Looking to the Future by Craig A

Total Page:16

File Type:pdf, Size:1020Kb

Looking to the Future by Craig A FOCUS CELEBRATING THE PAST, Looking to the Future by Craig A. Shutt Completed in December 2009, the $125-million Route 36 Bridge over the Shrewsbury River in Sea Bright, N.J., replaced an existing bascule bridge with a high-level precast concrete segmental box girder design supported on precast, post-tensioned concrete piers. Hardesty & Hanover designed two pedestrian bridges for the project and provided engineering services, including concrete pier design and seismic analysis. All photos: Hardesty & Hanover. Hardesty & Hanover and other movable-bridge innovations. so we can first deliver a service and The firm’s work still includes many ultimately create the best product for enters its 125th year movable bridges, but expansion into them. Our project managers stress other sectors has enabled its designers communication and teamwork.” with innovative to implement new techniques and innovations. Assessing Original Designs techniques for The firm’s long history has allowed it to “We are experienced in all types of return to some of its original designs. designing bridges bridges, both fixed and movable,” “We have a long history of building says Glen Schetelich, a partner in the durable structures,” notes Tim Noles, that are more New York-based engineering firm’s a partner in the Sunrise, Fla., office. Hoboken, N.J., office. The firm’s “Having the original plans for a project durable, faster engineers have focused primarily on can be beneficial during rehabilitation mid- to short-span bridges, which have work, because it gives us insight into the to construct, and involved a range of challenges dealing original intent. Frequently, the owners with terrain, environmental concerns, themselves no longer have copies of the more aesthetically owners’ growing needs, and additional plans.” community input. pleasing The firm has extensive history with “Our clients look to us because of the rehabilitation, often analyzing bridges Bridge engineering has changed depth of service we provide,” adds to determine if they can be preserved. drastically since Hardesty & Hanover Keith Griesing, director of engineering. “In some cases, we try to rehabilitate opened its doors in 1887. Founder “Many companies are technically a bridge in kind, with improvements Dr. J. A. L. Waddell was a leader in capable of creating bridges, but they to meet current AASHTO criteria,” reinforced concrete and steel bridge aren’t as attuned to the client’s needs as Noles notes. “But often we replace a design and held the patent for the we are. Our goal is to partner with our movable bridge with a new high-level, first modern vertical-lift bridge design clients and understand their challenges fixed bridge.” That is happening more 8 | ASPIRE, Winter 2011 ‘We are experienced in all types of bridges, both fixed and movable.’ The new $43 million precast concrete bridge along Route 35 over the Shark River in he notes. “It was interesting to me that Belmar, N.J., extends 2000 ft using 17 spans of AASHTO girders, including a main span of they were more interested in the ‘how’ 170 ft. The bridge, which replaced a bascule bridge that disrupted traffic to beachfront than in the ‘what,’ ” he says. “The communities, is 84 ft wide and carries four lanes of traffic. construction staging, scheduling, and interaction with the work on a daily today, Schetelich adds. “The federal also understand the owner’s goals and basis were key parts of the process.” government especially is looking to can represent those to the community. replace movable bridges, if it’s feasible.” Today, engineering represents one small Aesthetics part of the puzzle in moving a project a Growing Priority For instance, the Route 36 Bridge over from its concept to completion.” Aesthetics also was a concern on the the Shrewsbury River in Monmouth Roslyn Viaduct, as it often is in such County, N.J., a 75-year-old double-leaf That was a key challenge for the new meetings, he adds. “Owners are bascule bridge, was replaced with a design of the Roslyn Viaduct project realizing that aesthetics have a great high-level structure consisting of precast along Route 25A over Hempstead value to a community, particularly as concrete segmental box girders and Harbor in Roslyn, N.Y. The 29-span, pin- older, established bridges are replaced. precast, post-tensioned concrete piers. and-hanger steel viaduct was replaced Citizens want a proportionate structure The new bridge increases clearance to with twin concrete segmental box- that reflects the community and the 65 ft along this main corridor to New girder bridges built using the balanced- surrounding environment. It’s going Jersey’s eastern beaches and the national cantilever method. The 2200-ft-long to be there for a long time, and those park at Sandy Hook. Hardesty & Hanover viaduct and its 2775-ft-long approach concerns have to be taken seriously. You designed two adjoining pedestrian roadway and ramps were replaced in have to partner with the community to bridges and provided geotechnical staged construction including innovative get it right,” says Greising.” engineering, foundation and segmental design schemes to minimize traffic concrete pier design, scour and seismic congestion. More details of this project That’s especially important for many analysis, and utility relocation and are provided in the Fall 2009 issue of structures in Florida, adds Noles. “It’s a access. More details of this project are ASPIRE. national trend, but Florida is a leader in provided in the Summer 2010 issue of creating aesthetically pleasing bridges. ASPIRE.