運 輸 署 TRANSPORT DEPARTMENT Schedule of Service Hotel Service

Total Page:16

File Type:pdf, Size:1020Kb

運 輸 署 TRANSPORT DEPARTMENT Schedule of Service Hotel Service 運 輸 署 TRANSPORT DEPARTMENT Schedule of Service Hotel Service Route Passenger Service Licence (PSL) Number: 16507A PSL Holder: Bus Tung Company Limited I. Name and Address of Hotel Hotel COZi Resort Address:4 Kin Fung Circuit, Tuen Mun, New Territories II. Route From Hotel COZi Wetland to Hong Kong International Airport (Circular): via Tin Shui Road, Tin Kwai Road, Wetland Park Road, Tin Tsz Road, Long Tin Road, Yuen Long Highway, Tuen Mun Road, Pui To Road, Tsun Wen Road, Kin Fung Circuit, Tsun Wen Road, Pui To Road, Tsing Wun Road, Wong Chu Road, Tuen Mun Road, Tsing Long Highway," Lantau Link, North Lantau Highway, Airport Road, Sky Plaza Road, Cheong Wong Road, Cheong King Road, East Coast Road, Cheong Lin Road, Cheong Shun Road, Airport Road, North Lantau Highway, Lantau Link, Tsing Long Highway, Tuen Mun Road, Tuen Hing Road, Tuen Mun Heung Sze Wui Road, Pui To Road, Tsun Wen Road, Kin Fung Circuit, Tsun Wen Road, Pui To Road, Tuen Mun Road, Yuen Long Highway, Hung Tin Road, Tin Ying Road and Tin Sau Road. From Hotel COZi Wetland to Hong Kong International Airport (via Hong Kong Disneyland) (Circular): Tin Shui Road, Tin Kwai Road, Wetland Park Road, Tin Tsz Road, Long Tin Road, Yuen Long Highway, Tuen Mun Road, Pui To Road, Tsun Wen Road, Kin Fung Circuit, Tsun Wen Road, Pui To Road, Tsing Wun Road, Wong Chu Road, Tuen Mun Road, Tsing Long Highway, Lantau Link, North Lantau Highway, Penny's Bay Highway, Magic Road, Fantasy Road, Magic Road, Penny's Bay Highway, North Lantau Highway, Airport Road, Sky Plaza Road, Cheong Wong Road, Cheong King Road, East Coast Road, Cheong Lin Road, Cheong Shun Road, Airport Road, North Lantau Highway, Lantau Link, Tsing Long Highway, Tuen Mun Road, Tuen Hing Road, Tuen Mun Heung Sze Wui Road, Pui To Road, Tsun Wen Road, Kin Fung Circuit, Tsun Wen Road, Pui To Road, Tuen Mun Road, Yuen Long Highway, Hung Tin Road, Tin Ying Road and Tin Sau Road. III. Stopping Points Without contravening the Road Traffic Ordinance, boarding/alighting activities should be conducted at the following places (except restricted zones, prohibited zones, bus-only-lanes, bus stops and taxi stands): From Hotel COZi Wetland to Hong Kong International Airport (Circular): (1) Access road in Hotel COZI Wetland (2) Access road in Hotel COZI Resort (3) Hong Kong International Airport (4) Access road in Hotel COZI Resort (5) Access road in Hotel COZI Wetland From Hotel COZi Wetland to Hong Kong International Airport (via Hong Kong Disneyland) (Circular): (1) Access road in Hotel COZI Wetland (2) Access road in Hotel COZI Resort (3) Hong Kong Disneyland (4) Hong Kong International Airport (5) Access road in Hotel COZI Resort (6) Access road in Hotel COZI Wetland IV Timetable From Hotel COZi Wetland 06:00 a.m. 08:00 a.m. 10:00 a.m.* 01:00 p.m. 03:00 p.m. 05:00 p.m. 07:30 p.m.* 10:00 p.m. *Via Hong Kong Disneyland V Vehicle Allocation One single-deck public bus of carrying capacity not exceeding 28 passengers granted with valid hotel service (A02) endorsement. VI Passengers restricted to hotel residents Passengers of the service should be restricted to the residents of the Hotel COZi Resort. Proof of hotel resident identity should be presented when boarding. VII Fare Free of charge VIII Validity Validity from 12 August 2019 to 11 August 2020 or up to the expiry of the PSL, whichever is the earlier. Transport Department 12 August 2019 .
