Ice 4 (Br 412)
Total Page:16
File Type:pdf, Size:1020Kb

Load more
Recommended publications
-
The California High Speed Rail Proposal: a Due Diligence Report
September 2008 THE CALIFORNIA HIGH SPEED RAIL PROPO S AL : A DUE DILIGENCE REPOR T By Wendell Cox and Joseph Vranich Project Director: Adrian T. Moore, Ph.D. POLICY STUDY 370 Reason Citizens Against Howard Jarvis Taxpayers Foundation Government Waste Foundation reason.org cagw.org hjta.org/hjtf Reason Foundation’s mission is to advance Citizens Against Government Waste Howard Jarvis Taxpayers Foundation a free society by developing, applying and (CAGW) is a private, nonprofit, nonparti- (HJTF) is devoted to promoting economic promoting libertarian principles, including education, the study of tax policy and san organization dedicated to educating the individual liberty, free markets and the rule defending the interests of taxpayers in the American public about waste, mismanage- of law. We use journalism and public policy courts. research to influence the frameworks and ment, and inefficiency in the federal govern- The Foundation funds and directs stud- actions of policymakers, journalists and ment. ies on tax and economic issues and works opinion leaders. CAGW was founded in 1984 by J. Peter to provide constructive alternatives to the Reason Foundation’s nonpartisan public Grace and nationally-syndicated columnist tax-and-spend proposals from our state policy research promotes choice, competi- Jack Anderson to build support for imple- legislators. tion and a dynamic market economy as the HJTF also advances the interests of mentation of the Grace Commission recom- foundation for human dignity and progress. taxpayers in the courtroom. In appro- mendations and other waste-cutting propos- Reason produces rigorous, peer-reviewed priate cases, HJTF provides legal repre- research and directly engages the policy als. -
Mezinárodní Komparace Vysokorychlostních Tratí
Masarykova univerzita Ekonomicko-správní fakulta Studijní obor: Hospodářská politika MEZINÁRODNÍ KOMPARACE VYSOKORYCHLOSTNÍCH TRATÍ International comparison of high-speed rails Diplomová práce Vedoucí diplomové práce: Autor: doc. Ing. Martin Kvizda, Ph.D. Bc. Barbora KUKLOVÁ Brno, 2018 MASARYKOVA UNIVERZITA Ekonomicko-správní fakulta ZADÁNÍ DIPLOMOVÉ PRÁCE Akademický rok: 2017/2018 Studentka: Bc. Barbora Kuklová Obor: Hospodářská politika Název práce: Mezinárodní komparace vysokorychlostích tratí Název práce anglicky: International comparison of high-speed rails Cíl práce, postup a použité metody: Cíl práce: Cílem práce je komparace systémů vysokorychlostní železniční dopravy ve vybra- ných zemích, následné určení, který z modelů se nejvíce blíží zamýšlené vysoko- rychlostní dopravě v České republice, a ze srovnání plynoucí soupis doporučení pro ČR. Pracovní postup: Předmětem práce bude vymezení, kategorizace a rozčlenění vysokorychlostních tratí dle jednotlivých zemí, ze kterých budou dle zadaných kritérií vybrány ty státy, kde model vysokorychlostních tratí alespoň částečně odpovídá zamýšlenému sys- tému v ČR. Následovat bude vlastní komparace vysokorychlostních tratí v těchto vybraných státech a aplikace na český dopravní systém. Struktura práce: 1. Úvod 2. Kategorizace a členění vysokorychlostních tratí a stanovení hodnotících kritérií 3. Výběr relevantních zemí 4. Komparace systémů ve vybraných zemích 5. Vyhodnocení výsledků a aplikace na Českou republiku 6. Závěr Rozsah grafických prací: Podle pokynů vedoucího práce Rozsah práce bez příloh: 60 – 80 stran Literatura: A handbook of transport economics / edited by André de Palma ... [et al.]. Edited by André De Palma. Cheltenham, UK: Edward Elgar, 2011. xviii, 904. ISBN 9781847202031. Analytical studies in transport economics. Edited by Andrew F. Daughety. 1st ed. Cambridge: Cambridge University Press, 1985. ix, 253. ISBN 9780521268103. -
Railway Station Liège-Guillemins
