PPP CELL, GOVERNMENT OF Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark Animal Husbandry, GoMP Date Disbursement 1 Establishment of Milk DBFOT . Dairy 61.77Pipe Line Ujjain Cooperative Milk 2014-2015 /(19-03-2015) Approved for Cabinet Drying Unit of MPTPD Union Approval Capacity at Main Dairy Plant of Ujjain Union

2 Establishment of DBFOT Indore Dairy 31.37Pipe Line Indore Cooperative 2015-2016 /(23-05-2015) Approved for Cabinet Aseptic Packaging Unit Milk Union Approval. of 40,000 LPD at Indore

Biodiversity and Biotechnology, GoMP Commerce, Industry and Employment, GoMP 3 Dewas Industrial Area BOT Dewas. Industry 77.58Construction MP State Industrial 2010-2011 /NA Concessional agreement has Water Supply Development been executed on 07-01-2018, Corporation Ltd concessional period upto 15- 06-2037. As per MPIDC letter 4 Rau-Pithampur 4 lane Annuity Indore. Road 78.52 Bidding MP AKVN Ltd., Indore 2008-2009 17/(14-08-2013) Concessional agreement has (from 2-lane) 13.826 been executed on 30-09-2014, kms concessional period upto 04- 06-2030. As per MPIDC letter No.MPIDC/CE/2021/736 dated 03-02-2021, project running 5 Upgradation of BOT Multiple. Industry 20.38Pipe Line Directorate of 2014-2015 26/(19-03-2015) SLEC on 19 March 2015 Employment Exchanges Commerce, Industry approved for approval by the into Placement Centres and Employment, MP Cabinet (Revised)

Energy, GoMP 6 Development of Input- OMT Sagar. Energy 30Completed MP Poorv Kshetra 2011-2012 /(02-01-2012) Levelised input rate Rs. Based Electricity Vidyut Vitran Co Ltd, 3.726/kWh Distribution System in Jabalpur Sagar

7 Construction of 400 KV DBFOT Multiple Energy 282.7Completed MP Power 2011-2012 10/(02-01-2012) 20+15% Not claimed Planning Commiss Model coz Satpura-Ashta DCDS Transmission Co Ltd, of State suitability and VGF Transmission line Jabalpur (20+15% for O&M support). LI Project for Evacuationb identified (60.75 crs). LoA on of Power from 2x250 26-Apr-13 to Kalpataru Power MW Extension units at Trans Ltd, amended 29-May- Satpura through PPP 13. Project completed and Mode achieved commercial operation on 07-04-2015. 8 Development of Input- OMT Ujjain. Energy 70Completed MP Pashchim Kshetra 2011-2012 10/(02-01-2012) Levelised input rate Rs. Based Electricity Vidyut Vitran Co Ltd, 3.781/kWh Distribution System in Indore Ujjain

Farmer Welfare and Agriculture Development, GoMP 9 Logistics Park BOOT Hoshangabad Warehousing 138.5 Construction MP Agriculture 2011-2012 4/(26-02-2011) Vide Pawarkheda (115 acres) . and Logistics Marketing Board Lt.No.Board/Cons/PPP/20- (Mandi Board) 21/1667 dated 05-02-2021, informed that the project Food, Civil Supplies and Consumer Protection, GoMP PPP CELL, GOVERNMENT OF MADHYA PRADESH Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark 10 Development, BOT Multiple. Warehousing 249.92 Completed MP State Warehousing 2013-2014 19/(05-02-2014)Date 20% NotDisbursement claimed DEA/GoI accorded in principal Operaration & and Logistics and Logistics approval for 20% VGF. The maintenance of Steel Corporation Committee recommended the Silos for wheat (10) project for in-principle 50,000 MTonne capacity approval by the Cabinet. each 11 Logistics Hub in Katni DBFOT Katni Warehousing 125 Bidding MP State Warehousing 2015-2016 27/(23-05-2015) In-principle approval, final and Logistics and Logistics approval accorded for the Forest, GoMP 12 Eco-Tourism and BOT Rewa. Tourism 15.68Construction MP Ecotourism 2012-2013 13/(30-08-2012) Bidding date 29/08/13, CA Adventure Park (5.783 Development Board signed 28/04/14, Ruchi Realty ha) Holdings Pvt Ltd has formed 13 Eco-tourism park at BOT Dewas. Vill Tourism 1Completed MP Ecotourism 2009-2010 /(18-01-2010) CA signed 19/05/2010, Date of Arnia near Sonkatch (4.5 Arnia Development Board commencement of work Hect) 23/04/2011, COD on 15/08/2013, Concessionaire - 14 Eco-Tourism Adventure BOT Indore Tourism 50Bidding Forest Department, 2012-2013 /(15-02-2013) MPPDF assistance approved Park - Ralamandal, GoMP Indore 15 World-Class Zoological BOT Bhopal. Tourism 130Pipe Line Forest Department, 2008-2009 /NA RFP forTA submitted to Dept. Park on 350 ha GoMP PD expense 2 Cr. IIPDF approved Horticulture and Food Processing, GoMP Housing and Environment, GoMP 16 Fitness Centre O & M of OMT Bhopal. Urban 1Completed Capital Project 2010-2011 22/NA CA signed 11 Feb 2011 Prakash Swimming Pool Administration, Bhopal

17 Kalpana Nagar OMT Bhopal. Urban 1Completed Capital Project 2011-2012 /NA CA signed 11 Feb 2012 Swimming Pool O&M Administration, Bhopal

18 Development of Hostel BOT Bhopal Technical 45 Completed Capital Project 2014-2015 22/(15-07-2014) As CPA construction for National Institute of Education Administration, Bhopal divn.No.1,email dated 29-01- Fashion Technology 2021, project completed. Lett No.EESLEC on 15 July 2014 Medical Education, GoMP 19 Installation of LINACs at DBFOT Bhopal- Health 105.73Pipe Line Medical Education, 2020-2021 34/(17-12-2019) In-principle with Proj.Cost of Approved 7 Medical Colleges in Indore-Rewa: GoMP Dept Rs.164.01 Crore. Now the MP (Redio Therapy DBFOT and revised Project cost is Centres) Jabalpur- Rs.105.73 Crore approved in Gwalior : 36th SLEC dt 17-12-2020. Pubic Health and Family Welfare, GoMP 20 Dindayal Chalit Aspatal BOT Multiple. Health 67Completed National Rural Health 2010-2011 3/(17-01-2011) SLEC on 17-01-11 (in- Yojana Mission principle+final approval). Public Health Engineering, GoMP Public Works, GoMP 21 Gwalior to MP/UP BOT Road 314.53Completed MP Road Development 2010-2011 /(13-12-2010) CA on 13-12-10 with MP Border (Bhind) 2-lane Corporation Ltd. Highways Ltd. Govt contrib 27 with paved shoulder cr (NH-92) 108.00 kms PPP CELL, GOVERNMENT OF MADHYA PRADESH Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark 22 Hoshangabad- Harda- BOT Road 81Completed MP Road Development 2005-2006 /NA Date Disbursement Khandwa intermediate Corporation Ltd. lane (SH-15) 185.00 kms

