-

: W.M + R.E.S, 255 2016 June

Tamil Nadu Tamil Hydro, 2,182 Thermal, 9159

Nuclear, 0

W.M + R.E.S, 9511

Puducherry Hydro, 0 Thermal, 33 Nuclear, 0

W.M + R.E.S, 0 Central Central Sector Hydro, 0 Thermal, 12250 Nuclear, 2,320 W.M + R.E.S, 0

:3: 3.बिजली कि आपूर्त ि कि स्थिर्त Power Supply Position 3.1 उपयोग एव ं उपल녍धता Requirement Vs Availability 3.1.1 मांग (ए啍स िस) Ex-Bus Demand (MW) from revised PSP SL No. Description Andhra Pradesh Telangana Karnataka Kerala T.N. Puducherry S. Region

Ex-Bus Peak Demand a) 7038 6114 8183 3565 14362 369 37079 (Maximum Unrestricted Requirement )

b) Ex -Bus Peak Met(Actuals) 7000 6082 8189 3494 14358 367 36817

c) Shortfall -38 -32 6 -71 -5 -2 -262

d) %age shortfall -1% -1% 0% -2% 0% -1% -1%

e) Average of daily max shortage -28 -27 -35 -35 -53 -1 -169

f) Maximum of daily max shortage -53 -50 -65 -137 -99 -2 -294

Note: Item Nos.a, b & c are not for same day/hour.

3.1.2 मांग Demand Maximum & Minimum Demand and Peak Demand Met (MW)

SL No. Description A.P. Telangana Karnataka Kerala T.N. Puducherry S. Region

Max Unresrticted a) 7399 6293 8440 3567 14644 369 38087 Requirement (PSP: Gross) #

$ b) Gross Peak Met(Actual) 7361 6261 8446 3496 14640 367 37825 (Ex-bus) 7000 6082 8189 Date 1-Jun-16 1-Jun-16 1-Jun-16 6-Jun-16 15-Jun-16 16-Jun-16 2-Jun-16

c) Unrestricted Requirement (LGBR) 7333 6750 9619 3920 13800 395 39970

d) Minimum Demand 4092 3692 4626 1689 9273 202 24578

Date 26-Jun-16 7-Jun-16 4-Jun-16 30-Jun-16 27-Jun-16 26-Jun-16 30-Jun-16 Maximum Demand e) 6872 6054 8415 3456 13278 350 35837 ( June 2015) (Ex-bus) 6620 5912 8235

Date 28-Jun-15 05-Jun-15 30-Jun-15 2-Jun-15 30-Jun-15 23/6 & 24/6/15 30-Jun-15 Note: Item Nos. a & b are not for same day/hour. The hourly Southern Regional Grid Demand for the maximum and minimum demand days are shown in Annexures-II A, II B & II C. # Frequency Correction , Effect of Load Shedding and Power Cuts taken into account. $ Actual figures for AP & Karnataka are ex-bus, for Kerala, TN, Puducherry & SR actual figures are gross Note: State-wise daily Maximun & Minimum Demand and load factor has been shown in Annexure-I A, B, C, D & Load pattern of Southern Region on maximum and minimum demand day in Annexure-II A, B & C :4:

Maximum & Minimum Demand and Peak Demand Met in June 2016

087

40000 ,

38 37,825

35000

30000

578

, 24

25000

MW

20000

644

640

,

, 14

15000 14

9,273 8,446

10000 8,440

7,399

7,361

6,293

6,261

4,626

4,092

3,692 3,567

5000 3,496

1,689

369

367 202 0 A.P. Telangana Karnataka Kerala T.N. Puducherry S. Region

Max Unresrticted Gross Peak Met(Actual) $ Minimum Demand Requirement (PSP: Gross) #

Reference: Page No.2,No.2, Item No.3.1.2No.3.1.2 :5: 3.2.1.ऊजाि (ए啍स-िस) Energy (Ex-Bus) - (PSP Figures) Figures in MU State A.P. TS Karnataka Kerala T.N. Puducherry S. Region a) Unrestricted Energy 3,940.41 3,608.55 4,408.39 1,795.61 8,729.20 217.50 22,699.66 requirement b) Actual Energy Supplied 3,939.20 3,607.41 4,406.89 1,794.70 8,726.92 217.38 22,692.51 c) Surplus+/Deficit- -1.21 -1.14 -1.49 -0.91 -2.27 -0.12 -7.14 d) Percentage -0.03 -0.03 -0.03 -0.05 -0.03 -0.05 -0.03

3.2.2 ववधतु उपयोग Gross Energy Consumption (in MU) - (Constituent figures)

Puducherry Southern State AP TS Karnataka Kerala Tamil Nadu ** Region # # # # # # Unrestricted Requirement # 4171 3812 4576 1781 8900 217 23458

Unrestricted Requirement (LGBR ) 4567 3985 5610 1871 8732 220 25067

Actual 4169 3997 3811 3691 4575 4504 1780 8898 217 23451

Average/ Day 139 133 127 123 153 150 59 297 7 782

Actual -June 2015 4090 3904 3646 3551 4667 4553 1758 8355 207 22723

Average/ Day 136 130 122 118 156 152 59 279 7 757 June 2015 AP consumption includes Srisailam Pump Mode consumption of 0 MU Kadamparai Pump mode consumption is 0.00 MU ## Ex-bus figure # Frequency Correction , Effect of Load Shedding and Power Cuts taken into account. ** Puducherry Energy Consumption Actual (Gross) is REA/ABT figure MU 15000 20000 25000 10000 5000 Reference: Reference: Page No.3, Item No.3.2.1 0

A.P. 3,940

a) Unrestricted Energy 3,939 requirement Energy Requirement Vs Availability

TS 3,609

3,607

Karnataka

4,408 4,407

Kerala 1,796

: : 6

1,795 :

b) Actual EnergySupplied T.N. -

8,729 June June 2016

8,727 Puducherry

218

217

S. Region

22,700 22,693

: :7 : Gross Energy Consumption (Actual) June 2016

9000

8000

7000

MU

-

6000 8898 5000

4000

3000

Energy Consumption Energy

2000 4575

4169

1000 3811

217 1780

0 AP TS Karnataka Kerala Tamil Nadu Puducherry** ** Puducherry Energy Consumption Actual (Gross) is REA/ABT figure Reference: Page No.3, Item No.3.2.2 :8: 3.3 लोड शडे डगं ,मम य ू मᴂ Load shedding in MU Andhra Tamil Puducherr Southern State Telangana Karnataka Kerala Pradesh Nadu y Region

Load Shedding (MU) 0.00 0.00 0.00 0.35 0.00 0.06 0.41

Load Shedding (MW) 0 0 0 125 0 15

3.4 ि• ᴂ द्रीय उ配पादन िᴂ द्र Central Generating Stations

Generation & Relief to the Grid Local Loads + Auxiliaries STATION Gross Generation(MU) Relief to the Grid(MU) (Actuals) MU ISGS/CGS NTPC Ramagundam STPS,NTPC 1367.71 1274.33 93.38 Talcher Stage II NTPC 1237.36 1163.27 74.09 Simhadri Stage -I NTPC 552.816 512.04 40.77 (for Andra Pradesh & Telangana) Simhadri Stage II NTPC 539.55 508.42 31.13

Vallur JV, NTECL(NTPC_TANGEDCO) 554.98 516.43 38.55

RGCCPP 0.000 0.00 0.00 NLC Neyveli TS-I(CGS) 279.034 220.95 58.08 (for Tamil Nadu) Neyveli TS-II 799.39 654.29 145.11 Neyveli TS I Expn 284.77 259.99 24.77 Neyveli TS II Expn. 128.81 106.13 22.68 NTPL(JV_NLC & TANGEDCO) 295.47 268.39 27.08 NPCIL MAPS 272.23 232.06 40.17 Kaiga GS 430.81 388.90 41.91 Kudankulam NPP 721.38 670.85 50.53 : 9 :

3.5 Schedule (as per LGBR), Actuals And Ex-Bus Consumption of Energy in MU (as per PSP)

Schedule as per LGBR (ex Bus)

STATE AP TS KAR KER TN PUDU Southern Region

जल / Hydro 137 50 611 509 354 1661 तापीय /Thermal 1789 1350 1367 3 1890 6399 डीजल / Diesel 0 0 4 4 गैस / Gas 31 25 0 136 192 Sim(AP)/RGCCPP, KYM(KER)/ 235 NLC TS-I(TN) 274 320 829 IPPs 546 64 1215 706 2760 5291 Captive Plants 0 0 40 40 Wind Mill 0 0 0 0 2260 2260 Allocation of power from ISGS 721 815 1749 815 2539 6639 ER/ Bilateral 542 1212 685 22 241 2702

Total 4040 3836 5631 2033 10236 241 26017

ACTUALS (Gross) 53.98 9.47 461.13 350.03 129.24 1003.86 जल / Hydro 2091.58 1460.88 1003.71 1796.17 6352.35 तापीय /Thermal 0.00 0.00 डीजल / Diesel 104.40 117.22 221.62 गैस / Gas Total 2249.96 1470.36 1464.85 350.03 2042.63 7577.83

वाथतव मᴂ आपूर्त ि िी गई ववधतु मम य ू मᴂ/ Actual Energy Supplied in MU Hydro Ex-bus 53.44 9.38 456.52 346.53 127.95 0.00 993.82

Thermal Ex-bus 1903.34 1329.41 1003.71 0.00 1634.51 0.00 5870.97

Diesel Ex-bus 0.00 0.00 Gas Ex-bus 101.27 113.71 214.97 Sim(AP)/RGCCPP, KYM(KER)/ NLC TS-I(TN) 512.04 0.00 220.95 733.00

IPPs Ex-bus 592.71 120.40 1061.50 0.00 178.36 1952.97

Captive Plants Ex-bus 165.68 16.00 19.32 4.05 713.28 918.33 Wind Mill 339.05 21.96 203.80 10.37 2087.35 2662.52 Total 3667.53 1497.15 2744.86 360.94 5076.10 0.00 13346.57 Actual Drawls from CPSUs +Bilateral Power+Inter- Regional Power (Ex-bus including losses)** 271.68 2110.26 1662.04 1433.76 3650.82 217.38 9345.94 Total Actual Energy Supplied in MU 3939.20 3607.41 4406.89 1794.70 8726.92 217.38 22692.51 ** Losses are transmission losses in CTU / wheeling losses. : 10 :

4. दक्षिण िेत्र म े अधधसूधित िर्टⴂर्तयां एवं िृ वि िेत्र िे मलए ववधतु प्रर्तिंध Notified Power Cuts and Restrictions on Power Supply to Agricultural Sector in Southern Region

The details of notified power cuts and restrictions on power supply to the agricultural sector for the month of June 2016 as reported by the constituents in respect of Southern Region are given below :

I अधिसुधित ववधतु प्रर्तिंध Notified Power Cuts

1 आंध्रा प्रदेश Andhra Pradesh NIL

2 तेलंगाणा Telangana NIL

3 कर्ााटक Karnataka NIL

4 के रल Kerala NIL

5 तमिल र्ाडु Tamil Nadu NIL

II िृ वि उपभेिताओं िो, जून 2016 मे ववधतु िी दैर्नि आपूर्ति

Daily Power Supply to Agricultural Consumers in June 2016

Per Day Values in Hr/प्रददददन घंर्टे

रा煍य State तीन फे स मसगं ल फे स अपूर्ति 7 hrs 3-phase Andhra Pradesh आंध्रा प्रदेश 7 घंटे तीर् फे स की अपू셍त ा की जाती है 9 hrs 3-phase तेलंगाणा Telangana 9 घंटे तीर् फे स की अपू셍त ा की जाती है िनािर्टि Karnataka 6 (6-12) other hrs

िे रल Kerala 24 0 0

तममल नाडु Tamil Nadu 9 hrs three phase supply is ensured(6hrs during day time and 3 hrs during night time) :11:

5.0 ववधतु ववर्नमय Energy Exchanges

5.1 Intra regional energy exchanges in MU using ISTS (Annexure-III) (िेत्रीय वव饍युत ववर्नमय)

5.2 Inter Regional Energy Exchanges using ISTS अतं र-िेत्रीय वव饍युत ववर्नमय EXPORT IN MU June-16 Cum. From April 2016 From At State Periphery Andhra Pradesh आंध्र प्रदेश 0.000 0.000

Telangana तेलंगाण 0.000 0.000

Karnataka कर्ााटक 0.000 0.000

Kerala के रल 0.000 0.000

Tamil Nadu तमिलर्ाडु 0.000 0.000 IPPs/CPPs आइपीपी / सीपीपी 7.170 8.580

Total Southern Region दक्षिण िेत्र (कु ल) 7.170 8.580 IMPORT IN MU June-16 Cum. From April 2016 To At State Periphery Andhra Pradesh आंध्र प्रदेश 54.660 254.565 Telangana तेलंगाण 46.760 347.690 Karnataka कर्ााटक 233.990 839.330 Kerala के रल 581.260 1535.408

Tamil Nadu तमिलर्ाडु 1068.681 3199.585 IPPs/CPPs आइपीपी / सीपीपी 9.270 27.250

Total Southern Region दक्षिण िेत्र (कु ल) 1994.621 6203.828 :12 :

5. 3 ENERGY EXCHANGES THROUGH IEX & PXI वव饍युत ववर्नमय EXPORT IN MU TO IEX & PXI June-16 Cum. from April 2016 From At Seller Periphery To Power Exchanges 1 Andhra Pradesh आंध्र प्रदेश 23.870 39.665 2 Telangana तेलंगाण 69.388 151.665 3 Karnataka कर्ााटक 22.111 22.111 4 Kerala के रल 13.086 20.694 5 Tamil Nadu तमिलर्ाडु 10.632 10.632 IPPs/CPPs ऐ पी पी 6 LKPPL एल के पी पी एल 0.000 0.000 7 SEPL एस ई पी एल 74.856 166.194 8 MEPL एि ई पी एल 150.303 342.288 9 TPCIL टी सी पी एल 90.096 118.320 10 Total Southern Region दक्षिण िेत्र (िु ल) 454.341 871.568 IMPORT IN MU FROM IEX & PXI June-16 Cum. from April 2016 To At Seller Periphery From Power Exchanges 1 Andhra Pradesh आंध्र प्रदेश 108.705 477.202 2 Telangana तेलंगाण 252.225 574.336 3 Karnataka कर्ााटक 198.734 483.131 4 Kerala के रल 41.690 179.420 5 Tamil Nadu तमिलर्ाडु 19.703 61.980 IPPs/CPPs ऐ पी पी 6 LANCO एल के पी पी एल 0.000 0.000 7 SEPL एस ई पी एल 0.000 0.000 8 MEPL एि ई पी एल 0.000 0.000 9 Total Southern Region दक्षिण िेत्र (कु ल) 621.058 1776.070 Note: Energy Exchanges includes the Exports/Imports by IPPs/CPPs and State Sector. :13:

6. ददपिीय ववर्नमय िे साि, िू ल पत्रता / शडे यूल / वाथतववि ड्रावल- मम य ू मᴂ 6. TOTAL ENTITLEMENT/SCHEDULE/ACTUAL DRAWAL INCLUDING BILATERAL IN MU

Actual Drawl from Net Schedule from Grid(including Constutuent Entitlement from Grid(ISGS) Total Schedule from Grid(ISGS) Grid including Grid Bilaterals) Loss (MU):REA figures

Andhra Pradesh आंध्र प्रदेश 731.788 558.534 329.664 271.678 Telangana तेलंगाण 814.920 713.180 2132.091 2110.265 Karnataka कर्ााटक 1470.294 1288.025 1677.534 1662.035 Kerala के रल 835.213 809.668 1397.247 1433.758 Tamil Nadu तमिलर्ाडु 2525.992 2236.113 3735.684 3650.821 Puducherry पुडुचरे ी िेत्र 244.612 225.305 228.034 217.384 Goa गोआ 55.811 55.336 47.178 44.174 Orissa ओरीसा 126.767 126.384 126.384 126.384 PGCIL पी जी सी आइ एल 3.827 3.815 3.815 1.867

Total िु ल 6809.224 6016.359 9677.630 9518.367 Note Entitlement : includes entitlements from RSTPS-NTPC, Neyveli II Stage I & II, Neyveli TS I Expansion, Neyveli TS II Expansion,NTPL. Talcher Stage II, Simhadri stage II & NTECL Vallur & schedules of ER/NR Power and actuals of MAPS , KGS & KKNPP This does not include bilateral exchanges. Schedule : includes schedules from RSTPS-NTPC, Neyveli II Stage I & II,NTPL, Neyveli TS I Expansion, Neyveli TS II Expansion, Talcher Stage II, Simhadri stage II & NTECL Vallur & ER/NR Power and actuals of MAPS, KGS and KKNPP. Total schedule does not include of bilateral exchanges. Net schedule includes schedule of bilateral exchanges. Actuals: 1. Goa actuals include schedule at Chandrapur West Bus (wheeled via WR) 2. Actuals are at Generator Ex bus periphery. 7. Meetings held in the month of June 2016 Sl.No. Meeting Place Date 1 31st Commercial Sub Committee Meeting SRPC,Bengaluru 02.06.2016 2 Special meeting to discuss pending protection issues of KPCL SRPC,Bengaluru 03.06.2016 3 120th OCC Meeting SRPC,Bengaluru 10.06.2016 4 Special meeting to discuss 4th IEGC Amendment issues SRLDC,Bengaluru 17.06.2016 5 Special meeting to discuss Pending issues of KPTCL SRPC,Bengaluru 17.06.2016 6 55th Protection Coordination Sub Committee Meeting SRPC,Bengaluru 29.06.2016 :14:

Actual Drawal - June 2016

4000 736

,

3 3,651 3500

3000

2,526

2500 236

,

132

2

110

,

,

2

2

2000

678

,

1 1,662

MU

434

,

1,470 1

1500 1,397

1,288

1000 835

815

810

732

713

559

500 330

272

245

228

225 217

0 Andhra Telangana Karnataka Kerala Tamil Nadu Puducherry Pradesh Entitlement from Grid(ISGS) Reference: Page No.8, Total Schedule from Grid(ISGS) Item No.6 Net Schedule from Grid(including Bilaterals) Actual Drawl from Grid including Grid Loss (MU):REA figures 8. िᴂ द्रवार उ配पादन(Station Wise Generation) Effective Cumulative Power Station Installed Capacity Gen. Gen. Capacity Generation As on 30th June 2016 Jun-15 Jun-16 From April 2016 MW MU MU Andhra Pradesh Hydro(State) 3x23 + 3x17 = 120x0.7 1 84 14.35 28.16 82.29 Machkund (70% share) 2 8 x 9 = 72 x 0.8(80% share) 57.6 0.00 0.17 4.12 T.B. Dam & Hampi 3 Upper Sileru 4 x 60 240 25.65 9.66 36.41 4 Donkarai 1 x 25 25 9.81 0.00 1.28 5 Lower Sileru 4 x115 460 78.73 16.32 117.98 6 Srisailam RB 4x110 + 3x110 770 0.01 0.00 6.70 7 Penna Ahobilam 2 x 10 20 0.00 0.00 0.00 8 Nagarjunasagar RCPH 3 x 30 90 0.00 0.00 0.00 9 Mini Hydro 1 0.00 0.08 0.12 Total Hydro(State) 1747.6 128.55 54.39 248.90 Thermal (State) 0.00 1 Vijayawada 1 2 x 210 420 225.270 143.61 636.56 2 Vijayawada 2 2 x 210 420 241.190 117.83 670.86 3 Vijayawada 3 2 x 210 420 193.000 211.91 727.03 4 Vijayawada 4 1x500 500 260.190 272.47 932.60 5 Rayalaseema A 2 x 210 420 224.170 162.11 698.90 6 Rayalaseema B 2x210 420 219.540 194.00 717.88 7 Rayalaseema Stg-III Unit V 1 x 210 210 103.810 115.21 357.56 Krishnapatanam(SDSTPS) 8 800 800 335.590 397.31 1449.34 Unit - I Krishnapatanam 9 (SDSTPS) Unit II 800 800 38.660 457.22 868.57 Effective Cumulative Power Station Installed Capacity Gen. Gen. Capacity Generation As on 30th June 2016 Jun-15 Jun-16 From April 2016 MW MU MU Total Thermal (State) 4410 1841.42 2071.66 7059.30 Wind 2 2 0 0.00 Solar State Total (State) 6159.6 1969.97 2126.05 7308.20 Joint Venture Gas 1 Vijjeswaram stage II 172 172 83.680 102.36 208.45 2 Vijjeswaram stage I 2x33 + 1x34 100 0.000 0.00 0.00 Total Joint Venture 272 83.680 102.36 208.45 Private Sector Gas 1 Jegurupadu - I 2x45.8+1x48.9+1x75.5 216.82 76.740 67.90 149.47 2 Jegurupadu - II 220 220 0.000 0.00 0.00 3 Spectrum 1x46.8+2x46.1+1x68.88 208.31 78.400 88.07 153.24 4 Kondapalli (LANCO) 2x115+1x121.49 351.49 7.150 0.00 110.96 5 Reliance (BSES) 1x140+1x80 220 0.000 0.00 0.00 6 GMR Vemagiri 1x137+1x233 370 0.000 114.72 369.49 7 Gowthami 2x145+1x174 464 0.000 0.00 0.00

8 Konaseema 2x145+1x174 444.08 0.000 0.00 0.00

Total Gas Private 2494.7 162.29 270.70 783.16

Private Sector 0.00

Hinduja Unit I 520 520 0 174.86 263.73 Effective Cumulative Power Station Installed Capacity Gen. Gen. Capacity Generation As on 30th June 2016 Jun-15 Jun-16 From April 2016 MW MU MU

Hinduja Unit II 147.15 194.49

Total Private Others 520 0 322.01 458.22

Total Private Sector 3014.7 162.29 592.71 1241.38 0.00 1 Wind(Private) 1397.89 296.930 353.53 656.73 2 Other Mini Hydels 89.1 5.120 9.54 25.89

3 Other Bio-mass co gen, Biomass 198.95+171.25+50.94 421.14 40.270 26.76 105.00 Power Projects , Bagasse group

4 Other Mini Power Plants 78.79 4.150 12.61 53.00 Other purchases from CPPs 5 (Muncipal waste based Power 6.15+26.51+27.04 59.7 185.070 23.58 442.40 projects, Industrial waste based power projects), Isolated gas wells

6 Solar Energy(RPSSGP,NVVN,Grid 544.14 10.030 86.55 232.87 Interactive) 7 40.85 0.000 0.00 0.00 Solar Energy(AP State Solar Policy) Total Others 2631.61 541.57 512.57 1515.87 Total AP 12075.91 2757.510 3333.68 10273.91 TELANGANA Hydro 1 Srisailam LBPH 6x150 900 0.000 0.00 0.00 2 Nagarjunasagar 1x110 + 7x100 .8 815.6 0.280 9.46 16.48 3 Nagarjunasagar LCPH 2 x 30 60 0.000 0.00 0.00 Effective Cumulative Power Station Installed Capacity Gen. Gen. Capacity Generation As on 30th June 2016 Jun-15 Jun-16 From April 2016 MW MU MU 4 Nizamsagar 2 x 5 10 0.000 0.00 0.00 5 Pochampad 4 x 9 36 0.000 0.00 0.00 6 Singuru 2x7.5 15 0.000 0.00 0.00 7 Priyadarsini Jurala 6x39 234 0.000 0.00 0.00 8 Paleru MH 0.000 0.00 0.00 9 Peddapalli MH 0.000 0.00 0.00 10 Upper Jurala 2x40 80 0.00 0.00 Total Hydro 2150.6 0.28 9.46 16.48 1 Kothagudem A 4 x 60 240 101.730 130.82 394.18 2 Kothagudem B 2 x 120 240 110.460 123.61 372.67 3 Kothagudem C 2 x 120 240 101.990 79.56 303.10 4 Kothagudem D 2 x 250 500 277.740 257.64 934.32 5 Kothagudem E 1X500 500 92.030 260.92 785.85 6 Ramagundam B 1 x 62.5 62.5 35.970 41.64 131.29 7 Kakatiya TPP Stage I Unit I 1x500 500 246.780 229.09 729.16 8 Kakatiya TPP Stage I Unit II 1x800 800 321.62 767.39 Total Thermal 3082.5 966.7 1444.89 4417.95 Wind Mill (State) 0.00 0.00 Solar(State) 1 0 0.00 0.00 Total Satae 5234.1 966.98 1454.35 4434.43 1 Wind(Private) 20.870 21.47 39.50 2 Solar(Private) 336.87 60.75 207.01 3 Singareni collieries TPS 2.810 57.83 57.83 4 Other NCES group 18.730 28.05 45.41 5 Other purchases from CPPs 215.180 24.95 334.34 Total Purchase 336.87 257.590 193.06 684.09 Total Telangana 5570.97 1224.57 1647.40 5118.52 Karnataka Hydro 1 Sharavathi 10 x 103.5 1035 139.160 180.17 556.81 Effective Cumulative Power Station Installed Capacity Gen. Gen. Capacity Generation As on 30th June 2016 Jun-15 Jun-16 From April 2016 MW MU MU 2 Linganamakki Dam PH 2 x 27.5 55 3.500 4.97 22.42 3 Jog (MGHES) 4x21.6 + 4x13.2 139.2 29.540 44.20 158.93 4 Nagjhari 5x150+1x135 885 145.380 82.82 377.89 5 Supa 2 x 50 100 22.040 11.13 57.68 6 Varahi 2 x 115 230 57.730 70.84 208.83 7 Varahi UGPH 2 x 115 230 0.000 0.00 0.00 8 Bhadra 1x7+ 2x12 + 1x2+6 39 0.000 0.00 2.49 9 Sivasamudram 6x3 + 4x6 42 20.300 12.47 23.78 10 Shimsha 2 x 8.6 17.2 5.520 2.41 3.40 11 Munirabad 2 x 9+10 28 0.000 0.00 0.00 12 T.B.Dam & Hampi 8 x 9 (20% share) 14.4 0.000 0.00 1.06 13 Ghataprabha 2 x 16 32 0.000 0.00 2.29 14 Mani Dam 2 x 4.5 9 0.310 0.62 4.07 15 Mini Hydro 1.40 + 0.35+0.27 4.45 0.000 0.00 0.00 Effective Cumulative Power Station Installed Capacity Gen. Gen. Capacity Generation As on 30th June 2016 Jun-15 Jun-16 From April 2016 MW MU MU 16 Mallapur 2 x 4.5 9 0.000 0.00 0.00 17 Kadra 3x50 150 30.670 15.07 37.94 18 Kodasalli 3x40 120 23.440 13.40 41.02 19 4x60 240 16.970 23.03 64.43 Gerusoppa (SharavathiTail Race) 20 Almatti 1X15+5X55 290 3.370 0.00 0.55 21 Jural Share 0.000 0.00 0.00 Total Hydro 3669.25 497.930 461.13 1563.58 Thermal 1 Raichur TPS (Gross) 7 x 210+1 x 250 1720 843.690 603.62 2575.24 2 Bellari TPS 2 x 500 1000 497.090 400.09 1539.84 3 Bellari Unit III(infirm power) 0.00 23.57 Total Thermal 2720.0 1340.78 1003.71 4138.65 Diesel Yelahanka Diesel 6 x 21.3 127.8 0 0.00 0.00 Total Diesel 127.8 0 0.00 0.00 1 Kappatagudda 4.55 4.55 1.100 0.91 1.83 2 Solar 25 25 1.760 2.21 7.93 Total State 6546.6 1841.570 1467.98 5711.99 Effective Cumulative Power Station Installed Capacity Gen. Gen. Capacity Generation As on 30th June 2016 Jun-15 Jun-16 From April 2016 MW MU MU 2 Co Generation 1053 1053 901.120 3 Bio Mass 133.5 133.5 0.000 635.98 1916.68 4 Mini Hydel 728.25 728.25 0.000 5 Wind Mill 2174 2174 0.000 6 Jindal 2x130+4x300 1460 409.820 19.32 1030.63 7 UPCL 2*600 1200 503.370 627.11 1943.60 8 Solar 0.00 Total Purchase 6748.75 1814.310 1282.41 4890.91 Total 13295.35 3655.880 2750.38 10602.90 Kerala Hydro(State) 1 Kuttiadi+KES+KAES 3 x 25+ 1 x 50 + 2 x 50 225 53.680 35.76 115.64 2 Sholayar 3 x 18 54 12.740 12.54 61.24 3 Poringalkuthu 4 x 8 32 12.810 8.52 12.41 4 Poringalkuthu LBE 1x16 16 8.170 5.28 25.74 5 Pallivasal 3x5 + 3x7.5 37.5 18.620 16.34 47.65 6 Sengulam 4 x 12 48 14.600 11.18 30.29 7 Panniar 2 x 16 32 11.870 0.05 13.26 8 Neriamangalam + NES 3 x 17.5 + 25 77.5 32.270 19.32 44.81 9 Sabarigiri 4 x 55 + 2x60 340 97.350 55.08 258.83 10 Idukki 3 x 130 + 3 x 130 780 150.670 97.40 488.07 11 Idamalayar 2 x 37.5 75 15.980 11.35 55.68 12 Kallada 2 x 7.5 15 2.790 3.12 15.65 13 Peppara 3 3 0.000 0.00 0.60 14 Madupetty 1 x 2 2 0.340 0.21 1.55 15 Malampuzha 1 x 2.5 2.5 0.000 0.00 0.00 16 Lower Periyar 3 x 60 180 57.210 37.56 62.18 17 Kakkad 2 x 25 50 16.620 11.56 42.36 18 Chembukadav 09 x 3+1.25 x 3 6.45 1.290 1.43 1.43 19 Urumi I & II 3 x 1.25 + 3 x 0.8 6.15 1.650 2.04 2.04 20 Malankara 3 x 3.5 10.5 2.940 2.59 7.98 21 Lower Meenmutty 2 x1.5 + 0.5 3.5 0.580 0.68 1.00 22 Kuttiyadi Tail race 3 x 1.25 3.75 0.760 0.45 1.77 Effective Cumulative Power Station Installed Capacity Gen. Gen. Capacity Generation As on 30th June 2016 Jun-15 Jun-16 From April 2016 MW MU MU 23 Poozhithode 3x1.6 4.8 1.350 1.61 1.61 24 Rani Perunadu 2x2 4 1.010 0.80 1.69 25 Peechi 1x1.25 1.25 0.000 0.00 0.12 26 Chimney 0.00 0.00

