Police Telecom. Head Quarters, M.P. Bhadbhada Road, BHOPAL- 462003 (Fax No

Total Page:16

File Type:pdf, Size:1020Kb

Police Telecom. Head Quarters, M.P. Bhadbhada Road, BHOPAL- 462003 (Fax No F Police Telecom. Head Quarters, M.P. Bhadbhada Road, BHOPAL- 462003 (Fax No. 0755-2443674, E-mail: [email protected]) e-Tender Request for Proposals for 3D Modeling of Ujjain City, Supply of the Software, 360 Degree Camera system, Computer Hardware Systems (On turnkey basis) (Bid Reference No. PTHQ/Pur/3D Mapping/F-959/2015, Bhopal, Date: 26/11/2015) Single stage E- Tender process/ Three envelop procedure Last date for online submission of e-Tender :- 28/12/2015, up to 2300 Hrs. Last date for submission of Bid in Hard copy :- 29/12/2015, up to 1200 Hrs. Date of Bid Opening :- 29/12/2015 at 1300 Hrs. Director General Of Police Through- S.S.P. (Radio) Police Telecom. Head Quarters,M.P. Bhadbhada Road, Bhopal-462003 Phone &Fax : 0755- 2443674 E-mail: [email protected] 3- D Modeling Project Ujjain City MP Police Page 1 of 125 Disclaimer To participate in the open competitive process with a view of getting finally shortlisted to execute the works mentioned in the Tender Document. This Tender Document (also referred to as “Request for Proposal” or “ RFP” is not nor an Agreement or an offer or invitation by MP Police to any Bidder other than the one that qualifies based on evaluation of submitted Bids. The purpose of this Tender Document is to provide all the relevant information to the potential Bidders to assist them in responding to this Tender Document. Though this Tender Document is prepared with sufficient care to provide all required information to the potential Bidders, they may still need more information than what has been provided. In such cases, the potential Bidder is solely responsible to seek the additional information required from MP Police, at his / her own cost well in time. MP Police reserves the right to provide such additional information at its sole discretion. In order to respond to the Tender Document, if required, and with the prior permission of MP Police, the potential Bidder may conduct his own study and analysis, as may be necessary. MP Police makes no representation or on-site warranty and shall incur no liability under any law, statute, rules or regulations on any claim the potential Bidder may make in case of failure to understand the essential requirements of the Bidding process and then to respond to the Tender Document. MP Police may, in its absolute discretion, but without being under any obligation to do so, update, amend or supplement the information in this Tender Document at any time prior to the last date of submission of Bids. 3- D Modeling Project Ujjain City MP Police Page 2 of 125 Abbreviations 3D 3 dimensional AMC Annual Maintenance Contract ATP Acceptance Testing Plan BG Bank Guarantee BOM Bill of Material BoQ Bill of Quantity CMDB Common Management Database DD Demand Draft DSC Digital Signature Certificate EMD Earnest Money Deposit FAT Final Acceptance Testing FPS Frames Per Second GCC General Conditions of Contract GoI Government of India GoMP Government of Madhya Pradesh HD High Definition ICT Information and Communication Technology IP Internet Protocol LMOC Lead Member of Consortium LoI Letter of Intent MPP Madhya Pradesh Police MTTR Mean Time To Repair O and M Operation and Maintenance OEM Original Equipment Manufacturer PBG Performance Bank Guarantee PMU Project Management Unit PoC Proof of Concept POD Proof of Design PST Peak Service Time QA Quality Assurance RFP Request For Proposal SI System Integrator SITC Supply, Installation, Testing & Commissioning SLA Service Level Agreement 3- D Modeling Project Ujjain City MP Police Page 3 of 125 SOP Standard Operating Procedures SOW Scope of Work SP Office Superintendent of Police Office SSS Security and Surveillance Solution SWOT Strength, Weakness, Opportunity and Threat Analysis TC Treasury Challan TEC Technical Evaluation Committee TOR Terms of Reference TPA Third Party Agency UPS Uninterrupted Power Supply 3- D Modeling Project Ujjain City MP Police Page 4 of 125 Table of contents DISCLAIMER ............................................................................................................. 2 ABBREVIATIONS ..................................................................................................... 3 1 INVITATION FOR PROPOSAL ........................................................................... 8 1.1 EXECUTIVE SUMMARY .................................................................................................................................... 8 1.3 DEFINITIONS ....................................................................................................................................................... 10 1.4 GENERAL CONDITIONS .................................................................................................................................. 12 2 SCOPE OF WORK ................................................................................................ 13 2.1 SCOPE OF WORK .............................................................................................................................................. 13 2.2 SYSTEM REQUIREMENT................................................................................................................................. 14 2.3 OPERATING CONDITION ................................................................................................................................ 15 2.4 SCOPE OF INSTALLATION, COMMISSIONING AND SYSTEM INTEGRATION ...................................... 16 2.5 HANDHOLDING SUPPORT .............................................................................................................................. 