23 Hoshangabad-Piparia- BOT Road 57Completed MP Road Development 2003-2004 /NA Pachmarhi (SH-22 & 19) Corporation Ltd. 126.00 kms

24 Indore-Edelabad 2-lane BOT Road 124.05Completed MP Road Development 2003-2004 /NA (SH-27) 203.00 kms Corporation Ltd.

25 Indore-Ujjain 4-lane (SH- BOT Road 298Completed MP Road Development 2010-2011 /NA Premium 26.38% of toll on 27) 48.85 kms Corporation Ltd. COD 26 Jabalpur-Narsinghpur- BOT Road 74.96Completed MP Road Development 2006-2007 /NA Piparia intermediate Corporation Ltd. lane (SH-22) 140.00 kms

27 Jaora-Nayagaon section BOT Road 425.71Completed MP Road Development 2011-2012 /NA 15.39 crs premium/year. 94% 4-lane (SH-31) 127.81 Corporation Ltd. completed kms 28 Lebad (SH-31 )- BOT Road 200.1Completed MP Road Development 2009-2010 /(02-09-2009) Premium 1.01. CA signed on Narayanpura-Digthan- Corporation Ltd. 04/05/2010 Manpur (NH-3) 4-lane 34.30 kms 29 Lebad-Jaora section 4- BOT Road 589.31Completed MP Road Development 2011-2012 /NA Premium 4.76% of toll on COD lane (SH-31) 125.00 kms Corporation Ltd.

30 Manawar-Singhana 2- BOT Dhar. Road 96.73Completed MP Road Development 2011-2012 7/(14-07-2011) 27.32 8.41 Crore GoMP VGF (20+14 for O&M) lane (MDR) 38.23 kms Corporation Ltd. Share

31 Mandsaur-Pratapgarh- BOT(T+A) Road 19.45Completed MP Road Development 2010-2011 1/(13-12-2010) Annuity 1.17 cr. 86% complete Rajasthan Border Corporation Ltd. intermediate lane (SH- 14) 11.526 kms

32 Mandsaur-Sitamau BOT Mandsaur Road 42.34Completed MP Road Development 2008-2009 /NA Toll started on 05 Feb 2009 (upto Rajasthan border) Corporation Ltd. 2-lane (SH-14) 44.00 kms 33 Matkuli-Tamia- BOT Road 213.25Completed MP Road Development 2009-2010 /NA Toll started on 19 March 2010 Chhindwara 2-lane (SH- Corporation Ltd. on 33.38 km 19) 112.00 kms 34 Mhow-Ghata Billod 4- BOT Road 186.61Completed MP Road Development 2010-2011 4/(26-02-2011) 25% complete lane (SH-27) 26.88 kms Corporation Ltd.

35 Mundi-Punasa-Sanawad BOT(T+A) Khandwa Road 124.77Completed MP Road Development 2011-2012 7/(14-07-2011) 2-lane (MDR) 67.63 kms Corporation Ltd.

36 Raisen-Rahatgarh 2-lane BOT Road 57.72Completed MP Road Development 2006-2007 /NA (SH-42) 101.40 kms Corporation Ltd. PPP CELL, GOVERNMENT OF MADHYA PRADESH Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark 37 Rewa-Shahdol- BOT Road 111.27Completed MP Road Development 2006-2007 /NA Date Disbursement Amarkantak Corporation Ltd. intermediate lane (SH-9 & 9A) 246.00 kms

38 Sagar-Damoh 2-lane (SH-BOT Road 116.5Completed MP Road Development 2008-2009 /(26-07-2008) 44.28 Crore 20.94 GoMP VGF 44.28. 89.16% completed 14) 98.90 kms Corporation Ltd. Share released 39 Sardarpur Badnawar 2- BOT(T+A) Road 91.69Completed MP Road Development 2010-2011 4/(26-02-2011) Annuity 4.71 cr. 100% With ref. to lane (SH-35) 42.98 kms Corporation Ltd. complete. 28th SLEC held on lt.No.7370/195-2/MIS 27-02-2016, approved revised dt.30-8-2019, inform project cost from 86.75 Crore on completion to 91.69 Crore. Change in 40 Satna-Maihiar-Umaria BOT Road 53.29Completed MP Road Development 2006-2007 /NA intermediate lane (SH- Corporation Ltd. 11) 141.00 kms

41 Seoni-Balaghat-Gondia BOT Road 59.8Completed MP Road Development 2005-2006 /NA (SH-26 & 11) 114.00 Corporation Ltd. kms 42 Silwani-Sultanganj-Sagar BOT(T+A) Road 121.51Completed MP Road Development 2011-2012 5/(15-04-2011) Annuity to be not more than 2-lane (SH-15) 76.00 Corporation Ltd. 16% of TPC. Annuity 9.49 cr. kms 60% complete 43 Sitamau-Basia-Suwasara BOT(T+A) Mandsaur Road 54.26Completed MP Road Development 2011-2012 7/(14-07-2011) intermediate lane Corporation Ltd. (MDR) 34.97 kms

44 Tikamgarh-Maheroni 2- BOT(T+A) Road 29.38Completed MP Road Development 2010-2011 1/(13-12-2010) Annuity 1.44 cr. 2% complete lane (SH-37) 15.7 kms Corporation Ltd.

45 Ujjain-Jhalawad BOT Road 66.7Completed MP Road Development 2003-2004 /NA intermediate lane (SH- Corporation Ltd. 27) 134.00 kms 46 Ujjain-Unhel-Nagda- BOT Road 189.29Completed MP Road Development 2009-2010 /(03-07-2009) Premium 1.01 Crore. CA Ghiloda Road 2-lane Corporation Ltd. signed on 06/05/2010. 69% (MDR) 95.22 kms complete 47 AB Road-Magarkhedi- Annuity Khargone Road 17.19Completed MP Road Development 2011-2012 7/(14-07-2011) Bamri (MDR) 12.61 kms Corporation Ltd.

48 Alirajpur-Jobat (MDR) Annuity Alirajpur Road 45.31Completed MP Road Development 2011-2012 7/(14-07-2011) 32.11 kms Corporation Ltd. 49 Ankhiya-Barkheda- Annuity Bhopal Road 14.13Completed MP Road Development 2011-2012 7/(14-07-2011) Dongargaon-Nazirabad Corporation Ltd. (MDR) 10.40 kms

50 Ashapur-Khalwa-Singot Annuity Khandwa Road 56.9Completed MP Road Development 2011-2012 7/(14-07-2011) (MDR) 41.70 kms Corporation Ltd.

