Pre-Feasibility Report for North-West (NW) Quarry of Pakri Barwadih (PB

Total Page:16

File Type:pdf, Size:1020Kb

Pre-Feasibility Report for North-West (NW) Quarry of Pakri Barwadih (PB Pre-Feasibility Report for North-West DOC. NO.: 7010/999/GOG/M/001 (NW) Quarry of Pakri Barwadih (PB) REV. NO.: 1 REV. DATE: 10.10.2018 Coal Mine Block (3.0 MTPA) Page 1 of 22 1.0 EXECUTIVE SUMMARY The NW Quarry area of Pakri Barwadih Coal Mine Block is part of North Karanpura Coalfield and is present in villages Bariatu, Basaria, Beltu, Jabra, Kandaber, Nawadih, Sirma and Urub, district Hazaribagh in Jharkhand state. Area of the block is 485.159 ha. The project falls under category A and Schedule 1 (A) as per MoEF&CC notification dated 14.09.2006 and its amendments till date. Mining is proposed to be carried out in two pits namely PIT-1 and PIT-2 by Open-cast method. Shovel dumpers are proposed for excavation, loading and in pit transportation. Drilling & Blasting is proposed for coal and OB. Crushing is proposed for reduction of coal from ROM to (-50) mm size. Coal evacuation will be done by 20-40T dumpers from PB (NW) quarry to the Banadag siding. Proposed production from the mine is 3 MTPA. The salient features of the project are given in Table 1. TABLE 1 SALIENT FEATURES OF THE PROJECT Project name North West (NW) Quarry of Pakri Barwadih (PB) Coal Mine Block Project proponent NTPC Ltd. Villages in block area Bariatu, Basaria, Beltu, Jabra, Kandaber, Nawadih, Sirma and Urub Coordinates Latitude: 23°54'08" N to 23°55'40" N Longitude: 85°09'19" E to 85°11'11" E Area ML area: 485.159 ha. Pre Mining land use Sl. Type Area in ownership and pattern No. ha I. Within ML 1 Tenancy Agricultural 113.557 Habitation Grazing Barren 2 Govt. Agricultural 19.713 Non Habitation Forest Grazing Barren 3 GMJJ 24.666 4 Forest Forest 327.224 Total 485.16 II. Outside the ML No additional land is required for the colony of NW Quarry and PAF’s of NW Quarry. They may be accommodated /adjusted within the earlier acquired land for Rehabilitation for Colony & Township of PB Coal Block. Pre-Feasibility Report for North-West DOC. NO.: 7010/999/GOG/M/001 (NW) Quarry of Pakri Barwadih (PB) REV. NO.: 1 REV. DATE: 10.10.2018 Coal Mine Block (3.0 MTPA) Page 2 of 22 Coal reserves Sl. Description Reserves (Mt) No. 1 Net Geological Reserve upto seam K1 137.584 2 Reserves blocked in batter and barrier 31.804 3 Extractable reserves (1-2) 105.78 4 Additional reserves from common 33.18 boundary batter and barrier between PB(W) and PB(NW) 5 Total Extractable reserve in NW Quarry 138.96 (3+4)* Note-* Overall till the exhaustion of PB (NW) Quarry Rated capacity 3 MTPA Life of the mine 52 years including 3 years of construction Stripping ratio 3.15 Total OB Generation 438.24 MCM Method of Mining Opencast (OC) Method Blasting Required for ooverburden and coal prior to excavation Explosives Site Mix Slurry and 3T Magazine Working days 3 shifts of 8 hour each for 330 days Manpower Approx. 862 Transportation By road up to Banadag Railway Siding / Yard Expected cost of the ₹ 912.32 Crores project Elevation 430 m to 460 m above mean sea level Topography Undulating topography with general slope towards south Water requirement 0.81 MLD (0.41 MLD: potable and 0.40 ML: for industrial purpose) Source of water Potable: Bore-wells; Iindustrial: Treated mine discharged water Power requirement 8.5 MVA Power source From JUSNL (Jharkhand Urja Sanchar Nigam Ltd), Patratu at 220 KV to Main receiving Substation of 220/33/11 KV at Pakri Barwadih 2.0 INTRODUCTION 2.1 Identification of project and project proponent Project: North West (NW) Quarry of Pakri Barwadih (PB) Coal Mine Block The Pakri Barwadih North-West is a part of Pakri Barwadih Coal Mine Block, located in North Karanpura Coalfields in Hazaribagh district of Jharkhand state. The block has been allocated to NTPC Ltd., for captive mining for supply of coal to their super thermal power stations by Ministry of Coal, Government of India vide letter no. 13016/29/2003-CA, New Delhi, dated 11th Oct 2004 & DO No.13016/29/2003-CA dated 24th August 2005 for a total area of 46.26 sq. km. Pre-Feasibility Report for North-West DOC. NO.: 7010/999/GOG/M/001 (NW) Quarry of Pakri Barwadih (PB) REV. NO.: 1 REV. DATE: 10.10.2018 Coal Mine Block (3.0 MTPA) Page 3 of 22 Mining Plan for the block (excluding NW part) was prepared by M/s MECON based on the Geological Report on Coal Exploration (2005) prepared by CMPDI on the partly explored block. MOC approved a Mining Plan for targeted capacity of 15 MTPA, which did not include NW part. The detailed exploration work of North West Section (PB-A) was completed By M/S MECL and the Geological Report was submitted to NTPC in October 2012. Subsequently, revised Mining Plan 1st