Reference report Railway station Liège-Guillemins A shining example of a European transport hub in the Wallonia region Designing clean entrances Liège-Guillemins: Liège‘s high-speed railway station The most important railway station in the Belgian city of Liège and in Fresh momentum for the city the Wallonia region as a whole, Liège-Guillemins was erected in Sep- This image of communication and transparency stands in sharp con- tember 2009 on the basis of designs by Santiago Calatrava. It is a stop- trast to the structure that preceded it. The old railway station, a 1958 ping point for Thalys and Intercity-Express trains, making the station a building that had fallen into disrepair, attempted to exert a sense of hub within the European high-speed network that runs between Lon- control over the growing numbers of railway services it saw – but the don, Paris, Brussels, Amsterdam and Cologne/Frankfurt: the distance glass and steel work of art that replaces it exudes light and radiance between Cologne and Liège can now be covered in just under an hour. and has given fresh momentum to Belgium‘s third-largest city. Oth- A good 500 trains per day are accommodated by this through station, er projects involving the station are being planned and the recently whose monumental canopy transforms it into a real landmark. opened Médiacité shopping and media centre, designed by Ron Arad, has created another new highlight. The futuristic station complex has Guiding principles: Communication and transparency a pivotal role to play in all these developments. The steel and glass roof – at once powerful and delicate – hangs above the platform like a colossal wave and flows into the oscillating roof Daylight on every level that reaches up to 50 metres over the 33,000-square metre main hall. -
The ICE 4 the New Flagship of the DB AG in the Exact Scale 1:87
PIKO vehicle information 1:87 booklet 6/2019 The ICE 4 The new flagship of the DB AG in the exact scale 1:87 Also available as sound versions for direct and alternating current Electric multiple unit Class 412 / 812, ICE 4 Picture: M. Fröhlich In 2011, the Deutsche Bahn AG assigned Siemens Mobility with the construction of up to 300 new high-speed trains the use in Germany, Austria and Switzerland. The new Class 412/812 trains, which are being jointly developed by Siemens and Bombardier, will be powered by several power cars. The train configuration provides for various modular units ranging from five-car to 14-car trains. This concept allows the train to be easily adapted to the individual requirements of the transport companies for the desired acceleration, speed and number of seats. To date, the DB has ordered 85 twelve-car and 45 seven-car multiple units in the basic configuration, consisting of tractionless end and control cars, powered seating cars and on-board bistro as well as non-driven seating, dining and service cars. The seven-car multiple unit train has three powered cars and offers 456 seats over a length of 200 meters. A twelve-car multiple unit has six powered cars and 830 seats over a length of 346 metres. The maximum speed is 250 km/h. The external shape was based on the existing ICE fleet and further developed. Since December 2017, the first 12-car trains have been in regular service on the Hamburg-Würzburg, Stuttgart-Munich and Hamburg-Berlin-Munich lines. -
Ricardo Supports Siemens Mobility on New ICE Trains for Deutsche Bahn
Ricardo plc Shoreham Technical Centre, Old Shoreham Road, Shoreham-by-Sea, West Sussex, BN43 5FG, UK Tel: +44 (0)1273 455 611 • Fax: +44 (0)1273 794 556 • Web: www.ricardo.com • Registered in England: 222915 PRESS RELEASE 14 September 2020 Ricardo supports Siemens Mobility on new ICE trains for Deutsche Bahn Siemens Mobility has nominated Ricardo Certification in the role of Notified Body for its project to supply 30 new high speed intercity express (ICE) trains for German national railway operator Deutsche Bahn The new trainsets, based on the Velaro MS design and due to be delivered into service starting in 2022, are part of a one billion Euro investment by Deutsche Bahn (DB) to expand its mainline fleet. Ricardo Certification is accredited by the EU Agency for Railways as a Notified Body (NoBo). In this role, the company is accredited to provide conformity assessments of trains and subsystems against the relevant requirements of the European Interoperability Directives 2008/57/EC and 