51 Ashoknagar-Vidisha BOT(T+A) Ashoknagar Road 87.06Completed MP Road Development 2011-2012 7/(14-07-2011) VGF Not claimed VGF (20+20 for O&M). Re- (MDR) 35.68 kms Corporation Ltd. SLEC on 25-Apr-12 for 52 Badnavvar-Thandla (SH- BOT(OMT) Road 10.38Completed MP Road Development 2012-2013 12/(25-04-2012) Toll only on comm vehicle, 18) 78.80 kms Corporation Ltd. from 45 day 53 Badwah-Katekut (MDR) Annuity Khargone Road 34.99Completed MP Road Development 2011-2012 7/(14-07-2011) 23.60 kms Corporation Ltd. PPP CELL, GOVERNMENT OF MADHYA PRADESH Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark 54 Bahari-Hanumana BOT(T+A) Rewa/Sidhi Road 106.78Completed MP Road Development 2011-2012 7/(14-07-2011)Date Disbursement (MDR) 49.28 kms Corporation Ltd. 55 Bamkhlafata-Dogawa- Annuity Khargone Road 33.99Completed MP Road Development 2011-2012 7/(14-07-2011) Viaborawa-Savardevala Corporation Ltd. (MDR) 24.00 kms

56 Barwah-Dhamnod (SH- BOT(OMT) Road 22.69Completed MP Road Development 2012-2013 12/(25-04-2012) Toll only on comm vehicle, With ref. to 38) 61.927 kms Corporation Ltd. from 45 day lt.No.7370/195-2/MIS 57 Bawangaja-Pati-Bokrata Annuity Barwani Road 47.01Completed MP Road Development 2011-2012 7/(14-07-2011) (MDR) 34.00 kms Corporation Ltd.

58 Beed-Mundi-Devala- Annuity Khandwa Road 52.39Completed MP Road Development 2011-2012 7/(14-07-2011) Khutala-Attot-NVDA Corporation Ltd. (MDR) 37.00 kms 59 Rewa-Hanumana 4-Lane BOT Road 776.23Completed MP Road Development 2012-2013 /NA MP/UP Border (NH-7) Corporation Ltd. 89.30 kms 60 Betul-Atner (MDR) Annuity Betul Road 45.39Completed MP Road Development 2011-2012 7/(14-07-2011) 34.50 kms Corporation Ltd. 61 Betul-Sarni-Tikadhan- BOT(T+A) Jabalpur Road 243.24Completed MP Road Development 2010-2011 /(30-08-2010) VGF+Deemed Not claimed VGF+Deemed Shadow Fee not Junnardeo-Parasiya 2- Corporation Ltd. Shadow over 50% of TPC. Re-SLEC on lane (SH-43) 124.10 kms 08-Feb-13 for (t+a) mode, since CA signed on 12-May-11 terminated coz no FC 62 Bhopal bypass 4 lane BOT Road 276.56Completed MP Road Development 2010-2011 /NA Initial CA terminated. New 52.00 kms Corporation Ltd. agreement signed on 63 Bijawad-Kushmaniya- Annuity Dewas Road 109.08Completed MP Road Development 2011-2012 7/(14-07-2011) Haran-Deepgaon (MDR) Corporation Ltd. 75.62 kms

64 Bina-Kurwai-Sironj 2- BOT Road 95.1Completed MP Road Development 2010-2011 /NA VGF 36.68 Crore Premimum VGF 36.68 cr sanctioned, but lane (SH-14) 57.10 kms Corporation Ltd. quated, not premium quoted 1.06 cr. CAon claimed 23.11.2010. 17% complete 65 Damoh-Katni 2-Iane (SH- BOT(T+A) Damoh/Katni Road 272.07 Completed MP Road Development 2011-2012 11/(24-02-2012) VGF Not claimed VGF 40% (20% GoMP share as 14) 117.93 kms Corporation Ltd. O&M support). Re-SLEC on 08- Feb-13 for (t+a) mode, since no bid in Jul 2012 under 66 Damoh-Patharia- BOT(T+A) Damoh Road 71.88Completed MP Road Development 2011-2012 7/(14-07-2011) With ref. to Garhakota (MDR) 40.50 Corporation Ltd. lt.No.7370/195-2/MIS kms dt.30-8-2019, inform 67 Dariapur-Jasaundhi Annuity Burhanpur Road 21.16Completed MP Road Development 2011-2012 7/(14-07-2011) (MDR) 15.55 kms Corporation Ltd. 68 Datia-Bhander (MDR) BOT(T+A) Datia Road 52.83Completed MP Road Development 2011-2012 7/(14-07-2011) 29.18 kms Corporation Ltd. 69 Deharda-Ishagrah BOT(T+A) Road 50.57Construction MP Road Development 2010-2011 /(13-12-2010) Annuity 2.45 cr. 15% complete intermediate lane (SH- Corporation Ltd. 10) 32.93 kms 70 Devgularjod-Arandia Annuity Shajapur Road 57.84Completed MP Road Development 2011-2012 7/(14-07-2011) (MDR) 34.96 kms Corporation Ltd.

71 Dinara-Datia 2-lane (SH- Annuity Road 17.02Completed MP Road Development 2011-2012 5/(15-04-2011) Annuity to be not more than 19) 8.39 kms Corporation Ltd. 16% of TPC PPP CELL, GOVERNMENT OF MADHYA PRADESH Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark 72 Gadarwara-Tendukheda Annuity Narsinghpur Road 60.82Completed MP Road Development 2011-2012 7/(14-07-2011)Date Disbursement (MDR) 32.12 kms Corporation Ltd.

73 Garhakota-Rehli-Devri Annuity Sagar Road 72.98Completed MP Road Development 2011-2012 7/(14-07-2011) (MDR) 49.30 kms Corporation Ltd.