™ The New York State Department of That’s because of its tourist industry Transportation set up a Bridge Task and the many bridges along the coast, A similar replacement occurred with the Force that met monthly with community where they are landmarks in the former Route 35 Bridge over Shark River groups and concerned citizens. “We community. The state wants its bridges in Belmar, N.J., where a low-level bascule really got to know the people most to make an impression, because they bridge was replaced by a 2000-ft-long, involved, and they learned about us,” add to the scenic landscape and can high-level, prestressed concrete bridge says Griesing. “The repetition created a have a financial impact.” with AASHTO girders comprising 17 more relaxed atmosphere so we could spans, including a main span of 170 ft. discuss concerns more informally.” That was certainly the case when Hardesty & Hanover redesigned the Community Input Increases The meetings included new ideas Sanibel Island Causeway over San Carlos Movable bridges often are replaced garnered from the groups and handouts Bay in 2006. The firm first conducted due to the growing focus on user costs, that showed the current plan. “This was an in-depth inspection of the existing which have become a key priority for a new approach to a project for me, and double-leaf, Hopkins Trunnion-type bridge owners. This concern often leads it required a different set of skills than bascule bridge with accompanying to more community input on each aspect engineers typically use,” he says. “But steel-stringer flanking spans. of the project. “Some projects require I expect it will occur more often with a lot of community outreach, and, in bridge owners.” Then it developed construction plans those cases, we serve as the owner’s and specifications to implement the partner,” explains Griesing. “We can The biggest concerns were the recommended high-level fixed bridge, answer the technical questions, but we construction process and disruptions, consisting of precast, prestressed ‘Owners are realizing that aesthetics have a great value to a community.’ ASPIRE, Winter 2011 | 9 ‘We are always looking for new ideas Adds Noles, “Many owners prefer and working with concrete, because they won’t have to manufacturers to find paint it, even with new painting systems that extend paint life. Concrete bridges new concepts.’ can result in lower maintenance costs than steel bridges.” concrete Florida bulb-tee girders spanning a maximum of 144 ft over Concrete bridges also are being 21 spans for a total length of 2996 ft. considered more often due to the speed The substructure features canted-leg with which they can be built once reinforced concrete piers founded on the site is available. Precast concrete precast, prestressed concrete piles. The components in particular can reduce The design of the $127-million precast substructure was designed for vessel- the amount of time needed for road concrete Roslyn Viaduct project over collision impacts and a 100-year storm closures, even if they don’t speed up the Hempstead Harbor in Roslyn, N.Y., was scour. See the related article, “Concrete overall design-to-completion time, notes developed with input from a Bridge Bridges in Lee County, Florida,” in the Griesing. “They provide a more intense Task Force that included local public Spring 2009 issue of ASPIRE. impact for a shorter duration, which officials and appointed representatives officials like.” of community groups. Those discussions “The biggest challenge was working included the replacement bridge with citizen groups to create a design Preconstruction activity has increased, and pier types, staged construction, that satisfied their concerns and met the he adds, because it keeps the site clear traffic noise concerns, aesthetics, owner’s needs,” says Noles. Its impact and open for longer. “New York State environmental impact, business impact, on the skyline was a particular concern, likes precast concrete projects,” he says. and other factors. as were aesthetic treatments and colors “They like the prefabrication aspect, for railings, MSE walls, and other visible as well as the shop-level quality of the elements. “We invited the community components and the amount that can to provide ideas and incorporated be done in a short time once the pieces many of them into the design during a arrive at the site.” 3-month process.” Using the NEXT Beam Interchange in Queens, N.Y., which Maintenance is Key The firm recently worked with PCI consists of the Van Wyck Expressway, Owners also are guarding their long- Northeast, a chapter of the Precast/ Grand Central Parkway, and the term budgets more than ever.