Recommended publications
  • Islands District Council Traffic and Transport Committee Paper T&TC
    Islands District Council Traffic and Transport Committee Paper T&TC 41/2020 2020 Hong Kong Cyclothon 1. Objectives 1.1 The 2020 Hong Kong Cyclothon, organised by the Hong Kong Tourism Board, is scheduled to be held on 15 November 2020. This document outlines to the Islands District Council Traffic and Transport Committee the event information and traffic arrangements for 2020 Hong Kong Cyclothon, with the aim to obtain the District Council’s continuous support. 2. Event Background 2.1. Hong Kong Tourism Board (HKTB) is tasked to market and promote Hong Kong as a travel destination worldwide and to enhance visitors' experience in Hong Kong, by hosting different mega events. 2.2. The Hong Kong Cyclothon was debuted in 2015 in the theme of “Sports for All” and “Exercise for a Good Cause”. Over the past years, the event attracted more than 20,000 local and overseas cyclists to participate in various cycling programmes, as well as professional cyclists from around the world to compete in the International Criterium Race, which was sanctioned by the Union Cycliste Internationale (UCI) and The Cycling Association of Hong Kong, China Limited (CAHK). The 50km Ride is the first cycling activity which covers “Three Tunnels and Three Bridges (Tsing Ma Bridge, Ting Kau Bridge, Stonecutters Bridge, Cheung Tsing Tunnel, Nam Wan Tunnel, Eagle’s Nest Tunnel)” in the route. 2.3. Besides, all the entry fees from the CEO Charity and Celebrity Ride and Family Fun Ride and partial amount of the entry fee from other rides/ races will be donated to the beneficiaries of the event.
    [Show full text]
  • Transport Infrastructure and Traffic Review
    Transport Infrastructure and Traffic Review Planning Department October 2016 Hong Kong 2030+ 1 TABLE OF CONTENTS 1 PREFACE ........................................................... 1 5 POSSIBLE TRAFFIC AND TRANSPORT 2 CHALLENGES ................................................... 2 ARRANGEMENTS FOR THE STRATEGIC Changing Demographic Profile .............................................2 GROWTH AREAS ............................................. 27 Unbalanced Spatial Distribution of Population and Synopsis of Strategic Growth Areas ................................. 27 Employment ........................................................................3 Strategic Traffic and Transport Directions ........................ 30 Increasing Growth in Private Vehicles .................................6 Possible Traffic and Transport Arrangements ................. 32 Increasing Cross-boundary Travel with Pearl River Delta Region .......................................................................7 3 FUTURE TRANSPORT NETWORK ................... 9 Railways as Backbone ...........................................................9 Future Highway Network at a Glance ................................11 Connecting with Neighbouring Areas in the Region ........12 Transport System Performance ..........................................15 4 STRATEGIC DEVELOPMENT DIRECTIONS FROM TRAFFIC AND TRANSPORT PERSPECTIVE ................................................. 19 Transport and Land Use Optimisation ...............................19 Railways Continue to be
    [Show full text]
  • Schedule of Routes (Long Win Bus Company Limited) Order 2019
