Version: 2.7 Operational Plan Rail Baltica Track Layout – Time Horizons 2026 – 2036-46 – 2056 Date: 08.01.2021 Main Track Part 1 Helsinki Tunnel entrance Rae freight station 8.548

Infrastructure Maintenance Tallin- Iru Junction facilities Ülemiste north station Tallin-Ülemiste station 0.000 (Helsinki Shuttle tracks)

405

405 Narva/ 200 Baltii Jam Tartu

500 500 10.936 6.160 Cleaning Ülemiste car shuttle facility FinEst-link loading station shuttle terminal service (km 9 from Iru depot junction Maintenance assume suff. Overall 0.000 1.450 hall 7,61 9.998 capacity) 12.386 distance

FinEst tunnel Legend Rapla Tunnel station Tunnel Operational point Pasila entrance Track Layout in 2026 11,46 entrance station 107.400 with indication of line-km 5.600 93.000 Track Layout in 2036-46 0.000 Airport link 1524 mm Track Layout in 2056 7 / 6 0/18,696 Interfaces to local facilities/ Freight Planning section border terminals other projects with change of line-km Helsinki and depots station Helsinki-Vantaa 92,33 (approx. Track 1520 mm 7,00 89.630 Airport station km 112) 106.530 Dual gauge track 1435/1520 mm change of line-km Optional track Speed on specific turnout 230 Passenger platform in diverging direction 405 210 (405 m / 210 m) 6,10 Turnout with indication of line- km

Water front Ro/Ro and Muuga Freight container terminal 24 tracks in total Other Abbreviations Legend Terminal Water front 1.200 1.450 18 tracks loading points 2.710 2.800 3.800 RBE-Rail Baltica CR-Change Request 0 ALT-Alternative 16.700 RB-Rail Baltica EDzL-Eiropas dzelzceļa līnijas CG-Gauge changing facility Rae IMF-Infrastructure maintenance facility Junction DS-Design section (9a) LGI-Lietuvos Geležinkelei Infrastruktura EE-Estonia LV-Latvia LT-Lithuania

Main Track Part 2

Kurtna Saku station Rapla station station station 16.066 Maintenance point 10.080 3.936 station station 1.518 11.479 3.095 Emergency platform 220 220 (210m /option 405 m) 220 210 220 220 Tallinn Latvia

210 220 220 Emergency platform 220 220 (210m /option 405 m) 220

17.208 40.335 45.815 59.890 61.408 77.115 Overall distance 12.929 20.303 27.288 33.274 36.399

Main Track Part 3

Pärnu 1520yard Järvakandi freight Urge Pärnu station station 9.621 station station Häädemeste station station 7.800 Surju station Factory siding 16.050 25.600 station 11.600 3.720 17.800 3.768 3.650 220 405 210

220 210 210 210 Tallinn 405 Latvia 210 220 210 210

220 405 210

Pärnu River

IMF Direct Terminal

Overall 77.115 86.736 91.087 94.855 106.919 111.060 127.110 135.360 138.800 139.440 143.559 156.360 187.513 188.914 200.313 distance

Main Track Part 4 Valga

Vangaži Salacgrīva Skulte Loop station station Ādaži 2.757 Tuja Vangaži 13.350 61.700 loop station station 43.000 Maintenance/regional 86.200 Regional train parking 0.865 storage sidings 220 210 210 Limbaži 210 Estonia Lithuania 210

IMF track connection Riga 220 210 210 Freight terminal track connection Port Access track Reversing siding 210 Access to (for manoeuvres) Gauja River Vangaži freight Skulte 88.500 terminal freight terminal Riga 200.313 214.510 226.113 237.960 262.86 266.013 287.360 289.660 294.113 294.978 295.132 296.87 307.996 Overall distance

Main Track Part 5

Upeslejas Upeslejas Slāvu tilts Torņakalns station Triangle North Triangle West Acone station Imanta 12.249 Riga Central junction junction Saurieši station Krustpils 0.425 Jelgava Zasulauks station Riga bypass station station station 7.713 4.325 Daugava River 7.877 12.296 1.007 Riga bypass 0 1.356

405 7.332 210 210 210 210 210 210 Estonia tunnel Lithuania 405 210 210 210 210 210 210 4 reception tracks 12.383 4 depot tracks Acone depot Depo 7 storage sidings

Zemitāni Bolderāja Overall307.996 315.873 320.807 325.132 333.056 336.221 338.060 338.759 339.184 346.472 346.629 distance

Riga Bypass

Salaspils intermodal terminal

Krustpils

Salaspils Salaspils / Salaspils Ro-Ro Reception / Bulk+transfer parking sidings Gauge Changing Salaspils Baldone station station 5.410 126.250 With emergency 137.950 International platforms 405 210 Estonia Lithuania

405 210 Riga

Riga Central Salaspils freight Misa Triangle Station West junction Daugava River 128.000

Overall distance0 .000 8.718 10.620 17.218 26.718 28.550(bypass ending) (bypass) Main Track Part 6