Recommended publications
  • X735.82 Noise Barrier Workshop Brochure
    VAN WYCK EXPRESSWAY (I-678) CAPACITY AND ACCESS IMPROVEMENTS TO JFK AIRPORT PROJECT ANTICIPATED TIMELINE: Noise Barriers FEBRUARY 1, 2019 MAY 22, 2019 FALL 2019 Project Background Release of FEIS DEIS Released for Ballots Returned The New York State Department of Transportation, in cooperation with the Federal Highway Administration, is & Record of Public Review to NYSDOT preparing an Environmental Impact Statement (EIS) for the Van Wyck Expressway (VWE) Capacity and Access Decision Improvements to JFK Airport Project. The Project is located along a 4.3-mile segment of the VWE, also known as Interstate 678, including the northbound and southbound service roads. The northern project limit is Hoover Avenue and the southern project limit is the southern end of Federal Circle at the entrance to JFK Airport. The purpose of the Project is to provide increased capacity on the VWE between the Kew Gardens Interchange RETURN OF BALLOTS (KGI) and JFK Airport to improve vehicular access to and from JFK Airport. The Project would add a fourth vehicular travel lane in each direction between JFK Airport and the KGI. The additional lane would be a managed-use lane Completed ballots may be submitted in one of the following ways: with high-occupancy vehicle (HOV) restrictions. In addition, the Project will address operational, geometric, and structural deficiencies on the VWE between the KGI and JFK Airport. The Draft EIS (DEIS) for the Project was released for public review on February 1, 2019 and is available on the project website at: www.dot.ny.gov/vwe.
    [Show full text]
  • Kew Gardens Interchange Infrastructure and Operational Improvement Project Grand Central Parkway
    KEW GARDENS INTERCHANGE INFRASTRUCTURE AND OPERATIONAL IMPROVEMENT PROJECT GRAND CENTRAL PARKWAY DESIGN-BUILD PROJECT PIN X051.60, Contract D900043 Request for Proposals Addendum #10 June 8, 2018 New York State Department of Transportation Modification to the Request for Proposals KEW GARDENS INTERCHANGE INFRASTRUCTURE AND OPERATIONAL IMPROVEMENT PROJECT GRAND CENTRAL PARKWAY Design-Build Project PIN X051.60, Contract D900043 Note to Proposers Differences between the deleted pages and the revised pages have been identified as follows: • Brackets have been inserted on the left-hand margin of the pages to indicate where changes have been made to the documents; and • Text additions have been shown in underlined red font and text deletions have been shown in crossed out red font. General Instructions Delete Page A-3 of the Instructions to Proposers, Appendix A, Project Information, and substitute the attached revised Page A-3. Delete Page C-9 of the Instructions to Proposers, Appendix C, Technical Submittal, and substitute the attached revised Page C-9. Delete Form SCD of the Instructions to Proposers, Appendix E, Forms, and substitute the attached revised Form SCD. Delete Pages 12, 55, 56, 57, 58, 59, 91, 92 and 101 of the DB Contract Documents, Part 3, Project Requirements, and substitute the attached revised Pages 12, 55, 56, 57, 58, 59, 91, 92 and 101. Please note, there are no tracked changes on Pages 56, 57, 58, 59 and 92, but the pages are included due to the shift of text resulting from the additions to Pages 55 and 91. Delete the OCMC Permit and substitute the attached revised signed OCMC Permit to the DB Contract Documents, Part 7 – Engineering Data.