    《2019 年路線表 ( 龍運巴士有限公司 ) 令》 Schedule of Routes (Long Win Bus Company Limited) Order 2019 2019 年第 123 號法律公告 L.N. 123 of 2019 B3398 第 1 條 Section 1 B3399 2019 年第 123 號法律公告 L.N. 123 of 2019 《2019 年路線表 ( 龍運巴士有限公司 ) 令》 Schedule of Routes (Long Win Bus Company Limited) Order 2019 ( 由行政長官會同行政會議根據《公共巴士服務條例》( 第 230 章 ) 第 (Made by the Chief Executive in Council under section 5(1) of the 5(1) 條作出 ) Public Bus Services Ordinance (Cap. 230)) 1. 生效日期 1. Commencement 本命令自 2019 年 12 月 31 日起實施。 This Order comes into operation on 31 December 2019. 2. 指明路線 2. Specified routes 現指明附表所列的路線為龍運巴士有限公司有權經營公共巴 The routes set out in the Schedule are specified as the routes on 士服務的路線。 which the Long Win Bus Company Limited has the right to operate a public bus service. 3. 廢 除《 2018 年路線表 ( 龍運巴士有限公司 ) 令》 3. Schedule of Routes (Long Win Bus Company Limited) Order 《2018 年路線表 ( 龍運巴士有限公司 ) 令》(2018 年第 86 號法 2018 repealed 律公告 ) 現予廢除。 The Schedule of Routes (Long Win Bus Company Limited) Order 2018 (L.N. 86 of 2018) is repealed. 《2019 年路線表 ( 龍運巴士有限公司 ) 令》 Schedule of Routes (Long Win Bus Company Limited) Order 2019 2019 年第 123 號法律公告 附表 Schedule L.N. 123 of 2019 B3400 B3401 附表 Schedule [ 第 2 條 ] [s. 2] 指明路線 Specified Routes 機場巴士路線第 A31 號 Airbus Route No. A31 荃灣 ( 如心廣場 )——機場 ( 地面運輸中心 ) Tsuen Wan (Nina Tower)—Airport (Ground Transportation Centre) 荃灣 ( 如心廣場 ) 往機場 ( 地面運輸中心 ):途經大河道、沙 TSUEN WAN (NINA TOWER) to AIRPORT (GROUND 咀道、大涌道、青山公路 ( 荃灣段 )、荃景圍、美環街、愉景 TRANSPORTATION CENTRE): via Tai Ho Road, Sha Tsui 新城巴士總站、美環街、西樓角路、大河道、青山公路 ( 荃 Road, Tai Chung Road, Castle Peak Road (Tsuen
    [Show full text]
  • Transportation, Infrastructure and Logistics
    Transportation, Infrastructure and Logistics Staff of Transport International are committed to premium service. Route 3 (CPS) has the most advanced monitoring system to ensure smooth traffic flow. Franchised Bus Operation Toll Road Transport International Holdings Limited (TIH) is a publicly- The Group has a 70 per cent interest in the Route 3 listed company engaged primarily in franchised public bus (CPS) Company Limited, which operates the north-south operations in Hong Kong. It has faced a challenging operating expressway between Yuen Long and Ting Kau under a 30-year environment in Hong Kong with wage increases, higher build-operate-transfer franchise running from 1995 to 2025. fuel prices and intense competition from railways exerting pressure on franchised bus operations, and its mainland joint The dual three-lane expressway consists of the 3.8-kilometre ventures have also been affected by fuel prices and rising Tai Lam Tunnel and 6.3-kilometre Tsing Long Highway. It operating costs. On a positive note, revenue and earnings provides a direct link from Lok Ma Chau and northwest New from its non-franchised transport operations in Hong Kong Territories to the container ports in Kwai Chung, Hong Kong have shown healthy growth, and good sales of the Manhattan International Airport, Disney theme park and the urban areas. Hill residential development in West Kowloon have enhanced The route reduces congestion on Tuen Mun Road and the the company’s financial position. The Group owns 33.3 per Tolo Highway and offers a faster, safer and more convenient cent of TIH. link for commuters. TIH also owns 73 per cent of RoadShow Holdings Limited, The traffic flow remained steady during the year.
