Federal Register/Vol. 70, No. 175/Monday, September 12, 2005
Total Page:16
File Type:pdf, Size:1020Kb
53790 Federal Register / Vol. 70, No. 175 / Monday, September 12, 2005 / Notices The Commission encourages g. Filed Pursuant to: Federal Power comment date for the particular electronic submission of protests and Act, 16 U.S.C. 791a–825r. application. interventions in lieu of paper, using the h. Applicant Contacts: Mr. James o. Filing and Service of Responsive FERC Online links at http:// Price, P.O. Box 5550, Aiken, SC 29804, Documents—Any filings must bear in www.ferc.gov. To facilitate electronic (803) 642–2749. all capital letters the title service, persons with Internet access i. FERC Contact: Any questions on ‘‘COMMENTS’’, who will eFile a document and/or be this notice should be addressed to ‘‘RECOMMENDATIONS FOR TERMS listed as a contact for an intervenor Mohamad Fayyad at (202) 502–8759, or AND CONDITIONS’’, ‘‘PROTEST’’, OR must create and validate an e-mail address: [email protected] ‘‘MOTION TO INTERVENE’’, as eRegistration account using the j. Deadline for filing comments and or applicable, and the Project Number of eRegistration link. Select the eFiling motions: October 7, 2005. the particular application to which the link to log on and submit the k. Description of Filing: The City of filing refers. All documents (original intervention or protests. Marion, Kentucky, and Smithland and eight copies) should be filed with: Persons unable to file electronically Hydroelectric Partners filed an Magalie R. Salas, Secretary, Federal should submit an original and 14 copies application to modify the configuration Energy Regulatory Commission, 888 of the intervention or protest to the of the Smithland Lock and Dam Project. First Street, NE., Washington, DC 20426. Federal Energy Regulatory Commission, The licensees propose to install three A copy of any motion to intervene must 888 First St. NE., Washington, DC generating units (as was originally also be served upon each representative 20426. authorized) instead of the currently of the Applicant specified in the The filings in the above proceedings authorized Hydromatrix design that particular application. are accessible in the Commission’s consists of 140 small generating units. p. Agency Comments—Federal, State, eLibrary system by clicking on the The proposed design would change the and local agencies are invited to file appropriate link in the above list. They installed capacity from 79.8 MW to 71 comments on the described application. are also available for review in the MW, and the hydraulic capacity from A copy of the application may be Commission’s Public Reference Room in 55,200 cfs to 49,000 cfs. obtained by agencies directly from the Washington, DC. There is an l. Locations of Applications: A copy of Applicant. If an agency does not file eSubscription link on the Web site that the application is available for comments within the time specified for enables subscribers to receive e-mail inspection and reproduction at the filing comments, it will be presumed to notification when a document is added Commission in the Public Reference have no comments. One copy of an to a subscribed dockets(s). For Room, located at 888 First Street, NE., agency’s comments must also be sent to assistance with any FERC Online Room 2A, Washington, DC 20426, or by the Applicant’s representatives. service, please e-mail calling (202) 502–8371. This filing may q. Comments, protests and [email protected], or call also be viewed on the Commission’s interventions may be filed electronically (866) 208–3676 (toll free). For TTY, call Web site at http://www.ferc.gov using via the Internet in lieu of paper. See, 18 (202) 502–8659. the ‘‘eLibrary’’ link. Enter the docket CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web Magalie R. Salas, number excluding the last three digits in the docket number field to access the site at http://www.ferc.gov under the ‘‘e- Secretary. document. You may also register online Filing’’ link. [FR Doc. E5–4955 Filed 9–9–05; 8:45 am] at http://www.ferc.gov/docs-filing/ Magalie R. Salas, BILLING CODE 6717–01–P esubscription.asp to be notified via e- Secretary. mail of new filings and issuances [FR Doc. E5–4961 Filed 9–9–05; 8:45 am] related to this or other pending projects. DEPARTMENT OF ENERGY BILLING CODE 6717–01–P For assistance, call toll-free 1–866–208– Federal Energy Regulatory 3676 or e-mail Commission [email protected]. For TTY, DEPARTMENT OF ENERGY call (202) 502–8659. A copy is also Notice of Application for Amendment available for inspection and Federal Energy Regulatory of License and Soliciting Comments, reproduction at the address in item (h) Commission Motions To Intervene, and Protests above. m. Individuals desiring to be included Notice of Application Tendered for September 6, 2005. on the Commission’s mailing list should Filing With the Commission, Soliciting Take notice that the following so indicate by writing to the Secretary Additional Study Requests, and application has been filed with the of the Commission. Establishing Procedural Schedule for Commission and is available for public n. Comments, Protests, or Motions To Relicensing and a Deadline for inspection: Intervene—Anyone may submit Submission of Final Amendments a. Application Type: Amendment of comments, a protest, or a motion to September 6, 2005. license to change project design and intervene in accordance with the capacity. Take notice that the following requirements of Rules of Practice and hydroelectric application has been filed b. Project No.: 10228–038. Procedure, 18 CFR 385.210, .211, .214. with the Commission and is available c. Date Filed: May 5, 2005. In determining the appropriate action to for public inspection. d. Applicant: Cannelton Hydroelectric take, the Commission will consider all a. Type of Application: Subsequent Project, L.P. protests or other comments filed, but license. e. Name of Project: Cannelton. only those who file a motion to b. Project No.: 1051–012. f. Location: The project would be intervene in accordance with the c. Date Filed: August 29, 2005. located at the existing Corps of Commission’s Rules may become a d. Applicant: Alaska Power & Engineers’ Cannelton Locks and Dam on party to the proceeding. Any comments, Telephone Company (AP&T). the Ohio River, Hancock County, protests, or motions to intervene must e. Name of Project: Skagway-Dewey Kentucky. be received on or before the specified Lakes Project. VerDate Aug<18>2005 15:25 Sep 09, 2005 Jkt 205001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\12SEN1.SGM 12SEN1.