    [Show full text]
  • NYSDOT Bid Date: 6/22/18 Time: 12:00 Pm Duration: 3/1/2022 Project Goal: DBE 14%
    SCHIAVONE Construction Co. LLC CONSTRUCTORS & ENGINEERS 150 MEADOWLANDS PARKWAY • SECOND FLOOR • SECAUCUS, N.J. 07094-1589 PHONE (201) 867-5070 OUTREACH EVENT Kew Interchange Constructors, JV invites all DBE business enterprises that are seeking potential business opportunities to attend an Outreach Event at Hilton New York JFK Airport, 144‐02 135th Avenue, Jamaica, NY Monday, April 23rd from 9:00am – Noon. We will have two presentations starting at 9:30 and 11:15 AND breakfast will be provided. Registration is required prior to this event. Please complete and return the required information to Colleen Connors‐Casenta [email protected] NO LATER THAN Thursday, April 19th Company Name: ________________________________ Contact Person: _____________________________ Trade(s): __________________________________________________________________________________ Address: __________________________________________________________________________________ Phone: _______________________ Cell: __________________________ Email: ________________________________________________________ Please attach a copy of your certification with this form COMPLETELY filled out ______ Yes, we will bid _______ No, we will not bid ______ Yes, we are a union contractor ______________ Confirm Certifying Agency Owner: Owner: NYSDOT Bid Date: 6/22/18 Time: 12:00 pm Duration: 3/1/2022 Project Goal: DBE 14% Project: Contract: Kew Gardens Interchange Infrastructure and Operational Improvement Project Grand Central Parkway Pin X051.60 Contract No. D900043 If you are interested in reviewing contract documents, contact Colleen Connors‐Casenta at [email protected] for a copy of our Non‐Disclosure Agreement (NDA), which will need to be signed and emailed back prior to downloading drawings and specs from our FTP website. Confidential Information: Keep all information furnished by the Authority Confidential. Confidential Information includes specifications, drawings, plans, diagrams, sketches, renderings, and other technical data and information.
    [Show full text]
  • Chapter 10: Responses to Comments on the Draft EIS1 A
    Chapter 10: Responses to Comments on the Draft EIS1 A. INTRODUCTION This chapter of the Final Environmental Impact Statement (FEIS) summarizes and responds to substantive comments received during the public comment period for the Draft Environmental Impact Statement (DEIS), issued on March 22, 2019, for the proposed NYC Borough-Based Jail System. City Environmental Quality Review (CEQR) requires a public hearing on the DEIS as part of the environmental review process. The DEIS public hearing was held on July 10, 2019, at the John Jay College of Criminal Justice Theater, 524 West 59th Street, New York, NY at 10:00 AM. The comment period remained open through Monday, July 22, 2019. Section B contains a summary of relevant comments on the DEIS and a response to each. These summaries convey the substance of the comments made, but do not necessarily quote the comments verbatim. Comments are organized by subject matter and generally parallel the chapter structure of the DEIS. Where more than one commenter expressed similar views, those comments have been grouped and addressed together. Commenters who expressed general support or general opposition but did not provide substantive comments on the DEIS are listed at the end of Section B. A list of organizations and individuals who commented can be found in Section C. All written comments are included in Appendix K, “Written Comments Received on the Draft Environmental Impact Statement.” Where relevant, in response to comments on the DEIS, changes have been made and are shown with double underlines in the FEIS. B. COMMENTS AND RESPONSES COMMUNITY ENGAGEMENT AND PUBLIC PARTICIPATION Comment 1: CB1 is on record objecting to the administration’s “opaque site selection and lack of community input” for the Manhattan BBJ project, and CB1 continues to believe the administration should reconsider its selection of the Manhattan site in conjunction with a process of meaningful community engagement on site selection.
    [Show full text]
  • The Case for Freight NEEDS– NEW YORK
    GREATEST The Case for Freight NEEDS– NEW YORK Increasing capacity on “The Kew Gardens Interchange—built in the 1930s, well before interstate our nation’s standards were developed or the world economy of today emerged—is transportation now a key link serving thousands of trucks traveling each day to and system will: from John F. Kennedy International Airport, the busiest air freight facility • Unlock Gridlock, in the nation. It is critical that this complex urban highway be upgraded • Generate Jobs, not only to meet current safety standards and travel needs, but to • Deliver Freight, adequately and efficiently accommodate the national and international- • Access Energy, bound freight that passes through this interchange each day.” • Connect Communities —Stanley Gee, New York State Department of Transportation Acting Commissioner Did you know? Freight Capacity Needs • The amount of freight Kew Gardens Interchange Reconstruction moved in this coun- try—from milk, tooth- paste and toilet paper The Kew Gardens Interchange, located in the Queens borough of New York City, is the confluence of three major limited-access freeways, two major highways, and numerous to sparkplugs, wheat local streets. The interchange is a critical node on the Van Wyck Expressway (Inter- and wind turbines—is state 678) which serves as the only commercial limited-access link to JFK International expected to double in Airport, and it is essential for freight movement. Additionally, the interchange serves the the next 40 years? Grand Central Parkway, a major commuter route to Nassau and Suffolk counties on Long • The Interstate High- Island and the primary access route to LaGuardia Airport.