Revision- 2016 (including the NW area) was prepared in-house by NTPC for a rated capacity of 18 MTPA and submitted to MoC for approval in Sept’15 and was approved by MoC vide letter dated 07.03.2016. The revised Mining Plan envisages a production capacity of 15 MTPA form West & East Quarry and 3 MTPA from North-West Quarry (NW Quarry). Project proponent NTPC Limited (A Govt. of India Enterprise), is the largest power generating company in India. It was set up by Government of India (GoI) in November, 1975 with the objective of planning, promoting and organizing integrated development of thermal power in the country. In 1997, NTPC was conferred “Navratna” status by GoI and in 2007, it became the first public sector company to be granted “Maharatna” status. NTPC is now emerging as a well-diversified company on its way of becoming an Integrated Power Major, having entered into hydro power, coal mining, power trading, equipment manufacturing, power distribution business and renewable energy generation. Company also plans to enter into nuclear power development. Presently, NTPC generates power from Coal, Gas, Hydro and Renewable (i.e. Solar and Wind) projects. With an installed capacity of 53,651 MW (as on April 2018), NTPC is the largest power generating major in the country. Additional capacity of about 21,000 MW is under construction at various locations in India. NTPC has also diversified itself into coal mining, power equipment manufacturing, power trading & distribution. With an increasing presence in the power value chain, NTPC is well on its way to becoming an Integrated Power Major. 2.2 Need for the project and its importance to the country and or region Coal is the most important and abundant fossil fuel in India. It accounts for 55% of the country's energy need. The country's industrial heritage was built upon indigenous coal. Commercial primary energy consumption in India has grown by about 700% in the last four decades. The current per capita commercial primary energy consumption in India is about 350 kg/year which is well below that of developed countries. Driven by the rising population, expanding economy and a quest for improved quality of life, energy usage in India is expected to rise. Considering the limited reserve potentiality of petroleum & natural gas, eco-conservation restriction on hydel project and geo-political perception of nuclear power, coal will continue to occupy centre-stage of India's energy scenario. Indian coal offers a unique eco- friendly fuel source to domestic energy market for the next century and beyond. Pre-Feasibility Report for North-West DOC. NO.: 7010/999/GOG/M/001 (NW) Quarry of Pakri Barwadih (PB) REV. NO.: 1 REV. DATE: 10.10.2018 Coal Mine Block (3.0 MTPA) Page 4 of 22 Through sustained programme of investment and greater thrust on application of modern technologies, it has been possible to raise the production of coal from a level of about 70 million tonnes at the time of nationalization of coal mines in early 1970's to 676.48 (Provisional) million tonnes (All India) in 2017-18 (Source: http://coal.nic.in/content/coal-indian-energy-choice assessed on 29.05.2018). The importance of coal as a fuel or power resource cannot be overestimated. The economic development of any country largely depends upon its industrial progress. And, the industrial development of a country largely depends upon its possessing a sufficiently large stock of this most valuable mineral product. Coal is regarded as the backbone of power generation in India. There is huge demand for power in India. Power is essential and most important factor for industrial and business set up. India’s coal position is quite encouraging and it offers good prospects for the development of this industry. During 2011, India was the third largest coal producing country in the world. Hence, coal is an important constituent of the present Indian economy. The total reserves of coal in India have been over 290 billion metric tons. The coalfields in India are located mostly in Jharkhand, Odisha, Madhya Pradesh, Chhattisgarh, Uttar Pradesh, Meghalaya, Telangana, West Bengal, Sikkim, Arunachal Pradesh and Bihar. The power sector is the largest consumer of coal followed by the iron and steel and cement segments. India is the world’s fifth largest energy consumer, accounting for 4.1% of the global energy consumption. Of the total electricity consumed in the country, approximately 80% is produced from coal (Source: https://www.importantindia.com/21958/importance- of-coal-in-indian-economy assessed on 29.05.2018). Jharkhand is the largest coal producing state in the country followed by Orissa, Chhattisgarh, West Bengal, Madhya Pradesh, Telangana (previous part of Andhra Pradesh) and Maharashtra.