74 Garra-Waraseoni (MDR) BOT(T+A) Balaghat Road 97.77Completed MP Road Development 2012-2013 13/(30-08-2012) Annuity 16.30 Crs [upto Maharashtra Corporation Ltd. border] 46.98 kms

75 Gormi-Udotgarh Annuity Road 39.12Completed MP Road Development 2011-2012 5/(15-04-2011) SLEC dated 8-6-2016 accorded intermediate lane (SH- Corporation Ltd. approval for revised cost from 19) 16.77 kms 38.50 Cr to 39.118 Cr. 76 Guna-Ashoknagar- BOT Road 108.5Completed MP Road Development 2010-2011 11/(29-07-2010) 36.75 cr/15.73 13.66 cr. VGF sanctioned 40%. With ref. to Ishagarh 2-lane (SH-20) Corporation Ltd. gomp share Agreement signed on lt.No.7370/195-2/MIS 76.15 kms 07.02.201 1 dt.30-8-2019, inform 77 Harda-Chhipaner (MDR) Annuity Harda Road 38.57Completed MP Road Development 2011-2012 7/(14-07-2011) 29.30 kms Corporation Ltd. 78 Hata-Fatehpur-Rajpura- BOT(T+A) Road 76.8Completed MP Road Development 2010-2011 1/(13-12-2010) Annuity 4.38 cr. 23% Solapuir-Bajna- Corporation Ltd. complete. CA suspended, no Dargawon 2-lane (SH- substitution by the lenders. 48) 64.42 kms Termination done. SLEC 5 Feb 2014 approved documents for 79 Itkhedi-Raslakhedi Annuity Bhopal Road 11.52Completed MP Road Development 2011-2012 7/(14-07-2011) (MDR) 9.34 kms Corporation Ltd. 80 Jaora-Piplodha- Annuity Ratlam Road 60.03Completed MP Road Development 2011-2012 7/(14-07-2011) Jalandharkheda and Corporation Ltd. Piplodha-Sailana (MDR) 42.27 kms 81 Jawad-Khoh (MDR) Annuity Neemuch Road 30.86Completed MP Road Development 2011-2012 7/(14-07-2011) 21.00 kms Corporation Ltd. 82 Jhabua-Jobat-Zeerpanya-BOT Road 162.45Completed MP Road Development 2010-2011 /(30-08-2010) VGF+Deemed Not claimed VGF+Deemed Shadow Fee not With ref. to Kukshi 2-lane(SH-39) Corporation Ltd. Shadow over 50% of TPC. VGF sanction lt.No.7370/195-2/MIS 95.50 kms 62.98 cr, but actual grant 49 dt.30-8-2019, inform cr, on completion 83 Kantaphod-Nachabhor Annuity Dewas Road 90.95Completed MP Road Development 2011-2012 7/(14-07-2011) (MDR) 60.38 kms Corporation Ltd.

84 Khandwa-Dehtalai- BOT Road 243.24Completed MP Road Development 2010-2011 1/(13-12-2010) 66.36cr/20.96 gomp 18.04 VGF 66.33 Crore. With ref. to Burhanpur 2-lane(SH- Corporation Ltd. share lt.No.7370/195-2/MIS 50) 127.25 kms dt.30-8-2019, inform on completion 85 Kurawar-Eklara-Talen Annuity Rajgarh Road 49.89Completed MP Road Development 2011-2012 7/(14-07-2011) (MDR) 39.22 kms Corporation Ltd.

86 Lakhandon-Ghansore BOT Road 83.43Completed MP Road Development 2011-2012 5/(15-04-2011) Not claimed with 25.32 cr VGF. Actual With ref. to upto Seoni 2-lane(SH- Corporation Ltd. grant 0.54 cr lt.No.7370/195-2/MIS 40) 37.93 kms dt.30-8-2019, inform on completion 87 Lateri-Anadapur- Annuity Vidisha Road 24.47Completed MP Road Development 2011-2012 7/(14-07-2011) Bhagwantpur (MDR) Corporation Ltd. 22.60 kms PPP CELL, GOVERNMENT OF MADHYA PRADESH Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark 88 Mangawan to MP/UP BOT Road 410.72Completed MP Road Development 2011-2012 /NADate Disbursement AsperCE mprdc letter Border 4-lane (NH-27) Corporation Ltd. bot/13114 dated3.2.21 52.07 kms

89 Mangawar-Bekunthpur Annuity Rewa Road 26.29Completed MP Road Development 2011-2012 7/(14-07-2011) (MDR) 18.80 kms Corporation Ltd.

90 Ucchera-Nagod-Singpur- BOT(T+A) Satna Road 123.41Completed MP Road Development 2015-2016 7/(14-07-2011) 28th SLEC held on 27-02-2016, With ref. to Kalinjer 2-lane (SH-56) Corporation Ltd. approved revised project cost lt.No.7370/195-2/MIS 55.60 kms from 115.20 Crore to 123.41 dt.30-8-2019, inform Crore. Change in project cost on completion be borne by developer and 91 NH-86 (Teonda)-Ganj Annuity Vidisha Road 46.03Completed MP Road Development 2011-2012 7/(14-07-2011) Basoda (MDR) 37.80 Corporation Ltd. kms 92 Panna-Amanganj- BOT(T+A) Panna/Damo Road 97.13Completed MP Road Development 2011-2012 7/(14-07-2011) 14% complete Semariya-Gaisabad h. Corporation Ltd. intermediate lane (SH- 47) 58.18 kms 93 Paron-Goras BOT(T+A) Road 106.21Completed MP Road Development 2011-2012 7/(15-04-2011) Annuity to be not more than intermediate lane (SH- Corporation Ltd. 16% of TPC. Annuity 8.05 cr. 23) upto Raj border 25% complete 36.48 kms 94 Phoolsagar-Niwas- Annuity Mandla/Dind Road 156.9Completed MP Road Development 2011-2012 7/(14-07-2011) Shahpur (MDR) 83.70 ori. Corporation Ltd. kms 95 Pipliya-Manasa (MDR) Annuity Mandsaur Road 63.21Completed MP Road Development 2011-2012 7/(14-07-2011) 40.19 kms Corporation Ltd. 96 Poudi-Maharapur- Annuity Satna Road 31.42Completed MP Road Development 2011-2012 7/(14-07-2011) Parasmaniya (MDR) Corporation Ltd. 25.09 kms 97 Punasa-Mundi-Singhaji Annuity Khandwa Road 24.06Completed MP Road Development 2011-2012 7/(14-07-2011) (Thermal Power Plant Corporation Ltd. road) and Singhaji Bridge approach (MDR) 17.00 kms

98 Rajpuriya-Petlabad- Annuity Jhabua Road 25.73Completed MP Road Development 2011-2012 7/(14-07-2011) Bamniya (MDR) 18.18 Corporation Ltd. kms 99 Ratlam-Sailana- BOT(T+A) Ratlam Road 117.28Completed MP Road Development 2011-2012 11/(24-02-2012) 40% (20+20) Not claimed VGF 40% (20% GoMP share as Banswara 2-lane (SH-39) Corporation Ltd. O&M support). Re-SLEC on 08- 43.58 kms Feb-13 for (t+a) mode, since no bids in Jun 2012 under 100 Rau-Mhow- BOT Road 181.5Completed MP Road Development 2010-2011 /(30-08-2010) 66.33 Cr. Not claimed VGF 66.33 Crore Mandleshwar 2-lane Corporation Ltd. (MDR+1)74.40 kms