    [Show full text]
  • LEGISLATIVE COUNCIL PANEL on TRANSPORT Traffic Impact On
    LC Paper No. CB(1)848/03-04(03) LEGISLATIVE COUNCIL PANEL ON TRANSPORT Traffic Impact on Tuen Mun Road upon the Commissioning of Hong Kong – Shenzhen Western Corridor and Deep Bay Link Purpose This paper informs Members of the traffic impact on Tuen Mun Road upon the commissioning of the Hong Kong – Shenzhen Western Corridor (HK–SWC) and Deep Bay Link (DBL), as well as the options being considered by the Administration to improve the traffic flow of Tuen Mun Road. Background 2. The HK–SWC is a dual three-lane carriageway spanning across Deep Bay linking the northwestern part of the New Territories with Shekou in Shenzhen. The DBL serves as the connecting road between the HK–SWC and the local transport network, linking the HK–SWC at its landing point at Ngau Hom Shek with the Yuen Long Highway. Construction of the DBL and the HK–SWC have commenced in June and August 2003 respectively. They are scheduled for completion by the end of 2005. Traffic Situation of Tuen Mun Road 3. Tuen Mun Road was partially completed and opened in 1978 to link up Tsuen Wan and Tuen Mun. It was fully completed in 1983. It comprises two major sections – the Expressway Section (Wong Chu Road to Tsuen Wan Road) and the Town Centre Section (Wong Chu Interchange to Lam Tei Interchange). The design capacity of the Expressway Section is 118 000 vehicles. In 2003, the average daily traffic on the Expressway Section during weekdays was about 106 000 vehicles. The vehicle/capacity (v/c) ratio1 is 1.1 during peak hours.
    [Show full text]
  • PCT Gazette, Weekly Issue No. 7, 2004
    07/2004 12 Feb/fév 2004 PCT Gazette - Section I - Gazette du PCT 3337 SECTION I PUBLISHED INTERNATIONAL APPLICATIONS DEMANDES INTERNATIONALES PUBLIÉES (51) Not classified / non classée Seika-cho, Sakuraga-oka, Souraku-gun, Ky- (71) CNH BELGIUM NV [BE/BE]; Leon oto, Kyoto (JP). XU, Shugong [CN/US]; Claeysstraat 3A, B-8210 Zedelgem (BE). WO 2004/012492 (11) (13) A2 3608 SE 182ND AVE., Vancouver, WA (for all designated States except / pour tous (21) PCT/IB2003/005942 98683 (US). les États désignés sauf US) (22) 15 Dec/déc 2003 (15.12.2003) (74) MALISZEWSKI, Gerald; P.O. BOX (72, 75) MAERTENS, Koen [BE/BE]; Farazi- 270829, San Diego, CA 92198-2829 (US). jnstraat 4, B-8670 Oostduinkerke (BE). DE (25) en (26) en BAERDEMAEKER, Josse, G. [BE/BE]; (81) AE AG AL AM AT AU AZ BA BB BG BR 19 Sep/sep 2003 Eeckhoutveldweg 14, B-1785 Merchtem (30) 10/666,346 US BY BZ CA CH CN CO CR CU CZ DE DK (BE). (19.09.2003) DM DZ EC EE ES FI GB GD GE GH GM (43) 12 Feb/fév 2004 (12.02.2004) HR HU ID IL IN IS JP KE KG KP KR KZ (74) AMEYE, Dirk, C., A.; CNH IP Department, LC LK LR LS LT LU LV MA MD MG MK CNH Belgium N.V., Leon Claeysstraat 3A, (54) • GOLF CLUB HEAD HAVING A MN MW MX MZ NI NO NZ OM PG PH PL B-8210 Zedelgem (BE). BRIDGE MEMBER PT RO RU SC SD SE SG SK SL SY TJ TM • TETE DE CLUB DE GOLF AVEC ELE- TN TR TT TZ UA UG US UZ VC VN YU (81) AE AG AL AM AT AU AZ BA BB BG BR MENT PONTANT ZA ZM ZW.