27 Adiyanpara 0.44 0.44

28 Vilangad 7.5 7.5 1.78 1.78

Total Hydro(State) 2017.4 515.30 337.09 1295.82 Hydro(Private) 0.00 1 Ullumkal 2x3.5 7 1.840 1.58 3.99 2 Iruttukanam 3x1.5 4.5 2.360 2.91 3.68 3 Karikkayam 3x3.5 10.5 2.780 3.03 6.95 4 Meenvallam 1x3 3 0.800 0.73 0.89 6 Parambikkulam Mini Hydro 0.11 0.11 0.000 0.00 0.00 Total Private 25.11 7.780 8.25 15.50 Captive 0.00 1 Maniyar (Captive) 3x4 12 3.670 3.54 6.57 2 Kuthungal (Captive) 3x7 21 5.210 1.14 9.15 Total Captive 33 8.88 4.68 15.72 Total Hydro(Pvt+CPP) 58.11 16.66 12.94 31.22 Total Hydro 2075.51 531.96 350.03 1327.04 Diesel 1 Brahmapuram 1x21.32 21.32 0.220 0.00 5.49 2 Kozhikode 4x16 64 15.140 0.00 35.28 Total Diesel 85.32 15.36 0.00 40.77 Wind Mill State 9x0.225 2.025 0.080 0.15 0.39 Solar State 0.08 0.34 Total State 2162.855 547.40 350.26 1368.54 Effective Cumulative Power Station Installed Capacity Gen. Gen. Capacity Generation As on 30th June 2016 Jun-15 Jun-16 From April 2016 MW MU MU Kayamkulam RGCCPP, NTPC## 2 x 116.6 + 1x126.38 359.58 4.11 0.00 15.40 (Combined Cycle ) Private 1 3x7.31 21.93 0.000 0.00 0.00 Kasargode Power Corporation Ltd. 2 MPS Steel 1x10 10 0.000 0.00 0.00 3 Philips Carbon Black Ltd(PCBL) 10 10 2.860 4.05 12.08 Ramakkelmedu 19x0.75 14.25 2.750 4.67 6.94 Agali 31x0.600 18.6 2.650 4.23 8.55 Ahalya 8.4 8.4 0.00 1.96 Solar 1.23 4.35 Total Purchase 83.18 8.260 14.18 33.88 Total Kerala 2246.035 559.770 364.44 1402.42 Tamil Nadu Hydro 3x6.65 +1x11 + 2x14 58.95 12.590 0.92 0.98 Pykara Micro 1x2 2 0.140 0.12 1.60 Pykara Ultimate Stage (PUSHEP) 3x50 150 11.980 13.86 96.74 Moyar 3 x 12 36 9.380 4.78 29.03 Apravakandi Micro 1 x 0.75 0.75 0.090 0.02 0.10 Kundah I 3 x 20 60 14.860 11.36 68.50 Kundah II 5 x 35 175 63.360 32.71 172.78 Kundah III 3 x 60 180 37.900 17.77 92.37 Kundah IV 2 x 50 100 28.200 9.90 18.86 Kundah V 2 x 20 40 0.010 1.15 16.35 Suruliyar 1 x 35 35 4.250 0.00 11.40 Kadamparai 4 x 100 400 27.030 1.28 66.73 Aliyar 1 x 60 60 8.050 1.03 23.60 Poonachi 1 x 2 2 0.270 0.30 0.35 4 x 12.5 50 7.980 3.08 13.08 Mettur Tunnel 4 x 50 200 0.020 0.00 0.00 Lower Mettur HEP I 2 x 15 30 0.440 0.00 1.22 Effective Cumulative Power Station Installed Capacity Gen. Gen. Capacity Generation As on 30th June 2016 Jun-15 Jun-16 From April 2016 MW MU MU Lower Mettur HEP II 2 x 15 30 1.380 0.00 2.13 Lower Mettur HEP III 2 x 15 30 1.460 0.73 1.71 Lower Mettur HEP IV 2 x 15 30 1.260 0.53 2.18 Bhavani Sagar-Micro 4 x 2 8 0.610 0.02 1.54 Periyar 4 x 35 140 29.320 3.40 3.40 Vaigai 2 x 3 6 0.000 0.00 0.17 Papanasam 4 x 8 32 9.970 10.71 19.80 Servalar 1 x 20 20 2.820 1.89 4.16 Sarkarpathy 1 x 30 30 0.000 0.00 7.67 Sholayar I 2 x 35 70 5.030 2.27 6.40 Sholayar II 1 x 25 25 0.000 0.01 2.22 Kodayar I 1 x 60 60 0.770 4.23 40.02 Kodayar II 1 x 40 40 6.170 6.10 14.87 Lower Bhavani RBC 2*4 8 0.000 0.00 0.00 Sathanur 1x7.5 7.5 0.000 0.00 2.10 Parson's Valley 1x30 30 0.010 0.01 8.64 Mukurthi Micro 2x0.35 0.7 0.000 0.00 0.00 Thirumoorthy 0.65x3 1.95 0.000 0.00 0.23 Lower Aliyar 2x1.25 2.5 0.560 0.00 0.00 Bhavani Kattalai Barrage 2x15 30 2.070 1.04 2.67 Amaravathi Micro 2x2 4 0.110 0.00 0.00 Perunchani Micro 2x0.65 1.3 0.000 0.00 0.00 Periyar Vaigai Micro Hydel 2x2 4 0.110 0.00 0.00 Total Hydro 2190.65 288.2 129.24 733.60 Thermal Ennore 2x60 + 3x110 450 54.290 21.72 95.38 Tuticorin 5 x 210 1050 624.750 480.93 1749.60 Mettur 4 x 210 840 406.090 426.48 1495.07 North Chennai 3 x 210 630 403.050 375.92 1136.53 MTPP Stage III 1x600 600 174.190 0.00 673.25 NCTPP Stage II 2x600 1200 505.950 491.13 1780.50 Total Coal 4770 2168.32 1796.17 6930.33 Gas Effective Cumulative Power Station Installed Capacity Gen. Gen. Capacity Generation As on 30th June 2016 Jun-15 Jun-16 From April 2016 MW MU MU Basin Bridge 4 x 30 120 1.410 0.76 5.39 Kovil Kalappal 1x70+1x37 107.88 37.490 38.49 118.33 Valathur Stage I 1X60+1X34 94 62.150 59.63 166.84 Valathur Stage II 1x59.8+1X32.4 92.2 0.000 0.00 0.00 Kuttalam 1x64+1x37 101 49.780 18.34 79.77 Total Gas 515.08 150.83 117.22 370.31 Wind Mill (State) 17.465 17.555 0.000 0.00 0.00 Solar (State) 2.240 0.00 0.00 Total State Sector 7493.285 2609.59 2042.63 8146.26 Private GMR Vasavi 4x49 196 0.000 0.00 0.00 Samalpatty 7x15 105.66 0.650 0.00 0.00 Madurai PCPL 105.66 0.670 0.48 10.08 Pillai Perumal Nallur 330.5 3.610 0.00 121.06 Wind Mill 7376.8 7376.8 1194.91 2087.35 3417.77 TCPL 63.5 0.000 0.00 HITEC 15 0.000 0.00 Manali 0.000 0.00 Neyveli STCMS Unit 250 138.230 93.20 318.71 Lanco Tanjore Power Company 1x74.1+1x38.81 113.21 55.120 51.60 143.88 ABAN Cogeneration 0 0.000 0.00 Solar 246.6 2.240 93.85 343.96 Others + CPPs 0 974.630 619.43 2480.87 52.8 32.390 33.08 93.72 Arkay Energy Ltd.(PENNA)PIONEER Total Purchase 8855.73 2402.45 2978.99 6930.04 Total State 16349.015 5012.04 5021.61 15076.31 Neyveli TPS I 6x50 + 3x100 600 323.44 279.03 962.91 Total State Including TS -I 16949.015 5335.48 5300.65 16039.22 Kadamparai (Pump mode) 21.300 0.00 72.02 Effective Cumulative Power Station Installed Capacity Gen. Gen. Capacity Generation As on 30th June 2016 Jun-15 Jun-16 From April 2016 MW MU MU Karaikal Combined Cycle Gas Power 1x32.5 32.5 0.000 0.00 Plant ISGS Stations Ramagundam STPS 3x200 + 4x500 2600 1508.050 1367.71 4904.54 Talcher Stage II-NTPC 4x500 2000 1085.620 1237.36 3967.01 Simhadri Stage II-NTPC 2x500 1000 552.590 539.55 1822.13 Simhadri Stage I-NTPC 2x500 1000 534.810 552.82 1903.48 Total NTPC 6600 3681.07 3697.43 12597.17 NLC 0.00 Neyveli TS II 7 x 210 1470 964.100 799.39 2809.52 Neyveli TPS - I Exp. 2x210 420 293.980 284.77 796.13 Neyveli TS II Expansion 2x250 500 0.000 128.81 312.81 Total NLC 2390 1258.08 1212.97 3918.45 Joint Venture Vallur NTECL(TNEB-NTPC) 3x500 1500 642.350 554.98 2005.66 NTPL(TNEB-NLC) 2x500 1000 87.790 295.47 1464.49 Total Joint Venture 2500 730.14 850.45 3470.15 NPCIL MAPS (Kalpakkam) 2 x 220 440 293.720 272.23 765.59 Kaiga GS 4x220 880 668.390 430.81 1392.24 KKNPP 1x1000 1000 313.580 721.38 2149.90 TOTAL 2320 1275.690 1424.42 4307.73 Merchant Power Plants directly 0.00 connected to ISTS(400 kV System) LANCO(AP) 1x233+1x133 366 0.000 0.00 0.00 Simhapuri(AP) 3X150 450 307.170 124.30 855.66 Meenakshi(AP) 2X150 300 98.730 183.10 496.71 Costalenergen(TN) 2x600 1200 330.500 250.57 1301.38 TPCIL 2x660 1320 459.98 825.34 1990.86 IL & FS 2x600 1200 306.31 1026.92 Total MPPs 4836 1196.380 1689.62 5671.53 Effective Cumulative Power Station Installed Capacity Gen. Gen. Capacity Generation As on 30th June 2016 Jun-15 Jun-16 From April 2016 MW MU MU State Sector Hydro-Total 11775.5 1430.26 991.31 3858.38 Thermal-Total 14982.5 6317.22 6316.43 22546.23 Gas 787.08 234.51 219.58 578.76 Diesel 213.12 15.36 0.00 40.77 Wind Mill 26.13 1.18 1.06 2.22 Solar 26 4 2.30 8.27 Private Sector 0.00 Gas 2494.7 162.29 270.70 783.16 Wind Mill 10989.94 1518.110 2471.25 4131.45 Solar 1168.46 12.270 242.39 788.19 State Purchase- Total(co-gen, Mini 7100.96 3515.43 2552.93 9582.28 Hydel, Bio-mass etc) ISGS-Coal/Lignite-Total+NLC TS-I 12449.58 5996.84 6039.89 20964.09 +Kayamkulam ISGS Nuclear- Total 2320 1275.690 1424.42 4307.73 TOTAL MPPs** 4836 1196.38 1689.62 5671.53 TOTAL SR $ 69169.97 21679.54 22221.88 73263.04 :25:

PERFORMANCE OF IMPORTANT THERMAL/NUCLEAR PLANTS IN JUNE 2016 STATE/ STATION Installed Capacity (MW) Plant Load Factor (%) Plant Availability Factor (%) ANDHRA PRADESH Vijayawada 1760.00 58.86 75.75 Rayalaseema 1050.00 62.34 80.71 Krishnapatanam Unit I 1600.00 74.18 100.00 TELANGANA Kothagudam(Unit I-X) 1220.00 67.35 91.63 Kothagudam Unit XI 500.00 72.48 99.37 Kakathiya TPP I 500.00 69.53 89.94 KARNATAKA Raichur 1720.00 48.74 96.21 Bellari 1000.00 55.57 99.88 TAMIL NADU Ennore 450.00 6.70 21.80 Tuticorin 1050.00 63.62 72.02 Mettur 840.00 70.52 79.05 North Chennai Stage I 630.00 82.87 95.14 North Chennai Stage II 1200.00 56.84 78.65 Mettur Stage II 600.00 ISGS/JV NTPC Ramagundam STPS 2600.00 73.06 85.68 Talcher Stage II 2000.00 85.93 98.22 Simhadri Stage I 1000.00 76.78 95.58 Simhadri Stage II 1000.00 74.94 100.00 Vallur TPS JV(TNEB & NTPC) 1500.00 51.39 61.33 NLC Neyveli TS II 1470.00 75.53 83.39 Neyveli TS I Expansion 420.00 94.17 99.69 Neyveli TS II Expansion 500.00 35.78 35.592 NTPL (JV - TNEB & NLC) 1000.00 41.04 46.35 NPCIL MAPS (Nuclear) 440.00 85.93 100.00 Kaiga GS (Nuclear) 880.00 67.99 68.11 Kudankulam NPP 1000.00 100.19 100.00 CGS/Dedicated Neyveli TS I 600.00 64.59 87.40 RGCPP, Kayamkulam 359.68 100.00 MPPs- Connected to 400 kV Network Simhapuri 600.00 28.77 39.85 Meenakshi 300.00 84.77 #REF! Coastal Energen 1200.00 29.00 59.85 Thermal Powerteck(TPCIL) 1320.00 86.84 95.19 IL & FS 600.00 26.38 100.00 :24:

9. प्रमुख जलाशयⴂ मᴂ संियन िी स्थिर्त Storage Position in Major Hydel Reservoirs As on 30th June-16 As as on 30th Jun-15 Energy in Cumulative F.R.L.in MDDL in Energy Inflow Energy in Inflow in Reservoir MU at Level in M inflow from Level in M mtrs. M in MU in MU MU MU FRL April 16

Andhra Pradesh/Telangana Jalaput 838.40 532 818.39 826.92 131.44 44.00 77 831.24 251.28 96 Srisailam 270.70 268.8 243.84 238.20 3.00 3 244.51 6.05 Nagarjunasagar 179.90 179.8 156.97 153.77 156.27 25.47

Karnataka Linganamakki 554.50 4547 522.73 537.04 895.80 277.40 284 539.56 1188.86 38.00 Supa+Bommanhalli+Tattihalli 564.00 3152 495.00 525.74 658.85 90.90 103 536.20 1146.46 51.00

Kerala Idukki 732.43 2190 694.94 708.12 552.43 217.79 283 715.67 968.32 383.51 Kakki+Pampa 981.45 916 908.30 957.29 312.92 129.09 185 955.67 288.31 212.39 Total (Including all other Reservoirs) 4131 1146.92 567.54 753 1682.20 1034.99 Tamil Nadu Nilgiris 1504 - 384 204 294 - 933 729 Total 2182.87 - 604 359 487 - 1323 988 Mettur 240.79 210.02 - 12 3 3 - 69 26 29

11. ि• ेबत्रय धिड प्रिालन Regional Grid Operation 11.1 कि啍वेनसी प्रोफ़ाइल Frequency Profile The grid frequency profile is as follows: Percentage of time when frequency was between 49.9 50.00 50.05 IEGC( 49.9 to Range < 49.5 49.5 &<49.7 49.7 &< 49.9 >50.2 &<50.00 &<50.05 &<50.20 50.05 Hz) Jun-16 0.00 0.04 8.31 43.35 29.93 18.34 0.03 73.28 Jun-15 0.00 0.13 10.21 39.43 25.01 24.01 1.21 64.44 Maximum 50.37 09th June 2016 Minimum 49.65 29th June 2016 Average 49.99 11.2 VOLTAGE PROFILE AT IMPORTANT 400 kV NODES OF REGIONAL GRID IN KV

June-16 May-16 400 KV Station Average of Average of MAX MIN MAX MIN Hyderabad 426 409 423 406 Ramagundam 423 413 419 410 Nagarjunasagar 410 408 423 408 Cuddapah 427 410 421 405 Vijayawada 424 413 430 416 Gooty 426 408 426 406 Gazuwaka 406 400 411 400 Bangalore 410 399 408 379 Kolar 421 407 413 394 Narendra 427 409 425 407 Thiruvananthapuram 411 389 415 390 Thrissur 418 391 409 379 Chennai 414 399 415 404 Hosur 415 387 405 380 Neyveli II 407 397 408 396 30

टाई लाईर्ⴂ का प्रचालर् Operation of Tie Lines The availability of the transmission elements as furnished by PGCIL is given below:

Element Name Percentage Availability for June - 2016 1 Intra Regional AC System 99.91

Intra Regional HVDC System 99.38 2 HVDC Talcher-Kolar System. Inter Regional AC System (SR-WR) 3 100.00 Ramagundem_Chandrapur I & II Inter Regional AC System (SR-ER) 4 100.00 Jeypore-Gazuwaka I & II Inter Regional HVDC System (SR-WR) 5 99.98 Bhadravathi Back to Back I & II Inter Regional HVDC System (SR-ER) 6 98.61 VSP(Gazuwaka) back to Back I & II 7 Kayamkulam System 100.00 11.4 Status of Capacitor Installation as on 30.06.2016 All figures are in MVAR State / UT / System Installed Additional Addition Actual Addition Balance as on Requirement during April 2016 during 2016-17 30.06.2016 during 2016-17 upto 30.04.2016 A B C D * (D = B-C) Andhra Pradesh 6622.200 26.200 0.000 0.000 26.200 Karnataka 4484.324 56.310 0.000 0.000 56.310 Kerala 995.000 10.000 0.000 0.000 10.000 Tamil Nadu 3590.410 122.400 2.400 2.400 120.000 Puducherry 77.017 0.000 0.000 0.000 0.000 Total (SR) 15768.951 214.910 0.000 0.000 212.510 * These figures are carried forward from previous years

12.1 दतक्षण क्षेत्र की नई उ配पादन योजना䴂 की प्रगतत की समीक्षा 12.1 Review of Progress of Works on Ongoing / New Generation Schemes in Southern Region िा煍य का नाम / Name of the State : आंध्र प्रदशे / Andhra Pradesh

2016-17 को 2016-17 के बाद िालू क्षमता 2016-17 मᴂ कमीशन क्र.सं प्रगतत / तितत अनुसूतित Commissioned होने की परियोजना टेशन / Station Capacity Commissioning Sl. No Progress / Status Scheduled for During 2016-17 (MW) scheduled beyond 2016 - 17 (MW) (MW) 2016-17 (MW)

A जल / Hydro (िा煍य / State) : 1 Nagarjunasagar Tail Pond HEP, 2 x 25 = 50 Plant is ready. But not synchronised with Grid due 50 Guntur (Dist) to lack of water. Expected by July, 2016 2 Polavaram HEP, West Godavari District 12x80 = 960 2017-18 onwards 960 3 Dummugudem, Khammam District 320 2016-17 320

B (a) तापीय / Thermal (िा煍य / State) : 1 Rayalaseema TPP Stage- IV, Unit 6 1 x 600 = 600 Unit-VI (600MW) → Commissioning by June, 2016 600 Muddanuru, Kadapa (Dist) & CoD by Dec, 2016 2 Dr. NTTPS, Vijayawada (Stg - V) 1 x 800 = 800 2016-17 800 3 NTPC Pudimadaka, Vizag Dedicated Plant 4x1000 =4000 4000 4 Vadarevu Ultra Mega Power Project 5 x 800 = 4000 U - 1 : 2017-18 ; U - 2 : 2017-18 ; U - 3 : 2018-19 4000 Stage I (U-1,2) & Stage II (U-3,4,5) Unit - 4 : 2019-20 ; Unit - 5 : 2020-21 B (b) तापीय / Thermal (संयुक्त उद्यम / Joint Venture) : 1 Krishnapattanam TPP Stage - II (U-3) 1 x 800 = 800 2016-17 800 2 Srikakulam TPS (JV) 4 x 600 = 2400 To be tied up 2400 B (c) तापीय / Thermal (तनजी / Private) : 1 Bhavanapadu TPP (East Coast Energy (2x660) Phase I → U 1 : 2016-17, U 2 : 2016-17 2640 Ltd), Kakarapalli, Srikakulam (Dist) + Phase II → 2016-17 (2x660) 2 Paloncha (Nava Bharat), Khammam 150 150 3 Painampuram TPP by Thermal Powertech 1x660 = 660 Unit 3 → Mar 2017 660 (TPCIL), Nellore (Dt) (U - 1&2 CoD [ Unit : 3 ] done) 4 Krishnapattanam UMPP 6x660 = 3960 Project may be delayed. Developer has stopped 3960 the work. Case at Delhi High Court 5 Hinduja TPP by HNPCL, Pavalavasa, 520 Synchronized on 31.03.2016 520 520 Vizag [ Unit 2 ] CoD by 2016-17 6 Gunupudi (Surya Chakra TEPL) 660 + 660 1320 7 Thamminapatnam TPP(Ph-II : Unit-1&2) 2 x 350 = 700 Unit 1 → Sep 2016, Unit 2 → Dec 2016 700 [MEPL - Coastal Thermal Project] 2016-17 को 2016-17 के बाद िालू क्षमता 2016-17 मᴂ कमीशन क्र.सं प्रगतत / तितत अनुसूतित Commissioned होने की परियोजना टेशन / Station Capacity Commissioning Sl. No Progress / Status Scheduled for During 2016-17 (MW) scheduled beyond 2016 - 17 (MW) (MW) 2016-17 (MW)

8 Thamminapatnam TPP(Ph-III : Unit-2) 2x660 = 1320 2016-17 1320 [MEPL - Coastal Thermal Project] 9 NCCL (Sembcorp) Phase I, Unit 1&2, by 2x660 = 1320 Unit 1 → Synchronised on 26.05.2016 1320 660 Nagarjuna Construction Company Ltd Unit 2 → synchronisation by Sep, 2016 (SGPL) C नातिकीय / Nuclear (िा煍य संयुक्त उद्यम / State JV) : 1 Kadappa Nuclear Power Plant 2x1000=2000 To be tied up 2000 D (a) गॅस / Gas Based (िा煍य / State) : Integrated gassification combined 182 1 1 x 182 = 182 Unit 8 by , 2017-18 cycle (IGCC) plant at Dr. NTTPS (JV) D (b) गॅस / Gas Based (तनजी / Private) : 1 Peddapuram (SPP Ltd), EG (Dist) 2262.00 2262 2 Chigurukota (Sriba Industries), 13.60 13.6 Krishna (Dt) 3 Gautami CCPP Stage-II, Peddapuram 2 x 400 = 800 800

4 GVK Phase-III, Jegurupadu 2 x 400 = 800 800

5 Konaseema Phase-II, Ravulapalem 820.00 820

6 Lanco Phase - III, Kondapalli, Unit 3B 1 x 371 = 371 Achieved full load on 05.09.2015 371 371

7 Chandaparu, WG (Dist) - RVR 20.00 20

8 Vetlapalem, EG Dist (Greenco) 60 + 60 = 120 120 9 GMR Vemagiri, EG Dist, Stg - 2 [ GREL ] 2 x 384 = 768 U1 achieved full Load on 12.09.2015 768 768 U2 under progress 2x16.735 10 Gurrampalem, Vizag Dist (LVS) + Depends on permission of APEPDCL 52.93 2x9.73 = 52.93 76+120 11 RVK, Jegurupadu, EG Dist 486 + (2x120) + 50 12 Thamminapatnam (K.Patnam PCL), Nellore 1320 + 660 1980 13 Reliance Samalkot Power 2400.00 Held up for want of gas 2400 E नवीकिणीय ऊजाा के स्रोत / Sources (RES) : Municipal Waste based : 1 M/s. Jindal Urban Waste management 6.00 2016-17 6.00 (Tirupati) Ltd 2 M/s. Jindal Urban Waste management 15.00 2016-17 15.00 (Guntur) Ltd 2016-17 को 2016-17 के बाद िालू क्षमता 2016-17 मᴂ कमीशन क्र.सं प्रगतत / तितत अनुसूतित Commissioned होने की परियोजना टेशन / Station Capacity Commissioning Sl. No Progress / Status Scheduled for During 2016-17 (MW) scheduled beyond 2016 - 17 (MW) (MW) 2016-17 (MW)

Industrial waste (Poultry Litter based) : 1 M/s Annapurna Renewables Pvt Ltd 7.50 2016-17 7.50

F ववड / Wind (तनजी / Private) : 1 Private Wind Mills 499.10 2016-17 499.10

G तमनी तबजली संयंत्रⴂ / Mini Power Plants : H (a) सोलाि / Solar (िा煍य / State) : 1 NTPC Solar Projects 1000.00 Expected during 2017-18 1000 2 NP Kunta, Anantapur by NTPC (200+50) MW 200 MW commissioned on 09.05.2016 and 50 MW 250 200 within 6 months

H (b) सोलाि / Solar (तनजी / Private) : 1 Private Solar Projects as per PPA Condition 145.00 Expected during 2016-17 145.00 2 First Solar Power Pvt Ltd 40.00 Commissioned on 09.05.2016 40 40 3 Acme Clean Tech Solutions Ltd 20.00 Commissioned on 12.05.2016 20 20 4 Acme Clean Tech Solutions Ltd 30.00 Commissioned on 02.04.2016 30 30

कु ल / Total 11882 2609 29727 12.2 दतक्षण क्षेत्र की नई उ配पादन योजना䴂 की प्रगतत की समीक्षा 12.2 Review of Progress of Works on Ongoing / New Generation Schemes in Southern Region रा煍य का नाम / Name of the State : कनााटक / Karnataka

2016-17 के बाद िालू 2016-17 मᴂ कमीशन 2016-17 को अनुसूतित होने की परियोजना क्र.सं क्षमता Capacity प्रगतत / तितत Commissioned टेशन / Station Scheduled for Commissioning During 2016-17 Sl. No (MW) Progress / Status 2016 - 17 (MW) scheduled beyond (MW) 2016-17 (MW)

A जल / Hydro (िा煍य / State) : 1 Gundia Hydro Electric Project (Phase - I) 200 Environmental Clearance awaited from MOEF. 200 Hassan, Dakshina Kannada District TEC cleared by CEA on 25.04.2015 2 Gundia Hydro Electric Proj. (Phase - II) 200 After getting Environmental Clearance from MoEF for Phase- 200 Hassan, Dakshina Kannada District I, Survry, Invetigation works & EIA Studies will be made for Phase-II 3 Shivasamudram Run-of-the River Project 345 Allotment of land is awaited. DPR has been submitted to 345 CEA and observations of CEA are being attended. 4 Gangavali Stage - II Scheme (Bedthi) 400 Pre Feasibility Report (PFR) submitted to CEA 400

5 Kali - Stage III (KHEP) Hydro Electric 300 DPR could not be taken up, as this project is within wild life 300 Project sanctuary 6 Aghanashini (Tadri) Hydro Electric Project 600 KPCL submitted DPR to CEA vide their letter dated 600 29.10.2007 7 Pumped Storage Schemes : 600 (i) Kali 600 NOCs received from Fisheries Dept. and Archaeological Survey of India. Investigation works are stopped due to local protest. (ii) Sharavathy 900 NOCs received from Fisheries Dept. and Archaeological 900 Survey of India. FRL survey work completed. Investigation works are stopped due to local protest.

iii) Varahi 700 Survey & Investigation works are in progress. 700

8 Mahadayi Hydro Electric Project 200 A revised proposal is being worked out 200

9 Additional Unit at Munirabad PH 10 LoA has been issued on 04-02-2012 to M/s. Allonward- 10 SSIPL-KR & Co. Site Clearance received. Expected by July, 2016 10 Additional units at Ghataprabha Dam 2 x 10 = 20 New NIT with revised PQR has been approved. PQR under 20 (Right Bank) review

B (a) तापीय / Thermal (िा煍य / State) : 1 Bellary TPS, Stage I, Unit - 3 700 Synchronised on 25.12.2015. 700 700 (Super Critical) - Kudatini Achieved full load on 01.03.2016 CoD by June, 2016 2016-17 के बाद िालू 2016-17 मᴂ कमीशन 2016-17 को अनुसूतित होने की परियोजना क्र.सं क्षमता Capacity प्रगतत / तितत Commissioned टेशन / Station Scheduled for Commissioning During 2016-17 Sl. No (MW) Progress / Status 2016 - 17 (MW) scheduled beyond (MW) 2016-17 (MW)

2 RTPS Stg - II : a) Yermarus TPS 2 x 800 = 1600 Unit 2 :Jan -17, Clearance awaited. 1600 800 Unit 1 first synch.on 09.02.2016, Full Load on 29.03.16

b) Edlapur TPS 800 Proposed to be set up in the available land at RTPS mill 800 reject area Clearance from MoEF is awaited. (By 2016-17) 3 Mangalore TPS 1600 12th Plan 1600 4 Chattisgarh Super Critical T.P.P, Godhna, 2 x 800 = 1600 Applied for Coal for allotment and environmental 1600 Janjgir-Champa Dist, Chattisgarh clearancecation from Ministry. Commissioning by 2016-17

B (b) तापीय / Thermal (तनजी / Private) :

1 Annechakanahalli Phase I 1000 12th Plan 1000 2 Kalgurki Phase I 1000 12th Plan 1000 3 Yadagiri Phase I 1000 12th Plan 1000

B (c) नवीकिणीय ऊजाा के स्रोत / Renewable Energy Sources (RES) : 1 Bio Mass 6 + 9 + 5 = 20 MW Expected by November, 2015 20 2 Co Generation 50 MW Expected during 2016-17 50 3 Small Hydro (Bhadragiri,Sai, Kare, Mount, 29.25 MW Expected by March, 2017 29.25 Devar) 4 Wind (Pvt) 418.8 MW Expected by March, 2017 418.8 5 Solar (Pvt) 74 MW Expected by March, 2017 74 6 ववड / Wind (संयुक्त उद्यम / Joint Venture) 500 MW Wind Energy Projects by KPTCL 500 GoK approved for the development of 500 MW Wind Energy 383.5 in JV with NTPC Projects. Sites identified for Kappatagudda (39.5 MW-KPCL), ( NTPC 400 MW + KPCL 100 MW ) Guledagudda (100 MW-NTPC). Requested for allotment of Forest Land. Expected in XII plan. 116.5 MW commissioned during 2013-14

Wind potential measurements to be carried out for 2 years C गॅस / Gas Based (िा煍य / State) : 1 Yelahanka Combined Cycle Power Plant 350 LOI is issued on 14.01.2015 to BHEL for Supply and Service 350 (YCCPP, Yelahanka, Bangalore) ± 20 % for EPC works. Survey Works completed.