    [Show full text]
  • Utility Requirements
    KEW GARDENS INTERCHANGE INFRASTRUCTURE AND OPERATIONAL IMPROVEMENT PROJECT GRAND CENTRAL PARKWAY PIN X051.60, Contract D900043 DB CONTRACT DOCUMENTS PART 4 UTILITY REQUIREMENTS Final MARCH 16, 2018 This page is intentionally left blank. New York State Department of Transportation Table of Contents PART 4 - UTILITY REQUIREMENTS ........................................................... 1 4.1 SCOPE ....................................................................................................................................... 1 4.2 GENERAL ..................................................................................................................................... 1 4.2.1 Utility Coordination ................................................................................................................ 1 4.2.2 Utility Coordination Manager ................................................................................................. 2 4.2.3 Utility Relocation Design ....................................................................................................... 2 4.2.4 Scheduling Utility Relocation Work ........................................................................................ 3 4.2.5 Utility Design and Construction Constraints ........................................................................... 3 4.2.6 Standard of Care Applicable to Utility Work ........................................................................... 3 4.2.7 Coordination with Utility Owners ...........................................................................................
    [Show full text]
  • Kew Gardens Interchange Infrastructure and Operational Improvement Project Grand Central Parkway
    KEW GARDENS INTERCHANGE INFRASTRUCTURE AND OPERATIONAL IMPROVEMENT PROJECT GRAND CENTRAL PARKWAY PIN X051.60, Contract D900043 DB CONTRACT DOCUMENTS PART 3 PROJECT REQUIREMENTS Draft FEBRUARY 26, 2018 This Page is intentionally left blank New York State Department of Transportation Table of Contents SECTION 1 GENERAL .................................................................................................................. 1 1.1 PURPOSE .................................................................................................................................. 1 1.2 SCOPE ...................................................................................................................................... 1 1.3 SCOPE OF WORK – MAJOR ITEMS ................................................................................................ 2 1.4 COORDINATION WITH OTHER PROJECTS ....................................................................................... 4 1.5 THIRD PARTY AGREEMENTS (NON-UTILITY) .................................................................................. 5 1.6 DESIGN CODES AND MANUALS..................................................................................................... 5 1.7 REQUIREMENTS ....................................................................................................................... 10 1.8 DELIVERABLES ......................................................................................................................... 10 1.9 INDICATIVE PLANS ...................................................................................................................
    [Show full text]
  • Kew Gardens Interchange Infrastructure and Operational Improvement Project Grand Central Parkway Design-Build Project
    KEW GARDENS INTERCHANGE INFRASTRUCTURE AND OPERATIONAL IMPROVEMENT PROJECT GRAND CENTRAL PARKWAY DESIGN-BUILD PROJECT PIN X051.60, D900043 REQUEST FOR QUALIFICATIONS ADDENDUM #1 Appendix A – Project Information, Appendix C – SOQ Forms, and Appendix C – Editable SOQ Forms Revised DECEMBER 19, 2017 New York State Department of Transportation Modifications to the Request for Qualifications KEW GARDENS INTERCHANGE INFRASTRUCTURE AND OPERATIONAL IMPROVEMENT PROJECT GRAND CENTRAL PARKWAY DESIGN-BUILD PROJECT PIN X051.60, D900043 RFQ Appendix A – Project Information, Appendix C – SOQ Forms, and Appendix C – Editable SOQ Forms Revised: Delete RFQ Appendix A – Project Information and substitute the attached revised RFQ Appendix A – Project Information (Amended). The footer has been added, and page A- 5, Section 10.0 has been amended. Delete RFQ Appendix C – Forms and substitute the attached revised RFQ Appendix C – Forms (Amended). Delete RFQ Appendix C – Editable Forms and substitute the attached revised RFQ Appendix C – Editable Forms (Amended). The footers have been corrected to align with the corresponding forms. No other provisions of the solicitation are otherwise changed or modified. Note to Proposers: Differences between the deleted pages and the revised pages have been identified as follows: Brackets have been inserted on the left-hand margin of the pages to indicate where changes have been made to the documents; and Text additions have been shown in underlined red font and text deletions have been shown in crossed out red font. KEW GARDENS INTERCHANGE INFRASTRUCTURE AND OPERATIONAL IMPROVEMENT PROJECT GRAND CENTRAL PARKWAY DESIGN-BUILD PROJECT PIN X051.60, D900043 REQUEST FOR QUALIFICATIONS APPENDIX A PROJECT INFORMATION December 19, 2017 This page is intentionally left blank.
