PROJECT SUMMARY Dulmi Stone Deposit Is Situated Near Village-Siru
Total Page:16
File Type:pdf, Size:1020Kb
PROJECT SUMMARY Dulmi Stone Deposit is situated near Village-Siru, Block - Dulmi, District-Ramgarh, Jharkhand over an area of 9.50 hectares (23.474 Acre). The LOI has been issued in favour of Sri Mukesh Kumar (Director)M/s M/s Elite Power Project and Construction Pvt.Ltd, by state Government vide letter no. 1173 on date 27-05-2019. Copy attached as (Annexure – I). The proposed rate of production is 349428.04 TPA of Stone. The estimated project cost is Rs 45 Lakhs. The expected life of mine is 10 years. Salient feature Environmental setting Project Name Dulmi Stone Deposit Location of mine Village: Siru Tehsil- Dulmi District: Ramgarh State :- Jharkhand Site co-ordinate Latitude- 23°32'58.81"N - 23°32'57.84"N Longitude - 85°38'32.09"E – 85°38'31.60"E Toposheet number 73E/10 Land use 9.50 ha (23.474) Minerals of mine Stone Total mineable reserves 34,93,833.60 tons Life of mine 10 years Total Proposed production of mine 3,49,428.04 TPA Method of mining Open Cast semi Mining method No of working days 300 days Water demand 9.1 KLD Sources of water Water will be taken from Private tanker. Man power 44 Nearest Railway Station Chitarpur Railway station, approx. 2.0 km toward North direction 1 Nearest State Highway/National NH- 23, approx, 3.0 km towards NorthDirection. Highway Nearest Airport Bisra Munda Airport, approx. 31.0 km towards SW direction. Seismic Zone Zone III Location The mining lease area is located in Village Siru, Block – Dulmi, District Ramgarh , Jharkahnd . The project site is located at: Latitude- 23°32'58.81"N - 23°32'57.84"N Longitude - 85°38'32.09"E – 85°38'31.60"E . Size or magnitude of operation The proposed mine has lease over an area of 9.5 ha. The total extractable material would be approx. 349428.04TPA. Method of mining Mining of Stone in the area shall be accomplished by Opencast Semi Mechanized Mining method of working with adoption of drilling & blasting. It is planned to achieve a production of 349428.04 TPA. A barrier zone of 7.5 m will be left all along the lease boundary. The following mining parameters are proposed. Type of working : Opencast semi mechanized mining Bench height : 6m Bench width : 6m (working width) Overall pit slope of dump : 600 maximum Employment Generation The total direct manpower requirement for the proposed mining operation will be around44 Significant Indirect employments is also expected due to the associated activities. This project 2 operation will provide livelihood to the poorest section of the society. Depending upon the General shifts working, following will be the proposed manpower. Employment detail SI. No Designation of Employee No. of persons 1 Manager 2nd Class 01 2 Mining Mate 01 3 Blaster 02 4 Blaster healper 02 5 Munshi (Official Staff) 02 6 Compressor Operator 04 7 Driller 04 8 Porcelain operator 04 9 Tripper operator 08 10 Miner (Semi Skilled) 6 (inclusive of absentees & leave) 11 Unskilled 10 Total 44 Water Requirement Total water requirement will be 9.1 KLD. This water will be supplied by private tankers. Activity Water requirement (KLD) Drinking 1.98 Dust Suppression 2.1 Plantation 5.0 Total 9.1 KLD Solid Waste Generation & its Disposal There is no material which can be called as waste. SITE ANALYSIS Connectivity Particulars Distance/direction Nearest Railway Station Chitarpur Railway station, approx. 2.0 km toward 3 North direction. Nearest Airport Bisra Munda Airport, approx. 31.0 km towards SW direction. Nearest Highway NH- 23, approx, 3.0 km towards NorthDirection. Green belt About 5000 trees will be planted in next five years. Plantation will be raised along both sides of roads and civic amenities in consultation with the local authorities. PROJECT SCHEDULE & COST ESTIMATES The project will commence once Environmental Clearance and other necessary certificates are obtained from the respective departments. The Total cost of project would be around Rs. 45 lakhs. Environmental Management Plan The environmental management plan consists of the set of mitigation, management, monitoring and institutional measures to be taken during the implementation and operation of the project, to eliminate adverse environmental impacts or reduce them to acceptable levels. The present environmental management plan addresses the components of environment, which are likely to be affected by the different operations in the mine area. Budget Allotted for the Environmental Management Plan:- SI. No. Measures Capital Cost Recurring Cost (In Rs.) (In Rs.) 1. Pollution Control 1,00,000 50,000 Dust Suppression /Water Sprinkling 2. Pollution Monitoring i) Air pollution 80,000 ii) Water pollution 30,000 iii) Soil Pollution 10,000 iv) Noise Pollution 10,000 3. Green belt development 2,00,000 1,00,000 4 4. Construction & Maintenance of haul road 2,00,000 50,000 Total 5,00,000/- 3,30,000 Social Infrastructure The Applicant shall spend some amount of project cost for the development of the area as per the local needs i.e. treatment of poor, schools, temples and other social work. Budget for Corporate Environment Responsibility (CER) SI. No. Activity Capital Cost (in Rs.) 1 Drinking water facilities by constructing two bore wells in Siru 1.00, 000/- villages 2 Educational support & sanitary facilities in schools for poor 80, 000/- students TOTAL (in life time) 1,80,000/- ******************** 5 .