101 Rehli-Salwara- Annuity Sagar Road 28.27Completed MP Road Development 2011-2012 7/(14-07-2011) Gorjhamar (MDR) 18.08 Corporation Ltd. kms PPP CELL, GOVERNMENT OF MADHYA PRADESH Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark 102 Rewa Ring Road 4-lane BOT(T+A) Rewa Road 74.2Completed MP Road Development 2012-2013 9/(29-10-2011)Date 20%+20% NotDisbursement claimed VGF 20% (Gol) + 20% (GoMP, 8.92 kms Corporation Ltd. for O&M). Re-SLEC on 08-Feb- 13 for(t+a) mode, since no bids in May 2012 under earlier 103 Salsalai-Gulana-Gulai Annuity Shajapur Road 31.03Completed MP Road Development 2011-2012 7/(14-07-2011) Rly Stn (MDR) 19.31 Corporation Ltd. kms 104 Sausar-Mohgaon- Annuity Chhindwara Road 58.2Completed MP Road Development 2011-2012 7/(14-07-2011) Mordongri (MDR) 29.58 Corporation Ltd. kms 105 Seliora-Majhgawan BOT(T+A) Jabalpur Road 92.65Completed MP Road Development 2011-2012 7/(14-07-2011) 40% (20+20) Not claimed VGF (20+20 for O&M). Re- (MDR) 39.85 kms Corporation Ltd. SLEC on 25-Apr-12 for 106 Sehore-Icchawar-Kosmi BOT(T+A) Road 91.54Completed MP Road Development 2011-2012 5/(15-04-2011) Annuity to be not more than 2-lane (SH-53) 50.12 Corporation Ltd. 16% of TPC. Annuity 4.41 cr. kms 11 % complete 107 Semaria-Manikpur BOT(T+A) Road 34.83Completed MP Road Development 2010-2011 1/(13-12-2010) Annuity 2.57 cr. 13% complete intermediate lane (SH-9) Corporation Ltd. 16.36 kms 108 Seoni-Katangi (SH-54) BOT Road 165.9Completed MP Road Development 2011-2012 5/(15-04-2011) 54.50 Cr. Not claimed for VGF. Actual 54.50 cr With ref. to upto Maha border 75.60 Corporation Ltd. lt.No.7370/195-2/MIS kms dt.30-8-2019, inform 109 Sheopur-Baroda- BOT(T+A) Sheopur Road 61.8Completed MP Road Development 2011-2012 7/(14-07-2011) Khwajapur (MDR) 32.29 Corporation Ltd. kms 110 Sidhi-Singrauli 4-lane BOT Road 736.72Construction MP Road Development 2011-2012 /NA As per MPRDC Lett No. (NH-75E) 102.60 kms Corporation Ltd. BOT/13114 dated 3-2-2021 concessioneir default CA 111 Sijhat-Hinoti-Malgaon- Annuity Satna Road 43.56Completed MP Road Development 2011-2012 7/(14-07-2011) Khamariya-Ater (MDR) Corporation Ltd. 32.20 kms

112 Singhana-Chikalda Annuity Dhar Road 23.04Completed MP Road Development 2011-2012 7/(14-07-2011) (MDR) 16.27 kms Corporation Ltd. 113 Sonapipari-Umerth- Annuity Chhindwara Road 43.73Completed MP Road Development 2011-2012 7/(14-07-2011) Monari-Umbah (MDR) Corporation Ltd. 22.25 kms 114 Soyat-Pidawa (MDR) Annuity Shajapur Road 8.78Completed MP Road Development 2011-2012 7/(14-07-2011) 6.23 kms Corporation Ltd. 115 Thandla-Limdi BOT(T+A) Road 56.16Completed MP Road Development 2010-2011 1/(13-12-2010) Annuity 0.90 cr. 18% complete intermediate lane (SH- Corporation Ltd. 18) upto Guj border 31.18 kms 116 Ujjain-Simhastha Bypass BOT(T+A) Ujjain Road 94.3Completed MP Road Development 2012-2013 14/(08-02-2013) 2-lane 14.29 kms Corporation Ltd.

117 Umari-Phoop-Pratappur BOT(T+A) Bhind Road 75.3Completed MP Road Development 2011-2012 7/(14-07-2011) (MDR) 43.67 kms Corporation Ltd.

118 Waraseoni-Lalbarra BOT(T+A) Balaghat Road 42.51Completed MP Road Development 2011-2012 7/(14-07-2011) (MDR) 18.30 kms Corporation Ltd. 119 Baretha - BOT(T+A) Road 40.87Completed MP Road Development 2013-2014 14/(05-02-2014) Approved the Project for in- With ref. to Ghodadongri15.10 kms Corporation Ltd. principle approval by the lt.No.7370/195-2/MIS Cabinet. dt.30-8-2019, inform PPP CELL, GOVERNMENT OF MADHYA PRADESH Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark 120 Guna-Aron-Sironj (SH- BOT(T+A) Guna-Vidisha Road 199.13 Completed MP Road Development 2013-2014 22/(15-07-2014)Date Disbursement Approved the Project for in- With ref. to 28) Corporation Ltd. principle approval by the lt.No.7370/195-2/MIS 121 Agar-Sarangpur Road OMT Shajapur- Road 1.95Completed MP Road Development 2014-2015 22/(15-07-2014) Approved the Project for in- With ref. to (SH-41) Rajgarh Corporation Ltd. principle approval by the lt.No.7370/195-2/MIS 122 Ashta-Kannod Road (SH- OMT Sehore- Road 1.63Completed MP Road Development 2014-2015 22/(15-07-2014) Approved the Project for in- 41) Dewas Corporation Ltd. principle approval by the 123 Badgawan-Bedhan Road OMT Katni- Road 16.67Completed MP Road Development 2014-2015 22/(15-07-2014) Approved the Project for in- Singrauli Corporation Ltd. principle approval by the 124 Bhopal-Vidisha (SH-18) OMT Bhopal- Road 3.38Completed MP Road Development 2014-2015 /(28-07-2014) DLEC Vidisha Corporation Ltd. 125 Ghansour-Mandla (SH- OMT Seoni-MandlaRoad 4.47Completed MP Road Development 2014-2015 /(28-07-2014) DLEC 40) Corporation Ltd. 126 Khalghat-Manawar (SH- OMT Dhar Road 6.2Completed MP Road Development 2014-2015 /(28-07-2014) DLEC With ref. to 38) Corporation Ltd. lt.No.7370/195-2/MIS 127 Udaipura-Gadarwara OMT Raisen- Road 2.06Completed MP Road Development 2014-2015 /(28-07-2014) DLEC With ref. to (SH-44) Narsinghpur Corporation Ltd. lt.No.7370/195-2/MIS 128 Vidisha-Kurwai (SH-19) OMT Vidisha Road 2.79Completed MP Road Development 2014-2015 /(28-07-2014) DLEC Corporation Ltd. 129 Four/Six Laning with BOT(T) Dewas Road 286.25Completed MP Road Development 2015-2016 28/(27-02-2016) Accorded in-principal approval With ref. to Paved Shoulder of Corporation Ltd. to the project. lt.No.7370/195-2/MIS Dewas Bypass 19.80 KM dt.30-8-2019, inform on construction 130 Rehab.&Upgradation of BOT(T) Gwalior Road 76.52Completed MP Road Development 2016-2017 30/(22-08-2016) In-principal approval accorded With ref. to two lane plus Corporation Ltd. lt.No.7370/195-2/MIS paved/hard shoulder dt.30-8-2019, inform 19KMs road of NH-75 about construction (Gwalior-Jhansi Ghongha Village (Dabra- Singhpur Road via Bilua village)