2016/797/EC. Specifically, Ricardo Certification will verify the new ICE trains in terms of compliance with the current European Technical Specifications for Interoperability (TSI) regulations, including the quality management system of the production process. Preparing DB for the future The new ICE trains will initially run on routes between the state of North Rhine- Westphalia and Munich via the high-speed Cologne-Rhine-Main line, increasing DB’s daily passenger capacity on these mainline routes by 13,000 seats. DB is investing in a strong future proof rail system and plans to expand its fleet by over 20 percent in the coming years. -
The ICE 4 Provide Very Good Wifi and Mobile Reception in All Networks
◊ ◊ ◊ The new flagship With innovative technology, the latest in travel comfort and an award- winning design, the new ICE 4 is the future backbone of our new long- distance transport service. ◊ ◊ ◊ 22 % lower energy consumption per seat compared to the ICE 1 ◊ ◊ ◊ Completely new drive system provides flexible train composition ◊ ◊ ◊ New WiFi and telephone technology The latest repeater generation and WiFi technology in the ICE 4 provide very good WiFi and mobile reception in all networks. Throughout the journey, the system accesses the fastest data networks and pools the network operators’ capacities so that higher data volumes can be processed. The new WiFi system allows customers to surf free of charge on our ICE trains as of January 2017 in 2nd class as well. ◊ ◊ ◊ More storage space for luggage New luggage racks, 60 to 182 cm wide, close to the seats ensure that large and heavy items of luggage can be stored at floor level. ◊ ◊ ◊ Innovative lighting concept The innovative lighting concept is daytime-sensi- tive and creates a pleasant atmosphere. The auto- matic control of light color and intensity takes into account the time of day and the season. The improved air-conditioning system is designed for temperatures of up to 45 degrees Celsius. The ICE 4 provides a total of 830 seats, 205 of which are in 1st class and 625 in 2nd class. ◊ ◊ ◊ 9,900 kW engine power ◊ ◊ ◊ The ICE 4 – our new force for more mobility ◊ ◊ ◊ With 13,400 horsepower – the most powerful ICE ◊ ◊ ◊ 250 km/h maximum speed ◊ ◊ ◊ Elegant restaurant area ◊ ◊ ◊ More room for families In addition to the remodeled compartment for young children with five seats and space for a stroller, there are significantly larger family areas (16 seats). -
Cfs0997all2.Pdf
Acknowledgements United States Department of Transportation Secretary Federico F. Peña; Rodney E. Slater Deputy Secretary Mortimer L. Downey Federal Railroad Administration Administrator Jolene M. Molitoris Deputy Administrator Donald M. Itzkoff Associate Administrator for Railroad Development James T. McQueen Deputy Associate Administrator for Railroad Development Arrigo P. Mongini Study manager; general editor; principal writer Neil E. Moyer System benefits; financing; Alice M. Alexander Magnetic levitation John T. Harding contract administration James L. Milner Transportation analysis Bruce Goldberg Chapter 1; liability; State Gareth W. Rosenau Helen Ng opportunities Volpe National Transportation Systems Center Senior study advisor; Volpe Center project manager Ronald A. Mauri Travel demand forecasting Simon P. Prensky System concept definition Michael N. Coltman David M. Nienhaus Leonore I. Katz-Rhoads Sarah J. Lawrence* Robert P. Brodesky* Model implementation: Todd C. Green* Energy and emissions model Howard M. Eichenbaum* projections of operating results David L. Skinner implementation and investment needs *EG&G/Dynatrend Argonne National Laboratories Charles River Associates Energy and emissions model Donald M. Rote Demand model development Dan Brand development Zian Wang Thomas E. Parody Mark R. Kiefer DeLeuw, Cather & Co. and Associated Firms DeLeuw, Cather project manager Michael Holowaty Operating expense model Duncan W. Allen Ancillary activities model Steven A. LaRocco development Winn B. Frank development Richard L. Tower (Wilbur Eric C. MacDonald Smith) Charles H. Banks (R.L. Banks) Public benefits model design and Guillaume Shearin Liability Charles A. Spitulnik implementation Robert J. Zuelsdorf (Wilbur (Hopkins & Sutter) Smith) Kenneth G. Sislak (Wilbur Anne G. Reyner (Wilbur Smith) Smith) Jeffrey B. Allen Parsons Brinckerhoff Quade & Douglas, Inc. Parsons, Brinckerhoff project manager John A. -