2 Bidadi Combined Cycle Power Plant 700 All Clearances are obtained including MoEF. 700 ± 20 % EPC Tender stalled by Court. 2016-17 के बाद िालू 2016-17 मᴂ कमीशन 2016-17 को अनुसूतित होने की परियोजना क्र.सं क्षमता Capacity प्रगतत / तितत Commissioned टेशन / Station Scheduled for Commissioning During 2016-17 Sl. No (MW) Progress / Status 2016 - 17 (MW) scheduled beyond (MW) 2016-17 (MW)

3 Tadadi Combined Cycle Power Plant 2100 Pre Feasibility Report (PFR) prepared & action has been 2100 taken for obtaining statuatory clearences. KIADB allotted 400 cares of land.

D सोलाि / Solar (िा煍य / State) : Nil कु ल / Total 9250.55 1500 8650 12.3 दतक्षण क्षेत्र की नई उ配पादन योजना䴂 की प्रगतत की समीक्षा 12.3 Review of Progress of Works on Ongoing / New Generation Schemes in Southern Region रा煍य का नाम / Name of the State : के रल / Kerala

2016-17 के बाद िालू 2016-17 मᴂ कमीशन क्षमता 2016-17 को अनुसूतित होने की परियोजना क्र.सं प्रगतत / तितत Commissioned टेशन / Station Capacity Scheduled for Commissioning Sl. No Progress / Status During 2016-17 (MW) 2016 - 17 (MW) scheduled beyond (MW) 2016-17 (MW)

A जल / Hydro (िा煍य / State) : 1 Chattankottunada Stg-II , Kozhikode 3 x 2 = 6 Prposed date of commissioning : December, 2016 6.00 2 Pallivasal Extension 2 x 30 = 60 Expected by 2016-17 60.00 3 Thottiyar 30 + 10 = 40 Expected during 2016-17 40.00 4 Anakkayam H.E. Project 7.50 Expected by 2016-17 7.50 5 Barapole SHEP, Kannur 15.00 Prposed to commission during 2016-17 15.00 6 Vilangad SHEP, Kozhikode 3 x 2.5 = 7.5 Synchronised on 15.07.2014. CoD expected by 7.50 7.50 2016-17 7 Perumthenaruvi Project 6.00 Expected by October, 2016 6.00 8 Vellathooval SHEP 3.60 Expected during 2016-17 3.60 9 Adiyanpara 3.50 Prposed date of commissioning : 2016-17 3.50 10 Poringalkuthu SHEP 24.00 Expected by October, 2016 24.00 11 Bhoothathankettu Hydro Project, 24.00 Expected by August, 2016 24.00 Pindimana, Kothamangalam, Ernakulam Dist 12 Kakkayam SHEP, Kozhikode 3.00 Prposed date of commissioning : February, 2017 3.00 B आवर्ान / Augumentation : Nil C गॅस / Gas Based (िा煍य / State) : 1 Brahmapuram Gas Power Plant 39.86 Prposed date of commissioning : March, 2017 39.86 D आई.पी.पी / IPP (जल / Hydro) : Nil

E सोलाि / Solar (िा煍य / State) : 1 Solar Park, Kasargode 100.00 Prposed date of commissioning : March, 2017 100.00 2 Solar PV Projects at various locations 10.00 Prposed date of commissioning : March, 2017 10.00 of KSEB कु ल / Total 349.96 7.50 0.00 12.4 दतक्षण क्षेत्र की नई उ配पादन योजना䴂 की प्रगतत की समीक्षा 12.4 Review of Progress of Works on Ongoing / New Generation Schemes in Southern Region रा煍य का नाम / Name of the State : तममल नाडु / Tamil Nadu

2016-17 के बाद िालू 2016-17 मᴂ कमीशन क्षमता 2016-17 को अनुसूतित होने की परियोजना क्र.सं प्रगतत / तितत Commissioned टेशन / Station Capacity Scheduled for Commissioning Sl. No Progress / Status During 2016-17 (MW) 2016 - 17 (MW) scheduled beyond (MW) 2016-17 (MW)

A जल / Hydro (िा煍य / State) : 1 Kundah Pumped Storage HEP 1x125 = 125 Expected by 2016 125 Phase I (4x125 MW) 2 Kundah Pumped Storage HEP 3x125 = 375 Expected by 2016 375 Phase II (3x125 MW) 3 Mettur Pumped Storage HEP 500 Preliminary Stage 500

4 Vellimalai Pumped Storage HEP 200 Preliminary Stage 200 5 Small HEP proposed to be developed 118 Preliminary Stage 118 by Private Promoters 6 Moyar Ultimate Stage HEP 25 Preliminary Stage 25 7 Sholayar Phase I (Unit 1) 7.0 (35 to 42) Uprating from 35 MW to 42 MW 7 8 Sholayar Phase I (Unit 2) 7.0 (35 to 42) Uprating from 35 MW to 42 MW 7 9 Kollimalai HEP 520 Preliminary Stage 520

B (a) तापीय / Thermal (िा煍य / State) : 1 North Chennai TPS Stage -III 1x800=800 Expected by 2019-20 800 2 North Chennai TPS Stage -IV 2x800=1600 Expected after Stg III 1600 3 Ennore TPS Expansion Project 1x660=660 Expected by January, 2018 660 4 Replacement of existing 40 year old 1x660=660 Expected by January, 2018 660 ETPS 5 Ennore (SEZ) Super Critical Thermal Power 2x 660=1320 Case pending in Supreme Court 1320 Project, Kattupalli B (b) तापीय / Thermal (तनजी / Private) : 1 Cheyyur UMPP (Coastal Tamil Nadu Power Ltd) 5x800 = 4000 Expected by 2017-18. Draft of rapid EIA Report 4000 Subsidiary of Govt of India, PFC completed 2 IL & FS, Cuddalore IPP (ITPCL), Unit 2 1 x 600 MW Unit 2 : First synchronised on 13.04.2016 600 600 (Unit 1 CoD was during 2015-16, 29.09.2015) Full Load on 18.04.2016, CoD on 28.04.2016 3 Tuticorin Thermal Power Project by Ind Bharath 1x150=150 Stg - II, Unit under progress 150 at Swaminathan & Ottaipidaram Village

B (c) तापीय / Thermal (संयुक्त उद्यम / Joint Venture) : 1 Udangudi Power Project (Stage 1) 2x660 = 1320 Expected by 2019-20 1320 2016-17 के बाद िालू 2016-17 मᴂ कमीशन क्षमता 2016-17 को अनुसूतित होने की परियोजना क्र.सं प्रगतत / तितत Commissioned टेशन / Station Capacity Scheduled for Commissioning Sl. No Progress / Status During 2016-17 (MW) 2016 - 17 (MW) scheduled beyond (MW) 2016-17 (MW)

C गॅस / Gas Based (िा煍य / State) : 1 Basin Bridge Closed loop conversion 100 Subject to availability of gas 100 (120 MW to 220 MW) D नवीकिणीय ऊजाा के स्रोत / Renewable Energy Sources (RES) : 1 Establishment of Co-generation plants in 10 Nos. 6 x 15.5 = 93 183 Co-operative and 2 Nos Public Sector Sugar Mills 5 x 15.0 =75 in Tamil Nadu along with Sugar Mill 1 x 15.0 =15 Modernization. = 183 2 Wind (P) 18.45 18.45 3 Bio-Mass 10 10 4 Solar - Kamudhi 1000 By September, 2016 1000 E टी.बी.सी.बी मागा / Tariff Based Competitive Bidding Route : 1 Uppur TPP, Tiruvadanai, Ramanathapuram Dt 2x800 = 1600 Expected by 2019-20 1600

कु ल / Total 2475 618.45 13423 12.5 दतक्षण क्षेत्र की नई उ配पादन योजना䴂 की प्रगतत की समीक्षा 12.5 Review of Progress of Works on Ongoing / New Generation Schemes in Southern Region रा煍य का नाम / Name of the State : तेलंगाना / Telangana

2016-17 के बाद िालू 2016-17 मᴂ कमीशन क्षमता 2016-17 को अनुसूतित होने की परियोजना क्र.सं प्रगतत / तितत Commissioned टेशन / Station Scheduled for Commissioning Capacity During 2016-17 Sl. No Progress / Status 2016 - 17 (MW) scheduled beyond (MW) (MW) 2016-17 (MW)

A जल / Hydro (िा煍य / State) : 1 Lower Jurala HEP, Gundala, 4 x 40 = 160 Unit 3 : synchronised on 04.01.2016 160 Mahaboobnagar (Dist) (Unit - 3 to 6) Unit 4 : synchronised on 03.03.2016 Unit 5 : CoD schedule 01.08.2016 Unit 6 : CoD schedule 01.08.2016 2 Pulichintala HEP, Vazinepally, Nalgonda (Dist) 4 x 30 = 120 Expected during 2016-17 120

3 Kanthanapally, Warangal District 450 150 MW → 2016-17, 300 MW → 2016-17 450

B (a) तापीय / Thermal (िा煍य / State) : 1 Kakatiya TPP Stage-III 1 x 800 = 800 2017-18 onwards 800 2 Ramagunderm TPS 2 x 660 = 1320 2017-18 onwards 1320 3 Sattupalli TPS 1 x 600 = 600 to be tied up 600 4 Singareddipalli 5 x 40 = 200 U-I→ , U-2→ , U-3→ 200 U-4→ , U-5→March 2014 5 Kothagudem TPS (Stg - VII), Paloncha 1 x 800 = 800 CoD by 31.12.2017 800 Khammam District 6 Yadadri TPS (5x800 MW), Vazinepally, 5 x 800 = 4000 By 2018-19 4000 Dameracherla, Nalgonda (Dist) 7 NTPC Dedicated Plant, Ramagundam 2 x 800 = 1600 1600

8 Bhadradri TPS, Manuguru 4 x 270 = 1080 Expected CoD by : 270 810 Khammam (District) Unit 1 - 20.03.2017, Unit 2 - 20.05.2017 Unit 3 - 20.07.2017, Unit 4 - 20.09.2017 B (b) तापीय / Thermal (तनजी / Private) : 1 Singareni Collieries Thermal Power 2x600 = 1200 Unit 1 : April, 2016,Syn 12.03.16, F.Load on 1200 600 Projects (STPP), Jaipur, Adilabad (Dist) 13.03.2016, CoD by Oct 16 Unit 2 : January, 17

C (a) गॅस / Gas Based (िा煍य / State) :

1 Shankarpally Gas Power Plant 1x1000=1000 2016-17 1000

Combined cycle gas based project 1x700 = 700 Unit - 1 : 2016-17 ; Unit - 2 : 2017-18 700 1400 2 near Karimnagar 2x700 = 1400 Unit - 3 : 2018-19 2016-17 के बाद िालू 2016-17 मᴂ कमीशन क्षमता 2016-17 को अनुसूतित होने की परियोजना क्र.सं प्रगतत / तितत Commissioned टेशन / Station Scheduled for Commissioning Capacity During 2016-17 Sl. No Progress / Status 2016 - 17 (MW) scheduled beyond (MW) (MW) 2016-17 (MW)

D (b) गॅस / Gas Based (तनजी / Private) : 1 Patancheru (Astha PCPL), Medak (Dt) 28.00 2016-17 28

2 Mathya Giri (Vasavi), Nalgonda (Dist) 210.00 2016-17 210

3 Guggilla, Karimnagar (Dist) - Elgen 350 + 350 2016-17 700 E नवीकिणीय ऊजाा के स्रोत / Renewable Energy Sources (RES) :

F ववड / Wind (तनजी / Private) : Nil G तमनी तबजली संयंत्रⴂ / Mini Power Plants : 1 Mini Power Plants 516.51 2016-17 516.51

H (a) सोलाि / Solar (िा煍य / State) : 1 Nil H (b) सोलाि / Solar (तनजी / Private) : 752.68 2016-17 752.68 कु ल / Total 6107 600 11530 12.6 दतक्षण क्षेत्र की नई उ配पादन योजना䴂 की प्रगतत की समीक्षा 12.6 Review of Progress of Works on Ongoing / New Generation Schemes in Southern Region संगठन का नाम / Name of the Entity : कᴂ द्रीय से啍टर / Central Sector

2016-17 के बाद िालू 2016-17 मᴂ कमीशन क्षमता 2016-17 को अनुसूतित होने की परियोजना क्र.सं प्रगतत / तितत Commissioned टेशन / Station Scheduled for Commissioning Capacity During 2016-17 Sl. No Progress / Status 2016 - 17 (MW) scheduled beyond (MW) (MW) 2016-17 (MW)

I कᴂ द्रीय से啍टि / Central Sector (तापीय / Thermal) : 1 Kudgi Super Thermal Power Project, 3x800 =2400 Unit I by Mar 2017, Unit 2 by March 2017, & 1600 800 Bijapur (Stage - I), NTPC Unit 3 Dec 2017 2 Kudgi Super Thermal Power Project, 2x800 =1600 Expected during 13th Plan (2017-22) 1600 Bijapur (Stage - II), NTPC 3 NLC - New Thermal Power Project, 2x500 =1000 Unit 1 : CoD by 2017 1000 Neyveli Unit 2 : CoD by April 2018 4 Sirkali TPP, NLC 3x660=1980 From GoI approval 1980 Unit 1 :52 months Unit 2 : 58 months Unit 3: 64 months (PPA has been signed)

II कᴂ द्रीय से啍टि / Central Sector (नातिकीय / Nueclear) : 1 Kalpakkam (PFBR) 500 Synchronisation by March, 2017. CoD by August, 500 2017. Infirm Power from March, 2017 2 Kudankulam (NPCIL) 2x1000=2000 Unit I COD on 31.12.2014 1000 Unit II: Synchronisation by Aug, 2016, CoD by January, 2017.

III कᴂ द्रीय से啍टि / Central Sector (गॅस / Gas Based) : 1 Kayamkulam CCPP Module : 1 to 3 1050/1950 12th Plan 1950 (NTPC)

कु ल / Total 2600 0 7830 13.1 दतक्षण क्षेत्र मᴂ 400 एवं 220 कक.वो. की नई पािेषण लाइनⴂ के तनमााण काया की प्रगतत की समीक्षा 13.1 Review of Progress of Works on new 400 KV and 220 KV Transmission Lines under State Sector in SR िा煍य का नाम / Name of the State : आंध्र प्रदशे / Andhra Pradesh 2016-17 के 2016-17 मᴂ ग मूल लक्ष्य की संशोतर्त 2016-17 को बाद िालूﴂलाइन की पूिी ई व कमीशन क्र.सं लंबाई की लंबाई तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. Stringing Proposed Name of the Transmission Line Remarks during लाइन No Length in completed in Original for 2016-17 Revised 2016-17 Beyond Ckt.Kms ckt. Kms 2016-17 Circuit Kms. Target Date Target date ckt. Kms ckt. Kms A 400 KV लाइन (Lines) : 1 Evacuation of Power from HNPCL (1040 MW) Dec-15 Dec-16 Power Plant : 1.1 400 KV Twinmoose DC Line from M/s. HNPCL PO issued on 11.08.2014 Switchyard - Proposed Kamavarapukota SS 152 21.4 Dec-15 Dec-16 152 Tower Erection under progress Lot-I : [ HNPCL - Ramabhadrapuram, EG Dist ] Lot - II : Ramabhadrapuram, EG Dist - N.T. 148 39.472 Dec-15 Dec-16 PO issued on 21.07.2014 148 Rajapuram Tower Erection under progress Lot - III : N.T. Rajapuram, EG Dist - 187.6 55.772 Jun-15 Dec-16 The work awarded on 19.02.2014 and 187.6 Kamavarapukota under progress 2 400 KV Quad Moose DC Line from Proposed New Line proposed Kamavarapukota SS - Proposed Suryapet SS : 2.1 400 KV Twinmoose DC Line from Proposed 178.712 178.712 Sep-15 Jul-16 All works completed 178.712 Kamavarapukota SS - Proposed 400 KV Chinna Korukondi SS 3 400 KV Quad Moose DC Line from Proposed New Line proposed Kamavarapukota SS - Proposed Suryapet SS : 3.1 400 KV Twinmoose DC Line from Proposed 200 Apr-17 Apr-17 LOI issued on 04.09.2015 200 Kamavarapukota SS - 400 KV Vemagiri SS Purchase Order issued on 03.11.2015 4 Rayalaseema Power Transmission Scheme : 4.1 RTPP (Stage - IV) - Chittoor Twin Moose DC Line 216.03 96.098 May-15 Dec-16 Work awarded on 02.04.2014 and under 216.03 (a). RTPP - Pedda Jamgam Palli (P.J.Palli) progress (b). P.J. Palli-Chittoor 212.694 77.736 May-15 Dec-16 Work awarded on 02.04.2014 and under 212.694 progress (c). 220 kV Muddanur (RTPP) - Chinakampally 121 121 Dec-14 Jul-16 Commissioned on 16.06.2016 121 121

5 Evacuation of Wind Power in Kadappa, Anantpur & Kurnool Districts of AP (Phase - I) : 5.1 (a). 400 KV Quad DC Tungabhadra River - 43.536 40.92 Jul-15 Jul-16 Work awarded on 13.12.2013 & Work 43.536 Yemmignoor Line nearing completion (b). 400 KV Quad DC Yemmignoor - Uravakonda 205.2 205.2 Jul-15 Jul-16 Work awarded on 16.12.2013 & stringing 205.2 Line completed. Statutory Inspection going on

5.2 400 kV (Q) Uravakonda - Mahaboobnagar 190 Oct-15 2016-17 KfW funding 36th SCPSPSR 190 5.3 Jammalamadugu - Uravakonda Quad DC Line 255.244 255.244 Jul-15 Jul-16 Work awarded on 23.01.2014 & completed 255.244 2016-17 के 2016-17 मᴂ ग मूल लक्ष्य की संशोतर्त 2016-17 को बाद िालूﴂलाइन की पूिी ई व कमीशन क्र.सं लंबाई की लंबाई तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. Stringing Proposed Name of the Transmission Line Remarks during लाइन No Length in completed in Original for 2016-17 Revised 2016-17 Beyond Ckt.Kms ckt. Kms 2016-17 Circuit Kms. Target Date Target date ckt. Kms ckt. Kms 6 Evacuation of Wind Power in Kadappa, Anantpur & Kurnool Districts of AP (Phase - II) : 6.1 400 kV Uravakonda - Kondapur 35th SCPSPSR

6.2 400 kV Kondapur - Kurnool 35th SCPSPSR

6.3 400 kV QMDC Line from Hindupur S/S to the 260 2016-17 Oct-17 Purchase Order issued on 01.04.2016 260 proposed 400 kV Uravakonda S/S (130 km) 7 Transmission System Improvement Scheme at Vizianagaram & Srikakulam Districts : 7.1 400 KV Quad DC Line from 400/220 KV Kalpaka 226 28.492 Mar-16 Aug-16 PO issued on 25.08.2014. Work under 226 S/Sto 400/220 KV Maradam (Garividi) S/S progress 8 System strengthening works in 400/220 kV Sub- Station, Prakasam District on stand alone basis

8.1 400 kV Twin Moose DC Line from 400/220 kV 220 Nov-16 Nov-16 Purchase Order issued on 27.07.2015 Sattenapalli S/S to the proposed 400/220 kV Podili Works under progress 220 S/S (110 km) 9 System Improvement at 400 kV Kalikiri, Chittoor District, along with the connected network : 9.1 LILO of both the circuits of 400 kV RTPP - Chittoor 52 Feb-17 Feb-17 LOI issued on 16.09.2015 Purchase at the proposed 400 kV Kalikiri S/S Order issued in Nov-2015 52 10 1000 MW Wind Power Evacuation at Aspiri : 38 SCPSPSR 10.1 400 kV Aspiri - Uravakonda (Q) D/C Line

11 Renewables KfW Hindupur, Uravakonda & Jammalamadugu (Kondapuram) :

2016-17 11.1 400 kV Jammalamadugu - Kurnool (Q) D/C Line 125 125 2016-17 Commissioned on 29.06.2016 125 125 12 400 kV Transmission Scheme for evacuation of 32.44 0 Aug-16 Nov-16 1000 MW Power from Solar Park at Ghani / Panyam S/S, Kurnool District : 12.1 400 kV QMDC Line from existing 400 kV Narnoor 32.44 Aug-16 Nov-16 Purchase Order issued on 27.07.2015 32.44 S/S (Kurnool) to the proposed 400 kV Ghani / Works under progress Panyam S/S B 220 KV लाइन (Lines) : (a) Transmission Lines covered under various Lift Irrigation Schemes : 1 D/C line from Yellanur - Gaddamvaripalli 9.334 9.214 Dec-10 2016-17 Works under progress. 9.334 2 D/C line from Gaddamvaripalli - Goddumarai 18.23 Sep-11 2016-17 Works under progress. 18.23 2016-17 के 2016-17 मᴂ ग मूल लक्ष्य की संशोतर्त 2016-17 को बाद िालूﴂलाइन की पूिी ई व कमीशन क्र.सं लंबाई की लंबाई तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. Stringing Proposed Name of the Transmission Line Remarks during लाइन No Length in completed in Original for 2016-17 Revised 2016-17 Beyond Ckt.Kms ckt. Kms 2016-17 Circuit Kms. Target Date Target date ckt. Kms ckt. Kms (b) Transmission Lines covered under other Schemes : 1 220 kV LILO Line (Both Circuits) from 220 kV 78 Dec-14 Aug-16 Works under progress 78 Hindupur to Pulivendula D/C Line to the proposed 220 kV Gollapuram S/S 2 220 kV DC Line from Pulichintala HES to the 72 Mar-15 2016-17 Works to be commenced 72 proposed 220 kV Huzurnaga S/S 3 (a). 220 KV DC line from Pendurthy 220KV SS to 56.46 Jul-12 2016-17 Works under progress 56.46 proposed ADR Palem (Appannadorepalem) Switching Station (Two Circuits) (b). 220 KV DC line from ADR Palem Switching 24.71 Jul-12 2016-17 Works under progress 24.71 Station to Bheem Singh Village (Reach-I) for the proposed 220 KV SS Bobbili (2nd circuit) (c). Erection of 220 kV DC line from Bheemsing (V) 28.6 Jul-12 2016-17 Works under progress 28.6 to Champa River (Reach-2) for the proposed 220/132 kV SS at Bobbili (2nd circuit) (d). Erection of 220 kV DC line from Chamba River 28.24 2016-17 2016-17 Works under progress 28.24 to Bobbili Growth Centre (Reach-3) for the proposed 220/132 kV SS at Bobbili (2nd circuit) 4 220 kV LILO of existing 220 kV Garividi - 115 Mar-17 Mar-17 Work commenced 115 Pendurthy DC line to proposed 400 kV SS at Garividi (Maradam) 5 220 kV LILO of both the circuits of 220 kV ADR 8 Mar-17 Mar-17 Work commenced 8 Palem - Bobbili DC line from Loc NO.43 to proposed 400 kV SS at Garividi 6 Erection of 220kV DC line from 220kV Garividi SS 78 11.6 Jul-12 Dec-16 Works under progress 78 to proposed 220/132 kV SS at Bobbili (2 circuits) 7 220 kV D/C Line from proposed 400 kV 174.5 163.5 Mar-15 May-17 Remaining Works pending due to RoW 174.5 Talamanchipatnam S/S near Jammalamadugu to Issue 220 kV Chakrayapeta S/S 8 220 kV D/C Line from proposed 400 kV 200 173 Mar-15 Sep-16 Works under progress 200 Talamanchipatnam S/S near Jammalamadugu to Forest clearance is pending 220 kV Porumamilla S/S 9 220kV Jammalamadugu - Betamcherla D/C Line 68 68

10 220 kV Jammalamadugu - Tadipatri D/C Line 40 40

11 220 kV DC line from 220 kV Palamaneru SS to 131 Feb-17 Feb-17 Works under progress 131 proposed 220 kV Kuppam SS 2016-17 के 2016-17 मᴂ ग मूल लक्ष्य की संशोतर्त 2016-17 को बाद िालूﴂलाइन की पूिी ई व कमीशन क्र.सं लंबाई की लंबाई तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. Stringing Proposed Name of the Transmission Line Remarks during लाइन No Length in completed in Original for 2016-17 Revised 2016-17 Beyond Ckt.Kms ckt. Kms 2016-17 Circuit Kms. Target Date Target date ckt. Kms ckt. Kms 12 220 kV DC line from proposed 400 kV Podili SS to 114 Feb-17 Feb-17 Works under progress 114 proposed 220 kV SS Kandukur 13 Evacuation of Wind Power in Kadappa, Anantpur & Kurnool Districts of AP : (a). 220 kV DC Twin Moose Line from 400 kV 32.5 29 Mar-15 2016-17 Works under progress 32.5 Uravakonda S/S to 220 kV Vajra Karur S/S (b). 220 kV D/C Line from 400 kV Uravakonda 100 4.5 Mar-15 Aug-16 Works under progress 100 S/S to 220 kV Kalyandurg S/S (c). LILO of both the circuits of 220 kV 10 36 SCPSPSR 10 Uravakonda - Kalyan Durg at 220 kV Borampalli SS (d). 220 kV DC Moose Line from 400 kV 53 Mar-15 Aug-16 Preliminary Works under progress 53 Jammalamadugu (Konda Puram) S/S to 220 Thirumalaipally S/S (e). 220 kV twin moose D/C Line from proposed 67 Nov-14 Aug-16 Works under progress 67 400 kV Uravakonda S/S to proposed 220 kV Borampalli S/S 14 220 kV DC line from the proposed 400/220 kV 9 Sep-16 Sep-16 Works under progress 9 Kamavarapukota SS to the existing 220 kV Kamavarapukota SS 15 (a) 220 kV Hindupur-Penukonda D/C Line 50 36 SCPSPSR 50 (b) 220 kV Hindupur to Pampanur Tanda ( TM ) 90 36 SCPSPSR 90 D/C Line (c) 220kV D/C Line from Hindupur 400 kV SS - 20 36 SCPSPSR 20 Hindupur 220 kV SS

कु ल / Total 3788.53 246.00 912.50 13.2 दतक्षण क्षेत्र मᴂ 400 एवं 220 कक.वो. की नई पािेषण लाइनⴂ के तनमााण काया की प्रगतत की समीक्षा 13.2 Review of Progress of Works on new 400 KV and 220 KV Transmission Lines under State Sector in SR िा煍य का नाम / Name of the State : कनााटक / Karnataka लाइन की पूिी ई 2016-17 मᴂ 2016-17 के मूल लक्ष्य संशोतर्त 2016-17 को बाद िालू ग की कमीशनﴂलंबाई व क्र.सं की तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised लंबाई Proposed for लाइन Sl. during 2016- Name of the Transmission Line Length in Stringing Remarks 2016-17 Beyond No Original Revised 17 Circuit completed ckt. Kms 2016-17 Target Date Target date ckt. Kms Kms. in Ckt.Kms ckt. Kms A 400 KV लाइन (Lines) : 1 BTPS to Madhugiri Line (765/400 kV V.N.Pura 284.98 Aug-17 Aug-17 LOI issued to L&T on 19.10.2015 284.98 S/S (PGCIL) Tumkur to Rampura Limits) : (a). Construction of 400 kV MC Line (5.138 km) and 400 kV DC Line (137.355 km) totally for a route length of 142.493 km with Quad Moose ACSR from YTPS to proposed 400 kV Bellary Pooling Station (BPS)

(b). Construction of 400 kV MC Line with Quad 86.04 Apr-17 Apr-17 Work under progress 86.04 Moose ACSR from proposed 400 kV Bellary Pooling Station(BPS) to Ramapura Limits (Kelagina Kanavi) to link the proposed 765 kV Vasanthanarasapura S/S & 400 kV Chikka Nayakanahally Switching Stations (43.018 km)

(c). Construction of proposed 400 kV DC Line with 377.48 269.2 Dec-16 Dec-16 Work under progress 377.48 Quad Moose ACSR from proposed 765/400 kV Vasanthanarsapura (PGCIL) Station at Tumkur to Kelaginakanive Village limits (Rampua) towards proposed 400 kV BTPS Pooling Station in Bellary District (188.74 km)

2 Yermarus TPS - Gulbarga 400 kV D/C line (QM) Estimate is umder preparation

3 LILO of both the circuits of Nelamangala – Land Acquisition is under progress Talaguppa 400 kV lines to the proposed pooling station near CN Halli. 4 Bellary Pooling Station - C.N.Hally 400 kV D/C line 360 To be tendered 360 with quad moose conductor 5 LILO of 400 kV Bellary Pool – Madhugiri D/C 60 60 (Quad) (both circuits) [KPTCL line] at Tumkur PS 6 400 kV BTPS-Guttur D/C line (QM) Agreed in 39th SCPSPSR लाइन की पूिी ई 2016-17 मᴂ 2016-17 के मूल लक्ष्य संशोतर्त 2016-17 को बाद िालू ग की कमीशनﴂलंबाई व क्र.सं की तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised लंबाई Proposed for लाइन Sl. during 2016- Name of the Transmission Line Length in Stringing Remarks 2016-17 Beyond No Original Revised 17 Circuit completed ckt. Kms 2016-17 Target Date Target date ckt. Kms Kms. in Ckt.Kms ckt. Kms 7 LILO of 400 kV Guttur - Guddanahalli S/C at 26.798 26.798 Gadag (Doni) 8 400 kV Tumkur P S (190 km) - Hiriyur D/C Line 110 110 (Tumkur - Hiriyur - Mysore de-LILOed) 9 LILO of 400kV Gooty – Madhugiri D/C at Tumkur 5 Transmission System for Tumkur Ultra 5 (Pavagada) PS Mega Solar Park (1000 MW) 10 400 kV Tumkur PS- Devanhally (KPTCL) D/C 125 before Phase-II at Ultra Mega Solar 125 (Quad) Power Park

B 220 KV लाइन (Lines) : 1 Kudgi UMPP Evacuation Line (A) : 72.66 39.22 Mar-15 Jan-17 Work under progress 72.66 220 kV MC Line from proposed Kudgi 400 kV STPP to LILO to the existing 220 kV B.Bagewadi - Bijapur DC Line 18.16 km (72.656 ckm) 2 Kudgi UMPP Evacuation Line (B) : 158.84 Feb-17 Feb-17 Work under progress 158.84 220 kV DC Line from proposed Kudgi 400 kV STPP of NTPC to 220 kV Vajramatti SS along with 220 kV TBs at 220 kV Vajramatti SS in Bijapur Taluk of Bagalkot District