131 Bela-Govindgarh- BOT(OMT) Road 12.2Completed MP Road Development 2013-2014 19/(25-04-2012) Re-bid. No bids received. SLEC Churhat (SH-18) 56.74 Corporation Ltd. 5 Feb 2014 approved the kms revised proposal and 132 Budhni-Rehti- BOT(OMT) Sehore/Dewa Road 5.5Completed MP Road Development 2012-2013 14/(08-02-2013) Nasrullaganj-Khategaon s. Corporation Ltd. upgradation & maintenance (SH-22) 87.4 kms

133 Nagda-Gogapur (MDR) Annuity Road 40.58Completed MP Road Development 2013-2014 14/(18-06-2013) 14.98 kms Corporation Ltd. 134 Ti kamgarh( Dhajrai )- BOT(T+A) Tikamgarh/Ch Road 107.34Completed MP Road Development 2012-2013 14/(08-02-2013) Jatara- Palera-Nowgaon hatarpur. Corporation Ltd. (MDR) 76.40 kms

135 Badwani-Palsod- BOT(T+A) Road 103.99Completed MP Road Development 2010-2011 1/(13-12-2010) Annuity 4.97 cr Sendhwa intermediate Corporation Ltd. lane (SH-39) 56.89 kms

136 Bhind-Mihona-Gopalpur BOT Road 82.06Completed MP Road Development 2008-2009 /(26-07-2008) 31.71 cr. GoMP 15.13 Cr. VGF 31.71 2-lane (SH-2) 50.86 kms Corporation Ltd. Share 15.13 cr. PPP CELL, GOVERNMENT OF MADHYA PRADESH Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark 137 Bhopal-Dewas 4-lane BOT Road 640Completed MP Road Development 2010-2011 /NA Date Disbursement (SH-18) 140.79 kms Corporation Ltd.

138 Bina-Khimlasa-Malthon BOT Road 69.11Completed MP Road Development 2008-2009 /(26-07-2008) 26.27 cr. GOMP 12.44 Cr. VGF 26.27 2-lane (SH-42&42A) Corporation Ltd. Share 12.45 Cr. 39.42 kms 139 Cliandrapur-Alirajpur- BOT Road 144Completed MP Road Development 2009-2010 /NA Toll started on 18 Aug 2009 on Kukshi- Badvvani (SH- Corporation Ltd. 41 km 26)99.13 kms

140 Damoh-Jabalpur 2-lane BOT Road 212.13Completed MP Road Development 2008-2009 /(26-07-2008) 82.71 Cr. GoMP 12.73 Cr. VGF 82.71, 94.59% completed (SH-37) 50.86 kms Corporation Ltd. Share 42.43 Cr.

141 Dewas-Ujjain-Badnagar- BOT Road 49.93Completed MP Road Development 2004-2005 /NA Badnawar (SH-18) 98.26 Corporation Ltd. kms 142 Bhopal-Vidisha SH 28, OMT Bhopal- Road 16.22Bidding MP Road Development 2019-2020 34/(17-12-2019) Approved 36.15 KM Vidisha Corporation Ltd. 143 Manawar-Mangod SH OMT Dhar Road 18.89Bidding MP Road Development 2019-2020 34/(17-12-2019) Approved 37, 50.41 KM Corporation Ltd. 144 Sardarpur-Rajgarh-Bagh OMT Dhar-Rajgarh Road 18.83Bidding MP Road Development 2019-2020 34/(17-12-2019) In-Principal NH- SH 65, 50.23 KM Corporation Ltd. Approved

145 Damoh-Hata-Gaisabad OMT Damoh Road 28.18Bidding MP Road Development 2019-2020 34/(17-12-2019) In-Principal NH- SH 55, 73.42 KM Corporation Ltd. Approved

146 Shivpuri-Pohari-Karhal- OMT Shivpuri- Road 33.4Bidding MP Road Development 2019-2020 34/(17-12-2019) In-Principal NH- Goras SH 51, 85.40 KM Sheopur Corporation Ltd. Approved

147 Badwah-Dhamnod SH OMT Khargone- Road 29.96Bidding MP Road Development 2019-2020 34/(17-12-2019) Approved 36, 61.92 KM Dhar Corporation Ltd. 148 Nagda-Khachrod- OMT Ujjain Road 9.89Pipe Line Public Works 2019-2020 34/(17-12-2019) Approved Ghinoda (VR) Department 149 Narsinghgarh-Boda (MP- OMT Rajgarh Road 11.79Pipe Line Public Works 2019-2020 34/(17-12-2019) Approved MD-28-12) Department 150 Pachor-Boda-Borkheda OMT Rajgarh Road 13.15Pipe Line Public Works 2019-2020 34/(17-12-2019) Approved (MP-MDR-28-09) Department

151 Badagaon-Sihoniaya- OMT Morena Road 10.16Pipe Line Public Works 2019-2020 34/(17-12-2019) Approved Manpur Tiraha (MP- Department MDR-02-05, 04) 152 Satna-Kotar-Aber- OMT Satna Road 21.67Pipe Line Public Works 2019-2020 34/(17-12-2019) Approved Semariya (MP-MDR-09- Department 08) 153 Katangi-Polli-Majhauli OMT Jabalpur Road 2.71Pipe Line Public Works 2019-2020 34/(17-12-2019) Approved (MP-MDR-37-02) Department