    [Show full text]
  • Nysdot Kew Gardens Project Bim As an As-Built Record
    Case Study NYSDOT KEW GARDENS PROJECT BIM AS AN AS-BUILT RECORD BACKGROUND This case study covers the overall building information modeling (BIM) for infrastructure The New York State approach used in the Kew Gardens Interchange (KGI) project, as well as considerations Department of Transportation for model development and positive impacts to the project as a result of BIM use. (NYSDOT) used building information modeling (BIM) for the Kew Gardens Interchange (KGI) Reconstruction Project (Figure 1) in Queens, New York, during the third phase of the project. By making a three-dimensional (3D) computer-aided design and drafting (CADD) model an as-built record, the digital 3D model was refined and updated throughout construction completion. This accurate and complete as-built record (including underground utilities) was created for ongoing maintenance, operations, and asset management purposes during the life cycle of the Bernstein Associates Photographers, Tarrytown, NY, used with permission Figure 1. Section of the Kew Gardens Interchange Project during construction interchange. BIM FOR INFRASTRUCTURE APPROACH The KGI is the complex intersection of the Grand Central Parkway, the Van Wyck Expressway, the Jackie Robinson Parkway, and the Union Turnpike that serves nearly 600,000 vehicles daily. The NYSDOT is making a number of operational improvements at the interchange to enhance safety and improve traffic flow, with four construction contracts worth almost $700 million and with Phase 1 breaking ground in 2010. Due to the project’s complexity, BIM was used as an as-built record, which was used in subsequent phases of the project. Phase 3 of the KGI was the first design-bid-build (DBB) project to have a NYSDOT BIM requirement and was ongoing as of December 2019.
    [Show full text]
  • STATE of NEW YORK RELEASE: IMMEDIATE 11/9/2018 DEPARTMENT of TRANSPORTATION CONTACT: Thomas G
    STATE OF NEW YORK RELEASE: IMMEDIATE 11/9/2018 DEPARTMENT OF TRANSPORTATION CONTACT: Thomas G. Bayer (718)482-4002 REGION 11 ***** T R A F F I C A D V I S O R Y ***** All lane closures listed are expected to be in place, WEATHER PERMITTING: Bronx Arthur Sheridan Expressway 11/10/2018 • One lane closed N/B from Westchester Avenue to East 173rd Street from 7:00 a.m. to 3:00 p.m. Note: Remove Overhead Sign Structure, Intermittent 15 minutes full lane closure for removal of sign structure. 11/12/2018 – 11/16/2018 • One lane closed N/B from Westchester Avenue to East 173rd Street from 9:00 a.m. to 2:00 p.m. Note: Temporary Widening, Installation of Construction Signs, Survey, Temporary Striping. 11/12/2018 – 11/17/2018 • One lane closed S/B from East 173rd Street to Westchester Avenue from 10:00 a.m. to 3:00 p.m. Note: Install Construction Signs, Wall 303, Survey. 11/13/2018 • One lane closed N/B near Westchester Avenue from 10:00 a.m. to 3:00 p.m. 11/14/2018 • One lane closed N/B ramp to/from East Tremont Avenue from 10:00 a.m. to 3:00 p.m. 11/15/2018 • One lane closed S/B ramp to/from East Tremont Avenue from 10:00 a.m. to 3:00 p.m. 11/17/2018 • One lane closed N/B from Westchester Avenue to East 173rd Street from 7:00 a.m. to 3:00 p.m.