3 Nimhans 220 KV Cable: For running of S/C of 220 10.68 9 May-10 Nov-16 BBMB Approval awaited 10.68 kV 1000 Sq mm copper u/g cable for a route length of 10.68 km. from the 220 kV HSR layout station to the proposed 220 kV Nimhans station. 4 220 kV DC line to Hoskote (Pillaguppa) by 26.24 0.35 Apr-08 Mar-17 Work under progress. Court case being 26.24 constructing LILO of Hoody-Kolar SC line pursued 5 Shifting of 220 kV DC line passing through 35.34 21.95 Feb-08 Feb-17 Court Case. Forest clearance received on 35.34 proposed Airport land near Boovanahally limits by 03.02.2016 constructing new 220 kV LILO line from Shimoga - Mysore LILO line from Dandiganahally limits in Work under progress Hassan Taluk, Hassan District for a distance of 17.67 kms

6 Vikas Tech Park : Construction of 220 kV LILO 9.2 2.8 Jul-11 Mar-17 Work under progress. Local RoW 9.2 linr from one of the circuits of the proposed 220 kV problems D/C Somanahalli-Malur line to the proposed S/s लाइन की पूिी ई 2016-17 मᴂ 2016-17 के मूल लक्ष्य संशोतर्त 2016-17 को बाद िालू ग की कमीशनﴂलंबाई व क्र.सं की तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised लंबाई Proposed for लाइन Sl. during 2016- Name of the Transmission Line Length in Stringing Remarks 2016-17 Beyond No Original Revised 17 Circuit completed ckt. Kms 2016-17 Target Date Target date ckt. Kms Kms. in Ckt.Kms ckt. Kms 7 Magadi Line : (a) 220 kV DC Line from proposed Magadi SS to LILO one of the circuits of 220 kV Nelamangala - 30.9 Jul-14 Nov-16 Work under progress 30.9 Anchepalya Line

(b) 220 kV DC Line from 400/220 kV Bidathi 64.378 Jul-14 Nov-16 Work under progress 64.378 (PGCIL) SS to proposed 220 kV Magadi SS Line

8 Mittemari Line : Construction of 220 kV DC Line 91 Jun-17 2017-18 Work under progress 91 from 220 kV Gowribidanur to Mittemari for a distance of 45.5 km 9 D/C line from 400/ 220 KV PGCIL station, 15.52 8.916 Sep-09 Dec-16 Contract terminated vide letter dated 15.52 Shantigrama to the existing B-4 line near 12.05.2016 Hedanahalli limits, Hassan Taluk 10 DC line from Somanahalli to Kolar via Malur 180 140 Mar-08 Jul-16 Kolar - Malur line charged. Malur - 180 Somanahalli partly charged, upto stringing. RoW problem being pursued in court 11 Jigani 220 kV Line: Construction of 220 kV and 23.4 Oct-08 2016-17 Line work short closed vide OM dated 23.4 220-66 kV multi circuit lines from the proposed 220 12.08.2015 kV Somanahalli Malur I& II lines to the proposed 220 kV Jigani S/s 12 Ramnagar/ Channapatna (Kothipura) a) DC line from 220kV Tubinkere S/s 68.82 kM (a). 87.00 Work under progress. Delay due to RoW 173.86 Feb-08 2016-17 173.86 b) 220-66kV MC line from 220kV Bidadi S/s (b). - - - - problem. 18.117 km 13 Construction of 220 kV D/C link line from 39.28 Mar-11 Mar-17 Work terminated on 19.09.2015 and to be 39.28 220/66/11 kV Vajmangala S/s to the existing retendered for the balance works Kadakola S/s 14 Koppal 220 KV Line (Halavarthi) : 0.244 Feb-14 To be re-tendered 0.244 Construction of 220 KV DC Line (0.03 km) from existing 220 KV Munirabad Station to proposed Halvarthi Stattion 15 Vajamangala - Varun Limits Line : 9.06 May-15 Nov-16 Work under progress 9.06 (1) Construction of 220/66 kV MCMV Line from location No. 04 (3) to 20 along the proposed 66 kV Vajamangala - Kadakola DC Line Corridor in Vajamangala - Varun Limits (4.53 km) लाइन की पूिी ई 2016-17 मᴂ 2016-17 के मूल लक्ष्य संशोतर्त 2016-17 को बाद िालू ग की कमीशनﴂलंबाई व क्र.सं की तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised लंबाई Proposed for लाइन Sl. during 2016- Name of the Transmission Line Length in Stringing Remarks 2016-17 Beyond No Original Revised 17 Circuit completed ckt. Kms 2016-17 Target Date Target date ckt. Kms Kms. in Ckt.Kms ckt. Kms 16 Kudigi (Badeladaku) Line : 65.272 May-14 Dec-16 Work under progress 65.272 220 KV DC Line from existing 220 KV Station Ittagi to the proposed Station at Kudigi for a distance of 32.636 Km with 2 TBs at Kudigi Stattion

17 Pavagada 220 KV Line : 120.988 18 Jul-14 Nov-16 LOI issued on 16.01.2013. Work under 120.988 Construction of 220 KV DC Line from existing 220 progress. KV Madhugiri R/S to proposed Pavagada Station for a distance of 60.49 km 18 Mallat (Manvi) 220 KV Line : 5.6 5.5 Aug-14 Dec-16 LOI issued on 12.02.2013. 5.6 Construction of 220 KV LILO from 220 KV RTPS Work under progress -Lingasugur SC Line to the proposed 220 KV Station at Mallat for a distance of 2.8 Kms with TBs at Kavital and Byagwat existing stations and 110 KV SC/DC Evacuation Lines 19 Thallak Balance Work : 40.96 Aug-07 Mar-17 Station commissioned on 30.01.2009 by 40.96 Construction of 220 KV DC Line for a distance of M/s. Areva T&D. Line partially 60.481 km from 400/220 KV Beerenahalli SS to commissioned upto 40 km proposed 220/66 KV Thallak Sub-Station (Chitra Work restarted from 30.11.2013 and Durga Dist). Erection of Balance portion of line under progress. for 20.48 km (73 Towers) 20 220 kV Hiriyur - Chitradurga D/C Line 40 40

21 Vasanthanarasapura - Antharasanahally 220 kV 37.604 12 Jan-16 Nov-16 Work under progress 37.604 Line : Construction of 220 KV DC Line for a distance of 18.802 km from proposed 764/400/220 KV PGCIL SS 220 kV SS at Vasanthanarasapurato existing Antharasanahalli along with 2 terminal bays at Antharasanahally 220/66/11 kV SS and dismantling of 66 kV Antharasanahally Antharasanahally Korategere SC for a route length of 4.495 kms for construction of 220/66 kV MCMV Line in Tumkur Taluk and district

22 LILO of 220 kV Gadag-Lingapur D/C at Gadag 2.775 2.775 (Doni) 23 LILO of 220 kV BTPS – CN Halli at Jagalur M/C 40 40 लाइन की पूिी ई 2016-17 मᴂ 2016-17 के मूल लक्ष्य संशोतर्त 2016-17 को बाद िालू ग की कमीशनﴂलंबाई व क्र.सं की तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised लंबाई Proposed for लाइन Sl. during 2016- Name of the Transmission Line Length in Stringing Remarks 2016-17 Beyond No Original Revised 17 Circuit completed ckt. Kms 2016-17 Target Date Target date ckt. Kms Kms. in Ckt.Kms ckt. Kms 24 220 kV Jagalur-Thallak (Drake) 40 40

25 220 kV Jagalur-Kudligi(Drake) 50 50

26 220 kV Jagalur-Chitradurga D/C 50 50 27 LILO of 220 kV Narendra- Haveri at Bidnal 26 26

28 220 kV Hiriyur (PG) – Hiriyur 220/110/66 kV S/C 0 on D/C towers 29 220 kV Shivanasamudra – TK Halli D/C Line 1.5 1.5

30 220 kV Shivanasamudra – Madhuvanahalli D/C Line 1.5 1.5

31 LILO of 220 kV Ghatprabha - Chikkodi D/C at 40 40 Mughalkod 32 220 kV DC UG Cable Line from 400/220 kV 11.75 Jan-17 Jan-17 Tender evaluation under process 11.75 Singanayakanahally (Yelahanka PG) to the proposed 220/66/11 kV Yelahanka DG Plant Station 33 220 kV DB Pura BIAL (Yelahanka) to 400/220 kV DPR to be prepared Singanayakanahally (Yelahanka PG)DC 220 kV Line

34 220 kV D/C Hootagally -Vajamangala- T.K.Halli S/ 76 76 C corridor with Drake including LILO to 35 Vasanthanarasapura220/66/11kV - Madhugiri Line : 88.962 3 Jul-16 Jul-16 Work under progress 88.962 Construction of 220 KV DC Line with Moose ACSR for a distance of 44.481 km partly on multi circuit towers from proposed 765/220/66 kV Vasanthanarasapura PGCIL SS to existing 220 kV Madhugiri SS along with terminal bays

कु ल / Total 1586.224 0 1528.59 13.3 दतक्षण क्षेत्र मᴂ 400 एवं 220 कक.वो. की नई पािेषण लाइनⴂ के तनमााण काया की प्रगतत की समीक्षा 13.3 Review of Progress of Works on new 400 KV and 220 KV Transmission Lines under State Sector in SR िा煍य का नाम / Name of the State : के िल / Kerala पूिी ई 2016-17 मᴂ 2016-17 के लाइन की संशोतर्त 2016-17 को ग की कमीशन बाद िालूﴂव क्र.सं लंबाई तािीख अनुसूतित पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised होनेवाली Sl. लंबाई Proposed for लाइन Name of the Transmission Line Remarks during Stringing 2016-17 Beyond No Length in Revised 2016-17 completed ckt. Kms 2016-17 Circuit Kms. Target date ckt. Kms in Ckt.Kms ckt. Kms A 220 KV लाइन (Lines) : 1 LILO of one circuit of the 220 KV 62.06 2016-17 Work in progress. 62.06 Kayamkulam - New Pallom DC feeder 2 220 kV Pothencode - Kattakada (DC) Line 57.00 2016-17 Work in progress. 70% completed 57.00

3 Pallivasal Extension HEP Scheme : 1.00 2016-17 Work in progress. 1.00 LILO of 220 KV Udumalpet - Iduki S/C Line

4 Evacuating Power from Thottiyar HEP : 1.00 2016-17 Work in progress. 1.00 LILO of one of the 220 kV Lower Periyar - Madakathara D/C Line 5 220 kV Brahmapuram - Kaloor (DC) Line 2016-17 (OH + UG) 6 LILO to 220 kV Kuyilmala from 220 KV 2016-17 Udumalpet - Idukki feeder 7 220 kV Kattakada - Balaramapuram Line 12.00 2016-17 37 % completed 12.00 8 220 kV Balaramapuram - Vizhinjam Multi 12.00 2016-17 24 % completed 12.00 Circuit Multi Voltage Line 9 LILO of 220 kV Madakkathara - 2016-17 Elappully at 220 KV Shornur S/S 10 Upgradation of 66 kV Kalamassery - Aluva 2016-17 Line to 220/110 kV using multicircuit, multi voltage towers 11 220 kV Areakode - Kanhirode D/C Line 2017-18

कु ल / Total 145.06 0.00 0.00 13.4 दतक्षण क्षेत्र मᴂ 400 एवं 230 कक.वो. की नई पािेषण लाइनⴂ के तनमााण काया की प्रगतत की समीक्षा 13.4 Review of Progress of Works on new 400 KV and 230 KV Transmission Lines under State Sector in SR िा煍य का नाम / Name of the State : ततमल नाडु / Tamil Nadu पूिी ई 2016-17 मᴂ 2016-17 के लाइन की मूल लक्ष्य संशोतर्त 2016-17 को ग की कमीशन बाद िालूﴂव क्र.सं लंबाई की तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. लंबाई Proposed for लाइन Name of the Transmission Line Remarks during Stringing 2016-17 Beyond No Length in Original Revised 2016-17 completed ckt. Kms 2016-17 Circuit Kms. Target Date Target date ckt. Kms in Ckt.Kms ckt. Kms 765 KV लाइन (Lines) : 1 765 kv Ariyalur SS to 765/400 kV Thiruvalam 320 2018-19 Tender opened and under 320 PGCIL SS D/C Line with Hexa Zebra process conductor

A 400 KV लाइन (Lines) : 1 400 KV Kalivanthapattu SS - 400 KV 52 30.69 28.02.2014 31.10.2016 Case at National Green 52 Sholinganallur (Ottiyampakkam) SS DC Tribunal Judgement awaited 2 400 KV D/C Line from MTPS - Singarapet 400 200 2016-17 2016-17 Tender will be floated on 200 KV S/S acquiring the land for the S/S

3 400 kV Thoppakundu 400/110 kV Wind SS - Kamuthi 400/230-110 kV S/S 4 400 kV Kamuthi Solar park - Kamuthi 400/230- 110 kV S/S 5 400 kV DC Line on DC Tower with Quad 220 42 13.07.2016 31.12.2016 Work awarded and under 220 Moose Conductor from 400kV Karaikudi SS progress. Railway crossing (PGCIL) to proposed 400 kV Kamudhi SS approval awaited 6 (a). 400 KV D/C Line on multi circuit towers 74.4 2015-16 31.03.2017 Work awarded to M/s. 74.4 with twin moose conductor from the proposed SEW Aster JV on Thervaikandikai 400 KV SS to the prposed 30.03.2015 and under Korattur 400 KV SS and Manali 400 KV SS progress upto the common point (P.7) (b). Erection of 400 KV SC Line on multi 4.6 29.03.2016 31.03.2017 Work awarded to M/s. 4.6 circuit tower with twin moose conductor from SEW Aster JV on the common point A to the proposed Common 30.03.2015 and under Point B Korattur 400 KV SS to accommodate progress Thervaikandigai - Korattur & NCTPS-Manali SC Line पूिी ई 2016-17 मᴂ 2016-17 के लाइन की मूल लक्ष्य संशोतर्त 2016-17 को ग की कमीशन बाद िालूﴂव क्र.सं लंबाई की तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. लंबाई Proposed for लाइन Name of the Transmission Line Remarks during Stringing 2016-17 Beyond No Length in Original Revised 2016-17 completed ckt. Kms 2016-17 Circuit Kms. Target Date Target date ckt. Kms in Ckt.Kms ckt. Kms (c). Erection of 400 KV SC Line on DC 4.4 14.09.2015 31.12.2016 Work awarded and under 4.4 Towers with twin moose conductor from the progress LILO Point D of 400 kV NCTPS - Alamathy DC Line to the Common Point B to accommodate 400 kV NCTPS - Manali SC Line & 400 kV Alamathy - Korattur SC Line Line 22.2 4.755 14.09.2015 31.12.2016 Work under progress 22.2 (d) Erection of 400 KV DC line on DC tower with twin moose conductor from common point B to common point C towards the proposed Korattur 400 KV SS to accommodate 400 KV Thervaikandigai-Korattur SC line and 400 KV Alamathy-Korattur SC line.(P.8) 8b2

7 (a) Laying of 400 kV 1 X 2500 sqmm D/C UG 18 Retender will be floated 18 Cable Feeder from the Common Point C to the after JICA concurrence proposed 400 kV Korattur SS to accommodate 400 kV Thervaikandigai - Karattur S/C Circuit Line and 400 kV Alamatty - Korattur S/C Line (400 kV Korattur SS Line)

(b) Erection of 400 KV DC line on DC tower 60 12.701 14.09.2015 30.09.2016 Work awarded and under 60 with twin moose conductor from common point progress A of Thervaikandigai to the proposed Manali 400 KV SS to accommodate 400 KV Thervaikandigai -Manali SC line and 400 KV NCTPS-Manali SC line for a distance of 34 kms (superceeding the original sanction accorded for Thervaikandigai 400 KV Substation)(P.8) 8a

(c) Erection of 400 KV DC line on with twin 11.4 14.09.2015 31.08.2016 Work awarded and under 11.4 moose/HTLS conductor from the proposed progress Manali 400 KV SS to Manjakuppam point (towards proposed Korattur 400 KV Substation) 8c पूिी ई 2016-17 मᴂ 2016-17 के लाइन की मूल लक्ष्य संशोतर्त 2016-17 को ग की कमीशन बाद िालूﴂव क्र.सं लंबाई की तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. लंबाई Proposed for लाइन Name of the Transmission Line Remarks during Stringing 2016-17 Beyond No Length in Original Revised 2016-17 completed ckt. Kms 2016-17 Circuit Kms. Target Date Target date ckt. Kms in Ckt.Kms ckt. Kms 8 Laying of 400 kV 1 X 2500 sqmm D/C UG 22 2017-18 2017-18 Retender will be floated 22 Cable Feeder from Manjakuppam Point to the after JICA concurrence proposed 400 kV Korattur SS (Included in 400 kV Manali SS associated Line P6) 9 400 KV Line (4 Nos. circuits on multi circuit 160 20.52 27.04.2016 31.12.2016 Work awarded to M/s. 160 towers) with twin moose conductor from L&T on 28.04.2015 and proposed Karamadai 400 KV SS to LILO the work under progress "400 KV MTPS Stage III - PGCIL Arasur Line" Court Case involved 10 400 KV D/C Line on Towers with Quad Moose 31 19.6 04.03.2015 31.08.2016 Work awarded on 31 from Tirunelveli SS (Ahishekapatty) to the 20.08.2014 and under proposed Kanarpatty 400 KV SS progress 11 Erection of 400 KV Line on DC Tower with 358 338.538 10.03.2015 31.10.2016 Line work completed 358 twin moose conductor from the proposed and will be Thappukundu SS to 400 KV Anaikadavu SS commissioned along with Sub-Station 12 LILO of one circuit of 400 KV Thappakundu 30 2016-17 2016-17 Tender opened and under 30 SS to Anaikadavu SS at 400 kV Udumalpet process (PGCIL) SS 13 Erection of 400 KV Line on DC Tower with 77.342 77.342 08.08.2014 31.10.2016 Work completed and will 77.342 twin moose conductor from the proposed be commissioned with SS Rasipalayam SS to 400 KV Anaikadavu SS 14 (a). Erection of 400 KV DC Line on DC towers 390 368.36 03.04.2015 31.07.2016 Work under progress 390 with quad moose conductor from 400 kV RoW Issues Rasipalayam SS to 400 kV Dharmapuri SS by superceeding already sanctioned 400 kV DC Line from 400 kV Rasipalayam SS to 765/400 kV Salem SS (b). Erection of 400 kV DC Line on DC towers 390 31.03.2016 2017-18 Work awarded to M/s. 390 with quad moose conductor from Rasipalayam - KPTL on 21.12.2015 and Dharmapuri DC Line at 765/400 Dharmapuri under progress SS (kfw) 15 400 kV Salem - Palvadi (Singarpet) D/C Quad 90 As agreed in 36 SCPSPSR 90 Line पूिी ई 2016-17 मᴂ 2016-17 के लाइन की मूल लक्ष्य संशोतर्त 2016-17 को ग की कमीशन बाद िालूﴂव क्र.सं लंबाई की तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. लंबाई Proposed for लाइन Name of the Transmission Line Remarks during Stringing 2016-17 Beyond No Length in Original Revised 2016-17 completed ckt. Kms 2016-17 Circuit Kms. Target Date Target date ckt. Kms in Ckt.Kms ckt. Kms 16 400 kV Vagarai - Udumalpet (PGCIL) Twin DC Line 17 (a). Erection of 400 KV DC Line on the DC 9 2017-18 Specification is under 9 Tower with twin moose conductor from the preparation for floating proposed 400 kV Manali SS and NCTPS Stage - tender II to Tondaiyarpet point (400 kV Pulianthoppu SS) (b). Erection of 400 KV SC Line on the DC 40 2017-18 Specification is under 40 Tower with twin moose conductor from the preparation for floating proposed 400 kV Manali SS and NCTPS Stage - tender II to Tondaiyarpet point (400 kV Pulianthoppu SS) (c). Laying of 400 kV, 1x2500 sq.mm DC UG 10.8 31.08.2016 31.03.2017 Work awarded on 10.8 Cable Feeder from Tondaiyarpet point to the 10.02.2016 and is being proposed 400 kV Pulianthope SS (Manali and taken up NCTPS Stage - II 18 (a) 400 kV D/C Line with Quad Moose 1 1 31.03.2017 31.03.2017 Line Work completed. 1 conductor by making LILO in circuit 1 of Linking with the terminal MTPS III - Thiruvalam DC Line for 400 kV will be matched with 400 Dharmapuri SS kV Dharmapuri SS (b) 400 kV D/C Line with Quad Moose 1 1 31.03.2017 31.03.2017 Line Work completed. 1 conductor by making LILO in circuit 2 of Linking with the terminal MTPS III - Thiruvalam DC Line for 400 kV will be matched with 400 Dharmapuri SS kV Dharmapuri SS 19 400 kV D/C Line with Quad Moose conductor 190 2017-18 2017-18 Estimate is under process 190 by making LILO in Feeder 1 of Karakudi - Pugalur DC Line at the proposed 400 kV Vellalaviduthi SS 20 Erection of 400 KV DC Line on DC tower with 16 31.03.2017 31.03.2017 Board Note is under 16 twin moose conductor by making LILO in one approval for placing of of the 400 KV Sunguvarchatram-Alamathy DC order line upto Vellavedu towards Guindy (10) पूिी ई 2016-17 मᴂ 2016-17 के लाइन की मूल लक्ष्य संशोतर्त 2016-17 को ग की कमीशन बाद िालूﴂव क्र.सं लंबाई की तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. लंबाई Proposed for लाइन Name of the Transmission Line Remarks during Stringing 2016-17 Beyond No Length in Original Revised 2016-17 completed ckt. Kms 2016-17 Circuit Kms. Target Date Target date ckt. Kms in Ckt.Kms ckt. Kms 21 Erection of 400 KV SC on DC tower with twin 40 2016-17 2017-18 Board Note is under 40 moose conductor from sanctioned approval for placing of Sholinganallur 400 KV SS upto Perumbakkam order Jn towards Guindy 400 KV Substation (10) 22 (a). Laying of 400 kV, 1x2500 sq.mm DC UG 40 2016-17 23017-18 Re-tender is being floated 40 Cable Feeder from Vellavedu to the proposed after getting JICA 400 kV Guindy SS concurrence (b). Laying of 400 kV, 1x2500 sq.mm DC UG 12 2016-17 23017-18 Board Note is under 12 Cable Feeder from OH Portion (Perumbakkam approval for placing of Jn from the sanctioned 400 kV Sholinganallur order SS) to the proposed 400 kV Guindy SS (P 34)

23 400 kV DC Line on DC Towers with twin 24 17.28 04.03.2015 31.08.2016 RoW Issues. Enter upon 24 moose conductor from sanctioned 400 kV Permission awaited from Kanarpatti S/S to 400 kV Kayathar S/S Collector 24 400 kV Pavoorchatram (Thenampatty) - 112 2017-18 2017-18 Tender under process 112 Kayathar Quad DC Line with Quad Moose conductor 25 (a) 400 kV Kayathar - PGCIL 765 kV 110 2017-18 2017-18 Under scope of reduction 110 Kovilpatti Pooling Station Quad Moose DC from Kayathar to Line Thenampatty (b) 400 kV Udankudi - Samugarangapuram Land to be identified DC Line (c) LILO of 230 kV Kudankulam – SR Pudur S/C at Samugarengapuram (d) LILO of 230 kV Udayathur – Sankaneri at Samugarengapuram (b) 230 kV Samugarengapuram – D/C पूिी ई 2016-17 मᴂ 2016-17 के लाइन की मूल लक्ष्य संशोतर्त 2016-17 को ग की कमीशन बाद िालूﴂव क्र.सं लंबाई की तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. लंबाई Proposed for लाइन Name of the Transmission Line Remarks during Stringing 2016-17 Beyond No Length in Original Revised 2016-17 completed ckt. Kms 2016-17 Circuit Kms. Target Date Target date ckt. Kms in Ckt.Kms ckt. Kms B 230 KV लाइन (Lines) : 1 230 KV UG Cable Mylapore - Tharamani S/S 25 31.03.2015 30.09.2016 Work under progress 25

2 (a) Laying of 230 kV, 1x1200 sq.mm SC UG 1.8 31.08.2016 31.03.2017 Work awarded on 1.8 Cable Feeder from proposed 230 kV 10.02.2016 and is being Vyasarpadi to 400 kV Pulianthope SS. taken up (b) Laying of 230 kV, 1x2500 sq.mm SC UG 5.4 31.08.2016 31.03.2017 Work awarded on 5.4 Cable Feeder from 230 kV Tondaiyarpet point 10.02.2016 and is being to the proposed 400 kV Pulianthope SS taken up (Manali and NCTPS Stage - II) (c) Laying of 230 KV, 1x1200 sq.mm SC UG 1.5 31.12.2016 31.12.2016 Work awarded on 1.5 cable feeder from the Basin Bridge 230 KV SS 10.02.2016 and is being to the proposed Pulianthope 400 KV SS taken up 3 230 KV DC Line on DC tower by Making 2.08 2.08 2015-16 Apr-16 Line energised on 2.08 2.08 LILO of Gummidipoondi - M/s Michelin Tyres 15.04.2016 Feeder at Thervaikandigai 400 KV SS 4 Changing of conductor in Sriperumbudur - 20.27 12 2012-13 Line work is under 20.27 Korattur S/C Line (Improvement) modification & Admn approval under process 5 Erection of 230 kV DC Line on DC Towers 70 31.5 31.03.2015 31.12.2016 Work under progress 70 with Zebra Conductor from 400 kV Ottiyambakkam SS to Proposed 230 kV Omega SS 6 230 kV Cuddalore - SP Koil (Veerapuram) DC 347.988 31.12.2016 31.03.2017 Work under progress 347.988 Line via Neyveli (kfw) 7 230 kV UG Cable Line from Basin bridge 230 23.1 2013-14 Tender to be floated. 23.1 KV S/S (GMR Vasavi) to TNEB HQ 230 KV S/S 8 Laying of 230 KV SC 1X1200 sq.mm XLPE 9.2 30.09.2012 31.03.2017 Work awarded to M/S CCI 9.2 UG Cable from Guindy 230 KV SS to and to be commenced Koyembedu(AIS) 230 kV SS 9 LILO of 230 KV Sriperumpudur - Arni Line at 12 31.12.2011 Court Case pending. 12 Sunguvarchatram 400 KV S/S with Zebra Approval for revised route Conductor is under scrutiny पूिी ई 2016-17 मᴂ 2016-17 के लाइन की मूल लक्ष्य संशोतर्त 2016-17 को ग की कमीशन बाद िालूﴂव क्र.सं लंबाई की तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. लंबाई Proposed for लाइन Name of the Transmission Line Remarks during Stringing 2016-17 Beyond No Length in Original Revised 2016-17 completed ckt. Kms 2016-17 Circuit Kms. Target Date Target date ckt. Kms in Ckt.Kms ckt. Kms 10 LILO of 230 KV Siruseri - Taramani (Kids 4.8 4.8 31.03.2015 31.07.2016 Work completed 4.8 Park) Line at proposed Ottiyambakkam 400 KV S/S 11 230 KV D/C Line from Ottiyambakkam to 24 15.4 31.03.2015 31.08.2016 Work under progress 24 KITS 230 KV S/S 12 Additional Source from Alamathy (400 KV) - Koyambedu (230 KV) Line : a) Construction of 230 KV DC line from 28 24 2012-13 August, 2016 Work under progress 28 Koladi point to PH Road b) Laying of 230 KV 1 x 1200 sq mm UG cable 1.35 2012-13 Sep-16 Work under process 1.35 from PH Road to 230 kV Koyambedu 13 Erection of 230 kV DC Line on DC Towers with 4 2016-17 Work awarded and check 4 Zebra Conductor for connecting the proposed 400 kV survey is under progress Karamadai to the PUSHEP Feeder (Modification at LILO needed) 14 230 KV S/C Line on D/C Towers from 137 116 31.12.2011 30.09.2016 Balance Work awarded 137 Karaikudi 400 KV S/S to Sembatty 230 KV and to be taken up S/S with Zebra conductor 15 Erection of 230 kV D/C Line upto Location B 68 68 31.03.2015 31.07.2016 Work completed. 68 from Cuddalore Auto S/S to make LILO of the Panel awaited proposed Ulundurpet - STCMS Line at Ulundurpet 230 kV S/S 16 Erection of 230 KV S/C Line from Villupuram 55 31.03.2012 2016-17 Termination Notice issued to 55 230 KV S/S to the proposed Ulundurpet 230 the old Contractor. Tender to KV S/S with Zebra Conductor be floated after election

17 Erection of 230 KV S/C Line on D/C Tower 40 40 2012-13 2015-16 Work Completed 40 with Zebra Conductor from Gobi 230 KV S/S towards Thingalur upto common point of 230 KV D/C Line 18 (a). Erection of D/C Line on D/C Towers with 0.7 0.35 31.12.2015 July-16 Work completed 0.7 Zrbra Conductor for making LILO of existing 230 KV SP Koil - Thiruvalam Line at the proposed Kanchipuram 230 KV SS पूिी ई 2016-17 मᴂ 2016-17 के लाइन की मूल लक्ष्य संशोतर्त 2016-17 को ग की कमीशन बाद िालूﴂव क्र.सं लंबाई की तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. लंबाई Proposed for लाइन Name of the Transmission Line Remarks during Stringing 2016-17 Beyond No Length in Original Revised 2016-17 completed ckt. Kms 2016-17 Circuit Kms. Target Date Target date ckt. Kms in Ckt.Kms ckt. Kms (b). Erection of D/C Line on D/C Towers with 15.69 6.68 31.12.2015 July-16 Work Completed 15.69 Zrbra Conductor for making LILO of existing 230 KV Sunguvarchatram - Arni Line at proposed 230 KV Kanchipuram SS 19 LILO of 230 kV Thatchankurichi - Eachangadu 20 31.03.2016 2016-17 Re-tender awarded on 20 Line at proposed 230 kV Poiyur SS 03.09.2015 and under progress 20 Erection of D/C Line on D/C Towers with 12.86 12.86 2014-15 2016-17 Work Completed 12.86 Zebra Conductor for making LILO of existing 230 KV Tuticorin SIPCOT - Checkanurani Line at the proposed Savasapuram 230 KV SS