17 2.6 SCOPE OF TRAINING –DELIVERABLES & TIMELINES ...................................................................................... 17 2.7 MANPOWER FOR PROJECT MANAGEMENT, MAINTENANCE, TRAINING& HAND HOLDING SUPPORT BY BIDDER .............................................................................................................................................. 18 2.8 SCOPE OF ACCEPTANCE TESTING ............................................................................................................... 19 2.9 SYSTEM INTEGRATORS RESPONSIBILITY ................................................................................................. 19 2.10 MADHYA PRADESH POLICE DEPARTMENT’S RESPONSIBILITY .......................................................... 19 3 INSTRUCTIONS TO THE BIDDERS &BIDDING PROCESS ....................... 21 3.1 IMPORTANT DATES ......................................................................................................................................... 21 3.2 NOTE .................................................................................................................................................................... 21 3.3 ADVICE TO THE BIDDERS AND OEMS ........................................................................................................... 22 3.4 ETHICAL CONDUCT OF THE BIDDERS AND OEMS ..................................................................................... 23 3.5 COST OF BID DOCUMENT ................................................................................................................................ 24 3.6 VALIDITY OF THE BID .................................................................................................................................... 24 3.7 TRANSFERABILITY OF THE RFP DOCUMENT ............................................................................................ 24 3.8 ADDRESS AT WHICH THE BIDS ARE TO BE SUBMITTED ........................................................................ 24 3.9 EARNEST MONEY DEPOSIT (EMD) ............................................................................................................... 24 3.10 PRE-BID MEETING ........................................................................................................................................... 25 3.11 PROCEDURE FOR SUBMISSION OF THE BID (AS PER E -TENDER PROCESS) ................................................ 27 3.12 DOCUMENTS COMPRISING THE BIDS ......................................................................................................... 29 3.12.1 BID PACKET SHALL CONSIST OF THE FOLLOWING: ............................................................... 29 3.12.2 PRE-QUALIFICATION BID SHALL CONSIST OF FOLLOWING: ............................................................... 30 3.12.3 TECHNICAL BID SHALL CONSIST OF FOLLOWING: ................................................................. 31 3.13 FINANCIAL BID: ............................................................................................................................................... 33 3.14 OPENING OF BIDS AND PROCEDURE OF EVALUATION (E- TENDERING PROCESS) .................................. 36 3.15 DETAILED TECHNICAL EVALUATION MATRIX........................................................................................ 39 3.16 COST INVOLVED IN TENDERING ................................................................................................................. 39 3.17 AMENDMENT IN THE RFP DOCUMENT ....................................................................................................... 39 3.18 RIGHT TO VARY QUANTITIES ....................................................................................................................... 39 4 GENERAL TERMS AND CONDITIONS .......................................................... 41 3- D Modeling Project Ujjain
Recommended publications
  • At Season Cover Page 2019
    Treasures of India Dear Associate, Greetings from A. T. Seasons & Vacations Travel Pvt. Ltd.! We are New Delhi, India based Govt. of India, Ministry of Tourism recognized Destination Management Company and are committed to offer you a wide range of services at the best prices, starting from arrival to your safe departure from India! We are also well equipped to facilitate you with the Meet & AMARESH TIWARI Assistance services at Airport, Airport transfers, Accommoda- Managing Director tions, Transportations, Multi-language guides, Interpreter, sightseeing options, Exciting Tours of most exotic and sought after destinations, Foreign Exchange Facilities, etc. We well understand that customers look up to us to obtain the best value for their money spent – to be available if any problem arises, to ensure quality accommodations and transportations for best comfort and conveniences. And, we deliver what we promise with no compromise to our commitments made! Our philosophy is to make journey of our travelers a memorable one for lifetime, keeping in mind there purpose of travel. On behalf of my team, I assure you of the highest services standards in serving all the segments of the travelers. Thank you. Amaresh Tiwari Managing Director Colourful Rajasthan Rajasthan is a colorful mixture of forts, palaces, diverse cultures, delicious cuisines and warm people, set amidst a rugged yet inviting landscape. It is a land that has inspires countless visitors. In Rajasthan you will ind every hue in Nature's colour - the red sands, the blue of royalty, the pink cities or the amber sunsets. Sight and sounds that are far removed from any city.