Recommended publications
  • Dto Name Jun 2016 Jun 2016 1Regn No V Type
    DTO_NAME JUN_2016 JUN_2016_1REGN_NO V_TYPE TAX_PAID_UPTO O_NAME F_NAME ADD1 ADD2 CITY PINCODE STATUS TAX_AMOUNT PENALTY TOTAL RANCHI N N JH01BZ8715 BUS 19-08-16 KRISHNA KUMHARS/O LATE CHHOTUBARA MURIKUMHAR CHHOTASILLI MURI RANCHI SUCCESS 6414 1604 8018 RANCHI N N JH01G 4365 BUS 15-08-16 ASHISH ORAONS/O JATRU ORAONGAMARIYA SARAMPO- MURUPIRIRANCHI -PS- BURMU 000000 SUCCESS 5619 1604 7223 RANCHI N N JH01BP5656 BUS 29-06-16 SURESH BHAGATS/O KALDEV CHIRONDIBHAGAT BASTIBARIATU RANCHI SUCCESS 6414 6414 12828 RANCHI N N JH01BC8857 BUS 22-07-16 SDA HIGH SCHOOLI/C HENRY SINGHTORPA ROADKHUNTI KHUNTI , M- KHUNTI9431115173 SUCCESS 6649 3325 9974 RANCHI Y Y JH01BE4699 BUS 21-06-16 DHANESHWARS/O GANJHU MANGARSIDALU GANJHU BAHERAPIPARWAR KHELARIRANCHI , M- 9470128861 SUCCESS 5945 5945 11890 RANCHI N N JH01BF8141 BUS 19-08-16 URSULINE CONVENTI/C GIRLSDR HIGH CAMIL SCHOOL BULCKERANCHI PATH , M- RANCHI9835953187 SUCCESS 3762 941 4703 RANCHI N N JH01AX8750 BUS 15-08-16 DILIP KUMARS/O SINGH SRI NIRMALNEAR SINGH SHARDHANANDANAND NAGAR SCHOOLRANCHI KAMRE , M- RATU 9973803185SUCCESS 3318 830 4148 RANCHI Y Y JH01AZ6810 BUS 12-01-16 C C L RANCHII/C SUPDT.(M)PURCHASE COLLY MGR DEPARTMENTDARBHANGARANCHI HOUSE PH.NO- 0651-2360261SUCCESS 19242 28862 48104 RANCHI Y Y JH01AK0808 BUS 24-04-16 KAMAKHYA NARAYANS/O NAWAL SINGH KISHORECHERI KAMRE NATHKANKE SINGH RANCHI SUCCESS 4602 2504 7106 RANCHI N N JH01AE6193 BUS 04-08-16 MRS. GAYTRIW/O DEVI SRI PRADEEPKONBIR KUMARNAWATOLI GUPTA BASIAGUMLA SUCCESS 4602 2504 7106 RANCHI Y Y JH01AE0222 BUS 22-06-16 RANCHI MUNICIPALI/C CEO CORPORATIONGOVT OF JHARKHANDRANCHI RANCHI SUCCESS 2795 3019 5814 RANCHI N N JH01AE0099 BUS 06-07-16 RANCHI MUNICIPALI/C CEO CORPN.GOVT.