21 230 kV Kayathar - Tuticorin (Auto) DC Line 130 30.06.2015 31.03.2017 Work awarded on 30.06.15 130 (kfw) and under progress 22 230 kV Veeranam - Tirunelveli (PGCIL- 50 30.09.2016 31.03.2017 Work awarded on 30.06.15 50 Abhishekapatty) SC Line on DC Towers and under progress 23 230 kV Veeranam - Kodikuruichi SC Line on 25 31.12.2016 31.03.2017 Work awarded on 30.06.15 25 DC Towers (Partly dismantling the existing and under progress Line) 24 (a). Erection of 230 KV D/C Line on D/C Towers 8 31.07.2016 30.09.2016 Work awarded on 8 with Zebra Conductor for making LILO of existing 03.03.2016 and under 230 KV Checkanurani - TTPS I Feeder at the progress proposed Kinnimangalam 230 KV SS (b). Erection of 230 KV D/C Line on D/C Towers 12 31.07.2016 30.09.2016 Work awarded on 12 with Zebra Conductor for making LILO of existing 03.03.2016 and under 230 KV Checkanurani - Kayathar Feeder at the progress proposed Kinnimangalam 230 KV SS 25 230 kV Ingur - Arasur 400 kV (PGCIL) SC 60 30.06.2015 31.03.2017 Work awarded on 60 Line on DC Towers (Kfw) 30.06.2015 and under progress 26 230 kV Arasur 400 kV (PGCIL) - Gobi (kfw) 55 31.03.2012 31.03.2017 Work awarded on 55 SC Line on DC Towers 30.06.2015 and under progress 27 Erection of 230 KV S/C Line on D/C Towers 62 34 31.03.2014 31.03.2017 Work under progress 62 with Zebra Conductor between Palladam - Court Case at Perundurai Ingur 230 KV SS पूिी ई 2016-17 मᴂ 2016-17 के लाइन की मूल लक्ष्य संशोतर्त 2016-17 को ग की कमीशन बाद िालूﴂव क्र.सं लंबाई की तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. लंबाई Proposed for लाइन Name of the Transmission Line Remarks during Stringing 2016-17 Beyond No Length in Original Revised 2016-17 completed ckt. Kms 2016-17 Circuit Kms. Target Date Target date ckt. Kms in Ckt.Kms ckt. Kms 28 LILO of 230 KV Arasur - Palladam Line at 24 5 13.08.2015 31.12.2016 Work awarded on 14.08.2014 24 proposed Tiruppur 230 KV S/S and under progress 29 LILO of 230 KV Arasur - Karamadai Line at 90 27.5 13.08.2015 30.09.2016 Work awarded on 14.08.2014 90 proposed Shenbagapudur 230 KV S/S and RoW issue is being solved 30 230 KV S/C Line on D/C Towers from 31.36 02.09.2016 31.03.2017 Work awarded and under 31.36 Shenbagapudur 230 KV S/S to the proposed progress Karuvalur 230 KV SS 31 Replacement of Kunda Conductor with Zebra 39.9 31.03.2015 31.03.2017 Work under progress. 39.9 conductor in the existing Neyveli-Eachengadu 230 KV S/C Line on DC Tower 32 230 kV Otta Kal Mandapam - Thudiyalur DC Line 28 As agreed in 36 SCPSPSR 28 33 230 kV Villupuram - Neyveli DC Line 40 As agreed in 36 SCPSPSR 40 34 (a). Erection of DC Line on DC tower with Zebra 62 54 31.03.2015 31.10.2016 Work awarded on 62 Conductor for making LILO of existing 230 kV 29.11.2014 and under Ingur - Palladam Line at the proposed 230 kV progress Kurukathi SS (b). Erection of DC Line on DC tower with Zebra 62 5.2 30.11.2014 31.12.2016 Work under progress. 62 conductor for making LILO of existing 230 kV Myvady - Pugalur Line at the proposed 230 kV Kurukathi SS (c) 230 KV DC line on DC tower with Zebra 2 31.03.2017 31.03.2017 Estimate is under process 2 conductor for making LILO of the existing 230 KV Myvady -Othakalmandapam feeder-I at sanctioned Anaikadavu 400KV SS (d) 230 KV DC line on DC tower with Zebra 40 31.03.2017 31.03.2017 Estimate is under process 40 conductor for making LILO of the existing 230 KV Myvady -Kurukathi - Pugalur feeder at sanctioned Rasipalayam 400 KV SS (e) 230 KV DC line on DC tower with Zebra 50 31.03.2017 31.03.2017 Estimate is under process 50 conductor for making LILO of the existing 230 KV Ingur -Kurukathi - Palladam feeder at sanctioned Rasipalayam 400 KV SS 35 Laying of 230 kV 1X1200 Sq.mm, XLPE UG 10 31.03.2015 31.10.2016 Work under progress 10 Cable from the proposed 230 kV Thiruverkadu SS to the Sanctioned 230 kV Ambattur 3rd Main Road SS पूिी ई 2016-17 मᴂ 2016-17 के लाइन की मूल लक्ष्य संशोतर्त 2016-17 को ग की कमीशन बाद िालूﴂव क्र.सं लंबाई की तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. लंबाई Proposed for लाइन Name of the Transmission Line Remarks during Stringing 2016-17 Beyond No Length in Original Revised 2016-17 completed ckt. Kms 2016-17 Circuit Kms. Target Date Target date ckt. Kms in Ckt.Kms ckt. Kms 36 Erection of DC Line on DC tower with Zebra 53.64 24.97 31.03.2015 31.12.2016 Work under progress 53.64 conductor for making LILO of existing 230 KV Trichy - Perambalur Line at the proposed 230 kV Jambunathapuram SS 37 Erection of 230 kV DC Line on DC towers with 4 31.03.2016 30.09.2016 Work awarded and under 4 Zebra conductor by making LILO in 230 KV progress Korattur - CMRL Koyembedu feeder to the proposed 230 kV Ambattur 3rd Main Road SS 38 (a) LILO of existing 230 kV Paramathi - Alandur 59.68 31.12.2015 31.12.2016 Work awarded and under 59.68 Line at theproposed 230 kV Valayapatty SS, by progress erecting DC Line on DC Tower with Zebra Conductor (b) Erection of DC Line from Deviakurichy - 52 52 31.12.2015 31.12.2016 Work completed 52 Pudhansanthai line at Valayapatty 230 kV SS 39 Laying of SC 230 kV, 1x1200 sq.mm, XLPE UG 10 2016-17 2017-18 Retender to be floated 10 Cable feeder from 230 kV Kilpauk SS 7 and TNEB HQ 230 kV SS 3 to the proposed CMRL Central jail Complex Substation 40 (a). Laying of DC 230 kV 1 x 1200 sq.mm, XLPE 7 31.12.2015 31.03.2017 Work awarded and 7 UG Cable Feeder by making LILO in 230 KV Drawing approval under Mylapore - Taramani Feeder at proposed RA process puram Substation (b). Laying of SC 230 KV, 1 x 1200 sq.mm XLPE 8.1 31.12.2015 31.03.2017 Work awarded and being 8.1 UG cable Feeder from the sanctioned Guindy 400 commenced KV Substation to the proposed 230 kV R.A.Puram Substation 41 Erection of 230 kV DC Line on DC tower with 23.52 23.52 07.04.2016 31.07.2016 Work completed 23.52 Zebra conductor for making LILO of existing 230 kV Kalpakkam - Arani Line at the proposed 230 kV Purisai SS 42 Erection of 230 kV SC Line on DC towers with 57.57 19.02.2017 31.12.2016 Work awarded and to be 57.57 Zebra conductor from 400/230/110 kV Dharmapuri commenced SS to the proposed 230 kV Gurubarapally SS (Associated line of Dharmapuri 400 KV SS NABARD) पूिी ई 2016-17 मᴂ 2016-17 के लाइन की मूल लक्ष्य संशोतर्त 2016-17 को ग की कमीशन बाद िालूﴂव क्र.सं लंबाई की तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. लंबाई Proposed for लाइन Name of the Transmission Line Remarks during Stringing 2016-17 Beyond No Length in Original Revised 2016-17 completed ckt. Kms 2016-17 Circuit Kms. Target Date Target date ckt. Kms in Ckt.Kms ckt. Kms 43 Erection of 230 kV SC Line on DC towers with 3.2 2015-16 2016-17 Work awarded on 3.2 Zebra conductor from LILO of 230 kV Mettur - 21.05.2016 and under Karimangalam Line (Associated line of progress Dharmapuri 400 KV SS) 44 (a). Erection of 230 kV S/C Line on Multi Circuit 45 21.13 13.08.2015 31.07.2016 Work awarded on 45 Towers with Zebra Conductor from Karamadai 400 14.08.2014 and under kV S/S up to common point progress (b). Erection of 230 kV SC Line on DC Towers 37 13.08.2015 30.09.2016 Work awarded on 37 with Zebra Conductor from the common point to 14.08.2014 and under 230 kV Thudialur SS progress 45 Erection of 230 kV DC Line on DC Towers from 74.4 3 31.08.2016 Work under progress 74.4 230 kV Muthuramalingapuram S/S to Kamudhi

46 LILO of 230 KV Thiruvarur - Kadalangudi Line at 40 31.08.2016 31.03.2017 Work awarded and being 40 230 kV Kumbakonam S/S commenced 47 Erection of additional 230 kV link Lines from 400 46.3 2016-17 31.03.2017 Tender will be floated 46.3 kV Shoolagiri S/S to 230 kV Hosur S/S after election 48 Erection of 230 kV SC Line on DC Towers from 170 100 04.03.2015 31.10.2016 Work under progress. 170 the existing 230 kV Kavanoor SS to the existing Held up by cultivation & 230 kV Karaikudi SS Raillway crossing approval 49 230 kV Kamuthi - Kavanoor Line Sep-16 50 (a) LILO of 230 kV Kudankulam – SR Pudur S/C Land to be identified at Samugarengapuram (b) LILO of 230 kV Udayathur – Sankaneri at Land to be identified Samugarengapuram (c) 230 kV Samugarengapuram – Muppandal D/C Land to be identified Line

कु ल / Total 4085.18 2.08 1210.37 13.5 दतक्षण क्षेत्र मᴂ 400 एवं 220 कक.वो. की नई पािेषण लाइनⴂ के तनमााण काया की प्रगतत की समीक्षा 13.5 Review of Progress of Works on new 400 KV and 220 KV Transmission Lines under State Sector in SR िा煍य का नाम / Name of the State : तेलंगाना / Telangana 2016-17 मᴂ 2016-17 के ग मूल लक्ष्य की संशोतर्त 2016-17 कोﴂलाइन की पूिी ई व कमीशन बाद िालू क्र.सं लंबाई की लंबाई तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. Proposed for लाइन Name of the Transmission Line Stringing Remarks during 2016-17 Beyond No Length in completed in Original Revised 2016-17 ckt. Kms 2016-17 Circuit Kms. Ckt.Kms Target Date Target date ckt. Kms ckt. Kms A 400 KV लाइन (Lines) : 1 Ring Main Transmission Scheme : 1.1 Yeddumailaram (Shankarapally) - Edulapally (DC) 82.344 Dec-13 2016-17 New Tenders called for and PO issued on 82.344 04.02.2014 1.2 Idulapally to LILO point of Srisailam - Hyderabad 74.438 7.00 Dec-13 2016-17 New Tenders called for and PO issued on 74.438 line 04.02.2014 1.3 Yeddumailaram (Shakarapally) to LILO point of 158 156.616 Oct-14 2016-17 PO issued on 04.02.2014 and work under 158 Srisailam - Hyderabad Line (Ckt-I) progress 2 Evacuation of Power from HNPCL (1040 MW) Power Plant : 2.1 400 KV Quad DC Line from Suryapet SS - 240.042 240.042 Mar-15 2016-17 Work completed 240.042 Nandiwanaparthi SS 2.2 400 KV Quad DC Line from Nandiwanaparthi SS - 222 121.546 Mar-15 2016-17 Awarded in Sep-13 and under progress. 222 Shankarapally SS 3 400 KV Quad Moose DC Line from Proposed New Line proposed Kamavarapukota SS - Proposed Suryapet SS : 3.1 400 KV Twinmoose DC Line from Proposed Chinna 170.364 165.364 Sep-15 2016-17 Work awarded in March, 2014 170.364 Korukondi -Proposed 400 KV Suryapet SS 5 km of OPGW work only pending

4 Jaipur Power Transmission Scheme : 4.1 Jaipur TPP - Rangampet Quad DC Line 149.636 149.636 May-15 2015-16 Commissioned on 13.11.2015 149.636 149.636 (Reported during May, 2016 vide AR data) 4.2 Rangampet - Gajwel Quad DC Line 174.848 174.848 May-15 2015-16 Commissioned on 13.11.2015 174.848 174.848 (Reported during May, 2016 vide AR data) 5 Wind Power Evacuation Scheme : 5.1 (a). 400 KV Quad DC Veltoor - Tungabhadra 146.69 93.99 Jul-15 Jun-16 Work awarded in March, 2014 & Work under 146.69 River Line Crossing progress 6 Nirmal Power Transmission Scheme : 6.1 400 kV Quad Moose DC Line from STPP, Jaipur - 142 2016-17 2016-17 Work awarded on November, 2015 and 142 Jagityal (Package- I) under progress 6.2 400 kV Quad Moose DC Line from Jagityal - 148.176 88.964 2016-17 2016-17 Work awarded on Octoberber, 2015 and 148.176 Proposed Nirmal SS (Package- II) under progress 2016-17 मᴂ 2016-17 के ग मूल लक्ष्य की संशोतर्त 2016-17 कोﴂलाइन की पूिी ई व कमीशन बाद िालू क्र.सं लंबाई की लंबाई तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. Proposed for लाइन Name of the Transmission Line Stringing Remarks during 2016-17 Beyond No Length in completed in Original Revised 2016-17 ckt. Kms 2016-17 Circuit Kms. Ckt.Kms Target Date Target date ckt. Kms ckt. Kms 7 Bhadradri Thermal Transmission Scheme : 7.1 400 kV Quad Moose DC Line from 400 kV 112.954 6.404 2016-17 2016-17 Work awarded on December, 2015 and 112.954 Julurupadu SS to Burgampadu (Common Point), under progress Khammam of length 56.186 approx. 7.2 400 kV Quad Moose DC Line from Burgampadu 108.636 8.288 2016-17 2016-17 Work awarded on December, 2015 and 108.636 (Common Point), Khammam District to 400 kV under progress Switch Yard at Manuguru Plant of length 54.318 kms approx. 7.3 400 kV Quad Moose DC Line from 400 kV 214.812 2016-17 2016-17 Work awarded on December, 2015 and 214.812 Julurupadu SS to400 kV Suryapet SS, Nalgonda under progress District of length 107.406 km approx 8 KTPS Stage - VII (1 x 800 MW) Power Evacuation cheme : 8.1 400 kV Quad Moose DC Line from 400 kV 77.202 2016-17 2016-17 Work awarded on December, 2015 and 77.202 Julurupadu SS to KTPS (Stage - VII) Switching under progress Station in Khammam District of length 38.601 km approx. 9 System Improvement Transmission Scheme : 9.1 400 kV Quad Moose DC Line LILO from 400/220 5.034 2016-17 2016-17 LOI issued on 02.03.2016 and under 5.034 kV SS Dindi to Srisailam - Mamidipally 400 kV DC progress Line, 2.517 km 10 Indira Sagar Rudramakota Lift Irrigation Scheme : 10.1 400 KV DC Line from LILO Point of Vizag 34 33.554 Jan-14 2016-17 Work awarded on 18.05.2013 and under 34 (Kalpaka),Khammam to 400 KV Asupaka SS progress (OPGW Cable) B 220 KV लाइन (Lines) : (a) Transmission Lines covered under other Schemes : 1 Laying of 220 kV XLPE UG Cable from Marripally 14.44 10.6 May-13 2016-17 Works under progress. 14.44 (Common Point) near Nagole to proposed 220/132/33 kV Hayathnagar S/S 2 220kV Multi Circuit Line from 220 kV Ghanapur 36 33 Jun-13 2016-17 Works under progress 36 SS to proposed 220/33 kV SS at Hayathnagar upto terminal tower at Marripally (18 km) : 59 Nos of Multi Circuit and 4 Nos of Normal Towers 3 220 KV DC line from 400/220 KV Mamidipally S/s 11.32 11.32 Jan-11 2016-17 OPGW Works to be taken up 11.32 to M/s K.S.K. Photovoltaic Ltd.(Near Fabcity Ravirala) 2016-17 मᴂ 2016-17 के ग मूल लक्ष्य की संशोतर्त 2016-17 कोﴂलाइन की पूिी ई व कमीशन बाद िालू क्र.सं लंबाई की लंबाई तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. Proposed for लाइन Name of the Transmission Line Stringing Remarks during 2016-17 Beyond No Length in completed in Original Revised 2016-17 ckt. Kms 2016-17 Circuit Kms. Ckt.Kms Target Date Target date ckt. Kms ckt. Kms 4 220 kV LILO to Moulali S/S from kV Ghanapur - 18 7 Sep-14 2016-17 Work under progress 18 Malkaram D/C Line (One Circuit) 5 220 KV DC line from 220KV SS at Upper Jurala to 22 3.2 Sep-12 2016-17 Commissioned on 29.04.2016 22 22 Lower Jurala Hydro Electric project 6 220 KV D/C XLPE UG cable from 220 KV GIS S/s 9.5 9.5 Jun-11 2016-17 All works completed. Connected SS 9.5 at Chandrayanagutta to proposed 220 KV GIS S/s works are under progress Imlibun 7 220kV LILO from 220kV Gachiboli - Shapurnagar 6 Jun-14 2016-17 Works commenced 6 line to the proposed 220kV Miyapur S/S with XLPE UG Cable 8 220 KV LILO from 220 KV Wanaparthy - 10.416 10.412 Jul-12 2016-17 Nearing completion 10.416 Ramanagadda Line to proposed 220/33 KV Sub- Station at Singotham Cross Road 9 220 KV LILO to Manikonda from Mamidipally - 0.6 0 Jul-12 Court Case. Work stopped. 0.6 Gachibowli Line 10 (a) 220 kV DC Line for LILO of one of the 24.15 15.2 Feb-15 Jun-16 Work under progress 24.15 circuits Chilakallu - Narketpally DC line to the proposed Huzurnagar S/S (b) LILO of one circuit of Chilakallu - 23.41 16 Feb-15 Jun-16 Work under progress 23.41 Narkatpally DC line to the proposed 400/220/132 kV Suryapet SS (12 KM) 11 220 kV DC Line from 400 kV Suryapet S/S to 100 2015-16 2016-17 Tenders to be called 100 220 kV Narketpally S/S 12 220 kV D/C Line from the proposed 220 kV Parigi 80.092 80.092 Oct-15 2016-17 Works Completed. 80.092 S/S to the proposed 220/132 KV Kosigi S/S 13 (a). 220 KV DC Line from 400 KV Veltoor S/S to 80 76 May-15 2016-17 P.O issued on 25.08.2011. Works 80 the proposed 220 KV Switching Station at commenced. Thimmajipet. (b). 220 KV LILO Line from 220 KV Boothpur - 2 0 May-15 2016-17 P.O issued on 25.08.2011. Works 2 Kalwakurthy Circuit 1 to the proposed 220 commenced. KV Switching Station at Thimmajipet. (c). 220 KV LILO Line from 220 KV Boothpur - 2 0 May-15 2016-17 P.O issued on 25.08.2011. Works 2 Kalwakurthy Circuit 2 to the proposed 220 commenced. KV Switching Station at Thimmajipet. 14 220 KV Overhead Line from last multi circuit tower 3.2 3.2 Dec-13 2016-17 Works Completed. Multi Circuit Line 3.2 to cable termination tower for Uppal (Nagole) S/S Works are under progress. 15 220 kV DC line from 220/132 KV SS at Upper 22 22 Sep-12 Apr-16 Charged on 29.04.2016 22 22 Jurala to Lower jurala hydro electric project (11KM) 2016-17 मᴂ 2016-17 के ग मूल लक्ष्य की संशोतर्त 2016-17 कोﴂलाइन की पूिी ई व कमीशन बाद िालू क्र.सं लंबाई की लंबाई तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. Proposed for लाइन Name of the Transmission Line Stringing Remarks during 2016-17 Beyond No Length in completed in Original Revised 2016-17 ckt. Kms 2016-17 Circuit Kms. Ckt.Kms Target Date Target date ckt. Kms ckt. Kms (c) Transmission Lines planned beyond 2014-15 : 1 220 kV Line with 4 Circuits on Multi Circuit 40 2015-16 2016-17 Investment Approval (IA) to be received 40 Towers for LILO of both the Circuits of 220 kV from APERC Warangal - Boodidampadu DC Line at proposed 220 kV SS, Ayyagaripally 2 220 kV DC line with Moose ACSR on Galvanised 124 2015-16 2016-17 Investment Approval (IA) to be received 124 Towers from 400/220 kV Oglapur SS to the from APERC proposed 220 kV Jangaon SS 3 220 kV DC line with Moose ACSR on Galvanised 80 2015-16 2016-17 Investment Approval (IA) to be received 80 Towers from 220 kV SS, Durshed to the proposed from APERC 220 kV SS, Sircilla 4 220 kV LILO to the proposed 220 kV SS at 90 50 Jul-16 Jul-16 Work under progress 90 Suryapet from 220kV Budidampadu (Khammam) - Miryalaguda DC line (Both circuits) 5 Erection of 220 kV DC line from the proposed 120 2015-16 2016-17 Tenders to be called 120 400/220 kV Nirmal S/S to the existing 220kV Jagityal S/S 6 Erection of 220 kV DC line from the proposed 20 2015-16 2016-17 Tenders to be called 20 400/220 kV Nirmal S/S to the existing 220 kV Nirmal S/S 7 Erection of 220 kV DC Line from the proposed 200 2015-16 2016-17 Tenders to be called 200 400/220 kV Nirmal S/S to the proposed upgraded 220/132 kV Renzal S/S (100 km) 8 220 kV DC Line radially from proposed 220 kV 40 2015-16 2016-17 Tenders to be called 40 Thimmajipet Switching Station to the proposed 220/132 kV Jadcherla substation 9 220 kV DC Line with Moose ACSR on Galvanised 40 2015-16 2016-17 Investment Approval (IA) to be received 40 towers from the proposed 400/220 kV SS, from APERC Maheswaram to the proposed 220 kV SS, Kothur 10 Erection of 2nd circuit from 220 kV SS 3 2015-16 2016-17 Investment Approval (IA) to be received 3 Shivarampally to Asifnagar S/S by laying 220 kV from APERC XLPE UG Cable 11 220 kV LILO UG XPLE cable to the proposed 220 8 2015-16 2016-17 Tenders to be called 8 kV Raidurg SS from 220 kV Gachibowli - Shapurnagar Line 12 Erection of 220 kV Line with 4 Circuits on Multi 40 2015-16 2016-17 Investment Approval (IA) to be received 40 Circuit Towers for LILO of both the Circuits of 220 from APERC kV Gachibowli - Sivarampally SS at proposed 400/220 kV Manikonda SS 2016-17 मᴂ 2016-17 के ग मूल लक्ष्य की संशोतर्त 2016-17 कोﴂलाइन की पूिी ई व कमीशन बाद िालू क्र.सं लंबाई की लंबाई तािीख तािीख अनुसूतित होनेवाली पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised Sl. Proposed for लाइन Name of the Transmission Line Stringing Remarks during 2016-17 Beyond No Length in completed in Original Revised 2016-17 ckt. Kms 2016-17 Circuit Kms. Ckt.Kms Target Date Target date ckt. Kms ckt. Kms 13 Erection of 220 kV DC Line With Moose ACSR on 40 2015-16 2016-17 Investment Approval (IA) to be received 40 Galvanised Towers from the proposed 400/220 kV from APERC Maheswaram SS to the proposed 220/132kV Bonguluru SS 14 220 kV 2nd circuits (3rd & 4th circuit) stringing 8 2015-16 2016-17 Tenders to be called 8 from Loc. No. 12 on the existing narrow based M/C towers up to 220/132 kV Fab city on the 220 kV DC line from 400/220 kV Mamidipally SS to 220/132 kV Fab city (circuit 1 & 2 are already covered under Fab city line) - 4 km 15 (a). 220 kV DC line from Pulichintala Hydro 15.74 15.74 Feb-15 Jun-16 Work completed 15.74 Electric Station switch yard to 132KV (b).Sitapuram 220 kV switching DC220 KV station DC line from 132 kV 58.62 30 Feb-15 Sep-16 Work under progress 58.62 Sitapuram Switching station to 220/132KV Huzurnagar SS 16 220 kV LILO to the proposed 220/132 kV 10.27 0 26.11.2015 2016-17 Works under progress 10.27 Huzurabad SS for 220 kV Durshed - Oglapur Line 17 LILO of 220 kV Regumanugadda - Gudipalligattu 4.064 0 Nov-16 Sep-16 Works under progress 4.064 water grid SS line to 220/11 kV Substation Yelluru along with metering arrangements for water Grid (5 KM) M/s.Vertex Engineers, Hyderabad

18 2nd ckt from 400 kV Gajwel to Loc. No.34 of 132 10 10 2016-17 2016-17 Commissioned on 08.06.2016 10 10 kV Line from Gajwel to Thumki Bolarum Line 19 220 kV LILO to Bonguluru SS from 220 kV Dindi - 2 2 Apr-15 Apr-15 Charged on 02.04.2015 2 2 Chandrayanagutta, Rangareddy District

कु ल / Total 3532.71 380.48 147.29 14.1 दतक्षण क्षेत्र मᴂ 400 एवं 220/230 कक.वो. नये उप के न्द्द्रⴂ के तनमााण काया की प्रगतत की समीक्षा 14.1 Review of Progress of Works on new 400 KV & 220 KV Sub-Stations िा煍य का नाम / Name of the State : आंध्र प्रदशे / Andhra Pradesh संशोतर्त 2016-17 मᴂ 2016-17 के बाद वो쥍टेज के मूल लक्ष्य की 2016-17 को कमीशन िालू होनेवाले क्र.सं तािीख अनुसूतित उप कᴂ द्र का नाम अनुपात क्षमता तािीख अ땍युतक्तयां Energised उपकᴂ द्र Sl. Target date Proposed for Name of Sub-Station Capacity (MVA) Remarks during 2016- Beyond 2016-17 Voltage Ratio Original Target 2016-17 No for 17 MVA (KV) Date MVA completion MVA A 400 KV उप के न्द्द्रⴂ (Sub-Stations) : Short Gestation Power Transmission Scheme -II : 1 Bay Extentions : 1.1 400 KV Bays at Narsaraopet, pertaining Mar-14 2016-17 to VTS-Srisailam Line 2 Evacuation of Wind Power in Kadapa, Anantapur and Kurnool Districts (Phase - I) : 2.1 Uravakonda Substation (with 2 Quad 400/220 4x315 Jun-15 Jul-16 Work awarded to M/s. TEEECL in Bays at 400/220 Veltoor S/S) 20.08.2013 & work under progress. 1260 Bus 1 charged on 29.06.2016 2.2 Kondapuram Substation 400/220/132 (4x315) + (2x160) Feb-15 Jul-16 Work awarded to M/s. Tech Ele. [Jammalamadugu] &Engg. Ltd. On 26.08.2013. 950

3 Evacuation of Wind Power in Kadapa, Anantapur and Kurnool Districts (Phase - II) : 3.1 400 kV Hindupur Sub-Station 400/220 3x315 Aug-17 Aug-17 PO issued on 01.04.2016 945 4 Evacuation of Power from HNPCL (1040 MW) Power Plant : 4.1 Kamavarapukota Substation 400/220 2x315 Mar-16 Dec-16 Purchase Order issued on 13.03.2014. 630 Work under progress 4.2 2 Nos. of 400 KV Bay Extentions at 400 All works completed for 1 No. of 400 existing 400/220 KV Kalpaka S/S of kV Bay on 07.02.2014 HNPCL 5 Rayalaseema Power Transmission Scheme : 5.1 2 Nos. of 400 KV Bays at Chittoor PO issued on 03.05.2014 Purchase Order issued on 03.09.2014 and ready for charging 6 System strengthening works in 400/220 kV Sub-Station, Prakasam District on stand alone basis

6.1 400/220 kV Podili Sub-Station 400/220 3x315 Feb-17 Feb-17 LOI issued issued on 16.09.2015. 945 Purchase Order issued in Nov-15 7 Transmission System Improvement Scheme at Vizianagaram & Srikakulam Districts : 7.1 400/220 KV S/S at Maradam (Garividi) 400/220 2x315 Feb-16 Aug-16 Purchase order issued on 15.11.2014 along with 2 Nos. 400 KV Quad Bays at Work under progress the existing 400/220 KV Kalpaka S/S संशोतर्त 2016-17 मᴂ 2016-17 के बाद वो쥍टेज के मूल लक्ष्य की 2016-17 को कमीशन िालू होनेवाले क्र.सं तािीख अनुसूतित उप कᴂ द्र का नाम अनुपात क्षमता तािीख अ땍युतक्तयां Energised उपकᴂ द्र Sl. Target date Proposed for Name of Sub-Station Capacity (MVA) Remarks during 2016- Beyond 2016-17 Voltage Ratio Original Target 2016-17 No for 17 MVA (KV) Date MVA completion MVA 8 System Improvement at 400 kV Kalikiri, Chittoor District, along with the connected network : 8.1 400 kV Sub-Station at Kalikiri 400/220 2x315 Feb-17 Feb-17 LOI issued on 16.09.2015.P.O in 630 Nov-2015 9 1000 MW Wind Power Evacuation at Aspiri :

9.1 400/220 kV Substation in Aspiri 400/220 (3x315) + (2x125) 38th SCPSPSR 1195 10 400 kV Transmission Scheme for Aug-16 Nov-16 evacuation of 1000 MW Power from Solar Park at Ghani / Panyam S/S, Kurnool District : 10.1 400 kV Sub-Station at Ghani 400 3x500 Aug-16 Nov-16 Purchase Order issued on 27.07.2015 1500

B 220 KV उप के न्द्द्रⴂ (Sub-Stations) : (a) Sub-Stations covered under various Lift Irrigation Schemes : 1 Gaddamvaripalli 220/11 2x25 2016-17 Work under progress. 50 2 Goddumarri 220/11 2 x 50 2016-17 Work under progress. 100 3 Nansuralla 220/11 3x25 2016-17 2x25 MVA charged on 03.12.2011 25