    [Show full text]
  • Man Fung Building, Yuen Long – Central / Wan Chai
    Residents’ Service Route No. : NR922 Destinations﹕Man Fung Building, Yuen Long – Central / Wan Chai Routeing (Man Fung Building, Yuen Long to Central)﹕ via Fung Kwan Street, Fung Yau Street East, Fung Yau Street South, Fung Kam Street, Fung Cheung Road, Castle Peak Road, Long Yat Road, Castle Peak Road, Pok Oi Interchange, Yuen Long Highway, Tsing Long Highway, North West Tsing Yi Interchange, Cheung Tsing Highway, Cheung Tsing Tunnel, Tsing Kwai Highway, West Kowloon Highway, Western Harbour Crossing, Sai Ying Pun Interchange, Connaught Road West, Chung King Road, Chung Kong Road, Macau Ferry Pier access road, Connaught Road Central, Man Kat Street, Connaught Road Central, Queen Victoria Street, Des Voeux Road Central, Chater Road, Murray Road, Yee Wo Street, Sugar Street and Gloucester Road,. Stopping Places: Pick Up﹕ No. 11-15 Fung Kwan Street Set Down﹕ 1. Chung King Road (Man Fung Building) 2. Chater Road Statue Square 3. Hennessy Road opposite to Southorn Playground 4. Gloucester Road outside Park Lane Hotel Departure time﹕ Mondays to Fridays Saturdays (except public holidays) (except public holidays) 7.10 am to 8.20 am 7.25 am (Frequency: 10-20 minutes) 7.50 am Routeing (Wan Chai to Man Fung Building, Yuen Long)﹕ via Lockhart Road, Luard Road, Gloucester Road, Harcourt Road, Cotton Tree Drive, Lambeth Walk, Charter Road, Jackson Road, Connaught Road Central, Connaught Road West, Sai Ying Pun Interchange, Western Harbour Crossing, West Kowloon Highway, Tsing Kwai Highway, Cheung Tsing Tunnel, Cheung Tsing Highway, North West Tsing Yi Interchange, Tsing Long Highway, Yuen Long Highway, Pok Oi Interchange, Castle Peak Road – Yuen Long, Yuen Long Tai Yuk Road, Ma Tin Road, Ma Tong Road, Fung Cheung Road and Fung Kam Street.
    [Show full text]
  • Public Transport Services in Hong Kong: a Voice from Hong Kong Scientific Platform
    Journal of Sustainable Development of Transport and Logistics journal home page: https://jsdtl.sciview.net Yuen, S. S. M. (2019). Public transport services in Hong Kong: A voice from Hong Kong Scientific Platform citizen (Policy paper). Journal of Sustainable Development of Transport and Logistics, 4(2), 22-31. doi:10.14254/jsdtl.2019.4-2.2. ISSN 2520-2979 Public transport services in Hong Kong: A voice from Hong Kong citizen (Policy paper) Simon S.M. Yuen The Hong Kong Polytechnic University, Hung Hom, Hong Kong, China College of Professional and Continuing Education (CPCE) [email protected] Abstract: Hong Kong is a city with a diversified public transport system. However, the number of private cars has increased abnormally, especially the completion of private housings in the Article history: New Territories and North Lantau, due to the daily work of the Received: July 25, 2019 urban areas or personal needs. The number of citizens of private 1st Revision: August 10, 2019 cars has increased significantly. In recent years, the problem of Accepted: November 12, "frequent and severe congestion" has resulted in the saturation 2019 of the more timely railways. The main reason is that the roads in the existing busy areas cannot meet the large number of private cars, and the major roads in the New Territories of Hong Kong DOI: and Kowloon have been subject to "frequent and severe 10.14254/jsdtl.2019.4-2.2 congestion". The Government's solution to the problem is to build roads and railways only. In recent years, many new roads and railways, the congestion of old roads and highways have not been improved.