    [Show full text]
  • 30Th OCC Meeting Agenda
    MP POWER TRANSMISSION COMPANY LIMITED vkbZ ,l vks : 9001-2008 STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 ISO: 9001-2008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 No.07-05/SG-9B-II/ 2188 Jabalpur, dated 22-09-2012 To As per distribution list Sub: Agenda of 30th meeting of Operation and Coordination Committee of MP. The Agenda of 30th meeting of the Operation and Coordination Committee of MP scheduled on 29th September 2012 at 11.00 AM at Conference hall of Company Headquarter of Central Discom, Bhopal has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. ( K.K.Prabhakar) Member Secretary, OCC S. E. (LD), SLDC MPPTCL, Jabalpur Encl : As above. Distribution List The Chief Engineer (T&C), The Superintending Engineer (DCC-WZ), MP Power Transmission Co. Limited, DISCOM Control Centre, MP Paschim Jabalpur. Kshetra Vidyut Vitaran Co. Limited, Near Fax No- 0761-2665593, 2702710 Polo Ground, Jail Road, Indore Fax No- 0731-2421554. The Chief Engineer (T&P), The Superintending Engineer (DCC-EZ), MP Power Transmission Co. Limited, DISCOM Control Centre, MP Poorva Jabalpur Kshetra Vidyut Vitaran Co. Limited, Fax No- 0761-2665593. Jabalpur. Fax No- 0761-2668503 The Executive Director (Plg & PS), The Addl. Chief General Manager (LM), MP Power Transmission Co. Limited, DISCOM Control Centre, MP Madhya Jabalpur Kshetra Vidyut Vitaran Co. Limited, Fax No- 0761-2665593 Bhopal. Fax No- 0755-2580611 The Executive Director (O&M:Gen.), The Chief Engineer (PM&C), MP Power Generating Co. Limited, Narmada Hydroelectric Development Jabalpur. Corpn. Ltd, NHDC Parisar, Shamla Hills, Fax No- 0761-2664572 Bhopal – 462013.