(b) Sub-Stations covered under other Schemes : 1 APIIC Growth Centre, Bobbilli, 220/132 3 x 100 Dec-12 2016-17 One Transformer commissioned during 200 Vizianagarm 15-16. Balance 2 Transformers under progress 2 Chakrayapeta 220/132 (2x100) + (2x31.5) Mar-15 Apr-17 Works under progress 263

3 Porumamilla 220/132 2x100 Mar-15 Sep-16 Works under progress 200 4 Vajrakarur 220/132 1x100 Mar-15 Jul-16 Works under progress 100 5 Tirumalayapally 220/132 2x160 Apr-15 Aug-16 Works under progress 320 6 Borrampalli 220/132 1x100 Sep-15 Sep-16 Works under progress 100 7 Kuppam 220/132 2x100 Feb-17 Feb-17 Works under progress 200 8 Kandukuru 220/132 3x100 Feb-17 Feb-17 Works under progress 300 9 Penukonda (Renewables KfW 220/132 2x100 36 SCPSPSR 200 Hindupur) 10 Pampanur Tanda (Renewables KfW 220/132 2x100 36 SCPSPSR 263 Hindupur) 11 Betamcherla 220/132/33 (2x100) + (2x31.5) 36 SCPSPSR 263

12 Gollapuram 220/132/33 (2x100) + (2x50) Dec-14 Aug-16 Works under progress 300

उप-योग / Sub-Total 8073.00 0.00 2866.00 संशोतर्त 2016-17 मᴂ 2016-17 के बाद वो쥍टेज के मूल लक्ष्य की 2016-17 को कमीशन िालू होनेवाले क्र.सं तािीख अनुसूतित उप कᴂ द्र का नाम अनुपात क्षमता तािीख अ땍युतक्तयां Energised उपकᴂ द्र Sl. Target date Proposed for Name of Sub-Station Capacity (MVA) Remarks during 2016- Beyond 2016-17 Voltage Ratio Original Target 2016-17 No for 17 MVA (KV) Date MVA completion MVA C सुतनयोतजत नए 220 के .वी. उप के न्द्द्रⴂ / New 220 kV Sub-Stations Planned : 1 Nil D आवर्ान / Augumenatation : 1 400/220 KV Chittoor & Nellore S/S : 400/220 (2x315)→(3x315) @ Chittoor & 2016-17 3rd PTR at Chittoor charged on 315 315 Augmentation of 3rd 315 MVA PTR = 315 MVAR Nellore each 02.05.2016 (3rd PTR in Nellore idle charged on 31.01.2016 from 400 kV side) 2 220 kV Renigunta SS, Chittoor District 220 (3x100) → 2016-17 2016-17 Commissioned on 01.04.2016 60 60 (2x100) + (1x160) = 360 MVAR 3 220 kV Chinakampally SS, YSR 220 (1x100) → 2016-17 2016-17 Commissioned on 02.04.2016 160 160 Cuddappah District (1x100) + (1x160) = 260 MVAR 4 220 kV Kondapally SS, Krishna District 220 (3x100) → 2016-17 2016-17 Commissioned on 25.04.2016 60 60 (2x100) + (1x160) = 360 MVAR 5 400 Sattenapalli S/S : Augmentation of 400 (2x315)→(3x315) 2016-17 LOI issued on 16.09.2015. Purchase 315 3rd 315 MVA PTR = 315 MVAR order issued in Nov-15 6 220/132 kV S/S at Renzal with 2x100 220/132 2 x 100 2015-16 2016-17 Tenders to be called 200 MVA Transformer (up gradation from 132/33 kV) कु ल / Total (MVA) 8983 595 3066 E रिए啍टि योजनाए ँ / Reactor Scheme : 1 Kalpaka Bus Reactor 125 MVAR 2015-16 Mar-17 Approved in 36th SC. 125 Fresh Tenders opened on 28.03.2016 2 Vemagiri Bus Reactor (1x80 + 1x125) 2015-16 Mar-17 Approved in 36th SC. 205 Fresh Tenders opened on 28.03.2016 3 Kurnool Bus Reactor 125 MVAR 2015-16 Mar-17 Approved in 36th SC. 125 Fresh Tenders opened on 28.03.2016 4 Chittoor Bus Reactor 125 MVAR Mar-17 Mar-17 Approved in 39th SC. 125 Fresh Tenders opened on 28.03.2016 5 VTPS Stage-IV Bus Reactor 125 MVAR Mar-17 Mar-17 Approved in 39th SC. 125 Fresh Tenders opened on 28.03.2016 6 Vijayawada Bus Reactor - III 400 125 MVAR Mar-17 Mar-17 Commissioned on 19.06.2016 125 125

7 Uravakonda Bus Reactor 400 80 MVAR Jun-15 Jan-16 Work under progress, being done by 80 M/s TEEECL 8 Ghani / Panyam Bus Reactor 400/220 2 x 125 MVAR Aug-16 Nov-16 P.O issued on 27.07.2015 250

9 Hindupur Bus Reactor 400/220 80 MVAR 36 SCPSPSR 80 10 Jammalamadugu Bus Reactor 400/220/132 80 MVAR 36 SCPSPSR 80 (Kondapuram) कु ल / Total (MVAR) 1160 125 160 14.2 दतक्षण क्षेत्र मᴂ 400 एवं 220/230 कक.वो. नये उप के न्द्द्रⴂ के तनमााण काया की प्रगतत की समीक्षा 14.2 Review of Progress of Works on new 400 KV & 220 KV Sub-Stations िा煍य का नाम / Name of the State : कनााटक / Karnataka 2016-17 मᴂ 2016-17 के संशोतर्त 2016-17 को वो쥍टेज के मूल लक्ष्य की कमीशन बाद िालू क्र.सं तािीख अनुसूतित Energised होनेवाले उपकᴂ द्र उप कᴂ द्र का नाम अनुपात क्षमता तािीख अ땍युतक्तयां Sl. Target date Proposed for during Beyond 2016- Name of Sub-Station Voltage Capacity (MVA) Original Target Remarks No for 2016-17 2016-17 17 Ratio (KV) Date MVA completion MVA MVA

A 400 KV उप के न्द्द्रⴂ (Sub-Stations) : 1 Bellary PS : Bellary 400 Jul-16 Jul-16 Works under progress 400 kV Pooling Station near BTPS 2 400/220 kV Gulbarga SS 400/220 2 x 500 Estimate under preparation 1000 3 400 kV SS at 400/220 2 x 500 Land Acquisition is under Chikkanayakanahalli (C.N progress Halli) near LILO point on the Nelamangala – Talaguppa 400 kV lines to Hassan 4 400/220 kV substation at 400/220 before Phase-II at Ultra Mega Devanahally Solar Power Park 5 Third 400/220 kV Tumkur 400/220 3 x 500 1500 (Vasantnarsapur) 6 400/220 kV Gadag (Doni) 400/220 2 x 500 1000 SS, Mundaragi Taluk, Gadag District 7 400/220 kV Jagalur SS, 400/220 2 x 500 1000 Davanagere District 8 Electronics City 400/220 2 x 500 Sep-14 Court Case 1000

B 220 KV उप के न्द्द्रⴂ (Sub-Stations) : 1 Jigani: At Anekal Taluk 220/66 2x150 Oct-08 2016-17 PC Tests to be completed. 300 Source Line awaited 2016-17 मᴂ 2016-17 के संशोतर्त 2016-17 को वो쥍टेज के मूल लक्ष्य की कमीशन बाद िालू क्र.सं तािीख अनुसूतित Energised होनेवाले उपकᴂ द्र उप कᴂ द्र का नाम अनुपात क्षमता तािीख अ땍युतक्तयां Sl. Target date Proposed for during Beyond 2016- Name of Sub-Station Voltage Capacity (MVA) Original Target Remarks No for 2016-17 2016-17 17 Ratio (KV) Date MVA completion MVA MVA

2 Magadi : 2x100 MVA, 220/66 2x100 May-15 Nov-16 Work under progress 200 220/66/11 kV and 1x12.5 MVA, 66/11 kV SS at Magadi 3 Mittemari : 2x100 MVA, 220/66 2x100 Jul-15 Jan-17 Work under progress 200 220/66/11 kV SS at Mittemari 4 Ramnagar (Kothipura):East 220/66 2x100 Dec-07 2016-17 Source Line awaited. 200 5 Vikas Tech Park 220/66 2x150 Oct-11 Mar-17 PC Tests on Power Transformers and 300 Batteries will be done during commissioning. Source Line awaited. 6 Koppal 220 KV (Halavarthi) : 220/110 2x100 Feb-14 2016-17 Work short closed. To be 200 2 x 100 MVA ; 220 / 110 KV & rtendered 1 x 10 MVA ; 110 / 11 KV S/S 7 Kudigi (Bedeladaku) : 220/66 2x100 May-14 Jul-16 LOI issued on 20.11.12 & 200 Est 2x100 MVA, 220/66 DWA on 02.01.13. Work KV Station under progress. 8 Pavagada : 220/66 2x100 Jul-14 Nov-16 LOI issued on 16.01.2013. 200 Est of 1x100 MVA ; 220 / 66 KV Cable Laying Work under Station progress. 9 220/110 KV & 110/11 KV 220/110-11 (2x100) + (1x10) 210 Mughalkod SS, Raibag Taluk, Belgaum District 10 220/66 kV and 66/11kV 220/66-11 (2x100)+(1x12.5) 212.5 Hosadurga SS, Chitradurga district 11 220/66 kV & 66/11 kV 220/66 (2x100) + (1 x 8) 208 Shivanasamudra S/S, Malavalli taluk, Mandya district 12 Mallat (Manvi) : 220/66 2x100 Aug-14 Dec-16 LOI issued on 12.02.2013. 200 Est of 2x100 MVA ; 220 / 110 Work under progress KV Station and 1x10 MVA, 110 / 11 KV Sub-station उप-योग / Sub-Total 2000 0 6130.5 2016-17 मᴂ 2016-17 के संशोतर्त 2016-17 को वो쥍टेज के मूल लक्ष्य की कमीशन बाद िालू क्र.सं तािीख अनुसूतित Energised होनेवाले उपकᴂ द्र उप कᴂ द्र का नाम अनुपात क्षमता तािीख अ땍युतक्तयां Sl. Target date Proposed for during Beyond 2016- Name of Sub-Station Voltage Capacity (MVA) Original Target Remarks No for 2016-17 2016-17 17 Ratio (KV) Date MVA completion MVA MVA

C 220 के .वी उप के न्द्द्रⴂ का आवर्ान / 220 KV Sub-Station Augmentations : 1 Gowribidanur : 220 1x100 Nov-12 Aug-16 Transformer supplied by 100 Providing 3rd Additional KPTCL on 11.05.2016 100 MVA, 220/66/11 kV Work under progress Transformer 2 Chinthamani : 220 1x100 Jul-16 Jul-16 Work under progress 100 Providing 3rd Additional 100 MVA, 220/66/11 kV Transformer 3 Kanakapura : 220 1x100 Mar-15 Jul-16 Work under progress 100 100 MVA, 220/66/11 kV Transformer कु ल / Total 2300 0 6130.5 D िीए啍टि औि आई.सी.टी Reactors / ICTs : 1 Kaiga Reactor (NPCIL) 2x125 As agreed in the Standing 250 Committee. 2 Hoody BR 1x63 Sep-16 Oct-16 Approved in 22nd SC 63 3 Nelamangala BR 1x63 Jun-16 Jul-16 Approved in 22nd SC 63 4 Davangere BR 1x125 Approved in 39th SC 125 5 Talguppa BR 1x125 Approved in 39th SC 125

6 Tumkur BR 400/220 2x125 250

7 Hiriyur - Mysore LR @ 400/220 2x63 Mysore 8 Udupi Bus Reactor (Adani) 2x125 Approved in 39th SC 250

कु ल / Total 2426 0 7130.5 14.3 दतक्षण क्षेत्र मᴂ 400 एवं 220/230 कक.वो. नये उप के न्द्द्रⴂ के तनमााण काया की प्रगतत की समीक्षा 14.3 Review of Progress of Works on new 400 KV & 220 KV Sub-Stations िा煍य का नाम / Name of the State : के िल / Kerala

2016-17 मᴂ 2016-17 के बाद संशोतर्त 2016-17 को वो쥍टेज के कमीशन िालू होनेवाले क्र.सं तािीख अनुसूतित उप कᴂ द्र का नाम अनुपात क्षमता अ땍युतक्तयां Energised उपकᴂ द्र Sl. Target date Proposed for Name of Sub-Station Voltage Capacity (MVA) Remarks during 2016- Beyond 2016- No for 2016-17 17 Ratio (KV) 17 completion MVA MVA MVA A 220 KV उप के न्द्द्रⴂ (Sub-Stations) : अपग्रेडशे न / Upgradation : 1 Upgradation of Punnapra S/S from 220/110 2 x 200 2016-17 1x200 MVA Transformer 100 110 kV to 220 kV S/S commissioned on 18.08.2014. Other one under progress

2 Upgradation of Kattakkada S/S 220/110 2 x 200 2016-17 Work under progress 400 from 110 kV to 220 kV S/S 95% completed

3 220 KV S/S at Kothamangalam 2016-17

4 Upgradation of Kaloor S/S to 220 2016-17 kV

5 220 KV S/S at Chalakudy 2016-17

6 220 KV S/S at Aluva 2016-17

कु ल / Total 500 0 0 14.4 दतक्षण क्षेत्र मᴂ 765, 400 एवं 220/230 कक.वो. नये उप के न्द्द्रⴂ के तनमााण काया की प्रगतत की समीक्षा 14.4 Review of Progress of Works on new 765 KV, 400 KV & 220 KV Sub-Stations िा煍य का नाम / Name of the State : ततमल नाडु / Tamil Nadu 2016-17 मᴂ 2016-17 के संशोतर्त 2016-17 को मूल लक्ष्य की कमीशन बाद िालू क्र.सं वो쥍टेज के अनुपात तािीख अनुसूतित होनेवाले उपकᴂ द्र उप कᴂ द्र का नाम क्षमता तािीख अ땍युतक्तयां Energised Sl. Voltage Ratio Target date Proposed for during Beyond 2016- Name of Sub-Station Capacity (MVA) Original Target Remarks 17 No (KV) for 2016-17 2016-17 Date MVA completion MVA MVA A 765 KV उप के न्द्द्रⴂ (Sub-Stations) : 1 Ariyalur 765/400 2 x 1500 2018-19 Estimate is under preparation 3000 2 North Chennai Pooling 765/400 3 x 1500 2019-20 Estimate is under preparation 4500 Station B 400 KV उप के न्द्द्रⴂ (Sub-Stations) : 1 Thervaigandigai 400/230-110 (2x315) + (1x200) 03.03.2014 2016-17 Back Charged on 15.04.2016 at 230 830 830 kV level 2 Sholinganallur (JICA) 400/230-110 (2x315)+(1x100) 18.06.2015 31.09.2016 Nearing completion and Testing 730 under progress 3 Thappu Kundu, Theni 400/110 3x200 04.12.2014 31.10.2016 Work awarded and under progress 600 4 Anaikadavu 400/230-110 (2x315)+(2x200) 04.12.2014 31.10.2016 Work awarded and under progress 1030 5 Rasipalayam 400/230-110 (2x315)+(2x200) 15.11.2015 31.10.2016 Work awarded on 16.05.2014 and 1030 under progress 6 Palavadi (Dharmapuri) 400/230-110 (2x315)+(2x200) 25.11.2015 31.12.2016 Work awarded on 26.09.2014 and 1030 under progress 7 Kanarapatty 400/230-110 (2x500)+(4x200) 11.06.2015 31.12.2016 Work awarded and under progress 1800 8 Pulianthope (GIS) 400/230 3 x 315 2015-16 2017-18 Retender opened on 28.09.2015 and 945 under process 9 Manali 400/230-111 (2x315)+(2x200) 24.09.2016 31.03.2017 Work awarded andunder progress 1030 10 Kamudhi 400/230-110 (2x315)+(3x200) 02.07.2016 31.08.2016 Work handed over on 23.07.2015 and 1230 under progress 11 Pavoorchatram 400/230-110 (2x315)+(2x200) 31.07.2017 2017-18 Work awarded on 25.01.2016 and 1030 (Thenampatty), Tirunelveli under progress 12 Vellalaviduthi (Pudukottai) 400/230-110 (2x315)+(2x200) 2018-19 2018-19 Estimate is under preparation 830

13 Edayarpalayam (Under AC 400/230 2 x 500 Scheme awarded on 03.03.2015 1000 System Strengthening at Pugalur) 2016-17 मᴂ 2016-17 के संशोतर्त 2016-17 को मूल लक्ष्य की कमीशन बाद िालू क्र.सं वो쥍टेज के अनुपात तािीख अनुसूतित होनेवाले उपकᴂ द्र उप कᴂ द्र का नाम क्षमता तािीख अ땍युतक्तयां Energised Sl. Voltage Ratio Target date Proposed for during Beyond 2016- Name of Sub-Station Capacity (MVA) Original Target Remarks 17 No (KV) for 2016-17 2016-17 Date MVA completion MVA MVA 14 Vagarai, Udumalpet 400/230-110 15 Bay Extension at Udumalpet 09.05.2014 Agreement signed between (PGCIL) S/S for LILO of one TANTRANSCO and PGCIL. Work circuit of Thappukundu- to be executed by PGCIL Anaikadavu DC Line 16 Bay Provision at Kayathar, Kovilpatty Tender floated for Bay provision at for 400 kV Pavoorchatram Line Kayathar and Singarapet. Udumalpet for Vagarai Line Salem for Palavady Line Palavady (Singarapet) for Rasipalayam Line 17 Samugarengapuram SS 400/230-110 (3x315)+(2x200) Land to be identified 1345

C 230 KV उप के न्द्द्रⴂ (Sub-Stations) : 1 Singapuram 230/110 2x100 14.09.2013 31.05.2016 Test Charged on 02.05.2016 with 200 100 1x100 MVA Auto Transformer. Other one under progress 2 Kumbakonam (JICA) 230/110 2x100 19.08.2015 31.03.2017 All works completed and Testing 200 under progress 3 Kinnimangalam (JICA) 230/110 3x100 19.08.2015 30.06.2016 Work awarded on 20.08.2014 and 300 completed 4 Poyyur (JICA) 230/110 2x100 20.08.2015 31.12.2016 All works completed and will be 200 commissioned with Lines 5 Purisai (JICA) 230/110 2x100 17.09.2015 31.07.2016 Work awarded on 17.09.2014 and 200 under progress 6 Ambattur 3rd Main Road 230/110 2x100 02.03.2015 31.07.2016 Work awarded on 03.03.2014 and 200 (JICA) under progress 7 Kanchipuram (JICA) 230/110/11 (2x100) + (1x16) 2014-15 31.03.2017 Works under progress 216

8 Savasapuram (JICA) 230/110 2x100 2014-15 31.03.2017 Retender awarded and work under 200 progress 9 Tiruppur (JICA) 230/110 2x100 15.04.2016 31.03.2017 Work awarded on 16.04.2015 and 200 under progress 10 Shenpagapudur (JICA) 230/110 2x100 15.04.2016 31.03.2017 Work awarded on 16.04.2015 and 200 under progress 2016-17 मᴂ 2016-17 के संशोतर्त 2016-17 को मूल लक्ष्य की कमीशन बाद िालू क्र.सं वो쥍टेज के अनुपात तािीख अनुसूतित होनेवाले उपकᴂ द्र उप कᴂ द्र का नाम क्षमता तािीख अ땍युतक्तयां Energised Sl. Voltage Ratio Target date Proposed for during Beyond 2016- Name of Sub-Station Capacity (MVA) Original Target Remarks 17 No (KV) for 2016-17 2016-17 Date MVA completion MVA MVA 11 RA Puram (GIS) UG - JICA 230/33 - 11 2x100 23.07.2015 31.03.2017 Court case cleared and work 200 commenced 12 Central CMRL (GIS) - JICA 230/110 2x100 19.08.2015 30.09.2016 Work awarded on 21.08.2014 and 200 testing under progress 13 Kurukathi 230/110 2x100 2015-16 31.12.2016 Work under progress 200

14 Tiruchuli (Muthuramalingapuram) 230/110 5x100 2015-16 31.08.2016 Work awarded and under progress 500

15 Jambunathapuram 230/110 2x100 20.04.2016 31.12.2016 Work awarded on 21.04.2015 and 200 under progress 16 Valayapatty 230/110 2x100 2015-16 31.03.2017 Works under progress 200

17 TNEB HQ (GIS) 230/33 2x100 2012-13 2017-18 Tender will be floated on completion 200 of HQ Building Works 18 Mambalam (GIS) 230/110 2x160 2016-17 2017-18 Work awarded on 02.01.2016 and 320 under progress 19 Porur (UG) 230/110-33 (2x100) + (2x50) 2016-17 2017-18 Tender opened on 23.09.2015 and 300 under process 20 Uddanapally 230/110 2x100 2016-17 2017-18 Estimate is under preparation 200

21 Mondipatti, TNPL Premises 230/110 2x100 2016-17 2017-18 Work awarded and under progress 200

22 Thuvakudy 230/110 2x100 2017-18 2018-19 Estimate is under preparation 200

23 Neyveli 230/110 3x160 2017-18 2018-19 Estimate is under approval 480

24 Narimanam 230/110 2x100 2017-18 2018-19 Estimate is under preparation 200

25 Samayanallur 230/110 2x100 2017-18 2018-19 Estimate is under preparation 200

26 Sankarapuram 230/110 2x100 2018-19 2018-19 Estimate is under preparation 200

27 Thirupattur 230/110 2x100 2018-19 2018-19 Estimate is under preparation 200

28 OMEGA 230/110 3x100 18.05.2015 2016-17 1x100 MVA charged on 22.01.16. 200 Balance under progress 29 Anthiyur 230/110 2x100 2013-14 2016-17 1x100 MVA charged on 14.01.15. 100 Other one under progress 2016-17 मᴂ 2016-17 के संशोतर्त 2016-17 को मूल लक्ष्य की कमीशन बाद िालू क्र.सं वो쥍टेज के अनुपात तािीख अनुसूतित होनेवाले उपकᴂ द्र उप कᴂ द्र का नाम क्षमता तािीख अ땍युतक्तयां Energised Sl. Voltage Ratio Target date Proposed for during Beyond 2016- Name of Sub-Station Capacity (MVA) Original Target Remarks 17 No (KV) for 2016-17 2016-17 Date MVA completion MVA MVA 30 Ulundurpet 230/110 2x100 30.06.2012 2016-17 1x100 MVA charged on 18.01.16 100 Other one under progress 31 Bay Provision at Tuticorin, Tender opened and under process Tirunelveli (PGCIL), Kodikurichi, Arasur (PGCIL), Gobi, SP Koil

D अततरिक्त क्षमता / Additional Capacity : 1 Kids park (3rd Auto) 230/110 1x100 2016-17 2016-17 Commissioned on 28.04.2016 100 100 2 Guruparapally (2nd Auto) 230/110 1x100 2016-17 2016-17 Commissioned on 09.05.2016 100 100

E क्षमता की वृति / Enhancement of Capacity : 1 Nil

F आवर्ान / Augumenatation : 1 Sembatty SS 230/110 2x100 2016-17 Feb-17 Tender opened and under process 200 2 Anuppankulam SS 230/110 2x100 2016-17 Feb-17 Tender opened and under process 200 3 Cuddalore SS 230/110 2x100 2016-17 Feb-17 Tender opened and under process 200 4 Pudukkottai SS 230/110 2x150 2016-17 Feb-17 Tender opened and under process 300 5 Tiruvannamalai SS 230/110 2x150 2016-17 Feb-17 Tender opened and under process 300 6 Villupuram SS 230/110 2x150 2016-17 Feb-17 Tender opened and under process 300

G रिए啍टि योजनाए ँ / Reactor Scheme : 1 Mettur Bus Reactor 1x125 2016-17 2016-17 Appoved in the 39th SC 125 2 Almathy Bus Reactor 1x125 2016-17 2016-17 Appoved in the 39th SC 125 3 Kayathar Bus Reactor 1x125 2016-17 2016-17 Appoved in the 39th SC 125 4 Thappugundu Bus Reactor 400/110 1x63 2016-17 2016-17 Appoved in the 36th SC 63 5 Rasipalayam Bus Reactor 400/230-110 1x63 2016-17 2016-17 Appoved in the 36th SC 63 6 Edayarpalayam Bus Reactor 400/230 2x125 Scheme awarded on 10.12.2014 250

कु ल / Total 15527.00 1130.00 8100.00 14.5 दतक्षण क्षेत्र मᴂ 400 एवं 220/230 कक.वो. नये उप के न्द्द्रⴂ के तनमााण काया की प्रगतत की समीक्षा 14.5 Review of Progress of Works on new 400 KV & 220 KV Sub-Stations िा煍य का नाम / Name of the State : तेलंगाना / Telangana 2016-17 मᴂ 2016-17 के संशोतर्त 2016-17 को वो쥍टेज के मूल लक्ष्य की कमीशन बाद िालू क्र.सं तािीख अनुसूतित होनेवाले उपकᴂ द्र उप कᴂ द्र का नाम अनुपात क्षमता तािीख अ땍युतक्तयां Energised Sl. Proposed for Beyond Name of Sub-Station Capacity (MVA) Target date Remarks during Voltage Ratio Original 2016-17 2016-17 No for 2016-17 (KV) Target Date MVA MVA completion MVA A 765 KV उप के न्द्द्रⴂ (Sub-Stations) : Nil B 400 KV उप के न्द्द्रⴂ (Sub-Stations) : 1 Evacuation of Power from HNPCL (1040 MW) Power Plant : 1.1 2 Nos. of 400 KV Bay Extentions at 400 400/220 2016-17 Work awarded in Sep-13 and under KV Shankarapalli SS progress 2 Jaipur Power Transmission Scheme (Suryapet) :

2.1 400/220/132 kV SS at Narsapur, 400/220/132 1145 Dec-16 Dec-16 Work awarded in June, 2015 and under 1145 Medak District progress 3 Nirmal Power Transmission Scheme : 3.1 400 / 220 kV Sub-Station at Nirmal, 400/220 945 Jun-17 Jun-17 Work awarded on Dec'2015. Levelling Adilabad District Work under progress 945 4 Bhadradri Thermal Transmission Scheme :

4.1 400/220 kV Sub-Station at Julurupadu 400/220 630 Jun-17 Jul-17 Work awarded on Dec'2015. Levelling and 400 kV Bay extensions at Suryapet Work under progress 630 400/220/1320 kV Sub-Sation 5 System Improvement Transmission Scheme : 5.1 400/220 kV Dindi Sub-Station 400/220 1130 Mar-17 Mar-17 Work awarded on Dec'2015. Levelling Work under progress 1130 6 Deposit Contribution Work :

6.1 2 Nos of 400 kV Bays at 400 kV 400 2016-17 2016-17 Work awarded in February, 2016 and Dichpally SS under progress 7 765 kV Wardha Transmission Scheme : 7.1 400/220 kV Maheswaram Sub-Station , 400/220 1000 Jun-17 Jun-17 Work awarded in February, 2016 and Ranga Reddy District under progress 1000 8 Indira Sagar Rudramakota Lift Irrigation Scheme : 8.1 400 KV Asupaka S/S 400/220 630 Sep-15 Sep-16 Purchase Order issued on 25.03.2014 630 Work under progress 2016-17 मᴂ 2016-17 के संशोतर्त 2016-17 को वो쥍टेज के मूल लक्ष्य की कमीशन बाद िालू क्र.सं तािीख अनुसूतित होनेवाले उपकᴂ द्र उप कᴂ द्र का नाम अनुपात क्षमता तािीख अ땍युतक्तयां Energised Sl. Proposed for Beyond Name of Sub-Station Capacity (MVA) Target date Remarks during Voltage Ratio Original 2016-17 2016-17 No for 2016-17 (KV) Target Date MVA MVA completion MVA

C 220 KV उप के न्द्द्रⴂ (Sub-Stations) :

(a) Sub-Stations covered under other Schemes : 1 Singotham Cross Roads, 220/33 2 x 20 Feb-13 2016-17 Date of award : 25.01.2012 40 Mahaboobnagar Dist Work under progress. 2 Fabcity, Rangareddy Dist 220/132 (2x100) +(2x50) Jul-12 2016-17 Balance 100 MVA under progress 100 3 Manikonda 220/132/33 2x100+2x50 Jul-12 2016-17 Stay Order issued by Court and works 300 stopped 4 Hayathanagar, Rangareddy Dist 220/33 2x50 May-12 2016-17 Date of award : 08.02.2013. Work 100 under progress. By 2015-16 5 Imlibun - GIS, Hyderabad 220/132 2 x 160 Feb-12 2016-17 Date of award : 10.05.2013. Work 320 under progress. 6 Nagole, Rangareddy Dist 220/132/33 (2x100) + (2x31.5) Sep-13 2016-17 2nd PTR 31.5 MVA commissioned 200 22.06.2015. Balance under progress 7 Miyapur, Rangareddy Dist 220/132/33 (2x160) + (2x80) Jul-14 2016-17 240 MVA commissioned during 2014- 80 15. 160 MVA commissioned on 07.09.2015, Balance 80 MVA under progress 8 Bonguluru, Rangareddy Dist 220/132/33 (2x100) + (2x50) Sep-14 2015-16 100 MVA : 02.04.2015. 100 100 MVA : 31.10.2015. Balance works uner progress 9 Parigi 220/132 2x100 Dec-14 2016-17 1x100 MVA Transformer 100 commissioned on 04.03.2016 10 220 /11 kV Yelluru SS, Mahaboobnagar 220/11 2 x 50 Nov-16 2016-17 Work under progress 100 Dist 11 220 kV features at 132 kV Sitapuram 220/132 1 x 160 Oct-15 2016-17 Work under progress 160 Switching Station, Nalgonda Dist 12 Manthani 220/132 2x100 Oct-14 2016-17 Transformer 1 commissioned on 100 06.01.16. Balance under progress उप-योग / Sub-Total 4605.00 0.00 2575.00 C सुतनयोतजत नए 220 के .वी. उप के न्द्द्रⴂ / New 220 kV Sub-Stations Planned : 220/132 kV substation at Ayyagaripally Investment Approval (IA) to be 1 220/132 2 x 100 2015-16 2016-17 200.00 (Comprehensive scheme) received from APERC 220/132 kV substation at Jangaon Investment Approval (IA) to be 2 220/132 2 x 100 2015-16 2016-17 200.00 (Comprehensive scheme) received from APERC 220/132 kV substation at Sircilla Investment Approval (IA) to be 3 220/132 3 x 100 2015-16 2016-17 300.00 (Comprehensive scheme) received from APERC 2016-17 मᴂ 2016-17 के संशोतर्त 2016-17 को वो쥍टेज के मूल लक्ष्य की कमीशन बाद िालू क्र.सं तािीख अनुसूतित होनेवाले उपकᴂ द्र उप कᴂ द्र का नाम अनुपात क्षमता तािीख अ땍युतक्तयां Energised Sl. Proposed for Beyond Name of Sub-Station Capacity (MVA) Target date Remarks during Voltage Ratio Original 2016-17 2016-17 No for 2016-17 (KV) Target Date MVA MVA completion MVA