    [Show full text]
  • 3Rd Party Contractor Details Electrical Inspection
    ID LNO NAME FIRMNAME DOB FNAME ADDRESS CITY PARTS EXPIRY USERNAME ENTRYDATE Insulation No.: 964063 Ravindra Nagar New Kasidih 8/25/2014 1 1 Sudhir Kumar Jha Mech Chem & Co. Jamshedpur and Earth Tester: 12/31/2002 Bagan Area Rd. No.9 Sakchi 5:51:13 PM 963875 Anand Bahwan 1st floor Insulation No.: 21448 8/25/2014 2 2 Devi Dayan Pandey Sai Power contractor area Rd. Jamshedpur 12/31/2004 and Earth Tester: 9987 5:51:13 PM no.2,Bistupur Insulation No.: 312 and 8/25/2014 3 3 R. N. Pathak Nilesh Transmission & Co. Piska Mod Ranchi 5/27/2007 Earth Tester: 284 5:51:13 PM Insulation No.: 58573 8/25/2014 4 4 Robbin Kumar dey United Electrical Enterprises Heerapur Dhanbad 5/28/2007 and Earth Tester: 58503 5:51:13 PM Insulation No.: and 8/25/2014 5 5 Bikash Chandra Nandi Nandi Electrical New Baradwari Jamshedpur Earth Tester: 5:51:13 PM Insulation No.: 2204264 8/25/2014 6 6 Barun Kumar Gupta A.B.T.Kumar Sonari West Layout Rd. No.8 Jamshedpur and Earth Tester: 5/29/2007 5:51:13 PM 768594 Insulation No.: 5580 8/25/2014 7 7 S. Harjit Singh Singh Electric Co. Station Road , Jugsalai Jamshedpur 39790 and Earth Tester: 2489 5:51:13 PM Progressive Electric Insulation No.: 21261 8/25/2014 8 8 D.C.Nandi Kasidih,Skachi Jamshedpur 5/29/2007 Corporation and Earth Tester: 91803 5:51:13 PM Insulation No.: 5748 8/25/2014 9 9 Amitava Chakraborty Amitava Electricals Sundar Nagar Jamshedpur 5/29/2007 and Earth Tester: 73502 5:51:13 PM Insulation No.: 465 and 8/25/2014 10 10 Arun Kumar Gupta East India Electrical Sonari West Layout Rd.
    [Show full text]
  • How Coal Mining Is Trashing Tigerland
    Author Contact Ashish Fernandes Ashish Fernandes [email protected] Research coordination & North Karanpura case study Nandikesh Sivalingam Kanchi Kohli [email protected] Research Photo Editor Aishwarya Madineni, Vikal Samdariya, Arundhati Sudhanshu Malhotra Muthu and Preethi Herman Design GIS Analysis Aditi Bahri Ecoinformatics Lab, ATREE (Kiran M.C., Madhura Cover image Niphadkar, Aneesh A., Pranita Sambhus) © Harshad Barve / Greenpeace Acknowledgments Image Sudiep Shrivastava for detailed inputs on the Forests of Sanjay Dubri Tiger Hasdeo-Arand and Mandraigarh sections, Kishor Reserve near Singrauli coalfield Rithe for inputs on the Wardha and Kamptee © Dhritiman Mukherjee / Greenpeace sections, Bulu Imam and Justin Imam for their expertise on the North Karanpura section, Biswajit Printed on 100% recycled paper. Mohanty for feedback on the Talcher and Ib Valley sections and Belinda Wright for feedback on the Sohagpur and Singrauli sections. CONTENTS Executive Summary 01 9. Hasdeo-Arand (Chhattisgarh) 51 10. West Bokaro (Jharkhand) 55 Introduction 09 Central India,Tigers, Corridors and Coal 11. North Karanpura (Jharkhand) 60 How Coal is Trashing Tigerland 17 Case Study I 63 The North Karanpura Valley - On the edge Methodology 21 12. Wardha (Maharashtra) 00 Coalfield Analysis 25 13. Kamptee (Maharashtra) 00 1. Singrauli (Madhya Pradesh - Chhattisgarh) 27 Case Study II 87 2. Sohagpur (Madhya Pradesh - Chhattisgarh) 33 Chandrapur’s tigers - Encircled by coal 3. Sonhat (Chhattisgarh) 35 4. Tatapani (Chhattisgarh) 37 Alternatives: Efficiency and Renewables 101 5. Auranga (Jharkhand) 39 References 109 6. Talcher (Odisha) 41 Glossary 7. Ib Valley (Odisha) 47 110 8. Mandraigarh (Chhattisgarh) 49 Endnotes 111 EXECUTIVE SUMMARY As India’s national animal, the Royal Bengal Tiger Panthera tigris has ostensibly been a conservation priority for current and past governments.