Riga airport Riga airport Kekava Riga Bypass station Jaunmārupe station station station cargo yard Estonia 1520 mm 32,95 station 11.542 20.749 Iecava 105.620 Possible Jaunmārupe depot passing rail Iecava 6.608 14.597 Riga bypass LV 118.140 loop 5.678 220 210 210 405 210 210 Estonia 250 Lithuania 405 210 Service platform 210 210 Regional train 220 Misa Triangle 210 storage sidings West junction Optional for Optional for connect connect IMF 0.539 Misa Triangle IMF South junction

Overall346.629 350.850 351.145 357.753 362.687 371.894 383.074 383.613 388.752 389.422 396.422 423.520 433.914 distance

Main Track Part 7 Panevėžys

Panevėžys Uliūnai Vaškai Ramygala Joniškėlis passenger passing passing station station Regional unit sidings station loop loop Crossover 5.020

12.510 Industrial area 14.220 0.302

1.335 32.197

210 220 405 Kaunas/ Latvia Poland 405 220 210 1520&1435 yards

Loading ramp

IMF tracks

1520 IMF track CG

Klaipeda

Šiauliai/

Overall433.914 446.424 448.406 466.996 468.331 499.193 499.946 514.166 524.397 524.699 529.417 distance

Main Track Part 8

Kaunas

Vilnius Triangle East 230 9.300 230 junction

88,80

max max Anciškis Jonava passing loop Chainages for Kaunas triangle are first passing Crossover Pasraučiai estimates and need to be updated after 4.116 preliminary design is finished. loop station 23.574 Jonava Jonava 5.284 Ruciunai 10.791 General cargo loading station station area 1.363 8.703 0 Palemonas 5.000

220 Optional avoiding line (to bypass KUN station) 5.180

170 220 220 230 max 170 Latvia max 230 Palemonas 220 220 230 230

220 170 88.80 +

Kedainiai/ Karmelava Infrastructure Heavy

Klaipeda 5.400 freight station Maintenance Base Kaunas (Terminal / 405 Triangle South Freight yard Parking/ Rolling Neris River stock workshop) junction

Optional industrial siding to Kaunas FEZ 405

Kaunas Airport station Overall 535.188 547.971 553.596 558.881 571.298 572.661 573.183 575.414 580.001 581.798 583.494 588.494 distance

Main Track Part 9

Palemonas station Jiesia 2.600 1.500 0.000 -0.500 Junction 15.520 / Terminating 210 85.720 Gaiziunai Emergency platforms trains (Vilnius) 405 Industrial Industrial siding siding Turning Lithuania 405 sidings 405 Poland Kaunas 405 tunnel 17.570 / 85.720 Kazlų Rūda Palemonas Freight Station 8 tracks 18 tracks 7.050 8.780 Kaunas Central Station 9.620 River Nemunas Kaunas Node

Overall 603.371 611.490 614.110 614.470 622.06 distance

Main Track Part 10 Marijampolė Passing loop 35.00 Šeštokai Mockava optional station station Juragiai Ąžuolų Būda Marijampolė Marijampolė Intermodal Alytus terminal Passing loop Passing loop North junction optional freight station South junction (existing) LT / PL 78.000 57.500 42.500 optional 29.000/14.500 0.000 0.000 passenger station Passing loop Existing line 210 18.500 (1435 mm) Jiesia Poland Junction

210 Marijampolė station

8.400 28.550 5.350 210

Kazlų Rūda

Overall 629.780 650.280 672.780 692.780 707.940 distance

Kaunas - Vilnius

Kaišiadorys bypass Lentvaris station Vievis Crossover 15.400 station Crossover 77.000 Kaišiadorys Žasliai 40.200 28.000 Paneriai 77.600 station passing loop 0.870 Junction 65.500 56.500 11.000 210 210 210 8.980 Naujoji Vilnia 405 Latvia/ Palemonas Paneriu 405 RS depot / 210 210 210 Depot? Vilnius 405 terminal 405 Airport station Vaidotų Terminal 3.300 Reception sidings Palemonas Juodšiliai 7 tracks

1.350 loading sidings 0.000 Overall distance 65.500 56.500 40.200 15.400 11.000 0.000 Poland (based on E75 project LT-PL border to Elk )

LT / PL Punsk PODG Papiernia Wschodkm 0 / Polule station PODG Suwalki Wschod PODG Suwalki Poludnie PO Suwalki Poludnie 35.454 LK39 27.150 station 23.500 km 1.620 LK51 km 38.300 LK39 km 37.080 LK39 km 94.805 LK40 11.000 km 1.257 LK518 LK 39 to Suwalki km 0.000 LK518

210

210

210 210

707.940 711.590 724.090 733.833 735.090 736.310 737.936 Overall distance

Poland (based on E75 project LT-PL border to Elk )

Papiernia Bocznica TRACK TEC station Raczki PODG Kijewo km 14.500 km 34.000 station Norki station km 6.050 LK39 LK41 km0.000 LK39 LK 39 km 19.000 km 0.000 LK519 LK 519 do Zalyk (Olecka) LK 41 do Olecka LK 41 km 1.800 210

Punsk

LK 517 do Lasu Suwalskiego 210

739.390 754.390 767.340 773.390 Overall distance

Poland (for informative purpose only)

Białystok Ełk 189.800 LK 41 km 1,8/ Warszawa OP km 84.628 station 86.600 405 Centralna 405 374.300

210 405 405

Norki

210 Freight bypass 405 5 km shorter

891.262 1075.760 Overall distance 788.062