    [Show full text]
  • Precure History
    History (PRE-Cure) June 2019 - March 2020 Visit our website www.sleepyclasses.com or our YouTube channel for entire GS Course FREE of cost Also Available: Prelims Crash Course || Prelims Test Series Table of Contents 1. Srirangam Ranganathaswamy Temple Tiruchirapalli ............................................................1 2. Losar Bahubali, Khajuraho ...............................................................................................................2 3. Khajuraho Temples ..............................................................................................................................3 4. Jagannath Temple ................................................................................................................................4 5. Madhubani Paintings ..........................................................................................................................6 6. Adilabad Dhokra Warangal Dhurries Monument Mitras ....................................................7 7. GI Tags ......................................................................................................................................................8 8. Adopt a Heritage ..................................................................................................................................8 9. Bhakti Movement ................................................................................................................................9 10. Bhakti Saints ..........................................................................................................................................11
    [Show full text]
  • PPP CELL, GOVERNMENT of MADHYA PRADESH Financial Year - Wise Report of Projects As on 31-May-2021 (All Values in Indian Rupee Crores) S.No
    PPP CELL, GOVERNMENT OF MADHYA PRADESH Financial Year - Wise Report of Projects as on 31-May-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC /SLEC Date VGF_Sanction VGF_Disbursement Remarks Remark New 2003-2004 1 Hoshangabad-Piparia- BOT Road 57 Completed MP Road Development 2003-2004 / NA Pachmarhi (SH-22 & 19) Corporation Ltd. 126.00 kms 2 Indore-Edelabad 2-lane BOT Road 124.05 Completed MP Road Development 2003-2004 / NA (SH-27) 203.00 kms Corporation Ltd. 3 Ujjain-Jhalawad BOT Road 66.7 Completed MP Road Development 2003-2004 / NA intermediate lane (SH-27) Corporation Ltd. 134.00 kms 2004-2005 4 Dewas-Ujjain-Badnagar- BOT Road 49.93 Completed MP Road Development 2004-2005 / NA Badnawar (SH-18) 98.26 Corporation Ltd. kms 2005-2006 5 Hoshangabad- Harda- BOT Road 81 Completed MP Road Development 2005-2006 / NA Khandwa intermediate Corporation Ltd. lane (SH-15) 185.00 kms 6 Seoni-Balaghat-Gondia BOT Road 59.8 Completed MP Road Development 2005-2006 / NA (SH-26 & 11) 114.00 kms Corporation Ltd. 2006-2007 7 Jabalpur-Narsinghpur- BOT Road 74.96 Completed MP Road Development 2006-2007 / NA Piparia intermediate lane Corporation Ltd. (SH-22) 140.00 kms 8 Raisen-Rahatgarh 2-lane BOT Road 57.72 Completed MP Road Development 2006-2007 / NA (SH-42) 101.40 kms Corporation Ltd. 9 Rewa-Shahdol- BOT Road 111.27 Completed MP Road Development 2006-2007 / NA Amarkantak intermediate Corporation Ltd. lane (SH-9 & 9A) 246.00 kms 10 Satna-Maihiar-Umaria BOT Road 53.29 Completed MP Road Development 2006-2007 / NA intermediate lane (SH-11) Corporation Ltd.
    [Show full text]
  • Research Article
    Available Online at http://www.recentscientific.com International Journal of Recent Scientific International Journal of Recent Scientific Research Research Vol. 7, Issue, 7, pp. 12283-12286, July, 2016 ISSN: 0976-3031 Research Article AN OVERVIEW: OZONATION A TECHNIQUE FOR WATER PURIFICATION AND SIMHASTHA 2016 Geeta Verma Department of Chemistry Chandra Shekhar Azad. Govt P.G. Nodal College, Sehore, M.P. India ARTICLE INFO ABSTRACT Article History: Water disinfection means the removal, deactivation or killing of pathogenic microorganisms. Contaminated water is estimated to result in more than half a million deaths per year. Reduction Received 29th April, 2016 th of waterborne diseases and development of safe water resources is a major public health goal in Received in revised form 19 May, 2016 developing countries. Ozone was first used in water treatment in the late 1800s. Ozone has a Accepted 25th June, 2016 th greater disinfection effectiveness against bacteria and viruses compared to chlorination In present Published online 28 July, 2016 research paper we will discuss advantages of ozonation over chlorination. This technique has been Key Words: successfully applied for the first time during a festive congregation, Ujjain Simhastha 2016, in India. With this technique Kshipra’s water is cleaned in a Natural process. Ozonation, Trihalomethanes, Coagulation, Microorganisms, Chlorination, Hydroxy free radical, Ultraviolet radiation Copyright © Geeta Verma., 2016, this is an open-access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution and reproduction in any medium, provided the original work is properly cited. or lightning strike similar to smell of the air after a major INTRODUCTION thunderstorm.