    [Show full text]
  • Block Level Forecast
    METEOROLOGICAL CENTRE, RANCHI INDIA METEOROLOGICAL DEPARTMENT BLOCK LEVEL WEATHER FORECAST VALID TILL 0830 IST OF NEXT 5 DAYS AMFU, Ranchi : Districts of Central and North Eastern Plateau Zone FORECAST DISTRICTS BLOCK PARAMETERS DAY-1 DAY-2 DAY-3 DAY-4 DAY-5 17.04.21 18.04.21 19.04.21 20.04.21 21.04.21 BOKARO BOKARO Rainfall (mm) 2 0 0 0 0 Max Temperature ( deg C) 36 38 38 39 40 Min Temperature ( deg C) 25 25 23 22 24 Total cloud cover (octa) 4 3 2 0 0 Max Relative Humidity (%) 36 28 20 15 31 Min Relative Humidity (%) 9 12 11 6 6 Wind speed (kmph) 14 9 11 7 8 Wind direction (deg) 222 256 307 228 240 BOKARO BERMO Rainfall (mm) 2 0 0 0 0 Max Temperature ( deg C) 37 38 38 39 40 Min Temperature ( deg C) 25 25 23 22 24 Total cloud cover (octa) 4 3 2 0 0 Max Relative Humidity (%) 36 30 22 19 31 Min Relative Humidity (%) 9 12 11 6 6 Wind speed (kmph) 15 9 10 7 8 Wind direction (deg) 220 254 298 230 229 BOKARO CHANDANKIYARI Rainfall (mm) 2 0 0 0 0 Max Temperature ( deg C) 36 37 37 38 39 Min Temperature ( deg C) 25 24 21 22 24 Total cloud cover (octa) 3 3 2 0 0 Max Relative Humidity (%) 37 26 21 14 23 Min Relative Humidity (%) 10 12 11 7 7 Wind speed (kmph) 18 10 10 6 7 Wind direction (deg) 220 271 294 228 226 BOKARO CHANDRAPURA Rainfall (mm) 2 0 0 0 0 Max Temperature ( deg C) 36 38 38 39 40 Min Temperature ( deg C) 25 25 23 22 24 Total cloud cover (octa) 4 3 2 0 0 Max Relative Humidity (%) 36 28 20 15 31 Min Relative Humidity (%) 9 12 11 6 6 Wind speed (kmph) 14 9 11 7 8 Wind direction (deg) 222 255 306 228 239 BOKARO CHAS Rainfall (mm) 2 0 0
    [Show full text]
  • JHARKHAND BIJLI VITRAN NIGAM LTD. (JBVNL) Area Board –JBVNL
    JHARKHAND BIJLI VITRAN NIGAM LTD. (JBVNL) (CIN: U40108JH2013SGC001702) Engineering Building, HEC, Dhurwa, Ranchi–4 Email: [email protected] Phone: +91 651 2400760 Fax: 0651-2446055 Area Board –JBVNL Contact Details Office Area Board Type Designation Name Ph. No. Mail Id * General Manager DHANBAD 9431135800 [email protected] General Manager DUMKA 9431135850 [email protected] General Manager GIRIDIH 7541836195 [email protected] Area Board General Manager HAZARIBAGH 9431135700 [email protected] General Manager JAMSHEDPUR 9431135900 [email protected] General Manager MEDININAGAR 9431707400 [email protected] General Manager RANCHI 9431135508 [email protected] Circle Office -(DGM)-JBVNL Contact Details Office Type Designation Circle Name Ph. No. Mail Id Circle Dy. General Manger CHAIBASA 9431135910 [email protected] Circle Dy. General Manger CHAS 9431135806 [email protected] Circle Dy. General Manger DALTONGANJ 9431707401 [email protected] Circle Dy. General Manger DEOGHAR 9431135852 [email protected] Circle Dy. General Manger DHANBAD 9431135805 [email protected] Circle Dy. General Manger DUMKA 9431135854 [email protected] Circle Dy. General Manger GHARWA 9431707402 [email protected] Circle Dy. General Manger GIRIDIH 9431135703 [email protected] Circle Dy. General Manger GUMLA 9431106321 [email protected] Circle Dy. General Manger HAZARIBAGH 9431135702 [email protected] Circle Dy. General Manger JAMSHEDPUR 9431135909 [email protected] Circle Dy. General Manger KODERMA 9431135711 [email protected] Circle Dy. General Manger RAMGARH 9431135701 [email protected] Dy.
