PPP CELL, GOVERNMENT of MADHYA PRADESH Department - Wise Report of Projects As on 15-Jul-2021 (All Values in Indian Rupee Crores) S.No

PPP CELL, GOVERNMENT of MADHYA PRADESH Department - Wise Report of Projects As on 15-Jul-2021 (All Values in Indian Rupee Crores) S.No

PPP CELL, GOVERNMENT OF MADHYA PRADESH Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark Animal Husbandry, GoMP Date Disbursement 1 Establishment of Milk DBFOT Ujjain. Dairy 61.77Pipe Line Ujjain Cooperative Milk 2014-2015 /(19-03-2015) Approved for Cabinet Drying Unit of MPTPD Union Approval Capacity at Main Dairy Plant of Ujjain Union 2 Establishment of DBFOT Indore Dairy 31.37Pipe Line Indore Cooperative 2015-2016 /(23-05-2015) Approved for Cabinet Aseptic Packaging Unit Milk Union Approval. of 40,000 LPD at Indore Biodiversity and Biotechnology, GoMP Commerce, Industry and Employment, GoMP 3 Dewas Industrial Area BOT Dewas. Industry 77.58Construction MP State Industrial 2010-2011 /NA Concessional agreement has Water Supply Development been executed on 07-01-2018, Corporation Ltd concessional period upto 15- 06-2037. As per MPIDC letter 4 Rau-Pithampur 4 lane Annuity Indore. Road 78.52 Bidding MP AKVN Ltd., Indore 2008-2009 17/(14-08-2013) Concessional agreement has (from 2-lane) 13.826 been executed on 30-09-2014, kms concessional period upto 04- 06-2030. As per MPIDC letter No.MPIDC/CE/2021/736 dated 03-02-2021, project running 5 Upgradation of BOT Multiple. Industry 20.38Pipe Line Directorate of 2014-2015 26/(19-03-2015) SLEC on 19 March 2015 Employment Exchanges Commerce, Industry approved for approval by the into Placement Centres and Employment, MP Cabinet (Revised) Energy, GoMP 6 Development of Input- OMT Sagar. Energy 30Completed MP Poorv Kshetra 2011-2012 /(02-01-2012) Levelised input rate Rs. Based Electricity Vidyut Vitran Co Ltd, 3.726/kWh Distribution System in Jabalpur Sagar 7 Construction of 400 KV DBFOT Multiple Energy 282.7Completed MP Power 2011-2012 10/(02-01-2012) 20+15% Not claimed Planning Commiss Model coz Satpura-Ashta DCDS Transmission Co Ltd, of State suitability and VGF Transmission line Jabalpur (20+15% for O&M support). LI Project for Evacuationb identified (60.75 crs). LoA on of Power from 2x250 26-Apr-13 to Kalpataru Power MW Extension units at Trans Ltd, amended 29-May- Satpura through PPP 13. Project completed and Mode achieved commercial operation on 07-04-2015. 8 Development of Input- OMT Ujjain. Energy 70Completed MP Pashchim Kshetra 2011-2012 10/(02-01-2012) Levelised input rate Rs. Based Electricity Vidyut Vitran Co Ltd, 3.781/kWh Distribution System in Indore Ujjain Farmer Welfare and Agriculture Development, GoMP 9 Logistics Park BOOT Hoshangabad Warehousing 138.5 Construction MP Agriculture 2011-2012 4/(26-02-2011) Vide Pawarkheda (115 acres) . and Logistics Marketing Board Lt.No.Board/Cons/PPP/20- (Mandi Board) 21/1667 dated 05-02-2021, informed that the project Food, Civil Supplies and Consumer Protection, GoMP PPP CELL, GOVERNMENT OF MADHYA PRADESH Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark 10 