    [Show full text]
  • Research Paper QUALITY STATUS STUDY of RIVER KSHIPRA at UJJAIN BEFORE ITS LINKAGE with NARMADA WATER
    Journal of Global Biosciences ISSN 2320-1355 Volume 4, Number 2, 2015, pp. 1508-1516 Website: www.mutagens.co.in E-mail: [email protected] [email protected] Research Paper QUALITY STATUS STUDY OF RIVER KSHIPRA AT UJJAIN BEFORE ITS LINKAGE WITH NARMADA WATER Kumawat, D.M. 1 and Manish K. Sharma 2 1School of Studies in Environment Management, Vikram University, Ujjain (Madhya Pradesh), 456010 2 Govt. Madhav Science College, Vikram University, Ujjain. Abstract Kshipra is Holy River that originates from the Kakri-Badi (Indore) of Madhya Pradesh and flows across Ujjain city (23°18’ N, 75°77’ E) which is considered to be geographically, historically, geologically, astronomically and astrologically important. Unlike other river of our country the life line of Ujjain is also facing the consequences of various anthropogenic activities that are leading to its quality deterioration. The present study was carried out to assess the quality status of Kshipra water before its proper linkage with river Narmada, so as to have a baseline data for future studies and to plan a management strategy for forthcoming Simhastha (Kumbh) mela during 2016. Water quality was assessed in terms of physical, chemical and microbiological parameters. Four sampling sites (Ghat) viz., Triveni,Gau ,Ram , and Mangalnath were selected covering almost whole city along with river traverse. Physical parameters included pH, temperature, conductivity and opacity, while chemical parameters assessed were Total Dissolved Solid, Total Suspended Solid, hardness (Ca ++ and Mg ++ )Dissolved Oxygenand BOD.Total coliforms, fecal coliforms, fecal streptococciand Total Viable Count (TVC) were taken as microbial parameters. All parameters were studied following standard protocols.
    [Show full text]
  • PPP CELL, GOVERNMENT of MADHYA PRADESH Department - Wise Report of Projects As on 15-Jul-2021 (All Values in Indian Rupee Crores) S.No
    PPP CELL, GOVERNMENT OF MADHYA PRADESH Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark Animal Husbandry, GoMP Date Disbursement 1 Establishment of Milk DBFOT Ujjain. Dairy 61.77Pipe Line Ujjain Cooperative Milk 2014-2015 /(19-03-2015) Approved for Cabinet Drying Unit of MPTPD Union Approval Capacity at Main Dairy Plant of Ujjain Union 2 Establishment of DBFOT Indore Dairy 31.37Pipe Line Indore Cooperative 2015-2016 /(23-05-2015) Approved for Cabinet Aseptic Packaging Unit Milk Union Approval. of 40,000 LPD at Indore Biodiversity and Biotechnology, GoMP Commerce, Industry and Employment, GoMP 3 Dewas Industrial Area BOT Dewas. Industry 77.58Construction MP State Industrial 2010-2011 /NA Concessional agreement has Water Supply Development been executed on 07-01-2018, Corporation Ltd concessional period upto 15- 06-2037. As per MPIDC letter 4 Rau-Pithampur 4 lane Annuity Indore. Road 78.52 Bidding MP AKVN Ltd., Indore 2008-2009 17/(14-08-2013) Concessional agreement has (from 2-lane) 13.826 been executed on 30-09-2014, kms concessional period upto 04- 06-2030. As per MPIDC letter No.MPIDC/CE/2021/736 dated 03-02-2021, project running 5 Upgradation of BOT Multiple. Industry 20.38Pipe Line Directorate of 2014-2015 26/(19-03-2015) SLEC on 19 March 2015 Employment Exchanges Commerce, Industry approved for approval by the into Placement Centres and Employment, MP Cabinet (Revised) Energy, GoMP 6 Development of Input- OMT Sagar.