    [Show full text]
  • Land Use/Vegetation Cover Mapping of North and South Karanpura Coalfields Based on Satellite Data for the Year- 2012
    Land use/vegetation cover mapping of North and South Karanpura Coalfields based On Satellite Data for the Year- 2012 CMPDI A Miniratna Company Land use/vegetation cover mapping of North and South Karanpura Coalfields based On Satellite Data for the Year- 2012 March-2013 Remote Sensing Cell Geomatics Division CMPDI, Ranchi CMPDI Restricted Report on Vegetation cover mapping of North and South Karanpura Coalfields based On Satellite Data of the Year‐ 2012 March-2013 Remote Sensing Cell Geomatics Division CMPDI, Ranchi RSC-561410027 [ Page i of iv] CMPDI Document Control Sheet (1) Job No. RSC/561410027 (2) Publication Date March 2013 (3) Number of Pages 28 (4) Number of Figures 7 (5) Number of Tables 7 (6) Number of Plates 1 (7) Title of Report Land use /vegetation cover mapping of North & South Karanpura Coalfield based on satellite data of the year 2012. (8) Aim of the Report To prepare Land use / vegetation cover map of North & South Karanpura Coalfield on 1:50000 scale based on IRS R-2 L4FMX satellite data for assessing the impact of coal mining on land use pattern and vegetation cover (9) Executing Unit Remote Sensing Cell, Geomatics Division Central Mine Planning & Design Institute Limited, Gondwana Place, Kanke Road, Ranchi 834008 (10) User Agency Central Coalfields Ltd. (11) Authors Mr A. K. Singh Chief Manager (Remote Sensing) Mr. N.P.Singh, General Manager(Geomatics) (12) Security Restriction Restricted Circulation (13) No. of Copies 8 (14) Distribution Statement Official RSC-561410027 [ Page ii of iv] CMPDI Contents Page No. Document
    [Show full text]
  • Ramgarh District, Jharkhand State
    भूजल सूचना पस्ु तिका रामगढ़ स्जला, झारखंड Ground Water Information Booklet Ramgarh District, Jharkhand State Open cast mines at Ramgarh district केन्द्रीय भसू िजल बो셍ड Central Ground water Board Ministry of Water Resources जल िंिाधन िंत्रालय (Govt. of India) (भारि सरकार) State Unit Office,Ranchi रा煍य एकक कायाालय, रााँची Mid-Eastern Region म鵍य-पूर्वी क्षेत्र Patna पटना सितंबर 2013 September 2013 भूजल सूचना पस्ु तिका रामगढ़ स्जला, झारखंड Ground Water Information Booklet Ramgarh District, Jharkhand State Prepared By रोज अनीता कू जूर (वैज्ञाननक ग ) Rose Anita Kujur (Scientist C) रा煍य एकक कायाालय, रााँची म鵍य-पूर्वी क्षेत्र,पटना State Unit Office, Ranchi Mid Eastern Region, Patna GROUND WATER INFORMATION BOOKLET OF RAMGARH DISTRICT, JHARKHAND STATE CONTENTS Sl.No. Details Page No. RAMGARH DISTRICT AT A GLANCE 1.0 INTRODUCTION 1.1 Administration 1 1.2 Drainage 4 1.3 Studies/Activities Carried Out By CGWB 4 2.0 HYDROMETEROLOGY 2.1 Rainfall 4 2.2 Climate 4 3.0 GEOMORPHOLOGY AND SOIL TYPES 3.1 Geomorphology 4 3.2 Soil 5 4.0 GROUND WATER SCENARIO 4.1 Hydrogeology 5 4.2 Depth to Water Level 5 4.3 Water Level Trend 6 4.4 Aquifer Parameters 10 4.5 Ground Water Quality 10 4.6 Ground Water Resource 10 5.0 GROUND WATER MANAGEMENT STRATEGY 5.1 Ground Water Development 15 6.0 GROUND WATER RELATED ISSUES AND PROBLEMS 15 7.0 AWARENESS AND TRAINING ACTIVITY 7.1 Mass Awareness Program(MAP) & Water 16 Management Programme(WMTP) by CGWB 8.0 AREAS NOTIFIED BY CGWB / CGWA 16 9.0 RECOMMENDATIONS 16 Figure.No.
    [Show full text]
  • District Survey Report of Stone District- Ramgarh
    District Survey Report of Stone District- Ramgarh Prepared in accordance with Para 7 (iii) a of S.O.3611 (E) Dated 25th July 2018 of Ministry of Environment, Forest and Climate Change Notification August 2018 District Survey Report (Stone), Ramgarh District, Jharkhand CONTENT CHAPTER NO. Description Page No. Preamble 1 1. Introduction 2-3 2. Overview of mining activity in the district 4-5 3. General profile of the District 6-13 4. Geology of the district 14-15 5. Drainage of Irrigation pattern 16 6. Land Utilization Pattern of the District: Forest, Agricultural, 17 Horticultural, Mining etc. 7. Surface water and Ground water Scenario of the district 18-21 8. Rainfall of the District and Climatic Condition 22 9. Details of Mining leases in the district 23-30 10. Detail of Royalty or Revenue received in last 3 years 31 11. Detail of production of minor mineral in last 3 years 31 12. Mineral Map of the District 32 13. List of Letter of Intent(LOI) Holders in the District 33 14. Total Mineral Reserves Available in the District 33-34 15. Quality / Grade of Mineral Available in the District 34 16. Use of Mineral 34-35 17. Demand and Supply of the Mineral in the last three years 35 18. Mining Leases Marked on the Map of the District 36 19. Details of the area where there is a cluster of mining leases 36 20. Details of Eco-Sensitive Area in the District 37 21. Impact on the Environment due to mining activity 37-38 22. Remedial Measures to mitigate the impact of mining on the 39 Environment 23.