    [Show full text]
  • Administration's Paper on Route 11 (Section Between Yuen Long And
    LC Paper No. CB(4)619/20-21(03) For discussion on 19 March 2021 Legislative Council Panel on Transport Route 11 (section between Yuen Long and North Lantau) – Investigation PURPOSE This paper seeks Members’ views on the following funding proposal – (a) the upgrading of part of 884TH “Route 11 (section between Yuen Long and North Lantau)” to Category A as 885TH “Route 11 (section between Yuen Long and North Lantau) – investigation” at an estimated cost of $319.0 million in money-of-the-day (MOD) prices; and (b) the retention of the remainder of 884TH in Category B. PROJECT SCOPE AND NATURE 2. Subject to the findings of the investigation study, the scope of 884TH comprises – (a) construction of a dual three-lane Lam Tei Tunnel of approximately 4.2 kilometres (km) long connecting Lam Tei and So Kwun Wat, which connects to Kong Sham Western Highway and Yuen Long Highway at Lam Tei, and Tai Lam Chung Tunnel and So Kwun Wat Link Road at So Kwun Wat; (b) construction of a dual four-lane Tai Lam Chung Tunnel of approximately 1.7 km long connecting So Kwun Wat and Tsing Lung Tau, which connects to Lam Tei Tunnel and So Kwun Wat Link Road at So Kwun Wat, and Tsing Lung Bridge and Tuen Mun Road at Tsing Lung Tau; (c) construction of a dual three-lane Tsing Lung Bridge of approximately 1.4 km long connecting Tsing Lung Tau and North - 2 - Lantau, which connects to Tai Lam Chung Tunnel and Tuen Mun Road at Tsing Lung Tau, and Lantau Link, North Lantau Highway and the proposed Tsing Yi-Lantau Link at North Lantau; (d) construction of a dual two-lane So Kwun Wat Link Road of approximately 2.9 km long, in which about 1.3 km is in the form of a tunnel, connecting Lam Tei Tunnel and Tai Lam Chung Tunnel with Tuen Mun Road near So Kwun Wat; (e) construction of the connecting roads, interchanges and slip roads for the above road sections; and (f) the associated building, civil, structural, electrical and mechanical, environmental and other related works, establishment of traffic control and surveillance system, etc.
    [Show full text]
  • Information Note Strategic Cavern Area No. 09 – Ting
    - 1 - CAVERN MASTER PLAN – INFORMATION NOTE STRATEGIC CAVERN AREA NO. 09 – TING KAU This Information Note describes the characteristics, key development opportunities and constraints of Strategic Cavern Area No. 09 - Ting Kau (the SCVA). It indicates the potential land uses suitable for cavern development within the area, but would not pre-empt other possible land uses put forward by the project proponents with justifications. It also denotes the extent of potential portal locations. The spatial context of the SCVA is illustrated in the Reference Drawing appended to this Information Note. Reference should be made to the Explanatory Statement of the Cavern Master Plan for its background and purposes, as well as the definition and delineation criteria of SCVAs. 1. Location Plan Information Note (SCVA09 – Ting Kau) - 2 - 2. Strategic Cavern Area Details Outline Zoning Plans (OZPs): Approved Tsuen Wan West OZP No. S/TWW/19 Approved Tsuen Wan OZP No. S/TW/33 Area: 82.2 ha Maximum elevation in the SCVA: +418 mPD Minimum elevation in the SCVA: +11 mPD 3. District Context Location The SCVA is located at Ting Kau in the western part of the New Territories. Yau Kom Tau is to the east of the SCVA, Sham Tseng is to the west, Tai Lam Country Park is to the north and Tsing Yi across Rambler Channel is to the south. The SCVA is generally hilly with a maximum elevation of about +418 mPD. The majority of the SCVA, including its northern and central portions, encroaches onto Tai Lam Country Park. Surrounding the SCVA, Ting Kau is a residential area with low-rise residential developments, including Royal Dragon Villa (about 50 m to the south of the SCVA) and a local village namely Ting Kau Village (about 150 m to the southwest of the SCVA).