Development, BOT Multiple. Warehousing 249.92 Completed MP State Warehousing 2013-2014 19/(05-02-2014)Date 20% NotDisbursement claimed DEA/GoI accorded in principal Operaration & and Logistics and Logistics approval for 20% VGF. The maintenance of Steel Corporation Committee recommended the Silos for wheat (10) project for in-principle 50,000 MTonne capacity approval by the Cabinet. each 11 Logistics Hub in Katni DBFOT Katni Warehousing 125 Bidding MP State Warehousing 2015-2016 27/(23-05-2015) In-principle approval, final and Logistics and Logistics approval accorded for the Forest, GoMP 12 Eco-Tourism and BOT Rewa. Tourism 15.68Construction MP Ecotourism 2012-2013 13/(30-08-2012) Bidding date 29/08/13, CA Adventure Park (5.783 Development Board signed 28/04/14, Ruchi Realty ha) Holdings Pvt Ltd has formed 13 Eco-tourism park at BOT Dewas. Vill Tourism 1Completed MP Ecotourism 2009-2010 /(18-01-2010) CA signed 19/05/2010, Date of Arnia near Sonkatch (4.5 Arnia Development Board commencement of work Hect) 23/04/2011, COD on 15/08/2013, Concessionaire - 14 Eco-Tourism Adventure BOT Indore Tourism 50Bidding Forest Department, 2012-2013 /(15-02-2013) MPPDF assistance approved Park - Ralamandal, GoMP Indore 15 World-Class Zoological BOT Bhopal. Tourism 130Pipe Line Forest Department, 2008-2009 /NA RFP forTA submitted to Dept. Park on 350 ha GoMP PD expense 2 Cr. IIPDF approved Horticulture and Food Processing, GoMP Housing and Environment, GoMP 16 Fitness Centre O & M of OMT Bhopal. Urban 1Completed Capital Project 2010-2011 22/NA CA signed 11 Feb 2011 Prakash Swimming Pool Administration, Bhopal 17 Kalpana Nagar OMT Bhopal. Urban 1Completed Capital Project 2011-2012 /NA CA signed 11 Feb 2012 Swimming Pool O&M Administration, Bhopal 18 Development of Hostel BOT Bhopal Technical 45 Completed Capital Project 2014-2015 22/(15-07-2014) As CPA construction for National Institute of Education Administration, Bhopal divn.No.1,email dated 29-01- Fashion Technology 2021, project completed. Lett No.EESLEC on 15 July 2014 Medical Education, GoMP 19 Installation of LINACs at DBFOT Bhopal- Health 105.73Pipe Line Medical Education, 2020-2021 34/(17-12-2019) In-principle with Proj.Cost of Approved 7 Medical Colleges in Indore-Rewa: GoMP Dept Rs.164.01 Crore. Now the MP (Redio Therapy DBFOT and revised Project cost is Centres) Jabalpur- Rs.105.73 Crore approved in Gwalior : OM 36th SLEC dt 17-12-2020. Pubic Health and Family Welfare, GoMP 20 Dindayal Chalit Aspatal BOT Multiple. Health 67Completed National Rural Health 2010-2011 3/(17-01-2011) SLEC on 17-01-11 (in- Yojana Mission principle+final approval). Public Health Engineering, GoMP Public Works, GoMP 21 Gwalior to MP/UP BOT Road 314.53Completed MP Road Development 2010-2011 /(13-12-2010) CA on 13-12-10 with MP Border (Bhind) 2-lane Corporation Ltd. Highways Ltd. Govt contrib 27 with paved shoulder cr (NH-92) 108.00 kms PPP CELL, GOVERNMENT OF MADHYA PRADESH Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark 22 Hoshangabad- Harda- BOT Road 81Completed MP Road Development 2005-2006 /NA