    [Show full text]
  • Concession Agreement for Development of Ujjain-Simhastha Bypass on Bot (Toll +Annuity) Basis
    CONCESSION AGREEMENT FOR DEVELOPMENT OF UJJAIN-SIMHASTHA BYPASS ON BOT (TOLL +ANNUITY) BASIS THIS AGREEMENT IS ENTERED INTO ON THE 12th DAY OF JUNE, 2013, AT BHOPAL BETWEEN 1 MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED, a company incorporated under the provisions of Companies Act,1956 vide Certificate of Incorporation No. U-45203/MP/2004.PIC/16758 dated 14.07.2004 as issued by the Registrar of Companies , Madhya Pradesh, Gwalior, and having its offices at 16-A, Arera Hills, Bhopal – 462 -011 (hereinafter referred to as the “MPRDC” which expression shall, unless repugnant to the context or meaning thereof, include its administrators, successors and assigns) of One Part; 1 AND 2 M/s UJJAYINI HIGHWAYS PRIVATE LIMITED, a company incorporated under the provisions of the Companies Act, 1956 and having its registered office at Vidya Deep,15/3, Manoramaganj, Indore – 452 001, Madhya Pradesh (hereinafter referred to as the “Concessionaire” which expression shall, unless repugnant to the context or meaning thereof, include its successors and permitted assigns and substitutes) of the Other Part. WHEREAS: (A) Govt. of Madhya Pradesh has entrusted MPRDC with the construction of Ujjain-Simhastha Bypass its development, maintenance and management. 2 (B) MPRDC had resolved to augment the existing road of Ujjain Simhastha Bypass from km. 46.970) besides Hotel Shanti Palace to Ujjain – Unhel – Jaora Road (km 3.300) (Approximately 14.29 Km) (hereinafter called the “Bypass ”) in the State by two Laning on build, operate and transfer (“DBFOT”) basis in accordance with the terms and conditions to be set forth in a concession agreement to be entered into.
    [Show full text]
  • Kumbh Mela PAGE 20 PAGE 6 PEOPLE
    Advances Fusion, February-March, 2016 Vol. 6, #2, February-March 2016, No. 56 An Acquisition for the Ages Midea is set to buy a majority interest in Toshiba’s home appliance business 1 Advanceswww.midea.com Fusion, February-March, 2016 ADVANCES Contents Going Green by Turning Dessert-Serving Robots, NEWSLINE Black PAGE 9 FUSION Olympic Champions, and Profit up 21% Year-on-Year Singing Water Heaters PAGE PAGE 3 CAC Makes Its Mark in Milan PAGE 10 15-16 LittleSwan Profit up over 30% Midea the Biggest Winner at China’s Most Generous PAGE 3 Appliances Awards PAGE 17 Person PAGE 10 Toshiba and Midea Sign Brand Licensing Agreement MOU on Sale of Toshiba’s FUSION with US Giant PAGE 11 Home Appliances Business PAGE 4 Water Heaters Gain North CHINA: Tomb-Sweeping Day PAGE 18 Robotics Businesses Vietnam Certification PAGE 12 Formally Open PAGE 5 Rice Cooker JV Formed in INDONESIA: Balispirit Festival PAGE 19 Four Product Categories Korea PAGE 12 Exhibited at Chicago Show INDIA: Kumbh Mela PAGE 20 PAGE 6 PEOPLE Divisions Lavished with Wuxi Factory’s Outstanding SPAIN: Moors & Christians International Design Awards Female Employee PAGE 13 Festival PAGE 21 PAGE 7 Midea-Carrier Announces AWE GERMANY: New Latin America CEO PAGE Walpurgichsnacht PAGE 22 8 Fridges That Give Nutrition Advice: The Brave New World of M-Smart PAGE 14 Midea Advances Newsletter is published monthly by Midea International Business. We welcome all Quote of the comments, suggestions and contributions of articles, as well as requests for subscription to our newsletter. You can reach us by email at: Month: [email protected] Address: ADVANCES, Midea International Business Midea HQ A single arrow is No.