    [Show full text]
  • Ranchi District, Jharkhand State Godda BIHAR Pakur
    भूजल सूचना पुस्तिका रा車ची स्जला, झारख車ड Ground Water Information Booklet Sahibganj Ranchi District, Jharkhand State Godda BIHAR Pakur Koderma U.P. Deoghar Giridih Dumka Chatra Garhwa Palamau Hazaribagh Jamtara Dhanbad Latehar Bokaro Ramgarh CHHATTISGARH Lohardaga Ranchi WEST BENGAL Gumla Khunti Saraikela Kharsawan SIMDEGA East Singhbhum West Singhbhum ORISSA के न्द्रीय भूमिजल बोड ड Central Ground water Board जल स車साधन ि車त्रालय Ministry of Water Resources (Govt. of India) (भारि सरकार) State Unit Office,Ranchi रा煍य एकक कायाडलय, रा更ची Mid-Eastern Region िध्य-पूर्वी क्षेत्र Patna पटना मसि車बर 2013 September 2013 भूजल सूचना पुस्तिका रा車ची स्जला, झारख車ड Ground Water Information Booklet Ranchi District, Jharkhand State Prepared By हﴂ टी बी एन स (वैज्ञाननक ) T. B. N. Singh (Scientist C) रा煍य एकक कायाडलय, रा更ची िध्य-पूर्वी क्षेत्र,पटना State Unit Office, Ranchi Mid Eastern Region, Patna Contents Serial no. Contents 1.0 Introduction 1.1 Administration 1.2 Drainage 1.3 Land use, Irrigation and Cropping pattern 1.4 Studies, activities carried out by C.G.W.B. 2.0 Climate 2.1 Rainfall 2.2 Temperature 3.0 Geomorphology 3.1 Physiography 3.2 Soils 4.0 Ground water scenario 4.1 Hydrogeology Aquifer systems Exploratory Drilling Well design Water levels (Pre-monsoon, post-monsoon) 4.2 Ground water Resources 4.3 Ground water quality 4.4 Status of ground water development 5.0 Ground water management strategy 6.0 Ground water related issues and problems 7.0 Awareness and training activity 8.0 Area notified by CGWA/SCGWA 9.0 Recommendations List of Tables Table 1 Water level of HNS wells in Ranchi district (2012) Table 2 Results of chemical analysis of water quality parameters (HNS) in Ranchi district Table 3 Block-wise Ground water Resources of Ranchi district (2009) List of Figures Fig.
    [Show full text]
  • Central Coalfields Limited (A Subsidiary of Coal India Limited) OFFICE of the Dy
    Central Coalfields Limited (A Subsidiary of Coal India Limited) OFFICE OF THE Dy. GM (MM), RAJRAPPA AREA AT&PO-RAMGARH PROJECT, DISTT RAMGARH, TIN No. 20781905166 Phone: 08987784655, Fax: 06553-251104 Website: www.ccl.gov.in Corrigendum Ref:- Dy.GM (MM)/PUR/Amndt./13-14/ 102 Dated.27.04.13 To, 01. M/S Mahendra Engineering & Chemical Product Ltd., Mahendra OWEN Division, 148 Bombey- Puna Road, Pimpri, Puna – 411018. 02. M/S 3M Electro & Communication India Pvt Ltd., Concorde Block, UB City, 24, Vittal Mallya Road, Bangalore-560001. 03. M/S Akashvani, 4- Cantt Market, Ramgarh Cantt, Distt.- Ramgarh Cantt (Jharkhand) 04. M/S Mahendra Enterprises, Main Road, Gola-829110. Distt. Ramgarh Cantt (Jharkhand) 05. M/S Sukhmani Traders, Gurudwara Road, Ramgarh Cantt-829122 (Jharkhand) 06. M/S Eminent Supplier, 34, Dr. Meqnays Saha Sarani, Kolkata – 29. 07. M/S Sourav Enterprises, Main Road, Chitarpur, Ramgarh-825101.(Jharkand) Sub:- Corrigendum to our tender No. Dy.GM (MM)/PUR/ENQUIRY/13- 14/02 Dated 16.04.13 due on 14.05.13 in respect of annexure “BB” and annexure “CC”. Dear Sir, Subject mentioned tender is hereby corrigented as under in respect of annexure “BB” and annexure “CC”. ANNEXURE “BB” 1. SCHEDULE OF REQUIREMENT: Supply of M. Seal Jointing Kit for St. through joint box at RWP. Sl.NO. Description Unit of Measurement Required (UOM) Qty. 1. M Seal Jointing Kit for St. through joint box, No. 10 Compound type,240 Sq.mm , 3 Core, Voltage 6.6KV Grade 2. M Seal Jointing Kit for St. through joint box, No. 10 Compound type, 185 Sq.mm, 3 Core, Voltage 6.6KV Grade 3.