154 Bhopal-Barasia-Sironj OMT Vidisha- Road 29.28Pipe Line Public Works 2020-2021 35/(16-11-2020) Approved SH-10 Bhopal Department 155 Ganjbasoda-Sinronj OMT Vidisha Road 3.67Pipe Line Public Works 2020-2021 35/(16-11-2020) Approved Road (MDR) Department 156 Seoni-Katangi Road SH- OMT Seoni Road 16.65Pipe Line Public Works 2020-2021 35/(16-11-2020) Approved 42 Department PPP CELL, GOVERNMENT OF MADHYA PRADESH Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark 157 Balaghat-Behar Road SH-OMT Balaghat Road 15.71Pipe Line Public Works 2020-2021 35/(16-11-2020)Date Disbursement Approved 47 Department 158 Nagda-Dhar SH-52 OMT Dhar Road 1.93Pipe Line Public Works 2020-2021 35/(16-11-2020) Approved 159 Khandwa-Mundi Road OMT Khandwa Road 7.25Pipe LineDepartment Public Works 2020-2021 35/(16-11-2020) Approved SH-70 Department 160 Indore-Depalpur SH-27 OMT Indore Road 7.27Pipe Line Public Works 2020-2021 35/(16-11-2020) Approved Department 161 Jabalpur-Patan- OMT Jabalpur Road 9.36Pipe Line Public Works 2020-2021 35/(16-11-2020) Approved Shahpura Road SH-21A Department

162 Budhar-Amarkantak OMT Anuppur Road 11.01Pipe Line Public Works 2020-2021 35/(16-11-2020) Approved Road SH-34 Department 163 Neemuch-Manasa Road OMT Neemuch Road 1.87Pipe Line Public Works 2020-2021 35/(16-11-2020) Approved SH-7 Department 164 Sujalpur-Akodia Road OMT Shajapur Road 9.75Pipe Line Public Works 2020-2021 35/(16-11-2020) Approved SH-25 Department 165 Agar-Jaora Road SH-25 OMT Ujjain Road 25.02Pipe Line Public Works 2020-2021 35/(16-11-2020) Approved Department Punchayat & Rural Development, GoMP School Education, GoMP Sports and Youth Welfare, GoMP 166 Sports City with Cricket/ BOOT Bhopal-Vill Sports 900Construction Sports and Youth 2010-2011 /NA Premium 18.10crs. as perletter no. 6236 Hockey/ Satgarhi Welfare Department, dated 03-02-21 this Football/Indoor/ GoMP metter is pending in Aquatic/Admin high court Jabalpur Block/Hostel on 50 acres plus Star Hotel/Golf/Residential/ Commercial (Tota1172 acres) Technical Education Technical Education and Skill Development, GoMP 167 ITIs Upgradation under BOT Multiple Education 140 Construction Directorate of 2011-2012 /NA Gol int-free loan 2.5 cr/ITI for Gol scheme (56) Technical Education Inst Mgt Committee and Skill Development, 168 Two State of the Art ITIs BOT Ujjain & Education 176.3Pipe Line Directorate of 2014-2015 21/(09-05-2014) In-principle approval for Advance Vocational Bhopal Technical Education Training and Skill Development, 169 ITIs upgradation under BOT Multiple Education 15Construction Directorate of 2011-2012 /NA Gol int-free loan 2.5 cr/ITI for Gol Scheme (6) Technical Education Inst Mgt Committee and Skill Development, Tourism, GoMP 170 Water-based Tourism DBFOT Khandwa. Vill Tourism 10Bidding MP Tourism 2010-2011 3/(17-01-2011) (final approval). Bids invited activities on Indira Sagar Hanvantiya Development Dam -1 Corporation

171 Water-based Tourism DBFOT Khandwa. Vill Tourism 10Bidding MP Tourism 2010-2011 3/(17-01-2011) (final approval). Bids invited activities on Indira Sagar Hanvantiya Development Dam - II Corporation PPP CELL, GOVERNMENT OF MADHYA PRADESH Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark 172 Conversion of Rajgarh DBFOT Datia Tourism 15Construction MP Tourism 2011-2012 9/(29-10-2011)Date Disbursement Concession extendable by 15 With. ref. to Palace Fort, 4.15 ha, Development yrs lt.no.3908/84/MPTB/I into hotel Corporation P dt.07-9-2019 Transport, GoMP 173 Check-Post barriers at BOT Multiple Transport 1094Construction Transport Department , 2010-2011 /NA Agreement signed 10-Nov-10. With ref. to lt. entry points of MP (24) GoMP 2 yr construction period No.8835/35/MPRDC/IS IBC dt.25-9-2019, Tribal Welfare, GoMP 174 Setting up of White DBFOT Shahdol, Financial 52.02 Pipe Line Tribal Welfare 2019-2020 34/(17-12-2019) Approved Label ATMs through Sidhi, Ratlam, Inclusion Department WLAO in 413 Haat Jhabua, Dhar, Bazars of Tribal Villages Khargone, in 89 Blocks of MP Khandwa, Betul, Urban Development & Housing 175 Development of DBFOT Damoh Urban 34.19Pipe Line Municipal Council 2018-2019 33/(10-01-2018) Recommended the proposal Approved Integrated Bus Terminal Damoh for approval from the Cabinet cum Commercial Complex in Damoh

176 Hospital Project at Old BOOT Gwalior Health 13.64Pipe Line Gwalior Municipal 2011-2012 /NA TA : CRISIL. IIPDF approved. Nigam Work Shop, Dholi Corporation RFQ docs prep, sent 28.11.11 Bua ka Pull (2330.60 Sq to UADD. UADD comments Mts) sent, no reply. UADD reminders on 7-Aug-12 and 8- 177 Procurement & BOT Bhopal Transport 85Completed Bhopal Municipal 2011-2012 /NA JNNURM sanction of Gol. Operation of Modern Corporation 50:20:30 funding of Gol, Low floor buses for GoMP, ULB. 110 buses on 6 Bhopal city routes