Date Disbursement Khandwa intermediate Corporation Ltd. lane (SH-15) 185.00 kms 23 Hoshangabad-Piparia- BOT Road 57Completed MP Road Development 2003-2004 /NA Pachmarhi (SH-22 & 19) Corporation Ltd. 126.00 kms 24 Indore-Edelabad 2-lane BOT Road 124.05Completed MP Road Development 2003-2004 /NA (SH-27) 203.00 kms Corporation Ltd. 25 Indore-Ujjain 4-lane (SH- BOT Road 298Completed MP Road Development 2010-2011 /NA Premium 26.38% of toll on 27) 48.85 kms Corporation Ltd. COD 26 Jabalpur-Narsinghpur- BOT Road 74.96Completed MP Road Development 2006-2007 /NA Piparia intermediate Corporation Ltd. lane (SH-22) 140.00 kms 27 Jaora-Nayagaon section BOT Road 425.71Completed MP Road Development 2011-2012 /NA 15.39 crs premium/year. 94% 4-lane (SH-31) 127.81 Corporation Ltd. completed kms 28 Lebad (SH-31 )- BOT Road 200.1Completed MP Road Development 2009-2010 /(02-09-2009) Premium 1.01. CA signed on Narayanpura-Digthan- Corporation Ltd. 04/05/2010 Manpur (NH-3) 4-lane 34.30 kms 29 Lebad-Jaora section 4- BOT Road 589.31Completed MP Road Development 2011-2012 /NA Premium 4.76% of toll on COD lane (SH-31) 125.00 kms Corporation Ltd. 30 Manawar-Singhana 2- BOT Dhar. Road 96.73Completed MP Road Development 2011-2012 7/(14-07-2011) 27.32 8.41 Crore GoMP VGF (20+14 for O&M) lane (MDR) 38.23 kms Corporation Ltd. Share 31 Mandsaur-Pratapgarh- BOT(T+A) Road 19.45Completed MP Road Development 2010-2011 1/(13-12-2010) Annuity 1.17 cr. 86% complete Rajasthan Border Corporation Ltd. intermediate lane (SH- 14) 11.526 kms 32 Mandsaur-Sitamau BOT Mandsaur Road 42.34Completed MP Road Development 2008-2009 /NA Toll started on 05 Feb 2009 (upto Rajasthan border) Corporation Ltd. 2-lane (SH-14) 44.00 kms 33 Matkuli-Tamia- BOT Road 213.25Completed MP Road Development 2009-2010 /NA Toll started on 19 March 2010 Chhindwara 2-lane (SH- Corporation Ltd. on 33.38 km 19) 112.00 kms 34 Mhow-Ghata Billod 4- BOT Road 186.61Completed MP Road Development 2010-2011 4/(26-02-2011) 25% complete lane (SH-27) 26.88 kms Corporation Ltd. 35 Mundi-Punasa-Sanawad BOT(T+A) Khandwa Road 124.77Completed MP Road Development 2011-2012 7/(14-07-2011) 2-lane (MDR) 67.63 kms Corporation Ltd. 36 Raisen-Rahatgarh 2-lane BOT Road 57.72Completed MP Road Development 2006-2007 /NA (SH-42) 101.40 kms Corporation Ltd. PPP CELL, GOVERNMENT OF MADHYA PRADESH Department - Wise Report of Projects as on 15-Jul-2021 (All values in Indian Rupee Crores) S.No. Projects PPP Type Location Sector Cost Status Agency Financial Year SLEC No. / Meeting VGF Sanction VGF Remarks Internal Remark 37 Rewa-Shahdol- BOT Road 111.27Completed MP Road Development 2006-2007 /NA Date Disbursement Amarkantak Corporation Ltd. intermediate lane (SH-9 & 9A) 246.00 kms 38 Sagar-Damoh 2-lane (SH-BOT Road 116.5Completed MP Road Development 2008-2009 /(26-07-2008) 44.28 Crore 20.94 GoMP VGF 44.28. 89.16% completed 14) 98.90 kms Corporation Ltd. Share released 39 Sardarpur Badnawar 2- BOT(T+A) Road 91.69Completed MP Road Development 2010-2011 4/(26-02-2011) Annuity 4.71 cr.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us