220/132/33 kV substation at 4 220/132/33 (2 x 100) + (2 x 31.5) May-17 May-17 Tenders called and under process 263.00 (Garidepally) Huzurnagar (Revised) 132/33kV features at 220kV Switching Tenders to be called 5 220/132/33 (2 x 100) + (2 x 31.5) 2015-16 2016-17 263.00 Station, Dindi (Revised) 220 kV features at proposed 132/33 kV 6 220/132/33 2 x 100 2015-16 2016-17 Tenders called and under process 200.00 Kosigi SS in Mahaboobnagar district. 7 220/132 kV substation at Jadcherla 220/132 2 x 100 2015-16 2016-17 Tenders to be called 200.00 220/132 kV substation at Kothur Investment Approval (IA) to be 8 220/132 3 x 100 2015-16 2016-17 300.00 (Comprehensive scheme) received from APERC 220/132 kV substation at Thimmajipet Investment Approval (IA) to be 9 Switching Station (Comprehensive 220/132 - 2015-16 2016-17 received from APERC scheme) Date of Award : 30.09.2013 Tenders to be called 10 220/132/33 kV Substation at Raidurg 220/132/33 (2 x 100) + (2 x 50) 2015-16 2016-17 300.00

D आवर्ान / Augumenatation : 1 220 kV Dichpally SS, Nizamabad 220 (1 x 160) + (2 x 100) 2016-17 2016-17 Commissioned on 06.04.2016 160 160 District  (2 x 160) + (2 x 100) 2 220 kV Bongiri SS, Nalgonda District 220 (2 x 100) →(3 x 100) 2016-17 2016-17 Commissioned on 16.04.2016 100 100

3 220 kV Waddekothapally SS, Warangal 220 (2 x 160) + (2 x 100) 2016-17 2016-17 Commissioned on 25.04.2016 60 60 District  (3 x 160) 4 220 kV Miryalaguda SS, Nalgonda 220 (2 x 160) + (1 x 100) 2016-17 2016-17 Commissioned on 25.04.2016 100 100 District  (2 x 160) + (2 x 100) 5 Bay at 400/220 kV Veltoor SS 400/220 1 x 315 2016-17 Works under progress 315

6 220 kV Siddipet, Medak District 220/132 (2 x 100) 2016-17 2016-17 Commissioned on 13.05.2016 160 160  (1 x 160) + (2 x 100) 7 220 kV Minpur, Medak District 220/132 (1 x 160) + (2 x 100) 2016-17 2016-17 Commissioned on 14.05.2016 60 60  (2 x 160) + (1 x 100) 8 220 kV Narketpally, Nalgonda District 220/132 (1 x 160) + (2 x 100) 2016-17 2016-17 Commissioned on 20.05.2016 60 60  (2 x 160) + (1 x 100) 2016-17 मᴂ 2016-17 के संशोतर्त 2016-17 को वो쥍टेज के मूल लक्ष्य की कमीशन बाद िालू क्र.सं तािीख अनुसूतित होनेवाले उपकᴂ द्र उप कᴂ द्र का नाम अनुपात क्षमता तािीख अ땍युतक्तयां Energised Sl. Proposed for Beyond Name of Sub-Station Capacity (MVA) Target date Remarks during Voltage Ratio Original 2016-17 2016-17 No for 2016-17 (KV) Target Date MVA MVA completion MVA 9 220 kV Warangal 220/132 (2 x 160) + (1 x 100) 2016-17 2016-17 Commissioned on 26.05.2016 60 60  (3 x 160) 10 220 kV Moulali SS, Rangareddy District 220/132 (2 x 80) + (1 x 50) 2016-17 2016-17 Commissioned on 22.06.2016 80 80  (3 x 80) + (1 x 50) 11 220 kV Jurala SS, Mahaboobnagar 220/132 (2 x 100) (3 x 100) 2016-17 2016-17 Commissioned on 21.06.2016 100 100

12 220 kV Kondamallepally, Nalgonda Dist 220/132 (3 x 100) (4 x 100) 2016-17 2016-17 Commissioned on 13.06.2016 100 100

13 220 kV Budidampadu, Khammam Dist 220/132 (1 x 160) + (1 x 100) 2016-17 2016-17 Commissioned on 08.06.2016 60 60  (2 x 160) 14 400/220/132 KV Gajwel S/S (Scheme- 400/220/132 1x315 2016-17 P.O issued on 04.07.2013 and work 315 II) with 2 Nos. of Quad moose Feeder completed. Bays charged in July, Bays and 2 Nos. of Twin moose Feeder 2014. Equipment testing under Bays (3rd 315 MVA) progress 3rd 315 MVA PTR कु ल / Total (MVA) 8561 1100 2575 E रिए啍टि योजनाए ँ / Reactor Scheme : 1 Mamidipalli Bus Reactor 1x125 2016-17 Mar-17 Appoved in the 36th SC. Tender under 125 process 2 Gajwel Bus Reactor 1x125 2016-17 Mar-17 Appoved in the 36th SC. Tender under 125 process 3 Sankarapalli Bus Reactor 1x125 2016-17 Mar-17 Appoved in the 36th SC. Tender under 125 process 4 Mehaboobnagar Bus Reactor 1x125 2016-17 Mar-17 Appoved in the 36th SC. Tender under 125 process 5 Srisailam LB Bus Reactor 1x125 2016-17 Mar-17 Appoved in the 39th SC. Tender under 125 process कु ल / Total 9186.00 1100.00 2575.00 15.1 दतक्षण क्षेत्र मᴂ पावि तग्रड की कᴂ द्रीय पािेषण लाईनⴂ के तनमााण काया की समीक्षा 15.1 Review of Progress of Works of Power Grid Executed Central Transmission Lines under SR

तनवेश की तािीख 2016-17 मᴂ 2016-17 के ग मूल लक्ष्य 2016-17 को बाद िालूﴂलाइन की पूिी ई व Date of संशोतर्त तािीख कमीशन investment लंबाई की लंबाई की तािीख अनुसूतित होनेवाली क्र.सं पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised decision by Length in Stringing Original Proposed लाइन Sl. No Name of the Transmission Line Revised Remarks during Plg. Comm. Circuit completed in Target for 2016-17 Beyond Target date 2016-17 Kms. Ckt.Kms Date ckt. Kms 2016-17 ckt. Kms ckt. Kms ब क्षेत्रीय प्रणातलयाँ / Multi Regional Systems : 1 Commom System Associated with Jun-12 552 Jun- 15 Aug-16 BPTA Schedule revised to East Coast Energy Ltd. & NCC June, 2015 Projects Ltd LTOA Gen Proj. in Srikakulam Area Part-A 1.1 765 KV D/C Srikakulam Pooling Jun-12 552 444 Jun- 15 Aug-16 Retender awarded in June, 2015 552 Station - Angul Line and matching with TBCB 1.2 Talcher II – Behrampur (Odisha) 400 220 220 kV D/C Line 2 Transmission System Associated Feb-12 58 58 Oct- 14 Apr-16 with Krishnapatnam UMPP Part-B 2.1 LILO of 400 KV D/C Pune - Feb-12 58 58 Oct- 14 Apr-16 Line commissioned in April, 58 58 Aurangabad Line at Pune GIS 2016 (Including Multi Circuit) 3 765 kV Wardha - Hyderabad Links : Feb-15 1094 202 May-18 May-18 3.1 765 kV Wardha - Hyderabad D/C Line Feb-15 1072 202 May-18 May-18 Award placed in March, 2015 1072 Work commenced July, 2015 3.2 400 kV Nizamabad - Dichipalli D/C Line Feb-15 22 May-18 Mar-17 Award placed in March, 2015 22 and survey under progress 4 Green Energy Corridors : Inter State Apr-15 22 0 Apr-2017 Apr-17 Transmission Scheme (ISTS) - Part A 4.1 400 kV Tirunelveli (New) - Tuticorin PS Apr-15 11 Apr-2017 Apr-17 Award placed on April, 2015 11 D/C Line 1 (Q) 4.2 400 kV Tirunelveli (New) - Tuticorin PS Apr-15 11 Apr-2017 Apr-17 Award placed on April, 2015 11 D/C Line 2 (Q) 5 Commom System Associated with Mar-13 880 Dec-15 Jun-17 Revised BPTA Schedule - Dec, East Coast Energy Ltd. & NCC 2015 Projects Ltd LTOA Gen Proj. in Srikakulam Area Part-B 5.1 765 KV D/C Angul - Jharsauguda Line Mar-13 580 102 Dec-15 Jun-17 RoW being faced 580

5.2 765 KV D/C Jharsauguda - Mar-13 300 50 Dec-15 Jun-17 Award placed in May, 2014 300 Dharamjaygarh Line Huge forest involvement तनवेश की तािीख 2016-17 मᴂ 2016-17 के ग मूल लक्ष्य 2016-17 को बाद िालूﴂलाइन की पूिी ई व Date of संशोतर्त तािीख कमीशन investment लंबाई की लंबाई की तािीख अनुसूतित होनेवाली क्र.सं पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised decision by Length in Stringing Original Proposed लाइन Sl. No Name of the Transmission Line Revised Remarks during Plg. Comm. Circuit completed in Target for 2016-17 Beyond Target date 2016-17 Kms. Ckt.Kms Date ckt. Kms 2016-17 ckt. Kms ckt. Kms II System Strengthening Scheme of WR for transfer of Power to SR :

1 Part B : Regional System 696 408 Mar-17 Strengthening in WR for Mundra UMPP 1.1 400 KV D/C Wardha - Aurangabad 696 408 Oct-12 Mar-17 Work carried out by bifercating 696 Line (Upgradation 1200 KV S/C) two packages by fresh tender. Contract riviewed in Feb, 2016 2 Transmission System Strengthening Nov-11 690 356 Jun-15 Dec-16 Revised BPTA Schedule : in Western part of WR for IPP May-2015 Generation Projects in Chattisgarh - Part D 2.1 400 KV D/C Aurangabad - Boisar Nov-11 690 356 Jun-15 Dec-16 Forest Clearance received. 690 Quad. Line Severe RoW problem Critical 3 Transmission System Strengthening Dec-11 690 290 May-15 Mar-17 Revised BPTA Schedule : in North/West part of WR for IPP May-2015 Projects in Chattisgarh - Part E

3.1 765 KV D/C Aurangabad (PGCIL) - Dec-11 690 290 May-15 Mar-17 Forest Clearance awaited. 690 Padghe (PGCIL) Line Critical 4 HVDC Bipole Link Between Nov-19 Nov-19 Western Region (Raigarh, Chattishgarh) and Southern Region (Pugalur, TN) - North Trichur (Kerala) Scheme - I : Raigarh - Pugalur 6000 MW HVDC System 4.1 Raigarh (Chatisgarh) - Pugalur (TN) - Trichur (Kerala) 5 Transmission System Strengthening Jan-12 712 552 Dec-15 Dec-16 Revised BPTA Schedule : Dec- in Raipur - Wardha Corridor for 2015 IPP Generation Projects in Chattisgarh - Part 6 5.1 765 KV D/C Raipur Pooling Station - Jan-12 712 552 Dec-15 Dec-16 Forest Clearance received in July & 712 Wardha Line II Dec, 2015. Work under progress तनवेश की तािीख 2016-17 मᴂ 2016-17 के ग मूल लक्ष्य 2016-17 को बाद िालूﴂलाइन की पूिी ई व Date of संशोतर्त तािीख कमीशन investment लंबाई की लंबाई की तािीख अनुसूतित होनेवाली क्र.सं पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised decision by Length in Stringing Original Proposed लाइन Sl. No Name of the Transmission Line Revised Remarks during Plg. Comm. Circuit completed in Target for 2016-17 Beyond Target date 2016-17 Kms. Ckt.Kms Date ckt. Kms 2016-17 ckt. Kms ckt. Kms दतक्षण क्षेत्रीय प्रणातलयाँ / Southern Regional Systems : 1 Transmission System for Ultra Mega May-15 21 21 May-16 Apr-16 Solar Park in Anantapur District, Andhra Pradesh - Part A (Phase - I) : 1.1 LILO of Cuddappah - Kolar 400 kV S/C May-15 21 21 May-16 Apr-16 Commissioned on 28.04.2016 21 21 Line at NP Kunta Pooling Station

2 Kudankulam APP (2000 MW) May-05 297 29 Nov-08 Jun-17 Transmission System : (Balance Lines) 2.1 Edamon (KSEB) - Moovattupuzha (PG) : 297 29 Nov-08 Jun-17 Govt of Kerala issued Revised G.O 297 Quad DC Line in Jan,2015, with enhanced compensation 3 System Strengthening Scheme XII of SR Feb-10 34 25 Jun-12 Mar-17

3.1 LILO of ckts of Nelamangala- Hoodi 34 25 Jun-12 Mar-17 ROW issue resolved by Karnataka 34 400kV S/C line at Yelahanka High Court on 31.07.2013.Work stopped due to agitation. 4 Common system associated with Costal Sep ' 11 1102 550 Sep-14 Dec-16 Revised BPTA Schedule Dec-14 Energen Private Ltd & Ind-Barath Power Ltd. (LTOA) Gen. Proj. in Tuticorin area Part-B 4.1 765 kV D/C Tuticorian Pooling Station - 737 312 Dec-16 Work under progress 737 Salem Pooling Station line (initialy charged Contractual Issues @ 400 kV 4.2 400 kV D/C Salem Pooling Station - Salem 120 120 Sep-16 Line Completed & commissioning 120 line (Quad) matching with Salem-Somanahalli Line 4.3 765 kV S/C Salem Pooling Station 245 118 Sep-16 Stringing commenced from Mar '13 245 (Dharmapuri) - Madhugiri Pooling Station Severe RoW being faced line (initialy charged @ 400 kV) 5 System Strenghtening-XIII of SR grid Oct-11 132 0 Jun-14 Mar-17 Completion schedule: 32 months from investment approval. 5.1 400 kV D/C Madhugiri - Yelahanka Line. 132 Mar-17 Tower erection commenced from 132 March 2013. RoW being faced. तनवेश की तािीख 2016-17 मᴂ 2016-17 के ग मूल लक्ष्य 2016-17 को बाद िालूﴂलाइन की पूिी ई व Date of संशोतर्त तािीख कमीशन investment लंबाई की लंबाई की तािीख अनुसूतित होनेवाली क्र.सं पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised decision by Length in Stringing Original Proposed लाइन Sl. No Name of the Transmission Line Revised Remarks during Plg. Comm. Circuit completed in Target for 2016-17 Beyond Target date 2016-17 Kms. Ckt.Kms Date ckt. Kms 2016-17 ckt. Kms ckt. Kms 6 Scheme # 2: AC System strengthening at Scheme awarded on 10.12.2014 Pugalur end 6.1 Pugalur HVDC Station – Pugalur (Existing) 400 kV (quad) D/C Line 6.2 Pugalur HVDC Station – Arasur 400 kV (quad) D/C Line. 6.3 Pugalur HVDC Station – Thiruvalam 400 kV (quad) D/C Line 6.4 Pugalur HVDC Station - Edayarpalayam 400 kV (quad) D/C Line 6.5 Edayarpalayam – Udumulpeta 400 kV (quad) D/c line 7 Scheme # 3: Pugalur- Trichur 2000 MW Scheme awarded on 10.12.2014 VSC Based HVDC System 7.1 VSC based 2000 MW HVDC link between Pugalur and North Trichur 7.2 LILO of North -Trichur – Cochin 400 kV (Quad) D/C Line at North Trichur HVDC Stn 8 System Strenghtening-XIV of SR grid Dec-11 244 15 Aug-14 Sep-16 Compln sch : 32 months from Investment approval 8.1 400 kV Dharmapuri (Salem New) - 244 171 Sep-16 Stringing commenced from Nov 244 Somanahalli Line 2013. RoW problem. 35 km in Karnataka is pending 9 System Strengtheing of SR for import of Nov-14 37 Jun-14 Nov-17 Power from ER :

9.1 LILO of Gazuwaka - Vijayawada 400 KV Nov-14 37 Nov-17 Nov-17 RoW problem hampering 37 S/C Line at Vemagiri Pooling Station progress

10 Sub-Station work associated with Mar-15 7 0 Mar-18 Mar-18 Completion schedule : 36 months Hyderanad (Maheshwaram) Pooling from Investment Approval (IA) Station : 10.1 LILO of Hyderabad - Kurnool 400 kV S/C 7 Mar-18 Mar-18 Award placed in March, 2015 7 Line at Maheshwaram Sub Station तनवेश की तािीख 2016-17 मᴂ 2016-17 के ग मूल लक्ष्य 2016-17 को बाद िालूﴂलाइन की पूिी ई व Date of संशोतर्त तािीख कमीशन investment लंबाई की लंबाई की तािीख अनुसूतित होनेवाली क्र.सं पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised decision by Length in Stringing Original Proposed लाइन Sl. No Name of the Transmission Line Revised Remarks during Plg. Comm. Circuit completed in Target for 2016-17 Beyond Target date 2016-17 Kms. Ckt.Kms Date ckt. Kms 2016-17 ckt. Kms ckt. Kms 11 System Strengthening - XXIV in Jan-16 554 0 Jul-18 Jul-18 Completion schedule : 30 months Southern Region from Investment Approval (IA) 11.1 LILO of 765 kV DC Kurnool - Thiruvalam 194 Jul-18 Jul-18 Award placed in February, 2016 194 Line at Cuddappah 11.2 400 kV DC Cuddappah - Hindupur Line (Q) 360 Jul-18 Jul-18 Award placed in January, 2016 360 12 Connectivity for Kudankulam 3&4 with Jan-16 133 0 May-18 May-18 Completion schedule : 28 months Interstate Transmission System from Investment Approval (IA) 12.1 Extn. Of 400 kV DC Kudankulam APP - 133 May-18 May-18 Award placed in January, 2016 and 133 Tirunelveli Line (Q) work started 13 Transmission System for Ultra Mega Jan-16 36 0 Jul-18 Jul-18 Completion schedule : 16 LILO in Solar Park in Anantapur District, & 30 LILO Out months from Andhra Pradesh - Paret B (Phase-II) Investment Approval (IA) 13.1 LILO of 400 kV DC Cuddappah - Hindupur Line 19 May-17 May-17 Award placed in January, 2016 and 19 (Q) circuit - I at NP Kunta SS under progress 13.2 LILO of 400 kV DC Cuddappah - Hindupur Line 17 Jul-18 Jul-18 Award placed in January, 2016 and 17 (Q) circuit - II at NP Kunta SS under progress 14 Removal of constraints in 400 kV Bays Jan-16 116 0 Jul-18 Jul-18 Extn. At 400 kV Vemagiri Sub Station 14.1 Both circuits of first LILO D/C portion of 60 Jul-18 Jul-18 Award placed in March, 2016 and 60 400 kV Simhadri - Vijayawada Line at under progress Vemagiri - I (AP) shall be LILOed at Vemagiri - II )PG) - (D/C portion 1.8 km & Multi Circuit portion 13.2 km) 14.2 Both circuits of second LILO D/C portion 56 Jul-18 Jul-18 Award placed in March, 2016 and 30 of 400 kV Simhadri - Vijayawada Line at under progress Vemagiri - I (AP) shall be LILOed at Vemagiri - II )PG). There shall be no loop out. The open section of 400 kV D/C Line from Vemagiri - I (AP) shall be used for termination of 400 kV Kota Line. 15 Transmission System for Ultra Mega Solar Park Apr-16 328 0 Dec-18 Dec-18 Completion Schedule : 32 months at Tumkur (Pavagada, Karnataka (Phase-I) from IA

15.1 400 kV DC Tumkur (Pavagada) Pool - 218 Dec-18 Dec-18 Award placed in June, 2016 218 Hiriyur Line 15.2 LILO of 400 kV DC Gooty - Tumkur 3 Dec-18 Dec-18 Award placed in June, 2016 3 (Vasantnarsapur) Line at Tumkur Pool 15.3 LILO of 400 kV DC Bellary - Tumkur 107 Dec-18 Dec-18 Award placed in June, 2016 107 (Vasantnarsapur) Line (Q) at Tumkur Pool

कु ल / Total 1533 21 1482 तनवेश की तािीख 2016-17 मᴂ 2016-17 के ग मूल लक्ष्य 2016-17 को बाद िालूﴂलाइन की पूिी ई व Date of संशोतर्त तािीख कमीशन investment लंबाई की लंबाई की तािीख अनुसूतित होनेवाली क्र.सं पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised decision by Length in Stringing Original Proposed लाइन Sl. No Name of the Transmission Line Revised Remarks during Plg. Comm. Circuit completed in Target for 2016-17 Beyond Target date 2016-17 Kms. Ckt.Kms Date ckt. Kms 2016-17 ckt. Kms ckt. Kms 765 एवं 400 कक.वो. की नई टी.बी.सी.बी पािेषण लाइनⴂ के तनमााण काया की प्रगतत की समीक्षा / Review of Progress of Works on new 765 kV and 400 KV Transmission Lines under TBCB Route in SR 1 Transmission System Associated with Krishnapattnam UMPP – Synchronous interconnection between SR and WR (Part-B) : 1.1 765 kV S/C Raichur - Solapur Line 16/12/2010 250 6-Jan-14 2016-17 Agency : RECTPCL 250 (LOI) TSP : M/S Patel Engineering Ltd, M/S Simplex Infrastructure Ltd and M/s B S Transcom Ltd Status : Under Progress 2 Transmission System associated with IPPs of Vemagiri Area – Package – A : 2.1 765 kV D/C Vemagiri Pooling Station – 20/03/2012 250 Apr-15 2016-17 Agency : RECTPCL 250 Khammam Line (Ckt - 1) (LOI) TSP : PGCIL Status : Under Progress 2.2 765 kV D/C Khammam – Hyderabad Line 20/03/2012 250 Apr-15 2016-17 Agency : RECTPCL 250 (Ckt - 1) (LOI) TSP : PGCIL Status : Under Progress 3 System Strengthening in Southern Region for import of power from Eastern Region : 3.1 765 kV D/C Srikakulam PP – Vemagiri-II 31/07/2013 668 475 30-Aug-16 Aug-16 Agency : RECTPCL 668 Pooling Station Line (LOI) TSP : PGCIL Status : Under Progress 4 Transmission System required for evacuation of power from Kudgi TPS (3 x 800 MW in Phase-I) of NTPC Limited : 4.1 400 kV 2 x D/C Quad Kudgi TPS – 31/07/2013 40 29-Dec-15 2016-17 Agency : RECTPCL 40 Narendra (New) Lines (LOI) TSP : M/s L&T Status : Under Progress 4.2 765 kV D/C Narendra (New) - Madhugiri 31/07/2013 700 29-Dec-15 2016-17 Agency : RECTPCL 700 Lines (LOI) TSP : M/s L&T Status : Under Progress 4.3 400 kV 2 x D/C Quad Madhugiri - Bidadi 31/07/2013 200 29-Dec-15 2016-17 Agency : RECTPCL 200 Lines (LOI) TSP : M/s L&T Status : Under Progress 5 Connectivity Lines for 765/400 kV Maheshwaram (Hyderabad) Pooling S/S : 5.1 400 kV D/C Maheswaram (PG) – Mehboob 200 2015-16 Agency : RECTPCL 200 Nagar Lines TSP : Status : Revised RFP issued on 10.04.2015 5.2 400 kV D/C Nizamabad – Yeddumailaram 316 2015-16 Agency : RECTPCL 316 (Shankarpalli) Lines TSP : Status : Revised RFP issued on 10.04.2015 तनवेश की तािीख 2016-17 मᴂ 2016-17 के ग मूल लक्ष्य 2016-17 को बाद िालूﴂलाइन की पूिी ई व Date of संशोतर्त तािीख कमीशन investment लंबाई की लंबाई की तािीख अनुसूतित होनेवाली क्र.सं पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised decision by Length in Stringing Original Proposed लाइन Sl. No Name of the Transmission Line Revised Remarks during Plg. Comm. Circuit completed in Target for 2016-17 Beyond Target date 2016-17 Kms. Ckt.Kms Date ckt. Kms 2016-17 ckt. Kms ckt. Kms 6 Strengthening of transmission system beyond Vemagiri : 6.1 765 kV D/C Vemagiri II – Chilakaluripeta 06/04/2015 580 Apr-19 Agency : RECTPCL 580 Lines (SPV) TSP : PGCIL Status : Work started in Jun-16 6.2 765 kV D/C Chilakaluripeta – Cuddapah 06/04/2015 550 Apr-19 Agency : RECTPCL 550 Lines (SPV) TSP : PGCIL Status : Work started in Jun-16 6.3 400 kV (quad) D/C Chilakaluripeta – 06/04/2015 84 Apr-19 Agency : RECTPCL 84 Narsaraopeta Lines (SPV) TSP : PGCIL Status : Award placed in Mar-16 6.4 400 kV (quad) D/C Cuddapah – Madhugiri 06/04/2015 476 Apr-19 Agency : RECTPCL 476 Lines (SPV) TSP : PGCIL Status : Award placed in Mar-16

6.5 400 kV (quad) D/C Cuddapah – Hindupur 06/04/2015 360 Agency : RECTPCL 360 Lines (SPV) TSP : Status : RFQ has been issued on 12.04.2017 6.6 400 kV (quad) D/C Srikaukulam Pooling 06/04/2015 286 Feb-19 Agency : RECTPCL 286 Station – Garividi Lines (SPV) TSP : PGCIL Status : Award placed in Mar-16

6.7 400 kV D/C Chilakaluripeta - 84 Feb-19 Agency : RECTPCL 84 Narasaraopeta Transmission Line (Q) TSP : PGCIL Status : Award placed in Mar-16

7 Transmission System for evacuation of power from 2X500 MW Neyveli Lignite Corp. Ltd. TS-I (Replacement) (NNTPS) in Neyveli, Tamil Nadu : 7.1 400 kVD/C NNTPS Swithchyard – 160 Agency : RECTPCL 160 Villupuram (Ginjee) Line TSP : Status : RECTPCL has requested CEA to reconsider the decision for implementing 8 Transmission System associated with IPPs of Vemagiri Area – Package – B : 8.1 765 kV D/C Vemagiri Pooling Station – 250 Agency : RECTPCL 250 Khammam Line (Ckt - 2) TSP : Status : Under abeyance 8.2 765 kV D/C Khammam – Hyderabad Line 250 2016-17 2016-17 Agency : RECTPCL 250 (Ckt - 2) TSP : Status : Under Progress तनवेश की तािीख 2016-17 मᴂ 2016-17 के ग मूल लक्ष्य 2016-17 को बाद िालूﴂलाइन की पूिी ई व Date of संशोतर्त तािीख कमीशन investment लंबाई की लंबाई की तािीख अनुसूतित होनेवाली क्र.सं पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised decision by Length in Stringing Original Proposed लाइन Sl. No Name of the Transmission Line Revised Remarks during Plg. Comm. Circuit completed in Target for 2016-17 Beyond Target date 2016-17 Kms. Ckt.Kms Date ckt. Kms 2016-17 ckt. Kms ckt. Kms 9 Transmission System associated with IPPs of Vemagiri Area – Package – C :

9.1 765 kV D/C Wardha – Jabalpur Pooling 400 Agency : RECTPCL 400 Station TSP : Status : Under abeyance 10 Transmission System associated with IPPs of Nagapattinam / Cuddalore Area – Package A :

10.1 765 kV D/C Nagapattinam Pooling Station - 06/03/2012 406 262 29-Mar-15 Jul-16 Agency : PFCCL 406 Salem Line (LOI) TSP : PGCIL Status : Work under progress

10.2 765 kV S/C Salem-Madhugiri Line 06/03/2012 219 32 29-Mar-15 Jul-16 Agency : PFCCL 219 (LOI) TSP : PGCIL Status : RoW Problem

11 Additional inter- Regional AC link for import into Southern Region i.e. Warora – Warangal and Chilakaluripeta - Hyderabad - Kurnool 765 kV link :

11.1 765 kV D/C Warora Pool – Warangal 700 Agency : PFCCL 700 (New) Line TSP : Status : Yet to commence 11.2 765 kV D/C Warangal (New) – Hyderabad 320 Agency : PFCCL 320 Line TSP : Status : Yet to commence 11.3 400 kV (quad) D/C Warangal (New) – 20 Agency : PFCCL 20 Warangal (existing) Line TSP : Status : Yet to commence 11.4 765 kV Hyderabad – Kurnool D/C Line 340 Agency : PFCCL 340 TSP : Status : Yet to commence 11.5 765 kV Hyderabad – Kurnool D/C Line 340 Agency : PFCCL 340 TSP : Status : Yet to commence 11.6 765 kVWarangal (New) – Chilakaluripeta 500 Agency : PFCCL 500 D/c Line TSP : Status : Yet to commence