The Uk's Intercity Express Programme
Asia Pacific Projects Update CASE STUDY: THE UK'S INTERCITY EXPRESS PROGRAMME bidder by the DfT in February 2009. The solution selected KEY CONTACT by DfT was the Hitachi Super Express Train (SET) initially to be built and assembled by Hitachi in Japan Colin Wilson with later SETs being assembled at a state-of-the-art new Partner and London Head of Projects facility to be constructed for the project at Newton T +44 20 7796 6206 Aycliffe in Darlington, UK. [email protected] IEP is the most significant rolling stock investment program in the UK for 30 years, creating 730 new jobs in PPP FINANCING TO REPLACE THE EXISTING the rail industry, 200 in construction and thousands more INTERCITY 125 AND 225 ROLLING STOCK ON in the supply chain. THE UK NETWORK Given the size of the overall program, the transaction has The Intercity Express Programme (IEP) is the UK been split into two: (i) an initial funding for the Great Department for Transport (DfT) program to replace the Western Mainline (GWML) fleet, which has now reached older intercity trains currently running on the rail network financial close; and (ii) a second financing for the East in mainland UK with new trains in a major public-private Coast Mainline (ECML) fleet for which a commercial partnership (PPP) project that is both the biggest privately close has been achieved, and for which financial close is financed rolling stock deal in history, anywhere in the targeted for 2014. world, and one of the largest, most ambitious and complex PPP projects to date. -
El Tren De Pasajeros, Metro Y La Propuesta De Alta Velocidad Alumno: José Luis González Campillo [email protected] Fecha De Entrega: Lunes 25 De Enero De 2021
1 Universidad Nacional Autónoma de México Facultad de Ingeniería Materia: Ferrocarriles Semestre 2021-1 Prof. Jaime de Jesús Paredes Camacho [email protected] El tren de pasajeros, metro y la propuesta de alta velocidad Alumno: José Luis González Campillo [email protected] Fecha de entrega: lunes 25 de enero de 2021 Tren arribando a la estación Flughafen/Messe del tren de cercanías (S-Bahn) de Stuttgart, Alemania 2 Índice I. Introducción 3 II. Marco teórico 5 II.1. Un poco de historia del ferrocarril 5 II.2. Ferrocarril de pasajeros en el mundo 8 II.2.1. Ferrocarril de larga distancia 10 II.2.1.1. Tren de alta velocidad 11 II.2.1.2. Tren interurbano 12 II.2.1.3. Tren regional 13 II.2.1.4. Tren de mayor velocidad 14 II.2.1.5. Tren nocturno 15 II.2.2. Ferrocarril de corta distancia 15 II.2.2.1. Tren de cercanías 16 II.2.2.2. Metro 17 II.2.2.3. Tranvía 18 II.3. Trenes de alta velocidad 19 II.3.1. Italia 23 II.3.2. Japón 25 II.3.3. Francia 28 II.3.4. Alemania 30 II.3.5. España 32 II.3.6. China 34 II.3.7. Corea del Sur 37 II.3.8. Otros sistemas de alta velocidad 39 II.3.9. Cuestiones técnicas 42 II.3.10. Estadísticas generales de la alta velocidad ferroviaria 45 II.4. Sistemas de metro 45 II.4.1. El metro en el mundo 48 II.4.2. Datos operativos 54 II.5. -
Development of Class 800/801 High-Speed Rolling Stock for UK Intercity Express Programme
646 Hitachi Review Vol. 63 (2014), No. 10 Featured Articles Development of Class 800/801 High-speed Rolling Stock for UK Intercity Express Programme Andrew Rogers OVERVIEW: Hitachi was formally awarded a rolling stock manufacturing Chris Robinson and maintenance contract for the UK IEP project in July 2012 through Koji Agatsuma Agility Trains Ltd. Including additional orders, the contract covers the manufacture of a total of 866 cars and the provision of maintenance services Mitsuo Iwasaki for a period of 27.5 years. With a total value of 5.8 billion pounds, the IEP Satoru Inarida, Dr. Eng. is the largest project in the history of British railways, and is intended to Takahisa Yamamoto replace the aging rolling stock on the UK’s East Coast Main Line and Great Kenta Konishi Western Main Line, which run between London and other major cities in the