Sustainable Porto Santo - Smart CLIMATE ACTION Fossil Free Island
Total Page:16
File Type:pdf, Size:1020Kb
Renewable Energies Renewable REGIONS OF Sustainable Porto Santo - Smart CLIMATE ACTION Fossil Free Island Expected project CAPEX : 2’500’000 € Mandating Authority : Secretaria Regional da Economia, Turismo e Cultura Economy, Tourism and Culture of the Regional Government) Project Type : Hybrid Solar and Wind System Summary It is intended with this project to increase the current contribution of renewable energy from 15% to 30%, with more solar PV power and wind power, in electricity production. These components are part of a more ambitious project named: Porto Santo Sustentável - Smart Fossil Free Island, involving other local and regional authorities, with others technologies like: ESS (Energy Storage System), electric vehicles (Vehicle to Grid-V2G), LED lighting with tele management, building energy efficiency and smart grids. Location and population Porto Santo Island - Madeira, Portugal. 267 785 inh. Social and environmental impact The project is part of the European strategy 20-20-20, namely: reducing GHG emis- sions, increasing renewable energy and improving energy efficiency. Within this scope the project aims to replace fossil fu- els with renewable energy. Regarding social aspects, the project will create more and better opportunities for local businesses, increase local employment and increase revenue, enhancing the competitiveness of the local economy. Main stakeholders EEM – Empresa de Electricidade da Ma- deira, S.A. Regional Government of Madeira 100 Climate Solutions Project Campaign ~ 2016 100 Climate Solutions Project Campaign ~ 2016 Project maturity ( IFC / World Bank Categories ) STAGE 4 : Permitting / Financing / Contracts STAGE 1 : Concept Development, Site identification STAGE 2 : Pre-Feasibility Studies Land concession signed : Yes (solar:no) STAGE 3 : Feasibility Studies STAGE 4 : Permitting / Financing / Contracts Grid Connection : Wind Power: Yes (same as old wind power - may require some STAGE 5 : Engineering/Construction/Commercial Operation grid improvements); Solar PV: under consideration (It should be in the distribution network 6.6kV) Building permits signed : STAGE 1 : Concept Development, Site identification No Site identified : Yes (Solar: under negociation) Environmental impact study No Site access : Adequate road Rail access Port facilities Power Purchase Agreement Off-Taker : ✓ ✓ No Not applicable Expected installed capacity : Tenor : Price of electricity : Wind : 1.320 kW (2x660) (it´s a repower and a up rating from No No 2x225 kW): Solar PV: 1.000 kW Technology : Identified sources of fundings Wind: Commercial solutions, controlled by an AGC (Automatic Not planned now Generation Control) Solar PV: Commercial solutions, controlled by an AGC Energy resource data Existing resources data will be obtained from existing production STAGE 5 : Engineering / Construction / Commercial Operation near with similar technologies (more than 5 years of data). Wind (+/-2000 h/yr); Solar PV (+/-1500h/yr). Engineering, Procurement and Construction Contractor : Expected type of contract : TBD EPC/Turnkey Operation and Maintenance Contractor : STAGE 2 : Pre-Feasibility Studies TBD Comments Pre-feasibility study : It should be noted that the ESS (Energy Storage System) project No is currently in tendering procedure for the acquisition of a system with 4 MW / 3MWh, for Porto Santo Island. STAGE 3 : Feasibility Studies Feasibility study : No 100 Climate Solutions Project Campaign ~ 2016 100 Climate Solutions Project Campaign ~ 2016.