    [Show full text]
  • Hinduism: a Supplemental Resource for Grade 12 World of Religions: a Canadian Perspective 59 Although Castes Were Not Initially Hereditary, They Eventually Became So
    Practices, Rituals, Symbols, and Special Days/Celebrations Within Hindu devotion there are many practices and rituals. There are both everyday rites as well as rites to mark particularly important life events and passages, such as births, deaths, weddings, and so forth. Hindu practice aims towards the fulfillment of four central goals: kama (sensual pleasure, whether physical, psychological, or emotional), artha (virtuous material power and wealth), dharma (properly aligned conduct), and moksha (escape from the cycle of rebirth). Social Organization and Roles Hinduism, like many other faith groups, has social and cultural traditions, norms, and practices that have significant influence on the life of practitioners and the society in which they live. Many of these are not unique to Hinduism and some were the cause of social reform. The following are a few of these social practices and traditions. Caste System Figure 18: Seventy-Two Specimens of Castes in India 1837 Full book available from Historically, Indian and Hindu archive.org/details/seventytwospecimens1837 populations have been grouped along vocational lines into a caste system. The caste system divides Hindus into four main categories: Brahmins, Kshatriyas, Vaishyas, and Shudras. Many believe that these four castes originated from Brahma, the Hindu god of creation. The main castes were further divided into about 3,000 castes and 25,000 sub-castes, each based on their specific occupation. Outside of this Hindu caste system were the achhoots—the Dalits or the untouchables. Hinduism: A Supplemental Resource for Grade 12 World of Religions: A Canadian Perspective 59 Although castes were not initially hereditary, they eventually became so.
    [Show full text]
  • Ujjain City Water Supply, Sanitation and Hygiene (WASH) Situational Analysis Report - Rahul Banerjee (Anar-Kali.Blogspot.In), [email protected]
    Ujjain City Water Supply, Sanitation and Hygiene (WASH) Situational Analysis Report - Rahul Banerjee (anar-kali.blogspot.in), [email protected] Contents 1. General Situation .................................................................................................................................. 1 2. Hydrogeological Situation ..................................................................................................................... 3 3. Water Supply Situation ......................................................................................................................... 3 4. Sanitation Situation............................................................................................................................... 4 5. Finances of Ujjain Municipal Corporation ............................................................................................. 5 6. Situation in Slums.................................................................................................................................. 6 7. WASH Situation Improvement Plans of Government Agencies and their Implementation ................... 7 8. Critique of existing WASH Planning ....................................................................................................... 9 9. An Alternative WASH Scenario for Ujjain ............................................................................................ 10 9.1 Water Sensitive Urban Design ......................................................................................................
    [Show full text]
  • Comparative Assessment of Water Quality of River Kshipra During Kumbh Mela Ujjain, 2016
    ISSN: 2455-2631 © February 2018 IJSDR | Volume 3, Issue 2 COMPARATIVE ASSESSMENT OF WATER QUALITY OF RIVER KSHIPRA DURING KUMBH MELA UJJAIN, 2016 Dr. Sandeep Kumar Gohar1, Dr. Ashok Barua2* and Dr. Prakash Solanki3 Assistant Professor Department of Chemistry Government Holkar Science College Indore (M.P.) 452001 Abstract: The present study deals with the analysis of water during kumbh Mela 2016,Ujjain, Madhya Pradesh. The physico-chemical parameters like Colour, odour, pH, TDS, nitrates, sulphates, chromates as Hexavalent Cr(VI), Total Hardness as CaCO3, Calcium hardness as CaCO3, Magnesium Hardness as CaCO3, DO, BOD and Temperature were studied for consecutive days at selected sites of Ramghat, Mangalnath, Indore Road bridge and Lalpulghat of the holy city Ujjain. The results from all the sites clearly indicates that the mass bathing coupled with ritual activities performed by bathers was most probable cause of variation in the values of different parameters. Keywords: Total Hardness, pH, TDS and BOD. Introduction Water is one of the main essential component of all natural resources available on earth. The organic matter increases in such cases of mass bathing as the flowers, milk, ghee is being offered during many sacred practices[1]. Bathing also add the body hairs etc. to the river water which in turn provided food to bacteria and hence BOD increases [2]. It is believed that a dip in “Holy River” washes away all the sins. Consider it faith, people bath in holy rivers at some special occasions like as Deepawali, Amavasya, Purnima, Ganaga Dashara, Makar Sankaranti, etc. Such mass bathing poses a great threat to river health with respect to water pollution in general [3].
    [Show full text]