11.7 400 kV (quad) Cuddapah – Hoodi D/C Line 400 Agency : PFCCL 400 TSP : Status : Yet to commence तनवेश की तािीख 2016-17 मᴂ 2016-17 के ग मूल लक्ष्य 2016-17 को बाद िालूﴂलाइन की पूिी ई व Date of संशोतर्त तािीख कमीशन investment लंबाई की लंबाई की तािीख अनुसूतित होनेवाली क्र.सं पािेषण लाइनⴂ का नाम अ땍युतक्तयां Energised decision by Length in Stringing Original Proposed लाइन Sl. No Name of the Transmission Line Revised Remarks during Plg. Comm. Circuit completed in Target for 2016-17 Beyond Target date 2016-17 Kms. Ckt.Kms Date ckt. Kms 2016-17 ckt. Kms ckt. Kms 12 Beyond Vemagiri Transmission System : 12.1 765 kV D/C Vemagiri - Chilakaluripeta Line 580 Apr-19 Apr-19 TSP : PGCIL 580 Status : Award placed in March, 2016 12.2 765 kV D/C Chilakaluripeta - Cuddappah 550 Apr-19 Apr-19 TSP : PGCIL 550 Line Status : Award placed in March, 2016 12.3 400 kV D/C Cuddappah - Madhugiri Line 480 Feb-19 Feb-19 TSP : PGCIL 480 (Q) Status : Award placed in March, 2016 12.4 400 kV D/C Srikakulam - Garividi Line (Q) 286 Feb-19 Feb-19 TSP : PGCIL 286 Status : Award placed in March, 2016 12.5 400 kV D/C Chilakaluripeta - 84 1-Apr-19 Apr-19 TSP : PGCIL 84 Narasaraopeta Line (Q) Status : Award placed in March, 2016 13 Transmission System associated with Gadarwada STPPS of NTPC (Part - B) : 13.1 765 kV D/C Warora Pool – Parli Line 698 Jan-18 Jan-18 Agency : 698 TSP : PGCIL Status : Award placed in Feb-16 13.2 765 kV D/C Parli – Solapur Line 236 Jan-18 Jan-18 Agency : 236 TSP : PGCIL Status : Award placed in Dec-15 13.3 400 kV D/C Parli – Parli Line (Q) 36 Jan-18 Jan-18 Agency : 36 TSP : PGCIL Status : Award under progress कु ल / Total 3233 0 9316 15.2 दतक्षण क्षेत्र मᴂ पावि तग्रड की उप कᴂ द्रⴂ के तनमााण काया की समीक्षा 15.2 Review of Progress of Works of Power Grid Executed Sub-Stations under SR

2016-17 मᴂ 2016-17 के बाद वो쥍टेज के मूल लक्ष्य 2016-17 को कमीशन िालू होनेवाले क्षमता संशोतर्त अनुसूतित Energised उपकᴂ द्र क्र.सं उप कᴂ द्र का नाम अनुपात की तािीख अ땍युतक्तयां Capacity तािीख Proposed for during 2016- Beyond 2016- Sl Name of Sub-Station Remarks Voltage Ratio (MVA) Original Revised Date 2016-17 17 17 (KV) Target Date MVA MVA MVA अन्द्य क्षेत्रीय प्रणातलयाँ / Other Regional Systems : I System Strengthening Scheme of IR for transfer of Power to SR : 1 Commom System Associated with Dec-15 Jun-17 Completion Schedule : 33 East Coast Energy Ltd. & NCC months from IA Projects Ltd LTOA Gen Proj. in Srikakulam Area Part-B 1.1 Extn. of 765/400 KV Angul Sub-Station 765 / 400 1 x 1500 Dec-15 Jun-17 Award placed in August, 2013. Engg. 1500 & Civil Works under progress 1.2 Extn. of 765/400 KV Jharsuguda Sub- 765 / 400 Dec-15 Jun-17 Award placed in August, 2013. Engg. Station & Civil Works under progress 1.3 Extn. of 765/400 KV Dharamjaygarh Sub- 765 / 400 Dec-15 Jun-17 Award placed in August, 2013. Engg. Station & Civil Works under progress 2 Commom System Associated with East Jun-15 Aug-16 Completion Schedule : 27 Coast Energy Ltd. & NCC Projects Ltd LTOA months from IA Gen Proj. in Srikakulam Area Part-C 2.1 Srikakulam Pooling Station with 2 Nos. of 765 / 400 2 x 1500 Jun-15 Aug-16 Work under progress. Completion 3000 765 KV Bays. matching with Srikakulam - (400 KV S/S : AIS, 765 KV S/S : GIS) Vemagiri TBCB Line 2.2 Extn. of 765/400 KV Angul Sub-Station 765 / 400 Jun-15 Aug-16 Completion matching with Srikakulam - Vemagiri TBCB Line 3 765 kV Wardha - Hyderabad Links May-18 May-18 Completion Schedule : 40 months from IA 3.1 765/400 kV Nizamabad Sub-Station 765 / 400 2 x 1500 May-18 Mar-17 Award placed in May, 2015 and 3000 efforts are being made to finish by 2016-17 3.2 Extn. of 765/400 kV Hyderabad S/S 765 / 400 May-18 May-18 Award placed in May, 2015 and under progress 3.3 Extn. of 765/400 kV Wardha S/S 765 / 400 May-18 Mar-17 Award placed in August, 2016 and under progress 3.4 Extn. At 400 kV Dichpally S/S 765 / 400 May-18 Mar-17 Award placed in May, 2015 (APTRANSCO) Work executed by APTRANSCO on deposit basis 2016-17 मᴂ 2016-17 के बाद वो쥍टेज के मूल लक्ष्य 2016-17 को कमीशन िालू होनेवाले क्षमता संशोतर्त अनुसूतित Energised उपकᴂ द्र क्र.सं उप कᴂ द्र का नाम अनुपात की तािीख अ땍युतक्तयां Capacity तािीख Proposed for during 2016- Beyond 2016- Sl Name of Sub-Station Remarks Voltage Ratio (MVA) Original Revised Date 2016-17 17 17 (KV) Target Date MVA MVA MVA

4 Green Energy Corridors : Inter State Apr-17 Apr-17 Completion Schedule : 40 Transmission Scheme (ISTS) - Part A months from IA 4.1 400/230 kV Tirunelveli Pooling Station 400/230 2 x 500 Apr-17 Apr-17 Award placed in April, 2015 and 1000 (GIS) under progress 4.2 Extn. of 400/230 kV Tuticorin Pooling 400/230 Apr-17 Apr-17 Award placed in April, 2015 and Station under progress 5 HVDC Bipole Link Between Western Region Nov-19 Nov-19 Completion Schedule : 42 (Raigarh, Chattishgarh) and Southern months from IA Region (Pugalur, TN) - North Trichur (Kerala) Scheme - I : Raigarh - Pugalur 6000 MW HVDC System 5.1 800 kV HVDC Raigarh Station with 6000 800 6000 MW Nov-19 Nov-19 Awardplaced in June, 2016 and 6000 MW HVDC Terminal under court case 5.2 800 kV HVDC Pugalur Station with 6000 800 6000 MW Nov-19 Nov-19 Award under progress 6000 MW HVDC Terminal

II System Strengthening Scheme of WR for transfer of Power to SR : 1 Part B : Regional System Strengthening in Oct-12 Mar-17 Completion Schedule : 48 WR for Mundra UMPP months from IA 1.1 40 % Fixed Series Compensation on Oct-12 Mar-17 Award placed in Sep-12. Engg. & Civil works Wardha - Aurangabad 400 KV D/C Line under progress. Completion matching with Wardha - Aurangabad Line 2 Establishment of Pooling Station at Champa May-14 Jul-16 Revised BPTA Schedule : and Raigarh (Near Tamnar) for IPP Nov-2013 Generation Projects in Chattisgarh - B 2.1 765/400 KV Champa Pooling Station 765 / 400 6 x 1500 May-14 Jul-16 Work awarded in Oct-2011. ICT 1 & 6000 ICT-II commissioned in 2015-16. Other works under progress 3 Transmission System May-15 Mar-17 Revised BPTA Schedule : Strengthening in North/West part May-2015 of WR for IPP Projects in Chattisgarh - Part E 3.1 765/400 KV Padghe Sub-Station 765 / 400 2 x 1500 May-15 Mar-17 Award placed in May, 2012 3000 (GIS) Works under progress 3.2 Extn. at 765/400 KV Aurangabad 765 / 400 May-15 Mar-17 Award placed in Feb, 2012 Sub-Station Works under progress 3.3 Extn. at 400 KV Padghe Sub-Station May-15 Mar-17 Works under progress. Delay is (MSETCL) due to re-tendering 2016-17 मᴂ 2016-17 के बाद वो쥍टेज के मूल लक्ष्य 2016-17 को कमीशन िालू होनेवाले क्षमता संशोतर्त अनुसूतित Energised उपकᴂ द्र क्र.सं उप कᴂ द्र का नाम अनुपात की तािीख अ땍युतक्तयां Capacity तािीख Proposed for during 2016- Beyond 2016- Sl Name of Sub-Station Remarks Voltage Ratio (MVA) Original Revised Date 2016-17 17 17 (KV) Target Date MVA MVA MVA

4 Transmission System Dec-15 May-18 Revised BPTA Schedule : Strengthening in Raipur - Wardha Dec-2015 Corridor for IPP Generation Projects in Chattisgarh - Part 6 4.1 Extn. at 765 KV Raipur Pooling Station 765 / 400 Dec-15 Dec-16 Work under progress and matching with Line 4.2 Extn. at 765 KV Wardha Sub-Station 765 / 400 Dec-15 May-18 Award placed in June, 2013 Works under progress 5 Transmission System Associated for Oct-15 Mar-17 Completion Schedule : 24 Sholapur STPP (2 x 660 MW) months from IA Generation Projects 5.1 Extn. at 400/220 KV Sholapur Sub-Station 400 / 220 1 x 500 Oct-15 Mar-17 Award placed in June, 2015 500

6 Western Region Strengthening Mar-16 Feb-18 Completion schedule : 22 Scheme - XV months from IA (Under TBCB) 6.1 Extn. at 765 kV Sholapur SS Jan-18 Jan-18 Award placed in Apr-16 and under progress 6.2 Extn. at 400 kV Parli Switching Station Feb-18 Feb-18 Award placed in Apr-16 and under progress

III System Strengthening Scheme of ER for transfer of Power to SR : 1 Power Grid Works associated with Apr-16 Apr-19 Apr-19 Completion schedule : 36 Common Transmission System for months from IA (2 No.400 Phase-II Generation Projects in kV Bays Under TBCB, 16 Odisha months from IA) 1.1 765/400 kV Jharsuguda SS 765/400 2x1500 Apr-19 Apr-19 Award under progress 3000 (Sundargarh) with Split Bus Arrangement 1.2 765/400 kV Angul SS (Sundargarh) 765/400 2x1500 Apr-19 Apr-19 Award under progress 3000 with Split Bus Arrangement 1.3 400/220 kV Behrampaur Sub Station 400/220 2x315 Award under progress 630 2016-17 मᴂ 2016-17 के बाद वो쥍टेज के मूल लक्ष्य 2016-17 को कमीशन िालू होनेवाले क्षमता संशोतर्त अनुसूतित Energised उपकᴂ द्र क्र.सं उप कᴂ द्र का नाम अनुपात की तािीख अ땍युतक्तयां Capacity तािीख Proposed for during 2016- Beyond 2016- Sl Name of Sub-Station Remarks Voltage Ratio (MVA) Original Revised Date 2016-17 17 17 (KV) Target Date MVA MVA MVA

दतक्षण क्षेत्रीय प्रणातलयाँ / Southern Regional Systems : 1 System Strengthening Scheme XII of SR Feb-10 Jun-12 Mar-17 Completion scheduled 28 months from IA 1.1 400/ 220 KV Yelahanka Sub-station (GIS) 400/220 2 x 500 Jun-12 Mar-17 Uncertain. Completion matching 1000 with line, uncertain. 2 Common system associated with Costal Sep-11 Sep-14 Dec-16 Revised BPTA Schedule Dec-14 Energen Private Ltd & Ind-Barath Power Ltd. (LTOA) Gen. Proj. in Tuticorin Area Part B 2.1 765/400 KV Salem Pooling Station 765/400 Dec-16 Award placed in October 2011 and (initially charged @ 400 kV) under progress 2.2 Extn. of 765/400 KV Tuticorin pooling Stn 765/400 Sep-16 Award placed in October 2011 and under progress 2.3 Extn. of 765/400 KV Madhugiri pooling 765/400 Sep-16 Award placed in October 2011 and Stn under progress 2.4 Extn. of 765/400 kV Salem Sub-Station 765/400 Sep-16 Award placed in October 2011 and under progress 3 System Strengthening XIII of SR Grid Oct-11 Jun-14 Mar-17 Compln sch : 32 months from Investment approval. Uncertain 3.1 Extn. At 400/220 kV Yelahanka GIS 400/220 Mar-17 Works under progress

4 System Strengthening XIV of SR Grid Dec-11 Aug-14 Sep-16 Compln sch : 32 months from IA

4.1 Extn. At 400/220 KV Somanahalli Sub 400/220 Sep-16 Engg & civil works in progress Station. 4.2 Extn. At 400/220 KV Dharmapuri (Salem 400/220 Sep-16 Engg & civil works in progress New) Sub Station 5 Sub Station Works associated with Dec-15 Jul-16 Completion Schedule : 22 Transmission System required for months from Investment evacuation of Power from Kudgi TPS Approval (IA) Phase - I (3 x 800 MW) of NTPC 5.1 Extn. of 400/220 KV Madhugiri Sub 400/220 Jul-16 Award placed in Dec,2014 and Station work under progress 5.2 Extn. of 400/220 KV Bidadi Sub Station 400/220 Jul-16 Award placed in Dec,2014 and (GIS) work under progress 2016-17 मᴂ 2016-17 के बाद वो쥍टेज के मूल लक्ष्य 2016-17 को कमीशन िालू होनेवाले क्षमता संशोतर्त अनुसूतित Energised उपकᴂ द्र क्र.सं उप कᴂ द्र का नाम अनुपात की तािीख अ땍युतक्तयां Capacity तािीख Proposed for during 2016- Beyond 2016- Sl Name of Sub-Station Remarks Voltage Ratio (MVA) Original Revised Date 2016-17 17 17 (KV) Target Date MVA MVA MVA

6 System Strengthening in SR-XX 5870 Feb-17 Feb-17 Completion Schedule : 30 months from Investment 6.1 Extension at 400/220/33 kV Hyderabad 400/220/33 500 Feb-17 Feb-17 AwardApproval placed (IA) in September, 2014 500 Sub Station Work under progress 6.2 Extension at 400/220/33 kV Warangal Sub 400/220/33 500 Feb-17 Feb-17 Award placed in September, 2014 500 Station Work under progress 6.3 Extension at 400/220/33 kV Khammam 400/220/33 500 Feb-17 Feb-17 Award placed in September, 2014 500 Sub Station Work under progress 6.4 Extension at 400/220/33 kV Vijayawada 400/220/33 500 Feb-17 Feb-17 Award placed in September, 2014 500 Sub Station Work under progress 6.5 Extension at 400/220/33 kV Gooty Sub 400/220/33 500 Feb-17 Feb-17 Award placed in September, 2014 500 Station Work under progress 6.6 Extension at 400/220/33 kV Cuddappah 400/220/33 500 Feb-17 Feb-17 Award placed in September, 2014 500 Sub Station Work under progress 6.7 Extension at 400/220/33 kV Somanahalli 400/220/33 500 Feb-17 Jul-16 Award placed in September, 500 Sub Station 2014. Testing under progress 6.8 Extension at 400/220/33 kV Mysore Sub 400/220/33 500 Feb-17 Sep-16 Award placed in September, 2014 500 Station Work under progress 6.9 Extension at 400/220/33 kV Pugalur Sub 400/220/33 500 Feb-17 Feb-17 Award placed in September, 2014 500 Station Work under progress 6.10 Extension at 400/220/33 kV Trichy Sub 400/220/33 500 Feb-17 Feb-17 Award placed in September, 2014 500 Station Work under progress 6.11 Replacement of Existing 2 x 315 MVA 400/220 370 Feb-17 Feb-17 Award placed in September, 2014 370 Transformer to 2 x 500 MVA Transformer Work under progress at 400/220 kV Narendra SS 6.12 400/220/33 kV Melakottaiyur SS with 400/220 500 Jun-16 CoD on 22.07.2016 500 500 associated Bays and Equipments 6.13 Extn. at 400/220 KV Trissur Sub Station 400/220 - Feb-17 Feb-17 Award placed in September, 2014 (Conversion Line Reactors) Work under progress 7 Common Transmission Scheme May-17 May-17 Completion Schedule : 30 Associated with ISGS Projects in months from Investment Nagapattinam / Cuddalore Area of Approval (IA) Tamil Nadu - Part A1 (b) 7.1 Extn. at 2 Nos of Bays at 400 kV 400 Jul-16 Award placed in December, 2014 Nagapattinam Pooling Station (GIS) Nagapatnam PS Work (Provision of one 63 MVAR Line Reactor) completed, balance progress 2016-17 मᴂ 2016-17 के बाद वो쥍टेज के मूल लक्ष्य 2016-17 को कमीशन िालू होनेवाले क्षमता संशोतर्त अनुसूतित Energised उपकᴂ द्र क्र.सं उप कᴂ द्र का नाम अनुपात की तािीख अ땍युतक्तयां Capacity तािीख Proposed for during 2016- Beyond 2016- Sl Name of Sub-Station Remarks Voltage Ratio (MVA) Original Revised Date 2016-17 17 17 (KV) Target Date MVA MVA MVA

7.2 Extn. at 2+1 Nos of Bays at 400 kV New 400 May-17 Award placed in December, 2014 Salem (Dharmapuri) Station (Provision of one Work under progress 63 MVAR Line Reactor) 7.3 Extn. at No. of Bay at 400 kV Madhugiri 400 May-17 Award placed in December, 2014 S/S Work under progress 8 Scheme # 3: Pugalur- Trichur 2000 MW VSC Based HVDC System 8.1 320 kV, 2000 MW VSC based HVDC ± 320 kV 2000 MW Scheme awarded on 10.12.2014 2000 terminal at Pugalur 8.2 320 kV, 2000 MW VSC based HVDC ± 320 kV 2000 MW 2000 terminal at North Trichur 9 Sub Station Works associated with Nov-17 Dec-18 Completion Schedule : 36 System Strengthening in SR for import months from Investment of Power from ER Approval (IA) 9.1 765/400 kV Vemagiri Pooling Station (GIS) 765/400 2 x 1500 Nov-17 Nov-17 Award placed in December, 2014 3000 Work under progress 9.2 Extn. at 2 Nos of Bays each at 765 kV 765 Nov-17 Award placed in December, 2014 Vemagiri PS & Srikakulam PS Work under progress 10 System Strengthening in SR-XXIII Jul-17 Jul-17 Completion Schedule : 30 months from Investment 10.1 Extension at 400/220 kV Madugiri Sub- 400/220 500 Jul-17 Jul-17 AwardApproval placed (IA) in March, 2015 500 Station Work under progress 10.2 Extension at 400/220 kV Somanahalli Sub- 400/220 Jul-17 Jul-17 Award placed in March, 2015 Statiom Sub-Station (Replacent of 7x167 Work under progress MVA ICTs with 2x500 MVAR 11 Sub Station Works associated with Mar-18 Mar-18 Completion Schedule : 36 Hyderabad (Maheshwaeam ) Pooling months from Investment Station : Approval (IA) 11.1 765/400 kV Hyderabad (Maheshwaram) 765/400 2 x 1500 Mar-18 Mar-18 Award placed in May, 2015 3000 Sation (GIS) 12 Transmission System for Ultra Mega Mar-15 May-16 Completion Schedule : 12 Solar Park in Anantapur District, months from Investment Andhra Pradesh - Part A (Phase - I) : Approval (IA) 12.1 400 / 220 kV NP Kunta Pooling Station 400/220 3 x 500 Mar-15 May-16 ICT 1 commissioned on 28.04.2016, 1500 1500 ICT 2 on 02.06.2016 ICT 3 on 02.07.2016 (ICT 2&3 CoD on 11.07.2016) 2016-17 मᴂ 2016-17 के बाद वो쥍टेज के मूल लक्ष्य 2016-17 को कमीशन िालू होनेवाले क्षमता संशोतर्त अनुसूतित Energised उपकᴂ द्र क्र.सं उप कᴂ द्र का नाम अनुपात की तािीख अ땍युतक्तयां Capacity तािीख Proposed for during 2016- Beyond 2016- Sl Name of Sub-Station Remarks Voltage Ratio (MVA) Original Revised Date 2016-17 17 17 (KV) Target Date MVA MVA MVA

13 System Strengthening - XXIV in Jul-18 Jul-18 Completion Schedule : 30 Southern Region months from IA 13.1 765/400 kV Cuddappah Sub-Station 765 2 x 1500 Jul-18 Jul-18 Award placed in February, 2016 3000 13.2 Extn. At 400 kV Hindupur Sub-Station 400 Jul-18 Jul-18 To be implemented by APTRANSCO 14 Connectivity for Kudankulam 3&4 with May-18 May-18 Completion Schedule : 28 Interstate Transmission System months from IA 14.1 Extn. At 400 kV Tuticorin Pooling Station 400 May-18 May-18 Award placed in May, 2016

15 Transmission System for Ultra Mega Jul-18 Jul-18 Completion Schedule : 16/30 Solar Park in Anantapur District, months from Investment Andhra Pradesh - Paret B (Phase-II) Approval (IA) 15.1 Extn. At 400/220 kV NP Kunta sub-Station 400/220 Jul-18 Jul-18 Work commenced from May, 2016

16 Removal of Constraints in 400 kV Bays 400 Dec-18 Dec-18 Completion Schedule : 30 Extn. At 400 kV Vemagiri Sub Station months from Investment Approval (IA) 16.1 Extn. At 400 kV Vemagiri Sub Station 400 Jul-18 Jul-18 Award under progress (PG) 17 Transmission System for Ultra Mega Dec-18 Dec-18 Completion Schedule : 32 Solar Park at Tumkur (Pavagada) months from IA Phase -I 17.1 400 kV Tumkur (Pavagada) Pooling 400/220 2 x 500 Dec-18 Dec-18 Award under progress 1000 Station 17.2 Extn. at 400/220 kV Hiriyur Sub Station 400/220 Dec-18 Dec-18 Award under progress 18 Transmission System for Ultra Mega Jan-18 Nov-17 Completion Schedule : 19 Solar Park at Anantpur District, months from IA Andhra Pradesh Part - C (Phase -III) 18.1 400/220 kV NP Kunta Sub Station 500 Jan-18 Nov-17 Award under progress

कु ल / Total 23870 2000 35630 2016-17 मᴂ 2016-17 के बाद वो쥍टेज के मूल लक्ष्य 2016-17 को कमीशन िालू होनेवाले क्षमता संशोतर्त अनुसूतित Energised उपकᴂ द्र क्र.सं उप कᴂ द्र का नाम अनुपात की तािीख अ땍युतक्तयां Capacity तािीख Proposed for during 2016- Beyond 2016- Sl Name of Sub-Station Remarks Voltage Ratio (MVA) Original Revised Date 2016-17 17 17 (KV) Target Date MVA MVA MVA

Reactors in Sothern Regional Systems (PGCIL) : 1 Hyderabad (Maheshwaram) BR 765/400 2 x 240 2017-18 Mar-18 Award placed in May, 2015 480 2 Extension at 400 kV Bus Reactor at 400 1 x 125 Jul-17 Jul-17 Award placed in March, 2015 875 Gooty, Hassan, Khammam, Trivandrum, Each SS Work under progress Nellore (existing), Narendra and Nagarjunasagar Sub-Station (1x125 MVAR) 3 Extension at 400 kV Bus Reactor at 400 2 x 63 Jul-17 Jul-17 Award placed in March, 2015 126 Yelahanka Sub-Station (2x63 MVAR) Work under progress 4 Shifting of 2 Nos. of 63 MVAR Reactor 400 2 x 63 Jul-18 Jul-18 Award under progress 126 from Gazuwaka - Vemagiri II (PG) for utilization on 400 kV Simhadri II - Vemagiri II (PG) DC Line 5 Vijayawada BR 400 2 x 125 Oct-16 2016-17 125 MVAR commissioned on 250 125 19.06.2016, Balancer under progress 6 Nellore NPS LR @ Nellore NPS - Gooty 400 2 x 63 Oct-16 2016-17 Approved in 37th SC 126 Line 7 LR @ Kudgi PG - Tumkur Line each end 400 4 x 63 Oct-16 2016-17 Approved in 36th SC 252 8 Cuddappah BR 400 50 → 125 Oct-16 2016-17 Approved in 39th SC 75 9 Thiruvalam BR 765 2 x 240 Oct-16 2016-17 Approved in 39th SC 480 10 Cuddappah BR 765 2 x 240 RFQ has been issued on 480 06.04.2015 11 LR @ 400 kV Pugalur HVDC Station 400 2 x 80 Scheme awared on 10.12.2014 160 12 LR @ 400 kV Thiruvalam Ckt - II 400 63 Scheme awared on 10.12.2014 63

13 2nd BR @ Tumkur PS 400 1 x 125 125 14 Switchable Line Reactor @ Mysore 400 1 x 80 80 15 Tirunelveli Pooling Station BR 400 3 x 125 Agreed in 37 SCPSPSR 16 NP Kunta Pooling Station BR, Ultra Mega 400/220 1 x 125 Mar-15 Jun-16 CoD on 11.07.2016 125 125 Solar Park, Anantapur District

कु ल / Total 1308 250 2515 2016-17 मᴂ 2016-17 के बाद वो쥍टेज के मूल लक्ष्य 2016-17 को कमीशन िालू होनेवाले क्षमता संशोतर्त अनुसूतित Energised उपकᴂ द्र क्र.सं उप कᴂ द्र का नाम अनुपात की तािीख अ땍युतक्तयां Capacity तािीख Proposed for during 2016- Beyond 2016- Sl Name of Sub-Station Remarks Voltage Ratio (MVA) Original Revised Date 2016-17 17 17 (KV) Target Date MVA MVA MVA

डाइनतमक कांपेन्द्सेशन / Dynamic Compensation :

SC MVA Dynamic 2016-17 को 2016-17 मᴂ 2016-17 के ब द Sl Name of Bus Compensation Reactor Capacitor अ땍युक्तिय 車 अनसचिि कमीशन ि ल होनेव ले GVA / KA (±MVAR) MVAR MVAR Remarks ु ू ू Proposed for 2016- Energised during उपकᴂ द्र 17 2016-17 Beyond 2016-17 MVA MVA MVA 1 Hyderabad Bus 18.4 / 26.5 ± 200 2 x 125 1 x 125 Appoved in the 36th SC. 375 2 Udumalpet Bus 19.4 / 28.0 ± 200 2 x 125 1 x 125 Appoved in the 36th SC. 375 3 Trichy Bus 12.5 / 18.0 ± 200 2 x 125 1 x 125 Appoved in the 36th SC. 375 4 NP Kunta Bus ± 100

कु ल / Total 1308.00 250.00 3640.00 2016-17 मᴂ 2016-17 के बाद वो쥍टेज के मूल लक्ष्य 2016-17 को कमीशन िालू होनेवाले क्षमता संशोतर्त अनुसूतित Energised उपकᴂ द्र क्र.सं उप कᴂ द्र का नाम अनुपात की तािीख अ땍युतक्तयां Capacity तािीख Proposed for during 2016- Beyond 2016- Sl Name of Sub-Station Remarks Voltage Ratio (MVA) Original Revised Date 2016-17 17 17 (KV) Target Date MVA MVA MVA

765 एवं 400 कक.वो. की नई टी.बी.सी.बी उप कᴂ द्रⴂ के तनमााण काया की प्रगतत की समीक्षा / Review of Progress of Works on new 765 kV and 400 KV Sub-Stations under TBCB Route in SR 1 Connectivity Lines for 765/400 kV Maheshwaram (Hyderabad) Pooling S/S : 1.1 2 No. of 400 kV line bays at Mehboob 400 2016-17 Nagar S/S of TSTRANSCO 1.2 2 No. of 400 kV line bays at 400 2016-17 Yeddumailaram S/S of TSTRANSCO 2 Strengthening of transmission system beyond Vemagiri : 2.1 400 kV Satenapalli (Narasaraopeta) & 400 Apr-19 Apr-19 Award under progress Garividi Sub-Station 2.2 Establishment of substation at 765 / 400 7 x 500 Apr-19 Apr-19 Agency : RECTPCL 3500 Chilakaluripeta TSP : PGCIL Status : Award under progress 3 Additional inter- Regional AC link for import into Southern Region i.e. Warora – Warangal and Chilakaluripeta - Hyderabad - Kurnool 765 kV link : 3.1 Establishment of 765/400kV 765 / 400 2 x 1500 Agency : PFCCL 3000 substations at Warangal (New) with TSP : 2x1500 MVA transformers Status : Yet to commence 3.2 Establishment of 2x240 MVAR Bus 765 2 x 240 Agency : PFCCL 480 Reactors at 765/400kV Warangal TSP : (New) S/S Status : Yet to commence 3.3 240 MVAR switchable Line Reactors 765 2 x 240 Agency : PFCCL 480 at both ends of 765kV Warora Pool – TSP : Warangal (New) Line Status : Yet to commence 3.4 330 MVAR switchable Line Reactor at 765 330 Agency : PFCCL 330 Warangal end of 765 kV D/C TSP : Warangal (New) – Hyderabad Line Status : Yet to commence 3.5 240 MVAR switchable Line Reactor at 765 240 Agency : PFCCL 240 Kurnool end of 765 kV Hyderabad – TSP : Kurnool D/C Line Status : Yet to commence 3.6 240 MVAR switchable Line Reactor at 765 2 x 240 Agency : PFCCL 480 both ends of 765 kVWarangal (New) – TSP : Chilakaluripeta D/c Line Status : Yet to commence 3.7 63 MVAR switchable Line Reactor at 400 2 x 63 Agency : PFCCL 126 both ends of 400 kV (quad) Cuddapah TSP : – Hoodi D/C Line Status : Yet to commence 2016-17 मᴂ 2016-17 के बाद वो쥍टेज के मूल लक्ष्य 2016-17 को कमीशन िालू होनेवाले क्षमता संशोतर्त अनुसूतित Energised उपकᴂ द्र क्र.सं उप कᴂ द्र का नाम अनुपात की तािीख अ땍युतक्तयां Capacity तािीख Proposed for during 2016- Beyond 2016- Sl Name of Sub-Station Remarks Voltage Ratio (MVA) Original Revised Date 2016-17 17 17 (KV) Target Date MVA MVA MVA

4 Transmission system associated with Gadarawada STPPS of NTPC (Part - A & B) : 4.1 Warora Pooling Station 765 / 400 2 x 1500 Nov-17 Nov-17 Supply Package Award placed in Sep- 3000 2015 (Siemens) & balance award under progress 4.2 Establishment of substation at Parli 765 / 400 2 x 1500 Jan-18 Jan-18 Supply Package Award placed in Sep- 3000 2015 (Siemens) & balance award under progress कु ल / Total 0 0 14636