    [Show full text]
  • Disparities in Infrastructural Development in Ranchi
    International Journal of Science and Research (IJSR) ISSN: 2319-7064 ResearchGate Impact Factor (2018): 0.28 | SJIF (2019): 7.583 Disparities in Infrastructural Development in Ranchi Lochana Koirala Research Scholar (SRF), Department of Geography, Ranchi University, Ranchi, India Abstract: Infrastructure is the foundation for the development of any country; Infrastructural facilities are the wheels of development which plays a decisive role in determining the overall productivity and development of country’s economy as well as the quality of life of the citizens. This paper highlights the intra-district disparities in infrastructural facilities in Ranchi district using seven indicators viz. education, health, financial services, transport and communication and public utilities. An attempt has been made to examine the spatial disparities in infrastructural and rural development across the district, considering block as a unit of analysis, using simple multivariate method to construct a composite infrastructure development index (IDI) by combining various infrastructural facilities at the block level. The paper concludes suggesting suitable policies for developing the backward areas which would further aid in enhancing the levels of socio-economic development of Jharkhand. Keywords: Disparities, Infrastructural facilities, development 1. Introduction Efficiency, quality of these facilities is not uniform across the entire region. Disparities exist along all the hierarchical levels The word development report published in 1994 by the World of Administration from state to block level which is reflected Bank under the title “Infrastructure for development” rightly in both inter and intra forms. Disparities in economic mentions that the adequacy of infrastructure helps determine development can be explained in terms of varying level of one country‟s success and another‟s failure in diversifying infrastructural facilities to people in different regions.
    [Show full text]
  • GOVERNMENT of JHARKHAND E-Procurement Notice
    GOVERNMENT OF JHARKHAND JHARKHAND EDUCATION PROJECT COUNCIL,RANCHI NATIONAL COMPETITIVE BIDDING(OPEN TENDER) (CIVIL WORKS) e-Procurement Notice Tender Ref No: JEPC/03/418/2016/482 Dated: 23.03.2016 1 Approximate Amount of Earnest Cost of Period of S.No Name of Work Value of Work Money/Bid Security Document Completion (Rs in lakhs) (Rs in Lakhs) (Rs) Construction of 2 Jharkhand Balika Awasiye Vidyalaya in 1 Domchanch and Chandwara Block of Koderma District of North 873.41 17.47 10,000.00 15 months Chotanagpur Division of Jharkhand. Construction of 2 Jharkhand Balika Awasiye Vidyalaya in Dulmi 2 and Chitarpur Block of Ramgarh District of North Chotanagpur 873.41 17.47 10,000.00 15 months Division of Jharkhand. Construction of 2 Jharkhand Balika Awasiye Vidyalaya in 3 Mayurhand and Kanhachatti Block of Chatra District of North 873.41 17.47 10,000.00 15 months Chotanagpur Division of Jharkhand. Construction of 1 Jharkhand Balika Awasiye Vidyalaya in 4 Chandrapura Block of Bokaro District of North Chotanagpur 436.71 8.73 10,000.00 15 months Division of Jharkhand. Construction of 2 Jharkhand Balika Awasiye Vidyalaya in 5 Baghmara and Purbi Tundi Block of Dhanbad District of North 873.41 17.47 10,000.00 15 months Chotanagpur Division of Jharkhand. Construction of 1 Jharkhand Balika Awasiye Vidyalaya in 6 Dhanbad Block of Dhanbad District of North Chotanagpur 436.71 8.73 10,000.00 15 months Division of Jharkhand. Construction of 1 Jharkhand Balika Awasiye Vidyalaya in Saria 7 Block of Giridih District of North Chotanagpur Division of 436.71 8.73 10,000.00 15 months Jharkhand.
    [Show full text]