    [Show full text]
  • Daily-Referrals-For-36-Records
    Date Employer Name Employer Phone Number Job Site Name Site Address Site City Site State Total Requested mber F Referred From 4/12/2021 ABCD CONSTRUCTION CORP (718) 439-3385 SOTOMAYER HOUSES - PHASE 2B (SCAFF) 1090 ROSEDALE AVENUE BRONX NY 1 1 1556 SCAFF 4/12/2021 ADVANCED CONSTRUCTION EQUIPMENT CORP (914) 665-8383 AMSTERDAM HOUSES 62ND STREET & AMSTERDAM AVENUE NEW YORK NY 1 1 1556 SCAFF 4/12/2021 A-TECH CONCRETE CO., INC (732) 248-1777 PS 39 101 MACFARLAND AVENUE STATEN ISLANDNY 1 1 20 CARP 4/12/2021 Atlas Fence & Railing Co.,Inc. (718) 767-2200 102 ST & FDR DRIVE 102 ST B/W FDR DRIVE & 1ST AVENUE NEW YORK NY 1 1 157N CARP 4/12/2021 Atlas Fence & Railing Co.,Inc. (718) 767-2200 102 ST & FDR DRIVE 102 ST B/W FDR DRIVE & 1ST AVENUE NEW YORK NY 1 1 157N CARP 4/12/2021 Carl Walker Construction, Inc (412) 490-2924 LONG BEACH BUS GARAGE 1 WESTCHESTER ST LONG BEACH NY 1 1 45 CARP 4/12/2021 Commodore Construction Corporation (914) 297-3000 BROOKLYN HOSPITAL 121 DEKALB AVENUE BROOKLYN NY 1 1 157 CARP 4/12/2021 Cord Contracting Co. Inc. (516) 626-8800 CITADL 425 PARK AVE NEW YORK NY 1 1 157 CARP 4/12/2021 Cross Country Construction Llc (914) 909-6700 55-15 GRAND AVENUE FLUSHING NY 45 CARP 4/12/2021 Cross Country Construction Llc (914) 909-6700 AMAZON 55-15 GRAND AVE QUEENS NY 4 2 LU 212 APP 4/12/2021 Cross Country Construction Llc (914) 909-6700 55-15 GRAND AVENUE FLUSHING NY LU 212 4/12/2021 Elite Floors Inc.
    [Show full text]
  • Con-Tech Systems Ltd. Post-Tensioned Ground Anchor
    Press Release for CTS Wind Turbine Foundation Systems BULLETIN BULLETIN BULLETIN BULLETIN BULLETIN BULLETIN BULLETIN BULLETIN July 2012 Con-Tech Systems Ltd. Post-Tensioned Ground Anchor Foundation System with Groutable Void Form (GVF) CON -TE C H SY st EM S RE C EIVE S Canadian Patent/Brevet Canadien 2,551,712 CANADIAN PA T EN T : Con-Tech Systems Ltd. has developed a new more efficient and environmentally friendly foundation system for wind turbines that consumes up to 40% less concrete and up to 70% less reinforcing steel than traditional spread footing foundations. The patented design uses the Visit us at: Groutable Void /Form (GVF) post-tensioning technique whereby a void is created between the top of the ground DFI 37th Annual anchor and the bottom of the concrete cap. The void is Conference 2012 Oct. 16 - 19 expected to collapse as the post-tensioning force is Houston, TX transferred to the ground anchor causing it to move and mobilize soil resistance. After the anchor is post- tensioned and locked off, the void is cement grouted. The ADSC/DFI PT anchor can now resist compression as well as tension Micropile and forces thereby increasing foundation stiffness. AER meeting 2012 November 13 -14 Summary of Cost Estimates Herndon, VA Foundation construction cost estimates were provided by three qualified potential foundation contractors, CTS engineers estimate and a comparison with spread footing costs are tabulated below in Table 1 and illustrated graphically in Chart 1. We are a member of: % less than Unit spread Project Contractor Cost Notes/Remarks footing Savings Contractor 1 $103,000 60 work days to complete 29% $4,200,000 Contractor 2 $94,366 price for 2 units per day 35% $5,063,400 Contractor 3 $83,295 50 work days to complete 43% $6,170,500 CTS engineers estimate $84,334 42% $6,066,600 Spread Foundation in Rock $145,000 For Comparison Table 1 *Project Savings are potential cost savings for 100 foundations vs.
    [Show full text]