178 Procurement & BOT Indore Transport 59.75Completed Indore Municipal 2011-2012 /NA 111 buses on 15 routes. 5 Operation of Modern Corporation operators selected. 2 yrs extn Low floor buses for for 4, 1 cancelled premature Indore city 179 Bus stops for city BOOT Bhopal Urban 2.25Completed Bhopal Municipal 2006-2007 /NA Awarded in Sept 08, Rs. 1.24 service. 200 sq. ft. advt Corporation crs premium, 4 equal annual per stop (100 nos) instalments. 4 months construction. 5 yr concession 180 Commercial Complex BOOT Rewa Urban 20.46Completed Rewa Municipal 2010-2011 /(18-11-2010) DLEC. Reserve price 8.50 cr. construction 1.29 acres Corporation Premium 8,53,00,999 crs. User and O&M of Bus Charge Notification/Assets terminal handover done by 16.09.11. Expctd COD 15-Sep-13 181 Foot Over Bridges BOT Rau, nr Urban 2.12 Construction Nagar Palika Parishad 2009-2010 /NA CA with Edward (Divn of Swiift Indore. Rau Intermedia Convergence, Indore. Expected COD Mar 12, but due to 6-lane road 182 Multi-Level Parking at BOOT Indore Urban 56Construction Indore Municipal 2006-2007 /NA 2 complete, 2 construction, 3 Indore (7 sites) Corporation with land issues. Initial cost 14 183 Toilets with advt rights BOOT Bhopal Urban 7Construction Bhopal Municipal 2006-2007 /NA Premium 7.87 crs. in 14 (36) Corporation annual instalments. WO for PPP CELL, GOVERNMENT OF MADHYA PRADESH Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark 184 Bus Terminals (3) BOOT Bhopal Urban 43.6Pipe Line Bhopal Municipal 2012-2013 /NADate Disbursement Feasibility report submitted. Corporation IIPDF approved. RFP being prepared. MPRDC is dev terminals all over MP, hence proj dropped. 6-Jun-12, PS 185 Commercial Complex BOT Dewas Urban 45Pipe Line Dewas Municipal 2011-2012 /(29-10-2011) Land use to be changed from and Office of Municipal Corporation institutional to commercial Corporation cum institutional by T&CP. Land title under review by 186 Commercial Complex at BOT Satna Urban 16Pipe Line Satna Municipal 2011-2012 /(29-10-2011) Tender to be launched. Letter Bhais Khana on 0.4 ha Corporation to Collector to expedite land title issue 187 Commercial Complex at BOT Jabalpur Urban 31.52Pipe Line Jabalpur Municipal 2011-2012 /(29-10-2011) Presentation on 11.1.12 for Nagar Nigam Workshop Corporation JMC. CRISIL to revise cost by on 0.81 ha 10-Jul-12, done 19-Jul-12. MIC approved docs with 188 Multi Level Parking at BOOT Gwalior Urban 26.75Pipe Line Gwalior Municipal 2012-2013 /NA TA: CRISIL. IIPDF approved. Old Bus Stand Kampoo Corporation Feasibility report on 4-Jun-12, (731.25 Sq Mts and sent UADD 2-Jul-12. UADD 2027.96 Sq Mts) letters on 7-8-12 and 8-10-12 to MC for status, no response. 189 Multi Level Parking in BOOT Gwalior Urban 8.2Pipe Line Gwalior Municipal 2006-2007 /NA TA: CRISIL. IIPDF approved front of Nigam Shopping Corporation Complex Daulat Ganj (300.00 Sq Mts)

190 Multi Level Parking at BOT Bhopal Urban 38.67Pipe Line Bhopal Municipal 2006-2007 /NA TA appointed. Feasibility M.P. Nagar Corporation report submitted. Land issue 191 Multi Level Parking at BOT Bhopal. Urban 51Pipe Line Bhopal Municipal 2012-2013 /NA Feasibility report under New Mkt Corporation approval. Land issue (Community Centre & Commissioner Office) under Collector consideration. PS 192 Parking Cum BOOT Gwalior Urban 100Pipe Line Gwalior Municipal 2006-2007 /NA 5 bidders shortlisted. HC Commercial at Gandhi Corporation ordered status quo. Stay Mkt, Maharaj Bada for vacated 30.8.11, RfP being 300 cars, 252 shops prep. UADD comments sent relocation. (5,228 Sq. 11-6-12 to MC. Request from Mt.) 7 bidders recd 10-Nov-12, under eval. MIC approved RfP 193 ADB Pilot - 24x7 and OMT Indore Water Supply 13.94Bidding Indore Municipal 2007-2008 /NA RFP last date 15-jan-11. HC NRW Water reduction Corporation granted stay on the project. Single-bid tender cancelled. Rebid on 22-8-12, single bid, rejected for high cost on 30- 194 Water supply BOT Khandwa Water Supply 115.32 Completed Khandwa Municipal 2007-2008 /NA Rs. 11.95/KL. FC with IFC - augmentation and 24x7 Corporation $20L. Intake Well, RWRM, CW supply Feeder Mains 100%. CWRM 195 Water supply BOT Shivpuri Water Supply 80.71 Construction Shivpuri Nagar Palika 2007-2008 /NA Rs. 15.4/KL. Construction augmentation and 24x7 Parishad underway. Expected COD 30- supply Jun-13 PPP CELL, GOVERNMENT OF MADHYA PRADESH Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark 196 Development of Nodal BOT Bhopal Urban 111.74Pipe Line Bhopal Municipal 2014-2015 /(15-07-2014)Date Disbursement Accorded in-principle approval Citizen Center and Corporation for the project. Office Building at Mata Mandir 197 Development of Bus BOT Bhopal Urban 17.79Pipe Line Bhopal Municipal 2014-2015 /(15-07-2014) Accorded in-principle approval Stand and Commercial Corporation for the project. Complex at Putlighar

198 Development of DBFOT Bhopal Urban 323.17Pipe Line Bhopal Municipal 2014-2015 /(15-07-2014) Accorded in-principle approval Municipal Solid Waste Corporation for the project. at Adampur Chhawni

199 Development of BOT Bhopal Urban 23.36Pipe Line Bhopal Municipal 2014-2015 /(15-07-2014) Accorded in-principle approval Commercial Complex at Corporation for the project. Zone-8, Pulbogda

200 Implementation of DBFOT Katni Urban 35.4 Pipe Line Katni Municipality 2014-2015 /(15-09-2014) Accorded in-principle approval Regional Integrated for the project. Solid Waste Management Project, Katni 201 Implementation of DBFOT Sagar Urban 70.54 Pipe Line Sagar Municipality 2014-2015 /(15-09-2014) Accorded in-principle approval Regional Integrated for the project. Solid Waste Management Project, Sagar 202 Integrated Municipal DBFOT Bhopal Urban 465.76Pipe Line Bhopal Municipal 2015-2016 /(27-02-2016) Accorded in-principal approval Solid Waste Corporation for the Project Management Project, Bhopal (28 ULBs)

203 Integrated Municipal DBFOT Rewa Urban 158.67Pipe Line Rewa Municipal 2016-2017 28/(27-02-2016) The Project was earlier Approved Solid Waste Corporation approved in 28th SLEC Management Project, meeting and with certain Rewa (13 ULBs) amendments the project is again approved in 31st SLEC 204 Reginal integrated DBFOT Gwalior Urban 254.59Pipe Line Gwalior Municipal 2016-2017 31/(20-01-2017) Accorded in-principal approval Approved Municipal Solid Waste Corporation to the Project Management Project - Gwalior 205 Reginal integrated DBFOT Indore Urban 475.96Pipe Line Indore Municipal 2016-2017 31/(20-01-2017) Accorded in-principal approval Approved Municipal Solid Waste Corporation to the Project Management Project - Indore 206 In-Setu Redevelopment BOT Indore Urban 74.4Pipe Line Indore Municipal 2016-2017 31/(20-01-2017) Accorded in-principal approval Approved of Lodha Colony and PC Corporation to the Project Sethi Nagar Slum, Indore under Pradhan Mantri Awas Yojana

Total Projects : 206 20160.17