Toshihiko Mochida UK. The Class 800/801 rolling stock for the IEP was developed based on the A-train concepts of lightweight aluminum carbodies and self-supporting interior modules by taking technologies developed in Japan to provide lighter weight and higher speed and applying them to UK railway systems. It will contribute to the provision of high-quality and reliable railway services, with commercial operation scheduled to commence in 2017, following operation trials in the UK that will start in 2015. (ECML) and Great Western Main Line (GWML), that INTRODUCTION have been in service for more than 30 years(1). The IEP HITACHI developed the Class 800/801 rolling stock is an initiative of the UK Department for Transport. -
DB Event-Ticket
TRAVEL SAFELY In cooperation with Deutsche Bahn (German Rail), in cooperation with Leonardo Hotels offers you an exclusive opportunity Deutsche Bahn to travel relaxed and comfortably to your event in 2021. Travel safely, you are in good hands. We ensure a secure stay on site with our comprehensive and officially certified hygiene concepts. Find more information here. By the way: In trains of Deutsche Bahn you always travel with 100% renewable energy. DB EVENT TICKET + CITYTICKET* For a specific train1,2 SAFE TRAVELS: By constantly reviewing and adapting the hygiene and security concept to current circumstances, 2nd class » 49.50 € e.g. modified reservation rules. 1st class » 80.90 € NEW PAYMENT OPTIONS: In addition to credit card payment, Deutsche Bahn also offers its passengers the option of paying with PayPal or paydirekt. Totally flexible1,2 NON-STOP WIFI for more comfort: Once logged in, you can remain constantly online with WIFI@DB, even at stations and 2nd class » 67.50 € when switching train. 1st class » 98.90 € THE NEW TIMETABLE offers you a connection from Hamburg to Berlin every half hour as well as more direct connections between Berlin and Bonn as well as Munich and Zurich. BOOK YOUR TICKET » 15 NEW ICE 4-TRAINS provide increased seating capacity and comfort since December. FURTHER INFORMATION Book your ticket here: www.leonardo-hotels.com/meetings You collect BahnBonus points if you own a BahnCard, BahnCard Business or BahnBonus Card. Further information: www.bahn.com/bahn.bonus 1. This offer is valid until December 11, 2021 2. If you have any technical questions regarding the booking process, simply call +49 (0)30 – 58 602 0901. -
March 1992 Safety of High Speed
U.S. Department John A Volpe Kendall Square of Transportat~on Nalional Transportat~on Cambridge Massachusetts 021 42 Systems Center Research and Special Programs Administration March 1992 Safety of High Speed Magnetic Levitation Transportation Systems: German High-Speed Train Safety Requirements - Potential for Application in the United States Interim Report February 1992 DOT/FRA/ORD-92/02 ERATTA Page 7-14 Revise the first two complete paragraphs as follows: The draft MBO requires that the system operator establish measures that will minimize the potential for accidents, minimize the consequences of accidents that do occur, support individual rescue, and facilitate the rescue of others. The operator is also required to summarize these measures (in terms of infrastructure, vehicles, service, and rescue), particularly for tunnels, and to present them to the "competent authorityI1 (undefined) for approval. It also states that the system operator is obligated to manage the maglev operations safely and to maintain the facilities, vehicles, and accessories in I1a good, operationally safe condition." The EBO requires that new vehicles not be placed into service for the first time until they have been demonstrably tested. Page 9-7 The last sentence of the first paragraph should read as follows: In addition, the natural environment is a source of background levels of both steady (dc) and variable (ac) electrical and magnetic fields, and of electromagnetic radiation [46, 47, and 481. Page 9-15 Third sentence of second complete paragraph should read as follows: Magnetic fields are higher in the train operator cabin (about double) than in the passenger area. Technical Report Documentation Page 1 Report No 2.