    [Show full text]
  • Head 706 — HIGHWAYS (Expressed in Hong Kong Dollars)
    Capital Works Reserve Fund STATEMENT OF PROJECT PAYMENTS FOR 2017-18 Head 706 — HIGHWAYS (Expressed in Hong Kong dollars) Subhead Approved Original Project Estimate Estimate Actual up to Amended 31.3.2018 Estimate Actual $’000 $’000 $’000 Infrastructure Transport-Footbridges/pedestrian tunnels 6153TB Enhancement of footbridges in Tsim Sha Tsui East 71,400 370 55,387 370 3 6157TB Centre Street escalator link (stage 1) 60,700 - 53,409 50 42 6158TB Elevated walkway between Tong Ming Street and 221,600 30,000 Tong Tak Street, Tseung Kwan O 24,686 30,000 19,143 6164TB Footbridge connecting Tsuen Wan Plaza, Skyline 146,200 42,620 Plaza and adjacent landscaping area 11,993 42,620 11,993 6167TB Provision of barrier-free access facilities at public 292,100 13,695 footbridges, elevated walkways and subways- 230,887 13,695 10,122 design works and phase 1 construction works 6168TB Lift and pedestrian walkway system at Waterloo Hill 116,700 29,822 25,664 29,822 20,529 6169TB Lift and pedestrian walkway system at Cheung Hang 222,700 79,313 Estate, Tsing Yi 34,121 79,313 31,230 6173TB Extension of the CITIC Tower Footbridge to the 74,300 9,050 Legislative Council Complex at Tamar 49,323 9,050 1,505 6175TB Lift and pedestrian walkway system between Kwai 239,400 27,965 Shing Circuit and Hing Shing Road, Kwai Chung 22,393 27,965 22,393 6185TB Lift and pedestrian walkway system between Tai Wo 249,400 518 Hau Road and Wo Tong Tsui Street, Kwai Chung - 518 - Transport-Interchanges/bus termini 6045TI Transport terminus in Area 35, Tsuen Wan 20,900 20,900 -
    [Show full text]
  • M / SP / 14 / 172 San Tsuen ¥S SHEK LUNG KUNG –‰ Ú¥Oª SEE PLAN REF
    200 451 è¦K Catchwater 400 303 fih 100 The Cairnhill 100 ROUTE 314 TWISK 80 200 Ser Res 80 100 Catchwater Ser Res TAI LAM CHUNG RESERVOIR ú¥OªÐ 474 flA Kwong Pan Tin flW˘§⁄ł§¤‚˛†p›ˇ M / SP / 14 / 172 San Tsuen ¥s SHEK LUNG KUNG –‰ ú¥Oª SEE PLAN REF. No. M / SP / 14 / 172 Tso Kung Tam Kwong Pan Tin Tsuen “T FOR TSUEN WAN VILLAGE CLUSTER BOUNDARIES Fu Yung Shan fl” U¤á 315 80 j¤VÆ 300 Ha Fa Shan ¥—¥ flW˘ fl´« Pak Tin Pa TSUEN KING CIRCUIT San Tsuen 400 Allway Gardens 100 100 Tsuen Wan Centre fl”· 200 Tsuen King Garden ¤{ Ma Sim Pei Tsuen “T» ¥—¥ Pak Tin Pa fl Tsuen ·wƒ TSUEN KING CIRCUIT Adventist Hospital flw… A A ⁄· Tsuen Tak Garden Kam Fung r´º´s ½ Muk Min Ha Tsuen 200 259 Garden 200 Discovery Park ROUTE TWISK 300 A» 200 Summit C«s⁄‰⁄‚ CASTLE Terrace ã®W PEAK ROAD - TSUEN WAN CHAI WAN KOK _ b¥s D e NORTH Pun Shan Tsuen j ROAD HO ã®WÆ TAI C«fi Catchwater TSUEN WAN F¨L fi WAN ” fl CHAI WAN KOK STREET Fuk Loi Estate ñº¨· Tsuen Wan LineLuk Yeung 226 Catchwater HOI PA STREET Sun Chuen 3.3.5 TAI CHUNG ROAD TUEN MUN ROAD ¡º 200 SHA TSUI ROAD j¤ 300 oªa¬ Yau Kom Tau HOI SHING ROAD ½ CASTLE PEAK ROAD - TSUEN j¤e Village R˜« 8 HOI HING ROAD j¤VÆk¤ Ser Res ù Belvedere Garden flW Tai Lam Centre SAI LAU KOK j¤VÆg Ser Res for Women 100 flW˘ C Tai Lam Correctional 344 3.3.4 j¤F Institution M†§ s TAI HO ROAD ½ Tsing Fai Tong o“a‹Y New Village 1 fi‡ SHAM TSENG Yau Kom Tau ROAD flW˘ t¤s TSUEN WAN ê¶ `² w SETTLEMENT Treatment Works fl fi– Tsuen Wan HOI ON ROAD Yuen Tun Catchwater BASIN SHAM TSENG RÄ£³ A» Plaza W ³²w w… Lindo Green Greenview Court TSUEN WAN è¬w¼L MARKET
    [Show full text]